MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 IR 05000483/20203012020-10-13013 October 2020 NRC Examination Report 05000483/2020301 IR 05000483/20193012019-04-23023 April 2019 Unit - NRC Examination Report 05000483/2019301 IR 05000483/20173012017-10-12012 October 2017 NRC Examination Report 05000483/2017301 IR 05000483/20163012016-06-10010 June 2016 Examination Report 05000483/2016301; 05/23/2016 - 06/07/2016; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20153012015-05-27027 May 2015 Er 05000483/2015301; 05/18/2015 - 05/19/2015, Callaway Nuclear Station; Initial Operator Licensing Examination Report IR 05000483/20143012015-01-21021 January 2015 Er 05000483/2014301; December 8, 2014, to January 7, 2015; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20133022013-09-10010 September 2013 Er 05000483-13-302; July 10 - August 29, 2013; Callaway Plant; Retake Initial Operator Licensing Examination Report IR 05000483/20133012013-06-13013 June 2013 Er 05000483-13-301, 03/18/2013 - 05/02/2013; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20113022011-07-0808 July 2011 Er 05000483-11-302; June 8-10, 2011; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20113012011-03-14014 March 2011 Er 05000483-11-301; Amerenue; 02/04/11 - 03/03/11; Callaway Plant; NRC Examination Report IR 05000483/20093012009-08-0707 August 2009 Er 05000483-09-301 on June 19 - July 7, 2009; Callaway Plant; Initial Operator Licensing Examination Report IR 05000483/20073012008-01-18018 January 2008 Er 05000483-07-301, on November 26 Though December 7, 2007; Callaway Plant; Initial Operator Licensing Examination Report ML0615601372005-08-22022 August 2005 CW-08-2005-Final Outline ML0615600792005-08-22022 August 2005 08-2005-Draft Admin Outline ML0615600732005-08-22022 August 2005 08-2005 Draft Written Outline ML0615601892005-03-10010 March 2005 CW-08-2005-Final Operating Examination ML0615601392005-03-10010 March 2005 CW-08-2005-Final Written Examination ML0615601312005-03-10010 March 2005 CW-08-2005-Draft Operating Exam ML0615600862005-03-10010 March 2005 CW-08-2005-Draft Exam Comments ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination ML0409605912004-03-19019 March 2004 Calloway - Initial Operator Examination - February 2004 - Written Examination Performance Analysis and Applicant Questions 2022-04-12
[Table view] |
Text
October 13, 2020
SUBJECT:
CALLAWAY PLANT - NRC EXAMINATION REPORT 05000483/2020301
Dear Mr. Diya:
On October 1, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at your Callaway Plant. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on September 3, 2020, with Mr. M. McLachlan, Senior Director, Nuclear Plant Support, and other members of your staff. A telephonic exit meeting was conducted on October 1, 2020, with Mr. J. Czeschin, Operations Training Manager, who was provided the NRC licensing decisions.
The examination included the evaluation of five applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses, and two applicants for upgrade senior reactor operator licenses. The license examiners determined that all ten applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have either been issued or are pending completion of deferred training requirements. There were no post-examination comments submitted by your staff. The enclosure contains details of this report.
No findings were identified during this examination.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Docket No. 05000483 License No. NPF-30 Enclosure:
Examination Report 05000483/2020301 w/attachment: Supplemental Information cc: Electronic Distribution to Callaway Plant
U.S. NUCLEAR REGULATORY COMMISSION Examination Report Docket Number: 05000483 License Number: NPF-30 Report Number: 05000483/2020301 Enterprise Identifier: L-2020-OLL-0019 Licensee: Union Electric Company Facility: Callaway Plant Location: Steedman, Missouri Examination Dates: August 31, 2020, to October 1, 2020 Inspectors: T. Farina, Senior Operations Engineer (Chief Examiner)
K. Clayton, Senior Operations Engineer C. Osterholtz, Senior Operations Engineer M. Doyle, Operations Engineer Approved By: Gregory E. Werner Chief, Operations Branch Division of Reactor Safety Enclosure
SUMMARY
Examination Report 05000483/2020301; August 31 - October 1, 2020; Callaway Plant, Unit 1;
Initial Operator Licensing Examination The NRC examiners evaluated the competency of five applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses, and two applicants for upgrade senior reactor operator licenses at Callaway Plant.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The written examination was administered by the licensee on September 9, 2020. The NRC examiners administered the operating tests on August 31-September 3, 2020.
The NRC examiners determined that all applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have either been issued or are pending completion of deferred training requirements.
NRC-Identified and Self-Revealing Findings
None.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES
- INITIAL LICENSE EXAM
.1 License Applications
a. Scope
The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The NRC examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examiners conducted an onsite validation of the operating tests.
b. Findings
The NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
The NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On September 9, 2020, the licensee proctored the administration of the written examinations to all ten applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 16, 2020.
The NRC examination team administered the various portions of the operating tests to all applicants on August 31-September 3, 2020.
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
The examination team noted one generic weakness associated with applicant performance on the administrative job performance measures section of the operating tests. The applicants displayed a weakness in calculating hot shutdown boron concentration. Post-examination analysis revealed six questions on the written examination had a miss rate greater than or equal to 50 percent, specifically, questions 21, 22, 27, 39, 66, and 92. Copies of all individual examination reports were sent to the facility training manager for evaluation and determination of appropriate remedial training. These deficiencies were captured in the licensees corrective action program as Condition Report 202004316.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
Exit Meeting Summary
- The chief examiner presented the preliminary examination results to Mr. M. McLachlan, Senior Director, Nuclear Plant Support, and other members of the staff on September 3, 2020.
- A telephonic exit was conducted on October 1, 2020, between Mr. T. Farina, chief examiner, and Mr. J. Czeschin, Operations Training Manager. The licensee did not identify any information or materials used during the examination as proprietary.
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Czeschin, Operations Training Manager
- P. Swan, Exam Author
- S. Jones, Exam Author
NRC Personnel
- D. Bradley, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED