Monthly Operating Rept for Jan 1993 for Re Ginna Nuclear Power Plant
ML17262B170
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/31/1993
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9302220426
Download: ML17262B170 (7)


Text

,

. ACCELERATE DOCVMENT DIST TION SYSTEM REGULAT.

INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:9302220426 DOC.DATE: 93/Ol/31 NOTARIZED: NO DOCKET

= FACIE:50-244. Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.'

Rochester Gas

& Electric Corp.

RECIP.NAME "."':

RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1993 for RE Ginna Nuclear Power Plant.W/930215 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

D 05000244 i RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA LPEB10 REG FI E

01 EXTERNAL: EG&G BRYCEgJ.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 A

D D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

D TOTAL NUMBER'F COPIES REQUIRED:

LTTR 14 ENCL 14

r I

P

IIIIIIIIIIII(

SZZZ uijijSV IIIIIIIIZ ZZZ88'IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT t MECREDY Vice Prertdent Olnne Nucteer Production TELEPHONE hREA CODE 71B 546 2700 GINNA STATION February 15, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for Janaury, 1993 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1993.

Very truly yours, Robert C.

ecred RCM/

Attachments cc Mr. Thomas T. Martin NRC (1) 24000'p-o~-~

OPERATZNG DATA REPORT DOCKET NO.

50-244 DATE Februa 15 1993 CCMPLETED BY uV D-L PJc Robert E. Dodge lPERATING STATUS TELEPHONE 315 524-4446 ext. 396 1.

2.

3.

4.

5.

6.

70 8.

Unit Nano:

R.E.

GINNA MELAR PAAR PULNT Reporting Period:

Jager 1993 Licensed Thermal Power (Wt):

Nameplate Rating (Gross We):

Design Electrical Rating (Net We):

Maxiaua Dependable Capacity (Gross MNe):

Maxiaua Dependable Capacity (Net MMe):

If Changes Occur in Capacity Ratings (Items Notes:

The reactor power level averaged 98K for the majority of the report, with the following exception outlined on page 4.

1520 490 470 490 470 Nwher 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to which Restricted, If Any (Het MMe):

10.

Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumlative 11.

12.

13.

14.

15.

16.

17.

18.

19.

20

'1.

22.

23.

Hours In Report Period Number of Hours Reactor Nas Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (WH)

Gross Electrical Energy Generated (M%I)

Net Electrical Energy Generated (MNI)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using IIC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 744 744 744 1

100 087 374 379 355 941 100K 10(rl, 101 ~ 79K 101.79K 744 744 744 1 100 087 374 379 355 941 100K 100K 101.79K 101.79K 203 634.45 161 708.67 1 687.55 158 987.13 8.5 225 143 840 74 372 183 70 591 872 78.23K 78.23K, 75.09'4.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance - March 12 1993 45 da s 25'fShut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Camercial Operation):

Forecast Achieved INITIALCRITICALITY IHI7 IAL ELECTRIC I TY CCMMERCIAL OPERATION

  • CUWLATIVETOTAL COMMENCIHG JANUARY 1, 1975
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY 50-244 R.E.

Ginna Nuclear Power Plant Februar '5 1993 Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH Zanuar 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~

484 17 ~

485 2 ~

484 18.

484 3 ~

484 19.

455 484 20.

352 5.

484 21 ~

485 6.

484 22.

484 7 ~

484 23'84 8.

484 24.

484 9.

484 25'84 10'84 26.

484 484 27.

485 12.

484 28.

484 13.

484 29.

484 14.

484 30.

484 15.

484 31.

485 16.

484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

UNIT SHUTDOWN AND POWER REDUCTIONS l)O(:Kl:T NO.

SO-244 liNlTNAhll:.R.E. lslNNA NUCl.EAR po~ER pLANT 1)ATI:. Februarv 15 1993

(:OhlpLE1'l(D By Robert E. Dodge 1'I'Ll'.PllONI:.

Ho.

Da'te 0n.

I Vl4 0

~

0 O~

C0 00 CC Pl 0 ~0 0 co0 0IA C 0

Licensee Event Report II E~

o 0

o 00 VS COIA 0

o a 00 O

Cause g Corrective Action to Prevent Recurrence 93-01 1/19/93 F

20. 06 B

HH HTEXCH Condenser Tube Leak 1A2 Hater Box F: Forced S:

Scheduled Rtv. 4/ss 494s Reason:

A-Ecluipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training gc License Examination F-Administrative G-Operational Error (Explain)

H-Ocher (Explain)

Method:

I-hlanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO ~

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Februar 15 993 COMPLETED BY 8

Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH Januar 1993 The reactor power level averaged 984 for the majority of the report, with the following exception:

On January 19th reactor power was reduced to 484 for repair of condenser tube leak in 1A2 water box.

Full power was restored on January 20th and remained there at the end of the report period.