Monthly Operating Rept for Jan 1993 for Re Ginna Nuclear Power Plant.W/930215 Ltr
ML17262B170
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/31/1993
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9302220426
Download: ML17262B170 (7)


Text

DOCVMENT DIST TION SYSTEM ACCELERATE REGULAT . INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:9302220426 DOC.DATE: 93/Ol/31 NOTARIZED: NO DOCKET

=

FACIE:50-244. Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C.' Rochester Gas & Electric Corp.

RECIP.NAME "."': RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1993 for RE Ginna Nuclear Power Plant.W/930215 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 i RECIPIENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 3 3 PD1-3 PD 1 1 D JOHNSON,A 1 1 INTERNAL: AEOD/DOA D 1 1 AEOD/DSP/TPAB 1 1 LPEB10 1 1 NRR/DOEA/OEAB 1 1 REG FI E 01 1 1 RGNl 1 1 EXTERNAL: EG&G BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER'F COPIES REQUIRED: LTTR 14 ENCL 14

r I

P

IIIIIIIIIIII SZZZ

(

uijijSV IIIIIIIIZ ZZZ88'IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT t MECREDY TELEPHONE Vice Prertdent hREA CODE 71B 546 2700 Olnne Nucteer Production GINNA STATION February 15, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for Janaury, 1993 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1993.

Very truly yours, Robert C. ecred RCM/

Attachments cc Mr. Thomas T. Martin NRC (1) 24000'p-o~-~

OPERATZNG DATA REPORT DOCKET NO. 50-244 DATE Februa 15 1993 CCMPLETED BY uV D-L PJc Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 lPERATING STATUS

1. Unit Nano: R.E. GINNA MELAR PAAR PULNT Notes: The reactor power level averaged
2. Reporting Period: Jager 1993 98K for the majority of the
3. Licensed Thermal Power (Wt): 1520 report, with the following
4. Nameplate Rating (Gross We): 490 exception outlined on page 4.
5. Design Electrical Rating (Net We): 470
6. Maxiaua Dependable Capacity (Gross MNe): 490 70 Maxiaua Dependable Capacity (Net MMe): 470
8. If Changes Occur in Capacity Ratings (Items Nwher 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to which Restricted, If Any (Het MMe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumlative

11. Hours In Report Period 744 744 203 634.45
12. Number of Hours Reactor Nas Critical 744 744 161 708.67
13. Reactor Reserve Shutdown Hours 1 687.55 *
14. Hours Generator On-Line 744 744 158 987.13
15. Unit Reserve Shutdown Hours 8.5 *
16. Gross Thermal Energy Generated (WH) 1 100 087 1 100 087 225 143 840
17. Gross Electrical Energy Generated (M%I) 374 379 374 379 74 372 183
18. Net Electrical Energy Generated (MNI) 355 941 355 941 70 591 872
19. Unit Service Factor 100K 100K 78.23K 20 Unit Availability Factor 10(rl, 100K 78.23K,

'1.

Unit Capacity Factor (Using IIC Net) 101 ~ 79K 101.79K

22. Unit Capacity Factor (Using DER Net) 101.79K 101.79K 75.09'4.
23. Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance - March 12 1993 45 da s 25 26.

'f Shut Down At End Of Report Period, Estimated Date of Startup:

Units In Test Status (Prior to Camercial Operation): Forecast Achieved INITIAL CRITICALITY I HI 7 IAL ELECTRIC I TY CCMMERCIAL OPERATION

  • CUWLATIVE TOTAL COMMENCIHG JANUARY 1, 1975
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Februar '5 1993 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH Zanuar 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 484 17 ~ 485 2 ~ 484 18. 484 3 ~ 484 19. 455 484 20. 352

5. 484 21 ~ 485 6.

7~

484 484 22.

23 '84 484 8.

9.

10 '84 484 484 24.

25 26.

'84 484 484 484 27. 485

12. 484 28. 484
13. 484 29. 484
14. 484 30. 484
15. 484 31. 485
16. 484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l)O(:Kl:T NO. SO-244 liNlTNAhll:.R.E. lslNNA NUCl.EAR po~ER pLANT UNIT SHUTDOWN AND POWER REDUCTIONS 1)ATI:. Februarv 15 1993

(:OhlpLE1'l(D By Robert E. Dodge 1'I'Ll'.PllONI:.

Pl 0 ~0 0 co0 Licensee C

OIA Cause g Corrective Vl 4

C 0

E~

o Da'te 0 Event 0 0 0o Action to Ho. n. 0 0

~ 0 o 0 a 0 0 Report 0 Prevent Recurrence I O~ CC 0IA C II VS O

0 93-01 1/19/93 F 20. 06 B HH HTEXCH Condenser Tube Leak 1A2 Hater Box F: Forced Reason: Method: Fxhibit G - Instructions S: Scheduled A-Ecluipment Failure (Explain) I -hlanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E&perator Training gc License Examination F-Administrative G-Operational Error (Explain)

Rtv. 4/ss 494s H-Ocher (Explain) Exhibit I - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO ~ 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Februar 15 993 COMPLETED BY 8 Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH Januar 1993 The reactor power level averaged 984 for the majority of the report, with the following exception:

On January 19th reactor power was reduced to 484 for repair of condenser tube leak in 1A2 water box. Full power was restored on January 20th and remained there at the end of the report period.