April 20, 2020

SUBJECT:

CALLAWAY PLANT - INTEGRATED INSPECTION REPORT 05000483/2020001

Dear Mr. Diya:

On March 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant. On April 1, 2020, the NRC inspectors discussed the results of this inspection with Mr. B. Cox, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects

Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number:

05000483

License Number:

NPF-30

Report Number:

05000483/2020001

Enterprise Identifier: I-2020-001-0007

Licensee:

Union Electric Company

Facility:

Callaway Plant

Location:

Steedman, Missouri

Inspection Dates:

January 1 to March 31, 2020

Inspectors:

D. Bradley, Senior Resident Inspector

R. Bywater, Senior Project Engineer

S. Janicki, Resident Inspector

J. Vera, Resident Inspector

Approved By:

Neil F. OKeefe, Chief

Reactor Projects Branch B

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000483/2019-005-01 Inoperability of Control Room Emergency Ventilation System (CREVS) B Train 71153 Closed

PLANT STATUS

Callaway Plant began the inspection period at rated thermal power. On March 13, 2020, the unit was down powered to 73 percent for a dropped control rod. After recovering the dropped control rod, the licensee returned to rated thermal power on March 16 and remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. From January 1 - March 19, 2020, the inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; and observed risk significant activities when warranted. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In the cases where it was determined the objectives and requirements could not be performed remotely, management elected to postpone and reschedule the inspection to a later date.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe winter storms on January 20, 2020.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Control room air conditioning train B on January 13, 2020
(2) Service water train B on January 21, 2020
(3) Residual heat removal train B on February 18, 2020

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the train B safety injection system on January 27, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire pumphouse, fire area YD-1, on January 14, 2020
(2) Hardened storage building, fire area YD-1, on January 14, 2020
(3) Load center and motor generator set room, fire area A-27, on March 3, 2020
(4) Control room air conditioning and filtration unit rooms A and B, fire areas A-21 and A-22, on March 5, 2020

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Auxiliary building from the fire protection system on March 17, 2020

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during:

Surveillance testing of train A diesel generator and essential service water systems on January 22, 2020

Plant stabilization after a dropped control rod including off-normal procedure activities on March 13, 2020

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator continuing training in the simulator on February 13, 2020.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:

(1) Safety injection system on January 31, 2020
(2) Fire protection system on February 6, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Planned risk management actions for maintenance on a train B vital battery charger, instrument air compressor, and turbine hydraulics filter on January 7, 2020
(2) Planned risk management actions for maintenance on the train B fire pump and auxiliary transformer deluge station on February 12, 2020
(3) Planned risk management actions for maintenance on essential service water cross-tie valves to non-safety service water on February 17, 2020
(4) Planned risk management actions for maintenance on turbine-driven auxiliary feedwater on February 24, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Control rod drive motor generator coupling misalignment, Condition Report 202000245, on January 31, 2020
(2) Battery Charger NK22 potentiometer and float switch replacement, Condition Report 202000017, on January 18, 2020
(3) Resistance temperature detector BBTE0431A1 unexpected response time test results, Condition Report 202000376, on January 24, 2020
(4) Containment spray valve ENHV0006 position in question based on unexpected surveillance testing, Condition Report 202000742, on February 13, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Normal charging pump following planned maintenance on January 14, 2020
(2) Condenser vacuum pump B following planned maintenance on February 12, 2020
(3) Class 1E air conditioning system train A following planned maintenance on March 16, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Fire protection system three-year flow testing on January 7, 2020
(2) Class 1E air conditioning time delay relay and control relay testing on March 16, 2020

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Diesel generator train B air start check valve inservice test on January 2, 2020

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Residual heat removal containment isolation valve testing on January 21, 2020

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Emergency response organization team 1 training drill on February 20,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) January 1 to December 31, 2019

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) January 1 to December 31, 2019

BI01: Reactor Coolant System Specific Activity Sample (IP Section 02.10) (1 Sample)

(1) January 1 to December 31, 2019

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Main steam line pressure transmitter alarms under Condition Reports 201903761 and

===201907047 on January 8, 2020

(2) Inverter card replacements under Condition Reports 201706241 and 201907224 on February 20, 2020

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)===

The inspectors evaluated the following licensee event report (LER):

(1) LER 05000483/2019-005-01, Inoperability of CREVS B Train (ADAMS Accession Number ML20038A186), on March 17, 2020. The inspectors reviewed the updated LER submittal. The previous LER submittal was reviewed in Inspection Report 05000483/2019004 and the inspection conclusions associated with this LER were documented in the Inspection Results section of that report. This licensee event report is closed.

Personnel Performance (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the dropped control rod H-8 including licensee performance on March 13,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 1, 2020, the inspectors presented the integrated inspection results to Mr. B. Cox, Site Vice President, and other members of the licensee staff.

THIRD PARTY REVIEWS Inspectors reviewed World Association of Nuclear Operators (WANO) report that was issued during the inspection period.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

Condition Reports 200704771, 201907980, 202000308

Procedures

ESP-EM-F001A

Intermediate Head Safety Injection System Flow Balance

MSM-ZZ-QV001

IST Relief Valve Surveillance Test

OTN-EJ-00001

Residual Heat Removal System

OTN-EM-00001

Safety Injection System

OTO-ZZ-00012

Severe Weather

OTS-ZZ-00007

Plant Cold Weather

Work Orders

13505983,17512165, 17512735, 17512736

71111.04

Corrective Action

Documents

Condition Reports 200504670, 200602565, 200608723, 200704771,

200103027, 201803710, 201904394, 20195078, 201905228,

201905235, 201907060, 201907363, 201907421,

2000230, 202000330

Miscellaneous

BG-29

ECCS Flow Balance High Safety Injection

4A

EF-45

Acceptance Criteria used in Essential Service Water Flow

Balance Procedures

EJ-29

Residual Heat Removal Pump NPSH Margin During

Recirculation

2A

EOP, Addendum

Shutdown of Unnecessary Plant Equipment

M-721-00096

Safety Injection Pump Operation & Maintenance

M-HE-08

Relief Valve Pressure Drop

MPE-ZZ-NY137

Operational Test Sequence of 4.16KV Service Water Pump

RFR 18519A

Adequacy of Load Shed Shutdown LOCA Sequence Testing

RFR 200706039

Service Water as an Acceptable Heat Sink for CCW and

RHR in Mode 5

Procedures

APA-ZZ-00605

Temporary System Modifications

ESP-EM-F001A

Intermediate Head Safety Injection System Flow Balance

MPE-GK-QG002

Control Building Emergency Ventilation Train B Flow

Verification

MPE-ZZ-NY137

Operational Test Sequence of 4.16kV Service Water Pump

MSE-GK-QG003

Control Building Emergency Ventilation Train B Flow Rates

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MSM-ZZ-QV001

IST Relief Valve Surveillance Test

MTT-ZZ-00001

HVAC System Air Balancing

OSP-EM-00002

Rendering SI Pumps Incapable of Injection

OSP-EM-P002

Train A & B Safety Injection Comprehensive Pump Test

OTN-EM-00001

Safety Injection System

OTO-ZZ-00001

Control Room Inaccessibility

Work Orders

13505983, 17512165, 17512735, 17512736

71111.05

Corrective Action

Documents

Condition Reports 200601611, 200701781, 201802150, 201907740,

201907954, 201907960, 202000072, 202000205,

2000520

Miscellaneous

Fire Pre-Plan

Procedures

APA-ZZ-00741

Control of Combustible Materials

APA-ZZ-00701

Control of Fire Protection Impairments

FPP-ZZ-00100

Site Wide Fire Protection Inspection Procedure 71111.06

Corrective Action

Documents

Condition Reports 201505496, 201608573, 201707056, 201805151,

201907176

Miscellaneous

Watertight Doors for the SNUPPS

SK-06

Aux and Control Building Flood Analysis

Procedures

APA-ZZ-00750

Hazzard Barrier Program

MPM-SK-QW001,

Addendum 2

Service and Inspection of Watertight Doors

71111.11Q Corrective Action

Documents

Condition Reports 202000138, 202000510, 202000960, 202000967

Miscellaneous

T61.0810

Simulator Scenario S-7, Cycle 20-1

11/15/2019

Procedures

ODP-ZZ-00001

Operations Department - Code of Conduct

ODP-ZZ-00003

Shift Relief and Turnover

71111.12

Corrective Action

Documents

Condition Reports 201506040, 201602814, 201901958, 201903261, 20194704,

201904714, 201905300, 201905828, 201906609,

201906222, 201906832, 201907904, 202000118,

2000314, 202000316

Miscellaneous

NUMARC 93-01

Industry Guidelines for the Monitoring the Effectiveness of

Maintenance

4F

Procedures

APA-ZZ-00500

Corrective Action Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

APA-ZZ-00549,

Appendix B

Guidelines Used to Determine Functional Importance of a

Component

APA-ZZ-00703

Fire Protection Operability Criteria & Surveillance

Requirements

EDP-ZZ-01128

Maintenance Rule Program

EDP-ZZ-01129,

Appendix 4

Maintenance Rule System Functions

71111.13

Corrective Action

Documents

Condition Reports 200808259, 201000958, 201207322, 201501783,

201707612, 201803059, 202000019, 202001071,

2000216. 202000304, 202000316, 202000662

Miscellaneous

E601

Battery Chargers and Inverters Planned Maintenance Basis

Document

Job 18507501

NK22 Battery Charger Failure

M-22AL01

PI & D - Auxiliary Feedwater System

NUMARC 93-01

Industry Guidelines for Monitoring the Effectiveness of

Maintenance at Nuclear Power Plants

4F

RFR 180073

Evaluate Spline Torque Capacity at Minimum Effective

Spline Length

SCP970109

Safety Analysis for AFW Flow Assumptions

Procedures

APA-ZZ-00322

Integrated Work Management Process

APA-ZZ-00322,

Appendix F

Online Work Integrated Risk Management

APA-ZZ-00356

Pump and Valve Inservice Test Program

APA-ZZ-01250

Operational Decision Making

EDP-ZZ-01128,

Appendix 1

SSCs in the Scope of the Maintenance Rule at Callaway

EDP-ZZ-01129

Callaway Energy Center Risk Assessment

MPE-NK-QB004

NK Class 1E Battery Charger Inspection

ODP-ZZ-00002,

Appendix 2

Equipment Status Control

ODP-ZZ-0002,

Appendix 2

Risk management Actions for Planned Risk Significant

Activities

71111.15

Corrective Action

Documents

Condition Reports 200405304, 200812065, 201207322, 201707612,

201907876, 201907884, 201907951, 201907966,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2000019, 202000088, 202000333, 202000376,

2000782

Miscellaneous

CRD-MG.BID

Control Rod Drive System and MG Sets

E601

Battery Chargers & Inverters Planned Maintenance Basis

Document

Job 18507501

NK22 Battery Charger Failure

Job 20000025

NK22 Potentiometer Switch Replacement

M-766-01075

Power Supply for Nuclear Rod Controller

NUMARC 93-01

Industry Guidelines for Monitoring the Effectiveness of

maintenance at Nuclear Power Plants

4F

RFR 20458

Battery Charger Float/Equalize Potentiometer

B

RFR 6318

Grease Coming Out of Seals on Rod Drive MG Set

A

RFR 6318

Grease Coming Out of Seals on Rod Drive MG Set

A

Procedures

APA-ZZ-00500,

Appendix 1

Operability Determinations

APA-ZZ-01250

Operational Decision Making

EDP-ZZ-01111

Vibration Predictive Maintenance Program

EDP-ZZ-01128,

Appendix 1

SSCs in the Scope of the Maintenance Rule at Callaway

MPE-NK-QB004

NK Class 1E Battery Charger Inspection

MPE-SF-NM001

Rod Drive Motor Generator Inspection

MTE-ZZ-QB002

Battery Charger Maintenance, Field Adjustments and

Troubleshooting

MTE-ZZ-QN005

Electrical Scheme Checkout

ODP-ZZ-00001,

Addendum15

Operability Determinations

OTN-SF-00001

Control Rod Drive System

71111.19

Corrective Action

Documents

Condition Reports 201507305, 201608134, 201701056, 201701148,

201802626, 201806050, 201903184, 201903196,

201905364, 201906014, 201907399, 202001475

Miscellaneous

GK-17

Control Room Air Cond Unit Plugged Tubes Min Flow &

Fouling Limits

GK-35

Determination of Allowable Number of Plugged Tubes in

SGK05A/B

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Job 20000229

Condenser Mechanical Vacuum Pump A Seal Water

Reservoir Leaking

RFR 180048

Evaluate Non-Safety Accessories in Safety HVAC Systems

RFR 21483

Revise Setpoints for Condenser Vacuum Pump Start

Procedures

ETP-ZZ-03001

GL 89-13 Heat Exchanger Inspection

OTG-ZZ-00004

Power Operations

OTN-BG-00001

Chemical and Volume Control System

OTO-AD-00001

Loss of Condenser Vacuum

Work Orders

16507936, 18508898, 18508934, 18508937

71111.22

Corrective Action

Documents

Condition Reports 200609121, 200908896, 201200994, 2014058555,

201600396, 201901095, 201902558, 201902826,

201904595, 201906391, 202000178, 20204479

Miscellaneous

Valve Retest Manual

MP 09-0026

Callaway Fire Protection Monitoring Program

ULDBD-NE/KJ-

001

Emergency Diesel Generators

Procedures

APA-ZZ-00356

Pump and Valve Inservice Testing Program

APA-ZZ-00703

Fire Protection Operability Criteria and Surveillance

Requirements

MPM-KC-FW001

Three Year Water Spray Flow Test

OSP-EJ-V001A

Train A RHR Valve Inservice Test

OSP-KJ-V002B

Diesel Generator Train B Air Start Check Valve Inservice

Test

OTS-KC-00002

Transformer Water Spray System Flow Test

71114.06

Corrective Action

Documents

Condition Reports 201907623, 202000446, 202001494

Miscellaneous

Drill guide - ERO Team - 2/20/20

71151

Corrective Action

Documents

Condition Reports 200001037, 200403784, 200800219, 201302117,

201906299

Miscellaneous

MSPI Derivation Reports

Various

Procedures

Mitigating Systems Performance Index Basis Document

APA-ZZ-01111

Mitigating Systems Performance Index (MSPI) Program

Administration

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CSP-ZZ-07600

RCS Activity Determinations

CTP-ZZ-02540

Depressurized Liquid Specific Activity Determination

71152

Corrective Action

Documents

Condition Reports 201802027, 201802029, 201901729, 201903761,

201903828, 201906952, 201907047, 201907224,

201706241, 201907178

Miscellaneous

ZZ-427

Total Flow Uncertainties

1A

ZZ-526

Steam Line Pressure Uncertainty

1A

71153

Procedures

OTO-SF-00001

Rod Control Malfunctions

2