{{#Wiki_filter:,.ACCELERATE DOCVMENT DIST TION SYSTEM REGULAT.INFORMATION DISTRIBUTIO STEM (RIDS)ACCESSION NBR:9302220426 DOC.DATE: 93/Ol/31 NOTARIZED:
{{#Wiki_filter:DOCVMENT DIST                     TION SYSTEM
NO DOCKET=FACIE:50-244.
      , .
Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
ACCELERATE REGULAT .       INFORMATION DISTRIBUTIO         STEM (RIDS)
Rochester Gas&Electric Corp.MECREDY,R.C.'
ACCESSION NBR:9302220426               DOC.DATE: 93/Ol/31 NOTARIZED: NO                 DOCKET
Rochester Gas&Electric Corp.RECIP.NAME
=
"."': RECIPIENT AFFILIATION
FACIE:50-244. Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                   G 05000244 AUTH. NAME           AUTHOR AFFILIATION DODGE,R.E.           Rochester Gas & Electric Corp.
MECREDY,R.C.'         Rochester Gas & Electric Corp.
RECIP.NAME "."':     RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Jan 1993 for RE Ginna Nuclear Power Plant.W/930215 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
Monthly operating rept           for Jan 1993   for RE Ginna Nuclear Power Plant.W/930215           ltr.                                                 D DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR         ENCL       SIZE:
D 05000244 i RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA LPEB10 REG FI E 01 EXTERNAL: EG&G BRYCEgJ.H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 A D D D D NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER'F COPIES REQUIRED: LTTR 14 ENCL 14 r I P IIIIIIIIIIII (SZZZ uij ijSV IIIIIIIIZ ZZZ88'IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y.14649-0001 ROBERT t MECREDY Vice Prertdent Olnne Nucteer Production TELEPHONE hREA CODE 71B 546 2700 GINNA STATION February 15, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).               05000244 i RECIPIENT             COPIES            RECIPIENT          COPIES            A ID CODE/NAME            LTTR ENCL        ID CODE/NAME       LTTR ENCL PD1-3 LA                     3      3    PD1-3 PD                1    1            D JOHNSON,A                   1      1 INTERNAL: AEOD/DOA                                                                               D 1     1     AEOD/DSP/TPAB           1    1 LPEB10          1      1    NRR/DOEA/OEAB           1     1 REG  FI  E      01          1     1     RGNl                    1     1 EXTERNAL: EG&G BRYCEgJ.H                  1      1    NRC PDR                1     1 NSIC                        1     1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER'F COPIES REQUIRED: LTTR                 14   ENCL   14
 
r I
P
 
IIIIIIIIIIII SZZZ
(
uijijSV IIIIIIIIZ ZZZ88'IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION             o 89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT t       MECREDY                                                               TELEPHONE Vice Prertdent                                                                 hREA CODE 71B 546 2700 Olnne Nucteer Production GINNA STATION February 15, 1993 US       Nuclear Regulatory Commission Document               Control Desk Washington,               DC 20555


==Subject:==
==Subject:==
Monthly Report for Janaury, 1993 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for Janaury, 1993 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear            Sir:==
 
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1993.
Very  truly  yours, Robert C. ecred RCM/
Attachments cc              Mr. Thomas T. Martin  NRC  (1) 24000'p-o~-~
 
OPERATZNG DATA REPORT DOCKET NO.      50-244 DATE    Februa    15    1993 CCMPLETED BY    uV                              D-L PJc Robert E. Dodge TELEPHONE      315  524-4446  ext. 396 lPERATING STATUS
: 1.      Unit Nano:  R.E. GINNA MELAR PAAR PULNT                                        Notes: The reactor power level averaged
: 2.      Reporting Period:        Jager      1993                                                98K for the majority of the
: 3.      Licensed Thermal Power (Wt):                      1520                                  report, with the following
: 4.      Nameplate Rating (Gross We):                        490                                  exception outlined on page 4.
: 5.      Design Electrical Rating (Net We):                  470
: 6.      Maxiaua Dependable Capacity (Gross MNe):            490 70      Maxiaua Dependable Capacity (Net MMe):              470
: 8.      If Changes Occur in Capacity Ratings (Items Nwher 3 Through 7) Since Last Report, Give Reasons:
: 9.      Power Level  to which Restricted, If Any (Het      MMe):
: 10. Reasons For  Restrictions, If Any:
This Month          Yr.-to-Date            Cumlative
: 11. Hours  In Report Period                                      744                    744                203 634.45
: 12. Number  of Hours Reactor  Nas Critical                        744                    744                  161  708.67
: 13. Reactor Reserve Shutdown Hours                                                                              1  687.55            *
: 14. Hours Generator On-Line                                      744                    744                  158 987.13
: 15. Unit Reserve Shutdown Hours                                                                                              8.5      *
: 16. Gross Thermal Energy Generated (WH)                    1 100 087              1  100 087            225 143 840
: 17. Gross Electrical Energy Generated (M%I)                  374 379                374 379              74 372 183
: 18. Net Electrical Energy Generated (MNI)                    355 941                355 941              70 591 872
: 19. Unit  Service Factor                                          100K                    100K                      78.23K 20      Unit  Availability Factor                                    10(rl,                  100K                      78.23K,
    '1.
Unit  Capacity Factor (Using IIC Net)                        101 ~ 79K                101.79K
: 22. Unit  Capacity Factor (Using DER Net)                        101.79K                101.79K                    75.09'4.
: 23. Unit  Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration        of Each):
Refuelin and Maintenance - March 12 1993 45 da s 25 26.
    'f    Shut Down At End Of Report Period, Estimated Date of Startup:
Units In Test Status (Prior to Camercial Operation):                              Forecast              Achieved INITIAL CRITICALITY I HI 7 IAL ELECTRIC I TY CCMMERCIAL OPERATION
  *CUWLATIVE TOTAL COMMENCIHG JANUARY 1, 1975
**CUMULATIVETOTAL COMMENCING NOVEMBER      8, 1969
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.      50-244 UNIT R.E. Ginna Nuclear Power    Plant DATE Februar  '5    1993 COMPLETED BY Robert E. Dodge TELEPHONE  1  315  524-4446    ext. 396 MONTH      Zanuar  1993 DAY AVERAGE DAILY POWER LEVEL          DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                            (MWe-Net) 1~          484                      17 ~          485 2 ~          484                      18.          484 3 ~          484                      19.          455 484                      20.            352
: 5.          484                      21 ~          485 6.
7~
484 484 22.
23 '84        484 8.
9.
10  '84 484 484 24.
25 26.
                                          '84        484 484 484                      27.            485
: 12.          484                      28.          484
: 13.          484                      29.          484
: 14.          484                      30.          484
: 15.          484                      31.          485
: 16.          484 INSTRUCTIONS On  this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
l)O(:Kl:T NO.        SO-244 liNlTNAhll:.R.E. lslNNA NUCl.EAR po~ER pLANT UNIT SHUTDOWN AND POWER REDUCTIONS                      1)ATI:. Februarv 15        1993
(:OhlpLE1'l(D By Robert E. Dodge 1'I'Ll'.PllONI:.
Pl 0 ~0 0 co0    Licensee C
OIA                  Cause g Corrective Vl 4
C 0
E~
o Da'te    0                                Event            0      0 0o                      Action to Ho.                    n. 0 0
                                ~        0                              o 0      a 0 0              Report            0                            Prevent Recurrence I      O~        CC 0IA  C          II      VS O
0 93-01        1/19/93  F      20. 06      B                              HH    HTEXCH  Condenser Tube Leak 1A2 Hater Box F: Forced            Reason:                                      Method:                              Fxhibit G - Instructions S: Scheduled        A-Ecluipment Failure (Explain)              I -hlanual                          for Preparation of Data B-Maintenance or Test                        2-Manual Scram.                      Entry Sheets for Licensee C-Refueling                                  3-Automatic Scram.                  Event Report (LER) File (NUREG-D-Regulatory Restriction                    4-Other (Explain)                    0161)
E&perator Training gc License Examination F-Administrative G-Operational Error (Explain)
Rtv. 4/ss 494s        H-Ocher (Explain)                                                                  Exhibit I - Same Source


==Dear Sir:==
NARRATIVE  
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1993.Very truly yours, Robert C.ecred RCM/Attachments cc Mr.Thomas T.Martin NRC (1)24000'p-o~-~
OPERATZNG DATA REPORT DOCKET NO.50-244 DATE Februa 15 1993 CCMPLETED BY uV D-L PJc Robert E.Dodge lPERATING STATUS TELEPHONE 315 524-4446 ext.396 1.2.3.4.5.6.70 8.Unit Nano: R.E.GINNA MELAR PAAR PULNT Reporting Period: Jager 1993 Licensed Thermal Power (Wt): Nameplate Rating (Gross We): Design Electrical Rating (Net We): Maxiaua Dependable Capacity (Gross MNe): Maxiaua Dependable Capacity (Net MMe): If Changes Occur in Capacity Ratings (Items Notes: The reactor power level averaged 98K for the majority of the report, with the following exception outlined on page 4.1520 490 470 490 470 Nwher 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to which Restricted, If Any (Het MMe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cumlative 11.12.13.14.15.16.17.18.19.20'1.22.23.Hours In Report Period Number of Hours Reactor Nas Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (WH)Gross Electrical Energy Generated (M%I)Net Electrical Energy Generated (MNI)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using IIC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 744 744 744 1 100 087 374 379 355 941 100K 10(rl, 101~79K 101.79K 744 744 744 1 100 087 374 379 355 941 100K 100K 101.79K 101.79K 203 634.45 161 708.67 1 687.55*158 987.13 8.5*225 143 840 74 372 183 70 591 872 78.23K 78.23K, 75.09'4.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin and Maintenance
-March 12 1993 45 da s 25'f Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Camercial Operation):
Forecast Achieved INITIAL CRITICALITY I HI 7 IAL ELECTRIC I TY CCMMERCIAL OPERATION*CUWLATIVE TOTAL COMMENCIHG JANUARY 1, 1975**CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY 50-244 R.E.Ginna Nuclear Power Plant Februar'5 1993 Robert E.Dodge TELEPHONE 1 315 524-4446 ext.396 MONTH Zanuar 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1~484 17~485 2~484 18.484 3~484 19.455 484 20.352 5.484 21~485 6.484 22.484 7~484 23'84 8.484 24.484 9.484 25'84 10'84 26.484 484 27.485 12.484 28.484 13.484 29.484 14.484 30.484 15.484 31.485 16.484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.
UNIT SHUTDOWN AND POWER REDUCTIONS l)O(:Kl: T NO.SO-244 liNlTNAhll:.
R.E.lslNNA NUCl.EAR po~ER pLANT 1)ATI:.Februarv 15 1993 (:OhlpLE1'l(D By Robert E.Dodge 1'I'Ll'.PllONI:.
Ho.Da'te 0 n.I Vl 4 0~0 O~C 0 0 0 CC Pl 0~0 0 co 0 0IA C 0 Licensee Event Report II E~o 0 o 0 0 VS C OIA 0 o a 0 0 O Cause g Corrective Action to Prevent Recurrence 93-01 1/19/93 F 20.06 B HH HTEXCH Condenser Tube Leak 1A2 Hater Box F: Forced S: Scheduled Rtv.4/ss 494s Reason: A-Ecluipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training gc License Examination F-Administrative G-Operational Error (Explain)H-Ocher (Explain)Method: I-hlanual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Fxhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit I-Same Source NARRATIVE  


==SUMMARY==
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO~50-244 UNIT R.E.Ginna Nuclear Power Plant DATE Februar 15 993 COMPLETED BY 8 Robert E.Dodge TELEPHONE 1 315 524-4446 ext.396 MONTH Januar 1993 The reactor power level averaged 984 for the majority of the report, with the following exception:
OP OPERATING EXPERIENCE DOCKET NO ~     50-244 UNIT R.E. Ginna Nuclear Power   Plant DATE Februar     15   993 COMPLETED BY     8 Robert E. Dodge TELEPHONE 1   315   524-4446 ext. 396 MONTH     Januar 1993 The reactor power level averaged 984 for the majority of the report, with the following exception:
On January 19th reactor power was reduced to 484 for repair of condenser tube leak in 1A2 water box.Full power was restored on January 20th and remained there at the end of the report period.}}
On January 19th reactor power was reduced to 484 for repair of condenser tube leak in 1A2 water box. Full power was restored on January 20th and remained there at the end of the report period.}}

Revision as of 18:29, 29 October 2019

Monthly Operating Rept for Jan 1993 for Re Ginna Nuclear Power Plant.W/930215 Ltr
ML17262B170
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/31/1993
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9302220426
Download: ML17262B170 (7)


Text

DOCVMENT DIST TION SYSTEM

, .

ACCELERATE REGULAT . INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:9302220426 DOC.DATE: 93/Ol/31 NOTARIZED: NO DOCKET

=

FACIE:50-244. Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C.' Rochester Gas & Electric Corp.

RECIP.NAME "."': RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1993 for RE Ginna Nuclear Power Plant.W/930215 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 i RECIPIENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 3 3 PD1-3 PD 1 1 D JOHNSON,A 1 1 INTERNAL: AEOD/DOA D 1 1 AEOD/DSP/TPAB 1 1 LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FI E 01 1 1 RGNl 1 1 EXTERNAL: EG&G BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER'F COPIES REQUIRED: LTTR 14 ENCL 14

r I

P

IIIIIIIIIIII SZZZ

(

uijijSV IIIIIIIIZ ZZZ88'IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT t MECREDY TELEPHONE Vice Prertdent hREA CODE 71B 546 2700 Olnne Nucteer Production GINNA STATION February 15, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for Janaury, 1993 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1993.

Very truly yours, Robert C. ecred RCM/

Attachments cc Mr. Thomas T. Martin NRC (1) 24000'p-o~-~

OPERATZNG DATA REPORT DOCKET NO. 50-244 DATE Februa 15 1993 CCMPLETED BY uV D-L PJc Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 lPERATING STATUS

1. Unit Nano: R.E. GINNA MELAR PAAR PULNT Notes: The reactor power level averaged
2. Reporting Period: Jager 1993 98K for the majority of the
3. Licensed Thermal Power (Wt): 1520 report, with the following
4. Nameplate Rating (Gross We): 490 exception outlined on page 4.
5. Design Electrical Rating (Net We): 470
6. Maxiaua Dependable Capacity (Gross MNe): 490 70 Maxiaua Dependable Capacity (Net MMe): 470
8. If Changes Occur in Capacity Ratings (Items Nwher 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to which Restricted, If Any (Het MMe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumlative

11. Hours In Report Period 744 744 203 634.45
12. Number of Hours Reactor Nas Critical 744 744 161 708.67
13. Reactor Reserve Shutdown Hours 1 687.55 *
14. Hours Generator On-Line 744 744 158 987.13
15. Unit Reserve Shutdown Hours 8.5 *
16. Gross Thermal Energy Generated (WH) 1 100 087 1 100 087 225 143 840
17. Gross Electrical Energy Generated (M%I) 374 379 374 379 74 372 183
18. Net Electrical Energy Generated (MNI) 355 941 355 941 70 591 872
19. Unit Service Factor 100K 100K 78.23K 20 Unit Availability Factor 10(rl, 100K 78.23K,

'1.

Unit Capacity Factor (Using IIC Net) 101 ~ 79K 101.79K

22. Unit Capacity Factor (Using DER Net) 101.79K 101.79K 75.09'4.
23. Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance - March 12 1993 45 da s 25 26.

'f Shut Down At End Of Report Period, Estimated Date of Startup:

Units In Test Status (Prior to Camercial Operation): Forecast Achieved INITIAL CRITICALITY I HI 7 IAL ELECTRIC I TY CCMMERCIAL OPERATION

  • CUWLATIVE TOTAL COMMENCIHG JANUARY 1, 1975
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Februar '5 1993 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH Zanuar 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 484 17 ~ 485 2 ~ 484 18. 484 3 ~ 484 19. 455 484 20. 352

5. 484 21 ~ 485 6.

7~

484 484 22.

23 '84 484 8.

9.

10 '84 484 484 24.

25 26.

'84 484 484 484 27. 485

12. 484 28. 484
13. 484 29. 484
14. 484 30. 484
15. 484 31. 485
16. 484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l)O(:Kl:T NO. SO-244 liNlTNAhll:.R.E. lslNNA NUCl.EAR po~ER pLANT UNIT SHUTDOWN AND POWER REDUCTIONS 1)ATI:. Februarv 15 1993

(:OhlpLE1'l(D By Robert E. Dodge 1'I'Ll'.PllONI:.

Pl 0 ~0 0 co0 Licensee C

OIA Cause g Corrective Vl 4

C 0

E~

o Da'te 0 Event 0 0 0o Action to Ho. n. 0 0

~ 0 o 0 a 0 0 Report 0 Prevent Recurrence I O~ CC 0IA C II VS O

0 93-01 1/19/93 F 20. 06 B HH HTEXCH Condenser Tube Leak 1A2 Hater Box F: Forced Reason: Method: Fxhibit G - Instructions S: Scheduled A-Ecluipment Failure (Explain) I -hlanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E&perator Training gc License Examination F-Administrative G-Operational Error (Explain)

Rtv. 4/ss 494s H-Ocher (Explain) Exhibit I - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO ~ 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Februar 15 993 COMPLETED BY 8 Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH Januar 1993 The reactor power level averaged 984 for the majority of the report, with the following exception:

On January 19th reactor power was reduced to 484 for repair of condenser tube leak in 1A2 water box. Full power was restored on January 20th and remained there at the end of the report period.