September 27, 2022

SUBJECT:

CALLAWAY - SECURITY BASELINE INSPECTION REPORT 05000483/2022403

Dear Mr. Diya:

On September 15, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway and discussed the results of this inspection with Mr. Barry Cox, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number:

05000483

License Number:

NPF-30

Report Number:

05000483/2022403

Enterprise Identifier:

I-2022-403-0003

Licensee:

Ameren

Facility:

Callaway

Location:

Steadman, Mo

Inspection Dates:

September 12, 2022 to September 15, 2022

Inspectors:

A. Meyen, Physical Security Inspector

W. Tejada, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E. Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Callaway, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP dated [date].

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: [All requirements]

Tier II: [All requirements]

Tier III: [All requirements]

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On September 15, 2022, the inspectors presented the security baseline inspection results to Mr. Barry Cox, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CRs

2104310 202106494 202101044

2104086 202205532 202104254

2200138 202101294 202205532

2204168 202201649 202201271

2101507 202006177 202107042

2104586 202201806 202101836

2101686 202106072 202105927

2202806 202102190 202104463

2105928 202106073 202205552

2102571 202103889 202100616

2106109 202205554 202103669

2103511 202102066 202107021

2100009 202103853 202103508

2101889 202006318 202006372

2007427 202103904 202204755

2000395 202104586 202104586

2204909 202101294 202103889

Corrective Action

Documents

Resulting from

Inspection

CR

22060139 202206136 202206075

OTS-UB-00001

Security Diesel Generator Operability Test

Rev 20

OTS-UB-00002

Security Diesel Generator Load Test

Rev 13

SDP-PI-AG/AR

AR-15 Armorers Guide for Function Checks, Gauging,

Lubrication, Troubleshooting, Repairs

Rev 002

SDP-PI-AG/GL

Glock Armorers Guide for Field Inspections, Maintenance,

Lubrication, Troubleshooting, Repairs

Rev 001

SDP-PI-FA/CE

Firearms/Contingency Equipment

Rev 028

SDP-PI-FA/CE

Firearms/Contingency Equipment

Rev 028

SDP-PI-FC/AR

Proper Procedure for Field Cleaning the AR-15 Rifle

Rev 005

SDP-PI-MAFST

MAF Search Train

Rev 029

71130.04

Procedures

SDP-PI-PM/AR

Proper Procedure for AR-15 Rifle Preventive Maintenance,

Rev 004

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Clearing, Disassembly, Cleaning, Lubricating, and

Reassembly

SDP-PI-PM/GL

Proper Procedure for Glock Pistol Preventive Maintenance,

Disassembly, Cleaning, Lubricating, and Reassembly

Rev 001

SDP-PI-SP/VB

Sally Port/Vehicle Barrier Checkpoint

Rev 008

SDP-PI-STORE

Storeroom Officer

Rev 028

SDP-SF-00002

Testing of Security Equipment

Rev 039

SDP-SF-00033

Security Firearms Maintenance and Contingency Equipment

Inspection Programs

Rev 016

Self-Assessments Self-Assessment

71130.04 Self-Assessment

06/10/2022

Corrective Action

Documents

CRs

2006093 202100434 202102206 202104483 202105895

2201692 202202812 202202857 202205538

Corrective Action

Documents

Resulting from

Inspection

CRs

2206058 202206088 202206101 202206138

Course of Fire

Handgun, Day Qualification

Rifle Day Qualification

2/10/2018

Courses of Fire

Advanced Firearms Training Techniques

08/22/2022

Courses of Fire

Handgun, Night Low Light

Rifle, Night Low Light

Annual Tactical Qualification

Thermal Scope Rifle Qualification

03/17/2017

Dynamic Learning

Activity

Vehicle Search

Lesson Plans

Armed Responder Duties, Tamper/Sabotage

08/25/2009

Lesson Plans

Authority of Private Security - Use of Force and Rules of

Engagement

03/11/2020

Physical Fitness

Test

Security Agility Timeline Validation

09/09/2004

SDP-SF-00013

Security Officer OJT, Phase 2

Security Plans

Physical Security Plan/Training & Qualification Plan

T52.21005

Response Team Leader Training

04/28/2016

71130.07

Miscellaneous

Task

Task 8, Security Patrols

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Performance

Evaluation

Task

Performance

Evaluations

Task 16, Determine the Amount of Force Required to

Prevent an Unauthorized Act

APA-ZZ-00912-

APPD

Medical Certification Armed Security Officer and Security

Watchman

SDP-SF-00013

Administration of Security Training

Procedures

SDP-SF-00023

Security Training Qualifications and Examinations

2205538

Security Baseline Readiness Assessment Checklist,

71130.07

07/12/2022

Self-Assessments

AP 22003

Nuclear Oversight Audit of Security/Cyber-Security Programs

06/30/2022