ML071590154: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML071590154
| number = ML071590154
| issue date = 06/07/2007
| issue date = 06/07/2007
| title = 04/19/2007-Summary of Clarification Phone Call Regarding Pilot Plant (Shearon Harris) Transition to National Fire Protection Association Standard 805
| title = Summary of Clarification Phone Call Regarding Pilot Plant (Shearon Harris) Transition to National Fire Protection Association Standard 805
| author name = Lain P
| author name = Lain P
| author affiliation = NRC/NRR/ADRA/DRA/AFPB
| author affiliation = NRC/NRR/ADRA/DRA/AFPB
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:June 7, 2007MEMORANDUM TO:   Sunil D. Weerakkody, Branch ChiefFire Protection Branch Division of Risk Assessment Office of Nuclear Reactor RegulationFROM: Paul Lain, Senior Fire Protection Engineer     /RA/Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
{{#Wiki_filter:June 7, 2007 MEMORANDUM TO: Sunil D. Weerakkody, Branch Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:                   Paul Lain, Senior Fire Protection Engineer /RA/
Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF APRIL 19, 2007, CLARIFICATION PHONE CALLREGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805On April 19, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff from Headquartersand Region II participated in a teleconference with Progress Energy's National Fire Protection Association Standard 805 (NFPA 805) transition team regarding Shearon Harris's transition to the Title 10 of the Code of Federal Regulations Part 50.48(c) (10 CFR 50.48(c)) licensing basis. The subjects of the discussion were the analyses and supporting procedures for performing fire safe shutdown analyses, circuit analysis, and NFPA 805 Chapter 4 Fire Area transitions.Progress Energy recorded the NRC comments, answered those that they could, and areretaining the rest for subsequent disposition. The NRC staff comments are available in Agencywide Documents Access and Management System (ADAMS) at accession numbers ML071420431, ML071420444, and ML071430470. The remaining comments' resolutions will be discussed at the next observation visit.The publically available documents discussed in the teleconference are available in ADAMS atML071210335, ML071210337, ML071210341, ML071210344, and ML071210353. Two other documents are being withheld from public availability under 10 CFR 2.390(d)(1) as Sensitive, Unclassified Non-Safeguards Information: ML071210355 and ML071380241.A list of meeting attendees is enclosed with this memorandum.
OF APRIL 19, 2007, CLARIFICATION PHONE CALL REGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 On April 19, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff from Headquarters and Region II participated in a teleconference with Progress Energy's National Fire Protection Association Standard 805 (NFPA 805) transition team regarding Shearon Harriss transition to the Title 10 of the Code of Federal Regulations Part 50.48(c) (10 CFR 50.48(c)) licensing basis.
The subjects of the discussion were the analyses and supporting procedures for performing fire safe shutdown analyses, circuit analysis, and NFPA 805 Chapter 4 Fire Area transitions.
Progress Energy recorded the NRC comments, answered those that they could, and are retaining the rest for subsequent disposition. The NRC staff comments are available in Agencywide Documents Access and Management System (ADAMS) at accession numbers ML071420431, ML071420444, and ML071430470. The remaining comments resolutions will be discussed at the next observation visit.
The publically available documents discussed in the teleconference are available in ADAMS at ML071210335, ML071210337, ML071210341, ML071210344, and ML071210353. Two other documents are being withheld from public availability under 10 CFR 2.390(d)(1) as Sensitive, Unclassified Non-Safeguards Information: ML071210355 and ML071380241.
A list of meeting attendees is enclosed with this memorandum.


==Enclosure:==
==Enclosure:==
As statedCONTACT: Paul Lain, NRR/DRA         (301) 415-2346 MEMORANDUM TO:   Sunil D. Weerakkody, Branch ChiefFire Protection Branch Division of Risk Assessment Office of Nuclear Reactor RegulationFROM: Paul Lain, Senior Fire Protection Engineer Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation
 
As stated CONTACT: Paul Lain, NRR/DRA (301) 415-2346
 
MEMORANDUM TO: Sunil D. Weerakkody, Branch Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM:                   Paul Lain, Senior Fire Protection Engineer Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF APRIL 19, 2007, CLARIFICATION PHONE CALLREGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805On April 19, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff from Headquartersand Region II participated in a teleconference with Progress Energy's National Fire Protection Association Standard 805 (NFPA 805) transition team regarding Shearon Harris's transition to the Title 10 of the Code of Federal Regulations Part 50.48(c) (10 CFR 50.48(c)) licensing basis. The subjects of the discussion were the analyses and supporting procedures for performing fire safe shutdown analyses, circuit analysis, and NFPA 805 Chapter 4 Fire Area transitions.Progress Energy recorded the NRC comments, answered those that they could, and areretaining the rest for subsequent disposition. The NRC staff comments are available in Agencywide Documents Access and Management System (ADAMS) at accession numbers ML071420431, ML071420444, and ML071430470. The remaining comments' resolutions will be discussed at the next observation visit.The publically available documents discussed in the teleconference are available in ADAMS atML071210335, ML071210337, ML071210341, ML071210344, and ML071210353. Two other documents are being withheld from public availability under 10 CFR 2.390(d)(1) as Sensitive, Unclassified Non-Safeguards Information: ML071210355 and ML071380241.A list of meeting attendees is enclosed with this memorandum.
OF APRIL 19, 2007, CLARIFICATION PHONE CALL REGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 On April 19, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff from Headquarters and Region II participated in a teleconference with Progress Energy's National Fire Protection Association Standard 805 (NFPA 805) transition team regarding Shearon Harriss transition to the Title 10 of the Code of Federal Regulations Part 50.48(c) (10 CFR 50.48(c)) licensing basis.
The subjects of the discussion were the analyses and supporting procedures for performing fire safe shutdown analyses, circuit analysis, and NFPA 805 Chapter 4 Fire Area transitions.
Progress Energy recorded the NRC comments, answered those that they could, and are retaining the rest for subsequent disposition. The NRC staff comments are available in Agencywide Documents Access and Management System (ADAMS) at accession numbers ML071420431, ML071420444, and ML071430470. The remaining comments resolutions will be discussed at the next observation visit.
The publically available documents discussed in the teleconference are available in ADAMS at ML071210335, ML071210337, ML071210341, ML071210344, and ML071210353. Two other documents are being withheld from public availability under 10 CFR 2.390(d)(1) as Sensitive, Unclassified Non-Safeguards Information: ML071210355 and ML071380241.
A list of meeting attendees is enclosed with this memorandum.


==Enclosure:==
==Enclosure:==
As statedCONTACT: Paul Lain, NRR/DRA         (301) 415-2346DISTRIBUTION: DRA R/FPLainJCircle TDinhEMcCannCMoultonRGallucciSWongSWeerakkodyADAMS Accession #: ML071590154                     NRC-001     OFFICENRR/DRANRR/DRANAMEPLainSWeerakoddy DATE5/ 24 /076/ 07 /07OFFICIAL RECORD COPY ENCLOSURECLARIFICATION PHONE CALL REGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805April 19, 2007U.S. Nuclear Regulatory Commission StaffC. MoultonE. McCann J. Circle N. Merriweather*
 
As stated CONTACT: Paul Lain, NRR/DRA (301) 415-2346 DISTRIBUTION:           DRA R/F        PLain        JCircle      TDinh        EMcCann CMoulton        RGallucci    SWong        SWeerakkody ADAMS Accession #: ML071590154                       NRC-001 OFFICE            NRR/DRA                NRR/DRA NAME              PLain                  SWeerakoddy DATE              5/ 24 /07              6/ 07 /07 OFFICIAL RECORD COPY
 
CLARIFICATION PHONE CALL REGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 April 19, 2007 U.S. Nuclear Regulatory Commission Staff C. Moulton E. McCann J. Circle N. Merriweather*
P. Fillion*
P. Fillion*
P. Lain R. Gallucci S. Wong T. DinhW. Rogers*OTHERA. Holder (Progress)*A. Ratchford (Kleinsorg Group)*
P. Lain R. Gallucci S. Wong T. Dinh W. Rogers*
OTHER A. Holder (Progress)*
A. Ratchford (Kleinsorg Group)*
B. Jamar (NEI)*
B. Jamar (NEI)*
D. Goforth (Duke)*
D. Goforth (Duke)*
Line 41: Line 58:
J. Ertman (Progress)*
J. Ertman (Progress)*
K. Heffner (Progress)*
K. Heffner (Progress)*
R. Rhodes (Progress)**participated via phone}}
R. Rhodes (Progress)*
*participated via phone ENCLOSURE}}

Latest revision as of 12:45, 7 December 2019

Summary of Clarification Phone Call Regarding Pilot Plant (Shearon Harris) Transition to National Fire Protection Association Standard 805
ML071590154
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/07/2007
From: Lain P
NRC/NRR/ADRA/DRA/AFPB
To: Sunil Weerakkody
NRC/NRR/ADRA/DRA/AFPB
References
NFPA 805
Download: ML071590154 (3)


Text

June 7, 2007 MEMORANDUM TO: Sunil D. Weerakkody, Branch Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: Paul Lain, Senior Fire Protection Engineer /RA/

Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF APRIL 19, 2007, CLARIFICATION PHONE CALL REGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 On April 19, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff from Headquarters and Region II participated in a teleconference with Progress Energy's National Fire Protection Association Standard 805 (NFPA 805) transition team regarding Shearon Harriss transition to the Title 10 of the Code of Federal Regulations Part 50.48(c) (10 CFR 50.48(c)) licensing basis.

The subjects of the discussion were the analyses and supporting procedures for performing fire safe shutdown analyses, circuit analysis, and NFPA 805 Chapter 4 Fire Area transitions.

Progress Energy recorded the NRC comments, answered those that they could, and are retaining the rest for subsequent disposition. The NRC staff comments are available in Agencywide Documents Access and Management System (ADAMS) at accession numbers ML071420431, ML071420444, and ML071430470. The remaining comments resolutions will be discussed at the next observation visit.

The publically available documents discussed in the teleconference are available in ADAMS at ML071210335, ML071210337, ML071210341, ML071210344, and ML071210353. Two other documents are being withheld from public availability under 10 CFR 2.390(d)(1) as Sensitive, Unclassified Non-Safeguards Information: ML071210355 and ML071380241.

A list of meeting attendees is enclosed with this memorandum.

Enclosure:

As stated CONTACT: Paul Lain, NRR/DRA (301) 415-2346

MEMORANDUM TO: Sunil D. Weerakkody, Branch Chief Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation FROM: Paul Lain, Senior Fire Protection Engineer Fire Protection Branch Division of Risk Assessment Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF APRIL 19, 2007, CLARIFICATION PHONE CALL REGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 On April 19, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff from Headquarters and Region II participated in a teleconference with Progress Energy's National Fire Protection Association Standard 805 (NFPA 805) transition team regarding Shearon Harriss transition to the Title 10 of the Code of Federal Regulations Part 50.48(c) (10 CFR 50.48(c)) licensing basis.

The subjects of the discussion were the analyses and supporting procedures for performing fire safe shutdown analyses, circuit analysis, and NFPA 805 Chapter 4 Fire Area transitions.

Progress Energy recorded the NRC comments, answered those that they could, and are retaining the rest for subsequent disposition. The NRC staff comments are available in Agencywide Documents Access and Management System (ADAMS) at accession numbers ML071420431, ML071420444, and ML071430470. The remaining comments resolutions will be discussed at the next observation visit.

The publically available documents discussed in the teleconference are available in ADAMS at ML071210335, ML071210337, ML071210341, ML071210344, and ML071210353. Two other documents are being withheld from public availability under 10 CFR 2.390(d)(1) as Sensitive, Unclassified Non-Safeguards Information: ML071210355 and ML071380241.

A list of meeting attendees is enclosed with this memorandum.

Enclosure:

As stated CONTACT: Paul Lain, NRR/DRA (301) 415-2346 DISTRIBUTION: DRA R/F PLain JCircle TDinh EMcCann CMoulton RGallucci SWong SWeerakkody ADAMS Accession #: ML071590154 NRC-001 OFFICE NRR/DRA NRR/DRA NAME PLain SWeerakoddy DATE 5/ 24 /07 6/ 07 /07 OFFICIAL RECORD COPY

CLARIFICATION PHONE CALL REGARDING PILOT PLANT (SHEARON HARRIS) TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 April 19, 2007 U.S. Nuclear Regulatory Commission Staff C. Moulton E. McCann J. Circle N. Merriweather*

P. Fillion*

P. Lain R. Gallucci S. Wong T. Dinh W. Rogers*

OTHER A. Holder (Progress)*

A. Ratchford (Kleinsorg Group)*

B. Jamar (NEI)*

D. Goforth (Duke)*

D. Miskiewicz (Progress)*

E. Kleinsorg (Kleinsorg Group)*

J. Ertman (Progress)*

K. Heffner (Progress)*

R. Rhodes (Progress)*

  • participated via phone ENCLOSURE