March 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND 05000286/2014001)
Dear Mr. Coyle:
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform inspection procedure (IP) 60855, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, IP 92702, Follow-up on Corrective Actions for Violations, and Temporary Instruction 2516-001, Review of License Renewal Activities. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
NRC000185 Submitted: August 10, 2015
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
NRC000185-00-BD01 11/5/2015 11/5/2015 In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610)337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Arthur L. Burritt, Chief Reactor Projects Branch 2 Division of Reactor Projects
Docket Nos.
50-247 and 50-286 License Nos. DPR-26 and DPR-64
Enclosure:
Indian Point 2 & 3 Inspection/Activity Plan
cc w/encl:
Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP
NAME TSetzer/TCS ABurritt/ALB
DATE 02/23/15 03/02/15
Page 1 of 2 03/02/2015 15:16:39 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point Inspection / Activity Plan 01/01/2015 - 06/30/2016 5/11EXAM
- U3 INITIAL OL EXAM
3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM U01908 04/13/2015 04/17/2015
FY15-IP3 INITIAL OPERATOR LICENSING EXAM U01908 05/11/2015 05/15/2015 71124
- RETS
2, 3 IP Radiation Monitoring Instrumentation 71124.05 02/09/2015 02/13/2015 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/09/2015 02/13/2015 71124
- HP
3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/02/2015 03/06/2015
IP Occupational ALARA Planning and Controls 71124.02 03/02/2015 03/06/2015 7111108P
- U3 INSERVICE INSPECTION
3 IP Inservice Inspection Activities - PWR 7111108P 03/09/2015 03/20/2015 71152
- GROUNDWATER MONITORING
2 IP Problem Identification and Resolution 71152 05/04/2015 05/07/2015 71124
- HP
2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/07/2015 05/13/2015 2, 3 IP Occupational ALARA Planning and Controls 71124.02 05/07/2015 05/13/2015 7111107T
- TRIENNIAL HEAT SINK
2, 3 IP Heat Sink Performance 7111107T 07/06/2015 07/10/2015 CDBI
- COMPONENT DESIGN BASIS INSPECTION
2, 3 IP Component Design Bases Inspection 7111121 07/20/2015 07/24/2015 2, 3 IP Component Design Bases Inspection 7111121 08/03/2015 08/07/2015 2, 3 IP Component Design Bases Inspection 7111121 08/17/2015 08/21/2015 7111111B
- IP3 REQUAL INSP W/ P/F RESULTS
3 IP Licensed Operator Requalification Program 7111111B 09/21/2015 09/25/2015 71124
- HP
2, 3 IP Occupational Dose Assessment 71124.04 08/10/2015 08/14/2015 2, 3 IP Radiation Monitoring Instrumentation 71124.05 08/10/2015 08/14/2015 2, 3 IP Performance Indicator Verification 71151 08/10/2015 08/14/2015 EP
- EP PROGRAM INSPECTION
2, 3 IP Alert and Notification System Testing 7111402 08/17/2015 08/21/2015 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/17/2015 08/21/2015 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/17/2015 08/21/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 03/02/2015 15:16:39 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Indian Point Inspection / Activity Plan 01/01/2015 - 06/30/2016 ISFSI
- ISFSI LOADING INSPECTION
2, 3 IP Operation Of An ISFSI 60855 08/17/2015 08/21/2015
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/17/2015 08/21/2015 2516-001
- TI 2516-001 U3 LR COMMITMENTS INSPECTION
3 IP Review of License Renewal Activities 2516/001 11/16/2015 11/20/2015 71124.08
- RADWASTE
2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 11/16/2015 11/20/2015 71152B
- PI&R - BIENNIAL
2, 3 IP Problem Identification and Resolution 71152B 11/30/2015 12/04/2015 2, 3 IP Problem Identification and Resolution 71152B 12/14/2015 12/18/2015 71124
- HP
2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/07/2016 03/11/2016
IP Occupational ALARA Planning and Controls 71124.02 03/07/2016 03/11/2016 ISI
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 03/14/2016 03/25/2016 EP
- EP EXERCISE EVALUATION
2, 3 IP Exercise Evaluation 7111401 06/27/2016 07/01/2016 TRI FI
- TRIENNIAL FIRE PROTECTION
2, 3 IP Fire Protection [Triennial]
7111105T 05/23/2016 05/27/2016 2, 3 IP Fire Protection [Triennial]
7111105T 06/06/2016 06/10/2016 71124.07
- REMP
2, 3 IP Radiological Environmental Monitoring Program 71124.07 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.