| issue date = 03/04/2015
| issue date = 03/04/2015
| title = 2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
| title = 2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
| author name = Burritt A L
| author name = Burritt A
| author affiliation = NRC/RGN-I/DRP/PB2
| author affiliation = NRC/RGN-I/DRP/PB2
| addressee name = Coyle L
| addressee name = Coyle L
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number = DPR-026, DPR-064
| license number = DPR-026, DPR-064
| contact person = Burritt A L
| contact person = Burritt A
| case reference number = FOIA/PA-2016-0148
| case reference number = FOIA/PA-2016-0148
| document report number = IR 2014001
| document report number = IR 2014001
Line 15: Line 15:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000247/2014001]]
See also: [[see also::IR 05000247/2014001]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713   March 4, 2015  
{{#Wiki_filter:UNITED STATES
Mr. Larry Coyle  
                        NUCLEAR REGULATORY COMMISSION
Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center  
                                          REGION I
450 Broadway, GSB  
                              2100 RENAISSANCE BLVD., SUITE 100
P.O. Box 249  
                                KING OF PRUSSIA, PA 19406-2713
Buchanan, NY 10511-0249  
                                        March 4, 2015
SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND  
Mr. Larry Coyle
05000286/2014001)
Site Vice President
Dear Mr. Coyle: On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
Entergy Nuclear Operations, Inc.
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The  
Indian Point Energy Center
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection  
450 Broadway, GSB
results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.  
P.O. Box 249
Buchanan, NY 10511-0249
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined  
SUBJECT:         ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR
the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs  
                GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND
indicated that your performance was within the nominal, expected range (i.e., Green).
                05000286/2014001)
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.   The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The  
Dear Mr. Coyle:
inspections listed during the last nine months of the inspection plan are tentative and may be  
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform inspection procedure (IP) 60855, "Operation of an Independent Spent Fuel Storage  
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The
Installation at Operating Plants," IP 92702, "Follow-up on Corrective Actions for Violations," and Temporary Instruction 2516-001, "Review of License Renewal Activities.The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel  
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection
availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not  
results and enforcement actions from January 1, 2014 through December 31, 2014. This letter
include security-related inspections, which will be sent via separate, non-publicly available correspondence.  
informs you of the NRCs assessment of your facility during this period and its plans for future
L. Coyle 2 
inspections at your facility.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Please contact me at (610)337-5069 with any questions you have regarding this letter. 
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that
Sincerely,
preserved public health and safety and met all cornerstone objectives. The NRC determined
       
the performance at Indian Point Units 2 and 3 during the most recent quarter was within the
          /RA/  Arthur L. Burritt, Chief
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
Reactor Projects Branch 2
because all inspection findings had very low (i.e., Green) safety significance, and all PIs
Division of Reactor Projects  Docket Nos. 50-247 and 50-286
indicated that your performance was within the nominal, expected range (i.e., Green).
License Nos. DPR-26 and DPR-64
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine
Enclosure: Indian Point 2 & 3 Inspection/Activity Plan
inspections performed by resident inspectors are not included in the inspection plan. The
cc w/encl: Distribution via ListServ 
inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will
perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage
Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and
Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides
the inspection plan to allow for the resolution of any scheduling conflicts and personnel
availability issues. The NRC will contact you as soon as possible to discuss changes to the
inspection plan should circumstances warrant any changes. This inspection plan does not
include security-related inspections, which will be sent via separate, non-publicly available
correspondence.


  ML15061A401   SUNSI Review  Non-Sensitive Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP   NAME TSetzer/TCS ABurritt/ALB   DATE 02/23/15 03/02/15    
L. Coyle                                            2
Page 1 of 203/02/201515:16:39Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteIndian PointInspection / Activity Plan01/01/2015-06/30/20165/11EXAM-U3 INITIAL OL EXAM5    3 FY15-IP3 INITIAL OPERATOR LICENSING EXAMU0190804/13/201504/17/2015   3 FY15-IP3 INITIAL OPERATOR LICENSING EXAMU0190805/11/201505/15/201571124-RETS1  2,3 IPRadiation Monitoring Instrumentation71124.0502/09/201502/13/2015 2,3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/09/201502/13/201571124-HP1    3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/02/201503/06/2015   3 IPOccupational ALARA Planning and Controls71124.0203/02/201503/06/20157111108P-U3 INSERVICE INSPECTION1    3 IPInservice Inspection Activities - PWR7111108P03/09/201503/20/201571152-GROUNDWATER MONITORING5  2   IPProblem Identification and Resolution7115205/04/201505/07/201571124-HP1  2,3 IPRadiological Hazard Assessment and Exposure Controls71124.0105/07/201505/13/2015 2,3 IPOccupational ALARA Planning and Controls71124.0205/07/201505/13/20157111107T-TRIENNIAL HEAT SINK1  2,3 IPHeat Sink Performance7111107T07/06/201507/10/2015CDBI-COMPONENT DESIGN BASIS INSPECTION8  2,3 IPComponent Design Bases Inspection711112107/20/201507/24/2015 2,3 IPComponent Design Bases Inspection711112108/03/201508/07/2015 2,3 IPComponent Design Bases Inspection711112108/17/201508/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS2    3 IPLicensed Operator Requalification Program7111111B09/21/201509/25/201571124-HP1  2,3 IPOccupational Dose Assessment71124.0408/10/201508/14/2015 2,3 IPRadiation Monitoring Instrumentation71124.0508/10/201508/14/2015 2,3 IPPerformance Indicator Verification7115108/10/201508/14/2015EP-EP PROGRAM INSPECTION1  2,3 IPAlert and Notification System Testing711140208/17/201508/21/2015 2,3 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/17/201508/21/2015 2,3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/17/201508/21/2015This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.  
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules
Page 2 of 203/02/201515:16:39Report 22UnitNumberPlanned DatesStart          EndInspection ActivityTitleNo. of Staffon SiteIndian PointInspection / Activity Plan01/01/2015-06/30/2016ISFSI-ISFSI LOADING INSPECTION2  2,3 IPOperation Of An ISFSI6085508/17/201508/21/2015 2   IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/17/201508/21/20152516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION1    3 IPReview of License Renewal Activities2516/00111/16/201511/20/201571124.08-RADWASTE1  2,3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/16/201511/20/201571152B-PI&R - BIENNIAL4  2,3 IPProblem Identification and Resolution71152B11/30/201512/04/2015 2,3 IPProblem Identification and Resolution71152B12/14/201512/18/201571124-HP1  IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/2016 2   IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/2016ISI-U2 INSERVICE INSPECTION1  2   IPInservice Inspection Activities - PWR7111108P03/14/201603/25/2016EP-EP EXERCISE EVALUATION4  2,3 IPExercise Evaluation711140106/27/201607/01/2016TRI FI-TRIENNIAL FIRE PROTECTION4  2,3 IPFire Protection [Triennial]7111105T05/23/201605/27/2016 2,3 IPFire Protection [Triennial]7111105T06/06/201606/10/201671124.07-REMP1  2,3 IPRadiological Environmental Monitoring Program71124.0706/20/201606/24/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
of Practice, a copy of this letter will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records component of NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Please contact me at (610)337-5069 with any questions you have regarding this letter.
                                                Sincerely,
                                                    /RA/
                                                Arthur L. Burritt, Chief
                                                Reactor Projects Branch 2
                                                Division of Reactor Projects
Docket Nos. 50-247 and 50-286
License Nos. DPR-26 and DPR-64
Enclosure:      Indian Point 2 & 3 Inspection/Activity Plan
cc w/encl:      Distribution via ListServ
 
 
ML15061A401
                                                  Non-Sensitive                               Publicly Available
      SUNSI Review
                                                  Sensitive                                    Non-Publicly Available
OFFICE         RI/DRP                   RI/DRP
NAME           TSetzer/TCS             ABurritt/ALB
DATE           02/23/15                 03/02/15
                                               
Page 1 of 2                                                                              Indian Point
03/02/2015    15:16:39                                                        Inspection / Activity Plan
Report 22
                                                                                01/01/2015 - 06/30/2016
  Unit          Planned Dates                                                                                                      No. of Staff
Number          Start    End      Inspection Activity                                                          Title                on Site
                                    5/11EXAM     - U3 INITIAL OL EXAM                                                                      5
      3     04/13/2015  04/17/2015     U01908              FY15-IP3 INITIAL OPERATOR LICENSING EXAM
      3    05/11/2015  05/15/2015      U01908              FY15-IP3 INITIAL OPERATOR LICENSING EXAM
                                    71124        - RETS                                                                                    1
  2, 3     02/09/2015  02/13/2015   IP 71124.05            Radiation Monitoring Instrumentation
  2, 3     02/09/2015  02/13/2015  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment
                                    71124        - HP                                                                                      1
      3    03/02/2015  03/06/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls
      3    03/02/2015  03/06/2015   IP 71124.02            Occupational ALARA Planning and Controls
                                    7111108P      - U3 INSERVICE INSPECTION                                                                  1
      3    03/09/2015  03/20/2015  IP 7111108P            Inservice Inspection Activities - PWR
                                    71152        - GROUNDWATER MONITORING                                                                  5
  2       05/04/2015  05/07/2015  IP 71152                Problem Identification and Resolution
                                    71124        - HP                                                                                      1
  2, 3     05/07/2015  05/13/2015   IP 71124.01            Radiological Hazard Assessment and Exposure Controls
  2, 3     05/07/2015  05/13/2015  IP 71124.02            Occupational ALARA Planning and Controls
                                    7111107T      - TRIENNIAL HEAT SINK                                                                      1
  2, 3     07/06/2015  07/10/2015  IP 7111107T            Heat Sink Performance
                                    CDBI          - COMPONENT DESIGN BASIS INSPECTION                                                        8
  2, 3     07/20/2015  07/24/2015   IP 7111121              Component Design Bases Inspection
  2, 3     08/03/2015  08/07/2015   IP 7111121              Component Design Bases Inspection
  2, 3     08/17/2015  08/21/2015  IP 7111121              Component Design Bases Inspection
                                    7111111B      - IP3 REQUAL INSP W/ P/F RESULTS                                                          2
      3     09/21/2015  09/25/2015  IP 7111111B            Licensed Operator Requalification Program
                                    71124        - HP                                                                                      1
  2, 3     08/10/2015  08/14/2015   IP 71124.04            Occupational Dose Assessment
  2, 3     08/10/2015  08/14/2015   IP 71124.05            Radiation Monitoring Instrumentation
  2, 3     08/10/2015  08/14/2015  IP 71151                Performance Indicator Verification
                                    EP            - EP PROGRAM INSPECTION                                                                    1
  2, 3     08/17/2015  08/21/2015  IP 7111402              Alert and Notification System Testing
  2, 3    08/17/2015  08/21/2015   IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
  2, 3    08/17/2015  08/21/2015   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                              This report does not include INPO and OUTAGE activities.
                                                This report shows only on-site and announced inspection procedures.               Enclosure
 
Page 2 of 2                                                                              Indian Point
03/02/2015    15:16:39                                                        Inspection / Activity Plan
Report 22
                                                                                01/01/2015 - 06/30/2016
  Unit          Planned Dates                                                                                                                                    No. of Staff
Number          Start      End    Inspection Activity                                                            Title                                          on Site
                                    ISFSI        - ISFSI LOADING INSPECTION                                                                                              2
  2, 3     08/17/2015  08/21/2015  IP 60855                Operation Of An ISFSI
  2        08/17/2015  08/21/2015  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants
                                    2516-001     - TI 2516-001 U3 LR COMMITMENTS INSPECTION                                                                              1
      3     11/16/2015  11/20/2015  IP 2516/001            Review of License Renewal Activities
                                    71124.08     - RADWASTE                                                                                                              1
  2, 3     11/16/2015  11/20/2015  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                    71152B        - PI&R - BIENNIAL                                                                                                      4
  2, 3     11/30/2015  12/04/2015   IP 71152B              Problem Identification and Resolution
  2, 3     12/14/2015  12/18/2015  IP 71152B              Problem Identification and Resolution
                                    71124        - HP                                                                                                                    1
  2       03/07/2016  03/11/2016   IP 71124.01            Radiological Hazard Assessment and Exposure Controls
  2        03/07/2016  03/11/2016  IP 71124.02            Occupational ALARA Planning and Controls
                                    ISI          - U2 INSERVICE INSPECTION                                                                                              1
  2       03/14/2016  03/25/2016  IP 7111108P            Inservice Inspection Activities - PWR
                                    EP            - EP EXERCISE EVALUATION                                                                                                4
  2, 3     06/27/2016  07/01/2016  IP 7111401              Exercise Evaluation
                                    TRI FI       - TRIENNIAL FIRE PROTECTION                                                                                            4
  2, 3     05/23/2016  05/27/2016   IP 7111105T            Fire Protection [Triennial]
  2, 3    06/06/2016  06/10/2016  IP 7111105T            Fire Protection [Triennial]
                                    71124.07     - REMP                                                                                                                  1
  2, 3     06/20/2016  06/24/2016  IP 71124.07            Radiological Environmental Monitoring Program
                                              This report does not include INPO and OUTAGE activities.
                                                This report shows only on-site and announced inspection procedures.                                             Enclosure
}}
}}

Latest revision as of 15:44, 31 October 2019

2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
ML15061A401
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2015
From: Arthur Burritt
Reactor Projects Branch 2
To: Coyle L
Entergy Nuclear Operations
Burritt A
References
FOIA/PA-2016-0148 IR 2014001
Download: ML15061A401 (5)


See also: IR 05000247/2014001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100

KING OF PRUSSIA, PA 19406-2713

March 4, 2015

Mr. Larry Coyle

Site Vice President

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR

GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND

05000286/2014001)

Dear Mr. Coyle:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-

cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The

NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection

results and enforcement actions from January 1, 2014 through December 31, 2014. This letter

informs you of the NRCs assessment of your facility during this period and its plans for future

inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Indian Point Units 2 and 3 during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will

perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage

Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and

Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides

the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as soon as possible to discuss changes to the

inspection plan should circumstances warrant any changes. This inspection plan does not

include security-related inspections, which will be sent via separate, non-publicly available

correspondence.

L. Coyle 2

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules

of Practice, a copy of this letter will be available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Records component of NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Please contact me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-247 and 50-286

License Nos. DPR-26 and DPR-64

Enclosure: Indian Point 2 & 3 Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML15061A401

Non-Sensitive Publicly Available

SUNSI Review

Sensitive Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME TSetzer/TCS ABurritt/ALB

DATE 02/23/15 03/02/15

Page 1 of 2 Indian Point

03/02/2015 15:16:39 Inspection / Activity Plan

Report 22

01/01/2015 - 06/30/2016

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

5/11EXAM - U3 INITIAL OL EXAM 5

3 04/13/2015 04/17/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

3 05/11/2015 05/15/2015 U01908 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

71124 - RETS 1

2, 3 02/09/2015 02/13/2015 IP 71124.05 Radiation Monitoring Instrumentation

2, 3 02/09/2015 02/13/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

71124 - HP 1

3 03/02/2015 03/06/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

3 03/02/2015 03/06/2015 IP 71124.02 Occupational ALARA Planning and Controls

7111108P - U3 INSERVICE INSPECTION 1

3 03/09/2015 03/20/2015 IP 7111108P Inservice Inspection Activities - PWR

71152 - GROUNDWATER MONITORING 5

2 05/04/2015 05/07/2015 IP 71152 Problem Identification and Resolution

71124 - HP 1

2, 3 05/07/2015 05/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

2, 3 05/07/2015 05/13/2015 IP 71124.02 Occupational ALARA Planning and Controls

7111107T - TRIENNIAL HEAT SINK 1

2, 3 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance

CDBI - COMPONENT DESIGN BASIS INSPECTION 8

2, 3 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection

2, 3 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection

2, 3 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection

7111111B - IP3 REQUAL INSP W/ P/F RESULTS 2

3 09/21/2015 09/25/2015 IP 7111111B Licensed Operator Requalification Program

71124 - HP 1

2, 3 08/10/2015 08/14/2015 IP 71124.04 Occupational Dose Assessment

2, 3 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation

2, 3 08/10/2015 08/14/2015 IP 71151 Performance Indicator Verification

EP - EP PROGRAM INSPECTION 1

2, 3 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing

2, 3 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

2, 3 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Indian Point

03/02/2015 15:16:39 Inspection / Activity Plan

Report 22

01/01/2015 - 06/30/2016

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

ISFSI - ISFSI LOADING INSPECTION 2

2, 3 08/17/2015 08/21/2015 IP 60855 Operation Of An ISFSI

2 08/17/2015 08/21/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

2516-001 - TI 2516-001 U3 LR COMMITMENTS INSPECTION 1

3 11/16/2015 11/20/2015 IP 2516/001 Review of License Renewal Activities

71124.08 - RADWASTE 1

2, 3 11/16/2015 11/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71152B - PI&R - BIENNIAL 4

2, 3 11/30/2015 12/04/2015 IP 71152B Problem Identification and Resolution

2, 3 12/14/2015 12/18/2015 IP 71152B Problem Identification and Resolution

71124 - HP 1

2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls

ISI - U2 INSERVICE INSPECTION 1

2 03/14/2016 03/25/2016 IP 7111108P Inservice Inspection Activities - PWR

EP - EP EXERCISE EVALUATION 4

2, 3 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation

TRI FI - TRIENNIAL FIRE PROTECTION 4

2, 3 05/23/2016 05/27/2016 IP 7111105T Fire Protection [Triennial]

2, 3 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]

71124.07 - REMP 1

2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure