IR 05000483/2022005
| ML22230A221 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/23/2022 |
| From: | Greg Werner NRC/RGN-IV/DORS/PBB |
| To: | Diya F Ameren Missouri |
| Werner G | |
| References | |
| IR 2022005 | |
| Download: ML22230A221 (5) | |
Text
August 22, 2022
SUBJECT:
UPDATED INSPECTION PLAN FOR CALLAWAY PLANT (REPORT 05000483/2022005)
Dear Mr. Diya:
The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for the Callaway Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI)1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication and an engineering inspection that reviews age-related degradation and management2.
In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return 1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.
2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022.
2 to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021 memo, Implementation of Inspection Programs Following Reentry from the PHE for the Reactor Safety Program (ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.
For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). [Note: Verify the Web site works, and update it, if necessary.]
Please contact me at (817) 2001143 with any questions you have regarding this letter.
Sincerely, Gregory E. Werner, Chief Projects Branch B Division of Operating Reactor Safety Docket No. 05000483 License No. NPF-30 Enclosure:
Inspection Plan Distribution:
cc w/ encl: Distribution via LISTSERV Signed by Werner, Gregory on 08/22/22
ML22230A221 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: GEW Yes No Publicly Available Sensitive NRC-002 OFFICE PE:DORS/B BC:DORS/B NAME JMelfi /RA/
GWermer GEW DATE 08/22/2022 08/22/2022
Site Inspection Activity Plan Callaway 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count Fire Protection Inspection - CWY
1 7/11/2022 7/15/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Security Access Control.02
1 7/11/2022 7/15/2022 IP 71130.02 000734 Access Control
7/11/2022 7/15/2022 IP 71130.09 001656 Security Plan Changes
7/11/2022 7/15/2022 IP 71151 001338 Performance Indicator Verification Callaway Biennial PI&R
1 8/15/2022 8/19/2022 IP 71152B 000747 Problem Identification and Resolution
8/29/2022 9/2/2022 IP 71152B 000747 Problem Identification and Resolution Security Training/Equip Maint.07 and.04
1 9/12/2022 9/16/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
9/12/2022 9/16/2022 IP 71130.07 000739 Security Training Power-Operated Valves Inspection - 21N - Callaway
1 10/17/2022 11/4/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements EP 2022 Program & PI Inspection - CWY
1 11/28/2022 12/2/2022 IP 71114.02 000717 Alert and Notification System Testing
11/28/2022 12/2/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
11/28/2022 12/2/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
11/28/2022 12/2/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness
11/28/2022 12/2/2022 IP 71151 001397 Performance Indicator Verification Security Access Authorization.01 and Access Control.02 + PIV + Plan Change.09
1 3/6/2023 3/10/2023 IP 71130.01 000733 Access Authorization
3/6/2023 3/10/2023 IP 71130.02 000734 Access Control
3/6/2023 3/10/2023 IP 71130.09 001656 Security Plan Changes
3/6/2023 3/10/2023 IP 71151 001338 Performance Indicator Verification EP Exercise & PI Inspection (2023) - CWY
1 4/17/2023 4/21/2023 IP 71114.01 000716 Exercise Evaluation
4/17/2023 4/21/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
4/17/2023 4/21/2023 IP 71151 001397 Performance Indicator Verification Comprehensive Engineering Team Inspection - 21M - Callaway
1 5/8/2023 5/12/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
5/22/2023 5/26/2023 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
FORCE-ON-FORCE PLANNING AND EXERCISE - CWY
Prepared on 8/17/2022 12:48:48 PM 1 of 2
Site Inspection Activity Plan
5/15/2023 5/19/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
6/5/2023 6/9/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing CW 2023 BRQ
1 5/21/2023 5/27/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP 5,8 -
1 6/12/2023 6/16/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
6/12/2023 6/16/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Security FFD.08
1 8/14/2023 8/18/2023 IP 71130.08 000740 Fitness For Duty Program CW 2023 INITIAL EXAM
1 8/6/2023 8/12/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
9/10/2023 9/16/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
1 10/2/2023 10/6/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
10/2/2023 10/6/2023 IP 71124.04 000728 Occupational Dose Assessment
10/2/2023 10/6/2023 IP 71151 000746 Performance Indicator Verification License Renewal Inspection 71003 (Phase 1) - CWY
1 10/9/2023 10/13/2023 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection - CWY
1 10/9/2023 10/20/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1 3/11/2024 3/15/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
3/11/2024 3/15/2024 IP 71124.04 000728 Occupational Dose Assessment
3/11/2024 3/15/2024 IP 71151 000746 Performance Indicator Verification Cyber Security - CWY
1 3/25/2024 3/29/2024 IP 71130.10 000741 Cybersecurity CWY 2024 PI&R Inspection
1 4/8/2024 4/26/2024 IP 71152B 000747 Problem Identification and Resolution License Renewal 71003 - CWY (Phase 2)
1 6/10/2024 6/14/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal Prepared on 8/17/2022 12:48:48 PM 2 of 2