{{#Wiki_filter:0 TURKEY POINT PLANT UNIT 3 1997 REFUELING OUTAGE INSERVICE INSPECTION REPORT The required examinations scheduled during the Turkey Point Unit 3 refueling outage were completed.
{{#Wiki_filter:0                                 TURKEY POINT PLANT UNIT 3 1997 REFUELING OUTAGE INSERVICE INSPECTION REPORT The   required examinations scheduled during the Turkey Point Unit 3 refueling outage were completed. This completes the ISI requirements for the first refueling outage of the second period
This completes the ISI requirements for the first refueling outage of the second period.of the third inspection interval.100%of the A, B, and C steam generator tubes were eddy current tested.14 tubes were plugged during this outage.The.NIS-2 forms discuss the repairs and replacements which took place since the previous Unit 3 submittal and during the 1997 refueling/
    .of the   third inspection interval.
maintenance outage.Visual examination and functional testing of snubbers was completed in accordance with ASIDE Section XI and Technical Specifications.
100% of the A, B, and C steam generator tubes were eddy current tested. 14 tubes were plugged during this outage.
Visual examinations did not reveal any failures.There were no snubber failures in the, safety related functional test sample.The inservice inspection summary tables detail the examinations
The. NIS-2 forms discuss the repairs and replacements which took place since the previous Unit 3 submittal and during the 1997 refueling/ maintenance outage.
~~~~~~~~~performed during the first outage of the second period of the third ten-year interval.Selected Class 1 and 2 piping and supports were examined with surface, volumetric, and visual examination techniques in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and the Turkey Point Units 3 and 4 ISI Program.0 9707fh0096 9707i0 PDR ADQCK 05000250 8 PDR 0
Visual examination and functional testing of snubbers was completed in accordance with ASIDE Section XI and Technical Specifications. Visual examinations did not reveal any failures.
TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-1 Owners'ata Report-for Inservice Inspections 0
There were no snubber failures in the, safety related functional test sample.
FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 6 1.Owner: 2.Plant: Florida Power and Light Company, 700 Universe Blvd.juno Beach, Florida 33408 Florida Power&Light Company, Turkey Point Nuclear Power Plant, 9760 S.W.344th Street, Florida City, Florida 33035 3~Plant Unit:~Owner Certificate of Authorization (if recpxired)
The inservice inspection summary tables detail the examinations
Commercial Service Date 6 National Board Number for Unit: 7~Components Inspected:
          ~     ~   ~     ~
Component or Appurtenance Manufacturer or Installer Manufacturer State o Nat'l or Installer Province Board Serial No.No.No.Reactor Pressure Vessel Reactor Coolant Pump B Regenerative Heat Exchanger RHR Heat Exchan er A Safety In'ection System Residual Heat Removal Main Feedwater System Main Steam System Babcock and Wilcox Westinghouse Westinghouse Atlas Bechtel-Bechtel Bechtel Bechtel 3PSRV1 3P200B 3E200 3E206A N/A N/A N/A N/A N/A N-160 N/A N/A N/A N/A N/A N/A N/A N A N/A N A N/A N/A N/A N/A.8~Examination Dates: From to 9~Inspection Period Identification
performed during the first outage of the second period of the
: Second Period-10'nspection Interval Identification:
                    ~          ~
Third Interval, from 11.Applicable Edition of Section XI~39 Addenda~ug 12.Date/Revision of Inspection Plan:
third ten-year interval.
        ~              ~
                                ~
Selected Class 1 and 2 piping and supports were examined with surface, volumetric, and visual examination techniques in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and the Turkey Point Units 3 and 4 ISI Program.
0 9707fh0096 9707i0 PDR     ADQCK 05000250 8                 PDR


NIS-1 Report (continued)
0 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-1 Owners'ata Report-for Inservice Inspections
Page 2 of 6 1.2e 3~4.5.6.Owner: Florida Po~er 8 Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.W.344th Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required)ComInercial Service Date: National Board Number for Unit: 13.Abstract of examinations and test.Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.An Inservice Examination of selected Class 1 and 2 components and piping systems of Florida Power and Light's Turkey Point Unit 3 was performed during the 1997 Refueling Outage.This.outage began on March 3, 1997 and ended on April 16, 1997.This was the first outage of the second period of the third ten year interval.The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the ASME Section XI, 1989 Edition.Manual ultrasonic, visual, magnetic particle, and liquid penetrant non-destructive techniques were used to examine components, piping, and their supports.The examinations were performed'y FPL personnel, supported by examiners supplied by Raytheon Engineers&Constructors.
 
0 FORM  NIS-1 OWNERS'ATA      REPORT FOR INSERVICE INSPECTIONS Page of 6
: 1. Owner:    Florida  Power and  Light  Company, 700    Universe Blvd. juno Beach, Florida        33408
: 2. Plant:    Florida Power & Light Company, Turkey Point Nuclear Power Plant, 9760 S.W. 344th Street, Florida City, Florida      33035 3 ~   Plant  Unit:~
Owner  Certificate of Authorization      (if recpxired)
Commercial Service Date 6      National Board Number for Unit:
7 ~    Components Inspected:
Manufacturer State o Nat'l Component  or              Manufacturer or Installer Province Board Appurtenance                or Installer    Serial  No.      No. No.
Reactor Pressure Vessel Babcock and            3PSRV1        N/A    N-160 Wilcox Reactor Coolant Pump    B    Westinghouse      3P200B        N/A    N/A Regenerative Heat            Westinghouse        3E200        N/A    N/A Exchanger RHR Heat Exchan er A        Atlas              3E206A        N/A    N/A Safety In'ection System      Bechtel              N/A          N/A    N A Residual Heat Removal        -Bechtel            N/A          N/A    N A Main Feedwater System        Bechtel              N/A          N/A    N/A Main Steam System            Bechtel              N/A          N/A    N/A
.8 ~    Examination Dates    :  From              to 9 ~    Inspection Period Identification      : Second  Period 10  'nspection Interval Identification:          Third Interval, from
: 11. Applicable Edition of Section XI ~39            Addenda  ~ug
: 12. Date/Revision of Inspection Plan:
 
NIS-1 Report (continued)                              Page  2  of 6
: 1. Owner:   Florida Po~er 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 2e    Plant: Turkey Point Nuclear Power Plant, 9760 S.W. 344th Street, Florida City, Florida 33035 3~    Plant Unit:~
: 4. Owner Certificate of Authorization (if required)
: 5. ComInercial Service Date :
: 6. National Board Number for Unit:
: 13. Abstract of examinations and test. Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.
An Inservice Examination of selected Class 1 and 2 components and piping systems of Florida Power and Light's Turkey Point Unit 3 was performed during the 1997 Refueling Outage.                                 This. outage March                   and   ended     on   April     16,   1997. This was the first outage of3,the second period of the third ten year interval.
began  on                  1997 The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the ASME Section XI, 1989 Edition.
Manual   ultrasonic, visual, magnetic particle,                           and   liquid penetrant non-destructive techniques were used to examine components, piping, and their supports.                           The examinations were performed'y FPL personnel, supported by examiners supplied by Raytheon Engineers & Constructors.
Eddy Current testing was conducted on the three Steam Generators.
Eddy Current testing was conducted on the three Steam Generators.
A total of 9574 tubes were examined.Fourteen tubes required plugging.See the NIS-BB for details of the examinations.
A total of 9574 tubes were examined.                         Fourteen tubes required plugging. See the NIS-BB for details of the examinations.
Several Class 1, 2, 3, MC, and CC areas were repl'aced or repaired since the last Summary Report was submitted.
Several Class 1, 2, 3, MC, and CC areas were repl'aced or repaired since the last Summary Report was submitted. See the attached NIS-2 reports for a summary.
See the attached NIS-2 reports for a summary.The Steam Generator Feedwater Nozzle piping augmented examinations were conducted during this outage on all three loops.The entire area from the nozzle ramp to a point one pipe diameter out on the far side of the elbow was examined with ultrasonics.
The Steam Generator Feedwater Nozzle                       piping     augmented examinations were conducted during this outage on all three loops. The entire area from the nozzle ramp to a point one pipe diameter out on the far side of the elbow was examined with ultrasonics. No reportable indications were noted.
No reportable indications were noted.Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4.Examinations were performed by Raytheon, Inc.and testing services were supplied by Basic-PSA, Inc.System-Pressure testing was conducted by the plant to ASME Section XI and applicable Plant Procedures..
Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4.
One thimble tube was found to have a through wall leak.It was replaced and retested.Several mechanical connections were found to have leaks.These were all corrected.
Examinations were performed by Raytheon, Inc. and testing services were supplied by Basic-PSA, Inc.
Leakage was detected at 2 RHR valve bonnets.
System -Pressure testing was conducted by the plant to ASME Section XI and applicable Plant Procedures.. One thimble tube was found to have a through wall leak.                         It was replaced and retested.
0 0 0 NIS-l Report.(continued)
Several mechanical connections were found to have leaks. These were all corrected.             Leakage was detected at 2 RHR valve bonnets.
Page 3 of 6 e,,'4~5.6.Owner: Florida Power S Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Po~er Plant, 9760.S.M.344th, Street, Florida City, Florida 33035 Plant Unit:~O~ner Certificate of Authorization (if required)Comnercial'Service Date.: National Board Number for Unit: The bolt nearest the source of leakage was VT-l examined'nd found to be acceptable.
 
During, the outage, the bolting on-the two valves;was removed,and examined.No other.leakage was reported.All Quality Group A, B, and C pressure tests required for the.first period of the third inservice inspection interval were completed.
0 0
A listing of examinations performed is attached to this summary.The examinations performed during the outage meet the requirements of the Inspection Plan.14.Abstract of Results of Examinations and Tests.The seal surface on the Reactor Pressure Vessel head was examined using remote Visual techniques.
0
No reportable indications were noted.Eddy Current testing was conducted on all three Steam Generators.
 
See the'NIS-BB for details.A'VT-3 examination was, performed near the beginning of the outage to look for accumulated, boron crystals and evidence of leakage.A VT-2 examination was,performed during the system pressure test at plant startup.These.examinations were performed to meet the approved alternative requirements in Relief Request No.3.No reportable indications were detected.t The"B" R'eactor Coolant Pump Flywheel was examined in accordance with Technical Specifications.,No reportable indications were.  
NIS-l Report .(continued)                             Page   3 of 6 e,, '4 ~
'f NIS-1 Report (continued)
5.
Page 4 of 64~5.6.Owner: Florida Power&Light Company, 700 Universe Blvd.Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.W;344th Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required)Comnercial Service Date: National Board.Number for Unit: noted.Residual Heat Exchanger A was examined using surface and volumetric techniques.
Owner:   Florida Power S Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Po~er Plant, 9760.S.M. 344th, Street, Florida City, Florida Plant Unit:~
A round indication was found on the end of one of the integral attachments with Liquid Penetrant.
O~ner Certificate of Authorization (if required)
An engineering evaluation determined the indication to be a manufacturing process deficiency.
Comnercial'Service Date .:
The attachment has a partial penetration weld on the front side, and a cover weld on the back side.The indication was a result of the two welds not being joined at the end of the attachment, and was an acceptable condition.
33035
It was not a material or welding flaw, and is outside the scope of Section XI.No other indications were noted.The support on RHR Pump 3P210A was examined.with visual techniques.
: 6. National Board Number for Unit:
A bent bolt was found and accepted as-is by engineering evaluation.
The   bolt nearest the source of leakage was VT-l examined'nd found to be acceptable.                 During, the outage, the bolting on- the two valves;was removed,and examined. No other .leakage was reported.
An engineering evaluation determined the support was outside the scope of Section XI.It is part of the building structure, with the pump body allowed to slide on top of an embedded plate.Both RHR pump supports have been removed from the ISI Program.Residual Heat Removal piping welds and supports were examined using visual, surface and volumetric techniques.
All Quality Group A, B, and C pressure tests required for the.
Acceptable round and geometric indications were noted.No reportable indications were.noted.Safety Injection piping and.supports were examined using visual, surface and volumetric techniques.
first period of the third inservice inspection interval were completed.
No reportable indications were noted.During the outage, the Boron Injection Tank was bypassed and~~~~~~~abandoned in place.The piping welds to the tank were removed il ik NIS-1 Report (continued)
A   listing of       examinations performed                 is attached to this             summary.
Page-5 of 64~5.6.Owner: Florida.Power S Light ComPany, 700'Universe Blvd.Juno Beach, Florida 33408 Plant:.Turkey Point Nuclear Power Plant, 9760 S.M.344th Street, Florida City, Florida 33035 Plant Unit:~O~ner Certificate of Authorization (if required)Conmercial Service Date: National Board Number for Unit: from service and several new welds were added to bypass the tank.See the examination tables for information on which-welds-and components were affected.Main Steam piping, was examined using surface and volumetric techniques.
The examinations performed                 during the outage meet the requirements of the Inspection Plan.
Acceptable geometric indications were noted.No reportable indications were noted.Augmented volumetric examinations were performed on the feedwater piping out from the Steam Generator nozzle.Acceptable geometric and slag indications were found.No reportable indications were noted.15.Abstract of Corrective Measures There were no corrective actions required as.a result of ISI examinations.
: 14. Abstract of Results of Examinations and Tests.
Several acceptable rounded indications were removed for maintenance reasons as part of additional, surface preparation.
The seal     surface on the Reactor Pressure Vessel head was examined using remote Visual techniques. No reportable indications were noted.
0 il ib NIS-1 Report (continued)
Eddy Current testing was conducted on                         all     three   Steam Generators.
'Page 6 of 6: 4~5~6.Owner: Florida Power 8 Light Company, 700 Universe Blvd.'uno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.M.344th Street, Florida City, Florida 33035 Plant Unit:~Owner Certificate of Authorization (if required>Comnercial Service Date: National Board Number for Unit: We certify that a)the statements made in this report are correct, b)the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c)corrective measures taken conform to the rules of the ASME Code, Section XI.Certificate of Authorization No.Expiration Date Date: Signed: By: CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 3/3/97 to 4/16/97, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data.Report in accordance with'he Inspection Plan and as required by the ASME Code, Section XI.By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
See the 'NIS-BB for details.
spect's S'ature National Board, State, Province, and.Endorsements Date: 8 r~
A 'VT-3   examination was, performed near the beginning of the outage to look for accumulated, boron crystals and evidence of leakage.
0 Eg lt~ii, 4 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements 0
A VT-2 examination was,performed during the system pressure test at plant startup. These .examinations were performed to meet the approved alternative requirements in Relief Request No. 3. No reportable indications were detected.
FORH NIS 2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power&Li ht Date 12 06 95 700 Universe Blvd.Juno Beach Fl'.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Uni t 3 PWO¹:4229/63 WO¹: 95032858 9700 S'W 344 Street Florida Cit Fl.33034 Address Repair Organization P.O.'No.,Job No.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp N A Authorization Ho.N A Expiration Date N A 4.Identification of System: 5.(a)Applicable Construction Code 831.1'955 Edition, NA Addenda,~N A Code Case INTAKE COOLING MATER System¹: 19 Qual I ty Group: C (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Cocponent Name of Hanufacturer (Manufacturer)
t   The "B" R'eactor Coolant Pump Flywheel was examined with Technical Specifications.                     ,No   reportable indications in  accordance were.
National f Serial Ho.J Board I I I I Other Identification
 
[Year J.Repaired J ASHE t[Built(Replaced or)Code J f Reptacement JSterp (I I/~Yes llo[INTAKE COOLING IMATER PUHP.IJONHSTOH PUHP[N/A)H/A iHOOEL 33 CHC I ST-5/UNK~(Replaced iNo 3P9A J INTAKE COOLING CWATER PUHP IBOLTS (40)/1-1 4"-7-UN-2A IJOHNSTOH PUHP iH/A IH/A fH/A[MODEL 33 CHC IST-2 JUNK.]Replacement
'f NIS-1 Report (continued)                               Page 4   of 6 Owner:   Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.W; 344th Street, Florida City, Florida 33035 Plant Unit:~
]Ho 3P9A IN/A]H/A (R90-0831 ASHE SA-307 GR 8 fUNK./Replacement)Ho 3P9A 7.'Description of Mork: 3A INTAKE COOLING WATER PUHP IST-5 REPLACED WITH SPARE IST-2.Pneunatict Hominal Operating Pressure X Pressure 15 psig Test Temperature 76;F 95-064-3 Sheet 2 of 2 FORM NIS-2 (Back)4l 9.Remarks: HEcMAMIcAL coNNEGTIoM No'WELDING REoUIRED.CERTIFI~CATE OF COMPLIANCE Me certify that the.statements made in the report are correct and this replacenmnt confonas to the r'ules of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate Signed/thori tion NoM~A.'+M~jPcl~~N~ix.'QP-'wner'or Owner''Oesignee, Title~Expiration Date Oate~/I~~NA 19'0 CERTIFICATE OF INSLRVICE I',NSPECTIOM I, the undersigned, holding a valid caanission issued by'hLI Na'tional Boar'd of Boiler and Pressure Vessel inspectors and the state or Province of, Onde County and.employed by Arkwright.Hutual Insurance Company of Norwood, Ha.have inspected the components described'n this owners Report during the period 11/21/95'o 12/06/95 arid state that to the best of my knowledge and balief, t'e Owner has performed examihations'nd taken corrective measures described in this Owners Report i'n adcordande with the requirements of the ASHE'ode, Section Xt.By signing this certi'ficate neither the Inspector nor his enpioyer makes any warranty, expressed or implied, concerning the examinations and corrective measurea doser'ibed in'hi's.Owner's Repo'rt.'Fur'thekmore, neither the Inspector nor his eeployen shall be liable in ariy amnnier for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
4~    Owner Certificate of Authorization (if required)
Inspector SignQa,ure Comnissions
: 5. Comnercial Service Date :
'MB'23~0II~I~
: 6. National Board. Number for Unit:
~Nationhi Board, State, Providence, and Endorsements
noted.
'I9 95-064-3 FORM HIS~2 OWNERS REPORT FOR REPAIRS OR REPLACEHEN'IS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power 8 Li ht Date 12 05 95 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit 3 PWO¹:63/4109 WO¹:.95032545 9700 SW 344 Street'Florida Cit.Fl.33034 Address Repair Organization P.O.No.,Job Mo.,etc 3.Work Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032'Iype Code Symbol Stamp Authorization Ho.Expiration Date N A M A Address 4.Identification of System: 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~M A Code Case COMPONENT COOLING WATER System¹: 30 Quality Group: C (b)Applicable Edition of Section XI'Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component)BOLTS (4)Name of Manufacturer.
Residual Heat Exchanger A was examined using surface and volumetric techniques. A round indication was found on the end of one of the integral attachments with Liquid Penetrant. An engineering evaluation determined the indication to be a manufacturing process deficiency. The attachment has a partial penetration weld on the front side, and a cover weld on the back side. The indication was a result of the two welds not being joined at the end of the attachment, and was an acceptable condition.         It   was not a material or welding flaw, and is outside the scope of Section XI. No other indications were noted.
IH/A/Manufacturer/
The   support on RHR Pump 3P210A was examined .with visual techniques. A bent bolt was found and accepted as-is by engineering evaluation. An engineering evaluation determined the support was outside the scope of Section XI. It is part of the building structure, with the pump body allowed to slide on top of an embedded plate.               Both RHR pump supports have been removed from the ISI Program.
National)J Serial'No.
Residual Heat Removal piping welds and supports were examined using visual, surface and volumetric techniques. Acceptable round and geometric indications were noted. No reportable indications were. noted.
'Board Other.Identification IH/A iH/A)UTC349851 R94-4185 3E207C HX SA 193 GR 87]Year[Repaired]ASME f'JBui It]Replaced or J Code/f Replacement)Stamp f I I./Y~es No CHUNK.[Replacement)No 7.Description of Work: FOUR 4 HX'ANWAY BOLTS REPLACED ON UMIT-3'COMPONENT
Safety Injection piping and .supports were examined using visual, surface and volumetric techniques. No reportable indications were noted.
'COOLING WATER HX 3C 3E207C.t 8.Tests Conducted:
During the outage, the Boron Injection Tank was bypassed and
Hydrostatic:
    ~                                             ~       ~
abandoned in place.               The piping welds to the tank were removed
                ~                          ~  ~
                              ~
 
il ik
 
NIS-1 Report (continued)                               Page- 5 of 6 Owner:   Florida. Power S Light ComPany, 700'Universe Blvd. Juno Beach, Florida 33408 Plant:. Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035 Plant Unit:~
4~    O~ner Certificate of Authorization (if required)
: 5. Conmercial Service Date:
: 6. National Board Number for Unit:
from service and several new welds were added to bypass the tank.
See the examination tables for information on which-welds- and components were           affected.
Main Steam piping, was examined using surface and volumetric techniques. Acceptable geometric indications were noted. No reportable indications were noted.
Augmented     volumetric examinations were performed on the feedwater piping   out     from the Steam Generator nozzle. Acceptable geometric and slag indications were found. No reportable indications were noted.
: 15. Abstract of Corrective Measures There were no corrective actions required as. a result of ISI examinations. Several acceptable rounded indications were removed for maintenance reasons as part of additional, surface preparation.
 
0 il ib
:                                NIS-1 Report (continued)                                         of
                                                                                        'Page 6       6 Owner:   Florida Power 8 Light Company, 700 Universe Blvd.'uno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035 Plant Unit:~
4~    Owner Certificate of Authorization (if required>
5~    Comnercial Service Date :
: 6. National Board Number for Unit:
We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section XI.
Certificate of Authorization No.
Expiration Date Date:                                       Signed:
By:
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 3/3/97 to 4/16/97, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data .Report in accordance with'he Inspection Plan and as required by the ASME Code, Section XI.
By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
spect     's S'ature                               National Board, State, Province, and .Endorsements Date:                   8 r~
 
0 Eg lt   ~
ii, 4
 
TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements
 
0 FORH NIS 2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI
: 1. Owner         Florida   Power & Li ht                                     Date                       12 06 95 700 Universe   Blvd. Juno Beach Fl'. 33408                             Sheet         1                 of     2 Address
: 2. Plant           Turke   Point Plant                                           Uni t                               3 Name                                          PWO   ¹:4229/63       WO ¹:   95032858 9700 S'W 344 Street   Florida Cit     Fl. 33034 Address                                               Repair Organization P.O. 'No.,Job No.,etc
: 3. Work Performed by         Florida Power & Li   ht                               Type Code Symbol Stamp                      N A Name                                             Authorization Ho.                            N A Expiration Date                              N A P.O. Box 4332     Princeton   Fl. 33032 Address
: 4. Identification of System:                   INTAKE COOLING MATER            System  ¹:        19        Qual I ty Group:        C
: 5. (a) Applicable Construction Code                           831.1'955                             Edition,   NA   Addenda,~N A       Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements               1989   Edition,~NA     Addenda,~NA       Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name of                     Name of       (Manufacturer) National                   Other             [Year   J. Repaired J ASHE t Cocponent                  Hanufacturer    f Serial Ho. J Board            Identification          [Built(     Replaced or ) Code       J I            I                                                        f Reptacement     JSterp (
I            I                                              I       I                 /~Yes llo
[ INTAKE COOLING                 .IJONHSTOH           [N/A         )H/A         iHOOEL 33 CHC I ST-5               /UNK~   (Replaced         iNo IMATER PUHP                        PUHP                                            3P9A J
INTAKE COOLING                 IJOHNSTOH           IH/A         fH/A         [MODEL   33 CHC IST-2           JUNK.   ]Replacement       ]Ho CWATER PUHP                        PUHP                                            3P9A IBOLTS  (40)                    iH/A                 IN/A          ]H/A         (R90-0831 ASHE SA-307       GR 8 fUNK. /Replacement           )Ho
/
1-1 4"-7-UN-2A                                                                  3P9A 7.'Description of Mork:         3A INTAKE COOLING WATER PUHP     IST-5 REPLACED WITH SPARE     IST-2.
Pneunatict                   Hominal Operating Pressure             X Pressure   15     psig     Test Temperature               76           ;F 95-064-3
 
Sheet 2 of 2 FORM                 NIS-2 (Back) 4l
: 9. Remarks:   HEcMAMIcAL coNNEGTIoM No 'WELDING REoUIRED.
CERTIFI~CATE OF COMPLIANCE Me certify that the. statements     made in the report are correct                   and this replacenmnt confonas to the r'ules of the ASHE Code, Section   XI.
Type Code Symbol Stamp Certificate Signed
              /
thori tion     No Owner''Oesignee, M~A
                                                .'+M~jPcl Title
                                                              ~~N~ix.'QP-'wner'or
                                                                                                      ~
Expiration Date Oate ~/I~
                                                                                                                                ~NA 19
                                                                                                                                            '0 CERTIFICATE OF INSLRVICE I',NSPECTIOM I, the undersigned, holding a valid caanission issued by'hLI Na'tional Boar'd of Boiler and Pressure Vessel inspectors and the state or Province of, Onde County and.employed by Arkwright.Hutual Insurance Company of Norwood, Ha. have inspected the components described'n this owners Report during the period 12/06/95       arid state that to the best of my knowledge and balief, t'e Owner has performed examihations'nd 11/21/95  'o taken corrective measures described in this Owners Report i'n adcordande with the requirements of the ASHE'ode, Section Xt.
By signing this certi'ficate neither the Inspector nor his enpioyer makes any warranty, expressed or implied, concerning the examinations and corrective measurea doser'ibed in'hi's.Owner's Repo'rt.'Fur'thekmore, neither the Inspector nor his eeployen shall be liable in ariy amnnier for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Comnissions                   '
MB'23~0II~I~
Inspector  SignQa,ure                                                    ~
Nationhi Board, State, Providence, and Endorsements
                                      'I9 95-064-3
 
FORM HIS ~ 2 OWNERS REPORT FOR REPAIRS OR REPLACEHEN'IS As Required by the Provisions of the ASHE Code Section XI
: 1. Owner         Florida   Power 8 Li ht                                         Date                       12 05 95 700 Universe   Blvd. Juno Beach Fl. 33408                                 Sheet         1                   of   2 Address
: 2. Plant         Turke   Point Plant                                             Unit                               3 PWO ¹:63/4109       WO ¹:   .95032545 9700 SW 344 Street 'Florida Cit     .Fl. 33034 Address                                                 Repair Organization P.O. No.,Job Mo.,etc
: 3. Work Performed by       Florida Power 8   Li ht                                 'Iype Code Symbol Stamp                    N A Name                                                Authorization Ho.                          M A Expiration Date P.O. Box 4332   Princeton   Fl. 33032 Address
: 4. Identification of   System:             COMPONENT COOLING WATER            System  ¹:        30        Quality Group:          C
: 5. (a) Applicable Construction Code                         B31. 1                         1955   Edition, NA     Addenda,~M A     Code Case (b) Applicable Edition of Section XI 'Utilized for Repairs or Replacements               1989   Edition,~NA       Addenda,~MA       Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name of                   Name of      /Manufacturer/ National       )
Other.            ]Year    [    Repaired ] ASME        f Component                Manufacturer. J Serial'No.       'Board             Identification         'JBui  It] Replaced or J Code       /
f Replacement )Stamp       f I       I                 ./Y~es No
)BOLTS  (4)                    IH/A                IH/A            iH/A          )UTC349851 R94-4185                CHUNK.   [Replacement       )No 3E207C HX SA 193 GR 87
: 7. Description of Work:       FOUR 4   HX'ANWAY BOLTS REPLACED       ON UMIT-3 'COMPONENT 'COOLING     WATER HX 3C 3E207C .
t     8. Tests Conducted:       Hydrostatic:
Other Pneuaatic:
Other Pneuaatic:
Pressure Nominal Operating Pressure psig Test Temperature
Pressure            psig Nominal Operating Pressure Test Temperature                            'F 95 '63.3
'F 95'63.3
 
'Sheet 2 of 2 FORH NIS-2', (Back)Ik 9.Remarks: MECHANICAL CONNECTION
                                                                                                                                    'Sheet 2 of 2 FORH NIS-2', (Back)
~NO uELDING REQUIRED..
Ik
CERTIFICATE OF COHPLIANCE lie certify that the stater<ents made iin the report are correct and thiis replacement conforms to the r&ies of the ASHE Code, Section XI.Type Code Symbol Stamp N A Certific e f Autho ation No N~A Expiration Date N A Signed 42 7z('
: 9. Remarks:    MECHANICAL CONNECTION ~NO uELDING REQUIRED..
CERTIFICATE OF COHPLIANCE lie  certify that    the stater<ents  made iin the report are correct and thiis replacement conforms to the r&ies of the ASHE  Code,  Section XI.
Type Code Symbol Stamp                                              N A Certific    e  f  Autho    ation  No            N~A                                Expiration Date          N A 7z('0 i~sR'A~4<.g.
Signed    42 O~ner  or Owner+ Designee, Titl'.e 0
CERTIFICATE'OF INSERVICE INSPECTION I, the undersigned, holding a valid cor<mission issued by the National Board of Boiler and pressure vessel and the state or Province of Dade.County. and employed by Arkwriight.Hutual Insurance Company of                                  'nspectors Ha. have inspected the co<nponents descriibed in this Owners Report during the period              12/05/95            'orwood,
                                                                                                                                          ~
to~
12/05/95        and state that to the best of my knowledge and belle<I, the O~ner has perfdrmed examinati'ons'and taken corrective measures described in this Owners Report in accordance wiith the requirements of the ASHE Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed concerning, the examinations and correctiive measures described in this Owner's Report. Furthermore,  or'mplied, neither the Inspector nor his employer shall be i,iable in any mann<'.r for any peraonal injury or'raper'ty or a loss of any kind arising from or connected with this inspection.                                                    'amage 7
C<x<missions        NB  823~ON~I~                                                                I Inspect    s Si    ature                                    ~
Nat<ionsi 8'oard, state, providence, and Endorsements Date                                  19 95.063.3 4l
 
FORH    HIS-2  OMNERS REPORT  FOR REPAIRS OR REPLACEHEHTS As Required by      the Provisions of the    ASHE Code    Section XI
: 1. Owner          Florida  Power 8 LI  ht                                        Date                    03 04 96 Name 700
Other Pneunatic:
Other Pneunatic:
Hominal Operating Pressure Pressure~stg Test Temperature
pressure~tg Hominal Operating Pressure test testsereture                          oF 97-008-3
~F 97-004-3  
 
.Sheet 2 of 2 FORH NIS-2 (Back)9.Remarks: NO MELDING REOOIRED.CERTIFICATE OF iCOHPLIANCE Me certify that the statem>ants made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate of uthorizatlon No.N~A Expiration Date r~/8+Owner r Owne!'s 6esiignee, 4!t'le>d>~NA to9Z CERTIIFICATE OF INSERVICE INSPECTICIN I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Provincie of Dade County and&rplbyed by'rkwright
Sheet 2 of 2 FORM HIS 2 (Back)
'Hutual'Insurance Company of Norwood, Ha.have ins!pected the co>ponents
: 9. Remarks:   MEcHANIcAL col<NEcTIDM~MO MELDING REOUIRED.
'descriimS in this'wr>ers'eport during the period 01/09/97 to 02/11/97 and state.that to the best;of my, knowledge and bei,ief, thie 0>dner has perfo>oned examinations and taken corrective measiures described in this Owners Report 16 ace>ord!>>nce with the requirements of the ASHE Code, Section XI.By signing this certificate rieither the Inspector nor'his'm'>>loyler
CERTIFICATE OF COMPLIANCE Ile  certify that   the sicstements    maCk in the report are correct     and this                   replscecnent conforms to the cules of the ASME    Code, Section     XI.
>aakea any warranty,;
Type Code Symbol Stamp                                               ~NA Certificate of Authorization        No.           ~NA                                                 Ex'piration Date  '
expressed or i>>plied, concerning the examinations ard corrective measdres'eslcribed
A              l S i gned        ~         l+A+Y~fi          Si~ggJA~P                                                  pace  W~ ~+            '
'in this'wner's Report.Furt'hera>ores neither the Inspector nor his ee>ployer shall be liable ir'>an'y awinneir for any, personal Injury or'pro'perty damage or a loss of any kind arising from or connected with this inspection.
                                                                                                                                              'sy'~~     I Owner  or OwnelC/s Designee,   Tit.le iCERTIFI CATE OF INSERVI CE INSPECTilOH I, the undersign<4, holding s valid cccimission issued by the National Board of Boiler snd Piiessurc'Vessel inspectors and the state or province of.'D~sde'County'and employed by Arkwright Mutual', Insurance Company of Norwood, Ma. have inspected the ccimponents described in'his owners Report-cfuring the period                                   07/01/96    to 03/24/97         snd state that to thc; best of my knowLedge snd belief, the owner hss Ferformed elcsmi'nations'nd taken corrective measures. described in thiis Owners Repo'rt .in secor'danre With'the'equirements of the ASME Cocle, Section  XI'y signing this certificate neitheir,the Inspector nor his emplcyer makes any warranty, expressed. or implied, concerning the exciminations and corrective measures described in this Owner's Report.'ur'thermor'e, neither the Inspector nor his employcir.shall be Liable 'in any manner for any personal injury or pr'opei ty                              i damage or s loss of any kind arising from or connected with,this iinspecti'on.'nspec Canmissions      Hll                  828~0I~IQ orsyS" nature                                      i Hstiocial Board, State, Providence, snd Endorsements Date     +          ~ ~             19 7~~
II~r+g cease>asians,aa
97-008-3
>vd~s~t Inspec s nature sat>anat Boardstate prov>denee, dnd'dnddrsedents I D.t.M.'7 10++97-004-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida'Power S Li ht Date 03 20 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of.2 2.Plant Turke Point Plant Name Unit PMO&#xb9;:63/2502 WO&#xb9;: 97006743 CR&#xb9;: 97-0432 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.'Mork Performed by Florida Power 8 Li ht Name P;O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A H A N A 4.Identification of System: RESIDUAL HEAT REHOVAL System&#xb9;: 50 Quality Group: B 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addendas~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case 6.Identification of Conponents Repaired or Replaced and Replacement Coaponents Name of Component IPIPE TO ELBOW MELD Hame of Hanufacturer IN/A/Hanufacturer/
 
National (/, Serial Ho.Board Other Identification IN/A[H/A (14gg-RHR-2301-10 (Year)Repaired (ASHE))guilt]Replaced or (Code f f Replacement
FORH  NIS-2   OWNERS REPORT   FOR REPAIRS OR REPLACEHENTS As Required by     the Provisions of the     ASHE Code     Section XI
[Stamp f I I/~Yes se[UHK[Repaired]Ho 7.Description.
: 1. Owner         Florida   Power Li ht                                         Date                       03 24 97 Name 700.Universe Blvd. Juno Beach Fl. 33408                                   Sheet         1                 of   2 Address
of Mark: INDICATION BUFFED OUT THAT MAS FOUND DURING ROUTINE ISI INSPECTION.
: 2. Plant         Turke   Point Plant                                               Unit Name                                              PWO &#xb9;:0991/63         WO &#xb9;:   96030528
8.Tests Conducted:
              '9760 SW 344 Street   Florida Cit       Fl. 33035 Address                                                   Repair Organization P.O. No.,Job No.,etc
Hydrostatic:
: 3. Work Performed by       Florida Power. S Li ht                                   Type Code Symbol Stamp                     N A Name                                                Authorization Ho.                         N A Expiration'Date P.O. Box 4332     Princeton 'Fl. 33032 Address 4~ Identification of   System:   CHEHICAL 8 VOLUHE CONTROL                    System   &#xb9;:       47        Quality, Group:       C
Pneunatic:
: 5. (a) Applicable Construction     Code                       831.1                         1955   Edition,   NA    Addenda,~N A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                 1989   Edition,~N    A  Addenda,~N A    Code Case
Nominal Operating Pressure pressure~is rest Temperature
: 6. Identification of Components 'Repaired       or. Replaced and Replacement     Components Name of                   Name of       /Hanufacturer) National                      Other              [Year  ]  Repaired i ASHE i Component                Hanufacturer      )
~F 97-005.3 Sheet 2 of 2 FORH NIS-2 (Back)9.Remarks<<NO WELDING REaUIRED CERTIFICATE OF COHPLIANCE We certify that the statements made in the, rcport: are correct and<<his repair conforms to the rules of the ASME Code, Section XI.Type Code Symbol Stamp Certificate of A thorization No.~NA r Signed Qp)WQg~i6 cs~y wner or wner" s Designee, Title Date/WF/ZA 1ll~~0 CERTIF,lCATE OF INSERVICE INSPECTION I, thc undersigned, holding a valid comnission issued by the Iiatidnai Bohrd'of Boiler and Pressure Vessel inspectors and the state or province, of Dade County and ecyloyed'by ArkWright Hutual Insurance-Company of Norwood, Ha.have inspected the comp>nents descrilxxl in.this bwndrs kepdrt durihg the period'3/17/97 to 03/20/97 and state that to the best of my knowledge and belief, the O~ner has perforated examinations and taken corrective measures descriked in this Owners Report in 4ccdrdahcc with the requirements of the'SME Cade,'ection XI.By signing this certificate neither the-inspector nor.his ampl'oyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any~manner~for any personal injury or property damage or a loss of any kind arising from or connected with this~inspect~ion,, Inspe ors gnature Cocmissions
Serial Ho.       Board             Identification          iguilt)  Replaced or i Code (
, NB 8230,~N I Naticnai'Boa'rd,'State, proVidence, and Endorsements'ot~
(      f Replacement   igtaap i I       I               James se ITHREADED ROO                  iN/A                iH/A             iN/A         [UTC 398161 ASHE SA-193            iUHK. iRepiacement      (Ho I8 STUDS FABRICATED                                                                GRADE  87 IHEAVY HEX HUTS  (16)          iN/A                 iN/A             iH/A         iUTC 399723 ASME SA-194            iUHK. ]Replacement     iNo GRADE 2H
A 19 97-005-:3' FORM NIS-2 OVNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1~Owner Florida Power 8 Li ht Date 03 25 97 700'Universe Blvd.'Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Unit PNO&#xb9;:63/2531 MO&#xb9;: 97006917 CR&#xb9;: 97-479 9760 SU 3CC Street Florida Cit FI.33035 Address Repair Organization P.O.No.,Job No.,etc 3.llork Performed by'Florida Power 8'i ht Name, P.O.Box 4332 Princeton FI.33032 Address Type-Code Symbol Stamp Authorization No.Expiration Date N A N A 4.Identification of System: RESIDUAL HEAT REMOVAL System&#xb9;: 50 Duality Group: B 5.(a)Applicable Construction Code ASME SECTION III 1965 Edition,~N A Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Coeponent Name of Manufacturer
: 7. Description of Work:     REPLACED EIGHT      8  STUDS AND SIXTEEN      16  NUTS ON NON-REGENERATIVE HEAT EXCHANGER  3E201    FABRICATED BY ATLAS-COPCO INC. HOOEL          0-1503-7.
/Manufacturer('ational i Serial No.Board Other'Identification
t     8. Tests Conducted:     Hydrostatic:
-Iyear I Repaired I ASME I iguiiti Replaced or i Code i (Replacement istaep (I I Joyce ge 13A RHR HEAT EXCHANGER IATLAS INDUSTRIAL I877 MANUFACTURING I727 13E206A i1968 iRepaired iYes 7.Description of cwork:.GRIND OUT LIQUID PENETRANT INDICATION IDENTIFIED DURING ROUTINE'INSERVICE IHSPECT I OH.8.Tests conducted:
gydrostettc:
Other PT Pneunatic:
Nominal Operating Pressure Pressure~sic test yeepcreture 4F 97-006-3 Sheet 2 of 2 FOHN HIS-2 (Back)9.Remarksi NO lIELDIHG REQUIRIED CERTIFICATE OF COHPLIANCE
'Me certify that the statenents made in the report are cori ect and this repair conforms to the rules, of the ASIDE Code, Section XI.Type Code Symbol Stamp'N A'ertificate of Authorization No., IN~A Expiration Date~N A s;g,~W6Q&#xc3;Owner r Owner's Designee, Titlk Date CERTIFICATE OF IHSERVICE IHSPECTION I, the undersigned,.holding a,valid ceiiaission issued by the National Board of Boiler and Pressure Vessel.inspectors and the state or province" of Dade County and"'employed by'Arkwright Hutual'Insurance Corqpany of Norwood, Ha.have inspected the cavponents described in(this owners Report during the period'03/19/97'o 03/21/97 and state that to the best of my knowledge and belief, the owner has performed examinati'ons'and taken corrective measures descr3bed in.this owners Report ih accordance with the requirements af the AsNE~code, Section XI.By signing this.certiificate neither the Inspector nor his ecpioyer makes any warranty, exprassed od implied, concerning the examinations and corrective meakurels ddscr/bed in'this Oinieris Report.'Furthermora, neither the Inspector nor his employer shall.be, liable i'n any manner for any personal injury od praperty~damage or a loss of any kind arising, from or connected with~thiis iiispection.
'ate Inspec ors Si ture wagP-7 Cocmiasions,, HB, 823~ON~I,~,~Hationhi B'oard, State, Providence, and Endorsanents 97-006-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power&Li ht Date 03 25 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant kame Unit PWO&#xb9;:63/8991 WO&#xb9;: 96024216 CR&#xb9;: 96-776 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name Type Code Symbol Stamp N A Authorization No.N A Expiration Date H A P.O.Box 4332 Princeton'Fl.33032 Address 4.Identification of System: MAIN STEAM System&#xb9;: 72 Quality Group: B 5.(a)Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer)LOAD STUD (1)FOR PSA-35)H/A iSNUBBER TAG&#xb9;3-1084[HUTS (4)FOR PSA-35[N/A (SNUBBER TAG&#xb9;3-1084 (Manufacturer[
Hational (Serial Ho.Board lYear f Repaired I ASME I]guilt]Replaced or f Code]f Replacement JStasp f I I[r~es ue Other Identification IN/A)N/A)STOCK CODE&#xb9;0197328 17-4)UHK.[Replacement
]Ho SS ASME SA-564 A-194 GRADE 8 IH/A fH/A]STOCK CODE&#xb9;0209608 ASME fUHK.[Replacement
[Ho 7.Description of Work: REPLACED LOAD PIN ON PACIFIC SCIENTIFIC MODEL PSA-35'SHUBBER TAG&#xb9;3-1084 WITH LOAD STUD.8.Tests Conducted:
Hydrostatic:
Other VT-3 Pneuaatic:
Hominal Operating Pressure Pressure~sig Test teegereture 97-007-3 Sheet 2 of 2 FORH HIS"2 (IBack)9.Remarks: HECHANICAL COHHECTIOIN HIO M=LDIHG REOU'IREO.
CERTIFICATIE OF COHPLIANCI Ne certify that the statements made in the report are correct and this replacement conforms to thc rule's of thIc ASHE Code, Section XI.Type Code Symbol Stamp Certificate Authorization No.Signed Owner r Owner'sVesignee,~NA Expiration Date~N'A I p~+>>pn~~4:,I Pi+.~~;Oate,+~iiX4~/
2.9';19Q Title I CERTIFICATE OF INSERVICE IHSP'ECTIOH I, the undersigned, Iholcling a valid coamission issued by thh Haltiohal Board of Boiler arxl Preslurc,'Ves'sel
'inspectors and the state or Province of Dade County and.employed-by Arkwright Hutual, Insurance'oalpanV of'orwood, Ha.have inspected the ccraponents described in this Oianers Report d<rring tire period 09/18/96'6 03/24/97 and state that: to the best of my knowl.edge arkf&tieIf, thc O~ner has performed exami'nations'nd taken corrective measures described in this Owners Report in abcor'danke with the requirements of t'e ASHE'ode,'(Section XI.I By signing this c'crtificate neither the Irtspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure's dLscr'ibad in'his Owner''s Repart.Fur'thelmor'c, neither the Inspector nor his employer shall be liable in alny 6rann'er for'eny personal injury or property damage or a loss of any kfr>>d arising from or connected wlthl this insgctibn.
'Inspec rs S ature Coaraissions NB 823~0M~I~National Board, State, Providence, and Erx/orsIemedts
'(Date 19 QP O 97-007-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1~O~ner Florida Power&Li ht Date 03 24 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Hame Unit PWO&#xb9;:63/7603 WO&#xb9;: 96016980 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date H A N A H A 4.Identification of System: AUX FEEDWATER System&#xb9;: 75 Quality Group: C 5.(a)Applicable Construction.
Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component iHUTS (14)I ICAP SCREWS (14)Name of Hanufacturer IN/A IN/A iManufactureri National i i Serial No.Board Other Identification IN/A JH/A fN/A iSTK CODE 00278361 JH/A iSTK CODE 00271201 iYear,i Repaired i ASHE (iguilti Replaced or i Code J i Replacement
[Stamp i I'I[~res se iUHK iReplacement iHo iUNK)Replacement)Ho 7.Description of Work: DISASSEMBLE INSPECT REASSEMBLE 3-20-401 t 8.Tests Conducted:
Hydrostatic:
Other Pneunatic:
Other Pneunatic:
Hominal Operating Pressure pressure~tg test testsereture oF 97-008-3 Sheet 2 of 2 FORM HIS 2 (Back)9.Remarks: MEcHANIcAL col<NEcTIDM~MO MELDING REOUIRED.CERTIFICATE OF COMPLIANCE Ile certify that the sicstements maCk in the report are correct and this replscecnent conforms to the cules of the ASME Code, Section XI.Type Code Symbol Stamp~NA Certificate of Authorization No.~NA S i gned~l+A+Y~fi Si~ggJA~P Owner or OwnelC/s Designee, Tit.le Ex'piration Date'A l pace W~~+''sy'~~I iCERTIFI CATE OF INSERVI CE INSPECTilOH I, the undersign<4, holding s valid cccimission issued by the National Board of Boiler snd Piiessurc'Vessel inspectors and the state or province of.'D~sde'County'and employed by Arkwright Mutual', Insurance Company of Norwood, Ma.have inspected the ccimponents described in'his owners Report-cfuring the period 07/01/96 to 03/24/97 snd state that to thc;best of my knowLedge snd belief, the owner hss Ferformed elcsmi'nations'nd taken corrective measures.described in thiis Owners Repo'rt.in secor'danre With'the'equirements of the ASME Cocle, Section XI'y signing this certificate neitheir,the Inspector nor his emplcyer makes any warranty, expressed.
Pressure~erg Hominal Operating Pressure Test Tempereture                            oF 97-009-3
or implied, concerning the exciminations and corrective measures described in this Owner's Report.'ur'thermor'e, neither the Inspector nor his employcir.shall be Liable'in any manner for any personal injury or pr'opei ty i damage or s loss of any kind arising from or connected with, this iinspecti'on.'nspec orsyS" nature Canmissions Hll 828~0I~IQ i Hstiocial Board, State, Providence, snd Endorsements Date+~~19 7~~97-008-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power S Li ht Name Date 03 24 97 700.Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Unit PWO&#xb9;:0991/63 WO&#xb9;: 96030528'9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida Power.S Li ht Name P.O.Box 4332 Princeton'Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration'Date N A N A 4~Identification of System: CHEHICAL 8 VOLUHE CONTROL System&#xb9;: 47 Quality, Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case 6.Identification of Components
 
'Repaired or.Replaced and Replacement Components Name of Component Name of Hanufacturer
Sheet 2 o,f 2 FiDRH  NIS-2 (Back)
/Hanufacturer)
: 9. Remarks:   HECNANICAL CONNECTION NO WELDING REOUIRED.
National)Serial Ho.Board Other Identification
CERT  IF I CATE  OIF COHPL I ANCE Me  certify that the statenents  made in the report are,correc't and this ireplscement conforms to the rules of the ASHE  Code, Section XI.
[Year]Repaired i ASHE i iguilt)Replaced or i Code ((f Replacement igtaap i I I James se ITHREADED ROO iN/A I8 STUDS FABRICATED iH/A iN/A[UTC 398161 ASHE SA-193 iUHK.iRepiacement (Ho GRADE 87 IHEAVY HEX HUTS (16)iN/A iN/A iH/A iUTC 399723 ASME SA-194 iUHK.]Replacement iNo GRADE 2H 7.Description of Work: REPLACED EIGHT 8 STUDS AND SIXTEEN 16 NUTS ON NON-REGENERATIVE HEAT EXCHANGER 3E201 FABRICATED BY ATLAS-COPCO INC.HOOEL 0-1503-7.t 8.Tests Conducted:
Type Code Symbol Stamp Certificate of Authorization     No.         ~N A                                     Ekpiriation D'ate si                                                                                                      ~r  2. ~z Owner'   Owner'O'DesigneeTitle r
Hydrostatic:
CERT IF ICATI-: OF INSERVICE INSIPECT ION I, the undersigned, holding a valiid cnrmiSsion issued b'y thc National Board of Boiler and Presaurci Veaseli inspectors and the state or Province of Dade County and employed by Arkwright Hutual'nsurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period                     1'I/25/96     to 03/24/97       and state that to the best of my Iknowicdge a'nd belief, 'the Owner has performed examlnat'iona an'd taken corrective measures described in,.tlhis Owniers Report in accordance with the requirements 'of the.iASHF. Code,                   i Section XI.
By signing this certificate ncithcr tlhe Inspector nor hiis Cmplbyed makes 'any warranty, expressad or implied, concerning thie examinations snd correc'tive measures desciribed in this Owner's Rcport. Furthcrmor''e, thc Inspector nor his employer slhall be liable in any manner for any personal injury or property                    'either damage or a loss of any kind arising from or connected with this inspection.
                                                          ,Corrrriirssiions,      NB 8230 ~N~I Inspector  SigniitFre                                        'ational  'Board, State, Iprovidence, and Enkioraements Date 97-009-3I
 
FORH   HIS-2   OWERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the         Provisions of the     ASHE,Code     Section XI
: 1. Owner           Florida   Power   8  Li ht                                             Date                         04 18 97 700 Universe   Blvd. Juno Beach Fl. 33408                                       Sheet         1                     of     2 Address
: 2. Plant           Turke   Point Plant                                                     Unit
                                                                                                ,PNO  &#xb9;:63/0124        .WO   &#xb9;:  96025060 PCH  &#xb9;: 96-012 9760   SM  344 Street     Florida Cit       Fl. 33035 Address                                                         Repair Organization P.O. Mo.,Job Ho.,etc
: 3. Nark Performed by           Florida   Power Li ht                                     Type Code Syahoi Stamp                          N A Name                                                   Authorization Ho.
Expiration Date P.O. Box 4332     Princeton     Fl. 33032 Address
: 4. Identification of System:            Safet    In ection    S  tern                  System    &#xb9;:        62          Quality Group:          8
: 5. (a) Applicable Construction Code                                  831.1                            1955 Edi  t i on,~MA      Addenda,~NA      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                          1989  Edition,~N      A  Addenda,M416-1Code      Case
: 6. Identification of Coaponents Repaired or Replaced and Replacement Components Name  of                    Name  of        (Manufacturer[ National                          Other                ]Year    f    Repaired / ASHE      )
Component                  Hanufacturer        f Serial  Ho.        Board                Identification              (Built)    Replaced or ( Code      ]
I                                                                                                                                        ]  Replacement ')Stoep      (
I                                                                                                                                I      I                ]~res rre 13T208 BOROH INJECTION            I N/A                    IN/A              (H/A          )PC/H. 96-012 BORON IHJ TK            )UHK    [Replacement      )Mo ITAHK                                                                                      HOD IF I  CATION
: 7. Description of llork: PIPING HOOIFICATIONtOF                SAFETY IMJECTIOM LINE TO BYPASS THE BORON INJECTION TANK.
THE FOLLOMING HATERIAL llAS USED:            2  90  DRG  4"  SCH    80 ELBONS UTC 398779        4"  SCH  316  'ASME SA    312  SCH
        ,80 UTC 398561        4  SOCKOLET 'SS ASHE 'SA182 UTC 406901              2  45  DRG  4"  SCH  80 ELBONS UTC 406833 1  "4"  SS TEE SCH  80 ASHE SA403 UTC 407413.          FOR SUPPORTS      3-SIH-23 8    H  IC-248B-1    THE FOLLONIMG MATERIAL llAS USED:      2  4"  PIPE CLAHPS UTC 405948            2  NELDLESS EYE 'NUTS UTC 405946              2  llELDED BEAN ATTACHMENTS UTC 405945          2    MELDED EYE RODS UTC      405947  AHD    2  PLATES    1  2X6X7 UTC 390858.
Pneunatic:                      Hominal Operating Pressure                X tressure~1550            iu    test Tsetsereture                    83        4F 97-010-3
 
Sheet 2 of 2 FORH  NIS-2 (Back)
: 9. Rcmarkse    SUPPORT  3-SIH-139  THE FOLLOWING HATERIAL 'MAS.USED'            4" PIPE L1-BOLT LITC 400433 1  4" PIPE  SADDLE  UTC'405949'. SUPPORT 8080-H-007-1    THE F  I.LNIIN'ATER AL    AS USED:    1  CHANNEL'Y TEEL UTC 407359      2 CLAHP!>> UTC 374568    !~2NUT  SPRING UTC 3932C7      ANGLE C.S.ASTH A36 UTC 403958. TH REOUIREHNTS OF CODE CASE NC16-1 HAVE BEEN HET FOR THIS R-PL CEH:NT ACT              VITY.
iCERTIFICATE OF COHPLIANCE lie  certify that  the statcneehts    made in the report are, correct    and  this repiaccnent  conforms to the rules of the ASHE  Code, Section    XI.
Type Cade Symbol S'tamp                                              N A Certif icate      Author)zation    No-          I~!A                                Expireition Date          ~NA
      >>i>>.~.        u~PQ~M Owner  or
                                            /
OwnqPs Designed, 5~+~~~~-,
Title    4
                                                                              ~~~>>s~e          ,~gad,                      i  A CERTIFICATE OF INSERVICE INSPIECTION I, thc undersigned, holding a valicl connission issued by thc National Board o'f Boiler and Pressure Vessel inspectors and the state or province of Dade county and~cap~layed by Arkwright Hutual'nsurance company of Norwood, Ha. have inspected the caqmnents described in thils OWnerd Report during the periad                  04/07/96    ta 04/18/97        and state that to the best of my knowledga and baiicf, t'e O~ner has performed examinations'nd taken corrective measures dcscribeid in this owners Report ih adcordanc'e with 'the requirements.6f the ABHE~ code, Section XI.
By signing this certificate neither the Inspector nor hi!s employer 'makes any warranty, expressed or inpiied, concerning the exmninations aind correct!ive meaaures described .ln,this Owner's Report. Furthermore, neither the Inspectoir nor his eeyioyer shall be liable iin any sunnier far any personal injury ot pr~opci ty            ~
damage or a loss of any kind arising from or connect'ed with this inspection.
Comni as 1 ons,      NB 823~ON~I,~,
Inspe  ors'nature                                            National Board, State, Proviidence, and Endorsements Date                              .'I9 97-010-3
 
FORM  HIS-2  OMNERS REPORT  FOR  REPAIRS  OR REPLACEMENTS As Required by the    Provisions of the      ASHE Code    Section XI
: 1. O~ner          Florida  Power &  Li ht                                        Date                      03 30 97 700 Universe    Blvd. Juno Beach Fl. 33408                                Sheet        1                of    2 Address
: 2. Plant          Turke  Point Plant                                              Unit Nsne                                            PIIO &#xb9;:3648/63      IIO &#xb9;: .95028815 9760  SW  344  Street    Florida Cit      Fl. 33035 Address                                                 Repair Organization'P.O.        Ho.,Job Ho.,etc
: 3. llork Perforned by      Florida  Power & Ci  ht                                ,Type Code Symbol Stamp                   N A Name                                              Authorization.Ho.                         N A Expiration.Date                           N A P.O. Box 4332    Princeton    Fl. 33032 Address
: 4. Identification of System:       CHEMICAL AND VOLUME CONTROL                 System &#xb9;:       47       Quality Group:         C
: 5. (a) Applicable-Construction Code                           831.1                         1955   Edition, HA    Addenda,~H A     Code Case (b) Applicable Edition of Section.XI Utilized for Repairs or Replacements                 1989   Edition,~NA      Addenda,~MA      Code Case
: 6. Identification of Components Repaired-or Replaced snd'Replacement               Components Name of                   Mane  of       (Manufacturer( National                    Other              (Year  (    Repaired ( ASME (
Component                Manufacturer      (
Serial Ho.       Board             Identification         (Built(  Replaced or ( Code (
( Replacement     (Stamp (
I       I                 i~res ge (STUDS (24)                    (H/A                                 IN/A         I3E201                          (UHK. (Replacenent I
(HUTS (48)
(H/A'N/A             (H/A           (H/A         (3E201                            (UMK. (Replacement (Ho (Ho
: 7. Description of Ilorkt      REPLACED 24 STUDS AND 48tNUTS ON THE NON-REGENERATIVE HEAT EXCHANGER ENDBELL ASSEHBLY.
t     8. Tests Conducted:       Hydrostatic:
Other Pneunatic:
Other Pneunatic:
Hominal Operating Pressure Pressure~erg Test Tempereture oF 97-009-3 Sheet 2 o,f 2 FiDRH NIS-2 (Back)9.Remarks: HECNANICAL CONNECTION NO WELDING REOUIRED.CERT IF I CATE OIF COHPL I ANCE Me certify that the statenents made in the report are,correc't and this ireplscement conforms to the rules of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate of Authorization No.~N A Ekpiriation D'ate si Owner'Owner'O'DesigneeTitle
pressure~stg Nominal Operating Pressure Test Tespersture                          4F 97-011-3
~r 2.~z r CERT IF ICATI-: OF INSERVICE INSIPECT ION I, the undersigned, holding a valiid cnrmiSsion issued b'y thc National Board of Boiler and Presaurci Veaseli inspectors and the state or Province of Dade County and employed by Arkwright Hutual'nsurance Company of Norwood, Ha.have inspected the components described in this Owners Report during the period 1'I/25/96 to 03/24/97 and state that to the best of my Iknowicdge a'nd belief,'the Owner has performed examlnat'iona an'd taken corrective measures described in,.tlhis Owniers Report in accordance with the requirements
 
'of the.iASHF.
Sheet 2 of        2 FORH HIS-2 (Back)
Code, i Section XI.By signing this certificate ncithcr tlhe Inspector nor hiis Cmplbyed makes'any warranty, expressad or implied, concerning thie examinations snd correc'tive measures desciribed in this Owner's Rcport.Furthcrmor''e,'either thc Inspector nor his employer slhall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.,Corrrriirssiions, NB 8230~N~I Inspector SigniitFre
: 9. Remarks:   MECHANICAL CONNECTIOM MO MELOIMG REOUIRED.
'ational'Board, State, Iprovidence, and Enkioraements Date 97-009-3I FORH HIS-2 OWERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE,Code Section XI 1.Owner Florida Power 8 Li ht Date 04 18 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit ,PNO&#xb9;:63/0124.WO&#xb9;: 96025060 PCH&#xb9;: 96-012 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Mo.,Job Ho.,etc 3.Nark Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Syahoi Stamp Authorization Ho.Expiration Date N A 4.Identification of System: Safet In ection S tern System&#xb9;: 62 Quality Group: 8 5.(a)Applicable Construction Code 831.1 1955 Edi t i on,~MA Addenda,~NA Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,M416-1Code Case 6.Identification of Coaponents Repaired or Replaced and Replacement Components Name of Component I I 13T208 BOROH INJECTION I ITAHK Name of Hanufacturer N/A IN/A (H/A (Manufacturer[
CERTIFICATE OF COMPLIANCE
National f Serial Ho.Board Other Identification
    'Me certify that thc staterents          made in the report are correct  and ttais rcpiacenent  conforms <<o the rules of the ASHE   Code, Section XI'.                                                                                                                   I Type Code Symbol Stamp Certificate of+uthorization            Ho.         ~HA                              Expiration Ilste ~NA slgn~          842                                                                                                    19
]Year f Repaired/ASHE)(Built)Replaced or (Code]]Replacement
                                                        'Tlf.le
')Stoep (I I]~res rre)PC/H.96-012 BORON IHJ TK)UHK[Replacement)Mo HOD IF I CATION 7.Description of llork: PIPING HOOIFICATIONtOF SAFETY IMJECTIOM LINE TO BYPASS THE BORON INJECTION TANK.THE FOLLOMING HATERIAL llAS USED: 2 90 DRG 4" SCH 80 ELBONS UTC 398779 4" SCH 316'ASME SA 312 SCH ,80 UTC 398561 4 SOCKOLET'SS ASHE'SA182 UTC 406901 2 45 DRG 4" SCH 80 ELBONS UTC 406833 1"4" SS TEE SCH 80 ASHE SA403 UTC 407413.FOR SUPPORTS 3-SIH-23 8 H IC-248B-1 THE FOLLONIMG MATERIAL llAS USED: 2 4" PIPE CLAHPS UTC 405948 2 NELDLESS EYE'NUTS UTC 405946 2 llELDED BEAN ATTACHMENTS UTC 405945 2 MELDED EYE RODS UTC 405947 AHD 2 PLATES 1 2X6X7 UTC 390858.Pneunatic:
                              ~%~~M'wner 0
Hominal Operating Pressure X tressure~1550 iu test Tsetsereture 83 4F 97-010-3 Sheet 2 of 2 FORH NIS-2 (Back)9.Rcmarkse SUPPORT 3-SIH-139 THE FOLLOWING HATERIAL'MAS.USED' 4" PIPE L1-BOLT LITC 400433 1 4" PIPE SADDLE UTC'405949'.
o  Owner" s4'esigne'e, CERTIF ICAYE OF IHSERVICE IHSPECTIOH I, thc undersigned, holding a valid caw>ission issued by the Hational Board of Boiler and Prepsure Vessel inspectors and the state or Province. of Oade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha. have inspect'ed the components described in this Owners,Rcp'ort'during the period               '10/L3/95 'to and state that to thc best of my knowledge and belief the Amer has perfo'rmed examinations and                '3/27/97 taken corrective measure." described in this Owners Report in accordance with the requirenwnts of thc ASHE Code, Section XI.
SUPPORT 8080-H-007-1 THE F I.LNIIN'ATER AL AS USED: 1 CHANNEL'Y TEEL UTC 407359 2 CLAHP!>>UTC 374568!~2NUT SPRING UTC 3932C7 ANGLE C.S.ASTH A36 UTC 403958.TH REOUIREHNTS OF CODE CASE NC16-1 HAVE BEEN HET FOR THIS R-PL CEH:NT ACT VITY.iCERTIFICATE OF COHPLIANCE lie certify that the statcneehts made in the report are, correct and this repiaccnent conforms to the rules of the ASHE Code, Section XI.Type Cade Symbol S'tamp N A Certif icate Author)zation No-I~!A Expireition Date~NA/>>i>>.~.u~PQ~M 5~+~~~~-,~~~>>s~e ,~gad, i A Owner or OwnqPs Designed, Title 4 CERTIFICATE OF INSERVICE INSPIECTION I, thc undersigned, holding a valicl connission issued by thc National Board o'f Boiler and Pressure Vessel inspectors and the state or province of Dade county and~cap~layed by Arkwright Hutual'nsurance company of Norwood, Ha.have inspected the caqmnents described in thils OWnerd Report during the periad 04/07/96 ta 04/18/97 and state that to the best of my knowledga and baiicf, t'e O~ner has performed examinations'nd taken corrective measures dcscribeid in this owners Report ih adcordanc'e with'the requirements.6f the ABHE~code, Section XI.By signing this certificate neither the Inspector nor hi!s employer'makes any warranty, expressed or inpiied, concerning the exmninations aind correct!ive meaaures described.ln,this Owner's Report.Furthermore, neither the Inspectoir nor his eeyioyer shall be liable iin any sunnier far any personal injury ot pr~opci ty~damage or a loss of any kind arising from or connect'ed with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed'or                                 II implied, concerning the examinations and corrective measures described in this Owner's Rcport. Furthernere,
Inspe ors'nature Comni as 1 ons, NB 823~ON~I,~, National Board, State, Proviidence, and Endorsements Date.'I9 97-010-3 FORM HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1.O~ner Florida Power&Li ht Date 03 30 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Nsne Unit PIIO&#xb9;:3648/63 IIO&#xb9;:.95028815 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization'P.O.
      ,neither the Inspector nor his eayloyer shall be liable in any manner for any personal'nJury or;properiy damage or a loss of any kind arising from or connected with,thi;s inspection.                                                           1 Cceeissidns '
Ho.,Job Ho.,etc 3.llork Perforned by Florida Power&Ci ht Name P.O.Box 4332 Princeton Fl.33032 Address ,Type Code Symbol Stamp Authorization.Ho.
NB i823O~H~I~
Expiration.Date N A N A N A 4.Identification of System: CHEMICAL AND VOLUME CONTROL System&#xb9;: 47 Quality Group: C 5.(a)Applicable-Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section.XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of Components Repaired-or Replaced snd'Replacement Components Name of Component (STUDS (24)I (HUTS (48)Mane of Manufacturer (H/A (H/A'N/A (H/A IN/A I3E201 (H/A (3E201 (Manufacturer(National (Serial Ho.Board Other Identification (Year (Repaired (ASME ((Built(Replaced or (Code ((Replacement (Stamp (I I i~res ge (UHK.(Replacenent (Ho (UMK.(Replacement (Ho 7.Description of Ilorkt REPLACED 24 STUDS AND 48tNUTS ON THE NON-REGENERATIVE HEAT EXCHANGER ENDBELL ASSEHBLY.t 8.Tests Conducted:
Inspec  rs Si          ature                                ,'Nat,'io~i Board, State, Providence, and Endorsenents gate 97'01
Hydrostatic:
 
Other Pneunatic:
FORN  NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by   the Provisions of the   ASHE Code   Section XI
Nominal Operating Pressure pressure~stg Test Tespersture 4F 97-011-3 Sheet 2 of 2 FORH HIS-2 (Back)9.Remarks: MECHANICAL CONNECTIOM MO MELOIMG REOUIRED.CERTIFICATE OF COMPLIANCE
    ~ .1.. Owner         Florida   Power 8 Li ht                                     Date                     04 07 97 Name 700 Universe   Blvd. Juno Beach Fl. 33408                             Sheet       1                 of   2 Address
'Me certify that thc staterents made in the report are correct and ttais rcpiacenent conforms<<o the rules of the ASHE Code, Section XI'.I Type Code Symbol Stamp Certificate of+uthorization Ho.~HA slgn~842~%~~M'wner o Owner" s4'esigne'e,'Tlf.le Expiration Ilste~NA 19 0 CERTIF ICAYE OF IHSERVICE IHSPECTIOH I, thc undersigned, holding a valid caw>ission issued by the Hational Board of Boiler and Prepsure Vessel inspectors and the state or Province.of Oade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha.have inspect'ed the components described in this Owners,Rcp'ort'during the period'10/L3/95'to'3/27/97 and state that to thc best of my knowledge and beliefthe Amer has perfo'rmed examinations and taken corrective measure." described in this Owners Report in accordance with the requirenwnts of thc ASHE Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed'or II implied, concerning the examinations and corrective measures described in this Owner's Rcport.Furthernere, ,neither the Inspector nor his eayloyer shall be liable in any manner for any personal'nJury or;properiy damage or a loss of any kind arising from or connected with,thi;s inspection.
: 2. Plant         Turke   Point Plant                                           Unit Name                                          PWO &#xb9;:63/7853      WO &#xb9;:   96012069 9760 SW  344 Street 'Florida Cit       Fl. 33035 Address                                             Repair Organization P.O. No.,Job Ho.,etc 3.,llork Performed by       Florida Power & Li ht                               Type Code Symbol Stamp                  N A Name                                           Authorization No.                        H A Expiration Date                        N A P.O. Box 4332     Princeton   Fl. 33032 Address
1 Inspec rs Si ature Cceeissidns
: 4. Identification of, System:       REACTOR COOLANT                          System &#xb9;:       41        Quality Group:         A
'NB i823O~H~I~
: 5. (a) Applicable Construction Code                           831.1'955                        Edition, NA    Addenda,~H A      Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements             1989 Edition,~NA    Addenda,~HA      Code Case
,'Nat,'io~i Board, State, Providence, and Endorsenents gate 97'01 FORN NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI~.1..Owner Florida Power 8 Li ht Name Date 04 07 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Unit PWO&#xb9;:63/7853 WO&#xb9;: 96012069 9760 SW 344 Street'Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ho.,etc 3.,llork Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A H A N A 4.Identification of, System: REACTOR COOLANT System&#xb9;: 41 Quality Group: A 5.(a)Applicable Construction Code 831.1'955 Edition, NA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case 6.Identification.
: 6. Identification. of Components Repaired or Replaced.and Replacement Components Name of                   Name of       )Nanufacturerf National                  Other            )Year  )    Repaired ( ASHE Component                Hanufacturer     )  Serial Ho.     Board           Identification       [guilt)   Replaced or   J Code    (
of Components Repaired or Replaced.and Replacement Components Name of Component Name of Hanufacturer)Nanufacturerf National)Serial Ho.Board Other Identification)Year)Repaired (ASHE[guilt)Replaced or J Code (J Replacement (Stamp J I I JYesreue, IPRESSURIZER RELIEF VALVE ICROSBY IH51249-1580 IN/A IRV-3-551A)UNK.)Replaced (Ho (PRESSURIZER RELIEF VALVE (CROSBY IH51249-1362 IN/A IRV 1A (UNK.(Replacement)Ho 7.Description of llork: REHOVE PRESSURIZER SAFETY VALVE RV-3-'551A AHD INSTALL SPARE.Pneunatic:
J Replacement (Stamp      J I       I               JYesreue, IPRESSURIZER RELIEF VALVE        ICROSBY              IH51249-1580 IN/A          IRV-3-551A                    )UNK. )Replaced          (Ho (PRESSURIZER RELIEF VALVE        (CROSBY              IH51249-1362 IN/A          IRV      1A                    (UNK. (Replacement       )Ho
Hominal Operating Pressure X pressure~2280 siu test Temperature 535'F 97-012-3 Sheet 2 of 2 FORH, HIS-2 (Back)9.Remarks: HECHANICAL CONNECTION NO'WELOIHG REOUIREO.CERTIFICATE OF OOHPLIANCE lie certify that the statements made in the report are correct and this'eplacement conforms to thol rulles of the ASIDE'Code, Section XI.Type Code Symbol Stamp N A-Certif icate of Authori".ation No.~HA I Signed cf ar+ivw~~P(<~Own r or wner's Oesignee, T>tl'e CERTIFICATE OF IHSERVICE INSPECTIOH I, the undersigned,, holding a valid co>r>>>issiion issued by the National Board of Boiler and Pressure Vessel inspectors and the state or F'rovince of Dadle County and employed by Arkwright Hutual Insure'nce Cempany.*f Norwood, Ha.lieve inspected the comF>onents described in this'Owners'Report during the period 07/14/96 to 03/27/97 and state that to the best of my knowledge and belief, the Owner has perfors>ed examinations and taken corrective measures described in this Owners Report'n'accords'nce'with tHe requirements.
: 7. Description of llork:     REHOVE PRESSURIZER    SAFETY VALVE RV-3-'551A AHD INSTALL SPARE.
of the ASHE Code, Section XI.By signing this certificate neither the Inspector r>or his employer makes any warranty, expressed or implied, concerning the examinations and corrective measui os'described in this Owner's Report.Furthermore, neither the Inspector nor his e>qpioyer shall be liable in'ny manner for any personal injury or property damage or a loss of any kind ari:sing from or connected with this'ns'pection'.
Pneunatic:                 Hominal Operating Pressure          X pressure~2280      siu    test  Temperature            535          'F 97-012-3
Inspe tors>gnature National~Board, State, Providence, ahd&do>>sMnts Date 97-O12-3 FORM NIS-2 OLINERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power B Li ht Date 04 16 97 700:Universe Blvd.Juno Beach Fl.33408 Address Sheet of 2 2;.Plant Turke Point Plant Name Unit PNO&#xb9;:63/2645 NO&#xb9;: 97007310 CR&#xb9;: 97-53l 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ko.,etc 3'., llork Performed by Florida Power I Li ht Name P.O.Box 4332 Princeton Fl.33032 Type Code Symbol Stamp Authorization Ho.Expiration, Date N A N A N A Address 4.Identification of System: C onent Coolin Hater S stem System&#xb9;: 30 Quality Group: B 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case 6.Identification of Components Repaired or Replaced,and Replacement Components Name of Coayonent Name of,')Manufacturer)
 
National (Manufacturer
Sheet 2 of 2 FORH, HIS-2 (Back)
[Serial Ho.Board Other, Identification (Year.(Repaired)ASME][Built(Replaced or]Code J/Replacement JStaap f I I[~Yes No ITRANSITION TUBE IASSEMBLY N/A iH/A[FOR MSA TAG&#xb9;3-1096[UHi((Repaired)Ho 7.Description of llork: TRANSITION TUBE OH SNUBBER 3-1096 MAS SHORTENED BY REMOVING EXISTING HELD AHD RENELDING.
: 9. Remarks:    HECHANICAL CONNECTION NO 'WELOIHG REOUIREO.
8.Tests Conducted:
CERTIFICATE OF OOHPLIANCE lie  certify that    the statements  made  in the report are correct  and  this'eplacement conforms to thol rulles of the ASIDE  'Code, Section  XI.
Hydrostatic:
Type Code Symbol Stamp                                          N A
Other VT-3 Pneunatic:
    -Certif icate of Authori".ation    No.         ~HA I
Hominal Operating Pressure 4F 97-013-3 Sheet 2 of 2 FORH MIS.2 (Back)9.Remarks: ALL MELDING PIERFORHED IN ACCORDANCE MITH APPROVED PLANT'PROCEDURES.', CERTIFICATE OF COHPLIAHCI lie certify that the statements made in the report are cor'rect and this'epair'onfor'ms to the i;utels oP th'ASHE Code, Section Xl.Type Code Symbol StrmTo Certificate of Author'fzatfon Ho.~NA Expiration Date Owner or OwnerBdl/Designee/
Signed                              cfar      +ivw~~P(<~
Title p.~NA'9~CERTIFICATE OF INSIERVICE INSPECTION I, the undersigned, hoidling a valid comrrfssfon fssuk bg th2I.Ma'tfohai'Board o'f Boiie'r and P'resdure'essel'nspectors and the state or Province of Dade County,and empfoy2%by Arkwright Kutuai, Insurance'oripnnl/
Own  r or wner's  Oesignee,  T>tl'e CERTIFICATE OF IHSERVICE INSPECTIOH I, the undersigned,, holding a valid co>r>>>issiion issued by the National Board of Boiler and Pressure Vessel inspectors and the state or F'rovince of Dadle County and employed by Arkwright Hutual Insure'nce Cempany.*f Norwood, Ha. lieve inspected the comF>onents described in this 'Owners 'Report during the period        07/14/96    to 03/27/97        and state that to the best of my knowledge and belief, the Owner has perfors>ed examinations and taken corrective measures described in this Owners Report'n 'accords'nce'with tHe requirements. of the ASHE Code, Section XI.
of Norwood, Ha.have inspectedl the corrponents described in this Owners Report during the, period 03/25/97 tio 04/16/97 and staIte that to the best of my knowledge and belief, the owner has F2erformed ekamfnatfo&
By signing this certificate neither the Inspector r>or his employer makes any warranty, expressed or implied, concerning the examinations and corrective measui os 'described in this Owner's Report. Furthermore, neither the Inspector nor his e>qpioyer shall be liable in'ny manner for any personal injury or property damage or a loss of any kind ari:sing from or connected with this'ns'pection'.
and taken corrective measures dlescribed in this Owners Report in accordance with the requirements IOf the.ASME Code, Section XI.By sigriing this certilficate neither the InspeICtcr nor his eccployer makes any warranty, expressed or implied, concerning the examinations and corrective measure's drl.scribed fn'his Owner's Report.Furthermore, neither the Inspector nor his qaployer'hall be liable in any rtranner for,any personal injury or property damage or a loss of any kind arising from or connected with'hfs I'nspection.
Inspe tors    >gnature                                  National~ Board, State, Providence, ahd &do>>sMnts Date 97-O12-3
I I I BnmnIssInns MB 823~08~12 Inspect rs Si ature'affon'nl Board, State8 ProvidenIce, andi Endorsements Date iP 19 97-01,3-3 FORH NIS-2 OHHERS REPORT FOR REPAIRS OR REPL'ACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power&Li ht Date 04 08 97 700 Universe.Blvd.Juno Beach Fl.33COB Address'Sheet 1 of 2 2.Plant Turke Point Plant Unit PQO&#xb9;:63/2418 HO&#xb9;: '97006494 9760 Su 3CC Street Florida.Cit Fl.33035 Address 3.Hork Performed by Florida-Power
 
&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address 4.Identification of System: RHR N A System&#xb9;: 50 Quality Group: 8 Repair Organization P.O.Ho.,Job No.,etc Type Code Symbol Staap N A Authorization Ho.Expiration Date N A 5.(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~M A Code Case 6.Identification of ConTxinents Repaired or Replaced and Replacement Conponents Kame of Conponent Name of Hanufacturer iHanufacturer(National i Serial No.Board I Other Identification iyear i Repaired i ASHE i/Built(Replaced or,/Code i/Replacement
FORM   NIS-2 OLINERS REPORT   FOR REPAIRS OR REPLACEMENTS As Required by     the Provisions of the     ASME Code   Section XI
/Steap J l I[~Yes ue IPLUGS (4)H/A iH/A iH/A PRO-3-1469 UTC 406038 ASHE iUNK./Replacement
: 1. Owner          Florida   Power Li ht                                         Date                     04 16 97 700:Universe Blvd. Juno Beach Fl. 33408                                     Sheet                             of   2 Address 2; .Plant         Turke   Point Plant                                               Unit Name                                                PNO &#xb9;:63/2645        NO &#xb9;:   97007310        CR  &#xb9;:    97-53l 9760 SW 344 Street   Florida Cit         Fl. 33035 Address                                                   Repair Organization P.O. No.,Job Ko.,etc 3'., llork Performed by       Florida   Power   I Li ht                                 Type Code Symbol Stamp                    N A Name                                                 Authorization Ho.                         N A Expiration, Date                          N A P.O. Box 4332     Princeton     Fl. 33032 Address
/No SA-182 F316 SS 7.Description of Ilork: REPLACED PLUGS ON RESTRICTING ORIFICE RO-3-1469'FLANGES.
: 4. Identification of System:         C    onent Coolin Hater      S  stem        System &#xb9;:       30        Quality Group:         B
8.Tests Conducted:
: 5. (a) Applicable Construction Code                               B31.1                         1955   Edition,   NA    Addenda,~N A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                   1989   Edition,~N    A  Addenda,~H A      Code Case
Hydrostatic:
: 6. Identification of Components Repaired or Replaced,and Replacement Components Name of                   Name  of,      ')Manufacturer) National      (             Other,            (Year  .(  Repaired ) ASME        ]
Other PneLInat 1 c I'Hominal Operating Pressure Pressure~g A ig Test teepereture 97.014-3 Sheet 2 of 2 FORH NIS.2 (Back)9.Remarks: HECKANICAL CONNECTION~NO MELDING REOUIRED.CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are carr'ect'and'his replacement conforms to the ru'les of the ASHE Code, Section XI.Type Code Symbol St~>Certificate of Authorization No.N~A Expiration Date I Signed.~~+,)i~~~AAe i~~Data Dune or O~rrk's Designee, Ti e CERl'l I'I CATE OF INSERVI CIE IIIISPECT ION I, the undersigned, holding s valid clxtmission issued by the National Beard of Boiler and pressure Vessel J inspectors and the state.or Province.of Dade County and emp)<vyeai'by Arkuright l<utual'Insurance C'cxrphny of NorMOOd, Hs.have inspected the caqmnents descriked in this Owners Report during.the period i03/14/97 to 04/08/97 snd state that<<o the best of my knox)edge snd belief,, the Darner has performed examinations and taken corrective messue es described.in this owaers Report in accordance Hith the.requirements of the ABHE code, Section XI.By signing this certificate neither the Inspectot nor his'esp)oyer makes sny Msrranty,.expressed or implied, concerning the exsmiinations and corrective messu'res'descritied
Coayonent                Manufacturer       [ Serial  Ho.      Board            Identification          [Built(   Replaced or ] Code      J
'in t'his (Incr's Report.Furthermore, neither the Inspector nor his,employer shall be liablo in sn)~manner for any personal injury or)~rcport)<
                                                                                                                                / Replacement JStaap      f I        I                [~Yes No ITRANSITION TUBE                  N/A                   iH/A                         [FOR MSA TAG    &#xb9;3-1096          [UHi(   (Repaired        )Ho IASSEMBLY
: 7. Description of llork:      TRANSITION TUBE OH SNUBBER 3-1096 MAS SHORTENED BY REMOVING EXISTING HELD AHD RENELDING.
: 8. Tests Conducted:         Hydrostatic:                   Pneunatic:                   Hominal Operating Pressure Other VT-3                                                                                                4F 97-013-3
 
Sheet 2 of 2 FORH MIS.2 (Back)
: 9. Remarks:   ALL MELDING PIERFORHED IN ACCORDANCE MITH APPROVED PLANT 'PROCEDURES.',
CERTIFICATE OF COHPLIAHCI lie  certify that   the statements    made in the report are cor'rect  and this 'epair      'onfor'ms to the                         i;utels oP th' ASHE   Code, Section   Xl.
Type Code Symbol StrmTo Certificate of Author'fzatfon      Ho.         ~NA                              Expiration Date                      ~NA
                                                                                                                                                '9~
Owner  or OwnerBdl/Designee/ Title p.
CERTIFICATE OF INSIERVICE INSPECTION I, the undersigned, hoidling a valid comrrfssfon fssuk bg th2I. Ma'tfohai 'Board o'f Boiie'r and and the state or Province of Dade County,and empfoy2% by Arkwright Kutuai, Insurance'oripnnl/ of P'resdure'essel'nspectors I
Norwood, Ha. have inspectedl the corrponents described in this Owners Report during the, period                                   03/25/97    tio  I 04/16/97       and staIte that to the best of my knowledge and belief, the owner has F2erformed ekamfnatfo& and I
taken corrective measures dlescribed in this Owners Report in accordance with the requirements IOf the.ASME Code, Section XI.
By sigriing this certilficate neither the InspeICtcr nor his eccployer makes any warranty, expressed or implied, concerning the examinations and corrective measure's drl.scribed fn'his Owner's Report. Furthermore, neither the Inspector nor his qaployer'hall be liable in any rtranner for,any personal injury or property damage or a loss of any kind arising from or connected with'hfs I'nspection.
BnmnIssInns        MB  823~08~12 Inspect rs Si     ature                                   'affon'nl  Board, State8 ProvidenIce, andi Endorsements Date    iP 19 97-01,3-3
 
FORH  NIS-2 OHHERS REPORT     FOR REPAIRS OR REPL'ACEHEHTS As Required by the       Provisions of the     ASHE Code     Section XI
: 1. Owner         Florida Power Li ht                                           Date                     04 08 97 700 Universe. Blvd. Juno Beach       Fl. 33COB                            'Sheet         1                 of   2 Address
: 2. Plant       Turke   Point Plant                                                 Unit PQO &#xb9;:63/2418        HO &#xb9;: '97006494 9760 Su 3CC  Street   Florida.Cit       Fl. 33035 Address                                                     Repair Organization P.O. Ho.,Job No.,etc
: 3. Hork Performed by       Florida-Power     & Li ht                                 Type Code Symbol Staap                    N A Name                                                 Authorization Ho.                        N A Expiration Date                          N A P.O. Box 4332   Princeton   Fl. 33032 Address
: 4. Identification of System:       RHR                                            System   &#xb9;:       50        Quality Group:       8
: 5. (a) Applicable Construction     Code                       B31.1                           1955  Edition, HA    Addenda,~H A   Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                   1989   Edition,~N  A  Addenda,~M A    Code Case
: 6. Identification of ConTxinents Repaired or Replaced and Replacement Conponents Kame of                   Name of       iHanufacturer( National                      Other            iyear  i  Repaired i ASHE      i Conponent              Hanufacturer       i Serial No.         Board           Identification         /Built(   Replaced or,/ Code     i I                                                                      / Replacement /Steap    J l      I               [~Yes ue IPLUGS  (4)                    H/A                  iH/A            iH/A           PRO-3-1469 UTC 406038 ASHE iUNK. /Replacement           /No SA-182 F316 SS
: 7. Description of Ilork:     REPLACED PLUGS ON RESTRICTING ORIFICE RO-3-1469'FLANGES.
8 . Tests Conducted:    Hydrostatic:                   PneLInat 1 c I                'Hominal Operating Pressure Other                            Pressure~g      A      ig    Test teepereture 97.014-3
 
Sheet 2 of 2 FORH NIS.2 (Back)
: 9. Remarks:   HECKANICAL CONNECTION~NO MELDING REOUIRED.
CERTIFICATE OF COHPLIANCE Me  certify that   the statements   made in the report are carr'ect'and'his replacement conforms to the ru'les of the ASHE Code,   Section XI.
Type Code Symbol     St~>
Certificate of Authorization      No.           N~A                                  Expiration Date Signed     .
Dune
                            ~~+,)              i I or O~rrk's Designee, Ti
                                                        ~~~ AAe i~~
e Data CERl'l I'ICATE OF INSERVI CIE IIIISPECT ION J
I, the undersigned, holding s valid clxtmission issued by the National Beard of Boiler and pressure Vessel inspectors and the state. or Province. of Dade County and emp)<vyeai'by Arkuright l<utual 'Insurance C'cxrphny of NorMOOd, Hs. have inspected the caqmnents descriked in this Owners Report during .the period               i03/14/97    to 04/08/97       snd state that <<o the best of my knox)edge snd belief,, the Darner has performed examinations and taken corrective messue es described .in this owaers Report in accordance Hith the. requirements of the ABHE code, Section XI.
By signing this certificate neither the Inspectot nor his'esp)oyer makes sny Msrranty,.expressed or implied, concerning the exsmiinations and corrective messu'res'descritied 'in t'his (Incr's Report. Furthermore, neither the Inspector nor his,employer shall be liablo in sn)~ manner for any personal injury or )~rcport)<
damage or s loss of sny kind arising fries or connected Hith this inspection.
damage or s loss of sny kind arising fries or connected Hith this inspection.
Comsissions NB 8230~N LII Inspectors'gnatlxhf National Board, State, Providence, snd Endorsements Date 197 7 9?.CI14-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section Xt 1~Owner Florida Power&Li ht Date 04 01 97 700 Universe Blvd.Juno Beach Fl.33408 Address 2~Plant Turke Point Plant Sheet 1 Unit PWO&#xb9;:63/6231 of 2 WO&#xb9;: 96009195 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Pate M A N A 4.Identification of System: CHEMICAL&VOLUME COMTROL System&#xb9;: 47 Quality Group: B 5~(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~MA Code Case 6.Idgntif ication of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer iHanufacturer i Serial No.National i Board Other Identification (Year i Repaired i ASHE (JBuilti Replaced or i Code i J Replacement JStarp (I I JYesreue i4" BUTTERFLY VALVE (STUDS (8)I IHUTS (16)I FISHER ,(N/A ,iN/A IN/A I H/JI (H/A IN/A 13-269 UTC 407522)H/A i3-269 UTC 378831 IH/A I3-269 UTC 405142 iUNK.(Replacement iMo iUNK.iReplacement iHo iUNK./Replacement
Comsissions         NB 8230 ~N   LII Inspectors'gnatlxhf                                           National Board, State, Providence, snd Endorsements Date                               197   7 9?. CI14-3
/No 7.Description of Work: CHARGING PUMP 38 INLET ISOLATION VALVE 3-269 REPLACEHENT.
 
'e 8.Tests Conducted:
FORM   HIS-2 OWNERS REPORT   FOR REPAIRS OR REPLACEMENTS As Required by the     Provisions of the     ASHE Code     Section Xt 1 ~ Owner         Florida   Power &   Li ht                                         Date                       04 01 97 700 Universe   Blvd. Juno Beach Fl. 33408                                 Sheet          1                of      2 Address 2~   Plant         Turke   Point Plant                                               Unit PWO &#xb9;:63/6231       WO &#xb9;:   96009195 9760 SW 344 Street     Florida Cit       Fl. 33035 Address                                                 Repair Organization P.O. Ho.,Job Ho.,etc
Hydrostatic:
: 3. Work Performed by       Florida   Power &   Li ht                                 Type Code Symbol Stamp                    M A Name                                               Authorization Ho.
Pneunatic:
Expiration Pate                            N A P.O. Box 4332   Princeton     Fl. 33032 Address
Nominal Operating Pressure X Pressure~20 te Test tespereture 89'F 97-015-3 Sheet 2 of',2 FORN NIS-2 (Back)9.Remarks: NECKANICAL CONNECTION~NO MELDING RI=QUIRED, CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct andi.thiis replacement conforms to the r)iles of the ASHE Code, Section XI.Type Code Symbol Stamp~NA Certificate of Authorization No.N~A Signed Owner or Owners Designee, Tsti.e'ate',19 Expirsiion Date~ii A Ili CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdiing a valid conmission issued by the National Board of Boiler-and Pressure'Vessel inspectors and the state or province of.Dade County:andiempf.oyed by.Arkwright.
: 4. Identification of System:         CHEMICAL & VOLUME COMTROL                     System   &#xb9;:       47       Quality Group:         B 5~   (a) Applicable Construction       Code                       B31.1                         1955   Edition, HA   Addenda,~M A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                   1989   Edition,~HA     Addenda,~MA       Code Case
Hutual Insurance.
: 6. Idgntification of Components Repaired or Replaced and Replacement Components Name of                     Name of       iHanufacturer     National i                 Other            (Year i       Repaired i ASHE (
Company'f')v g Norwood, Na.have inspected the conyonents described in thiis Owners Report during the period'4/07/96'o'jiX I/I/9q and state that to the best of my knowiixige and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE'Code, Section XI.By signing this certificate, neither the Inspector nor his eciployer makes any warranty, expressed or implied, concerning the examinations and corriective measures described in this Owner~s.Report.Furthermore, neither the Inspector nor hiis employer shall be liablie in any manner for any personali injury or property damage or a loss of any kind arising from or connected with this inspection.
Component                Manufacturer      i  Serial  No.      Board            Identification          JBuilti   Replaced or i Code i J
Inspe ors Si+i~'.n ture National Boardl, State, Providence, and Endorsements Date 97-01'I-3 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI1.Owner Florida Power 8 Li ht Name Date 03 30 97 700 Universe Blvd.'uno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PWO&#xb9;:2508/63 WO&#xb9;: 97006766 CR&#xb9;: 97-0466 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida.Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date N A N A 4.Identification of System: SAFETY INJECTION System&#xb9;: i62 Quality Group: 8 5.(a)Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Coaponents Repaired or Replaced and Replacement Components Name of Component Name of Hanufacturer (Hanufacturer]
Replacement JStarp (
National J Serial Ho.Board Other.Identification (Year (Repaired J ASHE (,]guilt(Replaced or J Code f J Replacement
I     I                 JYesreue i4" BUTTERFLY VALVE               I FISHER               IN/A           IN/A         13-269 UTC 407522                 iUNK. (Replacement        iMo (STUDS    (8)                    ,(N/A                  I H/JI          )H/A         i3-269   UTC 378831               iUNK. iReplacement        iHo I
]Stamp I l I/t~es ee ISUPPORT 8080-R-007-01 IN/A fN/A'fN/A[DRWG&#xb9;5613-H-823 SHT 17 ,(UNK.[Repaired (No 7.Description of Work: GROUND PT IHDICATIONS UNTIL INDICATIONS WERE AN ACCEPTABLE SIZE OR WERE ACCEPTABLE AS-IS PER CONDITION REPORT CR97-0466.
IHUTS  (16)                      ,iN/A                  (H/A            IH/A         I3-269   UTC 405142             iUNK. /Replacement       /No
8.,Tests, Conducted:
: 7. Description of Work:         CHARGING PUMP   38 INLET ISOLATION VALVE 3-269 REPLACEHENT.
Hydrostatic:
                                                                                                                                  'e
I Other PT Pneunatic:
: 8. Tests Conducted:         Hydrostatic:                   Pneunatic:                   Nominal Operating Pressure             X Pressure~20           te     Test tespereture               89           'F 97-015-3
Nominal Operating Pressure eressure~ig test resgereture 4F 97-016-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarks:-NO MELDING IJAS PERFORMED.
 
CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correc't and this'repair conforms to the hule's of th'ASME Code, Section XI.Type Code Symbol Stamp Certificate f Authorization No.~NA Eilpiratldn Ohta~NA s.g.~cfD~@A'.'~4~~~w~~gg~ngive zl Owner'Owners Designee,&itic CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cermission issued by the,Natio'nal Board of Boiler and Presaure'easel'nspectors and the state or Provi:nce of Dade County and employed by Arkwright Mutual Insurance Cori@an'y of Norwood, Ma.have inspected the components described in this Owners Report during the period 03/18'/97'b 03/30/97 and state that to the best of my knowledge and belief, the O~ner has performed examiinat'Iona and taken corrective measures described in this Owners Report in accoi danae with'hd r+uir'ements of, the'ASME Code, Section XI.By signing this certificate neither the Inspector nor his,employer makes any warranty, expressed or implied, concerning the examinatiions and corrective measures d'escribed in this Owner's Report.Fukthermo/e, 1 neither the Inspector nor,his employer shall'be liable-in any'manner'for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Sheet 2 of',2 FORN NIS-2 (Back)
7 P'.Inspector Si iture 19 Comnissions NB 823~0~N I National Board, State, Providence, and Endorsements 0 97-0'I6-3 FORM NIS-2 OWNERS REPORT'FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power 8 Li ht Name Date 03 30 97 700 Universe Blvd.Juno Beach Fl.33C08 Sheet 1 of 2 2.Plant Address Turke Point Plant Name Unit PWO&#xb9;:2507/63 WO&#xb9;: 97006765 CR&#xb9;: 97-0465 9760 SW 3C4 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Ho.,etc 3.Work Performed by Florida Power 8 Li ht Name.P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Date N A H A N A 4.Identification of System: SAFETY INJECTION 5.(a)Applicable Construction Code B31.1 System&#xb9;: 62 Quality Group: B 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and'Replacement Components Name of Component Name of Nanufacturer ,fHanufacturerf National f Serial No.Board Other Identification fYear f Repaired f ASHE f fBui ltf Replaced or f Code f f Replacement fsterp f I I/~rs Ile.fSUPPORT 8080-H-007-07 fN/A IH/A fH/A fDRWG&#xb9;5613-H-823 SHT 11 fUNK.fRepaired fNo 7.Description of Work: GROUND PT INDICATIONS UNTIL THEY WERE AN'ACCEPTABLE SI2E'OR WERE ACCEPTABLE FOR USE AS-IS IAW CONDITION REPORT CR97-0465.
: 9. Remarks:   NECKANICAL CONNECTION~NO MELDING RI=QUIRED, CERTIFICATE OF COMPLIANCE Me certify that the   statements made in the report are correct andi.thiis replacement conforms to the r)iles of the ASHE Code, Section   XI.
t 8.Tests Conducted:
Type Code Symbol Stamp                                       ~NA Certificate of Authorization     No.         N~A                             Expirsiion Date          ~ii A
Hydrostatic:
                                                                                  'ate Ili Signed                                                                                                       ',19 Owner or Owners Designee, Tsti.e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdiing a valid conmission issued by the National Board of Boiler-and Pressure 'Vessel inspectors and the state or province of. Dade County:andiempf.oyed by. Arkwright. Hutual Insurance. Company'f v g Norwood, Na. have inspected the conyonents described in thiis Owners Report during the period '4/07/96             ')
Other PT Pneunatic:
            /
Nominal Operating Pressure Pressure~sip test Temperature oF'97-017-3 Sheet 2 of 2 FORH NIS-2 (Back),9.Remarks: NO IIELDING llAS PERFORMEI).
I/ I 9q and state that to the best of my knowiixige and belief, the Owner has performed examinations and         'o'jiX taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE 'Code, Section XI.
CERTIFICATE OF COMPLI ANCIE lre certify that the ststmrents made in the report are correct and this'epai'r conforms to the rules of th'e ASHE Code, Section XI.Type Code Symbol Stamp Certificate o Authorization No.~H A Signed O~ner.r Owrer/K Designee, Title Expiration Date~N A Qc~/fY~~Date~/~g~aP/CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding s valid conmlssion issued by tHe Hatiohai Board of Boiler and.pres!ure.Vessel inspectors snd the state or province of-Dade County and employed by~Arkwright Hutual Insurance Coriipan'y of Norwood, Ha.have inspected the components described in this owners R'eport during the period'3/18'/97'tb 03/30/97 and state that to.the best of my knowledge and belief, the O~ner has perforaed exsmiinat'iong and taken corrective measures describNI in this Owners Report in a'ccordan'ce With'he requirements of the-ASHE Code, Section XI.By signing this certificate neither the Inspector nor h'is employer makes any warranty, expressed, or implied, concerning the, examinations and corrective aeasures described in this Owner's Report.Furthermore, neither the Inspector.nor his empiloycr shall be liable in any manner for, any personal injury or pkopei ty~damage or a loss of any kind aris'ing frora or corrnected with this!inspection.
By signing this certificate, neither the Inspector nor his eciployer makes any warranty, expressed or implied, concerning the examinations and corriective measures described in this Owner~s. Report. Furthermore, neither the Inspector nor hiis employer shall be liablie in any manner for any personali injury or property damage or a loss of any kind arising from or connected with this inspection.
S-;I..i....r B~r~oSCu Ins pec rs iture Hatiorral Board, State, Providence, and Endorserrer)ts Date 0 9'7-0'I7-3 FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power&Li ht Name Date 03 30 97 700'Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PWO&#xb9;:2506/63 WO&#xb9;: 97006764 CR&#xb9;: 97-0464 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Mo.,etc 3.Work Performed by'Florida.Power&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration'Date M A N A N A 4.Identification of System: SAFETY INJECTION System&#xb9;: 62 Quality Group: B 5~(a)Applicable Construction Code B31.1 1955 Edition, MA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer IHanufacturerI National I, I Serial No.Board Other Identification I"ear I Repaired I ASHE I IBuiltI Replaced or I Code I I Replacement IStamp I I I/~res ue ISUPPORT 8080-H-007-10 I H/A IN/A IN/A IDRWG&#xb9;5613-H-823 SHT 15 IUMK.IRepaired INo 7.Description of Work: GROUND PT INDICATIONS UNTIL ACCEPTABLE SI2E OR WERE ACCEPTABLE FOR'USE AS-IS PER CONDITION REPORT CR97-0464.
                                  +i~'.n Inspe  ors Si    ture                                 National Boardl, State, Providence, and Endorsements Date 97-01'I-3
t 8.Tests Conducted:
 
Hydrostatic:
FORM   NIS-2 OWNERS REPORT   FOR REPAIRS OR REPLACEHEHTS As Required by the     Provisions of the   ASHE Code   Section XI
Other PT Pneunatic:
: 1. Owner         Florida   Power 8 Li ht                                         Date                       03 30 97 Name 700 Universe   Blvd.'uno   Beach   Fl. 33408                         Sheet         1                   of   2 Address
Nominal Operating Pressure Pressure~sig Test temperature 4F 97-018-3 Sheet 2 of 2 FORM NIS-2 (Back)0 9.Remarks: NO WELDINB WAS PERFORMED.
: 2. Plant         Turke   Point Plant                                             Unit PWO &#xb9;:2508/63         WO &#xb9;:   97006766       CR   &#xb9;:   97-0466 9760 SW 344 Street   Florida Cit       Fl. 33035 Address                                                 Repair Organization P.O. No.,Job No.,etc
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and t'his repair conforms to the Irules df the ASHE Code, Section XI'ype Code Symbol Stamp Certificate o Authorization No.~NA cC~Omar r Orner'&Oesignee, Title 7 N'A E'xpfration Date~P Z/j N~A 19~~0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler eind Predsurk Vessel inspectors and the state or pirovince of Dade County.and employed~by Arkuright.Mutual Insurance Company af Norwood, Ha.have inspected the components described in this Owners Repo'rt during the period'3/18/97 fo, 03/30/97 and state that to the best of my knowledge and beii'ef,'he'gner has perforced exadinakiods aQ taken corrective measures descrited in this ogners Report'in accordance with the requirements of~the~AsHE,cade, Section XI.I By signing this certifi,cate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descriix<in this Owner's Reporti Furthermore,~
: 3. Work Performed by     Florida. Power   8 Li ht                               Type Code Symbol Stamp Name                                               Authorization Ho.                            N A Expiration Date                              N A P.O. Box 4332     Princeton   Fl. 33032 Address
neither the Inspector,nor his empioyer shall be tiabte in~any~man'ner,~for any personal injury or property damage or a toss.of any ki'nd arising from or connected With this inspection., Inspec rs natur e Camni ssions~B80~30 II'I N'atia'nai
: 4. Identification of System:       SAFETY INJECTION                           System   &#xb9;:       i62         Quality Group:         8
'oard, State, Providence, arid Endor'semants Date 19%2 97-018-,'3 FORH HIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power 8 Li ht Name Date OC 08 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit PIS&#xb9;:63/2528 IS&#xb9;: 97006902 9760 SW 3C4 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job No.,etc 3~Work Performed by Florida Power 8 Li ht Nsae P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Mo.Expiration Date N A N A H A 4.Identification of System: CHEHICAL 8 VOLUHE CONTROL System&#xb9;: 47 Quality Group: A 5.(a)Applicable.
: 5. (a) Applicable Construction     Code                     831.1                         1955   Edition,     HA   Addenda,~H A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA                               Code Case
Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case<b),Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced snd Replacement Components Name of Component Name of Hsnufscturcr iHanufactureri National i i Serial Ho.Board Other Identification iYear,i Repaired i ASHE i igui lti Replaced or i Code i i Replacement iStsap i I I i~res se iSTUDS (4)I iNUTS<4)I IN/A IH/A iN/A IN/A iH/A iUTC 352606 ASHE SA-19,iUHK
: 6. Identification of Coaponents Repaired or Replaced and Replacement Components Name of                   Name of       (Hanufacturer] National                   Other.               (Year   (   Repaired J ASHE       (
'iReplacement iHo STK CODE&#xb9;28253 R95-0154 iN/A'UTC 393252 ASTH A-19C iUNK iReplacement iHo.STK CODE&#xb9;27963'VALVE BONNET iVELAH iN/A iH/A i3-312A UTC&#xb9;331592'iUNK.iReplacement iNo STK CODE&#xb9;52C97 7.Description of'Work: REPLACED 4 STUDS AND 4 NUTS ON BODY TO BONNET.REMOVED BONNET FROM SPARE VALVE IN STORES AND REPLACED EXISTIHG BONNET ON CHECK VALVE 3-312A.Pneunst 1 c I Hominal Operating Pressure X pressure~gggg sig rest Temperature 535 oF 97-019-3 Sheet,2 of 2 FORH NIS 2 (Back)9.Remarks: HECNANICAL CONNECTIOlk NO WELDINO REOUIRED.CERTIFICATE OF COHPLIANCE Ne certify that the statements made in the rcport are cor'rect and th'is replacement conforms to the rule., of the ASHE Code, Section XI.Type Code Symbol Stamp Certificate of Author ization Ho,.Signed N~A Expiration Date~HA'19O~ner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid catmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employe'd b)'I Arkwright Hutual Insurance C~ny of Norwood, Ha.have inspected the conponents descri'bed inIthik OwInerk Report during the period, 03)19/97 to 03/30/97 and state that to thc best of my knowledgeI and be'Iiei', the Owner has performed examinations
Component                Hanufacturer      J Serial Ho.      Board            Identification          ,]guilt(   Replaced or     J Code f J
'and taken corrective measures deScribof in thiis Owners Reposit id ac'cordanc'e with the requirements.of the ASHE Code, Section XI~By signing this certificate neither the Inspector nor'i.">>emplo)e'er smokes any warranty, expressed or implied, concerning the examinations and corrective measures described in this owner"s Report.Furthermore, neither the Inspector nor his employer shall be-Liable in any manner for any personal..injury or property damage or a loss of any kind arising from or connected with this inspection.
Replacement ]Stamp       I l     I                 /t~es ee ISUPPORT 8080-R-007-01       IN/A                   fN/A           'fN/A       [DRWG &#xb9; 5613-H-823   SHT 17   ,(UNK. [Repaired           (No
P Conmisslons NB 8230 H I Inspe ors Sii ture National Board, State, Providence, and Endorsements Date<<9)97 019'-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
: 7. Description of Work:       GROUND PT   IHDICATIONS UNTIL INDICATIONS       WERE AN ACCEPTABLE     SIZE   OR WERE ACCEPTABLE AS-IS PER CONDITION REPORT       CR97-0466.
'As Required by the Provisions of the ASME Code Section XI 1.Owner Florida Power&Li ht Date 03 0 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2., Plant Turke Point Plant Unit PWO&#xb9;:63/7857 WO&#xb9;: 96014466 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job Ho.,etc 3.Work Performed by Florida Power&Li ht Name P.O.Box 4332 Princeton Fl.33032'ddress Type Code Symbol Stamp Authorization Ho.Expiration Date N A N A 4.Identification of System: MAIN STEAM System&#xb9;: 72 Quality Group: 8 5.(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of CoJJponents Repaired or Replaced and Replacement Conponents Hame of Component I I)STUDS (4)I IHUTS (24)Name of Manufacturer fN/A IH/A)Serial Ho.Board i N/A (N/AlManufacturer[
8.,Tests, Conducted:     Hydrostatic:I                 Pneunatic:                 Nominal Operating Pressure Other  PT                      eressure~ig                 test resgereture                             4F 97-016-3
National Other, Identification iUTC 393207 STK CODE&#xb9;28047 IUTC 408254 STK CODE&#xb9;27869 R87-6134]Year]Repaired (ASME](Built/Replaced or/Code (/Replacement
 
/Steep/I I J~Ys ue (UHK[Replacement (No (UHK'J Replacement
Sheet 2 of 2 FORM NIS-2 (Back)
]No 7.Description of Work: REPLACEMEHT OF 4 STUDS AHD 24 HUTS ON BODY TO BONNET VALVE POV-3-2606.
: 9. Remarks:-   NO MELDING IJAS PERFORMED.
8.Tests Conducted:
CERTIFICATE OF COMPLIANCE Me   certify that   the statements   made in the report are correc't and this 'repair       conforms to the hule's of                     th' ASME   Code, Section   XI.
Hydrostatic:
Type Code Symbol Stamp Certificate f Authorization       No.         ~NA                               Eilpiratldn Ohta   ~NA s.g.~         cfD ~@A'.'~4~
Other Pneunatic:
Owner'    Owners  Designee,&itic
Hominal Operating Pressure Pressure~pig Test Temperature DF 97-020-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarks: THIS IS HECHANICAL CONMECTIOM MO WELDINB REOUIREDz CIERT IF I CATE OF COHPLIAh1CE Type Code Symbol Stamp M A Certificate f Authorization No.M~A Expiration Date M A We certify that the statements made in thc report are correct and this replacement conforms to the rules of ASHE Code, Section XI.I the I'I I Signed n sr~.4k~~<<Date pn~i5 Zl,, 119 f2 Owner r Ctwner'Vbesignee, Title CERTIFICATE OF INSERVICE IHSPECT ION I, the undersigned, holding s valid commis!ion issued by the National Boarcl of Boiler andi Pressure Vessel inspectors snd the state or Province of Dade County and enpboyed by'Arkwright*Hutual Insurance Company of Norwood, Ha.hive inspected the corponcnts descrilbed in this Owners: Report during the period 07/'IB/96, to 03/30/97 and state tlhat to the best of my knowledge:
                                                            ~~w~~gg~                   ngive         zl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cermission issued by the,Natio'nal Board of Boiler and and the state or Provi:nce of Dade County and employed by Arkwright Mutual Insurance Cori@an'y of Presaure'easel'nspectors Norwood, Ma. have inspected the components described in this Owners Report during the period                                     03/18'/97'b 03/30/97       and state that to the best of my knowledge and belief, the O~ner has performed examiinat'Iona and taken corrective measures described in this Owners Report in accoi danae with'hd r+uir'ements of, the 'ASME Code, Section XI.
and beltief,, the Owner has performed exhminlatibns land'aken corrective measures dcscribecl in this Owners Report in accordance with the requirements of the ASHE Code, Section XI.By signing this certificate neither the Inspector nor his employer.makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspe'ctor nor his enploycr shall be liabi,e in any manner for sny personal injury ori property damage or s loss of any kincl arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his,employer makes any warranty, expressed or implied, concerning the examinatiions and corrective measures d'escribed in this Owner's Report. Fukthermo/e, neither the Inspector nor,his employer shall 'be liable-in any 'manner 'for any personal injury or property                     1 damage or a loss of any kind arising from or connected with this inspection.
conmissioins NB 8230 N I Inspec ors~nature National Board, State, Providence,.
7 P'.
and Endorscmcnts Date 119++97-020-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR'REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1.Owner Florida Power 8 Li ht Name Date 04 02 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Unit 3 PIN&#xb9;:63/7086 QO&#xb9;: 96014408'9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization-P.O., No.,Job Ho.,etc 3.llork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization,No.
Comnissions       NB 823~0 ~N   I Inspector  Si  iture                                    National Board, State, Providence, and Endorsements 19 97-0'I6-3 0
Expiration.
 
Date H A N A N A 4.Identification of System: SAFETY INJECTION 5.(a)Applicable Construction Code B31.1 System&#xb9;: 62 Quality Group: A 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Idgntification of Components Repaired or Replaced'and Replacement
FORM   NIS-2 OWNERS REPORT'FOR   REPAIRS OR REPLACEHEHTS As Required by     the Provisions of the     ASHE Code Section XI
'Components I:I IPSA-3'JSMUBBER IPSA-3 iSHUBBER Name of Component Name of Nanufacturer IPACIFIC SCIENT I F I C IPACIFIC SCIENT I F IC (Hanufacturer(National J[Serial No.Board Other Identification
: 1. Owner         Florida   Power 8 Li ht                                         Date                       03 30 97 Name 700 Universe Blvd. Juno Beach       Fl. 33C08                         Sheet         1                   of   2 Address
[2889 117425 IN/A!3-1019, 3-PRWH-I.I3-1019, 3.PRWHu1[Year)Repaired J ASNE J[guilt]Replaced.or (Code']f, Replacement JStanp J I I~Ves ue (UHK (Replaced Yes)UHK[Replacement)Yes 7.Description of Mork: SNUBBER REPL CED DUE TO'LCO ON UNIT 4 8.Tests Conducted:
: 2. Plant         Turke   Point Plant                                               Unit Name                                             PWO &#xb9;:2507/63         WO &#xb9;:   97006765       CR   &#xb9;:   97-0465 9760 SW 3C4 Street   Florida Cit       Fl. 33035 Address                                                   Repair Organization P.O. No.,Job Ho.,etc
Hydrostatic:
: 3. Work Performed by       Florida   Power 8   Li ht                               Type Code Symbol Stamp                      N A Name.                                             Authorization Ho.                            H A Expiration Date                              N A P.O. Box 4332     Princeton     Fl. 33032 Address
Other VT-3 Pneuaatic:
: 4. Identification of System:         SAFETY INJECTION                           System   &#xb9;:       62         Quality Group:         B
Hominal Operating Pressure pressure~u S is test Temperature S S'F 97-021.3 Sheet 2 of 2 FORK HIS-2 (Back)0 9.Remarks: HECHAMICAL COHNECTIOM, MO WELDINB REOUIIRED.
: 5. (a) Applicable Construction Code                              B31.1                        1955   Edition,   NA   Addenda,~N A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                 1989   Edition,~NA       Addenda,~NA       Code Case
CERTIFICATE OF COHPLIAHCE Me certify that the statements mode in the report src correct iandi this rcplalcemcnt conforms to the rules of the ASHE,Code, Section XI~Type Code Symbol Stamp N A Certificate of Authorization No.N~A;z r Signed giWgrf'+i'~
: 6. Identification of Components Repaired or Replaced and'Replacement               Components Name of                   Name of       ,fHanufacturerf National                     Other               fYear   f   Repaired     f ASHE f Component                Nanufacturer        f  Serial  No.      Board            Identification          fBui ltf Replaced   or   f Code   f f Replacement     fsterp   f I       I                 /~rs Ile   .
di~A n.c:>Owner Ownerr+Designee,'title i Expiration Date~l~~~OnCe"0 CI.=RT IF I CATE OF I'NSERVICE IMSPECTIOM I, the undersigned, holding a valid crxrmission issued by the Mstlio&l Board of Boiler and Pressure Vessel inspectors snd thc state or province of Dade County snd employed by Arkwright Hutusl Insurance ComFrsny'f
fSUPPORT 8080-H-007-07       fN/A                   IH/A           fH/A       fDRWG &#xb9; 5613-H-823     SHT 11   fUNK. fRepaired           fNo
'orwood, Hs.have inspected thc crxrponcnts de!cribed.in thia Ownera Report dur'ing'ha pe'riod'9/18/96 i toi 04/01/97 and state tibet to'the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described'in this Orrners Report.in sccordlancc with the requirerrrents of this ASHE iCode, Section XI.I By signing this certificate neither the In, pector nor hiS emfrioyer rlrskes sny warranty, expressed orl implied, concerning the examinations and corrective measurea deacri'bed'.in
: 7. Description of Work:       GROUND PT   INDICATIONS UNTIL THEY       WERE AN'ACCEPTABLE SI2E'OR WERE ACCEPTABLE FOR USE AS-IS IAW CONDITION REPORT       CR97-0465.
'thia Owner's Report.Furtherraord, neither the Inspector nor his errpioyer shall be liabl.e in any manner for sny personal, injury or property damage or a loss of any Ikincl arising from or connects with'thiS irispct;Cion.
t     8. Tests Conducted:       Hydrostatic:
I Inspe ors:S nature Coerrrissions, HB 8230~M~I-iNstionell Bayard, State, Providcnc'e, snd Endorsements Date i4'9~$0 97-021-3 FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEH'IS As Required by.the Provisions of the ASME Code Section XI 1.Owner Florida Power 8 Li ht Name Date 04 07 97 700 Universe Blvd.Juno Beach Fl.33408 Address 2.Plant Turke Point Plant Sheet.1 Unit of 2 Name PNO&#xb9;:63/7855 lO&#xb9;96012072 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.Ho.,Job No.,etc 3~Nork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date N A N A H A 4.Identification of System: REACTOR COOLANT System&#xb9;: 41 Quality Group: 'A 5.(a)Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer
Other   PT Pneunatic:
/Manufacturer/
Pressure~sip Nominal Operating Pressure test Temperature                             oF
National (J'Serial Ho.Board Other Identification
                                                                                                                                            '97-017-3
[Year J Repaired J ASME])guilt)Replaced or)Code]]Replacement
 
[Stamp[I I J~res ue IPRESSURIZER RELIEF VALVE I CROSBY I IPRESSURIZER RELIEF VALVE ICROSBY (N51249e 1361 I H/A I RV 551C JUNK.)Replacement
Sheet 2     of 2 FORH NIS-2 (Back)
]Ho IH69877-01 IN/A IRV-3-551C
,9. Remarks:   NO IIELDING llAS PERFORMEI).
/UHK./Replaced/Ho-0009 7.Description, of Mark: REMOVE PRESSURIZER SAFETY VALVE RV-3-551C AHD INSTALL SPARE.Pneunatic:
CERTIFICATE OF COMPLI ANCIE lre certify that     the ststmrents made in the report are correct and this 'epai'r       conforms to the rules of th'e ASHE Code,     Section XI.
Hominal Operating, Pressure X Pressure~22SD sig Test Tesuereture 535'F 97.022-3 Sheet 2 of 2 FORM NIS-2 (Back)0 9.Remarks: MECHANICAL CONNECTION HO MELDING REOOIREO.CERTIFICATE OF COMPLIANCE lie certify that the statements made in the report are correct and-,this replacement conforms to the rules of the ASNE Code, Section XI.Type Code Symbol Stamp H A Certificate of Authorization Ho.~M A Signed Own r or wner's Designee, Tiitie Expi,ration Date H A Date 19 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, ho'lding a valid comnlsslon issued by the Hationai, Board of Boiler and Pressure Vessel inspectors and.the state or Province of Dade County and enpioyed by Arkwright Mutual Insurance Company of Norwood, Na.have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief, the Owner has performed examinations.and taken corrective measures descril)ed in this Owners Report in accordance with the requirements of the ASl{E Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his em!cloyer:
Type Code Symbol Stamp Certificate     o Authorization   No.         ~H A                           Expiration Date           ~N A Signed                                                    Qc~   /fY~ ~         Date ~/~g~           aP/
hall be liable ini any manners for any personal injury or prop'ert)~
O~ner. r Owrer/K Designee,  Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding s valid conmlssion issued by tHe Hatiohai Board of Boiler and.pres! ure.Vessel inspectors snd the state or province of-Dade County and employed by~Arkwright Hutual Insurance Coriipan'y of Norwood, Ha. have inspected the components described in this owners R'eport during the period '3/18'/97'tb 03/30/97         and state that to .the best of my knowledge and belief, the O~ner has perforaed exsmiinat'iong and taken corrective measures describNI in this Owners Report in a'ccordan'ce With'he requirements of the-ASHE Code, Section XI.
By signing this certificate neither the Inspector nor h'is employer makes any warranty, expressed, or implied, concerning the, examinations and corrective aeasures described in this Owner's Report. Furthermore, neither the Inspector.nor his empiloycr shall be liable in any manner for, any personal injury or pkopei ty       ~
damage or a loss of any kind aris'ing frora or corrnected with this !inspection.
Ins pec    rs      iture
                                                              -;I..i....r B~r~oSCu Hatiorral Board, State, S        Providence, and Endorserrer)ts Date 9'7-0'I7-3 0
 
FORM   NIS-2 OWNERS REPORT   FOR REPAIRS OR REPLACEMENTS As Required by the     Provisions of the     ASHE Code   Section XI
: 1. Owner         Florida   Power & Li   ht                                       Date                       03 30 97 Name 700'Universe Blvd. Juno Beach Fl. 33408                                 Sheet         1                   of   2 Address
: 2. Plant         Turke   Point Plant                                             Unit PWO &#xb9;:2506/63         WO &#xb9;:   97006764       CR   &#xb9;:   97-0464 9760 SW 344 Street   Florida Cit       Fl. 33035 Address                                                 Repair Organization P.O. No.,Job Mo.,etc
: 3. Work Performed by     'Florida. Power   & Li ht                               Type Code Symbol Stamp                      M A Name                                               Authorization No.                          N A Expiration'Date                            N A P.O. Box 4332     Princeton   Fl. 33032 Address
: 4. Identification of System:       SAFETY INJECTION                           System   &#xb9;:       62         Quality Group:         B 5~ (a) Applicable Construction     Code                     B31.1                         1955   Edition,   MA   Addenda,~N A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA                       Addenda,~MA       Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name of                   Name of       IHanufacturerI National     I,             Other               I"ear   I   Repaired     I ASHE I Component                Manufacturer      I Serial  No.      Board            Identification          IBuiltI Replaced or       I Code I I Replacement     IStamp   I I       I                 /~res ue ISUPPORT 8080-H-007-10       I H/A                 IN/A           IN/A         IDRWG &#xb9; 5613-H-823     SHT 15   IUMK. IRepaired         INo
: 7. Description of Work:       GROUND PT   INDICATIONS UNTIL ACCEPTABLE SI2E       OR WERE ACCEPTABLE       FOR'USE   AS-IS PER CONDITION REPORT CR97-0464.
t     8. Tests Conducted:       Hydrostatic:
Other PT Pneunatic:
Pressure~sig Nominal Operating Pressure Test temperature                           4F 97-018-3
 
Sheet 2   of 2 FORM NIS-2 (Back) 0
: 9. Remarks:   NO WELDINB WAS PERFORMED.
CERTIFICATE OF COMPLIANCE We certify that   the statements         made in the report are correct   and t'his     repair     conforms to the Irules df the ASHE Code, Section XI'ype Code Symbol Stamp                                               N 'A j
Certificate   o   Authorization         No.         ~NA                                 E'xpfration Date          N~A cC~                                                                   ~P Z/
Omar         r Orner'&Oesignee, Title 19  ~~
0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler eind Predsurk Vessel inspectors and the state or pirovince of Dade County.and employed ~by Arkuright.Mutual Insurance Company af Norwood, Ha. have inspected the components described in this Owners Repo'rt during the period '3/18/97                         fo, 03/30/97       and state that to the best of my knowledge and beii'ef,'he'gner has perforced exadinakiods aQ taken corrective measures descrited in this ogners Report'in accordance with the requirements of ~the~AsHE,cade, Section XI.                                                                                                                             I By signing this certifi,cate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descriix< in this Owner's Reporti Furthermore,~
neither the Inspector,nor his empioyer shall be tiabte in~any~ man'ner,~for any personal injury or property damage or a toss .of any ki'nd arising from or connected With this inspection.,
Camni ssions   ~B80~30         II 'I Inspec    rs        natur e                                    N'atia'nai 'oard, State,   Providence, arid Endor'semants Date                                     19%2 97-018-,'3
 
FORH   HIS-2 OWNERS REPORT     FOR'REPAIRS OR REPLACEMENTS As Required by the     Provisions of the         ASME Code Section XI
: 1. Owner         Florida   Power 8 Li ht                                             Date                               OC   08 97 Name 700 Universe Blvd. Juno Beach       Fl. 33408                               Sheet                   1                 of   2 Address
: 2. Plant         Turke   Point Plant                                                   Unit PIS &#xb9;:63/2528                 IS &#xb9;:   97006902 9760 SW 3C4 Street   Florida Cit       Fl. 33035 Address                                                     Repair Organization P.O. Ho.,Job No.,etc 3 ~ Work Performed by       Florida   Power 8   Li ht                                     Type Code Symbol Stamp                              N A Nsae                                                   Authorization Mo.                                    N A Expiration Date                                    H A P.O. Box 4332   Princeton     Fl. 33032 Address
: 4. Identification of System:         CHEHICAL 8 VOLUHE CONTROL                       System   &#xb9;:                 47       Quality Group:         A
: 5. (a) Applicable. Construction Code                           B31.1                                       1955   Edition,   NA   Addenda,~N A     Code Case
        <b),Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA                                           Code Case
: 6. Identification of Components Repaired or Replaced snd Replacement Components Name of                   Name of       iHanufactureri National i                                 Other             iYear,i Repaired         i ASHE i Component                Hsnufscturcr      i Serial Ho.          Board              Identification                    igui lti Replaced or     i Code i i Replacement   iStsap i I       I               i~res se iSTUDS (4)                     IN/A                 iN/A           iH/A             iUTC 352606 ASHE               SA-19,iUHK         'iReplacement     iHo I                                                                                      STK CODE   &#xb9;28253 R95-0154 iNUTS <4)                      IH/A                  IN/A            iN/A         'UTC     393252 ASTH A-19C                     iUNK   iReplacement     iHo I
                                                                                    .
STK CODE
                                                                                                  &#xb9;27963'VALVE BONNET                 iVELAH                 iN/A           iH/A             i3-312A UTC&#xb9; 331592                       'iUNK. iReplacement       iNo STK CODE   &#xb9;52C97
: 7. Description of 'Work:     REPLACED 4 STUDS AND 4 NUTS ON BODY TO BONNET. REMOVED BONNET FROM SPARE VALVE IN STORES AND REPLACED EXISTIHG BONNET ON CHECK VALVE               3-312A.
Pneunst 1 c I                   Hominal Operating Pressure                     X pressure~gggg           sig     rest Temperature                         535         oF 97-019-3
 
Sheet,2 of 2 FORH NIS 2 (Back)
: 9. Remarks:   HECNANICAL CONNECTIOlk     NO WELDINO REOUIRED.
CERTIFICATE OF COHPLIANCE Ne certify that the   statements   made   in the rcport are cor'rect and th'is replacement conforms to the rule., of the ASHE Code,   Section XI.
Type Code Symbol Stamp Certificate of Author ization     Ho,.           N~A                             Expiration Date       ~HA Signed                                                                                                            '19 O~ner or Owner's Designee,     Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid catmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employe'd b)'I Arkwright Hutual Insurance C~ny of Norwood, Ha. have inspected the conponents descri'bed inIthik OwInerk Report during the period, 03)19/97               to 03/30/97       and state that to thc best of my knowledgeI and be'Iiei', the Owner has performed examinations 'and taken corrective measures deScribof in thiis Owners Reposit id ac'cordanc'e with the requirements.of the ASHE Code, Section XI ~
By signing this certificate neither the Inspector nor'i.">> emplo)e'er smokes any warranty, expressed or implied, concerning the examinations and corrective measures described in this owner"s Report. Furthermore, neither the Inspector nor his employer shall be -Liable in any manner for any personal..injury or property damage or a loss of any kind arising from or connected with this inspection.
P Conmisslons       NB 8230   H I Inspe   ors Sii   ture                                     National Board, State, Providence, and Endorsements Date                               <<9     )
97 019'-3
 
FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS
                                                'As             Required by the Provisions of the ASME Code Section XI
: 1. Owner         Florida Power   & Li ht                                                 Date                     03   0 97 700 Universe   Blvd. Juno Beach Fl. 33408                                         Sheet         1                 of     2 Address 2., Plant         Turke   Point Plant                                                       Unit PWO &#xb9;:63/7857       WO &#xb9;:   96014466 9760 SW 344 Street   Florida Cit                   Fl. 33035 Address                                                         Repair Organization P.O. Ho.,Job Ho.,etc
: 3. Work Performed by       Florida   Power & Li               ht                           Type Code Symbol Stamp                    N A Name                                                       Authorization Ho.
Expiration Date                          N A P.O. Box 4332   Princeton     Fl. 33032'ddress
: 4. Identification of System:         MAIN STEAM                                           System &#xb9;:       72       Quality Group:         8
: 5. (a) Applicable Construction Code                                       B31.1                     1955   Edition, HA   Addenda,~N A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA                                     Code Case
: 6. Identification of     CoJJponents   Repaired or Replaced and Replacement Conponents Hame of                   Name   of                   lManufacturer[ National                Other,            ]Year  ]    Repaired ( ASME ]
Component                Manufacturer                  ) Serial Ho.       Board         Identification        (Built/    Replaced or / Code (
I                                                                                                                                    / Replacement    /Steep /
I                                                                                                                            I      I                J~Ys ue
)STUDS  (4)                    fN/A                              i N/A                     iUTC 393207                    (UHK    [Replacement      (No I                                                                                            STK CODE &#xb9;28047 IHUTS  (24)                    IH/A                              (N/A                      IUTC 408254                     (UHK  'J Replacement    ]No STK CODE &#xb9;27869 R87-6134
: 7. Description of Work:      REPLACEMEHT OF 4 STUDS AHD 24 HUTS ON BODY TO BONNET                     VALVE POV-3-2606.
: 8. Tests Conducted:       Hydrostatic:                               Pneunatic:               Hominal Operating Pressure Other                                      Pressure~pig             Test Temperature                           DF 97-020-3
 
Sheet 2 of 2 FORM   NIS-2 (Back)
: 9. Remarks: THIS IS HECHANICAL CONMECTIOM     MO WELDINB REOUIREDz CIERT IF I CATE OF COHPLIAh1CE                                                       I We certify that   the statements made in thc report are correct     and this replacement   conforms to the rules of the ASHE Code, Section XI.
I' Type Code Symbol Stamp                                            M  A Certificate f Authorization      No.                                              Expiration Date            A Zl,,
M~A                                                          M                      I Signed                                                     n   sr~. 4k~~ <<Date         pn~i5                     119  f2         I Owner   r Ctwner'Vbesignee, Title CERTIFICATE OF INSERVICE IHSPECT ION I, the undersigned, holding s valid commis! ion issued by the National Boarcl of Boiler andi Pressure Vessel inspectors snd the state or Province of Dade County and enpboyed by'Arkwright*Hutual Insurance Company of Norwood, Ha. hive inspected the corponcnts descrilbed in this Owners: Report during the period             07/'IB/96, to 03/30/97       and state tlhat to the best of my knowledge: and beltief,, the Owner has performed exhminlatibns corrective measures dcscribecl in this Owners Report in accordance with the requirements of the ASHE Code, land'aken Section XI.
By signing this certificate neither the Inspector nor his employer.makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspe'ctor nor his enploycr shall be liabi,e in any manner for sny personal injury ori property damage or s loss of any kincl arising from or connected with this inspection.
conmissioins       NB 8230   N I Inspec ors ~ nature                                       National Board, State, Providence,. and Endorscmcnts Date                               119++
97-020-3
 
FORH NIS-2 OWNERS REPORT   FOR REPAIRS OR'REPLACEHEHTS As Required by the     Provisions of the     ASHE Code     Section XI
: 1. Owner         Florida   Power   8 Li ht                                         Date                     04 02 97 Name 700 Universe Blvd. Juno Beach         Fl. 33408                           Sheet         1                 of     2 Address
: 2. Plant       Turke   Point Plant                                                 Unit                               3 PIN &#xb9;:63/7086         QO &#xb9;:   96014408
              '9760 SM 344 Street     Florida Cit         Fl. 33035 Address                                                   Repair Organization-P.O., No.,Job Ho.,etc
: 3. llork Performed by     Florida     Power 8 Li     ht                               Type Code Symbol Stamp                      H  A Name                                                 Authorization,No.                          N  A Expiration. Date                            N A P.O. Box 4332   Princeton       Fl. 33032 Address
: 4. Identification of System:         SAFETY INJECTION                             System  &#xb9;:      62        Quality Group:          A
: 5. (a) Applicable Construction Code                               B31.1                         1955 Edition,   HA     Addenda,~H A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                   1989 Edition,~NA     Addenda,~NA       Code Case
: 6. Idgntification of Components Repaired or Replaced'and Replacement 'Components Name of                    Name    of       (Hanufacturer( National     J Other            [Year    )    Repaired J ASNE      J Component                Nanufacturer        [ Serial   No.       Board             Identification         [guilt]    Replaced. or ( Code ']
I                                                                                                                              f, Replacement JStanp J
:I                                                                                                                      I        I                  ~Ves ue IPSA-3                        IPACIFIC                [2889          IN/A         !3-1019, 3-PRWH-I                 (UHK    (Replaced          Yes
'JSMUBBER                        SCIENT  IF IC IPSA-3                        IPACIFIC                117425                      .I3-1019,   3.PRWHu1               )UHK    [Replacement      )Yes iSHUBBER                        SCIENT  I F IC
: 7. Description of Mork:       SNUBBER REPL CED DUE TO'LCO ON UNIT 4
: 8. Tests Conducted:     Hydrostatic:                     Pneuaatic:                   Hominal Operating Pressure Other VT-3                        pressure~u   S       is   test   Temperature             S S           'F 97-021.3
 
Sheet 2 of 2 FORK HIS-2 (Back) 0
: 9. Remarks: HECHAMICAL COHNECTIOM, MO WELDINB REOUIIRED.
CERTIFICATE OF COHPLIAHCE Me certify that   the statements mode in the report src correct         iandi this rcplalcemcnt conforms to the rules of the ASHE,Code,   Section XI ~
Type Code Symbol Stamp                                               N A Certificate of Authorization Signed Owner
                                ;z No.
giWgrf'+i'~ r Ownerr+Designee, 'title N~A di~A n.c:>       ~l~~     ~
i Expiration Date OnCe "0
CI.=RT IF I CATE OF I'NSERVICE IMSPECTIOM I, the undersigned, holding a valid crxrmission issued by the Mstlio&l Board of Boiler and Pressure Vessel inspectors snd thc state or province of Dade County snd employed by Arkwright Hutusl Insurance ComFrsny'f Hs. have inspected thc crxrponcnts de! cribed .in thia Ownera Report dur'ing'ha pe'riod             '9/18/96 toi
                                                                                                                                'orwood, i
04/01/97       and state tibet to 'the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described 'in this Orrners Report .in sccordlancc with the requirerrrents of this ASHE iCode, Section XI.                                                                                                                         I By signing this certificate neither the In, pector nor hiS emfrioyer rlrskes sny warranty, expressed orl implied, concerning the examinations and corrective measurea deacri'bed'.in 'thia Owner's Report. Furtherraord, neither the Inspector nor his errpioyer shall be liabl.e in any manner for sny personal, injury or property damage or a loss of any Ikincl arising from or connects with 'thiS irispct;Cion.
I Coerrrissions,       HB 8230~M~I Inspe  ors:S    nature                                        -iNstionell Bayard, State, Providcnc'e, snd Endorsements Date   i4'9~$
97-021-3 0
 
FORM   HIS-2 OWNERS REPORT   FOR REPAIRS OR REPLACEMEH'IS As Required by .the   Provisions of the     ASME Code   Section XI
: 1. Owner         Florida   Power 8 Li ht                                         Date                     04 07 97 Name 700 Universe Blvd. Juno Beach Fl. 33408                                 Sheet        .1                of    2 Address
: 2. Plant         Turke   Point Plant                                             Unit Name                                             PNO &#xb9;:63/7855       lO &#xb9;   96012072 9760 SM 344 Street   Florida Cit       Fl. 33035 Address                                                 Repair Organization P.O. Ho.,Job No.,etc 3 ~ Nork Performed by       Florida Power 8 Li ht                                 Type Code Symbol Stamp                  N A Name                                              Authorization No.                        N A Expiration Date                          H A P.O. Box 4332   Princeton     Fl. 33032 Address
: 4. Identification of System:       REACTOR COOLANT                             System &#xb9;:       41       Quality Group:       'A
: 5. (a) Applicable Construction       Code                     B31.1                         1955   Edition, HA   Addenda,~H A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements               1989   Edition,~NA     Addenda,~NA     Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name of                   Name of       /Manufacturer/ National     (             Other             [Year   J Repaired J ASME ]
Component                Manufacturer      J'Serial  Ho.      Board            Identification        )guilt)   Replaced or ) Code ]
                                                                                                                          ] Replacement   [Stamp [
I       I               J~res ue IPRESSURIZER RELIEF VALVE     I CROSBY IH69877-01      IN/A        IRV-3-551C                      /UHK. /Replaced          /Ho I
                                                      -0009 IPRESSURIZER RELIEF VALVE     ICROSBY               (
N51249e 1361 I H/A       I RV   551C                     JUNK. )Replacement       ]Ho
: 7. Description, of Mark:     REMOVE PRESSURIZER     SAFETY VALVE RV-3-551C AHD INSTALL SPARE.
Pneunatic:                   Hominal Operating, Pressure         X Pressure~22SD         sig   Test Tesuereture             535         'F 97.022-3
 
Sheet 2   of 2 FORM NIS-2 (Back) 0
: 9. Remarks:   MECHANICAL CONNECTION HO MELDING REOOIREO.
CERTIFICATE OF COMPLIANCE lie certify that   the statements made in the report are correct and-,this replacement conforms to the rules of the ASNE   Code,   Section XI.
Type Code Symbol Stamp                                         H A Certificate of Authorization     Ho.         ~M A                            Expi,ration Date      H A Signed                                                                           Date                          19 Own r or wner's   Designee, Tiitie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, ho'lding a valid comnlsslon issued by the Hationai, Board of Boiler and Pressure Vessel inspectors and.the state or Province of Dade County and enpioyed by Arkwright Mutual Insurance Company of Norwood, Na. have inspected the components described in this Owners Report during the period         07/14/96     to 04/07/97        and state that to the best of my knowledge and belief, the Owner has performed examinations.and taken corrective measures descril)ed in this Owners Report in accordance with the requirements of the ASl{E Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his em!cloyer: hall be liable ini any manners for any personal injury or prop'ert)~
damage or a loss of any kind arising from or connected with this'ins'pection.
damage or a loss of any kind arising from or connected with this'ins'pection.
/y7 Commissiona NB 8230 N I Inspect s Sigr ture National Board, State, Providence, ahd Ehdoi'seaknts Date go 97-022.3 FORM NIS-2" OWNERS REPORT FOR" REPAIRS OR TREPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.O~ner Florida Power&Li ht Name Dote 04 08 97 700'Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turks Point Plant Name.Unit PNO.&#xb9;:63/7854 MO&#xb9;96012071 9760 SM 344 Street Florida Cit Fl..33035 Address.Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida Power&Li ht Name P."O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration,Date H A N A N A 4.Identification of System: REACTOR COOLANT System&#xb9;: 41 Quality Group: A 5.(s)Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of'omponent Name of Manufacturer)Manufacturer)
                                    /y7 Commissiona     NB 8230   N   I Inspect   s Sigr ture                                   National Board, State, Providence, ahd Ehdoi'seaknts Date go 97-022.3
National)J Serial Ho.Board Other Identification
 
]Year)Repaired/ASME[]guilt]Replaced or/Code//Replacement (Stamp/'I I/~res ue IPRESSURIZER RELIEF VALVE I CROSBY I IPRESSURIZER RELIEF VALVE ICROSBY i N69877 i N/A (RV-3-5518/UHK.(Replaced (Ho 0008 i 51249-1360 (H/A f RV-3-5518 fUNK.(Replacement
FORM   NIS-2" OWNERS   REPORT FOR" REPAIRS OR TREPLACEMENTS As Required by the     Provisions of the     ASME Code     Section XI
]Ho 7.Description of Mork: REMOVE PRESSURIZER SAFETY VALVE RV-3-5518 AND INSTALL SPARE.t 8'.Tests Conducted:
: 1. O~ner                 Florida   Power & Li ht                                           Dote                       04 08 97 Name 700'Universe Blvd. Juno Beach Fl. 33408                                             Sheet         1                 of   2 Address
Hydrostatic:
: 2. Plant                 Turks   Point Plant                                               Unit Name.                                               PNO.&#xb9;:63/7854         MO &#xb9;     96012071 9760         SM 344 Street   Florida Cit       Fl..33035 Address                                                   .Repair Organization P.O. No.,Job No.,etc
: 3. Work Performed by               Florida Power &   Li ht                                   Type Code Symbol Stamp                    H A Name                                                 Authorization No.                          N A Expiration,Date                            N A P."O. Box 4332           Princeton     Fl. 33032 Address
: 4. Identification of System:                 REACTOR COOLANT                               System   &#xb9;:       41       Quality Group:         A
: 5. (s) Applicable Construction Code                                     B31. 1                         1955   Edition,   NA   Addenda,~N A     Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA                                       Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name                               Name of       )Manufacturer) National       )               Other             ]Year   )   Repaired   / ASME [
of'omponent Manufacturer      J Serial  Ho.        Board            Identification          ]guilt] Replaced or     / Code /
                                                                                                                                        / Replacement   (Stamp   /
                                                                                                                                'I       I               /~res ue IPRESSURIZER RELIEF VALVE               I CROSBY               i N69877   i N/A         (
RV-3-5518                       /UHK. (Replaced         (Ho I
0008 IPRESSURIZER RELIEF VALVE              ICROSBY                i 51249-1360   ( H/A         f RV-3-5518                       fUNK. (Replacement       ]Ho
: 7. Description of Mork:               REMOVE PRESSURIZER     SAFETY VALVE     RV-3-5518   AND INSTALL SPARE.
t     8'. Tests Conducted:             Hydrostatic:
Other VT-2 Pneunatic:
Other VT-2 Pneunatic:
Hominal'perating Pressure X Pressure~2280 sig Test Temgereture 535 DF 97.023-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarks: MECHANICAL CONHECTIiO~NHO IAELDING REQUIRED.CERT I IF I CATE OF COMPLIANCE Ne certify.that the statements made in the report are correct and this replacement conforms to the rul,es of the ASME Code, Section Xl.Type Code Symbol Steep H A Certificate of Authorization Iko..~N'A J.,~'Signed Own or wner's Designee, fitle~Expiiration,Date Date Yi N A 19 CERT I IF I CATE OF'HSERVICI.
Pressure~2280          sig Hominal'perating Pressure Test Temgereture               535 X
=INSPECTION I , thc undersigned, holding a valid conrnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of.Dade County.and anpboycd by Arkwright.
DF 97.023-3
Mutual Insurance Company iof Norwood, Ma.have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief,, thc Owner has performed'examinations and taken corrective measures dcscrIibed in this Owners Rcport ini accordance with the requircnmnts of the ASME Code, Section XI.Il By signing this certificaitc neither thc Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in<<his Owner's Report.Furtlhcrnere, neither the Inspector noir his employer shall be liable in any manner fair any personal in)ury or property damage or a loss of enny Ikindl arising from or connected with ithis inspeotion.
 
g~r/7 Inspcc ors SITfnature iHationaii Board'state, Providence, and Endorsemcnts Date 1I9 97-023-3 FDRH Nls-2 ouMERs REP0RT F0R REPAIRs 0R REPLAcEHENTs As Required by the Provisions of the ASHE-Code Section XI 1.Oner Florida Power 8 Lf t Date 04 09 97 700 Universe Blvd.Jwm Beech Fl.33408 Address Sheet 1 of 2 2.Plant Turks Point'Plant Unit QO&#xb9;: 96023455 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Orgsnfzation P.O.No.,Job No.,etc 3.Mork Performed by VSL Cor ration Name 1671 Dell Ave.C ll CA 95008 Address Type Code Symbol Steep'Authorization Ko.Expiration Date.N A N A N A 4.Ident if ication of System: Contsfrrnent Buildi System&#xb9;: 51 Ouslfty Croup: B 5.(a)Applicable Construction Code ACI 318-63 ACI 301-66 19--Edition,~MA Addenda,~NA Code Case (b)Applicable Edition of Section XI Utilized for Repsfrs or Replacements 1992 Edfticn, 92 Addenda,~MA Code Case 6.Identification of Cosponents Repaired'or Replaced snd Repiscesent Ccmponents Kame of'oqxnent (Donut Shine (2 14N Other'dent i f i cst I on N~of (Hsnufscturer('ationsl (Hsnufscturer
Sheet 2 of 2 FORM NIS-2 (Back)
('erial No.Board I I (Year,(Repaired (ASHE ((Built(Replaced or (Code ((Replacement (Stanp (I I iYe~leuo (Kova Hschining (N/A Products Cor.LOT&#xb9;35284004 (N/A (ASTH A576-86 Cr.1045.,(1996 (Replacement (No 7.Descriptfon oflbrkt Added tMo 1 4>thick donut shims st Unit 3 tendon 61V27 to obtsfn orf inal\ift-off force after detensioni
: 9. Remarks:   MECHANICAL CONHECTIiO~NHO IAELDING REQUIRED.
.Tendcn Surveillance rformed under P.O.000f6055.Pneumat fc: Nominal Operating Pressure~F 97-024-3 FORM NIS-2 (Back)9.Remarks: Mo weldi r ired.CERTIFICATE OF CCHPI.IANCE Ne certify that the statements medic in the ri~rt are correct and'this re'placement conforms to, the rulles of the ASHE Code, Section XI.Type Code Symbol Staap Certificate of Authorization No.Expiration aate~VA Signed&I~Date Owner or Owner's Dksignee, Title 0 CEIRTIF I CATE OF INSERVICE INSPECTION I, the undersigned, hoidirMI a valid coaeission issued by.the National" Board of Boiler and'Pressure Vessel inspectors and the state or Province of Dade Cixnty and eapihyed by'Arkkright Hutual Insurance.
CERT I IF I CATE OF COMPLIANCE Ne certify. that the statements     made in the report are correct       and this replacement conforms to the rul,es of the ASME Code, Section Xl.
Company of Norwood, Ha.have inspected the c~enents described in this'Own'ers'Report during the period 09/01/96'to'4/08/97 and state that to the hest'of my knowiaige and'bel'ief,'his Owner'has performed'examinations and taken corrective measures described in'this (hairs Report in accordance with the requirements of the ASHE Code,', Section XI.By signing this certificate neither the Inspector nor his'esp'loyer makes any warranty, expressed or Ieylied, concerning thi exminations ard corrective measures'deslcr ibed in this'Owner's Report.Furthermbre,'e3ther the Inspector nor.his espioyer shall, be l3able in any mesmer for any personal injury or propert/damage:or a loss of any kind arising: from or c<xnected with this inspection.
Type Code Symbol Steep                                               H A Certificate of Authorization Iko..           ~N'A                                  Expiiration,Date          N A J.,     ~'
~t/,Commissions
Signed                                                                               Date        Yi                  19 Own   or wner's Designee,     fitle~
'B 8230'~M~I I'nspect s Sig I, e National'oard, State, Providence, and Endo)'s~tk Date 19K.Z-0 97.024-3 FORH NIS-2 QQERS REPORT FOR REPAIRS OR REPLACEMENTS As Requfred by the Provfsions of the ASHE Code Section XI, 1.Qner Florida P~r B Lf ht Date 700 Universe Blvd.Jtmo Beach F l.33408 Address 2.Plant Turks Point Plant'Sheet 1 Unit QO M'6023455 of 2 9760 Su'344 Street Florida Cit Fl.33035 Address Repair Orgsnfzatfon P.O.No.,Job No.,etc 3.Mork Perforaed by VSL Cor ration Nsae 1671 Dell Ave.C ll CA.95008 Type Code Symbol Stsap Authorization No Expiration Date N A N A N A 4.Identification, of Systea: Contsfrment Buildi Systea 0: 51 Quality Croup: 8 5.(s)Applicable Construction Code ACI 318-63 ACI 301-66 19--Edf tfon,~NA Addenda(~NA Code Case (b)APPlicable Edftfon of Section XI Utilized for RePafrs or RePIaceaents 1992 Edftion, 92 Addenda,~NA Code Case 6.Identificstfon of Ccwponents Repaired or Replaced snd Repisceaent Coeponents
CERT I IF I CATE OF'HSERVICI.=INSPECTION I , thc undersigned, holding a valid conrnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of. Dade County.and anpboycd by Arkwright. Mutual Insurance Company iof Norwood, Ma. have inspected the components described in this Owners Report during the period                 07/14/96     to 04/07/97     and state that to the best of my knowledge and belief,, thc Owner has performed'examinations and taken corrective measures dcscrIibed in this Owners Rcport ini accordance with the requircnmnts of the ASME Code, Section XI.                                                                                                                     Il By signing this certificaitc neither thc Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in <<his Owner's Report. Furtlhcrnere, neither the Inspector noir his employer shall be liable in any manner fair any personal in)ury or property damage or a loss of enny Ikindl arising from or connected with ithis inspeotion.
'sae of Coaponent M~of Hsrmf acturer (Hsnuficturer(National ((Serfsl No.Board I I Other Ident f f fcation.(Year'epaired,(ASHE ((Built Replaced or (Code ((Replsceaent (Starp (I I ivesleuo (Donut.Shia (1 12s (Donut Shia 1 14m (Nova Hschining (N/A Products Co (Nova Hsctdning'I N/A Products Cor (N/A'(ASTH A576-86 Gr., 1045 (1996 (Repiscenent (No LOT B 35284002 (N/A (ASTH A576-86.Gr.1045 (1996 (Replsceaent (Mo LOT M 35284004 7.Description of iJorkt Added 1 2e-snd 1 4<shia.st Unit 3 tendon 42H40 to obtain orf fnsl lift-off force after detensionf
g ~r/7 Inspcc ors SITfnature                                         iHationaii Board'state, Providence, and Endorsemcnts Date                             1I9 97-023-3
.Tendon Survefl lance rformed under P.O.0001605.Pneuoet 1 c t.Moainsl Operating Pressure~F 97-025.3 Sheet 2 of 2 FORH NIS 2 (Back)9.Remarks: Ko ueidi r ired.CERT IF ICATE OF COHPLIANCE Me certify that the statements eefe in, the report are correct and this rigiacesxmt conforms to the rules of'the ASHE Code, Section XI.Type Code Symbol Staap Cer'tificate of Authorization No.K~A Exp'iration Date'~K A I Signed S<~WV'+'a~a 4~thinner or Omer<s Desi~e, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid ccmnission issued by the Katicnai Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eaplbyed by'rkuright
 
'Hutual Insurance Coapany of Korwxd, Ha.have inspected the ceqmxnts described.
FDRH Nls-2 ouMERs REP0RT F0R REPAIRs 0R REPLAcEHENTs As Required by the       Provisions of the   ASHE-Code       Section XI
in this Owners Regort during the period'09/01/9'6
: 1. Oner                 Florida   Power 8 Lf     t                                         Date                       04 09 97 700 Universe           Blvd. Jwm Beech Fl. 33408                                     Sheet           1                 of   2 Address
'o'4/08/97 and state that to the best of my knowledge and belief, the Oav.'r has perfonaed.
: 2. Plant                   Turks     Point'Plant                                               Unit QO &#xb9;: 96023455 9760         SM 344 Street   Florida Cit       Fl. 33035 Address                                                   Repair Orgsnfzation P.O. No.,Job No.,etc
examinations and taken corrective measures described in this Wners Report in'ccord'anca Mith t'e requirements of the ASHE Bode, Section XI.By signing this certificate neither the Inspector nor his erployer wakes any warranty, expressed'or
: 3. Mork Performed by                 VSL Cor   ration                                           Type Code Symbol Steep                     N A Name                                                  'Authorization Ko.                         N A Expiration Date.                           N A 1671  Dell Ave.          C      ll    CA 95008 Address
'mplied, concerning the examinations and corrective measures described in this Orner's Report.Furthermore,l neither the Inspector nor his employer shall be Liable in aQ mlrnelr fear ahy personal'njury'r propert'y damage or a loss of any kind arising from or cheated with this irkpec'tion.
: 4. Ident   ification          of System:     Contsfrrnent Buildi                           System   &#xb9;:         51       Ouslfty Croup:         B
Inspector S I gnatdre Conmiss iona,','HB 8230~K~I'atl'onalt Bo'ard,, State, Providence, and Endorseeents Date 0 97.'025 3 FORH NIS-2 OWNERS REPORT'OR REPAIRS OR REPLACEHENTS As Required by the Provisfons of the ASHE Code Section XI 1.Ouner Florida Po>>er B Lf ht Date 04 09 97 700 Universe Blvd.Jwm Beach Fl.33408 Address Sheet 1 of 2'.Plant Turke Pofnt Plant Haec 9760 SW 344 Street Florida Cft Fl.33035 Address Uni t WO&#xb9;96023455 Repair Organization P.O.'No.,lob Ko.,etc 3.Work Pcrfors>>d by VSL Cor ration Howe 1671 Dell Ave.C ll CA.95008 Address Type Code Symbol Stamp Authorization Ko.Expfratfon Date N A N A N A 4.Idcntiffca't'fon of Systcll'ontofrn>>nt Bufldi System&#xb9;: 51 Guai fty Group: B 5.(a)Applicable Construction Code Acl 318-63 ACI 301-66 19--Edition,~NA.
: 5. (a) Applicable Construction Code                                         ACI 318-63   ACI 301-66       19-- Edition,~MA Addenda,~NA             Code Case (b) Applicable Edition of Section XI Utilized for Repsfrs or Replacements                             1992   Edfticn, 92   Addenda,~MA       Code Case
Addenda,~NA Code Case'(b)Applicable Edition of Section XI Utilized for Repairs or.Replaces>>nts 1992 Edition, 92 Addenda,~NA Code Case, 6.Identiffcation of Coeponents Repaired.or Replaced and Replaces>>nt Coeponents Noee of Coeponent (Donut shim (1 14>>(Harufacturer (Serial No.Kational (Board Kam of Hanuf actur er (Kova Nachining (N/A I Products Cor.(Year (Repaired (ASHE ((guilt(Replaced or (Code ((Rcpfoceaent (Stoep (I I iY~es Xo Other ldentif fcatfon N/A (ASTH A576-86 Gr.1045 (1996 (Replaceeent (No LOT&#xb9;35284004 7.Description of Work: Added 1 4" donut shia at Unit 3 tendon 3016 to obtain orf fnal lift-off force after detensioni
: 6. Identification of Cosponents Repaired'or Replaced snd Repiscesent Ccmponents Kame                                 N~     of       (Hsnufscturer('ationsl       (               Other '            (Year,(     Repaired ( ASHE       (
.Tendon surveillance rfors>>d under P.O.00016055.Pnaaetfct Nosfnal Operating Pressure'F 97-026-3 Sheet 2 of 2 4l FORH NIS-2 (Back)9.Remarks: No weldi r Ired.CERTIFICATE OF COHPLIANCE Ile certify that the statemiwts axle in the report are correct'and'hi's replacemeint conforms to the rules of the ASHE Code, Section XI.Type Code Symbol Starp Certificate of Authorization No.Exp'irat,ion Date N~A Signed/A't~~~~i~~~+~D~
of'oqxnent Hsnufscturer        ('erial    No.        Board              dent i f i cst I on    (Built(   Replaced or ( Code       (
'ate Owner or Owner's Designee, Title"-~lO il CERT I FI CATE OF IKSERVICE IIISPECT ION g I, the undersigned, holding a valid comslsslon issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and eapL'oyed by'rkwright Hutual Insurance Carpany of Norwood, Ha.have 3nspected the components descril~in this'wners'eltort'ue"ing'he per'3od'09/01/96'o'4/08/97 and state that to the'best of my kntwledge and bel,ief', the Owner has performed examinations and taken corrective measures described in thiis Seers Report in accordance with the requirements of the ASHE Code', Section XI.By signing this certificate neltiher the Inspector nor h3s employer makes any.warranty, expressed'r
I                                                                        ( Replacement (Stanp       (
'mplied, concerning the examinations arxi corrective measures'escribed
I                                                                I       I                 iYe~leuo (Donut Shine                              (Kova Hschining         (N/A             (N/A       (ASTH   A576-86 Cr. 1045.         ,( 1996 (Replacement       (No (2  14N                                  Products Cor .                                        LOT&#xb9; 35284004
'in (his Owner's Report., Furthermore,, neither the Inspector nor his esployer shall bie Liable in any manneir fair any personal.3njiury or prolpe'rty damage or a Loss of any kind arising from or c~.'cted with this Inspectiexo.
: 7. Descriptfon           oflbrkt     Added tMo   1   4> thick donut     shims   st Unit 3 tendon 61V27       to obtsfn orf inal     \ift-off force after detensioni                 . Tendcn   Surveillance       rformed under P.O. 000f6055.
+7-~seissions
Pneumat   fc:                 Nominal Operating Pressure
-NB 8230~K'~I Inspectors Signatt e National Baarde StateProvlclence, and Endorsecflents Dote 97-026-3 FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASHE Code Section XI 1.(haM,r Florida Poaer 8 Li ht Date 04 09 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Uni t PMO&#xb9;:63/2949 MO&#xb9;: 97008380 9760 SU 344'Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.llork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Mo.Expiration'Date N A M A N A 4.Identification of System: C nent Coolin Mater System&#xb9;: 30 Quality Group: 5.(a)Applicable Construction Code B31.1 1955 Edition, MA Addenda,~MA Code Case (b>Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edftion,~MA Addenda,~MA Code Case*6.Identification of Coaponents Repaired or Replaced and Replacement Canponents Name of Component IRELIEF VALVE IRELIEF VALVE Name of Manufacturer IORESSER INDUSTRIES IDRESSER INDUSTRIES iHanufactureri National i Serial No.Board iYear,[, Repaired i ASHE)iguiit(Replaced or i Code f ,i Replacement,iStaap i I I J~res se Other Identification 1TH 18073 IM/A Il 1/2" RELIEF VLV iUNK iReplacement iNo STK CODE 53514 ITH 18076 IN/A 11 1/2" RELIEF VLV iUMK'iReplaced)Mo 7.DescriPtion of Mork: REPLACED RV-3-1424 FOR CCM TO"Ca ECC.t 8.Tests Conducted:
                                                                                                                                                    ~
Hydrostatic:
F 97-024-3
 
FORM NIS-2 (Back)
: 9. Remarks:   Mo weldi   r     ired.
CERTIFICATE OF CCHPI.IANCE Ne certify that the   statements     medic in the ri~rt are     correct and 'this re'placement conforms to, the rulles of the ASHE Code, Section XI.
Type Code Symbol Staap
                                                                                                          ~VA 0
Certificate of Authorization         No.                                             Expiration aate Signed   &I                                                                   ~Date Owner or Owner's Dksignee, Title CEIRTIF I CATE OF INSERVICE INSPECTION I, the undersigned, hoidirMI a valid coaeission issued by. the National" Board of Boiler and'Pressure Vessel inspectors and the state or Province of Dade Cixnty and eapihyed by'Arkkright Hutual Insurance. Company of Norwood, Ha. have inspected the c~enents described in this'Own'ers'Report during the period                           09/01/96 'to and state that to the hest 'of my knowiaige and'bel'ief,'his Owner'has performed'examinations and                           '4/08/97 taken corrective measures described in 'this (hairs Report in accordance with the requirements of the ASHE Code,',
Section XI.
By signing this certificate neither the Inspector nor his'esp'loyer makes any warranty, expressed or Ieylied, concerning thi exminations ard corrective measures 'deslcr ibed in this'Owner's Report.             Furthermbre,'e3ther the Inspector nor. his espioyer shall, be l3able in any mesmer for any personal injury or propert/
damage:or a loss of any kind arising: from or c<xnected with this inspection.
                                    ~t/                         ,Commissions 'B     8230'~M~I s Sig     I, e                                     National'oard, State, Providence,     and                 Endo)'s~tk         I'nspect Date                                 19K.Z
                                                                                                                                                        -0 97.024-3
 
FORH   NIS-2 QQERS   REPORT FOR REPAIRS OR REPLACEMENTS As Requfred by the Provfsions           of the ASHE Code Section       XI,
: 1. Qner         Florida   P~r   B   Lf ht                                             Date 700 Universe Blvd. Jtmo Beach     F l. 33408                             'Sheet          1                of    2 Address
: 2. Plant         Turks   Point Plant                                                   Unit QO M'6023455 9760 Su'344   Street   Florida Cit         Fl. 33035 Address                                                       Repair Orgsnfzatfon P.O. No.,Job No.,etc
: 3. Mork Perforaed by       VSL Cor     ration                                             Type Code Symbol Stsap                    N  A Nsae                                                     Authorization No                          N  A Expiration Date                            N  A 1671 Dell Ave. C     ll   CA. 95008
: 4. Identification, of Systea:       Contsfrment Buildi                               Systea 0:           51       Quality Croup:           8
: 5. (s) Applicable Construction         Code                       ACI 318-63     ACI 301-66         19-- Edf tfon,~NA Addenda(~NA             Code Case (b) APPlicable Edftfon of Section XI Utilized for RePafrs or RePIaceaents                     1992   Edftion, 92   Addenda,~NA         Code Case
: 6. Identificstfon of Ccwponents Repaired or Replaced snd Repisceaent Coeponents
          'sae   of                 M~ of           (Hsnuficturer( National       (               Other             (Year     'epaired,(         ASHE (
Coaponent              Hsrmf acturer        ( Serfsl No.          Board                Ident f ffcation.      (Built    Replaced or ( Code       (
I                                                                        ( Replsceaent (Starp       (
I                                                                 I       I                  ivesleuo (Donut. Shia                   (Nova Hschining         (N/A           (N/A         '(ASTH A576-86 Gr., 1045             (1996 (Repiscenent         (No (1 12s                          Products Co                                            LOT B  35284002 (Donut Shia                    (Nova Hsctdning        'I N/A           (N/A          (ASTH A576-86 .Gr. 1045             (1996 (Replsceaent         (Mo 1  14m                        Products Cor                                            LOT M 35284004
: 7. Description of iJorkt     Added   1 2e-snd   1   4< shia.st Unit     3 tendon 42H40       to obtain orf fnsl     lift-off force after detensionf     . Tendon Survefl lance         rformed under P.O. 0001605.
Pneuoet 1 c t                   .Moainsl Operating Pressure
                                                                                                                                            ~
F 97-025.3
 
Sheet 2         of       2 FORH NIS 2 (Back)
: 9. Remarks:   Ko ueidi     r     ired.
CERT IF ICATE OF COHPLIANCE Me certify that the       statements   eefe in, the report are correct and this rigiacesxmt conforms to the rules of 'the ASHE Code, Section     XI.
Type Code Symbol Staap Cer'tificate of Authorization         No.           K~A                                             Exp'iration Date   '
                                                                                                                                    ~K A Signed thinner I
or Omer<s Desi~e, Title S <~WV         '+ 'a~a                                 4~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid ccmnission issued by the Katicnai Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eaplbyed by'rkuright 'Hutual Insurance Coapany of Korwxd, Ha. have inspected the ceqmxnts described. in this Owners Regort during the period                                     '09/01/9'6 'o and state that to the best of my knowledge and belief, the Oav.'r has perfonaed. examinations and                                     '4/08/97 taken corrective measures described in this Wners Report in'ccord'anca Mith t'e requirements of the ASHE Bode, Section XI.
By signing this certificate neither the Inspector nor his erployer wakes any warranty, expressed'or concerning the examinations and corrective measures described in this Orner's Report. Furthermore,l                         'mplied, neither the Inspector nor his employer shall be Liable in aQ mlrnelr fear ahy personal'njury'r propert'y damage or a loss of any kind arising from or cheated with this irkpec'tion.
Conmiss iona,','HB State, Providence, and Endorseeents 8230~K~I'atl'onalt Inspector      S I gnatdre                                                              Bo'ard,,
Date 0
97.'025 3
 
FORH NIS-2 OWNERS   REPORT'OR REPAIRS     OR REPLACEHENTS As Required by   the Provisfons of the     ASHE Code   Section XI
: 1. Ouner         Florida Po>>er   B   Lf ht                                       Date                     04 09 97 700 Universe Blvd. Jwm Beach         Fl. 33408                           Sheet         1                 of Address                                                                                  2'.
Plant         Turke   Pofnt Plant                                             Uni t Haec                                             WO  &#xb9;  96023455 9760 SW 344 Street   Florida Cft       Fl. 33035 Address                                                 Repair Organization P.O.'No.,lob Ko.,etc
: 3. Work Pcrfors>>d by       VSL Cor     ration                                     Type Code Symbol Stamp                      N  A Howe                                               Authorization Ko.                          N A Expfratfon Date                            N A 1671  Dell Ave. C     ll   CA. 95008 Address
: 4. Idcntiffca't'fon of   Systcll'ontofrn>>nt Bufldi                             System   &#xb9;:       51       Guai fty Group:         B
: 5. (a) Applicable Construction Code                           Acl 318-63   ACI 301-66       19-- Edition,~NA. Addenda,~NA             Code Case
        '(b) Applicable Edition of Section XI Utilized for Repairs or.Replaces>>nts               1992 Edition, 92     Addenda,~NA         Code Case,
: 6. Identiffcation of Coeponents Repaired.or Replaced and Replaces>>nt Coeponents Noee of                  Kam of         (Harufacturer     Kational (             Other              (Year         Repaired ( ASHE
(                           (
Coeponent              Hanuf actur er    (  Serial  No.      Board            ldentif fcatfon        (guilt(  Replaced or ( Code         (
( Rcpfoceaent (Stoep         (
I     I                   iY~es Xo (Donut shim                    (Kova Nachining      (N/A            I N/A       (ASTH A576-86 Gr. 1045           (1996 (Replaceeent         (No (1 14>>                          Products Cor .                                    LOT &#xb9; 35284004
: 7. Description of Work: Added         1 4" donut shia at Unit 3 tendon 3016 to obtain orf fnal           lift-off force after detensioni     . Tendon surveillance         rfors>>d under P.O. 00016055.
Pnaaetfct                   Nosfnal Operating Pressure
                                                                                                                                      'F 97-026-3
 
Sheet 2 of 2 4l FORH NIS-2 (Back)
: 9. Remarks:   No weldi   r   Ired.
CERTIFICATE OF COHPLIANCE Ile certify that the   statemiwts axle in the report are correct 'and'hi's replacemeint conforms to the rules of the ASHE   Code, Section XI.
Type Code Symbol Starp Certificate of Authorization     No.                                             Exp'irat,ion Date
                    't N~A Signed   /A                   ~~~~i~~~+~D~                                         ate                          "-~                    lO
                                                                                  '
Owner or Owner's Designee, Title il CERT I FI CATE OF IKSERVICE IIISPECT ION g
I, the undersigned, holding a valid comslsslon issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and eapL'oyed by'rkwright Hutual Insurance Carpany of Norwood, Ha. have 3nspected the components descril~ in this'wners'eltort'ue"ing'he per'3od               '09/01/96           'o and state that to the 'best of my kntwledge and bel,ief', the Owner has performed examinations and             '4/08/97 taken corrective measures described in thiis Seers Report in accordance with the requirements of the ASHE Code',
Section XI.
By signing this certificate neltiher the Inspector nor h3s employer makes any. warranty, expressed'r concerning the examinations arxi corrective measures'escribed 'in (his Owner's Report., Furthermore,,'mplied, neither the Inspector nor his esployer shall bie Liable in any manneir fair any personal .3njiury or prolpe'rty damage or a Loss of any kind arising from or c~.'cted with this Inspectiexo.
                                          +7 Inspectors Signatt
                                                      ~seissions         -
NB 8230~K'~I e                                   National Baarde State Provlclence, and Endorsecflents Dote 97-026-3
 
FORM NIS-2 OMNERS REPORT   FOR REPAIRS OR REPLACEKENTS As Required by the     Provisions of the     ASHE Code     Section XI
: 1. (haM,r       Florida Poaer 8 Li ht                                             Date                       04 09 97 700 Universe   Blvd. Juno Beach Fl. 33408                                 Sheet         1                 of   2 Address
: 2. Plant         Turke   Point Plant                                               Uni t PMO   &#xb9;:63/2949       MO &#xb9;:   97008380 9760 SU 344   'Street   Florida Cit       Fl. 33035 Address                                                   Repair Organization P.O. No.,Job No.,etc
: 3. llork Performed by       Florida   Power 8   Li ht                                 Type Code Symbol Stamp                   N A Name                                                Authorization Mo.                         M A Expiration'Date                           N A P.O. Box 4332      Princeton    Fl. 33032 Address
: 4. Identification of System:         C     nent Coolin Mater                     System   &#xb9;:       30       Quality Group:
: 5. (a) Applicable Construction Code                             B31.1                         1955   Edition, MA   Addenda,~MA       Code Case (b> Applicable   Edition of Section XI Utilized for Repairs or Replacements                 1989   Edftion,~MA     Addenda,~MA       Code Case
                              *
: 6. Identification of Coaponents Repaired or Replaced and Replacement Canponents Name   of                   Name   of       iHanufactureri National                     Other            iYear,[,   Repaired i ASHE       )
Component                Manufacturer      i Serial  No.      Board            Identification          iguiit(  Replaced or i Code       f
                                                                                                                              ,i Replacement,iStaap       i I       I                 J~res se IRELIEF VALVE                  IORESSER              ITH 18076      IN/A        11  1/2"  RELIEF VLV              iUMK  'iReplaced        )Mo INDUSTRIES IRELIEF VALVE                  IDRESSER              1TH 18073     IM/A         Il 1/2" RELIEF VLV             iUNK   iReplacement     iNo INDUSTRIES                                          STK CODE 53514
: 7. DescriPtion of Mork:       REPLACED   RV-3-1424   FOR CCM TO   "Ca ECC.
t     8. Tests Conducted:       Hydrostatic:
Other VT-2 Pneuaatic:
Other VT-2 Pneuaatic:
Nominal Operating Pressure X gressure~rg ig test Tesuersture 88~F 97.027-3 Sheet 2 of 2 FORH,"HIS-2 (Back)0 9.Remarks: THIS Is A NECNANICAL CONNECTION NO uELDINC REDUIREDCERTIFICATE OF COHPLIANCE I Ne certify that the statements madh in the report are correct and this replacement confonas to the kulak of'hai ASNE Code, Section XI.Type Code Sytrbol Staay Certificate of Authorization No.-~HA Expiration Date Signed CV I."QJ'~c~nay~4~~@~Date/Own r or er's Designee, tie 19 7-~CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid camnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eeployed by Arkwright NutuaL In urance Compariy of Norwood, Ha.have inspected the coaponents described in thi's 0&or's Rapport during th'e period'4706/97'o'4/09/97 and state that'to'he best of my knowledge and belief, the Owner has perf<}rmed examinations and taken corrective measures described in this Cheers Report in accordance with the requirements of the ASHE Code, Section XI.By signing this certificate neither the Irepector nor hid~Lo)er makes any>carrantli, expressed or'mplied, concerning the examinations and corrective measure's ddscribed in this Owner's Report.Further'morc, neither the Inspector nor his enployer shall be Liable iin any manner for any per.onal injury or property damage or a Loss of any kind arising from or connected with'his ihspection.
gressure~rg             ig Nominal Operating Pressure test Tesuersture               88 X
~f Cocmissions NB 823~ON~I~Inspec rs S~iture National Board, State, Providence, and Endorsments Date 97-027-3 FORH NIS 2 OMHERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASKE Code Section XI 1.Owner'lorida Power 8 Li ht Date 04 14 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant , Kame Uni t PMO&#xb9;:63/5765 MO&#xb9;:.96005866 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job Mo.,etc 3.Mock Performed by Florida Power Z Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Synhol Stamp Authorization Ko.Expiration Date N A N A N A 4.Identification.
                                                                                                                                        ~
of System: FEED'MATER 5~(a)Applicable Construction Code 831.1 System&#xb9;: 74 aualfty Croup: '1955 Edition, NA Addenda,~NA Code Case (b)Applicable Edition of Section Xl Utilized for Repairs or Replacenents 1989 Edftfon,~HA Addenda,~MA Code Case 6.Identification of Conyonents Repaired, or Replaced snd Replacement Components Name of Hsnufacturer)Manufacturers Kationsl i Serial No.Board I Other Identification
F 97.027-3
,(Year)Repaired)ASHE (,igufiti Replaced or.i Code i i Replacement istanp)I.I J~Yes Ho ISTUDS (14)I (NUTS (14)I iBOLT (1)(H/A'IN/A iH/A i FCV-3-498, UTC 407914 (UMK i Replacement iKo ASTH A-193 H/A N/A FCV-3-498, UTC 397774 iH/A iRepiacement iMo I I I HEAVY KEX ASTH A193 iM/A,/H/A iFCV-3-498, Ul'C 408129 JH/A[Replacement
 
/Mo ASKE SA-194 7.Description of Mork: REPLACED FOURTEEN 14 STUDS AHD HUTS AHD OME 1 BOLT OM FCV-3-498 S C wC" KAIN FM FLOM CONTROL'VALVE.8.Tests Conducted:
Sheet 2           of 2 FORH,"HIS-2 (Back) 0
Hydrostatic:
: 9. Remarks: THIS Is   A NECNANICAL CONNECTION     NO uELDINC REDUIRED CERTIFICATE OF COHPLIANCE I
Other VT-1 Pneunatic:
Ne certify that   the statements   madh in the report are correct   and this replacement confonas to the kulak         of'hai ASNE Code, Section XI.
Nominal Operating Pressure NA 4F 97-028-3 Sheet 2 of 2 FORN NIS-2 (Back)9.Remarks: THls ts A NEcHANtcAI.
Type Code Sytrbol Staay Certificate of Authorization No.-               ~HA                             Expiration Date Signed               CV I       . "QJ'~c~   nay ~4~~@~                     Date                                   19 7          - ~
cohrHEGTIow No llELGING REQUIRED.I CERTIF ICATE OF COMPLIANCE Me certify that the statenents made in the report are correct arxf this replacement conforms to the rules of the ASNE Code, Section XI.Type Code Symbol Steep~HA Signed+i/FS'gA~~~~m~~
Own r or     er's Designee,     tie CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid camnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eeployed by Arkwright NutuaL In urance Compariy of Norwood, Ha. have inspected the coaponents described in thi's 0&or's Rapport during th'e period       '4706/97 and state that'to'he best of my knowledge and belief, the Owner has perf<}rmed examinations and           'o'4/09/97 taken corrective measures described in this Cheers Report in accordance with the requirements of the ASHE Code, Section XI.
OSta+r or Owrrer's Oesfgir~re, Tft4P Certificate of Authorization No.~NA Expiration Date NrrA 19+g CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a'valid cicrrrnfssion issued by the Nstisnal'oard of Boiler snd Pres'surd Ve!sseL'nspectors and the state or.Province of l)ade County and errrployed by Arkwrfght Mutual'nsurance Corpany of Horwood, Na.have inspected'the components described in this Owners Report during the period 03/13/96 to 04/10/97 and state that to the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described.in this Owners Report'in accordance with the requirements of the'ASNF Code, Section XI.By signing this certificate neither the Inspector,nor his rleployer makes any warranty, expressed ar implied, concerning the examfrratfons and corrective measures tiescribcd in this Owner's Reports, Furthermore, neither the Inspector rror his errployer shall be Liable in sny'manner'for'any personal Injury or property damage or s Loss of sny kind arising from or connected wfth this fnspection.
By signing this certificate neither the Irepector nor hid ~Lo)er makes any >carrantli, expressed concerning the examinations and corrective measure's ddscribed in this Owner's Report. Further'morc, or'mplied, neither the Inspector nor his enployer shall be Liable iin any manner for any per. onal injury or property damage or a Loss of any kind arising from or connected with'his ihspection.
~~~c~/'omrrfssfons HB 8230~H~I Inspector Sigrqgcfre National Board, State, Providence, and Endoraements'ate 1.~Z 97-028-3 FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI e 1.Owner Florida Power 8 Li ht Date 04 16 97 700'Universe Bl'vd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Uni t PWO&#xb9;:63/0472 WO&#xb9;: 96026892 PCH&#xb9;: 96-070 9760 SW 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.llork Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization No.Expiration Date M A N A M A 4.Identification of System: Primar Water Hakeu S tern System&#xb9;: 20 Quality Group: '8 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addendas~NA Code Case (b)Applicable Edition of Section XI Utilized'or Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Coeponents Meme of Coeponent Name of Hanufacturer)Manufacturer),National.J'Serial No.Board'Other Identification
                                          ~ f Cocmissions       NB 823~ON~I~
]Year J Repaired]ASHE f'/Built/Replaced or/Code//Replacement)Stamp f I I/~tes ue CV-3-519A I N/A'M/A IM/A'I5610-P-900S (UNK ,]Repaired
Inspec   rs S~iture                                       National Board, State, Providence, and Endorsments Date 97-027-3
/Mo 7.Description of Work:,CUT RE WELD THE DOWMSTREAH PORTIOM OF CV-3 519A VERTICAL RUN.8.Tests Conducted:
 
Hydrostatic:
FORH NIS 2 OMHERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASKE Code Section XI
Other VT-2 Pneunatic:
: 1. Owner'lorida         Power 8   Li ht                                       Date                       04 14 97 700 Universe Blvd. Juno Beach         Fl. 33408                         Sheet         1                 of   2 Address
Nominal Operating Pressure pressure~220 im test Temperature 80 F 97-029.3 Sheer: 2 of 2 FORH NIS-2 (Back)Cl 9.Remarks: CERTIIF I CATE OF COHPLIANCE Me certify that the statements made in the report are correct rind this repair conforms to the rul,es of the ASHE Code, Section XI.Type Code Symbol Stamp N A Signed Certificate of Authori'!atjon No.-~N'A>I'i.gfc~, Owner or Owner'sg4signcc, Title Fxpi'ration Oatc 4Q/NYi+~~rgc/
: 2. Plant         Turke   Point Plant                                             Uni t
gate Qg~r/44'~A CENTI F, I CATE OF INSERVI CE INSPEC'T IOII I, the undersigned, holding a valid comriissiion issued Iby the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dadle County and crriployed by Arkwright Hutual Insurance C~ny bf Norwood, Ha.have inspected the compionents described in this'owners'Report during the period IO/09/96 to 04/16/97 and state that to the hest of my knowledge and belief, the Owner has performed examinaitiofrs and taken corrective measures described in this Owners Report'n'accbrda'nce'with the requiirements of the ASHE Code;, Section XI.By signing this certificate neither ithe Inspector nor his emplloyer makes any warranty, expressed or implied, concerning thee examinations and corrective measures'described in this'wner's Report.Furtherrrore, neither the Inspector nor his, cm!cloyer.hall be-liable ini any mahner for any.personal injury or jprogrtj/damage or a loss of any kind arisingi from or connected with t'hfs'ns'pcchion'.
                                      , Kame                                           PMO   &#xb9;:63/5765       MO &#xb9;:. 96005866 9760 SM 344 Street     Florida Cit       Fl. 33035 Address                                                 Repair Organization P.O. No.,Job Mo.,etc
/>Inspec rs Sjgg ture ComrriSSionS NB 8230 N I National Board, State, Providence, arnd Endorsements Date 97-029.3 FORK NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI 1~Owner Florida Power 8, Li ht Date 06 04 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant Name Uni t PMO&#xb9;:63/8810 MO&#xb9;: 96022773 9760 SM 344 Street Florida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3~Mark Performed by Florida Power 8 Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Stamp Authorization Ho.Expiration Oate N A N A N A 4.Identification of System: COKPOMEHT COOLING MATER System&#xb9;: 30 Qual I ty Group: C 5.(a)Applicable Construction Code B31.1 1955 Edition, NA Addendag~NA Code Case (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case 6.Identification of Components Repaired or Replaced and Replacement Components Name of Component Name of Manufacturer (Manufacturer)
: 3. Mock Performed by     Florida   Power   Z Li ht                               Type Code Synhol Stamp                    N  A Name                                             Authorization Ko.                          N  A Expiration Date                            N  A P.O. Box 4332   Princeton     Fl. 33032 Address
National f Serial No.Board I I Other Identification
                                                                                                                                        '
]Year J Repaired/ASKE/)guilt[Replaced or f Code//Replacement (Stamp J I I]~res se (CCM HX VALVE I ISTUOS (160)ISTUOS 40 iBOLTS (40)I IHUTS (320)I INUTS (120)I IN/A IN/A iN/A IH/A (N/A (UTC 409288 UTC 409357 IUTC 409330 (UMK[Replacement
: 4. Identification. of System:       FEED'MATER                                 System  &#xb9;:        74        aualfty    Croup:
[No (UHK (Replacement (Ho[H/A JUTC 409358, ASTK A-194)UHK (Replacement (Ho HEAVY HEX (UTC 409356, ASTM SA-194 JUNK)Replacement (No EAVY HEX[H/A[H/A f3-50-377 1-1/2" GATE/UMK]Replacement
5~   (a) Applicable Construction     Code                       831.1                       1955   Edition,   NA   Addenda,~NA       Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacenents               1989   Edftfon,~HA     Addenda,~MA       Code Case
/Mo UTC 407835 R62776 7.Oescription of Mork: REPLACE BOLTIHG OM 3E207A COMPONENT COOLING MATER HEAT EXCMAHGER AHO THE REPLACEKEHT OF VALVE 3-50-331.8.Tests Conducted:
: 6. Identification of Conyonents Repaired, or Replaced snd Replacement Components Name of       )Manufacturers Kationsl                   Other             ,(Year )   Repaired ) ASHE (
Hydrostatic:
Hsnufacturer        i  Serial  No.      Board          Identification          ,igufiti   Replaced or .i Code i I                                                                    i Replacement istanp )
Pneunatict Nominal Operating Pressure X Other VT-2 eressure~stu tg Test Testrereture MOK 4F 97-030-3 Sheet 2 of 2 FOHN NIS-2 (Back)9.Remarks: THIS IS A HECHANICAL CONNECTION NO MELDING MAS REOUIRED.CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct'nd this replacement conforms to the rules'f'the'SHE Code, Section XI.Type Code Sychol Stamp H A Certif icate of Authorization NoN~A/7 Signed>~4/~0 or er'4 Designee, Tit~le CERTIFICATE, OF INSLRVICE INSPECTION I, the undersigned, holcling a valid comnission issued by the Hational Board of Boiler and Pressure'Vessel', inspectors and the state or Province of Dade County and employed by Arkwright Nutual In urance Company of,'orwood, Na.have inspected the ccaponents described in this Oanerls Raport during the period 04/IS/97 to 06/04/97 and state that to the best of my knowledge and belie'f, the Owner has performed examinations,'and taken corrective measures described in this Owners Report i'n accordance with the requirements of the ASHE'ode, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in'his Owner,'s Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any'personal injury or property'amage or a loss of'ny kirxi arising from or connected with this ilnsgcti'on.', z7 Conmi ssions ,''Ng 8230 N Inspect s SLEDa re National Board, State, Providence, and Endorsements I I'I Date 19 II 97-030-3 FORK HIS-2 OWHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI 1.OMner Florida Power&Li ht Date 06 04 97 700 Universe Blvd.Juno Beach Fl.33408 Address Sheet 1 of 2 2.Plant Turke Point Plant;Uni t PWO"&#xb9;:63/1859 WO&#xb9;: 97002428 CR&#xb9;: 97-0070 9760 SW 344 Street Fior ida Cit Fl.33035 Address Repair Organization P.O.No.,Job No.,etc 3.Work Performed by Florida-Po<<er
I. I                   J~Yes Ho ISTUDS   (14)                   (H/A                                  iH/A       i FCV-3-498, UTC 407914           (UMK   i Replacement       iKo I                                                                                    ASTH A-193 (NUTS  (14)                    'IN/A                  iM/A,          /H/A       iFCV-3-498, Ul'C 408129            JH/A   [Replacement        /Mo I                                                                                   ASKE SA-194 iBOLT  (1)                                              I H/A           I N/A     I FCV-3-498,   UTC  397774        iH/A iRepiacement        iMo HEAVY KEX ASTH A193
&Li ht Name P.O.Box 4332 Princeton Fl.33032 Address Type Code Symbol Staap Authorization No.Expiration Date N A N A 4 Identification of System'OMPONENT COOLING WATER System&#xb9;: 30 Duality Group: C 5.(a)Applicable Construction Code 831.1 1955 Edition, HA Addendas~HA Code Case)Year (Repaired)ASHE J iguiit/Replaced or (Code//Replacement istaap J I I)~tes ue[Manufacturers.'National i i Serial No.Board Other Identification Name of Component Haec of Manufacturer (b)Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~MA Addenda,~NA Code Case t 6.Identification of Coaponents Repaired or Replaced and Replacement Components.
: 7. Description of Mork:       REPLACED FOURTEEN       14   STUDS AHD HUTS AHD OME     1   BOLT OM     FCV-3-498   S C wC" KAIN FM FLOM CONTROL   'VALVE.
3E207A i WESTINGHOUSE (N/A (047 (Component Cooling Water i1968 (Repaired i Yes Heat Exchan er<<A<<7., Description.
: 8. Tests Conducted:       Hydrostatic:                     Pneunatic:                 Nominal Operating Pressure Other VT-1                                                                                  NA           4F 97-028-3
of Work: CUT 6<<X 9" ACCESS'HOLE
 
'FOR FORIEGM HATERIAL RETRACTIOH.
Sheet 2               of 2 FORN NIS-2 (Back)
CODE'CASE M-416 1'AS BEEN ENVOKED FOR THIS REPAIR ACTIVITY.Pneunatic:
: 9. Remarks: THls ts     A NEcHANtcAI. cohrHEGTIow   No llELGING REQUIRED.
Hominal Operating Pressure Other VT-2 Pressure~Yes sis Test Tsssersture 91 oF 97-031-3 Sheet 2 of 2 FORM NIS-2 (Back)9.Remarkst Code Case NC16-1 was envod'ed for this~reEair activl~t., Al,l weldIndI was rfornod tn accordanca otth tt roc t td c trot~anno CERTliFICATE OF COMPLIANCE Ne certify that'the statements made in the report are correct and'this repair conferms to the'ul'es of the ASME Code, Section Xl.Type Code Symbol Steap N A Certificate f Authori cation (o.~N'A Signed ra Ac.cd pd oh.to Owner or Owner's Desi'IInee, Title Fxpiration Date Date~~~/'~CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cemsission issued by the',National Board of BoiLer and Preksur'e Vksse'I inspectors and the state or Province of Datie County and dnplbyed by~Arkuright Mutual Insurance Company bf Norwood, Ha.have inspected the ceq~ents described in this'Own'ers
I CERTIF ICATE OF COMPLIANCE Me   certify that   the statenents   made in the report are correct   arxf this replacement conforms to the rules of the ASNE Code,   Section XI.
'Repbrt'during the period 01/29/9/to 06/04/97 and state that to the best of my knowledge and belief, the Owner.has performed examinations and taken corrective measures, described in this O~ners Report in'acc'ordance with the requiirements of the ASME Code, Section Xl..By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed or implied, concerning the examinations and corrective measures'described in this'wner's Report.Furtherax>re, neither the Inspector nor his employer shai,l.be Liable In'i any ma'nner'oir ady personal injury or property, damage or a loss of any kind arising from or connected with thisi inspection.
Type Code Symbol Steep                                           ~HA Certificate of Authorization      No.            ~NA                              Expiration Date          NrrA Signed r or
d'oemissions i NB 8230~N~I lnspec rs~SI tore Nati'onal'oard, State,'Providence, and Endorsements Date 97-031-3 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations L 0  
                                      +i/FS   'gA~~~~m~~
~~~~i~s g@Qgg=W ggggg~~~~~~~~a geog@/Q~Q~RE W R5 s s s~e~~I'.~~~~~J 4~t C~~~~~~r~~I~~~~~~t II e COMPONENT: S/G A CUMULATIVE DISTRXBUTION
Owrrer's Oesfgir~re, Tft4P OSta
                                                                                            +                                        19               +g CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a 'valid cicrrrnfssion issued by the Nstisnal'oard of Boiler snd Pres'surd and the state or. Province of l)ade County and errrployed by Arkwrfght Mutual'nsurance Corpany of Ve!sseL'nspectors Horwood, Na. have inspected 'the components described in this Owners Report during the period             03/13/96                                 to 04/10/97         and state that to the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described .in this Owners Report 'in accordance with the requirements of the 'ASNF Code, Section XI.
By signing this certificate neither the Inspector,nor his rleployer makes any warranty, expressed ar implied, concerning the examfrratfons and corrective measures tiescribcd in this Owner's Reports, Furthermore, neither the Inspector rror his errployer shall be Liable in sny'manner'for'any personal Injury or property damage or s Loss of sny kind arising from or connected wfth this fnspection.
                                ~~~c~ /                   'omrrfssfons         HB 8230 ~H~I Inspector   Sigrqgcfre                                     National Board, State, Providence, and Endoraements'ate 1.~Z 97-028-3
 
FORH NIS-2 OWNERS REPORT     FOR REPAIRS OR REPLACEMENTS As Required by the     Provisions of the       ASHE Code   Section XI e     1. Owner         Florida   Power 8 Li ht                                           Date                       04 16 97 700'Universe Bl'vd. Juno Beach Fl. 33408                                   Sheet         1                 of   2 Address
: 2. Plant         Turke   Point Plant                                                 Uni t PWO   &#xb9;:63/0472       WO &#xb9;:   96026892 PCH   &#xb9;: 96-070 9760 SW 344 Street   Florida Cit       Fl. 33035 Address                                                     Repair Organization P.O. No.,Job No.,etc
: 3. llork Performed by       Florida Power 8 Li ht                                       Type Code Symbol Stamp                    M A Name                                                 Authorization No.                          N A Expiration Date                            M A P.O. Box 4332     Princeton     Fl. 33032 Address
: 4. Identification of System:         Primar   Water Hakeu   S   tern             System   &#xb9;:       20       Quality Group:       '8
: 5. (a) Applicable Construction       Code                     B31.1                           1955   Edition,   NA   Addendas~NA     Code Case (b) Applicable Edition of Section XI         Utilized'or     Repairs or Replacements         1989   Edition,~NA     Addenda,~NA     Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Coeponents Meme of                   Name of       )Manufacturer),National     .J'             'Other             ]Year   J Repaired ] ASHE     f Coeponent                Hanufacturer        Serial  No.        Board              Identification        '/Built/   Replaced or / Code     /
                                                                                                                                / Replacement )Stamp     f CV-3-519A                     I N/A'M/A                             IM/A         'I5610-P-900S I
(UNK I
                                                                                                                                ,]Repaired
                                                                                                                                                /~tes ue
                                                                                                                                                /Mo
: 7. Description of Work:,CUT       RE WELD THE DOWMSTREAH PORTIOM OF         CV-3 519A VERTICAL RUN.
: 8. Tests Conducted:       Hydrostatic:                   Pneunatic:                     Nominal Operating Pressure Other VT-2                    pressure~220             im   test   Temperature               80         F 97-029.3
 
Sheer: 2 of 2 FORH   NIS-2 (Back)
Cl
: 9. Remarks:
CERTIIF I CATE OF COHPLIANCE Me certify that   the statements made in the report are correct       rind this   repair     conforms to the rul,es of the ASHE Code,   Section XI.
Type Code Symbol Stamp                                             N A Certificate of Authori'!atjon   No.     - ~N'A                                   Fxpi'ration Oatc Signed
                              >I
                                                'i . gfc~,     4Q/NYi+~~rgc/           gate   Qg~r/
44'~A Owner  or Owner'sg4signcc,  Title CENTI F, I CATE OF INSERVI CE INSPEC'T IOII I, the undersigned, holding a valid comriissiion issued Iby the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dadle County and crriployed by Arkwright Hutual Insurance C~ny bf Norwood, Ha. have inspected the compionents described in this 'owners 'Report during the period               IO/09/96     to 04/16/97       and state that to the hest of my knowledge and belief, the Owner has performed examinaitiofrs and taken corrective measures described in this Owners Report'n 'accbrda'nce'with the requiirements of the ASHE Code;,
Section XI.
By signing this certificate neither ithe Inspector nor his emplloyer makes any warranty, expressed or implied, concerning thee examinations and corrective measures 'described in this'wner's Report. Furtherrrore, neither the Inspector nor his, cm!cloyer . hall be-liable ini any mahner for any. personal injury or jprogrtj/
damage or a loss of any kind arisingi from or connected with t'hfs'ns'pcchion'.
Inspec
                            />
rs Sjgg ture ComrriSSionS       NB 8230   N I National Board, State, Providence,   arnd Endorsements Date 97-029.3
 
FORK NIS-2 OMMERS REPORT   FOR REPAIRS OR REPLACEMENTS As Required by   the Provisions of the     ASKE Code     Section XI 1 ~ Owner         Florida   Power 8, Li ht                                         Date                     06 04 97 700 Universe   Blvd. Juno Beach Fl. 33408                                 Sheet         1                   of   2 Address
: 2. Plant           Turke   Point Plant                                               Uni t Name                                              PMO &#xb9;:63/8810       MO &#xb9;:   96022773 9760 SM 344 Street   Florida Cit       Fl. 33035 Address                                                   Repair Organization P.O. No.,Job No.,etc 3 ~ Mark Performed by         Florida   Power 8   Li ht                                 Type Code Symbol Stamp                    N  A Name                                                Authorization Ho.                          N A Expiration Oate                            N A P.O. Box 4332   Princeton     Fl. 33032 Address
: 4. Identification of System:         COKPOMEHT COOLING MATER                       System   &#xb9;:       30       Qual I ty Group:       C
: 5. (a) Applicable Construction         Code                     B31.1                           1955 Edition, NA     Addendag~NA       Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                   1989 Edition,~HA       Addenda,~NA       Code Case
: 6. Identification of Components Repaired or Replaced and Replacement Components Name of                   Name   of       (Manufacturer) National                     Other            ]Year        Repaired / ASKE J                        /
Component                Manufacturer        f Serial No.       Board             Identification         )guilt[   Replaced or f Code     /
I                                                                      / Replacement (Stamp     J I                                                             I       I                ]~res se (CCM HX VALVE                     IN/A                  [H/A          [H/A          f3-50-377 1-1/2"      GATE        /UMK    ]Replacement    /Mo I                                                                                     UTC 407835      R62776 ISTUOS  (160)                   IN/A                   IH/A                         (UTC 409288                      (UMK    [Replacement      [No ISTUOS    40                                                                          UTC 409357 iBOLTS  (40)                    iN/A                   (N/A                         IUTC 409330                     (UHK     (Replacement     (Ho I
IHUTS  (320)                                                                        JUTC   409358, ASTK A-194         )UHK     (Replacement     (Ho I                                                                                      HEAVY HEX INUTS  (120)                                            [H/A                        (UTC   409356,   ASTM SA-194   JUNK     )Replacement     (No I                                                                                      EAVY HEX
: 7. Oescription of Mork:         REPLACE BOLTIHG OM 3E207A COMPONENT COOLING MATER HEAT EXCMAHGER AHO THE REPLACEKEHT OF VALVE     3-50-331.
: 8. Tests Conducted:         Hydrostatic:                   Pneunatict                   Nominal Operating Pressure             X Other VT-2                     eressure~stu           tg   Test Testrereture               MOK         4F 97-030-3
 
Sheet 2                 of 2 FOHN NIS-2 (Back)
: 9. Remarks: THIS IS     A HECHANICAL CONNECTION NO MELDING MAS REOUIRED.
CERTIFICATE OF COHPLIANCE Me certify that   the statements   made in the report are correct'nd this replacement     conforms to the rules'f             'the'SHE Code, Section   XI.
Type Code Sychol Stamp                                           H A Certif icate of Authorization       NoN~A Signed                               >~4/~
                                                        /7 0       or   er'4 Designee, Tit~le CERTIFICATE, OF INSLRVICE INSPECTION I, the undersigned, holcling a valid comnission issued by the Hational Board of Boiler and Pressure 'Vessel',
inspectors and the state or Province of Dade County and employed by Arkwright Nutual In urance Company Na. have inspected the ccaponents described in this Oanerls Raport during the period           04/IS/97 to of,'orwood, 06/04/97       and state that to the best of my knowledge and belie'f, the Owner has performed examinations, 'and taken corrective measures described in this Owners Report i'n accordance with the requirements of the ASHE'ode, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in'his Owner,'s Report. Furthermore,                                   I neither the Inspector nor his employer shall be liable in any manner for any'personal injury or property                                     I or a loss of'ny kirxi arising from or connected with this ilnsgcti'on.',                                               'amage
                                                                                                                                                  'I z7 Inspect    s SLEDa  re Conmi ssions
                                                                          ''
                                                                          ,
Ng 8230 N National Board, State, Providence, and Endorsements Date                               19 II 97-030-3
 
FORK   HIS-2 OWHERS REPORT   FOR   REPAIRS OR REPLACEMENTS As Required by     the Provisions of the     ASKE Code     Section XI
: 1. OMner         Florida   Power &   Li ht                                         Date                     06 04 97 700 Universe Blvd. Juno Beach         Fl. 33408                             Sheet         1                 of     2 Address
: 2. Plant         Turke   Point Plant                                               ;Uni t PWO" &#xb9;:63/1859       WO &#xb9;:   97002428         CR   &#xb9;:   97-0070 9760 SW 344 Street   Fior ida Cit     Fl. 33035 Address                                                   Repair Organization P.O. No.,Job No.,etc
: 3. Work Performed by       Florida-Po<<er     & Li ht                                 Type Code Symbol Staap                    N  A Name                                                 Authorization No.
Expiration Date                            N A P.O. Box 4332   Princeton     Fl. 33032 Address 4   Identification of   System'OMPONENT         COOLING WATER                     System   &#xb9;:       30       Duality Group:           C t
: 5. (a) Applicable Construction       Code                       831.1                           1955 Edition, HA     Addendas~HA         Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements                  1989  Edition,~MA      Addenda,~NA        Code Case
: 6. Identification of Coaponents Repaired or Replaced and Replacement Components.
Name  of                    Haec  of      [Manufacturers.'National     i               Other            )Year  (    Repaired ) ASHE        J Component                Manufacturer      i Serial No.       Board             Identification         iguiit/    Replaced or ( Code        /
                                                                                                                                / Replacement      istaap  J I      I                  )~tes ue 3E207A                         i WESTINGHOUSE         (N/A           (047         (Component Cooling Water         i1968 (Repaired             i Yes Heat Exchan er <<A<<
7., Description. of Work:     CUT 6<<X 9"   ACCESS'HOLE 'FOR FORIEGM HATERIAL RETRACTIOH. CODE'CASE M-416                 1'AS BEEN ENVOKED FOR   THIS REPAIR ACTIVITY.
Pneunatic:                   Hominal Operating Pressure Other VT-2                     Pressure~Yes           sis   Test Tsssersture               91           oF 97-031-3
 
Sheet 2 of 2 FORM NIS-2 (Back)
: 9. Remarkst   Code Case NC16-1 was envod'ed   for this~reEair activl~t., Al,l       weldIndI was rfornod tn accordanca otth tt   roc t td c     trot~anno CERTliFICATE OF COMPLIANCE Ne certify that'the   statements made   in the report are correct     and   'this   repair   conferms to the'ul'es of the ASME Code, Section Xl.
Type Code Symbol Steap                                           N A Certificate f Authori cation (o.             ~N'A                                   Fxpiration Date Signed                                             ra Ac . cd pd oh .
to         Date~~~        /'~
Owner or Owner's Desi'IInee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cemsission issued by the',National Board of BoiLer and Preksur'e Vksse'I inspectors and the state or Province of Datie County and dnplbyed by~Arkuright Mutual Insurance Company bf Norwood, Ha. have inspected the ceq~ents described in this'Own'ers 'Repbrt 'during the period               01/29/9/ to 06/04/97       and state that to the best of my knowledge and belief, the Owner.has performed examinations and taken corrective measures, described in this O~ners Report in'acc'ordance with the requiirements of the ASME Code, Section Xl..
By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed or implied, concerning the examinations and corrective measures'described in this'wner's Report. Furtherax>re, neither the Inspector nor his employer shai,l. be Liable In'i any ma'nner'oir ady personal injury or property, damage or a loss of any kind arising from or connected with thisi inspection.
d'oemissions lnspec  rs~SI    tore i   NB   8230~N ~I Nati'onal'oard, State, 'Providence,   and Endorsements Date 97-031-3
 
TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations
 
L 0
 
                                                        ~ ~
        ~ ~ i
  ~ s
                  ~      ~    ~           ~ ~
                                                  ~ ~           e ~   ~
I '.
              ~ a geog@/Q~Q                                           ~ ~
g@Qgg                              RE W
                              ~
  =W                                                R5 ggggg            s             s     s       ~
J
            ~      ~  ~          ~ ~   ~ ~   ~     r    ~ ~
4   ~     t   C ~
I~           ~~   ~       ~
                                      ~ t
 
II e                             CUMULATIVE DISTRXBUTION  


==SUMMARY==
==SUMMARY==
TURKEY POINT UNIT g.3 03/97 Page: 1'ate: 05/12/97 Examination.Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Xnspected 3197 Total Indicati'ons Between 20%and 39%Greater than or equal to 40%Total Corrosion.
type Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged 6 (1)'2 1 3 Location Of Xndications, 20%to, 100%&"VOL" Hot.Leg TSH-.5 to 01H-2.1 01H-'2.0 to 06H'2.0 06H i2.1 to AVl-3.1 0 Cold Leg TSC-.'5 to 01C-2.1'.01C'2.0 to 06C+F 0 06C+2.1 to AV4-3,.1 0 0 0 AV1-3.0 to AV4-3.0: 6 (1)


INDICATIONS/TRENDING REPORT PTN 3 OUI'AGE: 03/97 t CONPONENT: S/G A DESCRIPTION
TURKEY POINT UNIT g .3 03/97 COMPONENT  :  S/G A                                              Page:
: ALL 40%to 100%, VOI.'PTP INDICATIONS Page: 1 Date: 5/12/97 Time: 10:00:00+~~I Extent 03/97 (Row(Col(Leg(***(Tst/Note(Reel I Probe I Location Ivoltsl'---I---I---I---I---
: 05/12/97 1'ate Examination .Dates    :  03/13/97  thru 03/19/97 Total  Number  of Tubes Xnspected                  3197 Total Indicati'ons Between  20%  and  39%                          6  (1)'
I.--I-.--.-.-I----"-I--I 13(I H ICNRIBAHTSHPLIAH002 (HRPC680.3C ITSH 3.8 I 1.4((31(18(.H I (06H SCIAH039 IMPRC720-3C
Greater than or equal to 40%
'(06H 1.1 (1.0(I 44I 36(c I I (AH037 IHPRc720.3c I I I ((C (CHR(TSH GY(AH037'INPRC720.3C (TSH.7 (1.2('--'I---I---I---I--------I-I-I.I.--I Number of RECORDS Selected.from Current Outage: 4 Naker of, TUBES Selected.from Current Outage: 3 I I N/A I oeg(CI I%(Diff(Location (voltslocg(CI I x I I I I-I--.-.--------
Total Corrosion. type Indications "VOL"                2 Total Tubes Plugged as Preventive Maint                    1 Total Tubes Plugged                                        3 Location Of Xndications,    20%  to, 100%  &  "VOL" Hot. Leg                                  Cold Leg TSH .5    to 01H -2.1                    TSC .'5  to  01C    -2.1  '. 0 01H -'2.0 to 06H'2.0                      01C'2.0 to      06C +F 0          0 06H i2.1 to AVl -3.1            0        06C +2.1 to    AV4    -3,.1      0 AV1 -3.0 to AV4 -3.0      :    6 (1)
I--".I-I".I--'19(1 IP'IP I I I I I I ,64 I 1(VOL ((I I I I I I IPTPI I I I I I I 14(1(VOI I (I I I'(I-I---l--.l.--.l--------.----l-----l-.-l---l-
 
-+
INDICATIONS/TRENDING REPORT PTN 3 OUI'AGE : 03/97 CONPONENT   : S/G A                                                                                                 Page :    1 DESCRIPTION :t ALL 40%     to 100%, VOI.'   PTP INDICATIONS                                                         Date :   5/12/97 Time : 10:00:00
II 0 Ik CNIPONENT: S/G A DESCRIPTION
+                                   ~             ~
: ALL 20K TO 39K IHDICATIONS INDICATIONS/TRENDING REPORT PTN-3 OUTAGE: 03/97 Page: 1 Date: 5/12/97 Time: 10:00:00 I Extent (Row(Col(Leg(*~*(Tst/Note(Reel (Probe'---I--I---I---I-I I I 33(41(C (ITEH PS(AC006 (A-720-M/ULC I I I C I ITEH P (AC006 IA-720-M/ULC I 38(45(C I ITEH PSIAC007 IA-720-M/ULC (37(47(C I (TEH PS(AC012 IA-720.M/ULC
I                   Extent                                                 03/97               I    I      N/A                            I (Row(Col(Leg(***(Tst/Note( Reel I           Probe         Location    Ivoltsloeg(CI    I %  (Diff( Location   (voltslocg(CI          x
'(30(52(H ((TEC PC(AH034 IA-720 M/ULC (28(59(H (ITEC PS(AH021 (A-720 M/ULC'---I---I---I---I--------I-I Number of RECORDS Selected.from Current Outage Number of TUBES Selected.from Current Outage:+03/97 I I'/A I (I.ocation (Volts(Deg(Ch (X fDiff(Location fVolts(Deg(ch (X (I--I-----I---I---I-" I---I---------I----l.--l---l---+
'---I---I---I---I--- I . --I                             I
IAY1.0 I.9(.IP 2(24(I I I I I IAV3.0 f'9((P 2(25(I I I I I (AvZ.0 (.1.5(IP 2(30(I I I I I (AV3.0 (.8(fP 2(22((I I I I I IAv3.0 (~4((P 2('0(I I I I I IAY2.0 I.6(IP 2(,26(I I I I I I I.I I I I-I".--".--.-.
                                            -.-- .-.- I----           "-I--     I    I  I    I
I"" I---I---I---+'6 5 0 0 COMPONENT: S/G B CUMULATIVE DISTRIBUTION
                                                                                                  -  I--.-.--------I--".I-    I".
I I--'19(
I 13(   I H ICNRIBAHTSHPLIAH002       (HRPC680.3C   ITSH     3.8     I   1.4(       1 IP'IP I                  I      I  I    I        I
( 31( 18(. H I   (06H     SCIAH039     IMPRC720-3C '(06H     1. 1   (   1.0( ,64 I 1(VOL (      (            I      I  I    I        I I 44I 36( c   I   I         (AH037     IHPRc720.3c   I                 I       I   I  IPTPI      I            I      I  I    I        I
(   ( C (CHR(TSH     GY(AH037   'INPRC720.3C   (TSH       .7     (   1.2( 14(  1(VOI I      (            I      I  I  '(        I
'- -'I---I---I---I--------I-             I
                                                      - I.
I
                                                                              .--I -I---l--.l.--.l--------.----l-----l-.-l---l--+
Number  of  RECORDS  Selected .from Current Outage    :      4 Naker of, TUBES    Selected .from Current Outage :            3
 
II 0
Ik
 
INDICATIONS/TRENDING REPORT PTN-3 OUTAGE : 03/97 CNIPONENT : S/G A                                                                                            Page   :   1 DESCRIPTION : ALL 20K TO 39K IHDICATIONS                                                                      Date :   5/12/97 I                   Extent (Row(Col(Leg(*~*(Tst/Note( Reel
'---I-- I---I---I-(   Probe    (   I.ocation 03/97 (Volts(Deg(Ch  ( X
                                                                  - -I-----I---I---I-"
I   I
                                                                                                  '/A fDiff( Location Time : 10:00:00 fVolts(Deg(ch (
                                                                                                                                +
I X (
I       I           I I--- I-- --- --- - I---- l.--l---l---+
33( 41(  C      ITEH    PS(AC006  (A-720-M/ULC IAY1       .0         .9(. IP 2( 24(
I I     I   I C I
(
ITEH    P  (AC006  IA-720-M/ULC IAV3       .0   f'9(
I (P 2( 25(
I I
I I
I I
I I
I I
I 38(  45(  C  I  ITEH    PSIAC007  IA-720-M/ULC (AvZ       .0   (. 1.5( IP 2( 30(                   I     I   I   I   I
( 37(  47(  C  I  (TEH    PS(AC012  IA-720.M/ULC (AV3       .0   (     .8( fP 2( 22(     (           I     I   I   I   I
'( 30(  52(  H (    (TEC    PC(AH034  IA-720 M/ULC IAv3       .0   (     ~ 4( (P 2('0(                   I     I   I   I   I
( 28(  59(  H      ITEC    PS(AH021  (A-720 M/ULC IAY2       .0         .6( IP 2(,26(
(
'---I---I---I---I--------I-            I           I I
I.       I I   I   I
                                                                                              - I".--".--.-.I"" I--- I--- I---+
I      I  I  I  I Number    of  RECORDS  Selected .from Current Outage        '6 Number    of  TUBES Selected .from Current Outage :      5
 
0 0
 
CUMULATIVE DISTRIBUTION  


==SUMMARY==
==SUMMARY==
TURKEY POINT UNIT g 3 03/97 Page: 1 Date: 05/12/97 Examination Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Inspected.....: 3196 Total Indications Between 20%and'9%Greater than or equal to 40%Total Corrosion type Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged (1)1 9 (2)2 9 (2)Location Of Indications 20~to 100~6"VOL" Hot Leg TSH-.5 to 01H-2.1 06H+2.1 to AV1 AV1-3.0 to AV4-3.1-3 0 01H-2.0 to 06H+2.0 0 Cold Leg TSC-.5 to 01C-2.1 01C-2.0 to 06C+2.0 06C+2.1 to AV4-3.1 0
 
INDICATIONS/'TRENDING REPOR I PTN 3 OUTAGE: '03/97 Page: 1'Date: 5/12/97 Time: 10:00:00 COMPONENT: S/G 8 DESCRIPTION
TURKEY POINT UNIT g 3 03/97 COMPONENT :  S/G  B                                            Page : 1 Date : 05/12/97 Examination Dates   :   03/13/97 thru 03/19/97 Total Number of Tubes Inspected     .....:       3196 Total Indications Between 20% and'9%                                   (1)
: ALL+40%to 100%, VOL&PTP INDICATIONS
Greater than or equal to 40%                     1 Total Corrosion type Indications "VOL"                 9  (2)
~~+I Extent (03/97 N/A I (Rou(col(Lcg(***(Tst/Note(Reel I probe ,(Location (volts(oeg(Ch
Total Tubes Plugged as Preventive Maint                   2 Total Tubes Plugged                                       9   (2)
(%'(Diff(Location (volts(oeg(Ch I/I I--I---l---l------.-l--------l------------l-------------l-----l---l---l--I----I-----."----I----I--I---I---+I I I H'cMRITsH'LIBH002 IHRPc680 c ITsH~4 I 1 (10 I 1(voL(I I I I I (42(38(H ICHR(01HTSKPLIBH004 IMRPC680-3C
Location Of Indications     20~ to 100~ 6 "VOL" Hot Leg                                  Cold Leg TSH .5   to 01H -2.1                   TSC .5    to  01C  -2.1 01H -2.0 to   06H +2.0                   01C  -2.0 to   06C  +2.0 06H +2.1 to   AV1 -3. 1       0          06C +2.1 to   AV4   -3.1 AV1 -3.0 to  AV4 -3  0
'(TSH 1.5 ,(1.2(87(1(VOL(I I I I I I 39(39(c IcMR(osK PLIBH043 IMRPc680 3c (05H.8 I 2.3(125(l(voLI I I I I-I (44(40(.C,(CMR(TSH PI.(BH043 (MRPC680-3C (TSH.3 (1.3(46(1(VOL,(I I I I I (c (PITITsH PL'(BH043 IHRPc680-3c (TsH 1.8 (.4(6o(P1(82((I I I I I (23(41(C (CMR(03C PCfBC031 (MRPC680-3C (03C.'5 (.4(93(1(VOL(I I I I (44(41(c (cMRITsH',PLIBK043 (HRPc680-3c ITsK.2 (1'.5(122(1(vol.(I I I I I I I I'C IcHRITsK PL(BH043 IHRPC680 3C ITsH.4 I\1(90(llvoLI I I I I I I c (cMRITsK ILIBK043 (MRPc680 3c ITsK.5 I.9(83(.1(voLI I I I I I I 45(41('ILPHITEH PL(BC009 (A-720-M/ULC (TsK.6 I I I II TPI I I I I I I (45(42(c ILPM(TEK PL(gc009 (A-720.M/ULc ITsK 1.3 I.(I (PT I I I'I I I 41(44 I C ICMR ITEH GY IBH043 (HRPC680-3C ITSH.6,(.3 I 52(1(YOL I I I I I I I'-I." I.-.I---I-I I-I.-I--" I.-I-.-I.-.I--I-.--.---I.---I--I.--I---Number of RECORDS Selected from Current Outage: 12 ,Number of TUBES Selected from Current Outage: 9 0'
 
t COHPONENT: S/0 8 DESCRIPTlON
0 INDICATIONS/'TRENDING REPOR           I PTN 3 OUTAGE :     '03/97 COMPONENT    : S/G 8                                                                                                        Page   :   1 DESCRIPTION : ALL 40%      to    100%, VOL & PTP INDICATIONS                                                                'Date   : 5/12/97 Time : 10:00:00
: ALL 20%TO 39%IHDlCATIONS IHDlCATlOHS/TREHDlNG REPORT PTH-3 OUTAGE: 03/97 Page: 1 Date: 5/12/97 Time: 10:00:00++I I Extent 03/97.I I N/A'I IR"I[Leg[***[Tst/Hotel Reel I Probe I Location IVolts[Deglch I%[Diff[l.ocation ,IVolts[Deg[Ch I%I+---I---I---I-I---I--.-I"----------I-----
+                                                                                                                              ~                ~  +
-.-----I--I I I I I I I I I I 32[34[C f,[TEH PSIBC019[A-720-N/ULC IAV1.0 I.7[IP 2[23[I I I I I I I'C I ITEH.Ps[BC019[A 720 H/ULC IAV3-.1 I 1.3[[P 2[31f f I I I I I I c I ITEH Ps[Bc019 IA-720-H/ULC IAv4-.2 I.7[.[r 2[22[I I I I I I 34f 46[C I ITEH PCIBC009'[A-720-N/ULC fAV2.0 I 1.0[fP Zf 28f, f ,I I I I'I'I C'I ITEH PCIBc009 IA-720-N/ULc IAv3~0 I 1.5[IP Zl 35['I I I I I[I 34f 51[C I ITEN PSIBC011 IA-720-N/ULC IAV2.0 f 1.2f IP 2[29f I I I I I I 42[55[c I: ITEH PCIBC012'IA 720 H/ULC IAv3-.3 I 1.7[.IP Zl 31[I I I I I+---I---I-I---I--------I--------I---------.
I                   Extent (                                                 03/97                                 N/A                             I (Rou(col(Lcg(***(Tst/Note( Reel           I   probe   ,(   Location       (volts(oeg(Ch         (
I-----I-----I--
                                                                                                      % '(Diff( Location   (volts(oeg(Ch     I   / I I- -I---l---l------.-l--------l------------l-------------l-----l---l---l-                       -I----I-- ---."----I--- -I-- I---I---+
I---I---I----
I   I   I H'cMRITsH'LIBH002             IHRPc680 c   ITsH       ~ 4     I   1     (10 I 1(voL(                     I       I   I   I       I
I-"---.----I--"-
( 42( 38( H ICHR(01HTSKPLIBH004           IMRPC680-3C '(TSH     1.5     ,(     1.2( 87( 1(VOL(             I           I       I   I   I I 39( 39( c IcMR(osK       PLIBH043       IMRPc680 3c   (05H       .8     I     2.3(125( l(voLI                         I       I   I   I-     I
I"-l.--[--.+
( 44( 40(. C,(CMR(TSH       PI. (BH043     (MRPC680-3C   (TSH     .3       (     1.3( 46( 1(VOL,(                       I       I     I   I       I
Number of RECORDS Selected from Current Outage: 7 Number of, TUBES Selected from Current Outage: 4 0
( c (PITITsH     PL'(BH043     IHRPc680-3c   (TsH     1.8       (       .4( 6o( P1( 82(         (           I       I     I   I       I
COMPONENT: S/G C CUMULATIVE DISTRIBUTION
( 23( 41( C (CMR(03C   PCfBC031     (MRPC680-3C   (03C     .'5     (       .4( 93( 1(VOL(                                 I   I   I       I
( 44( 41( c (cMRITsH',PLIBK043           (HRPc680-3c   ITsK     .2       (     1'.5(122( 1(vol.(                       I       I   I   I       I I     I   I'C IcHRITsK PL(BH043           IHRPC680 3C   ITsH     .4       I     \   1( 90(   llvoLI       I                     I   I   I       I I c (cMRITsK     ILIBK043     (MRPc680 3c   ITsK     .5       I       .9( 83(   .1(voLI                   I       I   I   I       I I 45( 41('   ILPHITEH   PL(BC009     (A-720-M/ULC (TsK       .6       I           I   I   II TPI     I           I       I   I   I       I
( 45( 42( c ILPM(TEK       PL(gc009     (A-720.M/ULc ITsK       1.3       I         .(         (PT                     I I'
'- I. " I.-.I---I-I 41( 44 I C ICMR ITEH     GY IBH043     (HRPC680-3C   ITSH       .6,(-            .3 I 52(
I 1(YOL I
                                                                                --" I. -I-.-I.-.I-I I           I        I   I I
I I
I I         I           -I.                 I                                -I- .-- .--- I.-- -I-- I.--I---
Number   of RECORDS Selected from Current Outage :           12
,Number   of TUBES Selected from Current Outage :           9
 
0' IHDlCATlOHS/TREHDlNG REPORT PTH-3 OUTAGE :   03/97 COHPONENT :    S/0 8                                                                                                Page   :   1 DESCRIPTlON :t ALL 20% TO 39% IHDlCATIONS                                                                            Date :   5/12/97 Time : 10:00:00
+                                                                                                                                         +
I               I     Extent                                               03/97             .I   I       N/A                       'I IR "I     [Leg[***[Tst/Hotel       Reel   I Probe     I   Location       IVolts[Deglch I % [Diff[ l.ocation ,IVolts[Deg[Ch     I % I
+---I---I---I-       I
                          --- I     - -.-I "----------I----- -.-----I         --I   I   I   I   I             I       I   I   I I 32[ 34[   C f,[TEH PSIBC019 [A-720-N/ULC IAV1 .0                       I   .7[   IP 2[ 23[                   I       I   I     I   I I     I'     C I   ITEH     .Ps[BC019     [A 720 H/ULC IAV3     -.1     I   1.3[   [P 2[ 31f     f             I     I   I   I     I I c I   ITEH     Ps[Bc019     IA-720-H/ULC IAv4     -.2     I   .7[. [r 2[ 22[                   I     I   I   I     I I 34f 46[   C I   ITEH     PCIBC009   '[A-720-N/ULC fAV2       .0     I   1.0[   fP Zf 28f,     f           ,I     I   I   I
'I'       I C 'I   ITEH     PCIBc009     IA-720-N/ULc IAv3       ~ 0   I   1.5[   IP Zl 35[     'I             I     I   I   I     [
I 34f 51[ C I     ITEN     PSIBC011     IA-720-N/ULC IAV2       .0     f   1.2f   IP 2[ 29f                   I     I   I   I     I I 42[ 55[ c I:     ITEH     PCIBC012   'IA 720 H/ULC IAv3     -.3     I   1.7[ .IP Zl 31[                   I     I   I   I   I
+--- I--- I- I--- I--------I--------I---------. I---                     --I-----I-- I---I---I----I- "---.----I--"-I"-l.--[--.+
Number   of RECORDS     Selected from Current Outage   :       7 Number of, TUBES     Selected from Current Outage :           4
 
0 CUMULATIVE DISTRIBUTION  


==SUMMARY==
==SUMMARY==
TURKEY POINT UNIT&#xb9;3 03/97 r Page: 1 Date: 05/12/97 Examination Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Inspected 31'81 Total Indications Between 20>and 39%Greater than or equal to 40%Total Corrosion type Indications"VOL"'Total Tubes Plugged, as Preventive Maint Total Tubes Plugged 20 (1)1 0 1 2 Location Of Indications 20~to 100:&"VOL" Hot Leg TSH-~5 to 01H-2.1 01H-2..0 to 06H+2.0 Cold Leg 1 TSC-.5 to 01C-2.1: 0 0 01C-2.0 to 06C+2.0: 0 06H+2.1 to AV1-3.1 0 06C+2.1 to AV4-3.1: 0 AV1-3.0 to AV4-3.0 20'(1) 0 0 INDICATIONS/TRENDING REPORT PTH-3 OUTACE: 03/97~~COHPONEHT S/0 C DESCRIPTION
: ALL 40/to 100/, VOL 8 PTP INDICATIONS Page: 1 Oat e: 5/12/97 Time: 10:00:00 I Extent I (Row(CoI(Leg(***(Tst/Note(Reei (Probe (Location'-I-I.-I--I-------I--.I------'I-(30(48(N ('TEC PL(CH009 (A 720 H/ULC (AV3-0 I 33(66(C IPITITSH PLICH047 IHRPC680-3C ITSH.6---I---I--I---I--.-----I-----".I-I Humber of RECOROS Seiected from Current Outage: 2 ,Number of TUBES Selected from.Current Outage: 2 03/97 I I H/A I (Voits(oeg(Ch,f 7.'(oiff(Location (Volts(oeg(cb (X (I I-I-I.I.I I I I--I---'I I IPTP((((.4(103(P 1(58(I I I I I (I I I ('---(((I 0
COMPONENT: S/G C DESCRIPTION
: ALL 20/TO 39/i INDICATIONS INDICATIONS/TRENDING REPORT PTN-3 OUTAGE: 03/97 Page: 1 Date: 5/12/97 Time: 10:00:00 I 34(31(H I I I I H I I 43(33(H I I 35(36(H I (34(41f H I I I IHI I 33(43(H (I 35J 43J H I I I (H(I I IHJ (35(4CJ H (I 301 48I H I ITEC PS(CH027 IA-7?O.M/ULC IAV2.0 (TEC PS(CH027 IA-720-M/ULC IAV3.0 JTEC PSiCH026 iA 720-M/ULC IAV3.0 iTEC PSiCH028.IA-720.H/ULC iAV2.0 fTEC PS(CH029 (A 7ZO.M/ULC (AVI.0 JTEC PSiCH029 JA 720-M/ULC,JAV3
.0 ITEC PSICH029:IA-720-M/ULC IAV4~0 JTEC PC(CH030 (A-720 M/ULC IAV3.0 ITEC PCICH030 IA.720-M/ULC IAVZ.0.ITEC PC(CH030 IA-720 M/ULC IAV3.0 ITEC PCICH030 IA-720-M/ULC IAV4.0 IT C PCICH'A 720 M/ULC (AV ITEC PCICHO IA?0 M/ULC IAV i'IEC (CH009 iA.720-M/ULC (AV2.0 I I I H I JTEC PCICH009 JA-720 M/ULC'JAV3.0 I 35(49(C (ITEN PSJCC009 (A-720-M/ULC JAVC.0 I 26(48(H (ITEC (CH009 JA.720-M/ULC IAVZ.0 (30(61f H f (38(71J C((TEC PS(CH009 (A.720.M/ULC JAV2.0 iTEN PS(CCOll JA 720-H/ULC JAVC..2 Number of RECORDS Selected from Current Outage: 20 Number of TUBES Selected from Current Outage: 13+I Extent I (Row(col(Leg(**"JTst/Note(Reel I Probe I Location+--I--I---I---I----.--I-I-I-I 30('17(H I ITEC Ps(CH006 IA.720 M/ULC IAvl.0 03/97 (Volts(D I-I I-5(I-5I I-5l I Cl I.5(I 6(.6(I.71 (6(J.8(I.C(I"9(1.5(1.6(1.5 f.6(I~5I I 5l I~6(-I-I I I eg(Ch (.X (Diff(-(-.-I-.-I-I JP 2(20(IP 2(21(l>>l 20(I I>>I ZZI,I I>>I>>I I (P 2(22(JP Zf 22(I>>l Zcl I iP Zl 27i J>>I>>I I IP Zl 32(I l>>l>>I I I>>l 34(I-(P 2(35(I fi 2(32f f I>>l 37l I>>(25(I I>>I 20(I (P 2(20(I>>I>>I I I I I-I" N/A I Location (Voltsfgeg(Ch (X f (I I I+I I I I I i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I (I I I (I I I I I I I I I I I I I I I I I I I I I I I Il TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers 0 0 MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 3'1997 SPRING REFUELING'UTAGE
'Commercial Service Date: December 14, 1972 Prepared By: Inservice Inspection Group Florida Power&Light Turkey Point Nuclear 9760'.'W.344 St.Florida City, Fl 33035 Originated by: M.Campbell D te Reviewed by: A.Pauleuc~z1 97 Date M.Blew Date 0
Mechanical shock arrestors (snubbers) were visually inspected/handstroked under purchase order B94536-40012 by Ratheon inspectors in accordance with the following plant procedures:
0-CMM-105'O-OSP-105.1 Implementing plant work orders were as follows: PWO WO 96014408-SNUBBER VISUAL/HANDSTROKE INSPECTION 3-1032, 3-1041, 3-1052, 3-1072/3-1081, 3-1096/3-1106, 3-1033, 3-1043, 3-1054/3-1073, 3-1082, 3-1099, 3-1110, 3-1034, 3-1044, 3-1057, 3-1074, 3-1083, 3-1100, 3-1111, 3-1035, 3-1045, 3-1058, 3-1075/3-1091, 3-1101, 3-1112, 3-1036, 3-1046, 3-1060, 3-1077, 3-1092, 3-1102, 3-1121, 3-1037/3-1048/3-1069, 3-1078, 3-1093, 3-1103, 3-1136 3-1038/3-1050/3-1070/3-1079, 3-1094, 3-1104,&3-1137 3-1039/3-1051/3-1071/3-1080/3-1095/3-1105, PWO WO 96014408-VISUAL INSPECTION (NO HANDSTROKE)
FOR FUNCTIONAL TESTING;3 1009/3 1011/3 1019/3 1023/3 1026/3 1031/3 1040/3 1042/3 1047/3 1049/3 1053/3 1055/3 1076/3 1084/3 1097/3 1098&.3-1120 PWO WO 96024188-REPLACE LOAD PIN WITH LOAD STUD;3 1007/3 1008/3 1009&3 1012 PWO WO 96024216-REPLACE LOAD PIN WITH LOAD STUD;3-1084 PWO WO 96016705-DISLODGED BEARING&LOAD STUD REPLACEMENT/
3-1005, 3-1006&3-1010 PWO WO 97006613-REMOVE SNUBBER 3-1009/3-MSHX-15 IMPLEMENTATION OF CR 97-399/3-1005, 3-1006, 3-1009&3-1010 Mechanical shock arrestors (snubbers) were functionally tested under purchase order B95691-50102 by Basic-PSA personnel in accordance with the following plant/vendor procedures:
0-CMM-105.1 O-OSP-105.2 il Implementing plant work orders were as follows: PWO WO'6024408
-FUNCTIONALLY TEST SNUBBERS LISTED BY ISI 3 1009'g 3 101 1'1019'1023'1026'1031 g 3 1040'1042'1047.g 3 1049 g 3 1053~3 1055/3 1076 g 3 1084 g 3 1097 (3 1098&3-1120 PWO WO'6024412
-REBUILD 10 SNUBBERS 10172 J 10174~1 1 1 10'2377 (12392~16232 g 16238'g 16242 g 16252&16253 0 il MECHANICAL SHOCK ARRESTOR FINAL REPORT SECTION I 0
PAGE NO.1 05/22/97 Turkey Point Outage Surmary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A 4L4 A Number Number Date T Test T Dimension T Visual Sunnary Ftmctional Sunnary 3-1005 10035 03/10/97 P 03/20/97 P 26.5000 P Visual inspection
-sat,"L4 diemsnion acceptable, handstroke
-sat, replaced load pins with load studs per IO 96016705, lubricated load studs and spherical bearings on both ends with neolube-24982-3.A factional test was performed with the following acceptable results under NO 97006613 and CR 97-399: Pre Rebuild-S/N 10035 Replaced snubber S/N 10035 with snubber S/N 10579 per CR 97-399.Snubber S/N 10035 was rebuilt under NO 97006613 by Basic-PSA and NRH back into stores.Test 1)Test 2)Test 3)Test 4)164.88 223.57 0.001 182.49 74.26 165.57 0.012 149.63 2500.00 2500.00 0.02g's 2500.00 Tension Compression Criteria The Pre Rebuild fextionai test was performed at Engineering direction per CR 97-399.Post Rebuild-S/N 10035 Tension Ccepression Criteria Test 1)Test 2)Test 3)Test 4)161.38 232.46 0.004 224.31 138.78 452.13 0.008 397.34 2500.00 2500.00 0,02gls 2500.00 The following parts were installed as part of the rebuild of snubber S/N 10035: (4)Drive Screws-0015673-3 (1)Clutch Spring-0015346-1 (1)Torque Carrier-0015343-1 (1)Capstan Spring-0015729-1


PAGE KO.2 05/22/97 Turkey Point Outage Smasry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A"i." A Nwher Kumber Date T Test T Dimension T Visual Suanary Functional Swmary After rebuild and successful post rebuild factional test, snubber S/H 10035 uas KRH back into stores.3-1006 6521 03/08/97 P 03/20/97 P 26.7500 P Visual inspection
TURKEY POINT UNIT        &#xb9;  3 03/97 r
-sat,"l." dimension acceptable, handstroke
COMPONENT :    S/G  C                                              Page  :  1 Date  :  05/12/97 Examination Dates: 03/13/97         thru    03/19/97 Total  Number  of Tubes Inspected                  31'81 Total Indications Between 20> and    39%                            20 (1)
-sat, lubricated spherical bearings and load studs on both ends.Installed Load studs in place of load pins per lO 96016705.A fwetionaL test Mas performed uith the foLLouing acceptable results under lO 97006613 and CR 97-399: Pre Rebuild-S/H 6521 Tension Cocpression Criteria Replaced snubber S/H 6521 with snubber S/N 6494 per CR 97-399.Snubber 6521 Mas rebuilt under lO 97006613 by Basic PSA and NRH back into stores.Test 1)Test 2)Test 3)Test 4)152.21 131.37 0.005 127.82 195.31 224.07 0.039 207.67 2500.00 2500.00 0.02g's 2500.00 This test Mas performed at Engineering direction per CR 97-399.Post Rebuild-S/H 6521 Tension Coapression Criteria Test 1)250.32 Test 2)'50.32 Test 3)0.002 Test 4)234.70 172.07 317.51 0.007 291.81 2500.00 2500.00 0.02g's 2500.00 The foLLcwing parts uere used during the rebuild of snubber S/K 6521 under LO 97006613: (4)Drive Screws 0015673-3  
Greater than or equal to 40%                      1 Total Corrosion type Indications "VOL"                  0
'Total Tubes Plugged, as Preventive Maint                    1 Total Tubes Plugged                                        2 Location Of Indications    20~  to 100:  &  "VOL" Hot Leg                                    Cold Leg TSH  5~    to  01H  -2.1      1          TSC .5    to  01C  -2.1  :  0 01H -2..0 to  06H  +2.0      0          01C  -2.0 to    06C  +2.0  :  0 06H +2.1 to    AV1  -3.1      0          06C  +2.1 to    AV4  -3.1  :  0 AV1  -3.0 to  AV4  -3.0    20 '(1)
 
0 0
 
INDICATIONS/TRENDING REPORT PTH-3 OUTACE  : 03/97 COHPONEHT    ~ S/0 C                                                                                              Page :    1 DESCRIPTION : ALL 40/~ to 100/,      VOL 8 PTP  INDICATIONS                                                      Oat e:  5/12/97 Time: 10:00:00 I                    Extent                            I                03/97              I    I        H/A                        I (Row(CoI(Leg(***(Tst/Note( Reei              Probe          Location    (Voits(oeg(Ch,f  7.'(oiff( Location    (Volts(oeg(cb
'-I-      I
            .-I- -I---- ---I --
(
                                      . I- -  -
(
                                                    ---'I-              I      I  -I -I. I. I                  I      I  I
( X (
                                                                                                                                --I---'
(  30( 48(  N  ('TEC PL(CH009          (A 720 H/ULC (AV3        -0            I  I  IPTP(    (                        (    (
I  33( 66(  C  IPITITSH    PLICH047    IHRPC680-3C    ITSH      .6        .4(103(P 1( 58(                    I      I  I    I  I
  ---I---I- -I---I--.-----I-----".I-                    I              (      I  I  I
('          -    --(      (  (    I Humber  of  RECOROS  Seiected from Current Outage :          2
,Number  of  TUBES  Selected from. Current Outage :          2
 
0 INDICATIONS/TRENDING REPORT PTN-3 OUTAGE    : 03/97 COMPONENT      : S/G  C                                                                                                Page    :    1 DESCRIPTION : ALL          20/ TO  39/i INDICATIONS                                                                      Date :      5/12/97 Time : 10:00:00
+
I                        Extent                              I                    03/97                I    I N/A                              I (Row(col(Leg(**"JTst/Note( Reel                I  Probe      I  Location        (Volts(Deg(Ch (.X (Diff( Location    (Voltsfgeg(Ch        (
X f
+-- I-- I---I---I----.--I-                                  -I-                    I      -I -(-.-I-.-I-      I                I                +
I                                                                      (              I    I I  30( '17(    H  I  ITEC    Ps(CH006      IA.720 M/ULC IAvl          .0      I      -5(    JP 2( 20(              I        I    I    I    I I  34(31(      H  I  ITEC    PS(CH027      IA-7?O.M/ULC IAV2          .0      I      -5I    IP 2( 21(              i        I    I    I    I I      I    I H I      (TEC    PS(CH027      IA-720-M/ULC IAV3          .0    I      -5l    l>>l    20(    I        I        I    I    I    I I 43( 33(      H I  JTEC    PSiCH026      iA 720-M/ULC IAV3          .0    I        Cl    I>>I ZZI,I              I        I    I    I    I I 35( 36(      H  I    iTEC    PSiCH028    .IA-720.H/ULC iAV2          .0    I      .5(    I>>I >>I        I        I      I      I    I    I (34(41f        H I      fTEC    PS(CH029      (A 7ZO.M/ULC (AVI          .0    I        6(  (P 2( 22(              I        I    I JTEC    PSiCH029      JA  720-M/ULC,JAV3          .0            .6(    JP  Zf 22(            I        I    I    I    I I    I      IHI        ITEC    PSICH029    :IA-720-M/ULC IAV4            ~ 0    I      .71    I>>l    Zcl    I      I        I    I    I    I I  33( 43(    H  (  JTEC      PC(CH030      (A-720 M/ULC IAV3          .0    (        6(  iP Zl 27i              I        I    I    I    I I 35J    43J  H I    ITEC      PCICH030      IA.720-M/ULC IAVZ          .0    J      .8(    J>>I >>I        I      I        I    I    I    I I      I    (H(      .ITEC      PC(CH030      IA-720 M/ULC IAV3          .0          I.C(    IP Zl 32(    I        I        I    I    I    I I      I    IHJ        ITEC      PCICH030
                                            'A  IA-720-M/ULC IAV4          .0    I    "9(      l>>l >>I        I      I        I    I    I
(  35(  4CJ H    (    IT  C  PCICH            720 M/ULC (AV                        1.5(    I>>l 34(        I      I        I    I    I    I ITEC    PCICHO        IA  ?0 M/ULC IAV                      1.6(  -(P  2( 35(    I      I        I    I    I    I I 301    48I  H  I    i'IEC      (CH009    iA.720-M/ULC (AV2          .0                  fi  2( 32f    f      I        (    I    I    I I      I    I H I      JTEC    PCICH009      JA-720 M/ULC 'JAV3          .0          1.5 f  I>>l 37l                (        I    I    I    I I  35( 49(    C  (    ITEN    PSJCC009      (A-720-M/ULC JAVC          .0            .6(    I>>( 25(        I      I        I    I    I    I I  26( 48(    H
(    ITEC        (CH009    JA.720-M/ULC IAVZ          .0    I      ~ 5I  I>>I 20(        I                I    I    I    I (30(61f        H  f    (TEC    PS(CH009      (A.720.M/ULC JAV2          .0    I        5l  (P 2( 20(              I        I    I    I    I (38(71J C(              iTEN    PS(CCOll      JA 720-H/ULC JAVC        ..2      I      ~ 6(  I>>I >>I        I      I        I    I    I    I
                                                                                -I-        I  I    I  I
                                                                                                              -I" Number    of  RECORDS    Selected from Current Outage      :      20 Number    of  TUBES  Selected from Current Outage :              13
 
Il TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers
 
0 0
 
MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 3
                                  '1997 SPRING REFUELING'UTAGE
            'Commercial Service Date: December 14, 1972 Prepared By:
Inservice Inspection Group Florida Power & Light Turkey Point Nuclear 9760'.'W. 344 St.
Florida City, Fl 33035 Originated by:            M. Campbell            D  te
                                                    ~z1 97 Reviewed by:              A. Pauleuc              Date M. Blew                  Date
 
0 Mechanical      shock      arrestors    (snubbers)    were  visually inspected/handstroked under purchase order B94536-40012 by Ratheon inspectors in accordance with the following plant procedures:
0-CMM-105 '
O-OSP-105.1 Implementing plant work orders were as follows:
PWO WO    96014408  SNUBBER VISUAL/HANDSTROKE INSPECTION 3-1032,    3-1033,  3-1034,    3-1035,  3-1036,  3-1037/  3-1038/ 3-1039/
3-1041,    3-1043,  3-1044,    3-1045,  3-1046,  3-1048/  3-1050/ 3-1051/
3-1052,    3-1054/  3-1057,    3-1058,  3-1060,  3-1069,  3-1070/ 3-1071/
3-1072/    3-1073,  3-1074,    3-1075/  3-1077,  3-1078,  3-1079, 3-1080/
3-1081,    3-1082,  3-1083,    3-1091,  3-1092,  3-1093,  3-1094, 3-1095/
3-1096/    3-1099,  3-1100,    3-1101,  3-1102,  3-1103,  3-1104, 3-1105, 3-1106,    3-1110,  3-1111,    3-1112,  3-1121,  3-1136  & 3-1137 PWO WO  96014408  VISUAL INSPECTION (NO HANDSTROKE) FOR FUNCTIONAL TESTING; 3  1009/ 3 1011/    3  1019/  3  1023/  3  1026/  3 1031/  3 1040/ 3  1042/
3  1047/ 3 1049/    3  1053/  3  1055/  3  1076/  3 1084/  3 1097/ 3  1098
&  .3-1120 PWO WO  96024188  REPLACE LOAD PIN WITH LOAD STUD; 3  1007/  3 1008/  3  1009  & 3  1012 PWO WO  96024216  REPLACE LOAD PIN WITH LOAD STUD; 3-1084 PWO WO  96016705  -  DISLODGED BEARING      & LOAD STUD REPLACEMENT/
3-1005, 3-1006    &  3-1010 PWO WO  97006613  REMOVE SNUBBER 3-1009 IMPLEMENTATION OF CR 97-399/
                                                  /  3-MSHX-15 3-1005, 3-1006, 3-1009        &  3-1010 Mechanical shock arrestors (snubbers) were functionally tested under purchase order B95691-50102 by Basic  PSA personnel in accordance with the following plant/vendor procedures:
0-CMM-105.1 O-OSP-105.2
 
il Implementing plant work orders were as follows:
PWO WO'6024408  FUNCTIONALLY TEST          SNUBBERS LISTED BY      ISI 3 1009'g 3 101 1 '      1019'  1023 '    1026'    1031 g  3  1040'      1042' 1047. g 3 1049 g 3 1053 ~ 3 1055 / 3 1076 g 3 1084    g  3  1097 (  3  1098
& 3-1120 PWO WO'6024412  REBUILD 10        SNUBBERS 10172 16253 J  10174 ~ 1 1 1 10 '2377 ( 12392 ~  16232 g 16238'g  16242 g  16252  &
 
0 il
 
MECHANICAL SHOCK ARRESTOR FINAL REPORT SECTION I
 
0 PAGE NO.      1 05/22/97 Turkey Point Outage Surmary Report Unit 3/4 S    Date  S            S Visual  T    of    T  I        T Tag  Serial Inspection A Fmctional A        4L4 A Number Number    Date  T    Test  T Dimension  T                    Visual Sunnary                                  Ftmctional Sunnary 3-1005 10035    03/10/97 P 03/20/97  P  26.5000  P Visual inspection - sat, "L4 diemsnion acceptable,    A factional test    was performed with the following handstroke - sat, replaced load pins with load studs  acceptable results under    NO 97006613 and CR 97-399:
per IO 96016705, lubricated load studs and spherical bearings on both ends with neolube - 24982-3.        Pre Rebuild - S/N 10035 Replaced snubber S/N 10035 with snubber S/N 10579 per              Tension      Compression      Criteria CR 97-399. Snubber S/N 10035 was rebuilt under NO 97006613 by Basic-PSA and NRH back into stores.      Test  1)      164.88        74.26          2500.00 Test  2)      223.57      165.57          2500.00 Test  3)        0.001        0.012            0.02g's Test  4)      182.49      149.63          2500.00 The Pre Rebuild fextionai test was performed at Engineering direction per CR 97-399.
Post Rebuild - S/N 10035 Tension      Ccepression      Criteria Test  1)      161.38      138.78          2500.00 Test  2)    232.46        452.13          2500.00 Test  3)        0.004        0.008            0,02gls Test  4)    224.31        397.34          2500.00 The  following parts were installed    as part of the rebuild of snubber S/N 10035:
(4)  Drive Screws      -  0015673-3 (1)  Clutch Spring    -  0015346-1 (1)  Torque Carrier    -  0015343-1 (1)  Capstan Spring    -  0015729-1
 
PAGE KO. 2 05/22/97 Turkey Point Outage Smasry Report Unit 3/4 S    Date  S            S Visual  T    of    T  I        T Serial Inspection                      "i." A                                                                      Functional Tag                    A Fmctional A Nwher Kumber    Date    T    Test  T Dimension  T                    Visual Suanary                                              Swmary After rebuild  and successful  post rebuild  factional test, snubber  S/H 10035 uas  KRH back  into stores.
3-1006 6521    03/08/97  P 03/20/97  P  26.7500  P Visual inspection - sat, "l." dimension acceptable,  A fwetionaL test Mas performed uith the foLLouing handstroke - sat, lubricated spherical bearings and  acceptable results under lO 97006613 and CR 97-399:
load studs on both ends.
Pre Rebuild - S/H 6521 Installed  Load studs in place of load pins per lO 96016705.                                                        Tension    Cocpression      Criteria Replaced snubber S/H 6521 with snubber S/N 6494 per  Test  1)      152.21      195.31            2500.00 CR 97-399. Snubber 6521 Mas rebuilt under lO 97006613 Test 2)      131.37      224.07            2500.00 by Basic PSA and NRH back into stores.                Test 3)        0.005        0.039            0.02g's Test 4)      127.82      207.67            2500.00 This test Mas performed at Engineering direction per CR 97-399.
Post Rebuild - S/H 6521 Tension      Coapression      Criteria Test 1)      250.32      172.07            2500.00 Test 2)  '50.32          317.51            2500.00 Test 3)        0.002      0.007              0.02g's Test 4)      234.70      291.81            2500.00 The foLLcwing parts uere used during the    rebuild of snubber S/K 6521 under LO 97006613:
(4) Drive  Screws                  0015673-3
 
PAGE NO.      3 05/22/97 Turkey Point Outage Slscsry Report Unit 3/4 S    Date  S            S Visual  T    of    T            T Tag    Serial inspection A Fumtional A        "L" A Nwher Number      Date    T    Test  T Dimension  T                      Visual  Summary                                          Factional  Soanary (1) inertia Hass                    0015344-1 (1) Capstan Spring                  0015729.1 (1) Thrust Bearing Assembly -      0215049-1 Upon  rebuild  and successful fmctional    testing the snubber was  HRH back into stores.
3-1007 4590    03/10/97  P  / /        28.0000  P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under MO 96016705.
Replaced load pins with load studs per    MO  96016705.
3-.1008 8084    03/08/97  P  / /        27.7500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under MO 96016705.
Replaced load pins with load studs per lN 96016705.
3-1009 1203    03/10/97  P 03/16/97  F  26.5000  P Visual inspection - sat,    4L4 dimension  acceptable,          A fuetional test    was performed  with the following no handstroke performed, snubber    is part of the            unacceptable  results under  NO 96024408:
initial OR  sample.
Pre Rebuild - S/N 1203 The snubber could  not be unpinned. CR 97-399 was written for this snubber to determine the      method    of                  Tension      Coapression        Criteria removal. A hydraulic  ram was  utilized to  move  the main steam pipe  to facilitate snubber removal.                Test 1)      7390.62          0.00          2500.00 Test 2)      7390.62          0.00          2500.00 Test 3)          0.00          0.00            0.02g's
                                                                                                              ~
                                                                                                          ~
                                                                                                            ~  I ~
 
0 PAGE NO. 4 05/22/97 Turkey Point Outage Scenery Report Unit 3/4 S  Date  S            S Visual    T    of    T  I        T Tag  Serial Inspection A F~tional A      ".i." A Naker Nether    Date    T  Test  T Dimension T  Visual granary                                      Fact iona( Summary Test 4)          0.00      7836.54          2500.00 This QR snubber was tested as part of the initial saapie. CR 97-399 was initiated for a QR fmctionai test failure and per engineering disposition, snubbers 3-1005, 3-1006 and 3-1010 sere fmtionally tested, no saapte expansion is required for a OR failed snubber; Snubber S/N 1203 was    rebuilt Mith the follouing acceptable test results under    MO 97006613 and  CR 97.399:
Post Rebuild - S/N 1203 Tension      Coapress ion    Cri teria Test 1)      244.85      308.48          2500.00 I'est 2)      244.85      707.74          2500.00 Test 3)        0.005        0.008              0.02g's Test 4)      455.77      615.54          2500.00 The  foiiouing parts Mere replaced during rebuild of snubber S/N 1203 under UO 97006613:
(4)  Drive Scram              0015673-3 (1)  Inertia  Ness            0015344-1 (1)  Torque Carrier            0015343.1 (1)  Capstan Spring            0015729-1 Upon  rebuild  and successful fmctionai    testing the snubber was  HRN  back into stores.
                                                                                    ~
                                                                                ~
                                                                                  /  I ~
 
/Qi I~
4
 
PAGE NO.      5 05/22/97 Turkey Point Outage Stellary Report Unit 3/4 S    Date    S            S Visual  T    of    T  i        T Tag  Serial Inspection A FLmctional A        "L" A Nunber Kosher    Date  T    Test    T Dimension T                      Visual Smmary                                          Fuetional Suansry 3-1010 11931    03/08/97 P 03/14/97  P  25.5000  F Visual inspection - sat, aL" dimension unacceptable,      . A fuetional test uas performed uith the folloMing condition report 97-0398 uas Mritten to address the          acceptable results under N 97006613 & CR97-399; "L" dimension uhich uas .5000" under the miniszza alloued. Snubber 3-1009 uas found frozen and per            Pre rebuild - S/N 11931 condition report 97-399, Engineering directed that snubber 3-1010 be removed, fmctionally tested,                            Tension    Coapressi on        Criteria disassembled  for Engineering revieM. Upon  disasseahly    Test  1)      105.93          286.57        2500.00 of snubber 3-1010, Engineering directed that the subject    Test  2)      160.27          307.04        2500.00 snubber be rebuilt, as uell as snubbers 3-1005 & 3-1006. Test  3)        0.002            0.0'i4        0.02g's Test  4)      148.42          22e.47        2500.00 Replaced load pins Kith load studs (2) 0214245-3 per lO 96016705, lubricated load studs and spherical            This test uas performed at Engineering direction bearings with neolube - 024982-3. installed neM nuts        per CR 97-399 in place of snubber 3-1009.
(8) 0209608-3, installed (4) spacer Mashers 197329-3 and torqued to 125 ft lbs, torque urench 85188,              Post Rebuild - S/N 11931 cal due 03/30/97. Restaked spherical bearing.
Tension    Coapression        Criteria Test  1)      212.70    161.34            2500.00 Test  2)    388.96      245.62            2500.00 Test  3)        0.002      0.007              0.02g's Test  4)    24e.57      403.70            2500.00 The follouing parts Vere used during the rebuild of sakber S/N 11931 under    ll  97006613:
(4)  Drive ScreMs                    0015673-3 (1)  Clutch Spring                    0015346.1 (1)  Capstan Spring                  0015729-1 (1)  Torque Carrier                  0015343-1 (1)  Thrust Bearing Asseahly          0215049.1
                                                                                                          ~
                                                                                                            ~ i ~
 
0 IO it
 
PAGE KO.      6 05/22/97 Turkey Point Outage  Story Report Unit 3/4 S    Date    S            S Visual  T    of      T  i        T Tag    Serial Inspection A Fisictional A        >>L" A Nisnber Number    Date  T    Test    T Dimension T                      Visual Smeary                                        Fisictional Surmsry After rebuild  and successful fisictionai  testing, the snubber Mas  NRH  back into stores.
3-1011 12376    03/10/97 P 03/13/97    P  20.2500  P Visual inspection - sat. "L>> dimension acceptable,        A fwctional test    was performed uith  the fotlouing no handstroke performed, lubricated spherical bearings    acceptable results under    N0 96024408; and load pins Mith neolube - 24982-3 under M0 960241M.
Snubber S/N  -  12376 Tension        Coapression      Criteria Test 1)      99.74              56.18        750.00 Test 2)    138.07              53.35        750.00 Test 3)        0.004            0.004        0.02g<s Test 4)    146.98              51.57        750.00 This OR  snubber  seas tested as part of the  initial sample.
3-1012 8086      03/10/97 P  / /          27.0000  P Visual inspection - sat, >>L>> dimension acceptable, Handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube'    24982-'3.
Load pin on building attachment (rear bracket) uas not replaced uith a load stud due to a 2" horizontal pipe risi 1>> above the rear bracket, not enough room for the stud to  fit and be double nutted per lO 96024188. Replaced 3 nuts on the coaponent pipe clamp side.
3-1019 2889      03/14/97 P 03/14/97    P  17.2500  P Visual inspection sat, >>L>> dimension acceptable,          A fwetionai test    was performed  Mith the folioiiing
                                                                                                          ~
i I~
 
0 0
0 0
 
GE NO.      7
/22/97 Turkey Point Outage Srmmsry Report Unit 3/4 S    Date    S            S Visual  T    of      T      I    T ag  Serial inspection A Frarctional A ~
                                          .  "L" A r Number    Date    T    Test    T Dimension  T                    Visual SrlrrMrry                                        Frnctional  SrmrrMrry no handstroke performed,  lubricated spherical                acceptable results under IN 96024408r r
bearings and load studse Snubber S/N - 2889 No iD  tag installed. Snubber  was changed out with S/N 17425 due  to unit 4 LCO. Mork was performed under                        Tension      Ccapression        Criteria IN 96014408.
Test  1)    29.92              13.06        300.00 Test  2)    30.87              22.91        300.00 Test  3)      0.007              0.0'17        0.02g's Test  4)    25.00              27.36        300.00 This SR snubber  was tested as part of th6      initial saaple.
1023 23273  03/13/97  P 03/13/97    P  12.7500  P Visual inspection - sat, "L4 dimension acceptable,            A frarctional test  was performed    witli the following no handstroke, lubricated spherical bearings and              acceptable results under    MO  96024408; load studs with neolube - 24982-3 under MO 96014408.
Snubber S/N - 23273 Tesnion      Coapressi on      Criteria Test  1)    11.87              8.23          75.00 Test  2)    16.58              9.61          75.00 Test  3)      0.007            0.007          0.02grs Test  4)    13.94            17.01          75.00 This SR snubber  was tested as part of the    initial saaple.
1026 12394  03/13/97  P 03/13/97    P  19.5000  P Visual inspection - sat, "L" dimension acceptable,            A frarctional testing  was performed    with the following
                                                                                                          ~    ~
r 1
 
0 0
0
 
PAGE NO. 8 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S    Date  S            S Visual    T    of    T  I          T Tag  Serial inspection A fmctionaL A        "L" A Number Nwher Date        T    Test  T Dimension T                        Visual Sumery                                        fmctionaL Swmsry handstroke - sat, lubricated spherical bearings and        acceptable results under  NO 960244M:
load pins on both ends Nith neolube - 24982-3 under MO 96014408.                                                Snubber S/N - 12394 Torqued TTA bolts to 450  ft lbs 4706 - 07/07/97                    Tension      Ccapression    Criteria Lock uired the TTA bolts.
Test  1)    57.58            37.52      750.00 Test  2)    71.83            39.95      750.00 Test  3)      0.014          0.009        0.02g's Test  4)    68.12            60.49      750.00 This  SR snubber uas tested as a previous  rebuild.
3-1031 27M6  03/13/97  P 03/15/97  P    17.8750  P Visual inspection - sat, <<L<< dimension acceptable,          A fuetionaL test Mas performed uith the foLLouing no handstroke, Lubricated spherical bearings and            acceptable results under LN 96024408; load pins uith neolube - 24982-3 under NO 96014408.
Snubber S/N  -  27086 No LD  tag installed.
Tension      Coapression    Criteria Test  1)    18.35            14.06      300.00 Test  2)    20.33            21.07      300.00 Test 3)        0.006          0.006        0.02g's Test 4)      21.24            20.08      300.00 This SR snubber uas tested as part of the  initial saaple.
3-1032 24410  03/12/97  P  / /          14.0625 P Visual inspection -    sat, "L<<dimension acceptable, handstroke - sat, Lubricated spherical bearings and
                                                                                                              '
                                                                                                      ~
i f ~
 
0 PAGE KO.      9 05/22/97 Turkey Point Outage Sumery Report Unit 3/4 S  Oate    S            S Visual  T    of    T  I          T Tag  Serial inspection A Fmctfonal A        4L" A Kunber Number    Oate    T  Test    T Dimension T                        Visual Smeary                          Flax:tional Suanary load pins    on both ends with neolube - 24982-3 under IJO 96014408.
3-1033 19328  03/13/97  P  / /          16.3750  P Visual inspection - sat, "i." dimension acceptable, handstroke; sat, lubricated spherical bearings and Load pins on both ends with neolube -. 24982-3 under iJO 96014408.
No LD  tag installed.
3-1034 24429A 03/16/97  P  / /          13.8750  P Visual inspection    = sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under lO 96014408.
3-1035 19330  03/15/97  P  / /          16.6250  P Visual inspection - sat, "L'! dimension acceptable, handstroke - sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under MO  96014408.
Ko LD  tag fnstallede 3.1036 27100  03/15/97  P  / /          16.3750  P Visual inspection - sat, "L" dimension acceptable,      ~
handstroke -, sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under QO  96014408.
No LO  tag lnstalfedr
                                                                                                        ~
                                                                                                          /  f ~
 
PAGE NO. 10 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S    Date  S            S Visual  T    of    T  I        T Tag  Serial inspection A Fuetional A        4L4 A Number Neer Date        T    Test  T Dimension T                    Visual Suanary                                        Fmetional Sunnary 3-1037 11922    03i14/97 P  / /        26.6250  P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under IQ 96014408.
3-1038 11934    03/14/97 P  / /        26.7500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.
3-1039 16241    03/14/97 P  / /        20.0625  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.
3-1040 16239    03/13/97 P 03/15/97  P  20.5000  P Visual inspection - sat, "L" dimension acceptable,        A fwetional test was performed with the following handstroke - sat, lubricated spherical bearings and        acceptable results under IQ 96024408; load pins on both ends with neolube - 24982-3 under IQ 96014408.                                              Snubber S/N - 16329 Tension      Compression    Cr i teria Test 1)      73.67          79.67        750.00 Test 2)    113.91          52.08        750.00 Test 3)      0.012          0.010        0.02g's Test 4)    122.59          202.88        750.00 This SR  snubber was tested as a previous  rebuild.
                                                                                                      ~
                                                                                                        ~ i ~
 
0 0
ll
 
PAGE NO. 11 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S    Date  S            S Visual  T    of    T  I        T Tag  Serial Inspection A Fuetional A        "L" A Number NLNScr    Date  T    Test  T Dimension  T                      Visual Suanary                                      Fweti ona I Suanary 3-1041 16234    03/11/97 P  / /        20.3750  P Visual inspection - sat, "L" dimension acceptable, handstroke sat, light rust on spherical bearings and load pins on both ends. Cleaned spherical bearings and load pins Nlth scotch bright and lubricated spherical bearings and load pins on both ends Mith neolube 24982-3 under  NO  96014408.
Installed black  ID tag to snubber  TTA.
3-1042 12365    03/12/97 P 03/15/97  P  20.7500  P Visual inspection - sat, "L4 dimension acceptable,          A fwxtional test uas performed Mith the foiioMing handstroke - sat, lubricated spherical bearings and        acceptable results under NO 96024408; load pins on both ends Nith neolube - 24982-3 under NO  96014408.                                              Snubber S/N  -  12365 No ID  tag installed.                                                      Tension      Coepression  Criteria Test 1)        158.38        59.09        750.00 Test 2)        162.40        120.08        750.00 Test 3)          0.009        0.002          0.02g's Test 4)        358.28        146.08        750.00 This SR  snubber Nas tested as a previous rebuild.
3-1043 17899    03/14/97 P  / /        22.2500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Mith neolube - 24982-3 under lJO 96014408.
                                                                                                          ~
                                                                                                      ~
[  I~
 
il ll
 
AGE NO. 12 5/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S    Date  S            S Visual  T    of    T      I    T Tag  Serial inspection A Fwetlonal A        "L4 A r Number    Date  T    Test  T Dimension T                      Visual Suanary                                        Fuetional Suanary
-1044 17900    03/14/97 P  / /        21.5000  P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under IO 96014408.
1045 17189    03/14/97 P  / /        21.5000  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under lQ 96014408.
1046 17903    03/14/97 P  / /        20.7500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under 10 96014408.
1047 17902    03/14/97 P 03/15/97  P  20.5000  P Visual inspection - sat, "L" dimension acceptable,          A factional test was performed with the following no handstroke performed (initial sac@le), lubricated        acceptable results under lS 96024408; spherical bearings and load pins on both ends with neolube - 24982-3 under N 96014408.                        Snubber S/N  -  17902 Drilled load pin per STD-C-011 for installation of                      Tension    Compression    Criteria cotter pin (M29146-3) installed lock wire on TTA bolts and torqued to 450 in lbs, 8-4701 - Cal Due Date: 07/07/97. Test  1)    60.77          19.34      750.00 Test  2)    100.32          26.59      750.M Test 3)        0.007          0.002      0.02g's Test 4)      87.42          115.18      750.M This SR snubber was tested as part of the initial saaple.
 
0 0
 
PAGE NO. 13 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S    Date  S            S Visual  T    of    T    I      T Tag  Serial Inspection A Fmctional A        "L" A Nuaber Kumber    Date  T    Test  T Dimension T                      Visual Suanary                                        Fuetional  Suanary 3-1048 17904    03/14/97 P  / /        19.5000  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under IJO 96014408.
3-1049 16245    03/14/97 P 03/15/97  P  20.5000  P Visual inspection - sat, 4L4 dimension acceptable,          A fmctional test    uas performed with the  follcwing handstroke - sat, lubricated spherical bearings and        acceptable results under    MO 96024408; load pins on both ends Kith neolube - 24982-3 under iO 96014408.                                                Snubber S/K  -  16245 Tension      Ccepression      Criteria Test 1)      79.24              50 ~ 53    300.00 Test 2)    128.31            166.94      300;00 Test 3)        0.013            0.007        0.02g's Test 4)    125.92            151.03      300.00 This SR  snubber Nas tested as a previous rebuild.
3-1050 17906    03/14/97 P  / /        22.0000  P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Kith neolube - 24982-3 under MO  96014408.
3.1051 16249    03/12/97 P  / /        21.5000  P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.
                                                                                                          ~
                                                                                                      ~
                                                                                                        ~  I~
 
0 PAGE NO. 14 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S    Date    S            S Visual  T    of      T  I        T Tag  Serial inspection A Ftsx:tional A        "La.A Neer  Number    Date  T    Test    T Dimension T                      Visual Spermary                                      factional  Sunnary 3-1052 16233    03/12/97 P  / /          21.7500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bear ings and load pins on both ends with neolube - 24982-3 under MO 96014408.
No ID  tag installed.
3-1053 2462    03/14/97 P 03/15/97    P  20.0000  P Visual inspection - sat, 4L" dimension acceptable,        A fmctfonal test was performed with the following no handstroke (previous rebuild), lubricated              acceptable results under NO 96024408; spherical bearfngs and load studs on both ends with neolube - 24982-3 under MO 96014408.                  Snubber S/K - 2462 Tension      Compression    Criteria Test  1)    32.11            56.25      750.00 Test  2)    68.78            77.39      750.00 Test 3)      0.010            0.010      0.02g's Test 4)    106.53            90.31      750.00 This OR  snubber was tested as a previous rebuild.
3-1054 16248  03/12/97  P  / /          20.2500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982.3 under MO 96014408.
3-1055 13697  03/14/97  P 03/15/97    P  20.7500  P Visual inspection - sat, "Lw dimension acceptable,        A functional test  was performed with the following no handstroke (initial san@le), lubricated                acceptable results under lN 96024408; spherical bearings and load studs on both ends
                                                                                                        ~    ~
                                                                                                          ~ 1
 
il 0
 
PAGE NO. 15 0
05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S  Date    S            S Visual  T    of    T            T Tag  Serial inspection A Fuetional A        "L" A Nunber Number    Date  T  Test    T Dimension  T                    Visual Smeary                                    Functional Suaaary with neolube - 24982-3 under  N 96014408.                Snubber S/N - 13697 Tension      Compression    Criteria Test 1)    69.00          62.64      750.00 Test 2)    88.54          85.69      750.00 Test 3)      0.012          0.013        0.02g's Test 4)    87.91          85.73      750.00 This QR snubber was tested as pert of the initial sample.
3-1057 27106    03/15/97 P  / /          16.2500  P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 960144M.
3.1058 27102    03/16/97 P  / /          16.2500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube . 24982-3 under lO 96014408.
3-1060 19329    03/14/97 P  / /          18.5000  P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Mith neolube - 24982-3 under lQ 96014408.
3-1069 27072    03/13/97 P  / /          16.7500  P Visual inspection - sat, "L" dimension acceptable,
                                                                                                    ~
( i ~
 
0 Ib Ik
 
PAGE NO. 16 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S  Date    S            S Visual  T    of    T    I      T Tag  Serial inspection A Fmctional A        "La A Number Number    Date  T  Test    T Dimension  T                      Visual Smeary                      Fwetional Sumery handstroke - sat, lubricated spherical bearings and load studs on both ends kith neolube - 24982-3 under lO 96014408.
Condition report 97-398 Mas Mritten to address boric acid on the snubber. The inspector found no boric acid uhen the snubber Mas inspected. Condition report 97-398 directed that herculite be put over the snubber before reload and removed prior to startup. The herculite Mas removed on 03/29/97.
3-1070 27079    03/13/97 P  / /          17.6250  P Visual inspection - sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 960144M.
3-1071 27069    03/13/97 P  / /          15.8125  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Nith neolube - 24982-3 under IQ 96014408.
No 10  tag installed. Load pin Nas ssmhroomed, filed pin for reinstallation in accrodance Nith STD-C-011.
3-1072 27073    03/15/97 P  / /          16.0625 P Visual inspection -    sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under MO 96014408.
 
0 I~
0 0
 
PAGE NO. 17 05/22/97 Turkey Point Outage Senary Report Unit 3/4 S    Date  S            S Visual  T    of    T    i      T Tag  Serial inspection A Fuetional A        4La A ether Naker      Date  T    Test  T Dimension T                      Visual Suanary                                          Fact iona l Stsmary No iD  tag installed. Removed paint and rust  on housing and  indicator tube Mith scotch brite.
-1073 27090    03/15/97 P  / /        17.0000  P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.
-1074 27104    03/15/97 P  / /        17.7500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends uith neolube - 24982-3 under 1JO 96014408.
-1075 18074    03/15/97 P  / /          8.1250  F Visual inspection - sat, "L" dimension macceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.
CR 97-0478 Mas issued for rusted rear plate and "L" dimension bale+ miniaua by .254. NO 97006948 Nas implemented to correct the conditions.
-1076 19725    03/13/97 P 03/15/97  P  17.5000  P Visual inspection - sat, "L" dimension acceptable,            A fuetional test Nas performed Mith the  follming no handstroke (initial sample), lubricated                    acceptable results under lO 96024408; spherical bearings and load pins on both ends Mith neolube - 24982-3 under NO 96014408.                    Snubber S/N - 19725
                                                                                                                              'Tension      Coopression  Criteria
                                                                                                        ~
                                                                                                          ~
                                                                                                            ~
i ~
 
Ib PAGE MO. 18 05/22/97 Turkey Point Outage SulNlary Report Unit 3/4 S    Date    S            S Visual  T    of    T  I        T Tag  Serial inspection A Flmctfonal A        "L" A Mmher Mumber      Date  T    Test    T Dimension T                      Visual Sundry                                          Factional  Stannary Test  1)    16 44            32 ~ 15  300.00 Test  2)    16.79            32.21    300.00 Test 3)      0.012            0.009      0.02g's Test 4)    17.19            31.28    300.00 This QR snubber was tested as part of the'initial saaple.
3-1077 16230    03/13/97 P  / /          20.2500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IN 96014408.
installed black  ID tag on TTA end.
3-1078 16244    03/12/97 P  / /          20.5000  P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherfcal bearfngs and load pins on both ends with neolube - 24982-3 under IN 96014408.
3-1079 10176    03/12/97 P  / /          22.0000  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends vfth  neo'      24982-3 under IN 96014408.
3-1080 12396    03/11/97 P  / /          21.2500  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and
                                                                                                            ~    '
                                                                                                        ~
i  f~
 
IS IS 0
0
 
PAGE NO. 19 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S    Date  S            S Visual  T    of    T    i      T Tag  Serial inspection A Fmctional A        "L" A Number Number    Date  T    Test  T Dimension T                        Visual Smeary                                        Fwetional Suaasry load pins on both ends with neolube - 24982-3 under lO 96014408.
3-1081 11921    03/12/97 P  / /        25.5000  P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under MO 96014408.
No iD  tag installed.
Replaced  1  spacer washer - 0197329-3 Replaced  1  cotter pin    - 0029146.3 3.1082 11932    03/12/97 P  / /        26.5000  P Visual inspection - sat, 4La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.
No ID  tag 'installedo 3-1083 11925    03/15/97 P  / /        25.1250  P Visual inspection - sat, aL" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.
3-1084 7000    03/14/97 P 03/16/97  P  24.7500  P Visual inspection - sat, "L" dimension acceptable,          A fmctional test  Mas performed Mith the folloMing no handstroke (initial saaple), lubricated                  acceptable results under MO  96024408; spherical bearings and load pins on both ends
                                                                                                      ~
                                                                                                        )
                                                                                                          ~
i ~
 
il Il il
 
PAGE NO. 20 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S  Date    S              S Visual  T    of    T  i          T Tag  Serial inspection A Fmctional A        "L'l A Naker  Kumber    Date  T  Test    T Dimension T                        Visual Suanary                                    Functional Suanary ui th neolube 24982-3 under  KO 96024216.                Snubber S/N - 7000 Ko ID  tag installed. installed 4 spacer Mashers-                      Tension      Coapressi on  Criteria 197329-3,  installed neu load stud - 15329-1 and 4 nuts - 209608-3 and torqued to 125    ft lbs on        Test  1)    504.13          154.54    2500.00 snubber end under lJO 96024216.                          Test  2)    504.13          407.02    2500 F 00 Test 3)        0.002          0.009      0.02g's Test 4)      217.05          225.69    2500.00 This  SR snubber Nas tested as part of the initial searle.
3-1091 27087    03/13/97 P  / /          19.0000  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Kith neolube - 24982-3 under MO  96014408.
3-1092 27105    03/13/97 P  / /          18.0000  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Kith neolube - 24982-3 under lO 96014408.
No iD  tag installed.
3-1093 27091    03/15/97 P  / /          18.1250  P Visual inspection . sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under QO  96014408.
                                                                                                        ~    ~
                                                                                                          ~ 1
 
II 0
 
PAGE NO. 21 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S    Date  S            S Visual  T    of    T  I        T Tag  Serial Inspection A Fuetional A        <<L<< A Number Number    Date  T    Test  T Dimension T                      Visual Summary                                    Fact i one l Sumery 3.1094 4388    03/16/97 P  / /        15.2500  P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 96014408.
3-1095 16733    03/14/97 P  / /          8.5000  P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.
3-1096 11993    03/18/97 P  / /          8.5000  F Visual inspection - sat, <<L<<dimension macceptable, condition report 97-531 written to address the <<L<<
dimension which is -.3750<< below minim!a, handstroke
                                                    - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under NO 96014408.
Snubber 3-1096 was swapped with tag 3-1097 from a previous installation. Reinstalled in the correct tag location.
3-1097 16724    03/13/97 P 03/15/97  P    9.0000  P Visual inspection - sat, "L" dimension acceptable,        A factional test was performed with the following no handstroke, lubricated spherical bearings and          acceptable results under NO 960244M; load pins on both ends with neolube - 24982-3 under lQ 96014408.                                              Snubber S/N - 16724 Snubber was previously  installed in the sister                      Tension      Compression  Criteria (3-1096) location. Reinstalled in the proper location.
                                                                                                      ~
                                                                                                        / 1
                                                                                                            ~
 
IO il il
 
PAGE NO. 22 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S    Date    S          S Visual  T    of    T    I      T Tag  Serial Inspection A Functional A      "L" A Naker  Number    Date  T    Test    T Dimension T                      Visual Suanary                              Fuetional Smmary Test  1)    1.98            2.63        32.50 Test  2)    3.28            3.76        32.50 Test  3)    0.010            0.011        0.02g's Test  4)    3.03            3.75        32.50 This  SR snubber vas tested as part of the  initial sample.
-1098 33628    03/16/97 P 03/15/97  P  10.3750 P Visual inspection - sat, "L" dimension acceptable,  A  fmctionaL test  was performed  with the foLLouing no handstroke (lnitaL sample), lubricated spherical acceptable results under  NO 96024408; bearings and load pins arith neolube - 24982-3 on building end only under 1JO 96014408.              Snubber S/N - 33628 No ID  tag installed.                                            Tension      Conpression      Criteria Test  1)    2.10            5.21        17.50 Test  2)    4.80            5.21        17.50 Test  3)    0.011            0.010        0.02g's Test  4)    6.52            8.60        17.50 This  SR snubber was tested as  part of the  initial saspleo
-1099 38481    03/16/97 P  / /          11.7500 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, Lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under MO 96014408.
No ID  tag installed.
 
II IJ il
 
PAGE NO.      23 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S    Date    S            S Visual  T    of    T  i        T Tag  Serial Inspection  A Flmctfonal A        "L" A Naker Nwhtr        Date  T    Test    T Dimension T                        Visual Suansry                        Fuctfonal Summary 3-1100 17819    03/16/97 P  / /            8.3125  P Visual inspection - sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.
No ID  tag installed.
3-1101 33626    03/16/97 P  / /          11.5625  P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 96014408.
No ID  tag installed.
3-1102 29451    03/16/97 P  / /          11.2500  P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends sfth neolube - 24982-3 under IO 96014408.
Ko ID  tag installed.
3-1103 '11996    03/17/97 P  / /            8.5000  P Visual inspectfon - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pfns on both ends elth neolube - 24982-3 under IO 96014408.
3-1104 24412    03/17/97 P  / /          13.5000  P Visual inspection - sat, "L" dimension acceptable,
                                                                                                          ~
                                                                                                            / I ~


PAGE NO.3 05/22/97 Turkey Point Outage Slscsry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fumtional A"L" A Nwher Number Date T Test T Dimension T Visual Summary Factional Soanary (1)inertia Hass 0015344-1 (1)Capstan Spring 0015729.1 (1)Thrust Bearing Assembly-0215049-1 Upon rebuild and successful fmctional testing the snubber was HRH back into stores.3-1007 4590 03/10/97 P//28.0000 P Visual inspection
0 PAGE NO. 24 05/22/97 Turkey Point Outage Suansry Report Unit 3/4 S   Date   S           S Visual T     of   T           T Tag   Serial inspection A fmctional A       "L4 A Number Nmher      Date   T   Test   T Dimension T                       Visual Suanary                            fuctionai Suanary Handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neoide - 24982-3 under IO 96014408.
-sat, 4L" dimension acceptable, handstroke
3-1105 16134    03/15/97 P   / /         13.1250  P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on ccmponent end due to piping and scaffold limitations on building end Mith neolube - 24982-3 under lO 96014408.
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under MO 96016705.Replaced load pins with load studs per MO 96016705.3-.1008 8084 03/08/97 P//27.7500 P Visual inspection
No ID  tag installed.
-sat,"L" dimension acceptable, handstroke
3-1106 38479    03/15/97 P   / /         11.3125 P Visual inspection -   sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IO 96014408.
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under MO 96016705.Replaced load pins with load studs per lN 96016705.3-1009 1203 03/10/97 P 03/16/97 F 26.5000 P Visual inspection
No ID  tag installed.
-sat, 4L4 dimension acceptable, no handstroke performed, snubber is part of the initial OR sample.The snubber could not be unpinned.CR 97-399 was written for this snubber to determine the method of removal.A hydraulic ram was utilized to move the main steam pipe to facilitate snubber removal.~~~I~Pre Rebuild-S/N 1203 Tension Coapression Criteria Test 1)7390.62 0.00 Test 2)7390.62 0.00 Test 3)0.00 0.00 2500.00 2500.00 0.02g's A fuetional test was performed with the following unacceptable results under NO 96024408:
3-1110 16136    03/15/97 P   / /         12.7500  P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.
0 PAGE NO.4 05/22/97 Turkey Point Outage Scenery Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A F~tional A".i." A Naker Nether Date T Test T Dimension T Visual granary Fact iona(Summary Test 4)0.00 7836.54 2500.00 This QR snubber was tested as part of the initial saapie.CR 97-399 was initiated for a QR fmctionai test failure and per engineering disposition, snubbers 3-1005, 3-1006 and 3-1010 sere fmtionally tested, no saapte expansion is required for a OR failed snubber;Snubber S/N 1203 was rebuilt Mith the follouing acceptable test results under MO 97006613 and CR 97.399: Post Rebuild-S/N 1203 Tension Coapress ion Cri teria Test 1)I'est 2)Test 3)Test 4)244.85 244.85 0.005 455.77 308.48 707.74 0.008 615.54 2500.00 2500.00 0.02g's 2500.00 The foiiouing parts Mere replaced during rebuild of snubber S/N 1203 under UO 97006613: (4)Drive Scram (1)Inertia Ness (1)Torque Carrier (1)Capstan Spring 0015673-3 0015344-1 0015343.1 0015729-1 Upon rebuild and successful fmctionai testing the snubber was HRN back into stores.~/~I~
No ID  tag installed.
/Qi I~4 PAGE NO.5 05/22/97 Turkey Point Outage Stellary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A FLmctional A"L" A Nunber Kosher Date T Test T Dimension T Visual Smmary Fuetional Suansry 3-1010 11931 03/08/97 P 03/14/97 P 25.5000 F Visual inspection
3-1111 2875    03/15/97 P   / /         17.0000  P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and
-sat, aL" dimension unacceptable,.condition report 97-0398 uas Mritten to address the"L" dimension uhich uas.5000" under the miniszza alloued.Snubber 3-1009 uas found frozen and per condition report 97-399, Engineering directed that snubber 3-1010 be removed, fmctionally tested, disassembled for Engineering revieM.Upon disasseahly of snubber 3-1010, Engineering directed that the subject snubber be rebuilt, as uell as snubbers 3-1005&3-1006.Replaced load pins Kith load studs (2)0214245-3 per lO 96016705, lubricated load studs and spherical bearings with neolube-024982-3.installed neM nuts (8)0209608-3, installed (4)spacer Mashers 197329-3 and torqued to 125 ft lbs, torque urench 85188, cal due 03/30/97.Restaked spherical bearing.Pre rebuild-S/N 11931 Test 1)Test 2)Test 3)Test 4)Tension 105.93 160.27 0.002 148.42 Coapressi on 286.57 307.04 0.0'i4 22e.47 Criteria 2500.00 2500.00 0.02g's 2500.00 This test uas performed at Engineering direction per CR 97-399 in place of snubber 3-1009.Post Rebuild-S/N 11931 Tension Coapression Criteria A fuetional test uas performed uith the folloMing acceptable results under N 97006613&CR97-399;Test 1)Test 2)Test 3)Test 4)212.70 388.96 0.002 24e.57 161.34 245.62 0.007 403.70 2500.00 2500.00 0.02g's 2500.00 The follouing parts Vere used during the rebuild of sakber S/N 11931 under ll 97006613: (4)Drive ScreMs (1)Clutch Spring (1)Capstan Spring (1)Torque Carrier (1)Thrust Bearing Asseahly 0015673-3 0015346.1 0015729-1 0015343-1 0215049.1~~i~
                                                                                                          ~    ~
0 IO it PAGE KO.6 05/22/97 Turkey Point Outage Story Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Fisictional A>>L" A Nisnber Number Date T Test T Dimension T Visual Smeary Fisictional Surmsry After rebuild and successful fisictionai testing, the snubber Mas NRH back into stores.3-1011 12376 03/10/97 P 03/13/97 P 20.2500 P Visual inspection
                                                                                                      ~
-sat."L>>dimension acceptable, no handstroke performed, lubricated spherical bearings and load pins Mith neolube-24982-3 under M0 960241M.A fwctional test was performed uith the fotlouing acceptable results under N0 96024408;Snubber S/N-12376 Tension Coapression Criteria Test 1)Test 2)Test 3)Test 4)99.74 138.07 0.004 146.98 56.18 53.35 0.004 51.57 750.00 750.00 0.02g<s 750.00 This OR snubber seas tested as part of the initial sample.3-1012 8086 03/10/97 P//27.0000 P Visual inspection
i  I ~
-sat,>>L>>dimension acceptable, Handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube'24982-'3.Load pin on building attachment (rear bracket)uas not replaced uith a load stud due to a 2" horizontal pipe risi 1>>above the rear bracket, not enough room for the stud to fit and be double nutted per lO 96024188.Replaced 3 nuts on the coaponent pipe clamp side.3-1019 2889 03/14/97 P 03/14/97 P 17.2500 P Visual inspection sat,>>L>>dimension acceptable,~i I~A fwetionai test was performed Mith the folioiiing 0 0 0 0 GE NO.7/22/97 Turkey Point Outage Srmmsry Report Unit 3/4 S Date S S Visual T of T I T ag Serial inspection A Frarctional A~."L" A r Number Date T Test T Dimension T Visual SrlrrMrry Frnctional SrmrrMrry no handstroke performed, lubricated spherical bearings and load studse No iD tag installed.
Snubber was changed out with S/N 17425 due to unit 4 LCO.Mork was performed under IN 96014408.acceptable results under IN 96024408r r Snubber S/N-2889 Tension Ccapression Criteria Test 1)Test 2)Test 3)Test 4)29.92 30.87 0.007 25.00 13.06 22.91 0.0'17 27.36 300.00 300.00 0.02g's 300.00 This SR snubber was tested as part of th6 initial saaple.1023 23273 03/13/97 P 03/13/97 P 12.7500 P Visual inspection
-sat,"L4 dimension acceptable, no handstroke, lubricated spherical bearings and load studs with neolube-24982-3 under MO 96014408.A frarctional test was performed witli the following acceptable results under MO 96024408;Snubber S/N-23273 Tesnion Coapressi on Criteria Test 1)Test 2)Test 3)Test 4)11.87 16.58 0.007 13.94 8.23 9.61 0.007 17.01 75.00 75.00 0.02grs 75.00 This SR snubber was tested as part of the initial saaple.1026 12394 03/13/97 P 03/13/97 P 19.5000 P Visual inspection
-sat,"L" dimension acceptable,~r 1~A frarctional testing was performed with the following 0 0 0 PAGE NO.8 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A fmctionaL A"L" A Number Nwher Date T Test T Dimension T Visual Sumery fmctionaL Swmsry handstroke
-sat, lubricated spherical bearings and load pins on both ends Nith neolube-24982-3 under MO 96014408.acceptable results under NO 960244M: Snubber S/N-12394 Torqued TTA bolts to 450 ft lbs-8-4706-07/07/97 Lock uired the TTA bolts.Tension Ccapression Criteria Test 1)Test 2)Test 3)Test 4)57.58 71.83 0.014 68.12 37.52 39.95 0.009 60.49 750.00 750.00 0.02g's 750.00 This SR snubber uas tested as a previous rebuild.3-1031 27M6 03/13/97 P 03/15/97 P 17.8750 P Visual inspection
-sat,<<L<<dimension acceptable, no handstroke, Lubricated spherical bearings and load pins uith neolube-24982-3 under NO 96014408.No LD tag installed.
A fuetionaL test Mas performed uith the foLLouing acceptable results under LN 96024408;Snubber S/N-27086 Tension Coapression Criteria Test 1)Test 2)Test 3)Test 4)18.35 20.33 0.006 21.24 14.06 21.07 0.006 20.08 300.00 300.00 0.02g's 300.00 This SR snubber uas tested as part of the initial saaple.3-1032 24410 03/12/97 P//14.0625 P Visual inspection
-sat,"L<<dimension acceptable, handstroke
-sat, Lubricated spherical bearings and~i f~'
0 PAGE KO.9 05/22/97 Turkey Point Outage Sumery Report Unit 3/4 S Oate S S Visual T of T I T Tag Serial inspection A Fmctfonal A 4L" A Kunber Number Oate T Test T Dimension T Visual Smeary Flax:tional Suanary load pins on both ends with neolube-24982-3 under IJO 96014408.3-1033 19328 03/13/97 P//16.3750 P Visual inspection
-sat,"i." dimension acceptable, handstroke; sat, lubricated spherical bearings and Load pins on both ends with neolube-.24982-3 under iJO 96014408.No LD tag installed.
3-1034 24429A 03/16/97 P//13.8750 P Visual inspection
=sat, 4L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under lO 96014408.3-1035 19330 03/15/97 P//16.6250 P Visual inspection
-sat,"L'!dimension acceptable, handstroke
-sat, lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under MO 96014408.Ko LD tag fnstallede 3.1036 27100 03/15/97 P//16.3750 P Visual inspection
-sat,"L" dimension acceptable,~handstroke
-, sat, lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under QO 96014408.No LO tag lnstalfedr
~/f~  


PAGE NO.10 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fuetional A 4L4 A Number Neer Date T Test T Dimension T Visual Suanary Fmetional Sunnary 3-1037 11922 03i14/97 P//26.6250 P Visual inspection
-sat, 4L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under IQ 96014408.3-1038 11934 03/14/97 P//26.7500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.3-1039 16241 03/14/97 P//20.0625 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.3-1040 16239 03/13/97 P 03/15/97 P 20.5000 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.A fwetional test was performed with the following acceptable results under IQ 96024408;Snubber S/N-16329 Tension Compression Cr i teria Test 1)Test 2)Test 3)Test 4)73.67 113.91 0.012 122.59 79.67 52.08 0.010 202.88 750.00 750.00 0.02g's 750.00~~i~This SR snubber was tested as a previous rebuild.
0 0 ll PAGE NO.11 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A"L" A Number NLNScr Date T Test T Dimension T Visual Suanary Fweti ona I Suanary 3-1041 16234 03/11/97 P//20.3750 P Visual inspection
-sat,"L" dimension acceptable, handstroke sat, light rust on spherical bearings and load pins on both ends.Cleaned spherical bearings and load pins Nlth scotch bright and lubricated spherical bearings and load pins on both ends Mith neolube 24982-3 under NO 96014408.Installed black ID tag to snubber TTA.3-1042 12365 03/12/97 P 03/15/97 P 20.7500 P Visual inspection
-sat,"L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Nith neolube-24982-3 under NO 96014408.A fwxtional test uas performed Mith the foiioMing acceptable results under NO 96024408;Snubber S/N-12365 No ID tag installed.
Tension Coepression Criteria Test 1)Test 2)Test 3)Test 4)158.38 162.40 0.009 358.28 59.09 120.08 0.002 146.08 750.00 750.00 0.02g's 750.00 This SR snubber Nas tested as a previous rebuild.3-1043 17899 03/14/97 P//22.2500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends Mith neolube-24982-3 under lJO 96014408.~[~I~
il ll AGE NO.12 5/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fwetlonal A"L4 A r Number Date T Test T Dimension T Visual Suanary Fuetional Suanary-1044 17900 03/14/97 P//21.5000 P Visual inspection
-sat,"La dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under IO 96014408.1045 17189 03/14/97 P//21.5000 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under lQ 96014408.1046 17903 03/14/97 P//20.7500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under 10 96014408.1047 17902 03/14/97 P 03/15/97 P 20.5000 P Visual inspection
-sat,"L" dimension acceptable, no handstroke performed (initial sac@le), lubricated spherical bearings and load pins on both ends with neolube-24982-3 under N 96014408.A factional test was performed with the following acceptable results under lS 96024408;Snubber S/N-17902 Drilled load pin per STD-C-011 for installation of cotter pin (M29146-3) installed lock wire on TTA bolts and torqued to 450 in lbs, 8-4701-Cal Due Date: 07/07/97.Tension Test 1)60.77 Test 2)100.32 Test 3)0.007 Test 4)87.42 19.34 26.59 0.002 115.18 750.00 750.M 0.02g's 750.M Compression Criteria This SR snubber was tested as part of the initial saaple.
0 0 PAGE NO.13 05/22/97 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A"L" A Nuaber Kumber Date T Test T Dimension T Turkey Point Outage Suaaary Report Unit 3/4 Visual Suanary Fuetional Suanary 3-1048 17904 03/14/97 P//19.5000 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under IJO 96014408.3-1049 16245 03/14/97 P 03/15/97 P 20.5000 P Visual inspection
-sat, 4L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Kith neolube-24982-3 under iO 96014408.A fmctional test uas performed with the follcwing acceptable results under MO 96024408;Snubber S/K-16245 Tension Ccepression Criteria Test 1)Test 2)Test 3)Test 4)79.24 128.31 0.013 125.92 50~53 166.94 0.007 151.03 300.00 300;00 0.02g's 300.00 This SR snubber Nas tested as a previous rebuild.3-1050 17906 03/14/97 P//22.0000 P Visual inspection
-sat, 4L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends Kith neolube-24982-3 under MO 96014408.3.1051 16249 03/12/97 P//21.5000 P Visual inspection
-sat, 4L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.~~~I~
0 PAGE NO.14 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Ftsx:tional A"La.A Neer Number Date T Test T Dimension T Visual Spermary factional Sunnary 3-1052 16233 03/12/97 P//21.7500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bear ings and load pins on both ends with neolube-24982-3 under MO 96014408.No ID tag installed.
3-1053 2462 03/14/97 P 03/15/97 P 20.0000 P Visual inspection
-sat, 4L" dimension acceptable, no handstroke (previous rebuild), lubricated spherical bearfngs and load studs on both ends with neolube-24982-3 under MO 96014408.A fmctfonal test was performed with the following acceptable results under NO 96024408;Snubber S/K-2462 Tension Compression Criteria Test 1)Test 2)Test 3)Test 4)32.11 68.78 0.010 106.53 56.25 77.39 0.010 90.31 750.00 750.00 0.02g's 750.00 This OR snubber was tested as a previous rebuild.3-1054 16248 03/12/97 P//20.2500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982.3 under MO 96014408.3-1055 13697 03/14/97 P 03/15/97 P 20.7500 P Visual inspection
-sat,"Lw dimension acceptable, no handstroke (initial san@le), lubricated spherical bearings and load studs on both ends~~1~A functional test was performed with the following acceptable results under lN 96024408; il 0 PAGE NO.15 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 0 S Date S S Visual T of T T Tag Serial inspection A Fuetional A"L" A Nunber Number Date T Test T Dimension T Visual Smeary Functional Suaaary with neolube-24982-3 under N 96014408.Snubber S/N-13697 Tension Compression Criteria Test 1)Test 2)Test 3)Test 4)69.00 88.54 0.012 87.91 62.64 85.69 0.013 85.73 750.00 750.00 0.02g's 750.00 This QR snubber was tested as pert of the initial sample.3-1057 27106 03/15/97 P//16.2500 P Visual inspection
-sat, 4L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lO 960144M.3.1058 27102 03/16/97 P//16.2500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends with neolube.24982-3 under lO 96014408.3-1060 19329 03/14/97 P//18.5000 P Visual inspection
-sat, 4L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends Mith neolube-24982-3 under lQ 96014408.3-1069 27072 03/13/97 P//16.7500 P Visual inspection
-sat,"L" dimension acceptable,~(i~
0 Ib Ik PAGE NO.16 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fmctional A"La A Number Number Date T Test T Dimension T Visual Smeary Fwetional Sumery handstroke
-sat, lubricated spherical bearings and load studs on both ends kith neolube-24982-3 under lO 96014408.Condition report 97-398 Mas Mritten to address boric acid on the snubber.The inspector found no boric acid uhen the snubber Mas inspected.
Condition report 97-398 directed that herculite be put over the snubber before reload and removed prior to startup.The herculite Mas removed on 03/29/97.3-1070 27079 03/13/97 P//17.6250 P Visual inspection
-sat, 4L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 960144M.3-1071 27069 03/13/97 P//15.8125 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Nith neolube-24982-3 under IQ 96014408.No 10 tag installed.
Load pin Nas ssmhroomed, filed pin for reinstallation in accrodance Nith STD-C-011.
3-1072 27073 03/15/97 P//16.0625 P Visual inspection
-sat,"L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under MO 96014408.
0 I~0 0 PAGE NO.17 05/22/97 Turkey Point Outage Senary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fuetional A 4La A ether Naker Date T Test T Dimension T Visual Suanary Fact iona l Stsmary No iD tag installed.
Removed paint and rust on housing and indicator tube Mith scotch brite.-1073 27090 03/15/97 P//17.0000 P Visual inspection
-sat,"L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.-1074 27104 03/15/97 P//17.7500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends uith neolube-24982-3 under 1JO 96014408.-1075 18074 03/15/97 P//8.1250 F Visual inspection
-sat,"L" dimension macceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.CR 97-0478 Mas issued for rusted rear plate and"L" dimension bale+miniaua by.254.NO 97006948 Nas implemented to correct the conditions.
-1076 19725 03/13/97 P 03/15/97 P 17.5000 P Visual inspection
-sat,"L" dimension acceptable, no handstroke (initial sample), lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under NO 96014408.A fuetional test Nas performed Mith the follming acceptable results under lO 96024408;Snubber S/N-19725~~~i~'Tension Coopression Criteria Ib PAGE MO.18 05/22/97 Turkey Point Outage SulNlary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Flmctfonal A"L" A Mmher Mumber Date T Test T Dimension T Visual Sundry Factional Stannary Test 1)Test 2)Test 3)Test 4)16 44 16.79 0.012 17.19 32~15 32.21 0.009 31.28 300.00 300.00 0.02g's 300.00 This QR snubber was tested as part of the'initial saaple.3-1077 16230 03/13/97 P//20.2500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IN 96014408.installed black ID tag on TTA end.3-1078 16244 03/12/97 P//20.5000 P Visual inspection
-sat,"L4 dimension acceptable, handstroke
-sat, lubricated spherfcal bearfngs and load pins on both ends with neolube-24982-3 under IN 96014408.3-1079 10176 03/12/97 P//22.0000 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends vfth neo'24982-3 under IN 96014408.3-1080 12396 03/11/97 P//21.2500 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and~i~f~'
IS IS 0 0 PAGE NO.19 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A"L" A Number Number Date T Test T Dimension T Visual Smeary Fwetional Suaasry load pins on both ends with neolube-24982-3 under lO 96014408.3-1081 11921 03/12/97 P//25.5000 P Visual inspection
-sat,"L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under MO 96014408.No iD tag installed.
Replaced 1 spacer washer-0197329-3 Replaced 1 cotter pin-0029146.3 3.1082 11932 03/12/97 P//26.5000 P Visual inspection
-sat, 4La dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under QO 96014408.No ID tag'installedo 3-1083 11925 03/15/97 P//25.1250 P Visual inspection
-sat, aL" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under QO 96014408.3-1084 7000 03/14/97 P 03/16/97 P 24.7500 P Visual inspection
-sat,"L" dimension acceptable, no handstroke (initial saaple), lubricated spherical bearings and load pins on both ends~)~i~A fmctional test Mas performed Mith the folloMing acceptable results under MO 96024408; il Il il PAGE NO.20 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A"L'l A Naker Kumber Date T Test T Dimension T Visual Suanary Functional Suanary ui th neolube 24982-3 under KO 96024216.Snubber S/N-7000 Ko ID tag installed.
installed 4 spacer Mashers-197329-3, installed neu load stud-15329-1 and 4 nuts-209608-3 and torqued to 125 ft lbs on snubber end under lJO 96024216.Test 1)Test 2)Test 3)Test 4)504.13 504.13 0.002 217.05 154.54 407.02 0.009 225.69 2500.00 2500 F 00 0.02g's 2500.00 Tension Coapressi on Criteria This SR snubber Nas tested as part of the initial searle.3-1091 27087 03/13/97 P//19.0000 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Kith neolube-24982-3 under MO 96014408.3-1092 27105 03/13/97 P//18.0000 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Kith neolube-24982-3 under lO 96014408.No iD tag installed.
3-1093 27091 03/15/97 P//18.1250 P Visual inspection
.sat, 4L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under QO 96014408.~~1~
II 0 PAGE NO.21 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A<<L<<A Number Number Date T Test T Dimension T Visual Summary Fact i one l Sumery 3.1094 4388 03/16/97 P//15.2500 P Visual inspection
-sat,<<L<<dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lO 96014408.3-1095 16733 03/14/97 P//8.5000 P Visual inspection
-sat,<<L<<dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IQ 96014408.3-1096 11993 03/18/97 P//8.5000 F Visual inspection
-sat,<<L<<dimension macceptable, condition report 97-531 written to address the<<L<<dimension which is-.3750<<below minim!a, handstroke
-sat, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under NO 96014408.Snubber 3-1096 was swapped with tag 3-1097 from a previous installation.
Reinstalled in the correct tag location.3-1097 16724 03/13/97 P 03/15/97 P 9.0000 P Visual inspection
-sat,"L" dimension acceptable, no handstroke, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lQ 96014408.A factional test was performed with the following acceptable results under NO 960244M;Snubber S/N-16724 Snubber was previously installed in the sister (3-1096)location.Reinstalled in the proper location.~/1~Tension Compression Criteria IO il il PAGE NO.22 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Functional A"L" A Naker Number Date T Test T Dimension T Visual Suanary Fuetional Smmary Test 1)Test 2)Test 3)Test 4)1.98 3.28 0.010 3.03 2.63 3.76 0.011 3.75 32.50 32.50 0.02g's 32.50 This SR snubber vas tested as part of the initial sample.-1098 33628 03/16/97 P 03/15/97 P 10.3750 P Visual inspection
-sat,"L" dimension acceptable, no handstroke (lnitaL sample), lubricated spherical bearings and load pins arith neolube-24982-3 on building end only under 1JO 96014408.A fmctionaL test was performed with the foLLouing acceptable results under NO 96024408;Snubber S/N-33628 No ID tag installed.
Tension Conpression Criteria Test 1)Test 2)Test 3)Test 4)2.10 4.80 0.011 6.52 5.21 5.21 0.010 8.60 17.50 17.50 0.02g's 17.50 This SR snubber was tested as part of the initial saspleo-1099 38481 03/16/97 P//11.7500 P Visual inspection
-sat, 4L" dimension acceptable, handstroke
-sat, Lubricated spherical bearings and Load pins on both ends with neolube-24982-3 under MO 96014408.No ID tag installed.
II IJ il PAGE NO.23 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Flmctfonal A"L" A Naker Nwhtr Date T Test T Dimension T Visual Suansry Fuctfonal Summary 3-1100 17819 03/16/97 P//8.3125 P Visual inspection
-sat, 4L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.No ID tag installed.
3-1101 33626 03/16/97 P//11.5625 P Visual inspection
-sat, 4L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under lO 96014408.No ID tag installed.
3-1102 29451 03/16/97 P//11.2500 P Visual inspection
-sat,"La dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends sfth neolube-24982-3 under IO 96014408.Ko ID tag installed.
3-1103'11996 03/17/97 P//8.5000 P Visual inspectfon
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pfns on both ends elth neolube-24982-3 under IO 96014408.3-1104 24412 03/17/97 P//13.5000 P Visual inspection
-sat,"L" dimension acceptable,~/I~
0 PAGE NO.24 05/22/97 Turkey Point Outage Suansry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A fmctional A"L4 A Number Nmher Date T Test T Dimension T Visual Suanary fuctionai Suanary Handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neoide-24982-3 under IO 96014408.3-1105 16134 03/15/97 P//13.1250 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on ccmponent end due to piping and scaffold limitations on building end Mith neolube-24982-3 under lO 96014408.No ID tag installed.
3-1106 38479 03/15/97 P//11.3125 P Visual inspection
-sat,"L" dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under IO 96014408.No ID tag installed.
3-1110 16136 03/15/97 P//12.7500 P Visual inspection
-sat,"La dimension acceptable, handstroke
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lO 96014408.No ID tag installed.
3-1111 2875 03/15/97 P//17.0000 P Visual inspection
-sat,"L4 dimension acceptable, handstroke
-sat, lubricated spherical bearings and~i~I~~
I~
I~
PAGE NO.25 05/22/97 Turkey Point Ou'tage SISllllbry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A"i" A Number Nmher Date T Test T Dimension T Visual Suanary Factional Suanary load studs on both ends with neolube-24982-3 under lO 96014408.3-1112 27083 03/16/97 P//16.2500 P Visual inspection
PAGE NO.     25 05/22/97 Turkey Point Ou'tage SISllllbry Report Unit 3/4 S   Date   S             S Visual T     of   T   I         T Tag   Serial Inspection A Fmctional A         "i" A Number Nmher       Date   T   Test   T Dimension T                       Visual Suanary                                         Factional Suanary load studs on both ends with neolube - 24982-3 under lO 96014408.
-sat,"L4 dimension acceptable, handstroke
3-1112 27083     03/16/97 P   / /         16.2500   P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, Lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lJO 96014408.
-sat, Lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under lJO 96014408.3-'1120 18325 03/16/97 P 03/15/97 P 8.6250 P Visual inspection
3-'1120 18325   03/16/97 P 03/15/97 P     8.6250 P Visual inspection - sat, "L4 dimension acceptable,           A  fmctionaL test  Mas performed with the foLLouing no handstroke (initiaL sample), Lubricated spherical         acceptable results under    NO 96024408; bearings and Load pins on both ends with neolube 24982-3 under NO 960144M.                                 Snubber S/N - 18325 No ID tag Installedo                                                     Tension     Coapress ion     Criteria Test 1)     5.91             11.90      32.50 Test 2)      8.31              23.94       32.50 Test 3)      0.017              0.015        0.02g's Test 4)      8.07              5.54        32.50 This SR snubber vas tested as part   of the initial sea@le.
-sat,"L4 dimension acceptable, no handstroke (initiaL sample), Lubricated spherical bearings and Load pins on both ends with neolube 24982-3 under NO 960144M.A fmctionaL test Mas performed with the foLLouing acceptable results under NO 96024408;Snubber S/N-18325 No ID tag Installedo Tension Coapress ion Criteria Test 1)Test 2)Test 3)Test 4)5.91 8.31 0.017 8.07 11.90 23.94 0.015 5.54 32.50 32.50 0.02g's 32.50 This SR snubber vas tested as part of the initial sea@le.3-1121 24430 03/16/97 P//12.7500 P Visual inspection
3-1121 24430     03/16/97 P   / /         12.7500   P Visual inspection - sat, "l." dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.
-sat,"l." dimension acceptable, handstroke
                                                                                                            ~
-sat, lubricated spherical bearings and load pins on both ends Mith neolube-24982-3 under QO 96014408.~~I~
                                                                                                              ~ I~
0~~
 
PAGE NO.26 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fwetional A<<L<<A Neer Naker Date T Test T Dimension T Visual Suanary Fmctional Suaaary No ID tag installed.
0
3-1136 19M4 03/16/97 P//9.0000 P Visual inspection
~ ~
-sat,<<L<<dimension acceptable, handstroke
 
-sat, lubricated spherical bearings and load pins on both ends Mith neotube-24982-3 under NO 96014408.3-1137 19885 03/15/97 P//9.0000 P Visual inspection
PAGE NO. 26 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S   Date   S           S Visual T     of   T   I       T Tag   Serial Inspection A Fwetional A       <<L<< A Neer   Naker Date       T   Test   T Dimension T                     Visual Suanary                                         Fmctional Suaaary No ID tag installed.
-sat,<<L<<dimension acceptable, handstroke
3-1136 19M4     03/16/97 P   / /         9.0000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neotube - 24982-3 under NO 96014408.
-sat, lubricated spherical bearings and load pins on both ends with neolube-24982-3 under NO 96014408.3-1005 10579 03/21/97 P 03/20/97 P 26.5000 P Visual inspection
3-1137 19885   03/15/97 P   / /         9.0000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under NO 96014408.
-sat,<<L<<dimension acceptable, no handstroke, lubricated spherical bearings and load studs on both ends with neolube-24982-3 under QO 97006613.A fmctional test Mas performed Mith the following acceptable results under NO 97006613: Snubber S/N 10579 Snubber S/N 10579 is a replacement per CR 97-399.Snubber S/N 10035 was rebuilt under NO 97006613 and HRN back into stores.Test 1)Test 2)Test 3)Test 4)93.16 171.37 0.005 153.93 56.95 92.16 0.007 135.11 2500.00 2500.00 0.02g's 2500.00 Tension Coapression Criteria This OR snubber was tested as a replacement snubber.3-1006 6494 03/21/97 P 03/20/97 P 26.7500 P Snubber S/N 6494 is the replacement snubber for snubber S/N 6521 per CR 97-399.Load studs and spherical bearings uere lubricated with neolube 24982-3 under NO 97006613.~/~I~A fmctional test was performed Mith the follouing acceptable results under NO 97006613 and CR 97-399:
3-1005 10579   03/21/97 P 03/20/97 P   26.5000 P Visual inspection - sat, <<L<<dimension acceptable,           A fmctional test    Mas performed Mith the following no handstroke, lubricated spherical bearings and           acceptable results under    NO 97006613:
0 PAGE NO.27 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A"La A Neer Nmher Date T Test T Dimension T Visual Summary Factional Showery installed 2 square washers 30263-3 and 8 spacer washers 197329-3.Snubber S/N-6494 Tension Cospression Criteria Test 1)132.16 Test 2)190.20 Test 3)0.016 Test 4)220.84 65.10 102.84 0.020 87.87 2500.00 2500.00 0.02g's 2500.00 This test was performed as a replacement test.3-1009 10542 03/17/97 P 03/14/97 P 26.8750 P Snubber S/N 10542 is a replacement snubber for snubber S/N 1203.The as left inspection was sat.under MO 97024188.A fmctional test was performed with the following acceptable results;Tension Coepression Criteria Load studs and spherical bearings were lubricated with neolube 24982-3.'Test 1)41.56 Test 2)90.30 Test 3)0.006 Test 4)86.96 128.27 146.42 0.008 115.11 2500.00 2500.00 0.02g's 2500.00 This factional test was performed on snubber 10542 which is a replacement snubber for srabber 1203.3-1010 6530 03/21/97 P 03/20/97 P 26.5000 P An as-left visuaL inspection was performed under lO 97006613 on replacement snubber 6530.Visual inspection was sat.Snubber 11931 was taken to the Basic-PSA trailer for tear down, Engineering inspection and subsequent rebuild.The rebuilt snubber tested sat and was HRH into stores.~~~i~Tension Coepression Criteria Test 1)Test 2)132.54.90.78 198.87 119.78 2500.00 2500.00 A fuetional test was performed with the following acceptable results under IO 97006613 and CR 97-399:
load studs on both ends with neolube - 24982-3 under QO 97006613.                                               Snubber S/N 10579 Snubber S/N 10579 is a replacement per CR 97-399.                       Tension      Coapression      Criteria Snubber S/N 10035 was rebuilt under NO 97006613 and HRN back into stores.                                       Test 1)     93.16            56.95        2500.00 Test 2)     171.37            92.16       2500.00 Test 3)      0.005             0.007           0.02g's Test 4)    153.93            135.11        2500.00 This OR  snubber was tested as a replacement snubber.
il it PAGE NO.28 05/22/97 Turkey Point Outage Sumsry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A 4L" A Number Nwher Date T Test T Dimension T Visual Sunnary Fuetional Sunnary Test 3)0.004 0.008 0.02g's Test 4)220.20 104.52 2500.00 This test uas performed as a replacement test.3-1019 17425 03/14/97 P 03/14/97 P 17.2500 P Visual inspection
3-1006 6494     03/21/97 P 03/20/97 P   26.7500 P Snubber S/N 6494 is the replacement snubber for snubber     A fmctional test    was performed Mith the  follouing S/N 6521 per CR 97-399. Load studs and spherical bearings   acceptable results under  NO  97006613 and  CR  97-399:
-sat,"L4 dimension acceptable, no handstroke performed, lubricated spherical bearings and load pins with neolube-24982-3 under MO 960144M.Snubber S/N 2889 uas changed out with snubber S/N 19425 due to a LCO condition on unit 4.A factional test Mas performed with the follouing acceptable results under NO 96024408;Snubber S/N-17425 Tension Ccepresion Criteria Test 1)Test 2)Test 3)Test 4)29.92 30.87 0.007 25.00 13.06 22.91 0.017 27.36 300.00 300.00 Oe02g~s 300.00 This SR snubber Mas tested as as a r'eplacement for snubber S/N 2M9 due to a LCO on unit 4.~~~I~
uere lubricated with neolube 24982-3 under NO 97006613.
0 TURKEY'OINT UNIT 3 1997 REFUELING OUTAGE Summary of Inservice Inspection Examinations
                                                                                                          ~
                                                                                                      ~
                                                                                                        /   I ~
 
0 PAGE NO. 27 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S   Date   S           S Visual   T     of   T   i       T Tag   Serial inspection A Fmctional A       "La A Neer   Nmher     Date   T   Test   T Dimension T                       Visual Summary                                         Factional     Showery installed 2 square washers 30263-3 and 8 spacer washers     Snubber S/N - 6494 197329-3.
Tension         Cospression         Criteria Test 1)     132.16         65.10              2500.00 Test 2)     190.20       102.84              2500.00 Test 3)       0.016         0.020                0.02g's Test  4)     220.84         87.87               2500.00 This test  was  performed as a replacement        test.
3-1009 10542   03/17/97 P 03/14/97 P   26.8750 P Snubber S/N 10542 is a replacement snubber for               A  fmctional test    was  performed with the following snubber S/N 1203. The as left inspection was sat.             acceptable results; under MO 97024188.
Tension         Coepression       Criteria Load studs and   spherical bearings were lubricated with neolube 24982-3.                                         'Test 1)     41.56               128.27        2500.00 Test 2)     90.30               146.42        2500.00 Test 3)       0.006                 0.008          0.02g's Test 4)     86.96               115.11        2500.00 This factional test was performed         on snubber 10542 which is a replacement snubber for       srabber 1203.
3-1010 6530   03/21/97 P 03/20/97 P   26.5000 P An as-left visuaL inspection was performed under             A  fuetional test was performed with the following lO 97006613 on replacement snubber 6530. Visual               acceptable results under IO 97006613 and CR 97-399:
inspection was sat. Snubber 11931 was taken to the Basic-PSA trailer for tear down, Engineering                               Tension        Coepression        Criteria inspection and subsequent rebuild. The rebuilt snubber tested sat and was HRH into stores.                   Test 1)     132.54     . 90.78             2500.00 Test 2)      198.87         119.78             2500.00
                                                                                                        ~
                                                                                                          ~
                                                                                                            ~
i ~
 
il it
 
PAGE NO. 28 05/22/97 Turkey Point Outage Sumsry Report Unit 3/4 S   Date   S           S Visual T     of   T   I       T Tag   Serial Inspection A Fuetional A       4L" A Number Nwher Date       T   Test   T Dimension T                     Visual Sunnary                                         Fuetional   Sunnary Test 3)       0.004       0.008             0.02g's Test 4)     220.20       104.52           2500.00 This test uas performed as a replacement test.
3-1019 17425   03/14/97 P 03/14/97 P   17.2500 P Visual inspection - sat, "L4 dimension acceptable,           A factional test    Mas performed with the  follouing no handstroke performed, lubricated spherical bearings       acceptable results under  NO 96024408; and load pins with neolube - 24982-3 under MO 960144M.
Snubber S/N -  17425 Snubber S/N 2889 uas changed out with snubber S/N 19425 due to a LCO condition on unit 4.                                 Tension      Ccepresion      Criteria Test 1)     29.92              13.06      300.00 Test 2)     30.87             22.91      300.00 Test 3)      0.007            0.017       Oe02g~s Test 4)    25.00              27.36       300.00 This SR snubber Mas tested as as a r'eplacement   for snubber S/N 2M9 due to a LCO on unit 4.
                                                                                                      ~   ~   ~
                                                                                                        ~
I


e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 IHSERVICE INSPECTION SUMNARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 1'CBEAR,'STATUS Components Page: 1 Zone Number,: 3-001 Summary-Examination Area Number Identification ASNE SEC.XI Catgy Exam:Item Ho Hethod , Procedure.Nil, 0 S ON'G T T RSEH A.'E I 0 E Remarks T, C G M R<<*Calibration Block**003200 VESSEL TO CLOSURE HEAD HATING B-N-1 VT-3 SURFACE OH.HEAD B13.10 NDE 4.3-28 X---03/22/97-VT-'3.complete, examination performed with remote camera  
0 TURKEY'OINT UNIT 3 1997 REFUELING OUTAGE Summary of Inservice Inspection Examinations
-J e: 06/13/97 TURKEY POINT NUCLEAR,PLANT UNIT 3 IHSERVI CE INSPECTION
 
e: 06/13/97                               TURKEY POINT NUCLEAR PLANT UNIT 3                                       Page:      1 IHSERVICE INSPECTION SUMNARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE   (97RF)
Class 1'CBEAR,'STATUS Components
                                                                                  .Nil,  0 Zone Number,: 3-001                   ASNE                                   S   ON'G T SEC. XI                                T   RSEH Summary-Examination Area              Catgy    Exam                          A. 'E I 0 E   Remarks Number  Identification                :Item Ho Hethod        , Procedure      T,   C G M R   <<* Calibration Block   **
003200 VESSEL TO CLOSURE HEAD HATING   B-N-1 VT-3             NDE 4.3-28         X - - -   03/22/97 - VT-'3. complete, examination SURFACE OH .HEAD                B13.10                                              performed with remote camera
 
-J e:   06/13/97                     TURKEY POINT NUCLEAR,PLANT UNIT   3                                 :Page:    2 IHSERVI CE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD'NTERVAL, SECOND'PERIOD, FIRST OUTAGE (97RF)Class 1 CBEAR STATUS Components
 
:Page: 2 Zone Number: 3-057 Sunnary, Examination Area Number Identification ,ASME SEC.XI Catgy Exam Item No Method Procedure N I 0 S ONGT T RSEH A'I O,E Remarks T C G M R<<*Calibration Block**202700 3-RCP-8-FLYWHEEL Flywheel RG 1.14UT NDE 5.15-1 X-03/27/97-UT complete, examined from the periphery surface, examinations performed in accordance with Technical Specifications
THIRD'NTERVAL, SECOND 'PERIOD, FIRST OUTAGE (97RF)
**FLYWHEEL*>>
Class 1 CBEAR STATUS Components N I  0 Zone Number: 3-057       ,ASME                                     S  ONGT SEC. XI                                   T  RSEH Sunnary, Examination Area  Catgy     Exam                           A'   I O,E Remarks Number  Identification    Item No Method          Procedure        T   C G M R <<* Calibration Block **
II~(J e: 06/13/97 ,TURKEY POINT NUCLEAR'PLANT UNIT 3 INSERVICE INSPECTIOH
202700   3-RCP-8-FLYWHEEL   RG 1.14UT             NDE 5.15-1           X-     03/27/97 - UT complete, examined from Flywheel                                                                the periphery surface, examinations performed in accordance with Technical Specifications
                                                                                ** FLYWHEEL *>>
 
II
~   (
J
 
e: 06/13/97                                         ,TURKEY POINT NUCLEAR'PLANT UNIT 3                                          Page      3 INSERVICE INSPECTIOH  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class'2 CBEAR STATUS Components Page 3 Zone Number:,3-063
 
'Smeary Examination Area Number Identification ASME SEC., XI Catgy ,Exam Item No'Method'rocedure.N I 0 S ONGT T'R:SE H A E I,O,E Remarks T C G M.,R**Calibration Block**214900'R-252 SPRING, HANGER F-A VT-3 F,1.20C.HDE 4.3-9'X---03/12/97-VT-3 complete, light rust found inside of spring can'215000 14"-RHR-2301-9'IPE.
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE         (97RF)
TO ELBOM C-F-1 PT C5.11'T 45 UT 60 UT 70 ,HDE 3.3-20'DE 5.4-2 X-X----X'---X-3/12/97-PT complete, two acceptable round indications, 3/14/97-UT complete, root.geometry, limited voiunetric examination from the elbow side due to'its configuration, limited examination from the pipe side due to support'interference
Class '2 CBEAR STATUS Components
**.UT 33**215050 14"-RHR-2301-9LD I LOHG SEAM'DOHHSTREAM.
                                                                                            .N  I    0 Zone Number:,3-063                           ASME                                     S    ONGT SEC., XI                                 T   'R:SE H
INSIDE RADIUS C-F-1'T C5.',12 UT 45 HDE 3;3-'20.HDE'5.4'-2 X---3/12/97-PT complete, 3/14/97-UT'-X-complete, beam redirection due to ,dendretics, inside surface geometry**UT 33**215100 14"-RHR-2301-9LDO C-F-1 PT LONG.SEAM.DOHHSTREAM OUTSIDE C5~12 UT'5 RADIUS HDE 3.3-20'DE'.4-2 X---3/12/97-PT complete, 3/14/97'-UT--X-complete, beam redirection due to dendretics, inside surface geometry UT 33 4*215180.14a-.RHR-2301-10LUI, LOHG SEAM UPSTREAM INSIDE RADIUS C-F-1 PT C5~12'UT 45 HDE 3.3-1 HDE 5.4-2 X---03/12/97-PT complete, 3/14/97-UT--X-complete, beam redirection due to dendretics, inside surface geometry.~*:UT-33**215190 14a-RHR-2301-10LUO C-F-1 PT LONG SEAM UPSTREAM OUTSIDE C5.12 U'I 45 RADIUS NDE 3.3-1'HDE 5.4-2 X---03/13/97-PT,complete, 3/14/97-UT-.-X.-'complete, beam redirection due to dendretics, inside:surface geometry*'T-33**
'Smeary Examination Area                      Catgy ,Exam                              A   E I,O,E     Remarks Number Identification                        Item No'Method'rocedure                  T   C G M.,R   ** Calibration Block **
0 0=J e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 IHSERVICE INSPECTION
214900'R-252                                 F-A     VT-3           .HDE 4.3-9'         X - - -   03/12/97 - VT-3 complete, light rust SPRING, HANGER                        F,1.20C                                                  found inside of spring can
'215000                                       C-F-1                                        X-          3/12/97 -      complete, two acceptable 14"-RHR-2301-9'IPE.
TO ELBOM           C5.11'T PT 45
                                                                        ,HDE 3.3-20'DE 5.4-2           X---
                                                                                                - X'-
round PT indications, 3/14/97 - UT UT 60                                            complete, root. geometry, limited UT 70                                --X-        voiunetric examination from the elbow side due to 'its configuration, limited examination from the pipe side due to support 'interference
                                                                                                        **.UT 33 **
215050 14"-RHR-2301-9LD I                     C-F-1'T                   HDE 3;3-'20.       X - - -   3/12/97 - PT complete, 3/14/97 - UT' LOHG SEAM 'DOHHSTREAM.        INSIDE  C5.',12  UT 45            HDE'5.4'-2            - X -   complete, beam redirection due to RADIUS                                                                                          ,dendretics, inside surface geometry
                                                                                                        ** UT 33 **
215100 14"-RHR-2301-9LDO                     C-F-1   PT               HDE 3.3-20         X - - -   3/12/97 - PT complete, 3/14/97'-   UT LONG. SEAM. DOHHSTREAM OUTSIDE        C5 ~ 12  UT'5          'DE'.4-2              - - X -     complete, beam redirection due to RADIUS                                                                                          dendretics, inside surface geometry UT 33 4*
215180 .14a-.RHR-2301-10LUI,                 C-F-1   PT               HDE 3.3-1           X - - -   03/12/97 - PT complete, 3/14/97 - UT LOHG SEAM UPSTREAM          INSIDE    C5 ~ 12 'UT 45            HDE 5.4-2          - - X -     complete, beam redirection due to RADIUS                                                                                          dendretics, inside surface geometry.
                                                                                                        ~*:UT-33 **
215190 14a-RHR-2301-10LUO                     C-F-1   PT               NDE                X  - - -    03/13/97 - PT,complete, 3/14/97 - UT LONG SEAM UPSTREAM OUTSIDE             C5.12   U'I 45 3.3-1'HDE 5.4-2           -. - X.- 'complete, beam redirection due to RADIUS                                                                                          dendretics, inside:surface geometry
                                                                                                        *'T-33 **
 
0 0
=J
 
e: 06/13/97                               TURKEY POINT NUCLEAR PLANT UNIT   3                                       Page      4 IHSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
.THIRD INTERVAL, SECOND PERIOD, FIRST'OUTAGE (97RF)Class 2 CBEAR STATUS Components Page 4 Zone Heber:,3-063 Swmary Examination.
 
Area-Number Identification ASME SEC.XI Catgy Exam Item No Method Procedure N I 0 S ONGT T'SEH A E'I O,E Remarks T C G M R**Calibration Block**215200 14>>RHR 230'I'10 ELBOW TO PIPE C-.F-1 PT C5~11 PT CR WO UT 45 UT 60 UT NDE 3.3-1 PTH-97-0432 9706743 NDE'.4-2;ND E 5'.18-1---X X---X-X-X-3/13/97-PT,complete, cresecent shaped indication at toe of weld, determined,to, be a surface anomoly,'3/14/97
                                      .THIRD INTERVAL, SECOND PERIOD, FIRST'OUTAGE (97RF)
-UT complete, root geometry,'3/17/97
Class 2 CBEAR STATUS Components N  I  0 Zone Heber:,3-063                   ASME                                     S  ONGT SEC. XI                                 T'SEH 'I Swmary Examination. Area            Catgy    Exam                          A   E   O,E Remarks
-PT completed after.weld.cleanup**UT-33**215250 14"-RHR-2301-25 Pipe to Pipe C-F-1 SUR C5~11'OL NDE.3.3 NDE 5.4 06/09/97-weld found during 1997 outage, no examination required during this outage**UT-33<<>>215300 14<<-RHR-2301-11 PIPE TO ELBOW C-F-1 PT C5.11 UT 45 UT 60 NDE 3.3-13 HDE 5.4-3 X---03/14/97-PT and.UT complete, root X---geometry--X-**UT 33<<*215400 14"-RHR-2301-11LS LONG SEAM DOWNSTREAM INSIDE RADIUS C-F-1 PT C5~12 UT 45 HDE 3.3-13 NDE 5.4-3 X---03/14/97-,PT and UT complete X---<<*UT-33*>>215410 14"-RHR-2301-.11LDO C-'F-1 PT LONG SEAM DOWNSTREAM OUTSIDE C5.12'T 45 RADIUS NDE'3.3-.13, ,NDE 5.4-3 X'---03/14'/97-PT and:UT complete X---<<>>UT-33>>*
-
0 0 e: 06/13/97 t ,TURKEY POINT NUCLEAR PLANT'UNIT 3 INSERVICE.INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Corryonents Page: 5'Zone Number: 3-063'cenery Examination Area Number Identification ASHE SEC.XI Catgy Exam Item Ho Nethod Procedure N I 0 S-ONGT T RSEH A E I 0 E Remarks T.C G N R*>>Calibration Block**215480 14"-RHR-2301-12LUI'OHG SEAN'.UPSTREAN INSIDE RADIUS C-F-1 PT C5.12 UT 45 NDE 3.3-13'DE 5.4-3 X---03/14/97-PT and UT, complete X'-**UT-33**215490 14"-RHR-2301-12LUO LONG SEAN UPSTREAH'OUTSIDE RADIUS C-F-1 PT C5~12 UT 45 NDE 3.3-13 NDE 5.4-3 X---03/14/97-PT and UT coaplete X->>*O'I 33**215500 14"-RHR-2301.-12 ELBOM TO PIPE e 215520 14"-RHR-2301-12LD Long i tudinal.'Seam Held Downstream C-F-'I P.T CS~11 UT 45 UT 60 C-F-1 PT C5.12 UT 45 NDE 3.3-13 NDE 5.4-3 NDE 3.3-13 NDE 5.4-3 X---03/14/97-PT;and UT complete, root X---geometry--X-<<>>UT-33**X---03/14/97-PT and UT complete X---**UT-33**216500 14"-RHR-2301-18 VALVE 3-752A TO PIPE C-F-1 PT C5'.'I1 UT 45 UT 60 UT 70 NDE 3.3-12 NDE 5.4-11---X X-----X---X-03/12/97,-PT coeplete, 2 acceptable round indications, 3/13/97-UT complete, root geometry, no volunntric examination from, the weld crown and from valve side due to their configuration
Number  Identification                Item No Method            Procedure    T   C G M R ** Calibration Block **
**UT-33**216520,, 14"-RHR-2301-'18LD
215200 14>> RHR 230'I '10             C-.F-1 PT               NDE 3.3-1       ---X X---     3/13/97 - PT,complete, cresecent shaped ELBOW TO PIPE                  C5 ~ 11 PT                                          indication at toe of weld, determined,to, CR              PTH-97-0432                be a surface anomoly,'3/14/97 - UT WO              9706743                    complete, root geometry,'3/17/97 - PT UT 45            NDE'.4-2          X-      completed after   .weld. cleanup UT 60                                  X- ** UT-33 **
'Long Seam Downstream C-F-.1'T C5.12 UT 45 NDE 3.3-12 NDE"5.4-11 X---03/12/97-PT complete, 3/13/97-UT X---complete**UT 33*>>
UT            ; ND E 5'. 18-1          X-215250 14"-RHR-2301-25               C-F-1   SUR             NDE.3.3                   06/09/97 - weld found during 1997 Pipe to Pipe                  C5 ~ 11'OL              NDE  5.4                  outage, no examination required during this outage
ll e: 06/13/97.TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION
                                                                                            ** UT-33 <<>>
215300 14<<-RHR-2301-11               C-F-1   PT               NDE 3.3-13       X - - - 03/14/97 -   PT and.UT complete,   root PIPE TO ELBOW                  C5.11  UT 45            HDE  5.4-3        X - - - geometry UT 60                              - - X-
                                                                                            ** UT 33 <<*
C-F-1                        3.3-13          - - - 03/14/97 -,PT and        complete 215400 14"-RHR-2301-11LS LONG SEAM DOWNSTREAM INSIDE   C5 ~ 12 PT UT 45 HDE NDE 5.4-3       X---
X                            UT RADIUS
                                                                                            <<* UT-33 *>>
C-'F-1                   NDE'3.3-.13,     X'- - - 03/14'/97 -   PT and:UT   complete 215410  14"-RHR-2301-.11LDO LONG SEAM DOWNSTREAM OUTSIDE  C5.12'T PT 45        ,NDE  5.4-3        X---
RADIUS
                                                                                            <<>> UT-33 >>*
 
0 0
 
e:06/13/97                                                   ,TURKEY POINT NUCLEAR         PLANT'UNIT 3                                   Page:      5 INSERVICE .INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)
Class 2 CBEAR STATUS Corryonents N I  0
'Zone Number:                                             ASHE                                            S-  ONGT 3-063'cenery SEC. XI                                         T  RSEH Examination Area                                Catgy     Exam                                 A E   I 0 E Remarks Number    Identification                                  Item Ho Nethod              Procedure            T .C G N R *>> Calibration Block   **
215480                                                     C-F-1    PT              NDE                      X - - - 03/14/97 -  PT  and UT, complete 14"-RHR-2301-12LUI'OHG SEAN'.UPSTREAN INSIDE     C5.12     UT 45 3.3-13'DE 5.4-3               X'-
RADIUS
                                                                                                                        ** UT-33 **
215490   14"-RHR-2301-12LUO                               C-F-1     PT               NDE 3.3-13               X - - - 03/14/97 - PT and UT   coaplete LONG SEAN UPSTREAH'OUTSIDE                      C5 ~ 12  UT 45            NDE 5.4-3                X-RADIUS
                                                                                                                        >>* O'I 33 **
215500   14"-RHR-2301.-12                                 C- F- 'I P.T             NDE 3.3-13               X - - - 03/14/97 - PT;and   UT complete, root ELBOM TO PIPE                                              UT 45            NDE  5.4-3              X - - - geometry e
CS ~ 11 UT 60                                    - - X-
                                                                                                                        <<>> UT-33 **
C-F-1                          3.3-13                - - - 03/14/97 -     and UT complete 215520    14"-RHR-2301-12LD Long i tudinal.'Seam Held                        C5.12 PT UT  45 NDE NDE  5.4-3              X---
X                  PT Downstream
                                                                                                                        ** UT-33 **
216500   14"-RHR-2301-18                                 C-F-1     PT               NDE 3.3-12               ---X X---   03/12/97, - PT coeplete, 2 acceptable C5'.'I1                        5.4-11                      round indications, 3/13/97 - UT VALVE                            3-752A TO PIPE            UT 45 UT 60 NDE
                                                                                                                --X-
                                                                                                                --X-    complete, root geometry, no volunntric UT 70                                            examination from, the weld crown and from valve side due to their configuration
                                                                                                                        ** UT-33 **
216520,, 14"-RHR-2301-'18LD
          'Long Seam Downstream C- F-.1 C5.12
                                                                    'T UT 45 NDE 3.3-12 NDE"5.4-11 X
X
                                                                                                                  - - - 03/12/97 -
                                                                                                                  - - - complete PT complete, 3/13/97 -   UT
                                                                                                                        ** UT 33 *>>
 
ll e: 06/13/97.                                 TURKEY POINT NUCLEAR PLANT UNIT   3                                   Page:      6 INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 6 Zone Number: 3-063 Sumery Examination Area Nunber Ident if ication ASME SEC.XI Catgy Exam Item No Method Procedure N I 0 S ONGT T RSEH A E I 0 E Remarks T C G M R**Calibration Block**, 216580 14"-RHR-2301-19LU Long Seam Upstream C-F-1 PT CS~12 UT 45 NDE 3.3-19 HDE 5.4-11 X---03/12/97-PT cceplete, 3/13/97-UT X---conplete**UT-33**216600 14"-RHR-2301-19 PIPE TO.TEE C-F-1 PT C5.11'T 45 UT 60 UT 70 HDE 3.3-19 HDE 5.4-11 X-X--X---X---03/12/97-PT complete, 3/13/97-UT coaplete, root geometry**UT 33*0 216620 14"-RHR-2301-19LD1 C-F-1 PT Long Seam Meld, Inside of Tee CS~12 UT 45 HDE 3.3-.19 HDE 5.4-11 X---03/12/97-PT complete, 3/13/97-UT X---coaplete**UT-33**0 14"-RHR-2301-19LD2 C-F-1 PT Long Seam'Weld Outside of Tee C5.12 Ul'5 HDE 3.3-19 HOE 5.4-11 X---03/12/97-PT cceplete, 3/13/97-UT X---complete++UT-33**217480 14"-RHR-2301-24LU Long Seam Upstream C-F-1 PT C5~12 UT 45 HDE 3.3-11 NDE 5.4-10 X---3/14/97-PT complete, 3/15/97-UT X---coaplete**UT-33**217500 14"-RHR-2301-24 PIPE TO PUMP CASING C-F-1 PT C5.11 UT 45 UT 60 UT 70 HOE 3.3-11 HDE 5.4 10 X---3/12/97.-PT complete, 3/15/97-UT coaplete, root geometry, no volunetric examination from the pump side and on the weld due to their configuration
 
**UT-33**217550 RHR PUMP 3P210A PUMP SUPPORT VT-3 CR HOE 4.3-5 97-0431 X 03/12/97-VT-3 coaplete, bent bolt on support plate, accepted as-is by engineering evaluation, support is part of building structure and is outside the scope of Secion XI ll!I 0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERV ICE INSPECT ION'UMMARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Coaponents Page: 7 Zone Number: 3-064 Showery Examination Area Number Identification ASME SEC.XI Catgy Exam'Item No Method Procedure N I.0 S ONGT T RSEH A E'I 0;E Remarks T C G M R**Calibration Block**217800 14!'-RHR-2303-1 TEE TO TEE C-F-1 PT C5.11 UT 45 UT 60 NDE 3.3-10 NDE 5.4-4 X'--03/14/97-PT complete, 3/15/97-UT X---coapiete, root geometry--X-*<<UT-33**217900 14"-RHR-2303-1LD1 C-F-1 PT Long Seam-Downstream Inside of C5.12 UT 45 Tee NDE 3.3-10 HDE 5.4-4 X---03/14/97-PT.complete, 3/15/97-.UT X-,--complete**UT'3**217920 14"-RHR-2303-1LD2 C-F-1 PT Long Seam DoMnstream.Outside C5.12 UT 45 of Tee NDE 3.3-10 HDE 5.4-4 X---03/'19/97-PT complete, 3/15/97-UT X---complete**UT 33**217980 14a-RHR-2303-2LU1 Long Seam Upstream Inside of Tee C-F-1'PT'C5~12 UT 45 NDE 3.3-10 HDE 5.4-4 X-"--03/14/97-PT complete, 3/15/97-UT X---complete<<*UT-33<<*217990'14"-RHR-2303-2LU2 C-F-1 PT'ong Seam Upstream Outside.of C5.12 UT 45 Tee HDE 3.3'-'10: NDE 5.4-4 X---03/14/97-.PT complete, 3/15/97-UT X---complete*<<UT-33<<<<218000 14"-RHR-2303-2 TEE TO PIPE C-F-1 PT C5.11 UT 45'T 60 UT 70 NDE 3.3-10:NDE 5.4-4---X 03/14/97-PT cotlpiete, 3/15/97-UT X---coeplete, root geometry--X---X-**UT 33**
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)
0 0 e: 06/13/97 TURKEY POINT"NUCLEAR PLANT UNIT 3 INSERVI CE INSPECTION
Class 2 CBEAR STATUS Components N I  0 Zone Number: 3-063                     ASME                                   S  ONGT SEC. XI                                 T  RSEH Sumery Examination Area                Catgy   Exam                           A   E I 0 E Remarks Nunber  Ident ification                Item No Method          Procedure      T   C G M R ** Calibration Block **
, 216580 14"-RHR-2301-19LU               C-F-1   PT             NDE 3.3-19         X - - - 03/12/97 -   PT cceplete, 3/13/97 - UT Long Seam Upstream              CS ~ 12 UT 45          HDE 5.4-11          X - - - conplete
                                                                                              ** UT-33 **
216600 14"-RHR-2301-19                 C-F-1   PT             HDE 3.3-19         X-     03/12/97 - PT complete, 3/13/97 -     UT C5.11'T                    5.4-11          X--    coaplete, root geometry PIPE TO .TEE                                45 UT 60 HDE X---
X---
UT 70
                                                                                              ** UT 33 *0 216620 14"-RHR-2301-19LD1               C-F-1   PT             HDE 3.3-.19         X - - - 03/12/97 -   PT complete, 3/13/97 - UT Long Seam Meld, Inside of  Tee  CS ~ 12 UT 45          HDE 5.4-11          X - - - coaplete
                                                                                              ** UT-33 **
0 14"-RHR-2301-19LD2               C-F-1   PT             HDE 3.3-19         X - - - 03/12/97 -   PT cceplete, 3/13/97 - UT Long Seam'Weld Outside  of  Tee  C5.12  Ul'5          HOE 5.4-11          X - - - complete
                                                                                              ++ UT-33   **
217480 14"-RHR-2301-24LU               C-F-1   PT             HDE 3.3-11         X - - - 3/14/97 -   PT complete, 3/15/97 - UT Long Seam Upstream              C5 ~ 12 UT 45          NDE 5.4-10          X - - - coaplete
                                                                                              ** UT-33 **
217500 14"-RHR-2301-24                 C-F-1   PT             HOE 3.3-11         X---   3/12/97. - PT complete, 3/15/97 - UT PIPE TO  PUMP CASING            C5.11  UT 45          HDE  5.4 10                coaplete, root geometry, no volunetric UT 60                                      examination from the pump side and on UT 70                                      the weld due to their configuration
                                                                                              ** UT-33 **
217550 RHR PUMP 3P210A                         VT-3           HOE 4.3-5                 X 03/12/97 - VT-3 coaplete, bent bolt on PUMP SUPPORT                            CR            97-0431                    support plate, accepted as-is by engineering evaluation, support is part of building structure and is outside the scope of Secion XI
 
ll
!I 0
 
e:   06/13/97                                           TURKEY POINT NUCLEAR PLANT UNIT 3                                           Page:      7 INSERV ICE INSPECT ION'UMMARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE               (97RF)
Class 2 CBEAR STATUS Coaponents N  I. 0 Zone Number: 3-064                       ASME                                               S ONGT SEC. XI                                           T RSEH Showery Examination Area                  Catgy     Exam                                   A E 'I 0;E   Remarks Number Identification                    'Item    No Method                  Procedure      T C G M R     ** Calibration Block **
217800   14!'-RHR-2303-1                   C-F-1   PT                     NDE 3.3-10       X'     - - 03/14/97 -   PT complete, 3/15/97 - UT 45                5.4-4            - - - coapiete, root geometry TEE TO TEE                        C5.11    UT UT      60 NDE
                                                                                              --X-X
                                                                                                            *<< UT-33 **
217900   14"-RHR-2303-1LD1                 C-F-1   PT                     NDE 3.3-10       X   - - -   03/14/97 - PT. complete, 3/15/97 -.UT Long Seam-Downstream  Inside of C5.12      UT 45                  HDE 5.4-4        X   -, - -   complete Tee
                                                                                                            ** UT'3 **
217920   14"-RHR-2303-1LD2                 C-F-1   PT                     NDE 3.3-10       X   - - - 03/'19/97 -   PT complete, 3/15/97 - UT Long Seam DoMnstream.Outside      C5.12    UT 45                  HDE 5.4-4        X   - - - complete of Tee
                                                                                                            ** UT 33 **
217980   14a-RHR-2303-2LU1                 C-F-1 'PT                       NDE 3.3-10       X   -"- -   03/14/97 - PT complete, 3/15/97 - UT Long Seam Upstream  Inside of    'C5 ~ 12  UT 45                  HDE 5.4-4        X   - - - complete Tee
                                                                                                            <<* UT-33 <<*
217990 '14"-RHR-2303-2LU2                 C-F-1                           HDE 3.3'-'10:     X   - - -   03/14/97 -.PT complete, 3/15/97 -   UT Seam Upstream Outside. of    C5.12 PT'ong UT 45                  NDE 5.4-4        X   - - -   complete Tee
                                                                                                            *<< UT-33 <<<<
218000   14"-RHR-2303-2                     C-F-1   PT                     NDE 3.3-10       - - - X 03/14/97 - PT cotlpiete, 3/15/97 -       UT 5.4-4            - - - coeplete, root geometry TEE TO PIPE                        C5.11    UT      45'T 60
:NDE
                                                                                              --X-X
                                                                                              --X-UT 70
                                                                                                            ** UT 33 **
 
0 0
 
e: 06/13/97                               TURKEY POINT "NUCLEAR PLANT UNIT   3                                     Page:      8 INSERVI CE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 8 Zone Heber: 3-064 Swmary Examination Area Nunber Identification ASME SEC.XI Catgy Exam Item No Method S T A Procedure T N I 0 ONGT R.SE H E I 0 E Remarks C G M'R<<>>Calibration Block**'218020 14>>-RHR-2303-'2LD Long Seam Downstream C-F-'1 PT C5.12 UT 45'DE 3.3-10 NDE 5.4-4 X'--'03/14/97-PT complete, 3/15/97-UT'X---complete*>>UT-33**218080 14"-RHR-2303-2ALU Long Seam Upstream C-F-1, PT'C5.12 UT 45 NDE 3.3-10 NDE 5.4-4 X---03/14/97-PT complete, 3/15/97-UT X---complete**UT 33**.218100 14"-RHR-2303;2A, PIPE TO PIPE C-F-1 PT.C5.11 UT 45 UT 60 NDE 3.3-10 NDE 5.4-4---X X-----X-03/14/97-'PT complete, one acceptable round indication, 3/15/97-UT coaplete, root geometry**UT 33**0 14>>-RHR-2303-2ALD Long Seam Downstream C-F-1 PT C5.12'T 45 NDE 3.3-10 NDE 5.4-4 X---03/14/97-PT complete, 3/15/97-UT X---complete**UT-33**218380 14"-RHR-2303-4LUI.LONG SEAM UPSTREAM~INSIDE RADIUS C-F-1 PT C5;12 UT, 45 NDE.3.3-5 NDE'5;4-5 X'---3/12/97-PT complete, 3/13/97-UT X---complete**UT 33**218390 14"-RHR-2303-4LUO Long Seam Upstream Outside Radius C-F-1 PT C5.12 UT 45 ,NDE 3.3-5 NDE 5.4-5 X---3/12/97-PT complete, 3/13/97-UT X---complete UT 33*>>.218400 14"-RHR-2303-4 ELBOM TO:VALVE 3-7528 C-F-1 PT C5.11 UT 45 UT 60, UT 70 NDE 3.3-5 NDE 5.4-5---X 03/12/97-.PT complete, one.acceptable X---round indication, 3/13/97-UT--.X-ccepiete,.root geometry,, no voiunctric X---examination from the valve side due to its configuration
 
*>>'UT-33<<>>
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)
0 0 e: 06/13/97 r TURKEY POINT'NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION
Class 2 CBEAR STATUS Components N  I  0 Zone Heber: 3-064                   ASME                                     S  ONGT SEC. XI                                   T   R.SE   H Swmary Examination Area              Catgy    Exam                            A  E I 0 E Remarks Nunber  Identification              Item No Method            Procedure      T  C G M'R <<>> Calibration Block   **
'218020   14>>-RHR-2303-'2LD Long Seam Downstream C- F-'1 C5.12 PT UT 45'DE 3.3-10NDE  5.4-4 X'
                                                                                  'X
                                                                                        - - '03/14/97 -
                                                                                      - - - complete PT   complete, 3/15/97 - UT
                                                                                              *>> UT-33 **
218080   14"-RHR-2303-2ALU             C-F-1, PT             NDE 3.3-10         X - - - 03/14/97 - PT   complete, 3/15/97 - UT Long Seam Upstream          'C5.12  UT 45          NDE  5.4-4          X - - - complete
                                                                                              ** UT 33 **
.218100   14"-RHR-2303;2A,             C-F-1   PT.             NDE 3.3-10         ---X X---     03/14/97 - 'PT complete, one acceptable UT 45                5.4-4                    round indication, 3/15/97 - UT coaplete, PIPE TO PIPE                  C5.11 UT 60 NDE
                                                                                    --X-      root geometry
                                                                                              ** UT   **
33 0 14>>-RHR-2303-2ALD             C-F-1   PT             NDE 3.3-10         X - - - 03/14/97 -   PT complete, 3/15/97 - UT Long Seam Downstream          C5.12'T    45          NDE  5.4-4          X - - - complete
                                                                                              ** UT-33 **
218380   14"-RHR-2303-4LUI             C-F-1   PT             NDE. 3.3-5         X'- - - 3/12/97 -   PT complete, 3/13/97 -   UT
        .LONG SEAM UPSTREAM~  INSIDE  C5;12  UT, 45          NDE'5;4-5          X - - - complete RADIUS
                                                                                              ** UT 33 **
218390   14"-RHR-2303-4LUO             C-F-1   PT             ,NDE 3.3-5         X - - - 3/12/97 -   PT complete, 3/13/97 -   UT Long Seam Upstream Outside    C5.12  UT 45          NDE  5.4-5          X - - - complete Radius UT 33 *>>.
218400   14"-RHR-2303-4               C-F-1   PT             NDE 3.3-5         - - - X 03/12/97 -.PT complete, one. acceptable ELBOM TO:VALVE  3-7528        C5.11  UT 45          NDE  5.4-5          X - - - round indication, 3/13/97 - UT UT 60,                              - -.X - ccepiete, .root geometry,, no voiunctric UT 70                              X - - - examination from the valve side due to its configuration
                                                                                              *>>'UT-33 <<>>
 
0 0
 
e:r 06/13/97                         TURKEY POINT 'NUCLEAR PLANT UNIT 3                                   'Page:              9 INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD'INTERVAL, SECOND PERIOD, FIRST OUTAGE,(97RF)
 
Class 2 CBEAR STATUS Components
THIRD 'INTERVAL, SECOND PERIOD, FIRST OUTAGE,(97RF)
'Page: 9 ,2one.Number: 3-064 SunnaryExamination Area Number Identification.ASME'SEC.XI Catgy Exam'Item No Method Procedure N I 0 S 0 N'G,T T RSEH A E I 0 E Remarks T C G M.R'**Calibration Block**-210550 14"-RHR-2303-12 PIPE TO TEE 06/13/97-;Neid does not'xist, removed'ode, category and item number, from.database*4 UT 33**219400 PS-54 DUAL SPRING HANGERS F-A VT-3 F1.20C NDE 4.3-13 X---03/12/97-VT-3 complete, light rust noted on the inside of both spring, cans 219550 RHR PUMP 3P210B PUHP SUPPORT 3/12/97-support is part of building structure and is outside the scope of Section XI e 0 0 Cl e: 06/13/97 TURKEY POINT'NUCLEAR PLANT UNIT 3'INSERVICE
Class 2 CBEAR STATUS Components N I  0
'INSPECTION SUHHARY THIRD INTERVAL, SECOND,PERIOD, FIRST OUTAGE'(9?RF).Class.2.CBEAR STATUS Coaponents
,2one. Number: 3-064         .ASME                                     S 0 N'G,T
'Page: 10 Zone Heber: 3-066 Surmary Examination Area Number Identification ASHE SEC.'XI Catgy Exam.Item No Hethod Procedure N I 0'OHGT T RS'EH A E I O'E.Remarks T C G H'R<<>>Cal3bration Block**222080 14"-RKR-2305-3LU Longitudinal Weld C-F-1 PT C5.12;UT 45 HDE 3.3-4 HDE 5.4 1 X---03/12/97-PT complete,, 3/13/97-UT X---coaplete<<*UT-33'**'222100 14>>-RHR-2305-3 PIPE TO VALVE HOV-3-860A C-F,-1 PT C5~11 UT 45 UT, 60'UT 70'DE'.3-4 HDE 5.4 1---X X-----X---X-03/12/97-PT complete, one acceptable round indication, 3/13/97.-UT completeroot geometry, no voiunetric examination from the valve side due to 3ts configuration
                              'SEC. XI                                  T RSEH SunnaryExamination Area      Catgy    Exam                          A E I 0 E Remarks Number  Identification      'Item  No Method        Procedure      T C G M.R '** Calibration Block **-
**UT-33*>>222860.14>>-RKR-2305-10LUI Long:Seam Ins3de Radius of Elbow C-F-1 PT C5~12 UT 45 NDE 3.'3-2 HDE 5.4-9 X---03/12/97-PT complete, 3/13/9?-UT X---complete UT 33**222880 ,14"-RHR-2305-10LUO Long Seam Outside Radius of-Elbow-C-F-1 PT C5.12 UT 45 HDE';3..2 HDE 5'.4-9'X---03/12/97-.PT complete, 3/13/97-'UT'X---coaplete**UT 33**222900 14"-RHR-2305-10 ELBOM TO PIPE C-F-1 PT C5.1'1 UT 45 UT'60 UT 70 NDE, 3.3.-2'DE 5.4-9 X---X-----X---X-03/12/97-PT coaplete, 3/13/97-UT complete, root geometry, limited volunetric examination due to the weld crown configuration
210550   14"-RHR-2303-12                                                           06/13/97 -;Neid does not'xist,     removed'ode, PIPE TO TEE                                                                      category and item number, from.
<<*UT-33*>>222920 14<<-RKR-2305-10LD Long Seam Downstream C-F-1.PT C5.12 UT 45 NDE 3.3.2'NDE 5.4-9 X---03/12/97-PT coaplete, 3/13/97-UT X---complete**UT 33 0 0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION SUNNARY THIRD INTERVAL, SECOND'PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 11 Zone Number: 3-066 Suanary Examination Area Number Identification
database
.ASHE SEC.XI Catgy Exam Item,No Nethod Procedure N I'0 S ONGT T RS'EH A E I 0 E.Remarks T C G N R**Calibration Block**222980 14"-RHR-2305-11LU Long Seam Upstream C-F-1 PT C5.12 UT 45'NDE 3.3-2 NDE 5.4-9 X---03/12/97-PT complete, 3/13/97-UT.--X-complete, beam redirection due to dendretics, inside surface geometry**UT-33*~.223000 14"-RHR-2305-'ll PIPE TO VALVE NOV-3-861A C-F.-1'PT'5.11 UT 45 UT 60 UT 70'DE 3.3'-2 HDE 5.4-9 X-----X---X---X-,03/12/97-PT complete, 3/13/97-UT complete, root geometry, limited volwetric examination due to the valve and,weld crown.configuration, lleld ID'tag in examination area.at.top of pipe*+UT-33**
                                                                                    *4 UT 33 **
0 0 il e: 06/13/97-TURKEY.POINT NUCLEAR PLANT UNIT 3.INSERVICE INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 12 Zone'Number: 3-090 SumMry Examination Area Number Identification ASHE SEC.XI'Catgy Exam.Item No Hethod Procedure N I 0 S'ONGT T R S:E N ,A E I O.E Remarks T C G H R**Calibration Block**274100.8"-SI-.2308-19 ELBOW TO PENETRATION P-11 C-F-1 PT C5.11 iUT 45 UT 60'DE 3.3-14 NDE 5.4-6 X---03/14/97-PT and UT complete, root X---geometry--X-**'UT-41**
219400   PS-54                   F-A     VT-3           NDE 4.3-13         X - - - 03/12/97 - VT-3 complete, light rust DUAL SPRING HANGERS    F1.20C                                            noted on the inside of both spring, cans 219550   RHR PUMP 3P210B                                                           3/12/97 - support is part of building PUHP SUPPORT                                                              structure and is outside the scope of Section XI e
0 II II e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 I HSERVI CE'NSPECTION
 
0 0
Cl
 
e: 06/13/97                                 TURKEY POINT'NUCLEAR PLANT UNIT 3                                                         'Page:    10
                                                      'INSERVICE 'INSPECTION SUHHARY THIRD INTERVAL, SECOND,PERIOD, FIRST OUTAGE         '(9?RF)
                                                    .Class. 2.CBEAR STATUS Coaponents N I    0' Zone Heber: 3-066                   ASHE                                             OHGT SEC.   'XI                                     T RS'EH Surmary Examination Area              Catgy      Exam.                              A E I O'E. Remarks Number  Identification              Item No Hethod                Procedure        T C G H'R <<>> Cal3bration Block                   **
222080   14"-RKR-2305-3LU               C-F-1     PT               HDE 3.3-4         X - - -   03/12/97 -               PT complete,, 3/13/97 - UT Longitudinal Weld              C5.12;UT 45                HDE  5.4      1    X - - -   coaplete
                                                                                                  <<*
UT-33'**'222100 14>>-RHR-2305-3                 C-F,-1   PT               'DE'.3-4             ---X X---       03/12/97 -               PT complete, one acceptable 5.4                      round             indication, 3/13/97. - UT complete PIPE TO VALVE HOV-3-860A      C5 ~ 11  UT 45 UT,  60 HDE            1
                                                                                        --X-
                                                                                        --X-      root geometry, no voiunetric examination
                                                'UT 70                                            from the valve side due to 3ts configuration
                                                                                                  ** UT-33 *>>
222860   .14>>-RKR-2305-10LUI           C-F-1     PT               NDE 3.'3-2         X - - -   03/12/97 -               PT complete, 3/13/9? -   UT Long:Seam Ins3de Radius  of    C5 ~ 12  UT 45            HDE  5.4-9          X - - -   complete Elbow UT 33             **
222880   ,14"-RHR-2305-10LUO           -C-F-1     PT               HDE';3..2         'X - - - 03/12/97                 -. PT complete, 3/13/97 - 'UT Long Seam Outside Radius  of  C5.12    UT 45            HDE 5'.4-9        'X - - - coaplete
        -Elbow
                                                                                                  ** UT             33 **
222900   14"-RHR-2305-10               C-F-1     PT               NDE, 3.3.-2'DE X---
X---       03/12/97 - PT coaplete, 3/13/97 - UT C5.1'1                          5.4-9                    complete, root geometry, limited ELBOM TO PIPE                            UT 45 UT'60                                --X-      volunetric examination due to the weld UT 70                                --X-      crown
                                                                                                  <<* UT-33 *>>
configuration 222920   14<<-RKR-2305-10LD             C-F-1 .PT                   NDE 3.3.2         X - - - 03/12/97 -                 PT coaplete, 3/13/97 -   UT Long Seam Downstream          C5.12 UT 45                'NDE  5.4-9          X - - -   complete
                                                                                                  ** UT             33
 
0 0
 
e: 06/13/97                                     TURKEY POINT NUCLEAR PLANT UNIT 3                                       Page:    11 INSERVICE INSPECTION SUNNARY THIRD INTERVAL, SECOND'PERIOD, FIRST OUTAGE           (97RF)
Class 2 CBEAR STATUS Components N I    '0 Zone Number: 3-066               . ASHE                                           S  ONGT SEC. XI                                       T   RS'EH Suanary Examination Area          Catgy          Exam                            A   E I 0 E   .Remarks Number  Identification            Item,No Nethod                Procedure      T   C G N R   ** Calibration Block **
222980 14"-RHR-2305-11LU           C-F-1         PT             'NDE 3.3-2           X - - -   03/12/97 - PT complete, 3/13/97 - UT.
Long Seam Upstream          C5.12        UT 45            NDE 5.4-9          - - X -   complete, beam redirection due to dendretics, inside surface geometry
                                                                                                  ** UT-33 *~
.223000 14"-RHR-2305-'ll           C- F.-1                           3.3'-2         X---
                                                                                      --X-     ,03/12/97 - PT complete, 3/13/97 - UT PIPE TO VALVE NOV-3-861A
                                            'PT'5.11 UT 45 UT 60 70'DE      HDE 5.4-9
                                                                                      --X-
                                                                                      --X-complete, root geometry, limited volwetric examination due to the valve and,weld crown. configuration, lleld ID UT
                                                                                                'tag in examination area. at .top of pipe
                                                                                                  *+ UT-33 **
 
0 0
il
 
e:   06/13/97-                           TURKEY. POINT NUCLEAR PLANT UNIT 3                                   Page:    12
                                              .INSERVICE INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)
Class 2 CBEAR STATUS Components N I  0 Zone 'Number: 3-090                 ASHE                                   S  'ONGT SEC. XI                               T   R S:E N SumMry Examination Area            'Catgy  Exam.                        ,A   E I O.E Remarks Number  Identification            Item No Hethod        Procedure      T   C G H R ** Calibration Block **
                                                                                  - - - 03/14/97 - PT and    complete, root 274100. 8"-SI-.2308-19 ELBOW TO PENETRATION P-11 C-F-1 PT 60'DE 3.3-14 C5.11 iUT 45 UT NDE 5.4-6 X
X - - - geometry
                                                                                - - X-UT
                                                                                        **'UT-41 **
 
0 II II
 
e: 06/13/97                       TURKEY'POINT NUCLEAR PLANT UNIT 3                                     Page:    13 I HSERVI CE 'NSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 13 Zone Heber: 3-095 Sumery Examination Area Number Identification ASME SEC.XI Catgy Exam Item No.Method P,rocedure N I 0 S ONGT T R'SEH ,A E I 0 E Remarks T C G M R<<*Calibration Block**288506 3-SIN-139 IA INTEGRAL'TTACHMENT
 
,05/13/97-pipe saddle cut back to 1" and abondoned'in place,,removed code category.and Item number from database 288519 4"-SI-2303-31 thru 49 06/05/97-Existing Molds removed'from service during 1997, outage per PC/M 96-012 288520 6"-S1-2306-1 thru 2 06/05/97-'Welds removed-from service during'1997 outage per PC/M 96-012 06/05/97-Boron Injection Tank and support abandoned in place and removed ,from:service during'1997 outage per PC/M 96-012 288522 6"-SI-2307-1 thru 2 06/05/97-Netds removed from service during 1997 outage per.PC/M 96-012 288523 4"-SI-2305-1 thru 11'06/05/97-Nelds removed, from service during 1997 outage per PC/M 96-012 288524 4"-SI.-2303-31 PIPE TO PIPE C-F-1 C5.21 HDE 3.3 HDE 5.4 ,03/24/97-neM veld installed per PC/M'.96-012, FW7**TO BE DETERMINED
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)
*>>
Class 2 CBEAR STATUS Components N I  0 Zone Heber: 3-095           ASME                                   S ONGT SEC. XI                                 T R'SEH Sumery Examination Area      Catgy  Exam                          ,A E I 0 E   Remarks Number  Identification        Item No.Method          P,rocedure    T C G M R   <<* Calibration Block **
0 0 e: 06/13/97 TURKEY''POINT NUCLEAR'PL'AHT UNIT 3'INSERVICE INSPECTION
288506 3-SIN-139 IA                                                             ,05/13/97 - pipe saddle cut back to 1" INTEGRAL'TTACHMENT                                                        and abondoned 'in place,,removed code category.and Item number from database 288519 4"-SI-2303-31 thru 49                                                     06/05/97 - Existing Molds removed 'from service during 1997, outage per PC/M 96-012 288520 6"-S1-2306-1 thru 2                                                       06/05/97 - 'Welds removed-from service during '1997 outage per PC/M 96-012 06/05/97 - Boron Injection Tank and support abandoned in place and removed
                                                                                ,from:service during '1997 outage per PC/M 96-012 288522 6"-SI-2307-1 thru 2                                                       06/05/97 - Netds removed from service during 1997 outage per.PC/M 96-012 288523 4"-SI-2305-1 thru 11                                                   '06/05/97 - Nelds removed, from service during 1997 outage per PC/M 96-012 288524 4"-SI.-2303-31         C-F-1                   HDE 3.3                 ,03/24/97 -   neM veld installed per PC/M PIPE TO PIPE          C5.21                  HDE  5.4                '.96-012, FW7
                                                                                  ** TO BE DETERMINED *>>
 
0 0
 
e: 06/13/97                             TURKEY''POINT NUCLEAR'PL'AHT UNIT 3                                                   Page:.  '14
                                                'INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD'NTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)Cl'ass 2 CBEAR STATUS Components Page:.'14 Zone Number: 3-095 Sunnnry Examination Area Number Identification ASHE SEC;XI Catgy Exam Item Ho Hethod Procedure.H.I 0 S ONGT T RSEH A E I 0 E Remarks T C'G H R**Calibration Block<<*288525 4"-S1-2303-32'IPE TO ELBOW'C-F-1 C5.2'I ,'HDE 3'.3 NDE 5.4 03/24/97-new weld installed'pcr PC/H 96-012, FW8**TO BE OETERHIHED
 
**288533 4"-S1-2303-35 Elbow'to Valve 3-867 C-F-1 C5.21 NDE 3.3 NDE 5.4.03/24/97-ncw weld installed pcr PC/H 96-012*<<TO BE DETERHIHED
THIRD'NTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)
*>>288536 4<<SI 2303 36 Valve 3-867 to Elbow, C-F-1 C5.21 NDE'.3 HDE 5.4 03/24/97-ncw weld installed pcr PC/H 96'-012(FW9'*TO BE DETERHINED
Cl'ass 2 CBEAR STATUS         Components
**9 4"-S1-2303-37 ELBOW TO PIPE C-F-1 C5.21 NDE 3.3:NDE 5.4 03/24/97-new weld installed:per PC/M 96-012, FW10<<<<TO'BE DETERHIHEO
                                                                                        .H. I  0 Zone Number: 3-095                 ASHE                                             S    ONGT SEC; XI                                         T    RSEH Sunnnry Examination Area            Catgy   Exam                                   A   E I 0 E Remarks Number  Identification            Item Ho Hethod            Procedure              T   C'G H R ** Calibration Block <<*
**288542 4"-S1-2303-38'IPE TO ELBOW: C-F-'1 C5.21'NDE 3.3 NDE'5.4 03/24/97-new weld installed per PC/M 96-012(FW11<<<<TO BE DETERHIHEO
288525 4"-S1-2303-32'IPE
**288545 4"-SI-2303-39 ELBOW TO PIPE C-F-1 C5.21 NDE 3.3'NDE 5.4 03/24/97,-new.weld installed per PC/H 96-012, FW12**TO BE DETERHIHED
                                    'C-F-1               ,'HDE         3'.3                     03/24/97 - new weld       installed'pcr PC/H TO ELBOW    C5.2'I                  NDE        5.4                      96-012, FW8
**288548 4"-SI-2303-40 Pipe to Tee C-F-1 C5.21 ,HDE'3.3'NDE 5.4 03/24/97-ncw weld.installed per.'PC/H 96-012, FW14**TO BE DETERMINED,**
                                                                                                  ** TO BE OETERHIHED       **
0 0 e:.06/.13/97'TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION
288533 4"-S1-2303-35                 C-F-1                   NDE       3.3                     .03/24/97 - ncw weld installed pcr       PC/H Elbow 'to Valve 3-867        C5.21                  NDE        5.4                      96-012
                                                                                                  *<<TO   BE DETERHIHED       *>>
288536 4<<SI               2303 36   C-F-1                   NDE'.3                               03/24/97 - ncw weld installed pcr       PC/H Valve 3-867 to Elbow,        C5.21                  HDE        5.4                      96'-012( FW9'*
TO BE DETERHINED       **
9 4"-S1-2303-37                 C-F-1                   NDE       3.3                       03/24/97 - new weld installed:per       PC/M ELBOW TO              PIPE    C5.21                :NDE          5.4                      96-012, FW10
                                                                                                  <<<<TO'BE         DETERHIHEO **
288542 4"-S1-2303-38'IPE C-F-'1               'NDE         3.3                       03/24/97 -       new weld installed per PC/M TO ELBOW:  C5.21                  NDE'5.4                              96-012(   FW11
                                                                                                  <<<<TO   BE DETERHIHEO       **
288545 4"-SI-2303-39                 C-F-1                   NDE       3.3                       03/24/97, - new. weld installed per PC/H ELBOW TO              PIPE    C5.21                'NDE        5.4                      96-012, FW12
                                                                                                  ** TO BE DETERHIHED       **
288548 4"-SI-2303-40                 C-F-1                 ,HDE'3.3'NDE 03/24/97 - ncw weld.installed per.'PC/H Pipe to Tee                  C5.21                              5.4                      96-012, FW14
                                                                                                  ** TO BE       DETERMINED,**
 
0 0
 
e:. 06/.13/97                                         'TURKEY POINT NUCLEAR PLANT UNIT 3                                                 Page:  15 INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)'lass 2 CBEAR STATUS Cocponcnts, Page: 15 Zone'Number 3-095 Stannary Examination Area Number Identification ASHE SEC.XI Catgy Exam Item No Method Procedure N I 0 S'ONGT T RSEH A E I 0 E Remarks T C G H R**Calibration, Block,**288551 4"-SI-2303-41'ee to Pipe C-F-1 C5.21 NDE'.3 NDE 5 4 03/24/97-new weld installed per PC/H 96-012, FM31**TO BE DETERHINED
 
**288554 4<<SI-2303-42'ipe to,valve MOV-3-843A C-F-1 c5.21 NDE 3.3 NDE 5;4 03/24/97-new weld installed per PC/N 96-012, FU30**TO-BE DETERHINED
THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE     (97RF)'lass 2 CBEAR STATUS Cocponcnts, N I            0 Zone 'Number                 3-095                 ASHE                                   S  'ONGT SEC. XI                               T    RSEH Stannary  Examination Area                          Catgy   Exam                           A   E I 0 E           Remarks Number    Identification                            Item No Method        Procedure      T   C G H R           ** Calibration, Block, **
*>>288578 4"-SI-2303-46 TEE TO PIPE C-F-1 SUR C5.21.VOL NDE 3.3 NDE: 5'.4 03/24/97-ncw weld installed per PC/H 96-012, FW15**TO BE DETERNINED
288551   4"-SI             -2303-41'ee C-F-1                 NDE'.3                                 03/24/97 - new weld installed per PC/H to Pipe                    C5.21                NDE 5        4                          96-012, FM31
**'I 4"-Sl-2303-47 PIPE TO,ELB(N C-F-1'UR C5.21 VOL HDE 3.3'DE 5.4 03/24/97-new weld'nstalled per PC/M, 96-012, FN16<<*TO BE DETERNINED
                                                                                                                    ** TO BE DETERHINED **
<<>>.288584 4"-Sl-2303-48 ELBSI TO'IPE'-F-1 SUR C5.21 VOL NDE 3.3 NDE 5.4 03/24/97-new weld installed per PC/H 96-012, FW17**TO BE DETERNIHED'**
288554   4<< SI-2303-42'ipe C-F-1                 NDE   3.3                               03/24/97 - new weld installed per PC/N to,valve    MOV-3-843A  c5.21                NDE  5;4                              96-012, FU30
28S586 8080-H-007-01 IA INTEGRAL ATTACHHENTS 05/13/97-Removed from pipe pcr PC/H 96-012, no longer, performs a support function, removed code category and item neer from database 288587, 4"-SI-2303-49 Pipe to Valve HOV-3-843B C-F-1 PT C5.21 UT NDE 3.3 NDE.5.'4 03/24/97-new, weld installed'per PC/H'96-012, FM25<<>>'O BE DETERHINED
                                                                                                                    ** TO-BE DETERHINED *>>
**
288578   4"-SI-2303-46                             C-F-1 SUR           NDE   3.3                               03/24/97 - ncw weld installed per PC/H TEE TO PIPE                                C5.21. VOL            NDE:  5'.4                              96-012, FW15
0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3'IHSERVICE INSPECTION SUNNARY THIRD'INTERVALED SECOND PERIOD, FIRST OUTAGE,(97RF)~
                                                                                                                    ** TO BE DETERNINED **
Class 2 CBEAR STATUS Components Page: 16'one Number.: 3-095 Stannary Examination Area Number Identification ASNE SEC.XI Catgy Exam Item Ho,'Hethod Procedure N.I 0 ONGT RS EH E I 0 E Remarks C 0 N R**Calibration Block"~288604 8080-R-007-01 DOUBLE'ACT ING'ESTRAINT F-A PT F1.20B HDE 4'.3-20'X---03/15/97-VT-3 complete 288820'080-H-004-01'OUBLE ACTING RESTRAINT F-A VT-3 F1.20B'NDE 4.3-18 X---03/14/97-VT-3 complete 288865 8080-H-007-07 DOUBLE, ACTING RESTRAINT'F-A'VT-3 F1.208 HDE 4.3-17 ,X---03/15/97-VT-3 complete 8 8080-H-007-10 DOUBLE ACTING RESTRAINT F-A'VT-3 F1.208 HDE 4.3-16 X---03/15/97-VT-3 complete 288896 8080-H-005-02 DOUBLE.ACTING,RESTRAINT F-.A, VT-3 F1.208 CR PMA I HDE 4.3-15 97-0485'PH97-03-210 X 03/15/97,-VT-3'complete, bottom lug is, missing, welds, possible drawing discrepancy, accepted as-is by engineering evaluation, drawing will be rev'ised,to show as built condition 288911 8080-H-005-01.
        'I 4"-Sl-2303-47                             C- F-1'UR             HDE   3.3'DE 03/24/97 - new weld'nstalled per   PC/M, PIPE TO,ELB(N                              C5.21  VOL                  5.4                              96-012, FN16
DOUBLE ACTING.RESTRAINT'F-A VT-3.F1'.208 HDE 4.3-19 X---03/15/97-'T-3 complete 0'il e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVI CE INSPECTION'UMMARY THIRD'NTERVALED SECOND PERIOD~F I RST OUTAGE (97RF)~Class 2'CBEAR STATUS Components a Page: '17 ,Zone Number: 3-096'Sugary Examination Area Number Identification
                                                                                                                    <<* TO BE DETERNINED <<>>
'ASME SEC.'I Catgy'Exam Item No:Method Procedure N I 0 S ONG,T T'S*EH A'E I 0 E Remarks T C G.M R**Calibration Block~*289298 SR-123 SINGLE AHD DOUBLE ACTING RESTRAINT F-A VT-3 F1.20ABCR HDE 4.3-4 97-0433---X 03/12/97-VT-3 complete, chipped concrete,.
.288584   4"-Sl -2303-48 ELBSI TO'IPE'-F-1     C5.21 SUR VOL NDE NDE 3.3 5.4 03/24/97 - new weld installed per PC/H 96-012, FW17
accepted as-is by engineering evaluation, drawing will be updated to show.spelled concrete 289301 SR-123 I A INTEGRAL ATTACHMENTS C-C PT C3.20 NDE 3.3-3 X---03/12/97-PT complete 0
                                                                                                                    ** TO BE DETERNIHED'**
e: 06/13/97 TURKEY, POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECTION
28S586   8080-H-007-01 IA                                                                                         05/13/97 - Removed from pipe pcr PC/H INTEGRAL ATTACHHENTS                                                                                    96-012, no longer, performs a support function, removed code category and item neer from database 288587,   4"-SI-2303-49                             C-F-1 PT             NDE   3.3                               03/24/97 - new, weld installed'per PC/H Pipe to Valve HOV-3-843B                  C5.21  UT            NDE  .5.'4                            '96-012, FM25
                                                                                                                    <<>>'O BE DETERHINED **
 
0 e:     06/13/97                               TURKEY POINT NUCLEAR PLANT UNIT 3                                     Page:
                                                          'IHSERVICE INSPECTION SUNNARY THIRD'INTERVALED SECOND PERIOD, FIRST OUTAGE,(97RF)~
Class 2 CBEAR STATUS Components                                               16'one N.I  0 Number.: 3-095                   ASNE                                           ONGT SEC. XI                                       RS EH Stannary      Examination Area            Catgy     Exam                               E I 0 E Remarks Number          Identification            Item Ho,'Hethod           Procedure           C 0 N R ** Calibration Block "~
288604         8080-R-007-01                 F-A     PT             HDE 4'.3-20'X         - - - 03/15/97 - VT-3 complete DOUBLE 'ACT ING 'ESTRAINT    F1.20B 288820'080-H-004-01'OUBLE                   F-A     VT-3           'NDE 4.3-18         X - - - 03/14/97 - VT-3 complete ACTING RESTRAINT  F1.20B 288865         8080-H-007-07               'F-A     'VT-3           HDE 4.3-17         ,X - - - 03/15/97 - VT-3 complete DOUBLE, ACTING RESTRAINT      F1.208 8   8080-H-007-10                 F-A'VT-3                 HDE 4.3-16         X - - - 03/15/97 - VT-3 complete DOUBLE ACTING RESTRAINT      F1.208 288896         8080-H-005-02                 F-.A,   VT-3           HDE 4.3-15               X 03/15/97, - VT-3'complete, bottom lug is, DOUBLE .ACTING,RESTRAINT      F1.208  CR              97-0485                    missing, welds, possible drawing PMA I          'PH97-03-210                discrepancy, accepted as-is by engineering evaluation, drawing will be rev'ised,to show as built condition 288911         8080-H-005-01.               'F-A     VT-3           HDE 4.3-19         X - - - 03/15/97   -'T-3 complete DOUBLE ACTING. RESTRAINT    .F1'.208
 
0' il
 
e: 06/13/97                             TURKEY POINT NUCLEAR PLANT UNIT     3                                 a  Page:    '17
                                          'NTERVALED INSERVI CE INSPECTION'UMMARY THIRD             SECOND PERIOD ~ F I RST OUTAGE (97RF ) ~
Class 2'CBEAR STATUS Components N I    0
,Zone Number: 3-096               'ASME                                         S  ONG,T SEC.'I                                       T'S*EH
'Sugary Examination Area          Catgy 'Exam                                  A 'E I 0 E   Remarks Number  Identification            Item No:Method            Procedure          T C G.M R     ** Calibration Block ~*
289298 SR-123                     F-A     VT-3           HDE 4.3-4             ---X       03/12/97 - VT-3 complete, chipped SINGLE AHD DOUBLE ACTING  F1.20ABCR                97-0433                          concrete,. accepted as-is by engineering RESTRAINT                                                                            evaluation, drawing will be updated to show.spelled concrete 289301 SR-123 I A                 C-C     PT             NDE 3.3-3             X - - - 03/12/97 -     PT complete INTEGRAL ATTACHMENTS      C3.20
 
0 e: 06/13/97                           TURKEY, POINT NUCLEAR PLANT UNIT 3                                       Page:    18 INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL', SECOND PERIOD, FIRST OUTAGE (97RF)Class 2'CBEAR STATUS Components Page: 18 Zone Number: 3-100 Sumury Examination.
 
Area Naker Identification ASME SEC.XI Catgy Exam Item No Hethod S T A-Procedure-T N I 0 ONGT R S, E'N E I 0 E Remarks C G M R**Calibration'Block
THIRD INTERVAL', SECOND PERIOD, FIRST OUTAGE       (97RF)
**301700 26"-HSA-2304-17 PIPE TO VALVE POV-3-2604 C-F-2 HT, C5 F 51: UT 45 UT 60 UT 70 NDE 2.2-3 NDE 5.2-2 X-----X---X---X-03/14/97-HT complete, 3/16/97-UT complete, root geometry, limited volunetric examination from the.valve side due to its configuration
Class 2 'CBEAR STATUS Components N I    0 Zone Number: 3-100               ASME                                       S  ONGT SEC. XI                                     T R S, E 'N Sumury Examination. Area        Catgy    Exam                              A  E I 0 E   Remarks Naker  Identification          Item No Hethod            -Procedure      -T  C G M R   ** Calibration'Block **
<<*UT-2'I**301800 26"-MSA-2304-17LU PIPE LONG SEAH UPSTREAH C-F-2 HT C5.52 UT 45 NDE 2.2-3 NDE 5.2-2 X---03/14/97-HT complete, 3/16/97-UT X---complete**UT-21**
301700 26"-HSA-2304-17           C-F-2   HT,               NDE 2.2-3         X---
0 0 4I e: 06/13/97 r TURKEY POINT NUCLEAR.PLANT UNIT 3 INSERVICE'INSPECTION''SUMHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components.Page: 19 Zone Number: 3-109 Swmary Examination Arear'wher Identification ASHE SEC.XI Catgy Exam Item No Method Procedure N I.0 S 0 N.G,T T RS-EM'E I 0 E Remarks T C G H.R**Calibration
                                                                                --X-       03/14/97 - HT complete, 3/16/97 - UT PIPE TO VALVE POV-3-2604                                5.2-2                    complete, root geometry, limited C5 F 51: UT UT 45 60 NDE
'Block**330500 AUGHENTED EXAMINATION AUG UT FROH NOZZLE.RAHP TO 1 DIAHETER ON ELBOW NDE 5.16-1'-X X 03/13/97-.UT complete, root and chill ring geometry, acceptable"slag
                                                                                --X-
'indication at weld FW1**UT-20(UT-29'~*
                                                                                --X-      volunetric examination from the. valve UT  70                                        side due to its configuration
II e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 INSERVICE,IHSPECTION
                                                                                          <<* UT-2'I **
301800 26"-MSA-2304-17LU         C-F-2   HT               NDE 2.2-3         X - - - 03/14/97 -     HT complete, 3/16/97 - UT PIPE LONG SEAH UPSTREAH  C5.52    UT  45          NDE 5.2-2          X - - - complete
                                                                                          ** UT-21 **
 
0 0
4I
 
e:r 06/13/97                               TURKEY POINT NUCLEAR. PLANT UNIT 3                                   .Page:  19 INSERVICE'INSPECTION''SUMHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)
Class 2 CBEAR STATUS Components N I. 0 Zone Number: 3-109                     ASHE                                   S 0 N.G,T SEC. XI                                T RS-EM' Swmary Examination                    Catgy  Exam                              E I 0 E Remarks Identification Arear'wher Item No Method          Procedure      T C G H.R ** Calibration 'Block **
330500 AUGHENTED EXAMINATION           AUG   UT             NDE 5.16-1'         - X X 03/13/97 -.UT complete, root and chill FROH NOZZLE.RAHP TO 1 DIAHETER                                                    ring geometry, acceptable"slag ON ELBOW                                                                          'indication at weld FW1
                                                                                          ** UT-20( UT-29'~*
 
II e: 06/13/97                                 TURKEY POINT NUCLEAR PLAHT UNIT     3                                     Page:    20 INSERVICE,IHSPECTION  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD,'FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 20 Zone Number: 3-110 Sugary'Examination Area Nunber Identification ASME SEC.XI Catgy Exam Item.'Ho Method Procedure N I 0 S O.NGT T RSEH A E I 0 E Remarks T C G M: R**Calibration Block**330700 14"-FWB-2304-1 VALVE CV-3-2901 TO PIPE C-F-2 MT C5.51 UT 45 UT 60 UT 70 NDE 2.2-1'DE'5.2-1 X---X-----X-X---:03/10/97-MT and UT coeplete, root geometry, limited volunetric-examination on the veld and the valve side due to their configuration
 
**UT 20**331100 14"-FWB-2304-3 PIPE TO ELBOW C-F-2 MT C5.51 UT 45 UT 60 NDE 2.2-2 NDE 5.2-1---'X 03/10/97-MT complete, acceptable X---linear indication, UT complete, backing,--X-ring geometry**UT-20**333800 AUGMEHTED EXAMINATION AUG UT FROM NOZZLE RAMP.TO 1 DIAMETER ON'LBOW NDE 5.16-2--X-03/12/97-UT complete, root and backing ring geometry**UT-20,'UT-29
THIRD INTERVAL, SECOND PERIOD, 'FIRST OUTAGE (97RF)
<<~
Class 2 CBEAR STATUS Components N I    0 Zone Number: 3-110                     ASME                                       S O.NGT SEC. XI                                    T RSEH Sugary'Examination Area                Catgy    Exam                              A E I 0 E Remarks Nunber  Identification                  Item.'Ho Method          Procedure          T C G M: R ** Calibration Block **
0 e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 INSERVICE INSPECTION
330700 14"-FWB-2304-1                   C-F-2   MT             NDE                 X---
X---     :03/10/97 - MT and UT coeplete, root geometry, limited volunetric-examination 2.2-1'DE'5.2-1 VALVE CV-3-2901 TO  PIPE        C5.51  UT 45 UT 60                                --X- on the veld and the valve side due to X---
UT 70                                          their configuration
                                                                                                ** UT 20 **
331100 14"-FWB-2304-3                   C-F-2   MT             NDE 2.2-2           - - -'X 03/10/97 - MT complete, acceptable PIPE TO ELBOW                    C5.51  UT 45          NDE 5.2-1            X - - - linear indication, UT complete, backing, UT 60                                - - X - ring geometry
                                                                                                ** UT-20 **
333800 AUGMEHTED EXAMINATION           AUG     UT             NDE 5.16-2           - - X - 03/12/97 - UT complete, root and FROM NOZZLE RAMP .TO 1 DIAMETER                                                        backing ring geometry ON'LBOW
                                                                                                ** UT-20,'UT-29 <<~
 
0 e: 06/13/97                                 TURKEY POINT NUCLEAR PLAHT UNIT   3                                   Page:,21 INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD ilNTERVAL, SECOND PERIOD,.FIRST OUTAGE'(97RF)Class.2 CBEAR STATUS Components Page:,21 Zone Nwher: 3-111 Swmary Examination Area Number Identification ASME SEC.XI Catgy Exam Item Ho Method Procedure N I~0 S ONGT T RSEK A E I 0 E Remarks T C G,M R**Calibration Block*>>338200'AUGMENTED EXAMINATION AUG UT FROM'NOZZLE RAMP TO.1 DIAMETER OH ELBOW HDE'5.16-3--X'X 03/12/97-UT complete, root and backing, ring geometry, acceptable slag inclusion and Internali undercut<<*UT-20(UT-29<<>>
 
0~'
THIRD ilNTERVAL, SECOND PERIOD, .FIRST OUTAGE '(97RF)
e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 INSERVICE INSPECT I OH  
Class. 2 CBEAR STATUS Components N I~  0 Zone Nwher: 3-111                       ASME                                     S  ONGT SEC. XI                                 T  RSEK Swmary Examination Area                  Catgy   Exam                           A   E I 0 E Remarks Number  Identification                  Item Ho Method          Procedure      T   C G,M R ** Calibration Block *>>
338200 'AUGMENTED EXAMINATION           AUG     UT             HDE '5.16-3         - - X'X 03/12/97 - UT complete, root and FROM'NOZZLE RAMP TO .1 DIAMETER                                                      backing, ring geometry, acceptable slag OH ELBOW                                                                              inclusion and Internali undercut
                                                                                              <<* UT-20( UT-29 <<>>
 
0
~ '
 
e: 06/13/97                                   TURKEY'POINT NUCLEAR PLANT UNIT 3                                       Page:            22 INSERVICE INSPECT I OH  


==SUMMARY==
==SUMMARY==
THIRD INTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)Class 2 CBEAR STATUS Components Page: 22 Zone Nwher: 3-115'ugary Examination.
Area Nunber Identification ASME SEC.XI Catgy Exam'Item No Method Procedure N I 0'S ONGT T RS'EH A'E I 0 E Remarks T C G M R>>>>Calibration Block**341200 3-RHE-A1 HEAD TO SHELL'-A UT, 45'C1.20 UT 60 NDE 5.4-7 X---03/15/97-UT complete, limited X---examination due to nozzles and reinforcement plates**UT 55**341300 3-RHE-A2 SHELL TO FLANGE C-A UT 45 C1.10 UT 60 NDE 5.4-7 X---03/15/97-UT complete, limited X---examination due to nozzles and reinforcement plates*>>UT;55**341800 3-RHE.-A7 C-B PT REINFORCEMENT PLATE TO SHELL C2.31'NDE 3.3.1B X---03/15/97-PT complete 0 3-RHE-AB C-B PT.REINFORCEMENT PL'ATE TO NOZZLE C2;31 NDE 3.3-18 X---03/15/97-PT complete 342000'-RHE-A9 C-B PT REINFORCEMENTi PLATE TO SHELL C2.31 NDE 3.3-.17 X,---03/15/97-"PT complete 342100'3-RHE-A10 C-B PT REINFORCEMENT PLATE TO NOZZLE C2.31'DE 3.3-17 X---03/15/97-PT complete 342400 3-RHE-SPA-1 SUPPORT Heat Exchanger Lo~er Support F-A VT-3 F1.40H NDE 4.3.,11',X
---03/12/97-,VT-3 complete 342500 3-RHE-SPA-2,IA Integral Attachment C-C PT.C3.10 CR VT-1 NDE 3.3-9 97-0479 NDE 4.1-6---X X---03/15/97-PT complete, one rejectabie round indication, engineering evaluation determined cover weld on partial penetration weld was not conpietely around end.of lug', 3/19/97-VT-1'omplete, examination performed to docunent final condition


e:.06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 INSERVICE,INSPECTION
THIRD INTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)
Class 2 CBEAR STATUS  Components N  I  0 Zone  Nwher:                            ASME                                      'S  ONGT 3-115'ugary                SEC. XI                                    T  RS'EH Examination. Area              Catgy    Exam                            A 'E  I 0 E Remarks Nunber  Identification                'Item  No Method          Procedure        T  C G M  R>>>> Calibration  Block **
341200  3-RHE-A1 HEAD TO SHELL'-A        'C1.20 UT, UT 45 60 NDE 5.4-7            X X
                                                                                          - - -
                                                                                          - - -
03/15/97 - UT complete, limited examination due to nozzles and reinforcement plates
                                                                                                ** UT  55 **
341300  3-RHE-A2                          C-A    UT 45          NDE 5.4-7            X  - - - 03/15/97 - UT complete, limited SHELL TO FLANGE                  C1.10  UT 60                                X  - - - examination due to nozzles and reinforcement plates
                                                                                                *>> UT;55 **
341800  3-RHE.-A7                        C-B    PT            'NDE 3.3.1B          X  - - - 03/15/97 -  PT complete REINFORCEMENT PLATE TO SHELL      C2.31 0  3-RHE-AB                          C-B    PT.            NDE 3.3-18          X  - - - 03/15/97 -  PT complete REINFORCEMENT PL'ATE TO NOZZLE    C2;31 342000'-RHE-A9                            C-B    PT              NDE 3.3-.17          X, - - - 03/15/97 -"PT complete REINFORCEMENTi PLATE TO SHELL    C2.31 342100  '3-RHE-A10 REINFORCEMENT PLATE TO NOZZLE    C2.31'DE C-B    PT                  3.3-17          X  - - - 03/15/97 -  PT complete 342400  3-RHE-SPA-1 SUPPORT              F-A    VT-3            NDE 4.3.,11',X          - - - 03/12/97 -,VT-3 complete Heat Exchanger Lo~er Support      F1.40H 342500  3-RHE-SPA-2,IA                    C-C    PT.            NDE 3.3-9            ---X    03/15/97 -  PT complete, one rejectabie Integral Attachment                                      97-0479                      round indication, engineering evaluation
                                                                                          - --
C3.10  CR VT-1            NDE 4.1-6            X        determined cover weld on partial penetration weld was not conpietely around end.of lug', 3/19/97 -
examination performed to VT-1'omplete, docunent final condition
 
e: .06/13/97                                 TURKEY POINT NUCLEAR PLANT UNIT 3                                     Page 23 INSERVICE,INSPECTION  


==SUMMARY==
==SUMMARY==
THIRD'NTERVAL, SECOND PERIOD;FIRST OUTAGE (97RF)Class 2 CBEAR STATUS Components Page 23 Zone Number:, 3-115 Suwery Examination Area Number Identification.ASME SEC.XI Catgy Exam Item'No Method Procedure N I 0''NGT T RSEH A E,I 0 E Remarks T O'G M R**Calibration Block**342600 3-RHE-SPA-2
 
'SUPPORT Heat Exchanger.
THIRD'NTERVAL, SECOND PERIOD; FIRST OUTAGE (97RF)
Lower Support F-A VT-3 F1.40H, ,NDE 4.3-10 X---03/12/97-VT-3 complete  
Class 2 CBEAR STATUS Components N  I Zone Number:, 3-115 0''NGT
~~~i5~il 0 TUR I NT;p'J NRC/FPL ENGINEERING INTERFACE MEETING JULY 15, 1SS7 il~il~il~  
                                      .ASME SEC. XI                               T  RSEH Suwery Examination Area                Catgy   Exam                         A  E,I 0 E     Remarks Number  Identification                Item'No Method          Procedure      T   O'G M R     ** Calibration Block **
@PL ENGINEERING DEPARTMENT AGENDA INTRODUCTION
342600 3-RHE-SPA-2 'SUPPORT           F-A     VT-3         ,NDE 4.3-10         X - - -       03/12/97 - VT-3 complete Heat Exchanger. Lower Support  F1.40H,
-PLANT INDICATORS
 
-ENGINEERlNG ORGANIZATION R.S.KUNDALKAR TURKEY POlNT ENGINEERING ORGANIZATION SAFETY SYSTEM PERFORMANCE SYSTEM ENGINEERING ROD CONTROL SYSTEM ENHANCEMENTS CCW HEAT EXCHANGERS EFFECTIVE USE OF PSA OUTAGE SUPPORT E.A.THOMPSON D.J.TOMASZEWSKI PLANT ENGINEERING 50.54(f}RESPONSE DRAFT NUREG'1 606 SOFTWARE CONTROL SAFETY/RELIABILITY UPGRADES W.A.SKELLEY ST.LUClE ENGINEERING ORGANIZATION SAFETY SYSTEM PERFORMANCE SOFTWARE CONTROL C.R., BIBLE REACTIVITY MANAGEMENT CONTROL ROD PERFORMANCE SAFETY/RELIABILITY, IMPROVEMENTS 50.54(f}RESPONSE C.A.PELL J.R.'HOFFMAN'R.S.iKUNDALKAR rrcl.wpd Page 1 il~i IS)  
~ ~~
~~g 0~~F~~~1 C Cg C C''C C C C'C r C C C C~C~C'~C~P~'~~~C~0 C P C~~
i5~
0 ili FPL ENGINEERING DEPARTMENT U%7 CAPABIUTY FACTOR TURKEY POINT P YR RUNNING AVERAGE+1997 AVG-THROUGH MAYJ 90;80a 75:-'',:,;34
il 0
+i3~~4+5~70 1994 1995 1996 1997 02GIG UNITS~'UNIT4 INDUSTRYAVG WANOYR2000GOAL 90--" UNIT CAPABILITY FACTOR ST.LUCIE (S YR RUNNINQ AVERAGE'+1997 AVQ1HROUQH MAY)W H W%W%W&W 0 Q~~4i 75-'(Qk'j'g 70 1994 1995 wg~yge'll 1996 1997 G 322--.G UNIT l~UNIT2 INDUSl1lYAVG WANOYR2000GOAI Page 3  
 
~~Oi APL ENGINEERING DEPARTMENT 1.75 1.5 1.25 UNPLANNED'AUTO TRIPS PER 7000 HOURS CRITICAL TURKEY POINT YR RUNNING AVERAGE+1997 AVG THROUGH MA 0.75 0.5 0.25 0'.': ke?@1994 1995 1996 1997 UNIT 3~UNIT 4 INDUSTRY AVG~WAND YR 2000 GOAL 1.75 1.5 1.25 0.75 0.5 4k',:gg UNPLANNED AUTO TRIPS PER 7000 HOURS CRITICAL ST.LUCIE YR RUNNING AVERAGE+1997AVGTHROUGH MA RGB)322)+$
TUR       I NT
~~~~'33(2423I;fi~a N4%~~9 k%~N+I"'c'!I2 Awe;5?$4<, 1994 1995 1997'SS.UNIT4~SS UNIT2 INDUSTRYAVG WANOYR2000GOAL Page 4 ik i il~
                              ;p' J
EPL ENGINEERING DEPARTMENT 101 j'O';'Aj, Qjh@jgh g~+>p (jPQk,.'00
NRC / FPL ENGINEERING INTERFACE MEETING JULY 15, 1SS7
--"'9--Si I l 98---'1 97.I THERMAL PERFORMANCE
 
.TVRKEY-POINT It12 MONTH RUNNING AVERAGE)1~>,%'4~%>>95 1994 1995 1996 1997~~~AS UNITS~mc UNIT 4.INOUSTRYAVG WANQ YR 2000 GOAL 101 THERMAL PERFORMANCE ST.LVCIE (12 MONTH RUNNINQ AVERAGE)100----99 I 98-I 1 97"---'96:.95: 1994 , m".11~~~'~~4l!1995%4m, S 1996 V.(i'c'ii&piki4h 1997~>>:" UNIT I~UNIT2 INOUSTNYAVG i WANQ YR 2000 GOAL Page 5 0 Oi  
il~
'~~g 0.4,a~h~.g~.oy f,y.ah+(i4glt lp i+,.-.a.f,()i\III il 0 Oi  
il~
+op TURKEY POINT ENGINEERING DEPARTMENT P(P+T Q TURKEY POINT'ENGINEERING ORGANIZATION p KA.THOMPSON J.BALAGUERO PLANT OPS SUPPORT E.LYONS ADIIINIYTRAYIVE W.SKELLEY PIANT ENOWEERWO D.TQMASZEWSIQ SYSTEMS ENOWEERWQ K;REMINQTON , SYS PERFORMANCE D.BAKER DESKIN BASS SUPV P.BANASZAK ELB4SC SYSTEMS RX ENO B.OUNN MECH SYSIENS J.CAOOOAN llECH DESKN Q.KUHN PROC ENGR T.SWEENEY MC DESKN+FIRST LINE SUPERVISORS HAVE OVER 12 YEARS EXPERIENCE
il~
+SYSTEM AND COMPONENT SUPERVISORS ARE SRO CERTIFIED Af Cp'th.Wpd Page 7 ii<I~
 
Pop+oi OgGSSr+TURKEY POINT ENGINEERING DEPARTMENT UNIT 3 SAFETY IN JECTION AVAILABILITY
ENGINEERING DEPARTMENT
,(18 MONTH CUMULATIVE AVERAGE)~SASI~.SSSI PERFORMANCECRITERIA WANOYRS000GOAIS AVAILABIUTY (4/e)100%SS%S&%97%96%95%12-95 02-96 04-96 06-96 0&-96 10-96 1248'2-97 04.97 UNIT a SAFETY INJECTION AVAILABILITY (18 MONTH CUMULATIVE AVERAGE)4A Sl~40 Sl-PERFORLIANCE CRITERIA'ANG YR 0000 GOALS AVAILABlLAY (44()100%I 99%98%S7%96%950/i 12-S5'2-S6 04-96 06-96 08-96 10-S6 12-S6 02-97 M'NSPTILWPG Page 8 0 lli Dog+ao~o>ear e TURKEY POINT ENGINEERING DEPARTMENT UNIT,3 EDG AVAILABILITY (18 MONTH CUMULATIVE AVERAGE)~BA EOG~, 88 EOG-PERFORMANCE CRITERIA WANG YR 2000 GOALS AVAILABIIJTY 100%'99%88%97%96%S5%94%S3%92%91%90%01-96 03-96 05-96 07-96 09-96 11-96 01-97 03-97 05-97 Note: SB EDG placed In a(1)2@6;returned to a(2)11/86.UNIT 4 EDG AVAILABILITY (18 MONTH CUMULATIVE AVERAGE)~4A EOG~48 EM PERFORMANCE CRITERIA WANG YR 8000 GOALS AVAILABILITY 100%9S%SS%97%96%85%94%93%82%91%808le.I 01-96 03-86 05-86 07-96 09-M 11-96 01-97'3-97 05-97 LVCOLn.WOd Page 9 ili O~r~4'URKEY POINT ENGINEERING DEPARTMENT EMERGENCY FEEDWATER AVAILABILITY (1 8 MONTH CUMULATIVE AVERAGE)AVAlLABlUTY 100%ss/88%87%,86%85%84/.93%820/i 81%80%('/0)KRRHI U3 TRAIN A~USTRAINS-PERFORMANCE CRITERIA WANG YR 2000 GOALS 01-96'3-96 05.96 07~SH}6 1146 01~0347 0$47 EMERGENCY FEEDWATER AVAILABILITY (16 MONTH CUMULATIVE AVERAGE)AVAILABIUlY 100%99%S8'/0 97%960/i 950/0 S4%93%820/0 91%80%~U4TRAINA~U4TRAIN8-PERFORMANCE CRITERIA: WANOYR2000GOALS 01-96 03-96 05-96 07-96 09-96 1'1-97 084'5-97 Page 10 0 ill Q~r>op Op TURKEY POINT ENGINEERING DEPARTMENT
            @PL AGENDA INTRODUCTION                               R.S. KUNDALKAR
+a ao clear~ROD CONTROL SYSTEM ENHANCEMENTS.
          - PLANT INDICATORS
+-SYSTEM EVENT  
          - ENGINEERlNG ORGANIZATION TURKEY POlNT ENGINEERING ORGANIZATION               E.A. THOMPSON SAFETY SYSTEM PERFORMANCE SYSTEM ENGINEERING                   D.J. TOMASZEWSKI ROD CONTROL SYSTEM ENHANCEMENTS CCW HEAT EXCHANGERS EFFECTIVE USE OF PSA OUTAGE SUPPORT PLANT ENGINEERING                    W.A. SKELLEY 50.54(f} RESPONSE DRAFT NUREG '1 606 SOFTWARE CONTROL SAFETY / RELIABILITYUPGRADES ST. LUClE ENGINEERING ORGANIZATION               C.R., BIBLE SAFETY SYSTEM PERFORMANCE SOFTWARE CONTROL REACTIVITY MANAGEMENT                  C.A. PELL CONTROL ROD PERFORMANCE SAFETY / RELIABILITY,IMPROVEMENTS     J.R. 'HOFFMAN 50.54(f} RESPONSE
                                                'R.S. iKUNDALKAR rrcl.wpd                           Page 1
 
il
~ i IS)
 
                                            ~   g 0
                                      ~
                          ~       ~  F ~   ~
                          ~ 1 C Cg     C C C C''C                 C
                                  '                             C   r C     C C     C
          ~   C
                                                    ~   C
                                                              '
                                                          ~C     ~
P~ '                     ~     ~
                                ~   0 C             P     C
                                                        ~      ~
        ~   C
 
0 ili
 
ENGINEERING DEPARTMENT FPL U%7 CAPABIUTYFACTOR TURKEY POINT P YR RUNNING AVERAGE+ 1997 AVG -THROUGH MAYJ 90; 80a                                                       :-'',:,;34
                                                            +i3~~4+5~
75 70 1994                 1995                       1996             1997 02GIG     UNITS~'UNIT4                 INDUSTRYAVG             WANOYR2000GOAL UNIT CAPABILITYFACTOR ST. LUCIE
                                              '+
(S YR RUNNINQ AVERAGE 1997 AVQ1HROUQH MAY) 90  -"
W H W   %   W % W & W   0 Q   ~
          ~4i 75   '   (Qk'j'g                                       wg~yge'll 70
                      ~
G 1994                  1995                        1996             1997 322--.G UNIT l         UNIT2           INDUSl1lYAVG               WANOYR2000GOAI Page 3
 
~ ~
Oi
 
ENGINEERING DEPARTMENT APL UNPLANNED'AUTO TRIPS PER 7000 HOURS CRITICAL TURKEY POINT YR RUNNING AVERAGE+ 1997 AVG THROUGH MA 1.75 1.5 1.25 0.75 0.5 0.25
        '. ': ke?@
0 UNIT 3     ~
1994 UNIT 4 1995 INDUSTRY AVG 1996
                                                                      ~
1997 WAND YR 2000 GOAL UNPLANNED AUTO TRIPS PER 7000 HOURS CRITICAL ST. LUCIE YR RUNNING AVERAGE+1997AVGTHROUGH MA 1.75 1.5 1.25 4k',:gg                  RGB)322)+$   ~ ~ ~~   '33( 2423I;fi ~a N4%~~9 0.75                                                                            ; 5?$4<,
                                                        'c'!
k%~N+I" I2 0.5 Awe 1994                     1995                                           1997
                  ~SS   UNIT2             INDUSTRYAVG                 WANOYR2000GOAL       'SS.UNIT4 Page 4
 
ik i
il~
 
ENGINEERING DEPARTMENT EPL THERMAL PERFORMANCE
                                                        . TVRKEY-POINT It12 MONTH RUNNING AVERAGE) 101 1~>, %'4~%>>
Si
              "'9 I        j'O';'Aj, 98 --'
l Qjh@jgh g~+>
(jPQk,.'00 1
97    .
I p
95 1994                  1995                        1996               1997
      ~
            ~~AS                 UNITS ~mc UNIT 4               .INOUSTRYAVG             WANQ YR 2000 GOAL THERMALPERFORMANCE ST. LVCIE (12 MONTH RUNNINQ AVERAGE) 101 100 99
                                                    , m".11 98 I I
97 "---'
1
                                              ~~~'~~4l!
96:      .                                                                                        V.(i'c
                                                                                                'ii&piki4h
                                                                          %4m, 95:                                                                                  S
      ~>>:" UNIT I 1994
                                      ~   UNIT2 1995 INOUSTNYAVG 1996              1997 i WANQ YR 2000 GOAL Page 5
 
0 Oi
 
                          '
                            ~ g 0
                        ~
    .4,a~ h~.
g~.oy   f,y.
ah+( i4glt lp i+
,.-.a
  . f,()i         \ III
 
il 0
Oi
 
                      +op TURKEY POINT ENGINEERING DEPARTMENT P(P+T   Q TURKEY POINT'ENGINEERING ORGANIZATION p
KA. THOMPSON J.BALAGUERO           E. LYONS                     W. SKELLEY     D. TQMASZEWSIQ PLANT OPS SUPPORT    ADIIINIYTRAYIVE              PIANTENOWEERWO  SYSTEMS ENOWEERWQ K; REMINQTON                                         D. BAKER        P. BANASZAK
              , SYS PERFORMANCE                                   DESKIN BASS SUPV   ELB4SC SYSTEMS B. OUNN RX ENO MECH SYSIENS J. CAOOOAN           Q. KUHN llECH DESKN         PROC ENGR T. SWEENEY MC DESKN
        +   FIRST LINE SUPERVISORS HAVE OVER 12 YEARS EXPERIENCE
        +   SYSTEM AND COMPONENT SUPERVISORS ARE SRO CERTIFIED AfCp'th.Wpd                                       Page 7
 
ii
<I~
 
Pop TURKEY POINT ENGINEERING DEPARTMENT
+ OgGSSr + oi UNIT 3 SAFETY INJECTION AVAILABILITY
                              ,(18 MONTH CUMULATIVEAVERAGE)
~         SASI~.SSSI AVAILABIUTY(4/e)
PERFORMANCECRITERIA          WANOYRS000GOAIS 100%
SS%
S&%
97%
96%
95%
12-95   02-96     04-96     06-96   0&-96   10-96   1248'2-97     04.97 UNIT a SAFETY INJECTION AVAILABILITY 4A Sl AVAILABlLAY
                  ~
(44()
40 Sl (18 MONTH CUMULATIVEAVERAGE)
PERFORLIANCE CRITERIA       'ANG YR 0000 GOALS 100%
I 99%
98%
S7%
96%
950/i 12-S5 '2-S6       04-96     06-96   08-96   10-S6 12-S6 02-97 Page 8 M'NSPTILWPG
 
0 lli
 
Dog TURKEY POINT ENGINEERING DEPARTMENT
          + o>ear e ao~
 
UNIT,3 EDG AVAILABILITY
            ~
AVAILABIIJTY BA EOG   ~,       (18 MONTH CUMULATIVEAVERAGE) 88 EOG           PERFORMANCE CRITERIA                     WANG YR 2000 GOALS 100%
                  '99%
88%
97%
96%
S5%
94%
S3%
92%
91%
90%
01-96 03-96     05-96     07-96       09-96       11-96       01-97   03-97   05-97 Note: SB EDG placed In a(1) 2@6; returned to a(2) 11/86.
UNIT 4 EDG AVAILABILITY
        ~ ~     4A EOG AVAILABILITY 48 EM (18 MONTH CUMULATIVEAVERAGE)
PERFORMANCE CRITERIA                       WANG YR 8000 GOALS 100%
9S%
SS%
97%
96%
85%
94%
93%
82%
91%
808le.                                                                                       I 01-96   03-86     05-86     07-96       09-M         11-96       01-97'3-97       05-97 LVCOLn.WOd                                           Page 9
 
ili O
  ~ r~
4'URKEY                 ENGINEERING DEPARTMENT POINT EMERGENCY FEEDWATER AVAILABILITY
                                                            ~
(1 8 MONTH CUMULATIVEAVERAGE)
AVAlLABlUTY('/0)
 
KRRHI U3 TRAIN A PERFORMANCE CRITERIA USTRAINS WANG YR 2000 GOALS 100%
ss/
88%
87%
        ,86%
85%
84/.
93%
820/i 81%
80%
01-96'3-96       05.96     07~     SH}6   1146   01~     0347 0$ 47 EMERGENCY FEEDWATER AVAILABILITY
                                                            ~
(16 MONTH CUMULATIVEAVERAGE)
                        ~      U4TRAINA PERFORMANCE CRITERIA:
U4TRAIN8 WANOYR2000GOALS AVAILABIUlY 100%
99%
S8'/0 97%
960/i 950/0 S4%
93%
820/0 91%
80%
01-96   03-96     05-96     07-96   09-96   1'1-97         084'5-97 Page 10
 
0 ill
 
                      >op Op TURKEY POINT Q
                ~r                    ENGINEERING DEPARTMENT
            +a clear ~ao ROD CONTROL SYSTEM ENHANCEMENTS.
        +   -
SYSTEM EVENT  


==SUMMARY==
==SUMMARY==
., OCTOBER 1995 TO MARCH 1997 7 UNIT 3 EVENTS 4 FORCED OUTAGES 3 EVENTS INITIATED BY DROPPED RODS NO UNIT 4 EVENTS MAY 1995 THROUGH DECEMBER 1995 UNIT 3 ROD CONTROL ROOM A/C DEGRADED AIR HANDLER OBSOLETE AND INACCESSIBLE
.,
~EXTENSIVE INVESTIGATION FOLLOWING EVENTS SYSTEM TESTING CONDUCTED NO COMMON PROBLEMS IDENTIFIED
OCTOBER 1995 TO MARCH 1997 7 UNIT 3 EVENTS 4 FORCED OUTAGES 3 EVENTS INITIATED BY DROPPED RODS NO UNIT 4 EVENTS MAY 1995 THROUGH DECEMBER 1995 UNIT 3 ROD CONTROL ROOM A/C DEGRADED AIR HANDLER OBSOLETE AND INACCESSIBLE
+CAUSE PRINTED CIRCUIT CARD FAILURES DUE TO HIGHER AMBIENT ROOM TEMPERATURES DURING 1995 nrcptn.wpd Page 11 0 i ii) 0~~g P~~~~~~~~
              ~       EXTENSIVE INVESTIGATION FOLLOWING EVENTS SYSTEM TESTING CONDUCTED NO COMMON PROBLEMS IDENTIFIED
iN i~~  
        +     CAUSE PRINTED CIRCUIT CARD FAILURES DUE TO HIGHER AMBIENT ROOM TEMPERATURES DURING 1995 nrcptn.wpd                                   Page 11
~lee Pyg+o oo~+o(Jgg g TURKEY POINT ENGINEERING DEPARTMENT.
 
0 i
ii)
 
0
                    ~ g P
                ~
    ~ ~ ~ ~ ~ ~
~ ~
 
iN i
~ ~
 
  ~lee Pyg TURKEY POINT ENGINEERING DEPARTMENT.
  +o+o(Jgg goo~
ROD CONTROL SYSTEM ENHANCEMENTS
ROD CONTROL SYSTEM ENHANCEMENTS
+CORRECTIVE ACTIONS~RESET ROOM TEMPERATURE ALARM FROM 102 F TO 75 F ROOM AIR HANDLER REPLACED 0 VERIFICATION OF THE ROD CONTROL SYSTEM OPERATION:
+   CORRECTIVE ACTIONS
POWER SUPPLIES LOGIC CABINET TIMING DYNAMIC TESTING~REPLACED EXISTING FIRING CARDS FORCED COOLING ADDED TO POWER CABINETS DYNAMIC'TESTING AT EXPECTED ELEVATED TEMPERATURES REPLACED SELECTED COMPONENTS DC HOLD CABINET+CORRECTIVE ACTIONS COMPLETED ON UNIT 3 IN SPRING, 1997 REFUELING OUTAGE~NO EVENTS SINCE RESTART+CORRECTIVE ACTIONS PLANNED FOR UNIT 4 1997 FALL OUTAGE Page 13 il~i "I I T (((0 I I'$'I j j,><(i((, j<<il (iii::<4 I((I f I.<<+6 4 I~-.(i'<1 ,I<~!(III.II gl I I I;;441LN..~4J IIIII."'!, II'R (Iig'Ig~(<it cI Ni (f~jh (((4 l gt I ,'ll, (~1;l I g3'..('4*~I~<jg:I I~"~I f<I 4~<(~<~'(~v<<!I W~~~~wiL;j<'.f'((4 II II V l~, j (~Wf!Ii i((PQ~I''(e~II I I'I gi<Q((tA 4f'v,~teak f4'!PP!++.~j ,=~~A~Vi'jI!444(~I l gii)I Ilj r."<<3 (I I Ti I(l g p I<<i II<I I S I'(p',<(4 I 0 iS~il~  
    ~     RESET ROOM TEMPERATURE ALARM FROM 102 F TO 75 F ROOM AIR HANDLER REPLACED 0     VERIFICATION OF THE ROD CONTROL SYSTEM OPERATION:
~<*IW'1 1 I~~1 1~'((~~" r I IC 5~~(rrr'I j~I~I~'I~C~C$1*(r 1 I t I s (,)~Lgd6((<<<~
POWER SUPPLIES LOGIC CABINET TIMING DYNAMICTESTING
~I (j' ill UNIT 3~dr f.;~'~Tip UNIT 4=x F~F 0~~
    ~     REPLACED EXISTING FIRING CARDS FORCED COOLING ADDED TO POWER CABINETS DYNAMIC'TESTING AT EXPECTED ELEVATED TEMPERATURES REPLACED SELECTED COMPONENTS DC HOLD CABINET
e~co~>op Op+o~TURKEY POINT ENGINEERING DEPARTMENT CCW HEAT EXCHANGER IMPROVEMENTS CCW HEAT EXCHANGER FOULING FACTOR IMPROVEMENT
+   CORRECTIVE ACTIONS COMPLETED ON UNIT 3 IN SPRING, 1997 REFUELING OUTAGE
+COMPREHENSIVE PERFORMANCE TESTING PROGRAM TO ENSURE CAPABILITY OF REMOVING DESIGN BASIS HEAT LOAD+FREQUENT TESTING, TRENDING AND CLEANING OF CCW HEAT EXCHANGERS WAS REQUIRED:~TESTING AT LEAST WEEKLY~CLEANING AT LEAST ONE HEAT EXCHANGER/UNIT WEEKLY~CLEANING SIGNIFICANTLY MORE OFTEN DURING SUMMER+UPRATING,EFFORT TARGETED IMPROVING THE MAXIMUM ALLOWABLE FOULING FACTOR OF CCW HEAT EXCHANGERS 0~IVIASS&.ENERGY RELEASES RECALCULATED CONTAINMENT RESPONSE RECALCULATED
    ~     NO EVENTS SINCE RESTART
~CCW THERMAL HYDRAULIC CASES RECALCULATED, HIGHER ALLOWABLE FOULING FACTOR ASSUMED'PIPING STRESSES AND SUPPORT LOADS ASSESSED~MODIFICATIONS IMPLEMENTED ECC AUTO-START MODIFICATION CCW PIPE SUPPORTS UPGRADE ON UNIT 4+CHANGES RESULTED'IN SIGNIFICANTLY REDUCED FREQUENCY FOR HEAT EXCHANGER CLEANING~REDUCED CLEANING FREQUENCY FROM ONCE PER WEEK TO ONCE'EVERY 6 WEEKS~REDUCES"WEAR" ON TUBES DUE TO CLEANING+OTHER RELATED INITIATIVES
+   CORRECTIVE ACTIONS PLANNED FOR UNIT 4 1997 FALL OUTAGE Page 13
~IMPROVED TESTING METHOD~'RETUBED UNIT 3 CCW HEAT EXCHANGERS Page 17 0 45~~i iso/0+o eo ofotrr+TURKEY POINT ENGINEERING DEPARTMENT PSA AND ON LINE ACTIVITIES
 
+PSA TECHNOLOGY USED IN PLANT ON LINE MAINTENANCE
il
~RISK SIGNIFICANT EQUIPMENT/COMPONENT LIST,~MULTIPLE COMPONENT MATRIX~GUIDELINES FOR WHEN PSA SHOULD BE USED~ON LINE MONITOR IN TRIAL USE 0 ADM-210 On-Une Malntcnaneei Wortt Coordination ATI'ACHhf ENT S fpagc l of 3)RISK SIGNIFICANT EQUIPMENT ILST'Dte folio win exceeding PSA thc following tt sted as flat duration of up to ABowed OOS Tllne Accumulator A Accumulator B Accumulator C g Tce)micd Spccificatitm components have each been cvdu risk limits when mnovcd from service individually for a mes for Mode I oecautions.
~i
AFW Pump A I2 Ttshts digaed)AFW Pump B I2 Trsias aligaed)AFW Pump C f2 Trains aligned)AFW Train I AFW Trdn 2 Botic Acid-BAST to Charging CCW Pump A CCW Pump B CCW Pump C Containment Spray Pump A Containment Spay Pump B ECC A ECC B ECC C EDG B Opposuc Unit EDG A 0 ite Unit EDG 8 30 days 30 days 30 days 72 hts 30 days 30 days 30 days 72 hrs 72 hrs mcptn.wpd Page 18 0 O~IS~
 
e~c>o f'o/Ots O 44 OJ4C T TURKEY POINT ENGINEERING DEPARTMENT PSA AND ON LINE ACTIVITIES 0-ADM-210 IOCCCXXO TC4l On-Line Maintenance/
0                                   I
Work Coordination POOL'7 APpvovtr Oxloc I/14/97 DUAL COMP8lHNS IN-KE hVh5k5NNCE MATRIX Tae Tall teaewss owwwwa el t eeeavws ossa ao soaewa ow wwe~awasawr sa ewwww la tt oaN aeaaa cess oaoetvte xxxx w t oalsaatw essa oaal eeet waotN oNI saws ateasaav slap os ew aellalee ael leave stilt aw NNAAN or IvIAC cela elva~e easer Isetosw seasasas er t etarwtaee aoaa ease aea laewee oaa wws~oe so so tt aaeo ete sswsteae os oa AN scatww aa eo lw taws lw sN etatwwa Tls aoatw ase d es NN 4 oll ol w ttNA QC tatto TVta AC Uel St 4 ATW FCV olWI lit 4W C TTITLt ATTV IIWAO A Q Tlsw AOOAet)AFW tvaO~n TNew ATW T4enp ATW C C Tloes TNII Axttwxr I AtxV Tlaa t Ataaawa 4 tsataava C Aow scvatealTWH, t ASW saw A IT'I vs A AIW Otas 4 rtvs Car~XXXX ASW lvs t t saws sat voa t all set sel'ltw~eetatwaaor v Ctw I~A CCW V 1~CCW V'I C CCW A CCw ww 4 CCW Iaset C Cw lots~Cw law as~Oaw OIN I tOOA TOO O~IW A tOO~vv 4 eoo l sow cesw A tw CAW Cwa 4 1 1XX~Ios A teal eo owov s Itv~INN Icw a ICW~~cwccwovw a was ICwCCWOvw 4 awa vtsvws st Ctver IA Cattetsl lot CO sxa Ia~CO la~arv lass asov.lass vovaasl vovealo xxxx xxxx XXXX XXXX XXXX atavess~OAVVs~claws~sas svN a wa svw o~s<<av ss o lava a 4 avast lwvasw~vw Isa oeasav Isle A'l I~BATVdVbvC)I XXX XXXX XXX1 IVCOTIIAVOd Page 19 il ill
                                                                                              <<+6
~cICo>oI 4p L3 rr TURKEY POINT ENGINEERING DEPARTMENT OUTAGE SUPPORT PREPLANNING EARLY MODIFICATION IDENTIFICATION AND ISSUANCE SAFE ON-LINE MAINTENANCE EFFECTIVE PSA USAGE HIGH EQUIPLIENT AVAILABILIIY JOB COVERAGE/PAOBLELI RESOLUTION SAFEIY AND AEUABIUTY FOCUSED SCOPE SAFETY RLSK ASSESSMENT OF SCHEDULE CONSERVATiVE SHUTDOWN OPERATIONS FULL CORE OFFLOAD HO REDVCED INVENTORY REUABLE ONCffEiOFFCITE POWER IMPROVED OUTAGE ERFOR.ACTIVE PARllCIPATION BREAKER TO BAEAKEA COVERAGE DESIGN ENGINEER INVOLVEMENT SYSTEM ENGINEERS LIANAGE TASK ENGINEERS ROTATE TO OTHER DEPARTMENTS RESPONSIVE MAINTENANCE SUPPORT EFFECTIVE STEALI GENERATOR INSPECTION/LWNTENANCE auALnY ELIABI SELF ASSESSMENT INPUT TO OVTAGE MAHAGELIENT IMPROVEMENT TEAMS SYSTEM WINDOW REVIEW REACTOR ENGINEERING INIATIVES RELOAD SEQUENCE 70 MINIMIZE FUEL HANDUNQ OPTIMIZED LOW POWEA PHYSICS TESTING ADDmONAL BORON CHANGE CUAVESITABLES BEITER PREDICTED AOD WORTHS(AFD DATA IMPROVED FLUX MAP PERFORMANCE CONSISTENT ERFORMANCE wCCth.WDd Page 20 ik~ili  
                                                                                              .4
~cWe>op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f)RESPONSE, DESIGN BASIS AND FSAR REVIEW+50.'54(f)REQUESTED 0 ADEQUACY OF DESIGN BASIS INFORMATION
                                                                                                                                    ~ (<
~AVAILABILITY AND CONTROL OF DESIGN BASIS INFORMATION
gt
+OVERVIEW OF PTN 50.54(f)RESPONSE 0~DESCRIBED THE FPL/PTN CONFIGURATION MANAGEMENT PROCESSES~DESCRIBED FPL PROGRAMS AND INITIATIVES
                                                                                      ~  - .(i'<1 I           ~
~FOCUSED ON MAJOR PROGRAMS AND PLANT BETTERMENT PROJECTS SINCE 1985 IMPROVED CONTROL PROCEDURES FOR DESIGN BASIS INFORMATION IMPROVED.QUALITY OF DESIGN BASIS INFORMATION Page 21 Ik 0  
4J IIIII."'!,
>op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f)RESPONSE, DESiGN.BASIS FSAR REVIEW RPS SYSTEM UPGRADE 1001 IMPROVED TECHNICAL SPECIPICATIONS 1001 PROCEDURE ENHANCEMENT PROJECTS STANDS Y APW UPGRADE 1005'AJORPROGRAMSAND BETTERMENT PROJECTS REQUIRING DESIGN BASIS REVIEW AND RECONSTITlmON ELECTRIC POWER SYSTEM UPGRADE 1091 INSTRUMENT AIR , UPGRADE 1095 THERLIAL POWER UPRATE PROJECT 1009 DESIGN BASIS RECONSTITUTION PROGRAM-FIRST PLANT TO COMPLETE MAJOR PROGRAM-18 PLANT SYSTEMS REVIEWED-19 DESIGN BASIS DOCUMENTS (DBD)CREATED-DBD's REVISED ON FSAR REVISION CYCLE-WORKING ON NEW ACCIDENT ANALYSIS DBD Page 22 0  
it
~cW~>op Op+~~o~+ogear TURKEY POINT ENGINEERING DEPARTMENT 50.54(f)RESPONSE, DESIGN BASIS FSAR REVIEW 50.54(f)FSAR REVIEW COMMITMENT
                                                                                  ,I I
+FSAR SELF ASSESSMENTS AND NEI 96-06 REVIEW COMPLETED AT PTN~SELF ASSESSMENT (3/96)~FSAR OPERATIONAL REVIEW (1994-1996)~NEI REVIEW (3/97)+RESULTS~NO SAFETY SIGNIFICANT DESIGN BASIS ISSUES IDENTIFIED
                                                                                                                                                                            ,  'll, II'R
~FSAR ADMINISTRATIVE AND INCONSISTENCY CHANGES IDENTIFIED AND RESOLVED BY RECENT FSAR REVISIONS+COMPLETE A"GRADED" FSAR REVIEW~REVIEW PRIORITIZED RISK SIGNIFICANCE
(~1 "I                                                                                                                                                                              ;l
~LEVEL OF REVIEW GRADED TO CONSIDER COMPLETED PROGRAMS COMPLETED DESIGN BASIS PROGRAMS RECENT PLANT BETTERMENT PROJECTS~WILL USE FPL INHOUSE RESOURCES DESIGN AND SYSTEM ENGINEERS OTHER PLANT DEPARTMENTS AS REQUIRED 8 COMPLETE REVIEW BY 10/98~COMPUTER.NETWORK FOR USERS IMPROVED SEARCH CAPABILITY PLANT PROCEDURES ON LAN Page 23 il~
                                                                                  <~
e>op Op++>oar+~O TURKEY POINT ENGINEERING DEPARTMENT FPL COMMENTS ON DRAFT NUREG-1606, PROPOSED REGULATORY GUIDANCE RELATED TO IMPLEMENTATION OF 10CFR50.59
I I
+
I'$      !
III.                                                              cI g3 '..
II
(                           (Iig'Ig                                                          (
gl                                Ni                              '4       *
(f~jh
((
(4                          ~I T
                              '
I j j,><(i((,j <<il(iii::<                                                                                                            ~<
jg:I I~"
(((                                                                     I                                                                      ~I 4 I((I                                                  I l
I f          I
                                                                                                  ;;441LN                    ..
                  ~ <~ '(                                                                             (           (                   ~ II 4
                                                                                                                                                                                  <Q((
4
            ~v<<                                                                                      II            II
            !I W~~
I
            ~
              ~                                                                                                                   I                                        tA
        ~ <
                                                                                                                                                                    'v, 4f l
                                                                                                                                                                                            ~    I
(
I'                                              gii)I Il
                                                                                                                                                                    ~teak f4'!PP!++
j r."<<3 (I I f<
V
                                                                                                                                                .                                        Ti   I(l
                                                                                                                                                    ~j
                                                                                                                                                  ,=~~A~
g pI I                                                       << i II l~,                                        gi
                                                                                                                                                                                          <I   I S
j
( ~
                                                                                                  !Ii i(            (
wiL;j<'. f'     Wf
                                                                                        ~
I       '            '
PQ (e
Vi'              I'(
p',< (
jI!444(
I 4
 
0 iS~
il~
 
5 I ~       ~
1 1
      ~ <
              *
            '1 ~             '((   ~
IW                  ~"
r ICI 1
                                              ~ ~(rrr 'I j~   I  ~ I
                                                                      ~ 'I ~
  ~ C
    $1                            (,  )~Lgd6((<<<~       I ~I  (
* r It 1
s
                          '
(  j
 
ill UNIT 3
            ~dr f.;
          ~
      ~ '
Tip UNIT 4
                        =x F ~ F
 
0
~ ~
 
    ~co~    >op Op TURKEY POINT e    +          o~
ENGINEERING DEPARTMENT CCW HEAT EXCHANGER IMPROVEMENTS CCW HEAT EXCHANGER FOULING FACTOR IMPROVEMENT
  +   COMPREHENSIVE PERFORMANCE TESTING PROGRAM TO ENSURE CAPABILITY OF REMOVING DESIGN BASIS HEAT LOAD
  +    FREQUENT TESTING, TRENDING AND CLEANING OF CCW HEAT EXCHANGERS WAS REQUIRED
: ~   TESTING AT LEAST WEEKLY
        ~    CLEANING AT LEAST ONE HEAT EXCHANGER/UNIT WEEKLY
        ~   CLEANING SIGNIFICANTLY MORE OFTEN DURING SUMMER
  +     UPRATING,EFFORT TARGETED IMPROVING THE MAXIMUMALLOWABLE FOULING FACTOR OF CCW HEAT EXCHANGERS 0     ~
      ~
IVIASS &. ENERGY RELEASES RECALCULATED CONTAINMENT RESPONSE RECALCULATED CCW THERMAL HYDRAULIC CASES RECALCULATED, HIGHER ALLOWABLEFOULING FACTOR ASSUMED' PIPING STRESSES AND SUPPORT LOADS ASSESSED
      ~      MODIFICATIONS IMPLEMENTED ECC AUTO-START MODIFICATION CCW PIPE SUPPORTS UPGRADE ON UNIT 4
  +   CHANGES RESULTED'IN SIGNIFICANTLY REDUCED FREQUENCY FOR HEAT EXCHANGER CLEANING
      ~     REDUCED CLEANING FREQUENCY FROM ONCE PER WEEK TO ONCE
          'EVERY 6 WEEKS
    ~      REDUCES "WEAR" ON TUBES DUE TO CLEANING
  +  OTHER RELATED INITIATIVES
    ~      IMPROVED TESTING METHOD
    ~    'RETUBED UNIT 3 CCW HEAT EXCHANGERS Page 17
 
0 45~
~i
 
iso/0 TURKEY POINT ENGINEERING DEPARTMENT
          +o ofotrr +eo PSA AND ON LINE ACTIVITIES
      +    PSA TECHNOLOGY USED IN PLANT ON LINE MAINTENANCE
            ~        RISK SIGNIFICANT EQUIPMENT/COMPONENT LIST,
            ~        MULTIPLE COMPONENT MATRIX
            ~        GUIDELINES FOR WHEN PSA SHOULD BE USED
            ~        ON LINE MONITOR IN TRIAL USE 0 ADM-210                    On-Une Malntcnaneei Wortt Coordination ATI'ACHhfENT S fpagc l of 3)
RISK SIGNIFICANTEQUIPMENT ILST
                            'Dte  foliowing Tce)micd Spccificatitm components have each been cvdu sted    as  flat exceeding PSA risk limits when mnovcd from service individually for a duration of up to thc following tt mes for Mode I oecautions.
ABowed OOS Tllne Accumulator A Accumulator B Accumulator C AFW Pump A I2 Ttshts digaed)                          30 days AFW Pump B I2 Trsias aligaed)                        30 days AFW Pump C f2 Trains aligned)                        30 days AFW Train I AFW Trdn 2                                            72 hts Botic Acid-BAST to Charging CCW Pump A                                          30 days CCW Pump B                                          30 days CCW Pump C                                            30 days Containment Spray Pump A Containment Spay Pump B ECC A ECC B ECC C 72 hrs EDG B Opposuc Unit EDG A                                    72 hrs 0      ite Unit EDG 8 mcptn.wpd                                                        Page 18
 
0 O~
IS~
 
              ~c>o f'o/Ots TURKEY POINT e             O OJ4C T
44 ENGINEERING DEPARTMENT PSA AND ON LINE ACTIVITIES IOCCCXXO    TC4l Coordination                      POOL'7 APpvovtr Oxloc 0-ADM-210                                      On-Line Maintenance/ Work                                                I/14/97 Tae DUAL COMP8lHNS IN-KEhVh5k5NNCE MATRIX
                          ~ e easer Isetosw seasasas er t etarwtaee aoaa ease aea laewee oaa wws aa eo lw taws lw sN etatwwa Tls aoatw ase d es NN 4 oll ol w ttNA QC tatto TVta AC                   olWI
                                                                                                          ~
el t eeeavws ossa ao soaewa ow wwe ~ awasawr sa ewwww la t oalsaatw essa oaal eeet waotN oNI saws ateasaav slap os ew aellalee ael leavettstilt aw NNAAN or IvIAC cela Tall teaewss owwwwa                                                                              oaN aeaaa cess oaoetvte xxxx w ATW FCV ATTVIIWAO AFW tvaO ATW T4enp lit 4W  A Q Tlsw ~ n TNew C C Tloes ATW TNII AtxV Tlaa elva oe so so tt aaeo ete sswsteae os oa AN scatww Uel St 4                    C    TTITLt    AOOAet)                  Axttwxr    I         t Ataaawa 4 tsataava C Aow scvatealTWH,          t ASW  saw A IT 'I vs A                                                 XXXX AIWOtas 4 rtvs Car~
ASW  lvs t t saws sat voa t allset sel 'ltw
                              ~ eetatwaaor      v Ctw I ~ A CCW V 1 ~
CCW V'I C CCW          A CCw ww 4 CCW Iaset C Cw lots ~
Cw law as ~
Oaw OIN I tOOA                                                                                                                        1 1XX TOO  O
                                      ~ IW A tOO
                                      ~ vv 4 eoo l            sow cesw A tw            CAW Cwa 4
                                      ~ Ios A teal eo owov s Itv ~ INN Icw          a ICW          ~
                            ~ cwccwovw a was ICwCCWOvw 4 awa                                                                                                              xxxx vtsvws st Ctver IA Cattetsl lot CO XXXX sxa Ia      ~ CO la
                          ~ arv lass                                              xxxx asov.lass XXXX vovaasl                                                                                                                      XXXX vovealo atavess
                          ~ OAVVs
                          ~ claws
                          ~ sas  svN a wa svw o
                          ~      s  <<av ss o lava a 4 avast lwvasw
                          ~ vw Isa oeasav Isle A                                                                                                      XXXX
                                                                            )I XXX                                                                      XXX1
                        'lI ~BATVdVbvC IVCOTIIAVOd                                                                        Page 19
 
il ill
 
          ~cICo >oI 4p TURKEY POINT L3 rr                              ENGINEERING DEPARTMENT OUTAGE SUPPORT PREPLANNING EARLY MODIFICATIONIDENTIFICATION AND ISSUANCE SAFE ON-LINE MAINTENANCE EFFECTIVE PSA USAGE HIGH EQUIPLIENT AVAILABILIIY JOB COVERAGE/PAOBLELI RESOLUTION SAFEIY AND AEUABIUTYFOCUSED SCOPE SAFETY                                                              . ACTIVE PARllCIPATION RLSK ASSESSMENT OF SCHEDULE                                                    BREAKER TO BAEAKEACOVERAGE CONSERVATiVE SHUTDOWN                                                          DESIGN ENGINEER INVOLVEMENT OPERATIONS                                                                    SYSTEM ENGINEERS LIANAGETASK FULL CORE OFFLOAD                                                              ENGINEERS ROTATE TO OTHER HO REDVCED INVENTORY                                                          DEPARTMENTS REUABLE ONCffEiOFFCITE POWER                                                  RESPONSIVE MAINTENANCE IMPROVED SUPPORT OUTAGE EFFECTIVE STEALI GENERATOR ERFOR INSPECTION/LWNTENANCE auALnY                                     ELIABI SELF ASSESSMENT                                           REACTOR ENGINEERING INIATIVES RELOAD SEQUENCE 70 MINIMIZEFUEL HANDUNQ INPUT TO OVTAGE MAHAGELIENT                                      OPTIMIZED LOW POWEA PHYSICS TESTING IMPROVEMENT TEAMS                                                ADDmONALBORON CHANGE CUAVESITABLES SYSTEM WINDOW REVIEW                                            BEITER PREDICTED AOD WORTHS(AFD DATA IMPROVED FLUX MAP PERFORMANCE CONSISTENT ERFORMANCE wCCth.WDd                                               Page 20
 
ik~
ili
 
    ~cWe >op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f) RESPONSE, DESIGN BASIS AND FSAR REVIEW
  +   50.'54(f) REQUESTED 0   ADEQUACY OF DESIGN BASIS INFORMATION
      ~   AVAILABILITYAND CONTROL OF DESIGN BASIS INFORMATION
  + OVERVIEW OF PTN 50.54(f) RESPONSE
    ~     DESCRIBED THE FPL/PTN CONFIGURATION MANAGEMENT PROCESSES
    ~     DESCRIBED FPL PROGRAMS AND INITIATIVES
    ~     FOCUSED ON MAJOR PROGRAMS AND PLANT BETTERMENT PROJECTS SINCE 1985 0              IMPROVED CONTROL PROCEDURES FOR DESIGN BASIS INFORMATION IMPROVED. QUALITY OF DESIGN BASIS INFORMATION Page 21
 
Ik 0
 
    >op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f) RESPONSE, DESiGN. BASIS FSAR REVIEW IMPROVED TECHNICAL RPS SYSTEM                       SPECIPICATIONS UPGRADE                               1001 1001 PROCEDURE ENHANCEMENT PROJECTS STANDS Y APW                     'AJORPROGRAMSAND UPGRADE                          BETTERMENT PROJECTS 1005 REQUIRING                       ELECTRIC POWER DESIGN BASIS                   SYSTEM UPGRADE REVIEW AND RECONSTITlmON                     1091 INSTRUMENT AIR                           THERLIALPOWER
                  , UPGRADE                             UPRATE PROJECT 1095                                  1009 DESIGN BASIS RECONSTITUTION PROGRAM
                      - FIRST PLANT TO COMPLETE MAJOR PROGRAM
                      - 18 PLANT SYSTEMS REVIEWED
                      - 19 DESIGN BASIS DOCUMENTS (DBD) CREATED
                      - DBD's REVISED ON FSAR REVISION CYCLE
                      - WORKING ON NEW ACCIDENTANALYSIS DBD Page 22
 
0
  ~cW~ >op Op TURKEY POINT ENGINEERING DEPARTMENT
  +~+ogear  ~o~
50.54(f) RESPONSE, DESIGN BASIS FSAR REVIEW 50.54(f) FSAR REVIEW COMMITMENT
+     FSAR SELF ASSESSMENTS AND NEI 96-06 REVIEW COMPLETED AT PTN
      ~     SELF ASSESSMENT (3/96)
      ~     FSAR OPERATIONAL REVIEW (1994 - 1996)
    ~       NEI REVIEW (3/97)
+   RESULTS
    ~     NO SAFETY SIGNIFICANT DESIGN BASIS ISSUES IDENTIFIED
    ~     FSAR ADMINISTRATIVEAND INCONSISTENCY CHANGES IDENTIFIED AND RESOLVED BY RECENT FSAR REVISIONS
+   COMPLETE A "GRADED" FSAR REVIEW
    ~     REVIEW PRIORITIZED RISK SIGNIFICANCE
    ~       LEVEL OF REVIEW GRADED TO CONSIDER COMPLETED PROGRAMS COMPLETED DESIGN BASIS PROGRAMS RECENT PLANT BETTERMENT PROJECTS
    ~       WILL USE FPL INHOUSE RESOURCES DESIGN AND SYSTEM ENGINEERS OTHER PLANT DEPARTMENTS AS REQUIRED 8       COMPLETE REVIEW BY 10/98
    ~      COMPUTER. NETWORK FOR USERS IMPROVED SEARCH CAPABILITY PLANT PROCEDURES ON LAN Page 23
 
il~
            >op Op TURKEY POINT e   + +>oar +~O ENGINEERING DEPARTMENT FPL COMMENTS ON DRAFT NUREG - 1606, PROPOSED REGULATORY GUIDANCE RELATED TO IMPLEMENTATION OF 10CFR50.59
  +  


==GENERAL COMMENT==
==GENERAL COMMENT==
S AND CONCERNS N 8 NEED TO WORK WITH INDUSTRY TO DEFINE COMPLIANCE VIA NEI 96-07~IMPORTANT THAT NRC/INDUSTRY RESOLVE ISSUES PRIOR TO IMPLEMENTING NEW REQUIREMENTS'AND PROCEDURES
S AND CONCERNS N
+DEFINITION OF"CHANGE." TO INCLUDE ANY INFORMAT~ION IN THE FSAR~WOULD REQUIRE ADDITIONAL 50.59 SAFETY EVA'LUATIONS
8     NEED TO WORK WITH INDUSTRY TO DEFINE COMPLIANCE VIA NEI 96-07
~NOT CONSISTENT WITH PAST PRACTICE+COMPONENT REPLACEMENT DURING ROUTINE MAINTENANCE
      ~     IMPORTANT THAT NRC/INDUSTRY RESOLVE ISSUES PRIOR TO IMPLEMENTING NEW REQUIREMENTS'AND PROCEDURES
~EQUIVALENT BUT NOT IDENTICAL COMPONENT VS DRAFT NUREG 1606 EXPANDED DEFINITION OF"MALFUNCTION OF A DIFFERENT TYPE"~NEED TO DEFINE NEW FAILURE MODES AT THE SYSTEM OR FUNCTIONAL LEVEL~ROUTINE COMPONENT REPLACEMENTS COULD INVOLVE USQs+USE OF MANUAL ACTIONS~COULD RESULT IN ADDITIONAL PLANT SHUT DOWN TRANSIENTS
  +   DEFINITION OF "CHANGE." TO INCLUDE ANY INFORMAT~ION IN THE FSAR
~NOT CONSISTENT WITH PAST INDUSTRY PRACTICE+APPLICATION OF 50.59 TO DEGRADED AND NONCONFORMING CONDITIONS I~TS AND OPERABILITY EVALUATIONS ADDRESS DEGRADED CONDITIONS
      ~     WOULD REQUIRE ADDITIONAL50.59 SAFETY EVA'LUATIONS
~PLANT RESTARTS COULD BE PROHIBITED 0 Page 24 4l 0  
      ~     NOT CONSISTENT WITH PAST PRACTICE
~C++O/~+q~O O>ear>TURKEY POINT ENGINEERING DEPARTMENT NEW AND REVISED SOFTWARE ISSUED BY DESIGN ENGINEERING (QUALITY INSTRUCTION 3.7 COMPUTER SOFTWARE CONTROL)NON-PROCESS SOFTWARE PROCESS SOFTWARE PROCESS SOFTWARE (NEW)PROCESS'SOFTWARE (PRE-EXISTING)
  +   COMPONENT REPLACEMENT DURING ROUTINE MAINTENANCE
-IMPLEMENTED BY FORMAL PLANT CHANGE PROCESS-REQUIREMENTS SPECIFICATION PREPARED~SOFTWARE DESIGN DESCRIPTlON
      ~     EQUIVALENT BUT NOT IDENTICAL COMPONENT VS DRAFT NUREG 1606 EXPANDED DEFINITION OF "MALFUNCTIONOF A DIFFERENT TYPE"
-VIVIV PLAN PREPARED~USE GUIDANCE OF IEEE STD 1012-VERIFICATlON REQUIREMENTS
      ~     NEED TO DEFINE NEW FAILURE MODES AT THE SYSTEM OR FUNCTIONAL LEVEL
~TEST PLAN-PERIODIC VAUDATION REQUIREMENTS
      ~     ROUTINE COMPONENT REPLACEMENTS COULD INVOLVE USQs
--SOFTWARE VERIFICATION REPORT-INDEPENDENT REVIEW-'MPLEMENTED BY FORMAL PLANT CHANGE PROCESS~ORIGINAL VIV REQUIREMENT AS MINIMUM-'ADDmONAL VILV REQUIREMENTS ON VENDOR-ADDITIONAL BLACK BOX TESTING ON RECEIPT FROM VENDOR-USE OF TRAINING SIMULATOR-INDEPENDENT REVIEW PROCESS SOFTWARE IMPLEMENTATION TESTING-CONTROL AND STORAGE PROCEDURES nrcptn.wpd Page 25 4k 0~,
  +   USE OF MANUALACTIONS
~c++OI Op+~~o~+Ogp~p Q4 TURKEY POINT ENGINEERING DEPARTMENT DDPS/ERDADS SOFTWARE CONTROL (NON-PROCESS SOFTWARE)0-ADM 401 SOFlWARE CHANGE REQUEST SOFTWARE CHANGE PRODUCTION SOFTWARE CHANGE COORD ASSIGN SOFlWARE CHANGE TRACKING 0 OPERATIONS SUPPORT SUPERVISOR APPROVAL ACCEPTANCE TESTING OF SOFTWARE CHANGE COMPUTER ENGINEER-SPECIFY PRETEST BENCHMARK REQM'TS IMPLEMENTATION CHECKUST-VENDOR MANUALS-I&C CAUBRATION PROC-DATA POINT UBRARY~SPECIFY SOFlWARE CHANGE~SPECIFYV&V ACCEPTANCE CRITERIA CONTROL RM DISPLAY CHANGE?SIMUIATOR CHANGES?INDEPENDENT VERIFICATION OF PROPOSED CHANGE TRANSMIT DOCUMENTATION TO DOCUMENT CONTROL wcplh.wpd Page 26 0 0 i
      ~     COULD RESULT IN ADDITIONALPLANT SHUT DOWN TRANSIENTS
+eo~+egecr P%o TURKEY POINT ENGINEERING DEPARTMENT PLANT SAFETY/RELIABILITY IMPROVEMENTS CONTINUE TO IMPLEMENT MODIFICATIONS TO IMPROVE EQUIPMENT RELIABILITY AGGRESSIVE ROOT CAUSE ANALYSIS AGGRESSIVE MANAGEMENT CONTROL OF MODIFICATION PROCESS INDICATIONS OF SUCCESS-REDUCED OPERATOR WORK AROUNDS-LOW NUMBER OF CONTROL ROOM, DEFICIENCIES
      ~     NOT CONSISTENT WITH PAST INDUSTRY PRACTICE
-REDUCED NUMBER OF SECONDARY LEAKS-EXCELLENT PLANT AVAILABILITY SPECIFIC IMPROVEMENTS REACTOR PROTECTION RELAY DESIGN IMPROVEMENTS ROD CONTROL IMPROVEMENTS
  + APPLICATION OF 50.59 TO DEGRADED AND NONCONFORMING CONDITIONS                                     I
-POWER SUPPUES FORCED COOUNG-BRING CARDS-ROOM HVAC-SMAlL BORE PIPING MODIFICATIONS SAFEGUARDS RACK IMPROVEMENTS C BUS MODIRCATIONS
    ~     TS AND OPERABILITY EVALUATIONS ADDRESS DEGRADED CONDITIONS
~BIT BYPASS MODIFICATlONS
    ~     PLANT RESTARTS COULD BE PROHIBITED 0
-REACTOR HEAD GUIDE FUNNEL MODIFICATIONS REACTOR HEAD GUIDE FUNNEL MODIRCATIONS
Page 24
-CRDM CANOPY SEAL PREVENTATIVE CIAMPING-SOURCE RANGE NUCLEAR INSTRUMENTS
 
-FEEDWATER PUMP RECIRCULATION PIPING SUPPORT UPGRADES Page 27 0
4l 0
e~cV+>op Op+~a~+Off~~p%TURKEY POINT ENGINEERING DEPARTMENT REACTOR HEAD GUIDE FUNNEL lVIODIFICATIONS
 
+INDUSTRY FAILURE FOR REACTOR VESSEL GUIDE FUNNELS FUNNEL FAILURE AT ZION (1984)SEVERAL PLANTS REPORT PIN AND FUNNEL FAILURES (1994)~WESTINGHOUSE ISSUES NSAL 94-002~NO FAILURE HISTORY AT TURKEY POINT+FAILURE MODE~VIBRATION INDUCED FAILURE OF RETAINING PIN~POTENTIAL TO BLOCK/JAM CRDM+PLANT, RELIABILITY AND POTENTIAL SAFETY ISSUE+TURKEY POINT CORRECTIVE ACTION ,REPAIR OF 45 CRDM GUIDE TUBES~REPAIRS COMPLETE ON BOTH UNITS 3 AND 4~-LEAD PLANT FOR PLANTS WITHOUT PREVIOUS FAILURES~NO INDICATION OF FAILURE ONSET NOTED DURING REPAIR Page 28 0  
              ~C+     +O/~
'Io TURKEY POINT ENGINEERING DEPARTMENT Control Rod Drive ShaF t Penetr a tlon Thernocouple Colunn Pene tro tion REACTOR MEAD GUIDE FUNNEL MODIFICATIONS I I I I Reoctor Vessel Heoa Thernol Sleeve T/C Colunn Housing Guide Thernal Sleeve Guide Page 29 0 0  
TURKEY POINT ENGINEERING DEPARTMENT
~tl~o>o(4p oo(oo TURKEY POINTi ENGINEERING DEPARTMENT REACTOR HEAD GUIDE FUNNEL MODIFICATIONS Fillet Weld VIEW A-A lttcpttLttttpd Page 30 4l 0 il~
            +q O>ear >~O NEW AND REVISED SOFTWARE ISSUED BY DESIGN ENGINEERING (QUALITYINSTRUCTION 3.7 COMPUTER SOFTWARE CONTROL)
ST.LUCIE ENGINEERING DEPARTMENT Iv c ps l.wpd Page 31 0'l~  
NON-PROCESS SOFTWARE PROCESS SOFTWARE PROCESS SOFTWARE                                          PROCESS'SOFTWARE (NEW)                                                 (PRE-EXISTING)
+vlc>i ,c/ST..LUCIE ENGINEERING DEPARTMENT ENGINEERING ORGANIZATION
          - IMPLEMENTED BY FORMAL PLANT                              - 'MPLEMENTED BY FORMAL PLANT CHANGE PROCESS                                             CHANGE PROCESS
+ORGANIZATIONAL STRENGTHS~AVERAGE NUMBER OF YEARS OF NUCLEAR EXPERIENCE (PER ENGINEER)IS 17 YEARS DIRECT SUPPORT TO OPERATIONS AND MAINTENANCE CONTINUES TO BE A STRENGTH~23 ENGINEERS HAVE OPERATIONS TRAINING+IMPROVEMENT
          - REQUIREMENTS SPECIFICATION PREPARED                     ~  ORIGINALVIVREQUIREMENT AS MINIMUM
/GROWTH PLANS DEVELOPMENT OF SYSTEMS ENGINEERING PROGRAM~STRENGTHENING OF SYSTEM HEALTH MONITORING AND TRENDING OF EQUIPMENT DATA~SYSTEM ENGINEERS TRAINING rvcpsl.w pd Page 32 0 il~
          ~ SOFTWARE DESIGN DESCRIPTlON
1 fe ST.LUCIE ENGINEERING DEPARTMENT AVABABILllY SAFETY)H JECTION 5.YEAR RUNNING AVERAGE 100%SS'/0 I+i I I1 i I P1~~SIf 98%-~0 I j 1~0 0>>M>>i'~0 00 OJ 00 ('I!I i li 97%.I 96%-95%I I I 94%9/96 11/96 1/97 0/97 EI97 OMIT I UMII'2 PERFORMANCE CRCERIA'AMOYR2000GOALS AVAIIABILIIV 100%99%I 98%,.I li i I EMERGENGY DIESEL GENERATORS 2 YEAR RUNNING AVERAGE I I I I I (0~IDM>>I I Ii I k>>JA II~I i j.I I'7~xi 7 I I ll 96%5/96 7/96 9/96 11/96 1/97 3/97 5/97 UNIT I UNIT2 PERFORMANCECRffERIA
                                                                    - 'ADDmONALVILVREQUIREMENTS ON VENDOR
" WANG YR 20M GOALS IMCPSI.WPC Page 33 i
          - VIVIVPLAN PREPARED                                     - ADDITIONALBLACK BOX TESTING ON
NR y.', 0~Xiii"'~~~g~~~ll ,"g N gx a>g~~S Y.~a jj'4 Pj 5 g~@0~i~~e~.Q Ik~i ST.LUCIE ENGINEERING DEPARTMENT UNIT 1 DDPS SOFTWARE ERROR+A 1994 SOFTWARE ERROR RESULTED IN UNIT&#xb9;1 OPERATION WITH A 0.63%NONCONSERVATIVE REACT'OR POWER CALORIMETRIC ERROR Vendor deaspwd sonttwe change lor Deacon was assed on late a copy mainunad hy vendor Inveattgstinn Results The new scasng onscaras were nct permanency saved Itao iho naster pmgrsm or~ella lo aontmro vendor tt revision et gN eolhtate wee laassed Ihat dld fwt Indedo BN now FW flow connsras Chsnnology leal PWCy ctnnged span of Fw now Itsnsmalers ltom 0~T00.0'0 0.00IP I Hew FVf liow scawtg conaant t vahws were swered Sao OOF ccnstwa IocetavN PCIM 0020 f00 provided the deapn fot ltleie'Ietten of Beacon syaem ant ns ccntNctka to DOFS The Ipse ctangea lo ON feodtmwr aow connancs were ovwwrts wc TIN Beeoen PCat scope wss ttsttad Io 0N INtottwo snd DO HOT Incktse SN ecossacy Chang ee Io BN OOPS eonewe Invsstlgation Results Forts Oio HOT Ptevido post modncacon Iecgng teovtrsnwtcs ler tae OOPS sensate cancskwl dal dN Boo sea!no cnnststas were ler BN&#xb9;I 0~fetes'Ssnttntecr Chronology The sothtwe Vay s perfntd hy sothmre vender natenged sw BoNa ostpas hca tered Io ctwrk sitar asperse of IIN Dops soteewe sech os IIN secondary plate caatnrtNcnc.
                ~ USE GUIDANCE OF IEEE STD 1012                           RECEIPT FROM VENDOR
I Reader wallop Iel tttdt dl Cycle SIS DNOO tspotts lo a FW Bat Iteontsnn', Ical towtd Iha 0 c&#xb9;ssaed reactor level wac lower teen ocntef poww ey Odats.Shy tong Tera I Devaaa genena Vay nenwnenks Io cnasenpo as i cnand eeraacee wltttn sech Vnlot srd ttrkst DOPSlet l~taonaseaNnHS 1 7-2M 2-2l 97 tvcpsI.vvpd Page 35 il
                - VERIFICATlON REQUIREMENTS                               - USE OF TRAINING SIMULATOR
/4 I ST.LUCIE ENGINEERING DEPARTMENT
                ~ TEST PLAN
'UNIT 2 DDPS SOFTWARE ERROR+A 1997 SOFTWARE'ERROR.WAS DISCOVERED DURING UNIT&#xb9;2 REACTOR POWER CALORIMETRIC VERIFICATION 6 VALIDATION TESTING PDrM reterence4 pen>>la V 5 v plan eveloped as ooneccrve eccl>>l lo Irnu~I evsnL Dvanap between ponionc ef lest fran ares nadectuete.
                                                                    - INDEPENDENT REVIEW
                - PERIODIC VAUDATIONREQUIREMENTS
          -- SOFTWARE VERIFICATIONREPORT
          - INDEPENDENT REVIEW PROCESS SOFTWARE IMPLEMENTATIONTESTING
                                          - CONTROL AND STORAGE PROCEDURES nrcptn.wpd                                            Page 25
 
4k 0
~,
 
          ~c+      +OI Op TURKEY POINT ENGINEERING DEPARTMENT
          +~+Ogp~p Q4~o~
DDPS  / ERDADS SOFTWARE CONTROL (NON-PROCESS SOFTWARE) 0-ADM401 SOFlWARE CHANGE REQUEST SOFTWARE CHANGE PRODUCTION SOFTWARE CHANGE COORD                              ACCEPTANCE TESTING OF SOFTWARE ASSIGN SOFlWARE                                      CHANGE CHANGE TRACKING 0 OPERATIONS SUPPORT SUPERVISOR APPROVAL IMPLEMENTATIONCHECKUST
                                                                    - VENDOR MANUALS COMPUTER ENGINEER                            - I&C CAUBRATIONPROC
                    - SPECIFY PRETEST                            - DATA POINT UBRARY BENCHMARK REQM'TS
                  ~ SPECIFY SOFlWARE CHANGE
              ~ SPECIFYV&V ACCEPTANCE CRITERIA CONTROL RM                SIMUIATOR DISPLAY CHANGE?              CHANGES?
INDEPENDENT VERIFICATION OF PROPOSED CHANGE TRANSMIT DOCUMENTATION TO DOCUMENT CONTROL wcplh.wpd                                      Page 26
 
0 0
i
 
TURKEY POINT ENGINEERING DEPARTMENT
++egecr    eo~
P%o PLANT SAFETY / RELIABILITYIMPROVEMENTS CONTINUE TO IMPLEMENTMODIFICATIONS TO IMPROVE EQUIPMENT RELIABILITY AGGRESSIVE ROOT CAUSE ANALYSIS AGGRESSIVE MANAGEMENTCONTROL OF MODIFICATIONPROCESS SPECIFIC IMPROVEMENTS REACTOR PROTECTION RELAY DESIGN IMPROVEMENTS INDICATIONS OF SUCCESS ROD CONTROL IMPROVEMENTS
                                                          - POWER SUPPUES
        - REDUCED OPERATOR WORK AROUNDS FORCED COOUNG
        - LOW NUMBER OF CONTROL ROOM, DEFICIENCIES        - BRING CARDS
        - REDUCED NUMBER OF SECONDARY LEAKS              - ROOM HVAC
        - EXCELLENT PLANTAVAILABILITY
                                                    - SMAlLBORE PIPING MODIFICATIONS SAFEGUARDS RACK IMPROVEMENTS C BUS MODIRCATIONS
                                                    ~ BIT BYPASS MODIFICATlONS
                                                    - REACTOR HEAD GUIDE FUNNEL MODIFICATIONS
                                                    - CRDM CANOPY SEAL PREVENTATIVE CIAMPING REACTOR HEAD GUIDE                  - SOURCE RANGE NUCLEAR INSTRUMENTS FUNNEL MODIRCATIONS                  - FEEDWATER PUMP RECIRCULATION PIPING SUPPORT UPGRADES Page 27
 
0
    ~cV+   >op Op TURKEY POINT e  ++Off~~ p%~a~
ENGINEERING DEPARTMENT REACTOR HEAD GUIDE FUNNEL lVIODIFICATIONS
  +   INDUSTRY FAILURE FOR REACTOR VESSEL GUIDE FUNNELS FUNNEL FAILURE AT ZION (1984)
SEVERAL PLANTS REPORT PIN AND FUNNEL FAILURES (1994)
      ~     WESTINGHOUSE ISSUES NSAL 94-002
      ~     NO FAILURE HISTORY AT TURKEY POINT
  +   FAILURE MODE
      ~     VIBRATION INDUCED FAILURE OF RETAINING PIN
    ~       POTENTIAL TO BLOCK/JAM CRDM
  + PLANT, RELIABILITYAND POTENTIAL SAFETY ISSUE
  + TURKEY POINT CORRECTIVE ACTION
            ,REPAIR OF 45 CRDM GUIDE TUBES
    ~       REPAIRS COMPLETE ON BOTH UNITS 3 AND 4
    ~   - LEAD PLANT FOR PLANTS WITHOUT PREVIOUS FAILURES
    ~       NO INDICATION OF FAILURE ONSET NOTED DURING REPAIR Page 28
 
0
    'Io TURKEY POINT ENGINEERING DEPARTMENT REACTOR MEAD GUIDE FUNNEL MODIFICATIONS I
I         I I
Thernocouple                                Control Rod Colunn                                       Drive ShaF t Pene tro tion Penetr  a tlon Thernol Reoctor                                              Sleeve Vessel Heoa T/C Colunn      Thernal Housing         Sleeve Guide           Guide Page 29
 
0 0
 
              ~tl~o >o(4p TURKEY POINTi ENGINEERING DEPARTMENT oo(oo REACTOR HEAD GUIDE FUNNEL MODIFICATIONS Fillet Weld VIEW A-A lttcpttLttttpd                         Page 30
 
4l 0
il~
 
ST. LUCIE ENGINEERING DEPARTMENT Ivc ps l.wpd     Page 31
 
0'l~
ST..LUCIE
                    ,c/
ENGINEERING DEPARTMENT
            +v    lc>i ENGINEERING ORGANIZATION
        +   ORGANIZATIONALSTRENGTHS
              ~   AVERAGE NUMBER OF YEARS OF NUCLEAR EXPERIENCE (PER ENGINEER)
IS 17 YEARS DIRECT SUPPORT TO OPERATIONS AND MAINTENANCECONTINUES TO BE A STRENGTH
              ~   23 ENGINEERS HAVE OPERATIONS TRAINING
        +     IMPROVEMENT / GROWTH PLANS DEVELOPMENT OF SYSTEMS ENGINEERING PROGRAM
            ~   STRENGTHENING OF SYSTEM HEALTH MONITORING AND TRENDING OF EQUIPMENT DATA
            ~   SYSTEM ENGINEERS TRAINING rvcpsl.w pd                           Page 32
 
0 il~
 
1 ST. LUCIE fe ENGINEERING DEPARTMENT SAFETY )HJECTION AVABABILllY                                    5.YEAR RUNNING AVERAGE 100%
I+     i I   I1 i I   P1 ~ ~           SIf SS'/0 j
1 i'                  ('I i
                                                                                    !I li 98%-      ~0 I            ~0    0>>M>> ~0 00   OJ 00 97%   .
I 96%-
95%   I I
I 94%
9/96     11/96   1/97       0/97           EI97 OMIT I         UMII'2             PERFORMANCE CRCERIA         'AMOYR2000GOALS EMERGENGY DIESEL GENERATORS 2 YEAR RUNNING AVERAGE AVAIIABILIIV 100%
I k
I                                                           >>
I                                                                                         II 99%
li                                                                I I
                                                                                                      >>
                                                                                                                    ~
i I
I i
I I I
Ii                    j 98%  ,.
I                                                                                      . I I
(
0 ~  IDM                                                              JA I'7~xi 7
I I
ll 96%
5/96           7/96           9/96       11/96   1/97         3/97           5/97 UNIT I             UNIT2             PERFORMANCECRffERIA           " WANG YR 20M GOALS IMCPSI.WPC                                                       Page 33
 
i NR y.',
0
                                                ~    ~
  ~Xiii"'~                                 ~     g
                                    ~ ~
ll
                  ,"g Pj Y
N gx a>
g 5
                        .~a
              ~                               g    ~
S                 '4 jj
                                                  @0
              ~
                                                      ~ i ~ ~ e ~ .
Q
 
Ik
~ i
 
ST. LUCIE ENGINEERING DEPARTMENT UNIT 1 DDPS SOFTWARE ERROR
        +         A 1994 SOFTWARE ERROR RESULTED IN UNIT &#xb9;1 OPERATION WITH A 0.63%
NONCONSERVATIVE REACT'OR POWER CALORIMETRIC ERROR Vendor deaspwd sonttwe change lor Deacon was assed on late a copy mainunad hy vendor The new scasng onscaras were nct permanency saved tt revision et gN eolhtate wee Itao iho naster pmgrsm or laassed Ihat dld fwt Indedo Inveattgstinn                                                                                                            BN now FW flow connsras
                                                                    ~ ella lo aontmro vendor Results Chsnnology leal PWCy ctnnged span of                                           I PCIM 0020 f00 provided the Fw now Itsnsmalers ltom             Hew FVfliow scawtg conaant        t    deapn fot ltleie'Ietten of The Ipse ctangea lo ON 0~                      vahws were swered Sao OOF                                           feodtmwr aow connancs were Beacon syaem ant ns T00.0'0 ccnstwa IocetavN                                                      ovwwrts wc
: 0. 00IP                                                          ccntNctka to DOFS TIN Beeoen PCat scope wss ttsttad Io 0N INtottwo snd DO HOT Incktse SN ecossacy Chang ee Io BN OOPS eonewe Forts Oio HOT Ptevido                                               cancskwl dal dN post modncacon Iecgng                                           Boo sea!no cnnststas were ler Invsstlgation        teovtrsnwtcs ler tae OOPS                                          BN  &#xb9;I 0 ~ fetes'Ssnttntecr sensate Results Chronology                                                                                                                   Shy tong Tera The sothtwe Vay s perfntd hy                                         DNOO tspotts lo a FW Bat I
sothmre vender natenged                                                                           Devaaa genena Vay Iteontsnn', Ical towtd Iha  nenwnenks Io cnasenpo as sw BoNa ostpas hca tered            Reader wallop Iel tttdt dl          0 c&#xb9;ssaed reactor Io ctwrk sitar asperse of IIN                 Cycle SIS                                          cnand eeraacee wltttn sech  i level wac lower teen ocntef Vnlot srd ttrkst DOPSlet Dops soteewe sech os IIN                                                   poww ey Odats.                                    l secondary plate caatnrtNcnc.                                                                         ~ taonaseaNnHS          1 I
7-2M                              2-2l 97 tvcpsI.vvpd                                                                  Page 35
 
il
            /
ST. LUCIE 4
I                                ENGINEERING DEPARTMENT
                                                      'UNIT 2 DDPS SOFTWARE ERROR
        +        A 1997 SOFTWARE'ERROR.WAS DISCOVERED DURING UNIT &#xb9;2 REACTOR POWER CALORIMETRIC VERIFICATION 6 VALIDATIONTESTING PDrM reterence4 pen>>la V 5 v plan eveloped as ooneccrve eccl>>l lo Irnu
                                                                                          ~ I evsnL Dvanap between ponionc ef lest fran ares nadectuete.
Invusti0stion
Invusti0stion
'estdts Inactoctuste I@croute DDP5 oobrare exporuce to oatccc verldv vrul'.pDfII 4ld not pruvtfs edoduare pent~tecttn0 fv DDP5 ochwwe chcnden pc/at eoo 1 c T.supplemonc1 provtfcd deride foc rarcaans of pw pow crsnsnvuv span from 0~600'O 0~000'DP5 vendor oorcraccod lo revtre software.FW now Beuavetrs Value Procasev scarard wes nol roe!red.New 0enerlo V5V of atitcal DDP5 ettctatos was pedonaed.Did not detect Ihoonert PW Crow scaaad cnctants In ed'ovstce Value Procecav.Al Sdta power oaoenclon ptaroou DDp5~uec Oetntlnkned tO Pe 0%IOwer pwn rnenual onnatrto ff&#xc3;s npaatssmwesa
        'estdts Inactoctuste I@croute DDP5 oobrare exporuce to oatccc verldv vrul'.
~padded pert of V5Vptaa)5-17-97 rvcpst.wod
pent  ~
'Page 36 0 0 0 ST.LUCIE ENGlNEERING, DEPARTMENT SOFTWARE VERIFICATION 6 VALIDATION PROGRAM IMPROVEMENTS
pDfII4ld not pruvtfs edoduare tecttn0 fvDDP5 ochwwe chcnden pc/at eoo 1 c T.
+DEVELOPED PROCEDURE'"MAINTENANCE'DEPARTMENTAL CONTROL OF COMPUTER SOFTWARE" IN FEBRUARY 1996+CONVEYED"LESSONS LEARNED" FROM THE RECENT SOFTWARE EVENTS TO ENGINEERING AND MAINTENANCE PERSONNEL+MADE ORGANIZATIONAL CHANGES TO PROVIDE MORE INTERACTION BETWEEN SOFTWARE ENGINEERS AND DESIGN/SYSTEM ENGINEERS+IDENTIFIED ADDITIONAL PROCEDURE/PROGRAM ENHANCEMENTS IN THE FOLLOWING AREAS:~IN-DEPTH TRAINING IN VERIFICATION AND VALIDATION FOR ENGINEERING
0~
/IS.C MAINTENANCE
supplemonc1 provtfcd deride foc rarcaans of 000'DP5 pw pow crsnsnvuv span from 600'O vendor oorcraccod lo revtre software.
~UPGRADE OF EXISTING SOFTWARE CONTROL PROCEDURES (MASTER&.BACKUP COPIES)DEVELOPMENT OF DETAILED SOFTWARE VERIFICATION 5 VALIDATION ON SELECTED COMPUTER SYSTEMS Page 37 45 Ik ST.LUCIE ENGINEERING DEPARTMENT REACTIVITY MANAGEMENT REACTOR ENGINEERING PROGRAIVIS
FW now Beuavetrs Value Procasev scarard wes nol roe!red.
+INSTRUCTIONS PROVIDED.FOR POWER MANEUVERING
New 0enerlo V5V of atitcal DDP5 ettctatos was pedonaed.
+, ENGINEERS ON SHIFT, DURING POWER:MANEUVERS
Did not detect Ihoonert PW Crow scaaad cnctants In ptaroou DDp5  ~
+BEACON REAL TIME MONITOR MODE+CORE OPERATING HISTORY ASSESSMENT
Al Sdta power oaoenclon Oetntlnkned tO Pe 0% IOwer pwn rnenual onnatrto ff&#xc3;s npaatssmwesa
+ECC VERIFICATIONS
                                                                                                                                  ~ padded pert of V5Vptaa) uec ed 'ovstce Value Procecav.
+REACTIVITY MANAGEMENT ASSESSMENTS
0 ~
+REACTIVITY MANAGEMENT TRAINING PROVIDED TO OPERATIONS DURING REQUAL+RE PROCEDURE REVIEW PROGRAM'RE PROCEDURE REVIEW PROGRAM+PERFORMED A TECHNICAL REVIEW OF 26 PROCEDURES
5-17-97 rvcpst.wod                                                         'Page 36
+REVIEW TEAM CONSISTED OF 2 ENGINEERS EACH FROM: REACTOR ENGINEERING (ON SITE)NUCLEAR FUELS (JUNO)~ABB/CE (NSSS VENDOR)PROCEDURE REVIEW RESULTS+THE REACTOR ENGINEERING PROCEDURES WERE FOUND TO BE TECHNICALLY ACCURATE AND CONSISTENT WITH TECHN)CAL SPECIFICATIONS AND DESIGN ANALYSIS.+THE MOST SIGNIFICANT PROCEDURE CHANGES FOCUSED ON CLARITY IN THE AREA OF SHUTDOWN MARGIN VERIFICATION ENSURING COMPLI'ANCE WITH T.S., AND'PROVIDING CONSISTENCY WITH OFF-NORMAL CEA PROCEDURE GUIDANCE.Page 38 0
 
w 0~Wv&wa~.pe Qr.e ST.LUCIE ENGINEERING DEPARTMENT REACTIVITY MANAGEMENT 14 12 Equipment GR Design E3 Human H 10 XX~~K Events CEA's.(U1) 66.6%12.5%Equip.(U2) 6.3%Design 12.5%OVERVIEW+NEARLY ALL EVENTS WERE ON UNIT 1(15 OF'16)+MOST WERE CEA EVENTS (11 OF 16)+HIGHER POWER THAN EXPECTED FOR PLANT CONDITIONS (2 OF 16)Page 39 0
0 0
ST.LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM ANALYSIS+DROPS RELATED TO:~MECHANICAL SLUGGISH GRIPPERS~TIMING MODUL'E FAILURE SYSTEM ASSESSMENT (ONE YEAR REVIEW)+OTHER FAILURES REED SWITCH POSITION INDICATIONS
0
~DDPS POSITION INDICATIONS CEA FAILURES TO MOVE DURING FLCEA CEA Drops@~Unit 1 QUnit2 S.i'>7/96 8/96 9/96 10/96 11/96 12/96 1/97 2/97 3/97 4/97 5/97 6/97 7/97 IvcDsl.wpd
 
'Page 40 il~'
ST. LUCIE ENGlNEERING, DEPARTMENT SOFTWARE VERIFICATION 6 VALIDATIONPROGRAM IMPROVEMENTS
ST.LUCIE ENG!NEERING DEPARTMENT CONTROL.ROD ELEMENT DRIVE SYSTEM SYSTEM ANALYSIS+DROPSiSLIPS ON UNIT 1 CAN BE ATTRIBUTED TO'LUGGISH CEDM GRIPPER ENGAGEMENTS, INADEQUATE DESIGN OF TIMING MODULES (NO CEA GRIPPER ENGAGEMENT FEEDBACK)AND POWER SWITCH FAILURES+ACTMS ON UNIT 2 PREVENT MOST PROBLEMS FROM MANIFESTING THEMSELVES AS DROPPED CEAS CORRECTIVE ACTIONS TAKEN+PERFORM CEDM COIL RESISTANCE TESTS EACH OUTAGE AND TREND DATA WITH PREVIOUS OUTAGES TO DETERMINE IF DETERIORATING COILS CAN BE IDENTIFIED 0+IDENTIFIED SLUGGISH GRIPPERS, TIMING MODULE AND POWER SWITCH FAILURES AS PRIMARY CAUSE OF UNIT 1 CEA DROPS AND SLIPS+CEA REED SWITCH REPLACEMENTS SCHEDULED EACH'OUTAGE CORRECTIVE ACTIONS PLANNED+IN-HOUSE REFURBISHMENT OF UNIT 1 COIL POWER SWITCH MODULES+IMPLEMENTATION OF UNIT 1 ACTM MODIFICATION (REFUELING 1997)+ENHANCE SCHEDULE FOR REPLACEMENT OF REED SWITCH ASSEMBLES IN UNIT 2 Page 41 0 O~
+ DEVELOPED PROCEDURE '"MAINTENANCE'DEPARTMENTALCONTROL OF COMPUTER SOFTWARE" IN FEBRUARY 1996
(p".ST.LUCIE ENGINEERlNG DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 CONTROL ELEMENT DRIVE.NIECHANISNI REED SWITCH ASSEMBLY REED SWITCH ACTUATING MAGNET UPPER PRESSURE HOUSING ASSEMBLY OMEGA, SEAL OPERATlNG RCD ANTI.EJECTION GRIPPER ELECTRICAL CONDUIT LIFT COll.LlFT AND PUL'L DOWN MAGNET ASSEMBLY UPPER GRIPPER DRIVE SHAFT COIL WIRE TROUGH PULL DOWN COIL L.OAD TRANSFER MAGNET ASSEMBLY LOAD TRANSFER COIL LOWER GRIPPER COiL LOWER GRIPPER MOTOR HOUSING ASSEMBLY REACTOR NOZZLE CONNECTION OMEGA SEAL.THERMAI.SLEEVE (PAQQPTI l40$.FhAtf Ivcpsl.wpd Page 42 0
+ CONVEYED "LESSONS LEARNED" FROM THE RECENT SOFTWARE EVENTS TO ENGINEERING AND MAINTENANCE PERSONNEL
ST.LUCIE ENGINEERING DEPARTlVIENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 ACTIVI UPGRADE AUTOMATIC CEDM TIMER MODULE (ACTM)+MICRO PROCESSOR BASED CONTROL ROD DRIVE SYSTEM CONTROLLER
+ MADE ORGANIZATIONALCHANGES TO PROVIDE MORE INTERACTION BETWEEN SOFTWARE ENGINEERS AND DESIGN / SYSTEM ENGINEERS
+REPLACES THE CPP TIMER DURING THE UPCOMING UNIT 1 REFUELING OUTAGE+CURRENTLY INSTALLED ON UNIT 2 (AND OTHER CE PLANTS)+CONTROLS CEA MOTION UTILIZING POSITIVE FEEDBACK VIA CURRENT SENSORS+EXPECTED TO REDUCE OR MITIGATE UNIT 1 CEA DROP EVENTS CONTROL ELEMENT DRIVE SYSTEM NSSS MG SET 240 VAC RPS TRIP BREAKERS CEAPDS (ADS)RSPT INHIBIT REACTOR REG.CEDS CEDMCS)CPP MAG JACK CEDM OPERATOR EQRJHD PlANT COMPUTER RSTP Page 43 i
+ IDENTIFIED ADDITIONALPROCEDURE / PROGRAM ENHANCEMENTS IN THE FOLLOWING AREAS:
ST.LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT.DRIVE'SYSTEM L(FTfNG 3/4" ANTl EJECT/ON GRIPPER (Not In Unit 2)UPPER GRIPPER L C P 0 LOWER GRIPPER fFAIOOOtl>ASJ'Pelt) rvcpal.wpd Page 44 0  
  ~   IN-DEPTH TRAINING IN VERIFICATION AND VALIDATIONFOR ENGINEERING / IS.C MAINTENANCE
>4'r.>c ST.LUCIE ENGINEERING
  ~   UPGRADE OF EXISTING SOFTWARE CONTROL PROCEDURES (MASTER
'DEPARTMENT PLANT SAFETY/RELlABILlTY lMPROVEMENTS ENGINEERING EMPHASIS FOCUSED ON SAFETY AND RELIABILITY MODIFICATIONS NEW MANAGEMENT REVIEW PROCESS ADOPTED INDICATIONS OF SUCCESS-REDUCED OPERATOR WORK AROUNDS-LOW NUMBER OF CONTROL ROOM DEFICIENCIES
      &. BACKUP COPIES)
-EXCELLENT PLANT AVAILABILITY SPECIFIC IMPROVEMENTS-199T UNIT20-PRESSURIZER SAFETY VALVE SCUD BLOCK Y DESIGN-'EACTOR VESSEL (HUNG REPLACEMENT DIESEL GENERATOR RELAY REPLACEMENT
DEVELOPMENT OF DETAILED SOFTWARE VERIFICATION 5 VALIDATIONON SELECTED COMPUTER SYSTEMS Page 37
-QUICKLOC INCORE INSTRUMENT FLANGE DESIGN-2C AFW PUMP WARMUP UNE MATERIAL CHANGE DUT-SIT FILL VALVE ACTUATOR UPGRADE PRESSURIZER SAFETY VALVE SOLID BLOCK BODY DESIGN-TCW PUMP DISCHARGE CHECK VALVE ENHANCEMENT IvccsLwcd Page 45 4I  
 
/~fss.(o".'T.LUCIE ENGINEERING DEPARTMENT OPERATOR WORKAROUNDS caus ts)OPEN I s 40 I I 35,"I Walked down plant to Identify nevr 30"'WAs 25" I 20 I I 15 l 10""'Operator Work Around:.A problem that Impedes an operator ln performing duties wlthln the approved procedures or ln accordance with the Intended design.last Updated: July S, 1SS7 0 Year End Target 4 12/95 9/96 10/96 11/96 12/I 1/97 2/97 3/97 4/97 5/97 6/97 7/97 8/97 9/97 10/97 11/97 12/97 Time (Month)OPEN nrcpsl.wpd Page 46 il i~~$4-r vp'I v~8 Ya)v~si'*.v'~~<j~<nggg~I cc.~)~wqgPi-.C v a)g~v.M~P~'c-.-.t.I I 0
45 Ik
I g F~r I ,A 0 C 1 4 e JW w~
 
ST. LUCIE ENGINEERING DEPARTMENT REACTIVITYMANAGEMENT REACTOR ENGINEERING PROGRAIVIS
  +   INSTRUCTIONS PROVIDED. FOR POWER MANEUVERING
  +, ENGINEERS ON SHIFT, DURING POWER:MANEUVERS
  + BEACON REAL TIME MONITOR MODE
  + CORE OPERATING HISTORY ASSESSMENT
  + ECC VERIFICATIONS
+   REACTIVITY MANAGEMENTASSESSMENTS
+   REACTIVITY MANAGEMENTTRAINING PROVIDED TO OPERATIONS DURING REQUAL
+   RE PROCEDURE REVIEW PROGRAM
'RE PROCEDURE REVIEW PROGRAM
+   PERFORMED A TECHNICAL REVIEW OF 26 PROCEDURES
+   REVIEW TEAM CONSISTED OF 2 ENGINEERS EACH FROM:
REACTOR ENGINEERING (ON SITE)
NUCLEAR FUELS (JUNO)
    ~     ABB/CE (NSSS VENDOR)
PROCEDURE REVIEW RESULTS
+   THE REACTOR ENGINEERING PROCEDURES WERE FOUND TO BE TECHNICALLY ACCURATE AND CONSISTENT WITH TECHN)CAL SPECIFICATIONS AND DESIGN ANALYSIS.
+   THE MOST SIGNIFICANTPROCEDURE CHANGES FOCUSED ON CLARITYIN THE AREA OF SHUTDOWN MARGIN VERIFICATION ENSURING COMPLI'ANCE WITH T.S., AND 'PROVIDING CONSISTENCY WITH OFF-NORMAL CEA PROCEDURE GUIDANCE.
Page 38
 
0 ST. LUCIE ENGINEERING DEPARTMENT w 0 ~ ~. pe Wv&
Qr. e wa REACTIVITY MANAGEMENT Equipment GR 14                            Design E3 Human 12                              H 10 XX~~K Events CEA's.(U1)     66.6%
12.5%
Design 12.5%
Equip.(U2) 6.3%
OVERVIEW
    +     NEARLY ALL EVENTS WERE ON UNIT 1(15 OF '16)
    +     MOST WERE CEA EVENTS (11 OF 16)
    +     HIGHER POWER THAN EXPECTED FOR PLANT CONDITIONS (2 OF 16)
Page 39
 
0 ST. LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM ANALYSIS
        +   DROPS RELATED TO:
            ~   MECHANICAL SLUGGISH GRIPPERS
            ~   TIMING MODUL'E FAILURE SYSTEM ASSESSMENT (ONE YEAR REVIEW)
        +   OTHER FAILURES REED SWITCH POSITION INDICATIONS
            ~   DDPS POSITION INDICATIONS CEA FAILURES TO MOVE DURING FLCEA CEA Drops
                                                                                  @~ Unit 1 QUnit2 S.
i'>
7/96 8/96 9/96 10/96 11/96 12/96 1/97 2/97 3/97 4/97 5/97 6/97 7/97 IvcDsl.wpd                                   'Page 40
 
il~ '
ST. LUCIE ENG! NEERING DEPARTMENT CONTROL .ROD ELEMENT DRIVE SYSTEM SYSTEM ANALYSIS
  +   DROPSiSLIPS ON UNIT 1 CAN BE ATTRIBUTED TO'LUGGISH CEDM GRIPPER ENGAGEMENTS, INADEQUATE DESIGN OF TIMING MODULES (NO CEA GRIPPER ENGAGEMENT FEEDBACK) AND POWER SWITCH FAILURES
  +   ACTMS ON UNIT 2 PREVENT MOST PROBLEMS FROM MANIFESTING THEMSELVES AS DROPPED CEAS CORRECTIVE ACTIONS TAKEN
  +   PERFORM CEDM COIL RESISTANCE TESTS EACH OUTAGE AND TREND DATA WITH PREVIOUS OUTAGES TO DETERMINE IF DETERIORATING COILS CAN BE IDENTIFIED 0 +
  +
IDENTIFIED SLUGGISH GRIPPERS, TIMING MODULE AND POWER SWITCH FAILURES AS PRIMARY CAUSE OF UNIT 1 CEA DROPS AND SLIPS CEA REED SWITCH REPLACEMENTS SCHEDULED EACH'OUTAGE CORRECTIVE ACTIONS PLANNED
  + IN-HOUSE REFURBISHMENT OF UNIT   1 COIL POWER SWITCH MODULES
  + IMPLEMENTATIONOF UNIT 1 ACTM MODIFICATION (REFUELING 1997)
  + ENHANCE SCHEDULE FOR REPLACEMENT OF REED SWITCH ASSEMBLES IN UNIT 2 Page 41
 
0 O~
 
              ".                                       ST. LUCIE (p                              ENGINEERlNG DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 CONTROL ELEMENT DRIVE.NIECHANISNI UPPER PRESSURE REED SWITCH                                         HOUSING ASSEMBLY ASSEMBLY REED SWITCH ACTUATING MAGNET OMEGA, SEAL OPERATlNG RCD ELECTRICAL CONDUIT ANTI.EJECTION GRIPPER LIFT COll.
LlFT AND PUL'L DOWN MAGNET ASSEMBLY UPPER GRIPPER COIL WIRE TROUGH DRIVE SHAFT PULL DOWN COIL LOAD TRANSFER COIL L.OAD TRANSFER MAGNET ASSEMBLY LOWER GRIPPER COiL LOWER GRIPPER MOTOR HOUSING ASSEMBLY REACTOR NOZZLE CONNECTION                                             THERMAI.SLEEVE OMEGA SEAL.
(PAQQPTI l40$ .FhAtf Ivcpsl.wpd                                     Page 42
 
0 ST. LUCIE ENGINEERING DEPARTlVIENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 ACTIVI UPGRADE AUTOMATIC CEDM TIMER MODULE (ACTM)
+   MICRO PROCESSOR BASED CONTROL ROD DRIVE SYSTEM CONTROLLER
+   REPLACES THE CPP TIMER DURING THE UPCOMING UNIT               1 REFUELING OUTAGE
+   CURRENTLY INSTALLED ON UNIT 2 (AND OTHER CE PLANTS)
+ CONTROLS CEA MOTION UTILIZING POSITIVE FEEDBACK VIA CURRENT SENSORS
+ EXPECTED TO REDUCE OR MITIGATE UNIT               1 CEA DROP EVENTS CONTROL ELEMENT DRIVE SYSTEM NSSS                     MG SET 240 VAC RPS                   TRIP BREAKERS CEAPDS (ADS)
RSPT     INHIBIT REACTOR           CEDS                             MAG JACK REG.                              CPP              CEDM CEDMCS)
RSTP OPERATOR           EQRJHD PlANT COMPUTER Page 43
 
i ST. LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT.DRIVE'SYSTEM L(FTfNG 3/4" ANTl EJECT/ON GRIPPER (Not In Unit 2)
L C
UPPER GRIPPER P
0 LOWER GRIPPER fFAIOOOtl>ASJ'Pelt) rvcpal.wpd                 Page 44
 
0 ST. LUCIE
        >4'r.>c                           ENGINEERING 'DEPARTMENT PLANT SAFETY / RELlABILlTYlMPROVEMENTS ENGINEERING EMPHASIS FOCUSED ON SAFETY AND RELIABILITYMODIFICATIONS NEW MANAGEMENTREVIEW PROCESS ADOPTED INDICATIONSOF SUCCESS SPECIFIC IMPROVEMENTS-
              - REDUCED OPERATOR WORK AROUNDS                   199T UNIT20
              - LOW NUMBER OF CONTROL ROOM DEFICIENCIES
                                                                - PRESSURIZER SAFETY VALVESCUD BLOCK
              - EXCELLENT PLANT AVAILABILITY Y DESIGN
                                                                -'EACTOR VESSEL (HUNG REPLACEMENT DIESEL GENERATOR RELAY REPLACEMENT
                                                                - QUICKLOC INCORE INSTRUMENT FLANGE DESIGN
                                                                - 2C AFW PUMP WARMUP UNE MATERIAL CHANGE DUT
                                                                - SIT FILLVALVEACTUATOR UPGRADE PRESSURIZER SAFETY VALVE                 - TCW PUMP DISCHARGE CHECK VALVE ENHANCEMENT SOLID BLOCK BODY DESIGN IvccsLwcd                                       Page 45
 
4I (o
              ".'T.
          /~fss    .
ENGINEERING DEPARTMENT OPERATOR WORKAROUNDS LUCIE caus   ts)                                           OPEN I
s Operator Work Around: . A problem that 40                                                               Impedes an operator ln performing duties I
I                                                         wlthln the approved procedures or ln 35,         "I Walked down plant                               accordance with the Intended design.
30"       'WAs     to Identify nevr 25"                                                                                       last Updated:
I                                                                                   July S, 1SS7 20 I
I 15 l
10"       "'
Year End Target 4 0
12/95      9/96  10/96 11/96    12/I 1/97  2/97  3/97 4/97 5/97   6/97   7/97 8/97   9/97 10/97 11/97 12/97 Time (Month)
OPEN nrcpsl.wpd                                                     Page 46
 
il i~
                  ~
                    $
4-r   vp
                                                                    'I v   ~
8   Ya
                                      .
              )v~si'*
v'~~<j~
                                <
nggg~
I
  ~) ~wqgPi-.
cc.
C v
a)g t.
                        ~ v. M~
P~ 'c-.-.
I I
 
0 I
g F ~
r I
            ,A 0    C 1
4 JW w~
e
 
O~
O~
ST.LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITY IMPROVEMENTS SPECIFIC UNIT 2 OUTAGE ACCOMPLISHMENTS
ST. LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITYIMPROVEMENTS SPECIFIC UNIT 2 OUTAGE ACCOMPLISHMENTS
+REVISED INTEGRATED SAFEGUARDS TEST PROCEDURE~NEW'PROCEDURE TESTS EACH TRAIN INDEPENDENTLY
        + REVISED INTEGRATED SAFEGUARDS TEST PROCEDURE
~ENSURES ONE COMPLETE TRAIN AVA'ILABLE FOR CORE COOLING+ON-LINE TESTING OF MSSVs+FULL CORE OFFLOAD ANALYSIS+VALVE OVERHAUL SUPPORT+AGGRESSIVE FLOW ACCELERATED CORROSION INSPECTION PROGRAM+MSIV REFURBISHMENT SUPPORT+COATINGS PROGRAMS nrepal.wpd P.age 49 il ST.LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITY IMPROVEMENTS MODIFICATIONS PLANNED FOR UPCOMING 1997 UNIT I OUTAGE+STEAM GENERATOR REPLACEMENT
            ~   NEW 'PROCEDURE TESTS EACH TRAIN INDEPENDENTLY
+PRESSURIZER HEATER SLEEVE NICKEL PLATING+QUICKLOC INCORE INSTRUMENT FLANGE DESIGN+CEDMCS ACTM UPGRADE+SIT FILL VALVE ACTUATOR UPGRADE+TCW PUMP DISCHARGE CHECK VAI VE ENHANCEMENT
            ~   ENSURES ONE COMPLETE TRAIN AVA'ILABLEFOR CORE COOLING
+REFUELING TRANSFER TUBE VALVE OPERATOR TORQUE LIMITER nrcpal.wpd Page 50 0
        +   ON-LINE TESTING OF MSSVs
ST.LUCIE ENGINEERING.
        +   FULL CORE OFFLOAD ANALYSIS
DEPARTMENT Pressurizer Heater Nozzle Nickel Plated Region{4" Long, 0.008" Thick)Weld Lower Head internal Cfadding.$25" Pressurizer Lower Head Typical Heater Nozzle.S05" Typical Nickel Plated t4ozzte Page 51 ik ST.LUCIE ENGINEERING DEPARTMENT HEATER, SLEEVE END EFFECTOR VPP=R SEAL vPPEP.gEA0 N I CKEL ANOOE LOWER SEAL SOLuT!0~OVTLET nr col.wpd Page 52
        +   VALVE OVERHAUL SUPPORT
        +   AGGRESSIVE FLOW ACCELERATED CORROSION INSPECTION PROGRAM
        +   MSIV REFURBISHMENT SUPPORT
        +   COATINGS PROGRAMS nrepal.wpd                           P.age 49


ST..LUCIE ENGINEERlNG DEPARTMENT DESIGN BASIS 50.54.(f)RESPONSE  
il ST. LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITYIMPROVEMENTS MODIFICATIONS PLANNED FOR UPCOMING 1997 UNIT I OUTAGE
        +  STEAM GENERATOR REPLACEMENT
        +  PRESSURIZER HEATER SLEEVE NICKEL PLATING
        +  QUICKLOC INCORE INSTRUMENT FLANGE DESIGN
        +  CEDMCS ACTM UPGRADE
        +  SIT FILL VALVE ACTUATOR UPGRADE
        +  TCW PUMP DISCHARGE CHECK VAI VE ENHANCEMENT
        +  REFUELING TRANSFER TUBE VALVE OPERATOR TORQUE LIMITER nrcpal.wpd                          Page 50
 
0 ST. LUCIE ENGINEERING. DEPARTMENT Pressurizer Heater Nozzle Nickel Plated Region                        Weld
{4" Long, 0.008" Thick)
Lower Head internal Cfadding
                                          .$ 25" Pressurizer Lower Head
                                          .S05" Typical Heater Nozzle Typical Nickel Plated t4ozzte Page 51
 
ik ST. LUCIE ENGINEERING DEPARTMENT HEATER, SLEEVE END EFFECTOR VPP=R SEAL vPPEP. gEA0 N I CKEL ANOOE LOWER SEAL SOLuT!0~ OVTLET nr col.wpd                    Page 52
 
ST.. LUCIE ENGINEERlNG DEPARTMENT DESIGN BASIS 50.54.(f) RESPONSE  


==SUMMARY==
==SUMMARY==
AND ACTIONS CURRENT AND FUTURE ACTIONS+FSAR/OPERATING CONSISTENCY REVIEW~FINDINGS TO BE RESOLVED OVER NEXT TWO YEARS+NEI INITIATIVE
AND ACTIONS CURRENT AND FUTURE ACTIONS
+ANNUNCIATOR
        + FSAR/OPERATING CONSISTENCY REVIEW
          ~   FINDINGS TO BE RESOLVED OVER NEXT TWO YEARS
        + NEI INITIATIVE
        + ANNUNCIATOR  


==SUMMARY==
==SUMMARY==
REVIEW COMPLETION DATE OF DECEMBER 1998+NRC A/E INSPECTION
REVIEW COMPLETION DATE OF DECEMBER 1998
~NRC INSPECTION REPORT ISSUED 3/25/97~DESIGN OF INSPECTED SYSTEMS GOOD WITH ADEQUATE DESIGN MARGINS.IMPLEMENTATION OF DESIGN ADEQUATE.~FPL RESPONDED TO INSPECTION REPORT ON 5/27/97 AND PROVIDED ACTIONS PLANNED FOR FOLLOW-UP AND UNRESOLVED ITEMS rvCpol.wpd Page 53 iS~0 c v<0 ST.LUClE ENGINEERlNG DEPARTMENT
        + NRC A/E INSPECTION
~VOLUNTARY FSAR REVIEW INITIATIVE
          ~   NRC INSPECTION REPORT ISSUED     3/25/97
+ST.LUCIE HAS COMMITTED.TO A GRADED REVIEW OF THE UNIT 1 Bc 2 FSAR+REVIEW PRIORITIZED TO RISK SIGNIFICANT SYSTEMS+CREDIT TAKEN FOR PREVIOUSLY INSPECTED SYSTEMS+FOUR PRIORITY LEVELS ESTABLISHED
          ~   DESIGN OF INSPECTED SYSTEMS GOOD WITH ADEQUATE DESIGN MARGINS. IMPLEMENTATIONOF DESIGN ADEQUATE.
+PLANT FIRE PROTECTION SECTIONS INCLUDED WITH PRIORITY 2 REVIEW+DISCOVERY PHASE FOR PRIORITY 1, 2, 5 3 TO BE COMPLETE BY OCTOBER 18,1998+SELECTED CHAPTER 15 ACCIDENT ANALYSES TO BE UPDATED nrcpsl.wpd Page 54  
          ~   FPL RESPONDED TO INSPECTION REPORT ON 5/27/97 AND PROVIDED ACTIONS PLANNED FOR FOLLOW-UP AND UNRESOLVED ITEMS rvCpol.wpd                             Page 53
~~il  
 
@PL ENGINEERING DEPARTMENT CHALLENGES
iS~
+MAINTAINING AND IMPROVING CURRENT LEVEL OF PERFORMANCE
0
+RETAINING TALENTED PERSONNEL+DEVELOPMENT OF ST.LUCIE SYSTEM ENGINEERING PROGRAM+IMPROV)NG EQUIPMENT PERFORMANCE MONITORING AND TRENDING  
 
ST. LUClE ENGINEERlNG DEPARTMENT c v    <0
                          ~ VOLUNTARY FSAR REVIEW INITIATIVE
        +     ST. LUCIE HAS COMMITTED.TO A GRADED REVIEW OF THE UNIT 1 Bc 2 FSAR
        +     REVIEW PRIORITIZED TO RISK SIGNIFICANT SYSTEMS
        +     CREDIT TAKEN FOR PREVIOUSLY INSPECTED SYSTEMS
        +     FOUR PRIORITY LEVELS ESTABLISHED
        +     PLANT FIRE PROTECTION SECTIONS INCLUDED WITH PRIORITY 2 REVIEW
        +     DISCOVERY PHASE FOR PRIORITY 1, 2, 5 3 TO BE COMPLETE BY OCTOBER 18,1998
        +   SELECTED CHAPTER 15 ACCIDENT ANALYSES TO BE UPDATED nrcpsl.wpd                             Page 54
 
~ ~
il
 
ENGINEERING DEPARTMENT
    @PL CHALLENGES
+ MAINTAININGAND IMPROVING CURRENT LEVEL OF PERFORMANCE
+ RETAINING TALENTED PERSONNEL
+ DEVELOPMENT OF ST. LUCIE SYSTEM ENGINEERING PROGRAM
+ IMPROV)NG EQUIPMENT PERFORMANCE MONITORING AND TRENDING


==SUMMARY==
==SUMMARY==
+STRONG DIRECT OPERATIONS AND MAINTENANCE.
 
SUPPORT~RESPONSIVE TO OPERATIONS PRIORITIES AND REQUESTS GOOD TEAMWORK AND COMMUNICATION
+ STRONG DIRECT OPERATIONS AND MAINTENANCE.SUPPORT
+GOOD FOCUS ON PLANT SAFETY AND EQUIPMENT, PERFORMANCE Page 55 0'0}}
  ~   RESPONSIVE TO OPERATIONS PRIORITIES AND REQUESTS GOOD TEAMWORK AND COMMUNICATION
+ GOOD FOCUS ON PLANT SAFETY AND EQUIPMENT, PERFORMANCE Page 55
 
0' 0}}

Revision as of 08:09, 22 October 2019

Refueling Outage ISI Rept.
ML17354A576
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/10/1997
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17354A575 List:
References
NUDOCS 9707160096
Download: ML17354A576 (352)


Text

0 TURKEY POINT PLANT UNIT 3 1997 REFUELING OUTAGE INSERVICE INSPECTION REPORT The required examinations scheduled during the Turkey Point Unit 3 refueling outage were completed. This completes the ISI requirements for the first refueling outage of the second period

.of the third inspection interval.

100% of the A, B, and C steam generator tubes were eddy current tested. 14 tubes were plugged during this outage.

The. NIS-2 forms discuss the repairs and replacements which took place since the previous Unit 3 submittal and during the 1997 refueling/ maintenance outage.

Visual examination and functional testing of snubbers was completed in accordance with ASIDE Section XI and Technical Specifications. Visual examinations did not reveal any failures.

There were no snubber failures in the, safety related functional test sample.

The inservice inspection summary tables detail the examinations

~ ~ ~ ~

performed during the first outage of the second period of the

~ ~

third ten-year interval.

~ ~

~

Selected Class 1 and 2 piping and supports were examined with surface, volumetric, and visual examination techniques in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and the Turkey Point Units 3 and 4 ISI Program.

0 9707fh0096 9707i0 PDR ADQCK 05000250 8 PDR

0 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-1 Owners'ata Report-for Inservice Inspections

0 FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 6

1. Owner: Florida Power and Light Company, 700 Universe Blvd. juno Beach, Florida 33408
2. Plant: Florida Power & Light Company, Turkey Point Nuclear Power Plant, 9760 S.W. 344th Street, Florida City, Florida 33035 3 ~ Plant Unit:~

Owner Certificate of Authorization (if recpxired)

Commercial Service Date 6 National Board Number for Unit:

7 ~ Components Inspected:

Manufacturer State o Nat'l Component or Manufacturer or Installer Province Board Appurtenance or Installer Serial No. No. No.

Reactor Pressure Vessel Babcock and 3PSRV1 N/A N-160 Wilcox Reactor Coolant Pump B Westinghouse 3P200B N/A N/A Regenerative Heat Westinghouse 3E200 N/A N/A Exchanger RHR Heat Exchan er A Atlas 3E206A N/A N/A Safety In'ection System Bechtel N/A N/A N A Residual Heat Removal -Bechtel N/A N/A N A Main Feedwater System Bechtel N/A N/A N/A Main Steam System Bechtel N/A N/A N/A

.8 ~ Examination Dates  : From to 9 ~ Inspection Period Identification  : Second Period 10 'nspection Interval Identification: Third Interval, from

11. Applicable Edition of Section XI ~39 Addenda ~ug
12. Date/Revision of Inspection Plan:

NIS-1 Report (continued) Page 2 of 6

1. Owner: Florida Po~er 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 2e Plant: Turkey Point Nuclear Power Plant, 9760 S.W. 344th Street, Florida City, Florida 33035 3~ Plant Unit:~
4. Owner Certificate of Authorization (if required)
5. ComInercial Service Date :
6. National Board Number for Unit:
13. Abstract of examinations and test. Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.

An Inservice Examination of selected Class 1 and 2 components and piping systems of Florida Power and Light's Turkey Point Unit 3 was performed during the 1997 Refueling Outage. This. outage March and ended on April 16, 1997. This was the first outage of3,the second period of the third ten year interval.

began on 1997 The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the ASME Section XI, 1989 Edition.

Manual ultrasonic, visual, magnetic particle, and liquid penetrant non-destructive techniques were used to examine components, piping, and their supports. The examinations were performed'y FPL personnel, supported by examiners supplied by Raytheon Engineers & Constructors.

Eddy Current testing was conducted on the three Steam Generators.

A total of 9574 tubes were examined. Fourteen tubes required plugging. See the NIS-BB for details of the examinations.

Several Class 1, 2, 3, MC, and CC areas were repl'aced or repaired since the last Summary Report was submitted. See the attached NIS-2 reports for a summary.

The Steam Generator Feedwater Nozzle piping augmented examinations were conducted during this outage on all three loops. The entire area from the nozzle ramp to a point one pipe diameter out on the far side of the elbow was examined with ultrasonics. No reportable indications were noted.

Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4.

Examinations were performed by Raytheon, Inc. and testing services were supplied by Basic-PSA, Inc.

System -Pressure testing was conducted by the plant to ASME Section XI and applicable Plant Procedures.. One thimble tube was found to have a through wall leak. It was replaced and retested.

Several mechanical connections were found to have leaks. These were all corrected. Leakage was detected at 2 RHR valve bonnets.

0 0

0

NIS-l Report .(continued) Page 3 of 6 e,, '4 ~

5.

Owner: Florida Power S Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Po~er Plant, 9760.S.M. 344th, Street, Florida City, Florida Plant Unit:~

O~ner Certificate of Authorization (if required)

Comnercial'Service Date .:

33035

6. National Board Number for Unit:

The bolt nearest the source of leakage was VT-l examined'nd found to be acceptable. During, the outage, the bolting on- the two valves;was removed,and examined. No other .leakage was reported.

All Quality Group A, B, and C pressure tests required for the.

first period of the third inservice inspection interval were completed.

A listing of examinations performed is attached to this summary.

The examinations performed during the outage meet the requirements of the Inspection Plan.

14. Abstract of Results of Examinations and Tests.

The seal surface on the Reactor Pressure Vessel head was examined using remote Visual techniques. No reportable indications were noted.

Eddy Current testing was conducted on all three Steam Generators.

See the 'NIS-BB for details.

A 'VT-3 examination was, performed near the beginning of the outage to look for accumulated, boron crystals and evidence of leakage.

A VT-2 examination was,performed during the system pressure test at plant startup. These .examinations were performed to meet the approved alternative requirements in Relief Request No. 3. No reportable indications were detected.

t The "B" R'eactor Coolant Pump Flywheel was examined with Technical Specifications. ,No reportable indications in accordance were.

'f NIS-1 Report (continued) Page 4 of 6 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.W; 344th Street, Florida City, Florida 33035 Plant Unit:~

4~ Owner Certificate of Authorization (if required)

5. Comnercial Service Date :
6. National Board. Number for Unit:

noted.

Residual Heat Exchanger A was examined using surface and volumetric techniques. A round indication was found on the end of one of the integral attachments with Liquid Penetrant. An engineering evaluation determined the indication to be a manufacturing process deficiency. The attachment has a partial penetration weld on the front side, and a cover weld on the back side. The indication was a result of the two welds not being joined at the end of the attachment, and was an acceptable condition. It was not a material or welding flaw, and is outside the scope of Section XI. No other indications were noted.

The support on RHR Pump 3P210A was examined .with visual techniques. A bent bolt was found and accepted as-is by engineering evaluation. An engineering evaluation determined the support was outside the scope of Section XI. It is part of the building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed from the ISI Program.

Residual Heat Removal piping welds and supports were examined using visual, surface and volumetric techniques. Acceptable round and geometric indications were noted. No reportable indications were. noted.

Safety Injection piping and .supports were examined using visual, surface and volumetric techniques. No reportable indications were noted.

During the outage, the Boron Injection Tank was bypassed and

~ ~ ~

abandoned in place. The piping welds to the tank were removed

~ ~ ~

~

il ik

NIS-1 Report (continued) Page- 5 of 6 Owner: Florida. Power S Light ComPany, 700'Universe Blvd. Juno Beach, Florida 33408 Plant:. Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035 Plant Unit:~

4~ O~ner Certificate of Authorization (if required)

5. Conmercial Service Date:
6. National Board Number for Unit:

from service and several new welds were added to bypass the tank.

See the examination tables for information on which-welds- and components were affected.

Main Steam piping, was examined using surface and volumetric techniques. Acceptable geometric indications were noted. No reportable indications were noted.

Augmented volumetric examinations were performed on the feedwater piping out from the Steam Generator nozzle. Acceptable geometric and slag indications were found. No reportable indications were noted.

15. Abstract of Corrective Measures There were no corrective actions required as. a result of ISI examinations. Several acceptable rounded indications were removed for maintenance reasons as part of additional, surface preparation.

0 il ib

NIS-1 Report (continued) of

'Page 6 6 Owner: Florida Power 8 Light Company, 700 Universe Blvd.'uno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035 Plant Unit:~

4~ Owner Certificate of Authorization (if required>

5~ Comnercial Service Date :

6. National Board Number for Unit:

We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No.

Expiration Date Date: Signed:

By:

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 3/3/97 to 4/16/97, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data .Report in accordance with'he Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

spect 's S'ature National Board, State, Province, and .Endorsements Date: 8 r~

0 Eg lt ~

ii, 4

TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements

0 FORH NIS 2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 12 06 95 700 Universe Blvd. Juno Beach Fl'. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t 3 Name PWO ¹:4229/63 WO ¹: 95032858 9700 S'W 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. 'No.,Job No.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING MATER System ¹: 19 Qual I ty Group: C
5. (a) Applicable Construction Code 831.1'955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer) National Other [Year J. Repaired J ASHE t Cocponent Hanufacturer f Serial Ho. J Board Identification [Built( Replaced or ) Code J I I f Reptacement JSterp (

I I I I /~Yes llo

[ INTAKE COOLING .IJONHSTOH [N/A )H/A iHOOEL 33 CHC I ST-5 /UNK~ (Replaced iNo IMATER PUHP PUHP 3P9A J

INTAKE COOLING IJOHNSTOH IH/A fH/A [MODEL 33 CHC IST-2 JUNK. ]Replacement ]Ho CWATER PUHP PUHP 3P9A IBOLTS (40) iH/A IN/A ]H/A (R90-0831 ASHE SA-307 GR 8 fUNK. /Replacement )Ho

/

1-1 4"-7-UN-2A 3P9A 7.'Description of Mork: 3A INTAKE COOLING WATER PUHP IST-5 REPLACED WITH SPARE IST-2.

Pneunatict Hominal Operating Pressure X Pressure 15 psig Test Temperature 76 ;F 95-064-3

Sheet 2 of 2 FORM NIS-2 (Back) 4l

9. Remarks: HEcMAMIcAL coNNEGTIoM No 'WELDING REoUIRED.

CERTIFI~CATE OF COMPLIANCE Me certify that the. statements made in the report are correct and this replacenmnt confonas to the r'ules of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate Signed

/

thori tion No OwnerOesignee, M~A

.'+M~jPcl Title

~~N~ix.'QP-'wner'or

~

Expiration Date Oate ~/I~

~NA 19

'0 CERTIFICATE OF INSLRVICE I',NSPECTIOM I, the undersigned, holding a valid caanission issued by'hLI Na'tional Boar'd of Boiler and Pressure Vessel inspectors and the state or Province of, Onde County and.employed by Arkwright.Hutual Insurance Company of Norwood, Ha. have inspected the components described'n this owners Report during the period 12/06/95 arid state that to the best of my knowledge and balief, t'e Owner has performed examihations'nd 11/21/95 'o taken corrective measures described in this Owners Report i'n adcordande with the requirements of the ASHE'ode, Section Xt.

By signing this certi'ficate neither the Inspector nor his enpioyer makes any warranty, expressed or implied, concerning the examinations and corrective measurea doser'ibed in'hi's.Owner's Repo'rt.'Fur'thekmore, neither the Inspector nor his eeployen shall be liable in ariy amnnier for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions '

MB'23~0II~I~

Inspector SignQa,ure ~

Nationhi Board, State, Providence, and Endorsements

'I9 95-064-3

FORM HIS ~ 2 OWNERS REPORT FOR REPAIRS OR REPLACEHEN'IS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 12 05 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PWO ¹:63/4109 WO ¹: .95032545 9700 SW 344 Street 'Florida Cit .Fl. 33034 Address Repair Organization P.O. No.,Job Mo.,etc
3. Work Performed by Florida Power 8 Li ht 'Iype Code Symbol Stamp N A Name Authorization Ho. M A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COMPONENT COOLING WATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~M A Code Case (b) Applicable Edition of Section XI 'Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of /Manufacturer/ National )

Other. ]Year [ Repaired ] ASME f Component Manufacturer. J Serial'No. 'Board Identification 'JBui It] Replaced or J Code /

f Replacement )Stamp f I I ./Y~es No

)BOLTS (4) IH/A IH/A iH/A )UTC349851 R94-4185 CHUNK. [Replacement )No 3E207C HX SA 193 GR 87

7. Description of Work: FOUR 4 HX'ANWAY BOLTS REPLACED ON UMIT-3 'COMPONENT 'COOLING WATER HX 3C 3E207C .

t 8. Tests Conducted: Hydrostatic:

Other Pneuaatic:

Pressure psig Nominal Operating Pressure Test Temperature 'F 95 '63.3

'Sheet 2 of 2 FORH NIS-2', (Back)

Ik

9. Remarks: MECHANICAL CONNECTION ~NO uELDING REQUIRED..

CERTIFICATE OF COHPLIANCE lie certify that the stater<ents made iin the report are correct and thiis replacement conforms to the r&ies of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certific e f Autho ation No N~A Expiration Date N A 7z('0 i~sR'A~4<.g.

Signed 42 O~ner or Owner+ Designee, Titl'.e 0

CERTIFICATE'OF INSERVICE INSPECTION I, the undersigned, holding a valid cor<mission issued by the National Board of Boiler and pressure vessel and the state or Province of Dade.County. and employed by Arkwriight.Hutual Insurance Company of 'nspectors Ha. have inspected the co<nponents descriibed in this Owners Report during the period 12/05/95 'orwood,

~

to~

12/05/95 and state that to the best of my knowledge and belle<I, the O~ner has perfdrmed examinati'ons'and taken corrective measures described in this Owners Report in accordance wiith the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed concerning, the examinations and correctiive measures described in this Owner's Report. Furthermore, or'mplied, neither the Inspector nor his employer shall be i,iable in any mann<'.r for any peraonal injury or'raper'ty or a loss of any kind arising from or connected with this inspection. 'amage 7

C<x<missions NB 823~ON~I~ I Inspect s Si ature ~

Nat<ionsi 8'oard, state, providence, and Endorsements Date 19 95.063.3 4l

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 LI ht Date 03 04 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PMO ¹:2579/63 MO ¹: 95024075 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Mork Performed by Florida Po~er 8, Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SPENT FUEL COOLING System ¹: 33 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case t

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,~N A Code Case

6. Identification of Components Repaired or Replaced and-Replacement Components Hame of Name of [Hanufacturer( National Other ]Year J Repaired ,] ASHE (

Component Hanufacturer ], Serial No. Board Identification [Built) Replaced or ) Code J

( Replacement )Stamp f I I /~res ue (HINGE PIH PLUGS (2) H/A iH/A IH/A IR91-5196 IUHK I Replacement I Ho

7. Description of Mork: CHECK VALVE HINGE PIN PLUGS REPLACED.

t 8. Tests Conducted: Hydrostatic:

Other VT-1 Pneunatic:

Pressure~sig Hominal Operating Pressure Test iempereture 'F 96.001-3

Sheet 2 of 2',

FORH NIS-2 (Back) 9.'.Remarks: THls Is A MEcHANIcAL coHHEcTIDN No.uELDING'REO IR D.

CERTIFICATE OF COHPI.IANCE Me certify that the statements made in,.the. report are correct and this replacement conforms to the rules ~of the

.ASHE Code, Section XI.

Type Code Symbol Stamp

'Certificate of Authorization No. ~H 'A Expiration Date N A O~ner or-Owner's Designee, Title CERT II'ICATE OF INSERVICI'. INSPECTION I, the undersigne'd, holding a, valid comaission issued by "the Hatiional Board.of'Boiler and Prdssule'less'.L

,inspectors and the state or Province of Dade'County ahd &rplbyed.by'Arkwrilbht.HutiiaL Insurance Coapany,'of Norwood, Ha.:have inspected the caqmnents described in this Owners Report during. the period 09/l)5/95 and.state that to the Imst of my knowledge and belief the (hner has performed examinations and to'3/04/96 taken corrective measures described in this Owners Report in'accordance with, the requirements of .the ASHE Code,Section XI.

By signing this ceirtificate neither 'the Inspector nor~hisI~Loylr stakes any warranty,'xpressed or impLied, concerning the examinations and corrective measures described in this Owner.'s Report. Furtheraere n'either the.Inspector nor his erployer shaLL be Liable in any manner for any personal injury, or',property damage or a loss of any k,ind arising from, or connected with this inspection.

Ccmmissi&s ,NB 8230~N'~I Inspectors S nature National Board State, Providence, alnd PndcIrsMnth Da 96-001-3

FORM HIS-2 OVNERS REPORT FOR 'REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Ouner Fior ida Po22er & Li ht Date 03 25 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit lo ¹: 95031214 PCH ¹: 95.103 9700 SV 3CC Street Florida Cit Fl. 3303C Address Repair Organization P.O. Ho.,Job No.,etc
3. Vork Performed by Florida Power & Li ht Type Code Symbol Staap Hame Authorization Ho. M A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification. of 'System: COMPONENT COOLING VATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Hame of )Hanufacturer) National ) Other )year ) Repaired ) ASHE )

Coaponent Hanufacturer ) Serial Ho. Board Identification )Built) Replaced or ) Code )

') Replacement )Staap )

I I I~PPP pp

)

1" BLIHD FLANGE I IDEAL )N/A )H/A )UTC 390755, 3E207A,B,C )UHK. )Replacement ,)Mo

) 6 HX'S

)3" BLIND FLAMGE ) IDEAL )N/A )H/A )UTC 390756, 3E207A,B,C )UNK. )Replacenent )Ho

)6 HX'S

)BOLTS (24) &r H/A IH/A )H/A )R94-2667 BOLTS, R93-2122 )UMK. )Replacement )Mo

)HUTS NUTS 3E207A B C HX'S

)HUTS (46) )H/A )H/A ')UTC351943 (15) UTC391981 )UHK. )Replacement )Ho I 31 3E207A B C

)STUDS (24) )M/A )H/A )U93.2949, 3E207A,B,C )UHK. )Replacement )Ho I HX'S

7. Description of Vork: REHOVED PIPING AHERTAP PIPING FROH'UNIT 3 CCV HX'S.AND INSTALL BLIND FLANGES P
8. Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure X Pressure~2 ig Test Temperature 72 ~

F'I 96-002-3

Sheet 2 of 2 FORK NIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION HO WELDIHB REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to 'the rules of the ASKE Code, Section XI.

Type Code Syahoi Stamp ~HA Certttioate Aothoritattoo No. ~N A Expiration Date M'IAA Signed rtha .Jgl '9.Q/

CERTIFICATE OF IHSERVI'CE INSPECTION I, the undersigned, holding a valid comnission issued by the Hational Board of Boileii and Pressure, Vessel, inspectors and the state or Province of Oade County and employ< by Arkwright Kutual Insurance Compan)I of Norwood, Ka. have inspected the components described in'his OImerp Rapport during the, period 11/09/96 to 03/24/96 and state that to the best of my knowledge and Qiief, the O~ner has performed examinations, and taken corrective measures described in this Owners Report in accordance with the requirements of tl)e ASKE Cod'e,Section XI.

By signing this certificate neither the Inspector nor his eapioyer makes any warranty, express'r icy\led, concerning. the examinations and rorrective measures described in this Owner's Report. Furl'her~re, neither the Inspector nor hiis employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or conrected with this inspection.

Commissions HB 8235~M~I

'

Inspect rs S ature National Board, Statet Providence, and Endorsements 9z 96.002-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS

'As Required by the-Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 05 23 96 Name 700,Universe Blvd. Juno,Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:6177/63 WO ¹: 96008678 CR ¹: 96-696 9700 SW 344 Street Florida Cit .Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc 3 ~ Work Performed by Florida Power S, Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton 'Fl. 33032 Address
4. Identification of System: CHEMICAL 8 VOLUME CONTROL System ¹: 47 Quality"Group:

B'.

(a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable. Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired, or Replaced and Replacement Components Name of Name of 'iHanufactureri National i Other iYear J Repaired f ASHE (

Component Hanufacturer ,i Serial No. Board Identification igui Iti Replaced or ] Code (

i Replacement igtamp J I I Yes No iCharging-Pump "8" iUnion I N52216 I N/A J3P2108 JUnk iReplacement No

7. Description of Work: REPLACED FLUID CYLINDER ASSEHBLY.
8. Tests Conducted: Hydrostatic: Pnewetic: Nominal Operating Pressure X Other VT-2 Pressure~gggg stg test temperature 114 ~

F 96.003.3

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: No weldin r uired.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in t'e report aire correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate Authorization No. N~A 'Expiration Date, z.x..: j N

Date ' 43> . 19 O~ner or Owner's Designee, Title gd'ERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdi,'ng,a valid cccmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or province of Dade county and empl'oyed by Arkwright'Hutual'Insurance Company'of Ha. have inspected the components described in thiS Owners'eport during the period 04/11/96 'orwood, and state that to the best of my knowlwige and beli6f, the Owner has performed examinlatilns and'(

'o'5/20/96 taken corrective measures described in this Owners Report in accord'ance with the requirenents of the ASHE 'Code,Section XI.

By signing this certificate neither the Inspector nor his ef3pioyer makes any warranty, expressed or is@lied, concerning the examinations and corrective measures descri'bed'in this owner's Report. Furthermore, neither the Inspector nor his erpioyer shall be liable in any manner, for'ny personal injury or property damage or a loss of any Ikind arising from or connected with 'thiS inspertioh.

I s~ N tanoiasiorls NB s23h~s~t Inspecto s Sig~n are Nattonslt Board, State, Providence, and Bndtrsetnnts Date ~ .C 19~+4 96.003e3

FORM NIS 2 OWNERS REPORT FOR REPAIRS OR'REPLACEMEHTS As Required by the Provisions of the ASME Code SectIon XI

1. Owner Florida Power B Li ht Date 07 01 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant 'Turke Point Plant Unit PWO ¹!5113/63 WO ¹: 96002325 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Work Performed by Florida Power B Li ht Type Code Symbol'tsap N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Intake Coolin Water S stem System ¹: 19 Duality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)'pplicable Edition of'ection XI Utilized for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Cocponents Name of Name'f IManufacturerI'ational I Other IYear I Repaired I ASHE I Component Manufacturer I Serial No. Board Identification IBuiltI Replaced or I Code I I Replacement ISterp I it~et se IICW CHECK VALVE IUNK I41195 IH/A I3-50-331 IH/A IReplaced IHo IICW CHECK VALVE IUHK I85223 'IH/A I3-50-331 IH/A 'IRepiacement ISTUDS(20)' 1/8" IUNK IH/A IN/A IUTC 383150 IN/A IReplacement IHo IHUTS 40
7. Description of Work: REPLACED ICW CHECK VALVE 3-50-331. REPLACED 20 STUDS AHD 40 NUTS .
8. Tests Conducted: Hydrostatic: Pnasast ic: Noainal Operating Pressure X Sressure~tg ig Test teegereture 91 ~

F 96-004-3

Sheet 2 of 2

9. Remarks: MECHANICAL CONNECTION~NO llELDING REQUIRED, FORM NIS-2 (Back)

Il CERTIFICATE OF COMPLIANCE Ne certify that the statee!ents made in the ireport lire correct'nd th'is replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol StaaT! N A Certificate of A thorizaticp No., N~A Expiration Date N Signed wner o

/gA n/,.-'~( ~~g~,

Owner'.s Des ignee, Title Date i~lr CERTIFICATE OF INSERVI CE 'INSPIECT ION I, the undersigned, holding a valid caanission issued by'he National Board of Boiler'nd Pressure 'Vesael and the state or Province of Dade County and .employed by Arkwright.Mutual..insurance.Ceqjany 'nspectors Ma. have inspected the co!Txwents described in thi's Owners Report during the period 01/29/96 of'orwood, to 06/27/96 and state that to the best of my knowledge and belief, the o~ner has performed examinati'ons'and taken corrective measures described in this 0 rners Report iih accordance with the requirements of the ASME'ode,Section XI ~

By signing this certiificate'neither the Inspector nor hi's eepioyer 'makes any isarrant5i, expressed or implied, concerning 'the examinations and corrective measurea descr'ibed in'hi's Owner's Report. Further'more, the Inspector nor his employer shall be Liable in any a'mnner for any peraonal injury or'roperty .'either damage or a loss of any kind arising from or connected with'his inspection.

r o' C(aaisslans ~HB 82 0 II~I!

Inspec r4 S nature National Board, State, Providence, and Endorse!!ents Dat )y .7-4 96-004-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASNE Code Section XI Florida Power & Li ht Date 07 01 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1. of 2 Address

2. Plant Turke Point Plant Unit 3 PQO ¹:63/3C05 IO ¹: 95028392 9700 SM 34C Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job No.,etc
3. Ilork Performed by Florida Power & Li ht Type Code Symbol Stamp Name .Authorization No. N A Expiration Date M A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Intake Coolin lister S stem System ¹: '19 Duality Group: C 5~ (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iNanufactureri National ) Other iYear i Repaired [ ASNE i Component Nsnufacturer ] Serial Ho. Board, Identification /Builti Replaced or i Code /

'i Replacement (Stamp /

I I J~res ue iIHTAKE COOLIHG MATER PUMP i JOHNSTON PUMP (H/A )MODEL 33 CNC IST-7 3P9C (UNK. iRepiaced iHo I

IIHTAKE COOLING MATER"PUNP IJOHHSTOH PUMP IH/A IH/A iNODEL 33 CNC IST-1 3P9C "iUNK. iRepiacement iHo

7. DescriPtion of Horkt INTAKE COOLING IIATER PUMP 3C 'IST-7 REPLACED IIITH REBUILT SPARE IST-1.
8. Tests Conducted: Hydrostatic: Pneusst i c: Nominal Operating Pressure X rressure~tr sig test teegersture 86 ~

F 96-005-3

I Sheet 2 of 2 FORH HIS-2 .(Back)

9. Remarks: HECHAHICAL CONNElCTICIN NO MELOIING REOUIRED.

CERl'IFICAYE OIF CCHPLIAHCE Me certify that the statenents made in the report are correc't aFrd this 'replacement conforms to the rules oF the ASHE Code, Section XI ~

Type Code Symbol Stanp

~ga t -X4,.g~/

Certificate of uthorization No. ~NA gaiorat Toogate tamer or ter'a TIeaigoee,

/

Title 19 CERTIFICATE OF IHSIERVICE INSPECT IOH I, the undersigned, hollding a valid conrnission issued by the Nhtidnal'Boa'rd 6f Boiler snd preshure'essel' (

inspectors and the state or Province of Oade County and entPLoged,bya A'rkuright.HutuaL, Insurance Co(rpany of Norrrood, Ha. have inspected the conpcnents described in this OMners Report during the period 'FI/10'/95'l 07/01/96 and state that to thte best of my knowledge and belief, the Ogner has performed examinat'Ion~ snd taken corrective measures Tdescrib< in this thnM'.rs Report in accordance'with the requirements of the 'ASHE Code,Section XI. I By signing this cert',ificate neither the Inspector nor, his employer makes any lrsrranty, expressed or, I implied, concerning the examinations snd corrective measurleS described in this Cnrnergs Report. FuI'thermor e, neither the Inspector rror his enployer shall be Liable 'in Sny manner for 'any'er'sorel 1'njury or property damage or a Loss of any kind arising from or connected Mith this inspection.

Inspect s Si ature Natiorurl Board, State, Providence, and Endorsements Oats 19 +&~

96.005-3

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACENENTS As Required by the Provisions of the ASNE Code Section XI Florida PoMer & .Li ht Date 08 27 96 700 Universe Blvd. Jwm Beach Fl-. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit PlJO ¹:7951/63 MO ¹: 96018245 9700 SM 344 Street Flor ida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Hork Performed by Florida PoMer & Li ht Type Code Symbol Staap N A Name - Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: 'CCM System ¹: 30 Quality Group: C 5~ (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized. for Repairs or Replacements 1989'Edition,~NA Addenda,~NA Code Case
6. Identification of Conponents Repaired or Replaced and Replacement Components Hane of Nane of (Hanufacturer( National Other (Year (

~

Repaired ( ASNE (

Conponent Hanufacturer ( Serial Ho. ~ Board Ident Ification (Built( Replaced or ( Code (

( Replacement (Stanp (

I I /~Yes Mo 13E207C HUTS, HEAVY HEX (8 IH/A (H/A (N/A (UTC.393249 R 35113048 (UHK (Replacement (Ho I ASTN A-194 GR7 (3E207C BOLTS (85) IN/A (H/A (UTC 398167 (N/A'Replacement (Ho

. H 81990

7. Description. of Mork: CLEAN DIRTY CONPONENT COOLING HEAT EXCHANGER TUBES REPLACED OUTLET DOOR iSTUDS AND BOLTIHG
8. Testa.ConductedI .Hydrostatict Pneunat ic: Hominal Operating Pressure Other Pressure~ig Test Telpereture ~

F 96-006-3

Sheet 2 of 2 I;"ORK HIS-2 (Back) 0

9. Remarks: THIS IS A KECHANICAL CONNECTION HO 4'ELDING REOLIIRE6.

CERTIFICATE, OF C(NPLIAHCE Me certify that the statements made in the report are co'rredt ahd t'hisepair conforms to the 'ru!Ls df the ASKE Code, Section XI.

Type Code Symbol Stanp Certificate of Authori atj< o. ~HA Expiration Date H~A

/l~

Signed Owner Q

or Owner's De 1

knee,, Title oate S 19~

p CERTIF!CATIE OF IHSERVICE INSPECTION I, the undersigned, holding a val!d cocmission issued by the Haticnal- Board of Boiler and Preshurd and the state or Province of Dade Catty and employed by hrkwright Kutual Insurance Cchpady of, Veksel'nspectors Norwood, Ka. have inspected the caqxxients c!escribed in this-Owners Report during the period O'/19/96o  !

08/07/96 and state that to the best of my knowledge and belief, 'the'Owner has performed examinations and taken corrective measures described in this Owxtrs Report 'in accordance with the requirements of the 'ASKL XI.

.Co'de,'ection By signing this certificate neither the Insixmtor nor his ~lawyer'akes 'any warranty, expressed or Implied, concerning the exam!nations and corrective measures described in this (!wner's Report. FuJ.thermo)a, neither the Inspector nor his esployer shall be liable in any 'manner 'for any persona'l Injury or property damage-or a loss of any kind arising from or corrected with this iinspectfon.

Cannissions LL 8250 H i Inspec rs Si~ ure Hatiorml Board, State, Prov!derma, and Endorsemeats Date 19 Q>

96.006.3 0

FORH HIS-2 ONMERS REPORT FOR REPAIRS OR REPLACEHEHTS

'As Required by the Provisions of the ASNE Code Section XI

1. OMner Florida Poser 8 Li ht Date 08 07 96 700 Universe Blvd. Jum Beach Fl. 33COS Sheet 1 of 2 Address
2. Plant Turks Point Plant Unit PNO ¹:5127/63 MO ¹: 96002326 9700 SM 34C Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ko.,Job Ko.,etc
3. 'llork,Performed by Florida Pc~sr 8 Li ht Type Code Syshol Steep N A Kame Authorization Mo. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Intake-Coolin Mater S tern System,¹: 19 Quality Group: C
5. (a) Applicable Ccestruction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Coeponents>>Repaired or Replaced snd Replacement Coeponents Kame of Kame of IHsnufacturerI Mational I Other I "ear I Repaired I ASKE I Coaponent Manufacturer ,I Serial No. Board Identification IBuiltI Replaced or I Code I Replacement I St8flp I I [~res se IBOLTS (20) IK/A IK/A IN/A IR 87-5164, '1-1/C"x5" IUKK IReplacement IMo UTC 351875 XJ-3-1COS I

IHUTS (20) IN/A IH/A IH/A IR 87-5164s 1 1/4" IUHK I Replacement I Ho UTC 351885 393251

7. Description of Nark: EXPANSION JOINT XJ-3-1408 REPLACED AT'3C ICM-PUMP DISCHARGE.

Pneusst 1 c: ,Nominal Operating Pressure X Pressure~tr te test Teeeeersture 91 ~

F 96.007-3

Sheet 2 of 2 FORH HIS1-2 (Back)

9. Remarka: THIS IS A HECHANICAIL CONNECTION HO NELDING REOUIREIDa CERTIIF ICATE OF COHPLIANCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol StanTD N A Certificate of Authoris i Owner 9

io or OImer's Designees, 7

jN 'A Title 9'7 Expiration Date H A CERI'IF I CATE CIF INSERVICE INSPECTION I, the undersigned, holding a, valiid cNImission-issued by the National Board of Boiler and pressui e Vessel inspectors and the state or province of Dade County and employed by Arkwright IKutual Insurance Company iof Horwood, Ha. have inspected the caqDonents descrit>>d in thisi OwnersiReport during the period 01/30/96 to 08/07/96 and state that to the IDest of my knowledge and belief the 099ner has performed examinations and taken corrective measures described in this Owners Report inI accordance with the requirements of the AsHE code,Section XI.

By signing this certificate neither the Inspector'nor'his'mployer makes any warranty, expressed or implied, concerning the examinations and corrective measuresi described. in <<his Ownercs Report. Furthersiores neither the Inspector nor his eeiployer shalll be liiable in any manner for any personal, injury or'roperty damage or a loss of any kind arising from oreconnected wi'th this inspection. Il ZA aHi ss 8999 cetasissieas II Inspecto s Si ndture National Beard, State providence, Snd Enddrsements Date 8'DZ 7 19 ?C 96-007e3

FORK NIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI Florida Pogger & Li ht Date 08 22 96 700 Universe Slvd. Juno Seach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit PMO ¹:63/8384 lO ¹: 96020299

.9700 SK 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job'Mo.,etc 3.'Mark Performed. by Florida Power & Li ht Type Code Syahol'tan@ N A Name Authorization Mo. H A Expiration Date P.O. Sox 4332 Princeton Fl. 33032 Address

4. Identification of System: COMPONENT COOLIMG MATER System ¹: 30 Guality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19S9 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or. Replaced and Replacement Components Kame of Name of (Kanufacturer[ National ) Other lYear ) Repaired I ASKE I Component Kanufacturer (

Serial No. 'Board .Identification (Guilt( Replaced or J Code J

) Replacement (St~ (

I I i Teereue (NUTS (2) HX OUTLET DOOR iH/A IH/A )H/A (3E207C UTC 393249'STK JUNK (Replacement [Ho A-194 GR 7

'I'STUDS (2) NX OUTLET DOOR IH/A (H/A )H/A (3E207C UTC 398167 (UHK )Replacement [Mo

7. Description of 'Mork: 2 STUDS AND NUTS REPLACED OH 3C CCll HEAT EXCHANGER ACCESS DOOR.
8. Tests Conducted: Hydrostatic: Pneumat i c: Hominal Operating Pressure 0 Other Pressure~tg test turgereture '.F 96.008-3

Sheet 2 of 2 FORM NIS.2 (IIack)

9. Remarks: THIS IS A MECNNICAL CONN'ECTION. NO NELOING REOUIRED'ERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct an'd this replacement conforms to the kuieh of the ASME Code, Section XI.

Type Code Symbol Ste~

~o'e 'I Certificate of Authorlzeltie Signed Owner or Owner .>>

Ho.

Oessgnee,

~HA Title ecol tete ~2~

tetlee oete 19 j I CERTIFICATE OF INSERVICE IHSF'ECTIOH I, the undersign9<, holding a valid ccemission issued by the National Board of Boiler and Pressurel'Vessell inspectors and 'the eetate or Province of Oade County and employ'ed by Airkwright'Mutual Insur~nce Coo@any,of Norwood, Ma. have inspected the conponents described in this Owners Report during the period 08/07/96 to 08/22/96 and state that to the best of my knowledg'e ahd b'eliaf, the Owner has performed examinations and taken corrective measures ciescritxxl in this Owners Report in accordance with the rmiuirements bf the ASME Code,Section XI. I By signing this certificate.neiither the Inspectoi ndr hiis elnpiayer'makes any warranty, expriessad ol.

iayli'ed, concerning the examinaticxm and corrective mea'suras d'escribed in this owneros,Report.'urthermore, neither the Inspector nor his employer shall be liable 'in any inner for 'any personal injury o'r pr'operty or a loss of any kind arisiing from or connected with th'is .Inspactfon. 'amage Comniissions NB 823~0~HI~

Inspe ors~SI nature Naltiodal Boar'd, State, Providence, anci Endorsements 19~~+

96;008-3 0

FORM HIS-2 OVHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 09 26 96 700 Universe Blvd. J~o Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PlO'¹:63/7082 lO ¹: 96014602 9700 SM 344 Street Florida Cit Fl. 33034 Address 'Repair Organization P.O'Ho.,dob Ho.,etc
3. Ilork Performed by Florida Power 8 Li ht .

Type Code Synodal Sterp N A Kame Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: .'CHEMICAL 8 VOLUME CONTROL System ¹: 47 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized.for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case 6.. Identification of Ccgponents Repaired or Replaced*and Replacement Cooponents kame of iHanufactureri National 'J' Other /Year ( Repaired i ASHE (

Manufacturer Serial Ko. Board Identification )guilt/ Replaced or ( Code i i Replacement JStsnp (

I I i~res s iRELIF VALVE ICROSBY VALVE T I51300 IH/A IRV-3-203 (UHK. (Replaced iKo l2ttX 3 'AGE iRELIEF VALVE ICROSBY VALVE 8 IN82705 IH/A (UTC 371565, RV-3-203 '/UNK. (Replacement iKo 12tt X 3 GAGE 0003 UP.O¹C95677-90722 C 0

,(STUDS (8) IH/A iH/A JUTC 378831, 5/8" X 11 UHC iUNX. (Replacement iMo I

(HUTS (16) iM/A N/A (UTC 391981, ASTM A-194 iUNK. iReplacement iHo GR 2H

7. Description of Uork: RELIEF VALVE RV-3-203 REPLACED UITH TESTEO SPARE. EIGHT 8 STUDS AHD sIXTEEN 16 HUTS REPLACED.

Pneumat ic: Hominal Operating Pressure X Pressure~270 tp Test Temperature 137 F 96-009-3

Sheet'2 of 2 FORH NIS-2 (Back)

9. Remarks: HECHAMICAL CONHECTION. MO llELDIMG REOliJIRED.

CERT IF I CA1'E OF COINPLIANCE Me certify that the statements made in the report are correct and this replacement confome to the rules,,of the ASHE Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorizat on Ho.

I

~NA gee'-wM-Etpitettetl tete ~ee Signed 3'>yre~ss Ouner or-Owmr's Designee,, Title tete 19 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a'valid cannission issued by, the Khtiohal 'Board of Boiler and Pressure Vessel.

inspectors and the state or Province of Dadh Cunty and ~loyjed by Arkuright Hutual Insurance Caiman'y Ha. have instated the compaeents d'escribed in this OMners R'epor t daring the period '6/05'/96o of'oruood, 09/26/96 and state that to the best of my knouledge and belief, the Ower has performed examiinat'ionf, and taken corrective measures describ< in this OMners Report in a'ccordan'ce with'he requirements of the,hSHE Code,Section XI.

By signing this-certificate neither the Inspector nor h'is eaployer makes any werranty, expressed o' IsT!I(ed, concerning the examinations and corrective measures described in this 0 eer's Reix!rt. Furthermore; neither the Inspector nor his employer shall be liable in any manr!er for any personal injury or or a loss of any kind arising from or coraected Mith this inspection. pkope'rty'amage M,'orAniss fons ,,NB

'a'tfohal 823~0~HI~'ure Inspect rs Si Board, State, Provider!ce, and Endorsemeits Date 9'6-009-3

FORM HIS-2 (NHERS REPORT- FOR REPAIRS OR REPLACEHEHTS As Required'by the Provisions of the ASNE Code Section XI

1. Owner Florida Po~er S Li ht Date 10 28 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address
2. Plant Turke Point Plant Unit

,PMO ¹:63/0522 MO ¹: 96027062 9700 SN 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job.No.,etc

3. Nark Performed by Florida Power B Li ht Type Code Syshol Stamp N A Name Authorization Ho. iH A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONENT COOLING llATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components Repaired or Replaced and Replacement Coaponents 0IHUTS (30)

Mane of Coaponent CCM HX Meme of Manufacturer

'[Manufacturer[ Mational

( Serial JN/A Ho.

iH/A Board Other Identification

,i3E2078 UTC 393249

[Year

/Built/

I

[

/

I Repaired [ ASNE Replaced or / Code Replacement (Stanp

/~tes ue

[

/

(

(UMK )Replacement (Mo (OUTLET DOOR ASTH A-194 GR 7 (BOLTS (30)'CM HX IN/A (N/A [3E2078 UTC 398167 JUNK [Replacement ]Ho lOUTLET DOOR

7. Description of Mork: CCM HX 3B ACCESS'DOOR'TUDS AMD HUTS REPLACED.
8. Tests Conducted: Hydrostatic: Pneunatfc: Hominal Operating Pressure Other Pressure~sig test tesgersture oF 96.010.3

Sheet 2 of 2

9. Remarks: THIS IS A NECNAHICAL CONNECTIOH.

PORN, NO MELOIHG HIS-2 (Back)

REOUIRED.

0 CERTIFICATE OF CONPLIAhlCE Me certffy that the statements made fn the repor't are correct and,this replacement conforer to the rules of the ASHE Code, Section XI.

Type Code Syrrhol Steep le A Certificate of Authorization,No. N~A Expiration gate N A

/

Sfgned Date pl/ 4 owner or owr3IrF's Designee, Tftle CERTIFICATE OF IHSERVICE I,NSPECTIOH I, the unders3gned, holding s valid conraissfon issuer( by, the Haf:fonaL Board of'oiler and Pressure VesseL inspectors and.the state or Province of Oade County and ettThloyed by Arkwright Nutual, Insurance CtxtTpanyi of Norwood, Na. have inspected the cortTxhnents de'scribed fri this Owners Report during che period 10/11/96 to 10/28/96 and state that to the best of my krewlcdgp and belief, the Owner has performed examinations and taken corrective measures described fn thiis Owners Report fn accordance wiith the requfreox.nts of the ASNE,Code,Section XI ~

By sfgn3ng this certificate neither the Inspector norI hiP eriployer Pmkgs any warranty, expressed or, I implied, concerning the examinations end corrective measures describedl in this Owner's Report. Furthermore, ,

(

neither the Inspector nor his eoployer shall be LiabLe in sny manner for any per..onal injury or prpperIty, damage or a Loss of,any kind arising from or connected fifth, th(s ipspectfpn.,

Cotrmfssions,, HB, 823~0M~I Inspectors'fgrwhr.ure ,

Hatfonpl EIoard, State, P'rovidence, and Endorsements 19 96-010-3

FORM NIS-2 OWNERS REPORT 'FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1 ~ Owner Florida Power & Li ht Date 01 02 97 Name 700:Universe Blvd. Juno Beach Fl. 33408 Sheet .1 of 2 Address

2. Plant Turke Point Plant Unit

,PHO ¹:1204/63 lJO ¹: 96031833 9700 SM 344 street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc

3. Hork"Per formed by Florida Power &'Li ht. Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COMPONENT COOLING HATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA'ode Case
6. fdentification of CoJJJponents Repaired or Replaced-and Replacement Components Name of Name of (Manufacturers. National ( Other iYear f Repaired [ ASME i Component Manufacturer i Serial No. Board Identification (Builti Replaced or / Code (.

( Replacement .]Stamp i I I J~Y*s u IHUT (1) 'i H/A iN/A iH/A )HEAVY HEX ASTM A-194 (UNK (Replacement (Ho UTC 393249 H CV333 7.,Description of Ilork: REPLACED ONE HUT ON COMPONENT COOLING HEAT EXCNANGER

8. Tests Conducted: Hydrostatic: Pnewetic: Hominal Operating Pressure Other Pressure~rg Test Teegersture 4F 97-001-3

Sheet 2 of' FORH HIS 2 (Back) 0

9. Remarks: THIS HAS A HECHNICAL CONHECTIOH. HO WELDIHG REOUIRED'.

CERTIFICATE OF COHPLIANCE Me certify that the statnnents made in the report are correct and this repl,aceaent conforms <<o the rule's of the ASME Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorizat3on Ho. ~NA Exp3ration Date r7 Owner or

/~, /ig Owner~s Designee, 0

Tif le Q&gyr~"6"C. t4A..o.~. /6 ,

19',

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding,a valid cixrmission issued by the National Board of Boiler and Pressur'e Vessel inspectors and the state or Province of Dade County"and employed by"Arkwrigh>> Hutual Insuran/e Con@any of Norwood, Ha. have inspected the components described in this Owners Report during the period 12/11/96 to 01/02/97 and state tha't to the best of my knowledge and belief, 'the Owner has performed examinations and taken corrective measures descrlh< in this Owners Report in accordance with the reciuirements of the ASHE Code,Section XI.

By signing this, cert.ificate neither the inspector nor his employer makes any warranty, express&1 o3 I

implied, concerning the examinations and corrective measures describe3 in this Owner's,Report. Furthermore, I ne3ther the Inspector nor his employer shall be liable in any manner for any personal i,njury or pdopel ty 'I or a loss of any kind arising from or connected with this inspection. 'amage

+ ~r/~ ~)

Comnissions HB 8230 N I Inspector Si ture 'atiodal Board, .State, Prov3dence, and Endorsements Date 19 P~'7-001-3

FDRH Nis-2 ouNERs REpoRT F0R REpAIRs 0R REpLAcEHENTs As Required by the Provisions of the ASHE Code Section XI Florida Power S Li ht Date 02 03 97 700 Universe Blvd. Jwa Beach Fl. Sheet 1 of 2 33408'ddress

'2. Plant Turke Point Plant Unit PQO ¹:63/1638 MO ¹: 97001635 CR ¹: 96-0070

'9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc'.

Mork Performed by Florida Power S Li ht Type Code Syshol Stamp N A

,Kame Authorization No. N A Expiration Date M A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: COHPOMENT COOLING MATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA AddendaP~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,NC16-1Code Case
6. Identification of'omponents Repaired or Replaced and Replacement Coaponents Kame of Name of )Manufacturer Kational i Other ,iYear.,l Repaired' ASHE I Component Manufacturer i Serial No. Board Ident ification iguiltl Replaced or I Code 'I

,i Replacement. JStasp Yes No 3E2078 Mestinghouse JN/A 047 iComponent Cooling Mater i1968 iRepaired Yes Neat Excha er >>B>>

7. Description of Mork: CUT 6>> X 8>> 'ACCESS MOLE FOR FORIEGM HATERIAL RETRACTION. CCOE CASE M-416-1 NAS BEEN ENVIED FOR THIS REPAIR ACTIVITY.
8. Tests Conducted: Hydrostatic: Pneunat i c. Nominal Operating Pressure X Other HT ROOT pressure~use is Test Tespereture MOH 'F 97.002-3

Sheet ',2 oi 2 FORM NIS-2 (Back)

Ik B. Rnnerks: cede case gala-1 vas en oknl for this ~ra ifr a~etlvit A.ll veld~i~as rforaecf in accordance with the FPL Weld Control Manual.

CERTIFICATE OF COHPLI ANCE We certify that the statements made in the report are correct and this l repair 'onforms to the rules of the ASHE Code, Section Xl ~ I I

Type Code Symbol,Stamp N A Certificate of Authorization No. 'NA Expiration Bate ~B'A S 1 gned Oat. ~4:>~~ Y I r or Ownerks Oekignee, Titi&

)CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holtiing a valid cccmlssicn I sued by tha National.Board of Boiler and pressure'es'sel and the state or province iof Blade county and,~>loyed by Arkwright Mutual, Insurance'ompany 'nspectors Ha. hive inspected the ccImpoients described. in this bkers Repoit during the period 01~/22/97 of'orwood,

~

tfkd 02/03/97 and state that to the best of my knowledge aQ bI.Iiif, khe Owner has performed exami'nations'nd taken corrective measures ciescribcxi in thiis Owners Report in aecordanee with the requirements of the ASHE Code, '

Section XI. I By signing this certificate neither the Inspector nor his enployer, makes any warranty, expressed or implied, concerning the exeainat3cfns and corrective measures descr'ibed in'his OWnerks Report.'urthermore, neither the 'Inspector nor his employer shall be liable in any sender for any personal Injury or property damage or a loss of any kird arising-froaf or connected with th/s ins~tion.'

Inspector S Ig re Rational Board, Stateproviden, ce, and Enllorstnedts 9'7 I

Oat 19 97-002-3

FORM HIS-2 OMNERS REPORT FOR 'REPAIRS OR REPL'ACEMEH'IS As Required by the Provisions of the ASHE Code Section XI O 1. Owner Florida Po~er 8 Li ht Name Date 02 11 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t 3 Name puo ¹:63/8809 uo.¹: 96020605 9700 Su 344 Street Florida Cit Fl. 33034 ~

.Address Repair Organization P.O. Ho.,Job Ho.,etc 3~ Ilork Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Name Authorization No. M A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032'ddress

4. Identification of System: COMPONENT COOLING HATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~M A 'Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of'Components Repaired or Replaced and Replacement Components Name of Name of rIHanufacturerI National Other IYear;I Repaired I ASME .I Coaponent Manufacturer I Serial Ho. Board Identification .'IBuiltI Replaced or I Code I

'I Replacement IStamp I

I I [~<<s ue I STUDS (160) I IH/A IN/A ITHREADED ROO JUNK IReplacement IHo I3 4" X 8 1 2" H/A'H/A 'TC 406446-1 406518-1 IHUTS (320) IN/A IH/A INUTS, ASME SA-194 GR 7 JUNK IRepiacement INo l3 4<<g UTC 393249-1 406514-1 ISTUDS (40) IH/A IN/A IH/A ,ITHREADED .ROOg IUNK IReplacement IHo 1 1 8" X 8 UTC 400981-1 INUTS (80) IH/A IN/A <<,IH/A INUTS, ASHE SA-194 GR 7 IUNK IReplacement IMo 11 1 Ba UTC 351807 398260 399264 I I I

7. Description of llorkt REPLACE 'BOLTING ON CCM HEAT 'EXCHANGER "8" CHANNEL HEAD ANO ELBOU.

t 8. Tests Conducted: 'Hydrostatic:

Other Pneunatict Pressure~erg Nominal Operating Pressure test Temperature 'F 97.003-3

Sheet 2 of 2 FORH HIS-2 (Back)

II

9. Remarks: NO MELDING REOUIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements macle in the report are correct and ~thia re'placement conform to the rules of the Code, Section XI. 'SIDE Type Code Synhol Steap I A Certificate of Authorization Ho. ~N(A Expiration Date ~HA Ouner or 99nerds IPesignee, Title D.te 99 7

~

CERTII ICATE OF IHSERVICIE INSPECTIOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Prc':ssu're VessB'nl inspectors and the state or Province of Dade County and Anplbyed by~Arkuright Mutual Insurance Carphny 'of Ma. have inspected the coeimnents described in this'09dners'Rep'ort'dur'ing the period 01/09/97 to

'orgood, 02/10/97 and state that to the est of my knoMledge and belief the Ihdner has performed examinations and taken corrective measures, described in this Ogners Report in~ accordance uith the requirements of the ASHE Code,Section XI ~ ,

By signing this certificate neither the Inspector nor~his~ eeglloykr makes any warranty, expressed or implied, concerning tlhe examinations and corrective measures'es'cribed in this Omar's Report. Furthersored neither the Inspector nor his erployer shalli be liable in an'y ma'nnet for any personal injury or ,'property damage or a loss of any kind arising from or connected with this inspection.

Coomissiorls -NB 230 N' Inspect s QShature Mationat Board, state araviden,oe, dnd Bnddraednnta Dat 97-003.3

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section,XI

1. Owner Fioridh Power & Li ht Date 02 11 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PNO ¹:63/8809 MO ¹: 96020605 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Mork'Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. 'N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONENT COOLING lJATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Coeponents Repaired or Replaced and Replacement CoJJTJonents Name of Name of (Hanufacturer( National ( Other (Year ( Repaired -( ASHE (

Component Hanufacturer (

Serial No. Board Identification (Built( Replaced or '( Code (

( Replacement (Stamp (

I' J~Ves me (SQUARE HEAD BOLT IN/A IN/A (H/A'UTC 406513 HEAT 54333 (UHK (Replacement (Ho

(

20 1 1 8" DI A (HEAVY HEX NUTS IH/A (N/A (H/A (UTC,399624 (UHK ,(Replacement (No I

20'1 1 8" DIA

7. Description of llork: REPLACED 20 SQUARE HEAD BOLTS & NUTS ON CDI HEAT EXCHANGER' CHANNEL HEAD.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other Pressure~stg Test Temperature ~

F 97-004-3

.Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: NO MELDING REOOIRED.

CERTIFICATE OF iCOHPLIANCE Me certify that the statem>ants made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate of uthorizatlon No. N~A Expiration Date ~NA r~/ 8+ to9Z Owner r Owne! 's 6esiignee, 4! t'le >d>

CERTIIFICATE OF INSERVICE INSPECTICIN I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Provincie of Dade County and &rplbyed by'rkwright 'Hutual 'Insurance Company of Norwood, Ha. have ins!pected the co>ponents 'descriimS in this'wr>ers'eport during the period 01/09/97 to 02/11/97 and state .that to the best; of my, knowledge and bei,ief, thie 0>dner has perfo>oned examinations and taken corrective measiures described in this Owners Report 16 ace>ord!>>nce with the requirements of the ASHE Code,Section XI.

By signing this certificate rieither the Inspector nor'his'm'>>loyler >aakea any warranty,; expressed or i>>plied, concerning the examinations ard corrective measdres'eslcribed 'in this'wner's Report. Furt'hera>ores neither the Inspector nor his ee>ployer shall be liable ir'> an'y awinneir for any, personal Injury or'pro'perty damage or a loss of any kind arising from or connected with this inspection.

II

~

r+g cease>asians,aa > vd~s~t Inspec s nature sat>anat Board state prov>denee, dnd'dnddrsedents I

D.t. M. '7 10++

97-004-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida'Power S Li ht Date 03 20 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of. 2 Address
2. Plant Turke Point Plant Unit Name PMO ¹:63/2502 WO ¹: 97006743 CR ¹: 97-0432 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. 'Mork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization No. H A Expiration Date N A P;O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: RESIDUAL HEAT REHOVAL System ¹: 50 Quality Group: B
5. (a) Applicable Construction Code 831. 1 1955 Edition, NA Addendas~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Conponents Repaired or Replaced and Replacement Coaponents Name of Hame of /Hanufacturer/ National ( Other (Year )

Repaired ( ASHE )

Component Hanufacturer /, Serial Ho. Board Identification )guilt] Replaced or ( Code f f Replacement [Stamp f I I /~Yes se IPIPE TO ELBOW MELD IN/A IN/A [H/A (14gg-RHR-2301-10 [UHK [Repaired ]Ho

7. Description. of Mark: INDICATION BUFFED OUT THAT MAS FOUND DURING ROUTINE ISI INSPECTION.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure pressure~is rest Temperature ~

F 97-005.3

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks<< NO WELDING REaUIRED CERTIFICATE OF COHPLIANCE We certify that the statements made in the, rcport: are correct and <<his repair conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp Certificate of A thorization No. ~NA r

Signed wner Qp)WQg~i6 cs~y or wner" s Designee, Title Date /WF/ZA 1ll ~~

0 CERTIF,lCATE OF INSERVICE INSPECTION I, thc undersigned, holding a valid comnission issued by the Iiatidnai Bohrd 'of Boiler and Pressure Vessel inspectors and the state or province, of Dade County and ecyloyed'by ArkWright Hutual Insurance-Company of Norwood, Ha. have inspected the comp>nents descrilxxl in. this bwndrs kepdrt durihg the period '3/17/97 to 03/20/97 and state that to the best of my knowledge and belief, the O~ner has perforated examinations and taken corrective measures descriked in this Owners Report in 4ccdrdahcc with the requirements of the'SME XI. Cade,'ection By signing this certificate neither the-inspector nor. his ampl'oyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any~ manner~for any personal injury or property damage or a loss of any kind arising from or connected with this ~inspect~ion,,

Cocmissions , NB 8230,~N I Inspe ors gnature Naticnai'Boa'rd,'State, proVidence, and Endorsements'ot~

A 19 97-005-:3'

FORM NIS-2 OVNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1 ~ Owner Florida Power 8 Li ht Date 03 25 97 700 'Universe Blvd. 'Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Name PNO ¹:63/2531 MO ¹: 97006917 CR ¹: 97-479 9760 SU 3CC Street Florida Cit FI. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by 'Florida Power 8'i ht Type-Code Symbol Stamp N A Name, Authorization No.

Expiration Date N A P.O. Box 4332 Princeton FI. 33032 Address

4. Identification of System: RESIDUAL HEAT REMOVAL System ¹: 50 Duality Group: B
5. (a) Applicable Construction Code ASME SECTION III 1965 Edition,~N A Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of /Manufacturer('ational Other -

Iyear I Repaired I ASME I Coeponent Manufacturer i Serial No. Board 'Identification iguiiti Replaced or i Code i

( Replacement istaep (

I I Joyce ge 13A RHR HEAT EXCHANGER IATLAS INDUSTRIAL I877 I727 13E206A i1968 iRepaired iYes MANUFACTURING

7. Description of cwork:. GRIND OUT LIQUID PENETRANT INDICATION IDENTIFIED DURING ROUTINE 'INSERVICE IHSPECT I OH.
8. Tests conducted: gydrostettc: Pneunatic: Nominal Operating Pressure Other PT Pressure~sic test yeepcreture 4F 97-006-3

Sheet 2 of 2 FOHN HIS-2 (Back)

9. Remarksi NO lIELDIHG REQUIRIED CERTIFICATE OF COHPLIANCE

'Me certify that the statenents made in the report are cori ect and this repair conforms to the rules, of the ASIDE Code, Section XI.

Type Code Symbol Stamp 'N of Authorization No., IN~A A'ertificate Expiration Date ~N A s;g,~ W6QÃ Owner r Owner's Designee, Titlk Date CERTIFICATE OF IHSERVICE IHSPECTION I, the undersigned,.holding a,valid ceiiaission issued by the National Board of Boiler and Pressure Vessel.

inspectors and the state or province" of Dade County and"'employed by'Arkwright Hutual 'Insurance Corqpany of Norwood, Ha. have inspected the cavponents described in(this owners Report during the period and state that to the best of my knowledge and belief, the owner has performed examinati'ons'and

'03/19/97 'o 03/21/97 taken corrective measures descr3bed in .this owners Report ih accordance with the requirements af the AsNE~code,Section XI.

By signing this. certiificate neither the Inspector nor his ecpioyer makes any warranty, exprassed od implied, concerning the examinations and corrective meakurels ddscr/bed in'this Oinieris Report. 'Furthermora, neither the Inspector nor his employer shall. be, liable i'n any manner for any personal injury od praperty ~

damage or a loss of any kind arising, from or connected with~ thiis iiispection.

Cocmiasions,, HB, 823~ON~I,~,

Inspec ors Si ture ~

Hationhi B'oard, State, Providence, and Endorsanents wag

'ate P-7 97-006-3

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 03 25 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit kame PWO ¹:63/8991 WO ¹: 96024216 CR ¹: 96-776 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date H A P.O. Box 4332 Princeton 'Fl. 33032 Address
4. Identification of System: MAIN STEAM System ¹: 72 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer[ Hational Other lYear f Repaired I ASME I Component Manufacturer (

Serial Ho. Board Identification ]guilt] Replaced or f Code ]

f Replacement JStasp f I I [r~es ue

)LOAD STUD (1) FOR PSA-35 )H/A IN/A )N/A )STOCK CODE ¹0197328 17-4 )UHK. [Replacement ]Ho iSNUBBER TAG ¹ 3-1084 SS ASME SA-564

[HUTS (4) FOR PSA-35 [N/A IH/A fH/A ]STOCK CODE ¹0209608 ASME fUHK. [Replacement [Ho (SNUBBER TAG ¹ 3-1084 A-194 GRADE 8

7. Description of Work: REPLACED LOAD PIN ON PACIFIC SCIENTIFIC MODEL PSA-35 'SHUBBER TAG ¹ 3-1084 WITH LOAD STUD.
8. Tests Conducted: Hydrostatic: Pneuaatic: Hominal Operating Pressure Other VT-3 Pressure~sig Test teegereture 97-007-3

Sheet 2 of 2 FORH HIS"2 (IBack)

9. Remarks: HECHANICAL COHHECTIOIN HIO M=LDIHG REOU'IREO.

CERTIFICATIE OF COHPLIANCI Ne certify that the statements made in the report are correct and this replacement conforms to thc rule's of thIc ASHE Code, Section XI.

Type Code Symbol Stamp Certificate Authorization No. ~NA Expiration Date ~N 'A Signed Owner r Owner'sVesignee, p~

Title

+>>pn ~~4:,I Pi+.~~; Oate,+~iiX4~/ 2.9'; 19Q I I

CERTIFICATE OF INSERVICE IHSP'ECTIOH I, the undersigned, Iholcling a valid coamission issued by thh Haltiohal Board of Boiler arxl Preslurc,'Ves'sel '

inspectors and the state or Province of Dade County and.employed-by Arkwright Hutual, Insurance'oalpanV 03/24/97 Ha. have inspected the ccraponents described in this Oianers Report d<rring tire period 09/18/96 and state that: to the best of my knowl.edge arkf &tieIf, thc O~ner has performed exami'nations'nd of'orwood,

'6 taken corrective measures described in this Owners Report in abcor'danke with the requirements of t'e ASHE'ode, '(

Section XI.

I By signing this c'crtificate neither the Irtspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure's dLscr'ibad in'his Owners Repart. Fur'thelmor'c, neither the Inspector nor his employer shall be liable in alny 6rann'er for 'eny personal injury or property damage or a loss of any kfr>>d arising from or connected wlthl this insgctibn. '

Coaraissions NB 823~0M~I~

Inspec rs S ature National Board, State, Providence, and Erx/orsIemedts '(

Date 19 QP O

97-007-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1 ~ O~ner Florida Power & Li ht Date 03 24 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Hame PWO ¹:63/7603 WO ¹: 96016980 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization Ho. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: AUX FEEDWATER System ¹: 75 Quality Group: C
5. (a) Applicable Construction. Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iManufactureri National i Other iYear,i Repaired i ASHE (

Component Hanufacturer i Serial No. Board Identification iguilti Replaced or i Code J i Replacement [Stamp i I

'I [~res se iHUTS (14) IN/A IN/A fN/A iSTK CODE 00278361 iUHK iReplacement iHo I

ICAP SCREWS (14) IN/A JH/A JH/A iSTK CODE 00271201 iUNK )Replacement )Ho

7. Description of Work: DISASSEMBLE INSPECT REASSEMBLE 3-20-401 t 8. Tests Conducted: Hydrostatic:

Other Pneunatic:

pressure~tg Hominal Operating Pressure test testsereture oF 97-008-3

Sheet 2 of 2 FORM HIS 2 (Back)

9. Remarks: MEcHANIcAL col<NEcTIDM~MO MELDING REOUIRED.

CERTIFICATE OF COMPLIANCE Ile certify that the sicstements maCk in the report are correct and this replscecnent conforms to the cules of the ASME Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorization No. ~NA Ex'piration Date '

A l S i gned ~ l+A+Y~fi Si~ggJA~P pace W~ ~+ '

'sy'~~ I Owner or OwnelC/s Designee, Tit.le iCERTIFI CATE OF INSERVI CE INSPECTilOH I, the undersign<4, holding s valid cccimission issued by the National Board of Boiler snd Piiessurc'Vessel inspectors and the state or province of.'D~sde'County'and employed by Arkwright Mutual', Insurance Company of Norwood, Ma. have inspected the ccimponents described in'his owners Report-cfuring the period 07/01/96 to 03/24/97 snd state that to thc; best of my knowLedge snd belief, the owner hss Ferformed elcsmi'nations'nd taken corrective measures. described in thiis Owners Repo'rt .in secor'danre With'the'equirements of the ASME Cocle, Section XI'y signing this certificate neitheir,the Inspector nor his emplcyer makes any warranty, expressed. or implied, concerning the exciminations and corrective measures described in this Owner's Report.'ur'thermor'e, neither the Inspector nor his employcir.shall be Liable 'in any manner for any personal injury or pr'opei ty i damage or s loss of any kind arising from or connected with,this iinspecti'on.'nspec Canmissions Hll 828~0I~IQ orsyS" nature i Hstiocial Board, State, Providence, snd Endorsements Date + ~ ~ 19 7~~

97-008-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power S Li ht Date 03 24 97 Name 700.Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PWO ¹:0991/63 WO ¹: 96030528

'9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc

3. Work Performed by Florida Power. S Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration'Date P.O. Box 4332 Princeton 'Fl. 33032 Address 4~ Identification of System: CHEHICAL 8 VOLUHE CONTROL System ¹: 47 Quality, Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components 'Repaired or. Replaced and Replacement Components Name of Name of /Hanufacturer) National Other [Year ] Repaired i ASHE i Component Hanufacturer )

Serial Ho. Board Identification iguilt) Replaced or i Code (

( f Replacement igtaap i I I James se ITHREADED ROO iN/A iH/A iN/A [UTC 398161 ASHE SA-193 iUHK. iRepiacement (Ho I8 STUDS FABRICATED GRADE 87 IHEAVY HEX HUTS (16) iN/A iN/A iH/A iUTC 399723 ASME SA-194 iUHK. ]Replacement iNo GRADE 2H

7. Description of Work: REPLACED EIGHT 8 STUDS AND SIXTEEN 16 NUTS ON NON-REGENERATIVE HEAT EXCHANGER 3E201 FABRICATED BY ATLAS-COPCO INC. HOOEL 0-1503-7.

t 8. Tests Conducted: Hydrostatic:

Other Pneunatic:

Pressure~erg Hominal Operating Pressure Test Tempereture oF 97-009-3

Sheet 2 o,f 2 FiDRH NIS-2 (Back)

9. Remarks: HECNANICAL CONNECTION NO WELDING REOUIRED.

CERT IF I CATE OIF COHPL I ANCE Me certify that the statenents made in the report are,correc't and this ireplscement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate of Authorization No. ~N A Ekpiriation D'ate si ~r 2. ~z Owner' Owner'O'DesigneeTitle r

CERT IF ICATI-: OF INSERVICE INSIPECT ION I, the undersigned, holding a valiid cnrmiSsion issued b'y thc National Board of Boiler and Presaurci Veaseli inspectors and the state or Province of Dade County and employed by Arkwright Hutual'nsurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 1'I/25/96 to 03/24/97 and state that to the best of my Iknowicdge a'nd belief, 'the Owner has performed examlnat'iona an'd taken corrective measures described in,.tlhis Owniers Report in accordance with the requirements 'of the.iASHF. Code, i Section XI.

By signing this certificate ncithcr tlhe Inspector nor hiis Cmplbyed makes 'any warranty, expressad or implied, concerning thie examinations snd correc'tive measures desciribed in this Owner's Rcport. Furthcrmore, thc Inspector nor his employer slhall be liable in any manner for any personal injury or property 'either damage or a loss of any kind arising from or connected with this inspection.

,Corrrriirssiions, NB 8230 ~N~I Inspector SigniitFre 'ational 'Board, State, Iprovidence, and Enkioraements Date 97-009-3I

FORH HIS-2 OWERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE,Code Section XI

1. Owner Florida Power 8 Li ht Date 04 18 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit

,PNO ¹:63/0124 .WO ¹: 96025060 PCH ¹: 96-012 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Mo.,Job Ho.,etc

3. Nark Performed by Florida Power 8 Li ht Type Code Syahoi Stamp N A Name Authorization Ho.

Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: Safet In ection S tern System ¹: 62 Quality Group: 8
5. (a) Applicable Construction Code 831.1 1955 Edi t i on,~MA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,M416-1Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Components Name of Name of (Manufacturer[ National Other ]Year f Repaired / ASHE )

Component Hanufacturer f Serial Ho. Board Identification (Built) Replaced or ( Code ]

I ] Replacement ')Stoep (

I I I ]~res rre 13T208 BOROH INJECTION I N/A IN/A (H/A )PC/H.96-012 BORON IHJ TK )UHK [Replacement )Mo ITAHK HOD IF I CATION

7. Description of llork: PIPING HOOIFICATIONtOF SAFETY IMJECTIOM LINE TO BYPASS THE BORON INJECTION TANK.

THE FOLLOMING HATERIAL llAS USED: 2 90 DRG 4" SCH 80 ELBONS UTC 398779 4" SCH 316 'ASME SA 312 SCH

,80 UTC 398561 4 SOCKOLET 'SS ASHE 'SA182 UTC 406901 2 45 DRG 4" SCH 80 ELBONS UTC 406833 1 "4" SS TEE SCH 80 ASHE SA403 UTC 407413. FOR SUPPORTS 3-SIH-23 8 H IC-248B-1 THE FOLLONIMG MATERIAL llAS USED: 2 4" PIPE CLAHPS UTC 405948 2 NELDLESS EYE 'NUTS UTC 405946 2 llELDED BEAN ATTACHMENTS UTC 405945 2 MELDED EYE RODS UTC 405947 AHD 2 PLATES 1 2X6X7 UTC 390858.

Pneunatic: Hominal Operating Pressure X tressure~1550 iu test Tsetsereture 83 4F 97-010-3

Sheet 2 of 2 FORH NIS-2 (Back)

9. Rcmarkse SUPPORT 3-SIH-139 THE FOLLOWING HATERIAL 'MAS.USED' 4" PIPE L1-BOLT LITC 400433 1 4" PIPE SADDLE UTC'405949'. SUPPORT 8080-H-007-1 THE F I.LNIIN'ATER AL AS USED: 1 CHANNEL'Y TEEL UTC 407359 2 CLAHP!>> UTC 374568  !~2NUT SPRING UTC 3932C7 ANGLE C.S.ASTH A36 UTC 403958. TH REOUIREHNTS OF CODE CASE NC16-1 HAVE BEEN HET FOR THIS R-PL CEH:NT ACT VITY.

iCERTIFICATE OF COHPLIANCE lie certify that the statcneehts made in the report are, correct and this repiaccnent conforms to the rules of the ASHE Code, Section XI.

Type Cade Symbol S'tamp N A Certif icate Author)zation No- I~!A Expireition Date ~NA

>>i>>.~. u~PQ~M Owner or

/

OwnqPs Designed, 5~+~~~~-,

Title 4

~~~>>s~e ,~gad, i A CERTIFICATE OF INSERVICE INSPIECTION I, thc undersigned, holding a valicl connission issued by thc National Board o'f Boiler and Pressure Vessel inspectors and the state or province of Dade county and~cap~layed by Arkwright Hutual'nsurance company of Norwood, Ha. have inspected the caqmnents described in thils OWnerd Report during the periad 04/07/96 ta 04/18/97 and state that to the best of my knowledga and baiicf, t'e O~ner has performed examinations'nd taken corrective measures dcscribeid in this owners Report ih adcordanc'e with 'the requirements.6f the ABHE~ code,Section XI.

By signing this certificate neither the Inspector nor hi!s employer 'makes any warranty, expressed or inpiied, concerning the exmninations aind correct!ive meaaures described .ln,this Owner's Report. Furthermore, neither the Inspectoir nor his eeyioyer shall be liable iin any sunnier far any personal injury ot pr~opci ty ~

damage or a loss of any kind arising from or connect'ed with this inspection.

Comni as 1 ons, NB 823~ON~I,~,

Inspe ors'nature National Board, State, Proviidence, and Endorsements Date .'I9 97-010-3

FORM HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. O~ner Florida Power & Li ht Date 03 30 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Nsne PIIO ¹:3648/63 IIO ¹: .95028815 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization'P.O. Ho.,Job Ho.,etc
3. llork Perforned by Florida Power & Ci ht ,Type Code Symbol Stamp N A Name Authorization.Ho. N A Expiration.Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: CHEMICAL AND VOLUME CONTROL System ¹: 47 Quality Group: C
5. (a) Applicable-Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section.XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired-or Replaced snd'Replacement Components Name of Mane of (Manufacturer( National Other (Year ( Repaired ( ASME (

Component Manufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

( Replacement (Stamp (

I I i~res ge (STUDS (24) (H/A IN/A I3E201 (UHK. (Replacenent I

(HUTS (48)

(H/A'N/A (H/A (H/A (3E201 (UMK. (Replacement (Ho (Ho

7. Description of Ilorkt REPLACED 24 STUDS AND 48tNUTS ON THE NON-REGENERATIVE HEAT EXCHANGER ENDBELL ASSEHBLY.

t 8. Tests Conducted: Hydrostatic:

Other Pneunatic:

pressure~stg Nominal Operating Pressure Test Tespersture 4F 97-011-3

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: MECHANICAL CONNECTIOM MO MELOIMG REOUIRED.

CERTIFICATE OF COMPLIANCE

'Me certify that thc staterents made in the report are correct and ttais rcpiacenent conforms <<o the rules of the ASHE Code,Section XI'. I Type Code Symbol Stamp Certificate of+uthorization Ho. ~HA Expiration Ilste ~NA slgn~ 842 19

'Tlf.le

~%~~M'wner 0

o Owner" s4'esigne'e, CERTIF ICAYE OF IHSERVICE IHSPECTIOH I, thc undersigned, holding a valid caw>ission issued by the Hational Board of Boiler and Prepsure Vessel inspectors and the state or Province. of Oade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha. have inspect'ed the components described in this Owners,Rcp'ort'during the period '10/L3/95 'to and state that to thc best of my knowledge and belief the Amer has perfo'rmed examinations and '3/27/97 taken corrective measure." described in this Owners Report in accordance with the requirenwnts of thc ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed'or II implied, concerning the examinations and corrective measures described in this Owner's Rcport. Furthernere,

,neither the Inspector nor his eayloyer shall be liable in any manner for any personal'nJury or;properiy damage or a loss of any kind arising from or connected with,thi;s inspection. 1 Cceeissidns '

NB i823O~H~I~

Inspec rs Si ature ,'Nat,'io~i Board, State, Providence, and Endorsenents gate 97'01

FORN NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

~ .1.. Owner Florida Power 8 Li ht Date 04 07 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Name PWO ¹:63/7853 WO ¹: 96012069 9760 SW 344 Street 'Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc 3.,llork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of, System: REACTOR COOLANT System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code 831.1'955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification. of Components Repaired or Replaced.and Replacement Components Name of Name of )Nanufacturerf National Other )Year ) Repaired ( ASHE Component Hanufacturer ) Serial Ho. Board Identification [guilt) Replaced or J Code (

J Replacement (Stamp J I I JYesreue, IPRESSURIZER RELIEF VALVE ICROSBY IH51249-1580 IN/A IRV-3-551A )UNK. )Replaced (Ho (PRESSURIZER RELIEF VALVE (CROSBY IH51249-1362 IN/A IRV 1A (UNK. (Replacement )Ho

7. Description of llork: REHOVE PRESSURIZER SAFETY VALVE RV-3-'551A AHD INSTALL SPARE.

Pneunatic: Hominal Operating Pressure X pressure~2280 siu test Temperature 535 'F 97-012-3

Sheet 2 of 2 FORH, HIS-2 (Back)

9. Remarks: HECHANICAL CONNECTION NO 'WELOIHG REOUIREO.

CERTIFICATE OF OOHPLIANCE lie certify that the statements made in the report are correct and this'eplacement conforms to thol rulles of the ASIDE 'Code, Section XI.

Type Code Symbol Stamp N A

-Certif icate of Authori".ation No. ~HA I

Signed cfar +ivw~~P(<~

Own r or wner's Oesignee, T>tl'e CERTIFICATE OF IHSERVICE INSPECTIOH I, the undersigned,, holding a valid co>r>>>issiion issued by the National Board of Boiler and Pressure Vessel inspectors and the state or F'rovince of Dadle County and employed by Arkwright Hutual Insure'nce Cempany.*f Norwood, Ha. lieve inspected the comF>onents described in this 'Owners 'Report during the period 07/14/96 to 03/27/97 and state that to the best of my knowledge and belief, the Owner has perfors>ed examinations and taken corrective measures described in this Owners Report'n 'accords'nce'with tHe requirements. of the ASHE Code,Section XI.

By signing this certificate neither the Inspector r>or his employer makes any warranty, expressed or implied, concerning the examinations and corrective measui os 'described in this Owner's Report. Furthermore, neither the Inspector nor his e>qpioyer shall be liable in'ny manner for any personal injury or property damage or a loss of any kind ari:sing from or connected with this'ns'pection'.

Inspe tors >gnature National~ Board, State, Providence, ahd &do>>sMnts Date 97-O12-3

FORM NIS-2 OLINERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power B Li ht Date 04 16 97 700:Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address 2; .Plant Turke Point Plant Unit Name PNO ¹:63/2645 NO ¹: 97007310 CR ¹: 97-53l 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ko.,etc 3'., llork Performed by Florida Power I Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration, Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: C onent Coolin Hater S stem System ¹: 30 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case
6. Identification of Components Repaired or Replaced,and Replacement Components Name of Name of, ')Manufacturer) National ( Other, (Year .( Repaired ) ASME ]

Coayonent Manufacturer [ Serial Ho. Board Identification [Built( Replaced or ] Code J

/ Replacement JStaap f I I [~Yes No ITRANSITION TUBE N/A iH/A [FOR MSA TAG ¹3-1096 [UHi( (Repaired )Ho IASSEMBLY

7. Description of llork: TRANSITION TUBE OH SNUBBER 3-1096 MAS SHORTENED BY REMOVING EXISTING HELD AHD RENELDING.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-3 4F 97-013-3

Sheet 2 of 2 FORH MIS.2 (Back)

9. Remarks: ALL MELDING PIERFORHED IN ACCORDANCE MITH APPROVED PLANT 'PROCEDURES.',

CERTIFICATE OF COHPLIAHCI lie certify that the statements made in the report are cor'rect and this 'epair 'onfor'ms to the i;utels oP th' ASHE Code, Section Xl.

Type Code Symbol StrmTo Certificate of Author'fzatfon Ho. ~NA Expiration Date ~NA

'9~

Owner or OwnerBdl/Designee/ Title p.

CERTIFICATE OF INSIERVICE INSPECTION I, the undersigned, hoidling a valid comrrfssfon fssuk bg th2I. Ma'tfohai 'Board o'f Boiie'r and and the state or Province of Dade County,and empfoy2% by Arkwright Kutuai, Insurance'oripnnl/ of P'resdure'essel'nspectors I

Norwood, Ha. have inspectedl the corrponents described in this Owners Report during the, period 03/25/97 tio I 04/16/97 and staIte that to the best of my knowledge and belief, the owner has F2erformed ekamfnatfo& and I

taken corrective measures dlescribed in this Owners Report in accordance with the requirements IOf the.ASME Code,Section XI.

By sigriing this certilficate neither the InspeICtcr nor his eccployer makes any warranty, expressed or implied, concerning the examinations and corrective measure's drl.scribed fn'his Owner's Report. Furthermore, neither the Inspector nor his qaployer'hall be liable in any rtranner for,any personal injury or property damage or a loss of any kind arising from or connected with'hfs I'nspection.

BnmnIssInns MB 823~08~12 Inspect rs Si ature 'affon'nl Board, State8 ProvidenIce, andi Endorsements Date iP 19 97-01,3-3

FORH NIS-2 OHHERS REPORT FOR REPAIRS OR REPL'ACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 04 08 97 700 Universe. Blvd. Juno Beach Fl. 33COB 'Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PQO ¹:63/2418 HO ¹: '97006494 9760 Su 3CC Street Florida.Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job No.,etc
3. Hork Performed by Florida-Power & Li ht Type Code Symbol Staap N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: RHR System ¹: 50 Quality Group: 8
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~M A Code Case
6. Identification of ConTxinents Repaired or Replaced and Replacement Conponents Kame of Name of iHanufacturer( National Other iyear i Repaired i ASHE i Conponent Hanufacturer i Serial No. Board Identification /Built( Replaced or,/ Code i I / Replacement /Steap J l I [~Yes ue IPLUGS (4) H/A iH/A iH/A PRO-3-1469 UTC 406038 ASHE iUNK. /Replacement /No SA-182 F316 SS
7. Description of Ilork: REPLACED PLUGS ON RESTRICTING ORIFICE RO-3-1469'FLANGES.

8 . Tests Conducted: Hydrostatic: PneLInat 1 c I 'Hominal Operating Pressure Other Pressure~g A ig Test teepereture 97.014-3

Sheet 2 of 2 FORH NIS.2 (Back)

9. Remarks: HECKANICAL CONNECTION~NO MELDING REOUIRED.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are carr'ect'and'his replacement conforms to the ru'les of the ASHE Code, Section XI.

Type Code Symbol St~>

Certificate of Authorization No. N~A Expiration Date Signed .

Dune

~~+,) i I or O~rrk's Designee, Ti

~~~ AAe i~~

e Data CERl'l I'ICATE OF INSERVI CIE IIIISPECT ION J

I, the undersigned, holding s valid clxtmission issued by the National Beard of Boiler and pressure Vessel inspectors and the state. or Province. of Dade County and emp)<vyeai'by Arkuright l<utual 'Insurance C'cxrphny of NorMOOd, Hs. have inspected the caqmnents descriked in this Owners Report during .the period i03/14/97 to 04/08/97 snd state that <<o the best of my knox)edge snd belief,, the Darner has performed examinations and taken corrective messue es described .in this owaers Report in accordance Hith the. requirements of the ABHE code,Section XI.

By signing this certificate neither the Inspectot nor his'esp)oyer makes sny Msrranty,.expressed or implied, concerning the exsmiinations and corrective messu'res'descritied 'in t'his (Incr's Report. Furthermore, neither the Inspector nor his,employer shall be liablo in sn)~ manner for any personal injury or )~rcport)<

damage or s loss of sny kind arising fries or connected Hith this inspection.

Comsissions NB 8230 ~N LII Inspectors'gnatlxhf National Board, State, Providence, snd Endorsements Date 197 7 9?. CI14-3

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section Xt 1 ~ Owner Florida Power & Li ht Date 04 01 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address 2~ Plant Turke Point Plant Unit PWO ¹:63/6231 WO ¹: 96009195 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp M A Name Authorization Ho.

Expiration Pate N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: CHEMICAL & VOLUME COMTROL System ¹: 47 Quality Group: B 5~ (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~MA Code Case
6. Idgntification of Components Repaired or Replaced and Replacement Components Name of Name of iHanufacturer National i Other (Year i Repaired i ASHE (

Component Manufacturer i Serial No. Board Identification JBuilti Replaced or i Code i J

Replacement JStarp (

I I JYesreue i4" BUTTERFLY VALVE I FISHER IN/A IN/A 13-269 UTC 407522 iUNK. (Replacement iMo (STUDS (8) ,(N/A I H/JI )H/A i3-269 UTC 378831 iUNK. iReplacement iHo I

IHUTS (16) ,iN/A (H/A IH/A I3-269 UTC 405142 iUNK. /Replacement /No

7. Description of Work: CHARGING PUMP 38 INLET ISOLATION VALVE 3-269 REPLACEHENT.

'e

8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X Pressure~20 te Test tespereture 89 'F 97-015-3

Sheet 2 of',2 FORN NIS-2 (Back)

9. Remarks: NECKANICAL CONNECTION~NO MELDING RI=QUIRED, CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct andi.thiis replacement conforms to the r)iles of the ASHE Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorization No. N~A Expirsiion Date ~ii A

'ate Ili Signed ',19 Owner or Owners Designee, Tsti.e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdiing a valid conmission issued by the National Board of Boiler-and Pressure 'Vessel inspectors and the state or province of. Dade County:andiempf.oyed by. Arkwright. Hutual Insurance. Company'f v g Norwood, Na. have inspected the conyonents described in thiis Owners Report during the period '4/07/96 ')

/

I/ I 9q and state that to the best of my knowiixige and belief, the Owner has performed examinations and 'o'jiX taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE 'Code,Section XI.

By signing this certificate, neither the Inspector nor his eciployer makes any warranty, expressed or implied, concerning the examinations and corriective measures described in this Owner~s. Report. Furthermore, neither the Inspector nor hiis employer shall be liablie in any manner for any personali injury or property damage or a loss of any kind arising from or connected with this inspection.

+i~'.n Inspe ors Si ture National Boardl, State, Providence, and Endorsements Date 97-01'I-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 30 97 Name 700 Universe Blvd.'uno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:2508/63 WO ¹: 97006766 CR ¹: 97-0466 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Work Performed by Florida. Power 8 Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: i62 Quality Group: 8
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Components Name of Name of (Hanufacturer] National Other. (Year ( Repaired J ASHE (

Component Hanufacturer J Serial Ho. Board Identification ,]guilt( Replaced or J Code f J

Replacement ]Stamp I l I /t~es ee ISUPPORT 8080-R-007-01 IN/A fN/A 'fN/A [DRWG ¹ 5613-H-823 SHT 17 ,(UNK. [Repaired (No

7. Description of Work: GROUND PT IHDICATIONS UNTIL INDICATIONS WERE AN ACCEPTABLE SIZE OR WERE ACCEPTABLE AS-IS PER CONDITION REPORT CR97-0466.

8.,Tests, Conducted: Hydrostatic:I Pneunatic: Nominal Operating Pressure Other PT eressure~ig test resgereture 4F 97-016-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks:- NO MELDING IJAS PERFORMED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correc't and this 'repair conforms to the hule's of th' ASME Code, Section XI.

Type Code Symbol Stamp Certificate f Authorization No. ~NA Eilpiratldn Ohta ~NA s.g.~ cfD ~@A'.'~4~

Owner' Owners Designee,&itic

~~w~~gg~ ngive zl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cermission issued by the,Natio'nal Board of Boiler and and the state or Provi:nce of Dade County and employed by Arkwright Mutual Insurance Cori@an'y of Presaure'easel'nspectors Norwood, Ma. have inspected the components described in this Owners Report during the period 03/18'/97'b 03/30/97 and state that to the best of my knowledge and belief, the O~ner has performed examiinat'Iona and taken corrective measures described in this Owners Report in accoi danae with'hd r+uir'ements of, the 'ASME Code,Section XI.

By signing this certificate neither the Inspector nor his,employer makes any warranty, expressed or implied, concerning the examinatiions and corrective measures d'escribed in this Owner's Report. Fukthermo/e, neither the Inspector nor,his employer shall 'be liable-in any 'manner 'for any personal injury or property 1 damage or a loss of any kind arising from or connected with this inspection.

7 P'.

Comnissions NB 823~0 ~N I Inspector Si iture National Board, State, Providence, and Endorsements 19 97-0'I6-3 0

FORM NIS-2 OWNERS REPORT'FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 30 97 Name 700 Universe Blvd. Juno Beach Fl. 33C08 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PWO ¹:2507/63 WO ¹: 97006765 CR ¹: 97-0465 9760 SW 3C4 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name. Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: 62 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and'Replacement Components Name of Name of ,fHanufacturerf National Other fYear f Repaired f ASHE f Component Nanufacturer f Serial No. Board Identification fBui ltf Replaced or f Code f f Replacement fsterp f I I /~rs Ile .

fSUPPORT 8080-H-007-07 fN/A IH/A fH/A fDRWG ¹ 5613-H-823 SHT 11 fUNK. fRepaired fNo

7. Description of Work: GROUND PT INDICATIONS UNTIL THEY WERE AN'ACCEPTABLE SI2E'OR WERE ACCEPTABLE FOR USE AS-IS IAW CONDITION REPORT CR97-0465.

t 8. Tests Conducted: Hydrostatic:

Other PT Pneunatic:

Pressure~sip Nominal Operating Pressure test Temperature oF

'97-017-3

Sheet 2 of 2 FORH NIS-2 (Back)

,9. Remarks: NO IIELDING llAS PERFORMEI).

CERTIFICATE OF COMPLI ANCIE lre certify that the ststmrents made in the report are correct and this 'epai'r conforms to the rules of th'e ASHE Code, Section XI.

Type Code Symbol Stamp Certificate o Authorization No. ~H A Expiration Date ~N A Signed Qc~ /fY~ ~ Date ~/~g~ aP/

O~ner. r Owrer/K Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding s valid conmlssion issued by tHe Hatiohai Board of Boiler and.pres! ure.Vessel inspectors snd the state or province of-Dade County and employed by~Arkwright Hutual Insurance Coriipan'y of Norwood, Ha. have inspected the components described in this owners R'eport during the period '3/18'/97'tb 03/30/97 and state that to .the best of my knowledge and belief, the O~ner has perforaed exsmiinat'iong and taken corrective measures describNI in this Owners Report in a'ccordan'ce With'he requirements of the-ASHE Code,Section XI.

By signing this certificate neither the Inspector nor h'is employer makes any warranty, expressed, or implied, concerning the, examinations and corrective aeasures described in this Owner's Report. Furthermore, neither the Inspector.nor his empiloycr shall be liable in any manner for, any personal injury or pkopei ty ~

damage or a loss of any kind aris'ing frora or corrnected with this !inspection.

Ins pec rs iture

-;I..i....r B~r~oSCu Hatiorral Board, State, S Providence, and Endorserrer)ts Date 9'7-0'I7-3 0

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 03 30 97 Name 700'Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:2506/63 WO ¹: 97006764 CR ¹: 97-0464 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc
3. Work Performed by 'Florida. Power & Li ht Type Code Symbol Stamp M A Name Authorization No. N A Expiration'Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: 62 Quality Group: B 5~ (a) Applicable Construction Code B31.1 1955 Edition, MA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of IHanufacturerI National I, Other I"ear I Repaired I ASHE I Component Manufacturer I Serial No. Board Identification IBuiltI Replaced or I Code I I Replacement IStamp I I I /~res ue ISUPPORT 8080-H-007-10 I H/A IN/A IN/A IDRWG ¹ 5613-H-823 SHT 15 IUMK. IRepaired INo
7. Description of Work: GROUND PT INDICATIONS UNTIL ACCEPTABLE SI2E OR WERE ACCEPTABLE FOR'USE AS-IS PER CONDITION REPORT CR97-0464.

t 8. Tests Conducted: Hydrostatic:

Other PT Pneunatic:

Pressure~sig Nominal Operating Pressure Test temperature 4F 97-018-3

Sheet 2 of 2 FORM NIS-2 (Back) 0

9. Remarks: NO WELDINB WAS PERFORMED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and t'his repair conforms to the Irules df the ASHE Code,Section XI'ype Code Symbol Stamp N 'A j

Certificate o Authorization No. ~NA E'xpfration Date N~A cC~ ~P Z/

Omar r Orner'&Oesignee, 7 Title 19 ~~

0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler eind Predsurk Vessel inspectors and the state or pirovince of Dade County.and employed ~by Arkuright.Mutual Insurance Company af Norwood, Ha. have inspected the components described in this Owners Repo'rt during the period '3/18/97 fo, 03/30/97 and state that to the best of my knowledge and beii'ef,'he'gner has perforced exadinakiods aQ taken corrective measures descrited in this ogners Report'in accordance with the requirements of ~the~AsHE,cade,Section XI. I By signing this certifi,cate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descriix< in this Owner's Reporti Furthermore,~

neither the Inspector,nor his empioyer shall be tiabte in~any~ man'ner,~for any personal injury or property damage or a toss .of any ki'nd arising from or connected With this inspection.,

Camni ssions ~B80~30 II 'I Inspec rs natur e N'atia'nai 'oard, State, Providence, arid Endor'semants Date 19%2 97-018-,'3

FORH HIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date OC 08 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PIS ¹:63/2528 IS ¹: 97006902 9760 SW 3C4 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job No.,etc 3 ~ Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Nsae Authorization Mo. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: CHEHICAL 8 VOLUHE CONTROL System ¹: 47 Quality Group: A
5. (a) Applicable. Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case

<b),Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced snd Replacement Components Name of Name of iHanufactureri National i Other iYear,i Repaired i ASHE i Component Hsnufscturcr i Serial Ho. Board Identification igui lti Replaced or i Code i i Replacement iStsap i I I i~res se iSTUDS (4) IN/A iN/A iH/A iUTC 352606 ASHE SA-19,iUHK 'iReplacement iHo I STK CODE ¹28253 R95-0154 iNUTS <4) IH/A IN/A iN/A 'UTC 393252 ASTH A-19C iUNK iReplacement iHo I

.

STK CODE

¹27963'VALVE BONNET iVELAH iN/A iH/A i3-312A UTC¹ 331592 'iUNK. iReplacement iNo STK CODE ¹52C97

7. Description of 'Work: REPLACED 4 STUDS AND 4 NUTS ON BODY TO BONNET. REMOVED BONNET FROM SPARE VALVE IN STORES AND REPLACED EXISTIHG BONNET ON CHECK VALVE 3-312A.

Pneunst 1 c I Hominal Operating Pressure X pressure~gggg sig rest Temperature 535 oF 97-019-3

Sheet,2 of 2 FORH NIS 2 (Back)

9. Remarks: HECNANICAL CONNECTIOlk NO WELDINO REOUIRED.

CERTIFICATE OF COHPLIANCE Ne certify that the statements made in the rcport are cor'rect and th'is replacement conforms to the rule., of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate of Author ization Ho,. N~A Expiration Date ~HA Signed '19 O~ner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid catmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employe'd b)'I Arkwright Hutual Insurance C~ny of Norwood, Ha. have inspected the conponents descri'bed inIthik OwInerk Report during the period, 03)19/97 to 03/30/97 and state that to thc best of my knowledgeI and be'Iiei', the Owner has performed examinations 'and taken corrective measures deScribof in thiis Owners Reposit id ac'cordanc'e with the requirements.of the ASHE Code,Section XI ~

By signing this certificate neither the Inspector nor'i.">> emplo)e'er smokes any warranty, expressed or implied, concerning the examinations and corrective measures described in this owner"s Report. Furthermore, neither the Inspector nor his employer shall be -Liable in any manner for any personal..injury or property damage or a loss of any kind arising from or connected with this inspection.

P Conmisslons NB 8230 H I Inspe ors Sii ture National Board, State, Providence, and Endorsements Date <<9 )

97 019'-3

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

'As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 03 0 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address 2., Plant Turke Point Plant Unit PWO ¹:63/7857 WO ¹: 96014466 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho.

Expiration Date N A P.O. Box 4332 Princeton Fl. 33032'ddress

4. Identification of System: MAIN STEAM System ¹: 72 Quality Group: 8
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of CoJJponents Repaired or Replaced and Replacement Conponents Hame of Name of lManufacturer[ National Other, ]Year ] Repaired ( ASME ]

Component Manufacturer ) Serial Ho. Board Identification (Built/ Replaced or / Code (

I / Replacement /Steep /

I I I J~Ys ue

)STUDS (4) fN/A i N/A iUTC 393207 (UHK [Replacement (No I STK CODE ¹28047 IHUTS (24) IH/A (N/A IUTC 408254 (UHK 'J Replacement ]No STK CODE ¹27869 R87-6134

7. Description of Work: REPLACEMEHT OF 4 STUDS AHD 24 HUTS ON BODY TO BONNET VALVE POV-3-2606.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other Pressure~pig Test Temperature DF 97-020-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: THIS IS HECHANICAL CONMECTIOM MO WELDINB REOUIREDz CIERT IF I CATE OF COHPLIAh1CE I We certify that the statements made in thc report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

I' Type Code Symbol Stamp M A Certificate f Authorization No. Expiration Date A Zl,,

M~A M I Signed n sr~. 4k~~ <<Date pn~i5 119 f2 I Owner r Ctwner'Vbesignee, Title CERTIFICATE OF INSERVICE IHSPECT ION I, the undersigned, holding s valid commis! ion issued by the National Boarcl of Boiler andi Pressure Vessel inspectors snd the state or Province of Dade County and enpboyed by'Arkwright*Hutual Insurance Company of Norwood, Ha. hive inspected the corponcnts descrilbed in this Owners: Report during the period 07/'IB/96, to 03/30/97 and state tlhat to the best of my knowledge: and beltief,, the Owner has performed exhminlatibns corrective measures dcscribecl in this Owners Report in accordance with the requirements of the ASHE Code, land'aken Section XI.

By signing this certificate neither the Inspector nor his employer.makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspe'ctor nor his enploycr shall be liabi,e in any manner for sny personal injury ori property damage or s loss of any kincl arising from or connected with this inspection.

conmissioins NB 8230 N I Inspec ors ~ nature National Board, State, Providence,. and Endorscmcnts Date 119++

97-020-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR'REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 04 02 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PIN ¹:63/7086 QO ¹: 96014408

'9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization-P.O., No.,Job Ho.,etc

3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Name Authorization,No. N A Expiration. Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: 62 Quality Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Idgntification of Components Repaired or Replaced'and Replacement 'Components Name of Name of (Hanufacturer( National J Other [Year ) Repaired J ASNE J Component Nanufacturer [ Serial No. Board Identification [guilt] Replaced. or ( Code ']

I f, Replacement JStanp J

I I I ~Ves ue IPSA-3 IPACIFIC [2889 IN/A !3-1019, 3-PRWH-I (UHK (Replaced Yes

'JSMUBBER SCIENT IF IC IPSA-3 IPACIFIC 117425 .I3-1019, 3.PRWHu1 )UHK [Replacement )Yes iSHUBBER SCIENT I F IC

7. Description of Mork: SNUBBER REPL CED DUE TO'LCO ON UNIT 4
8. Tests Conducted: Hydrostatic: Pneuaatic: Hominal Operating Pressure Other VT-3 pressure~u S is test Temperature S S 'F 97-021.3

Sheet 2 of 2 FORK HIS-2 (Back) 0

9. Remarks: HECHAMICAL COHNECTIOM, MO WELDINB REOUIIRED.

CERTIFICATE OF COHPLIAHCE Me certify that the statements mode in the report src correct iandi this rcplalcemcnt conforms to the rules of the ASHE,Code, Section XI ~

Type Code Symbol Stamp N A Certificate of Authorization Signed Owner

z No.

giWgrf'+i'~ r Ownerr+Designee, 'title N~A di~A n.c:> ~l~~ ~

i Expiration Date OnCe "0

CI.=RT IF I CATE OF I'NSERVICE IMSPECTIOM I, the undersigned, holding a valid crxrmission issued by the Mstlio&l Board of Boiler and Pressure Vessel inspectors snd thc state or province of Dade County snd employed by Arkwright Hutusl Insurance ComFrsny'f Hs. have inspected thc crxrponcnts de! cribed .in thia Ownera Report dur'ing'ha pe'riod '9/18/96 toi

'orwood, i

04/01/97 and state tibet to 'the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described 'in this Orrners Report .in sccordlancc with the requirerrrents of this ASHE iCode,Section XI. I By signing this certificate neither the In, pector nor hiS emfrioyer rlrskes sny warranty, expressed orl implied, concerning the examinations and corrective measurea deacri'bed'.in 'thia Owner's Report. Furtherraord, neither the Inspector nor his errpioyer shall be liabl.e in any manner for sny personal, injury or property damage or a loss of any Ikincl arising from or connects with 'thiS irispct;Cion.

I Coerrrissions, HB 8230~M~I Inspe ors:S nature -iNstionell Bayard, State, Providcnc'e, snd Endorsements Date i4'9~$

97-021-3 0

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEH'IS As Required by .the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 04 07 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet .1 of 2 Address
2. Plant Turke Point Plant Unit Name PNO ¹:63/7855 lO ¹ 96012072 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job No.,etc 3 ~ Nork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: REACTOR COOLANT System ¹: 41 Quality Group: 'A
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of /Manufacturer/ National ( Other [Year J Repaired J ASME ]

Component Manufacturer J'Serial Ho. Board Identification )guilt) Replaced or ) Code ]

] Replacement [Stamp [

I I J~res ue IPRESSURIZER RELIEF VALVE I CROSBY IH69877-01 IN/A IRV-3-551C /UHK. /Replaced /Ho I

-0009 IPRESSURIZER RELIEF VALVE ICROSBY (

N51249e 1361 I H/A I RV 551C JUNK. )Replacement ]Ho

7. Description, of Mark: REMOVE PRESSURIZER SAFETY VALVE RV-3-551C AHD INSTALL SPARE.

Pneunatic: Hominal Operating, Pressure X Pressure~22SD sig Test Tesuereture 535 'F 97.022-3

Sheet 2 of 2 FORM NIS-2 (Back) 0

9. Remarks: MECHANICAL CONNECTION HO MELDING REOOIREO.

CERTIFICATE OF COMPLIANCE lie certify that the statements made in the report are correct and-,this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Stamp H A Certificate of Authorization Ho. ~M A Expi,ration Date H A Signed Date 19 Own r or wner's Designee, Tiitie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, ho'lding a valid comnlsslon issued by the Hationai, Board of Boiler and Pressure Vessel inspectors and.the state or Province of Dade County and enpioyed by Arkwright Mutual Insurance Company of Norwood, Na. have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief, the Owner has performed examinations.and taken corrective measures descril)ed in this Owners Report in accordance with the requirements of the ASl{E Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his em!cloyer: hall be liable ini any manners for any personal injury or prop'ert)~

damage or a loss of any kind arising from or connected with this'ins'pection.

/y7 Commissiona NB 8230 N I Inspect s Sigr ture National Board, State, Providence, ahd Ehdoi'seaknts Date go 97-022.3

FORM NIS-2" OWNERS REPORT FOR" REPAIRS OR TREPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. O~ner Florida Power & Li ht Dote 04 08 97 Name 700'Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turks Point Plant Unit Name. PNO.¹:63/7854 MO ¹ 96012071 9760 SM 344 Street Florida Cit Fl..33035 Address .Repair Organization P.O. No.,Job No.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization No. N A Expiration,Date N A P."O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: REACTOR COOLANT System ¹: 41 Quality Group: A
5. (s) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name Name of )Manufacturer) National ) Other ]Year ) Repaired / ASME [

of'omponent Manufacturer J Serial Ho. Board Identification ]guilt] Replaced or / Code /

/ Replacement (Stamp /

'I I /~res ue IPRESSURIZER RELIEF VALVE I CROSBY i N69877 i N/A (

RV-3-5518 /UHK. (Replaced (Ho I

0008 IPRESSURIZER RELIEF VALVE ICROSBY i 51249-1360 ( H/A f RV-3-5518 fUNK. (Replacement ]Ho

7. Description of Mork: REMOVE PRESSURIZER SAFETY VALVE RV-3-5518 AND INSTALL SPARE.

t 8'. Tests Conducted: Hydrostatic:

Other VT-2 Pneunatic:

Pressure~2280 sig Hominal'perating Pressure Test Temgereture 535 X

DF 97.023-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONHECTIiO~NHO IAELDING REQUIRED.

CERT I IF I CATE OF COMPLIANCE Ne certify. that the statements made in the report are correct and this replacement conforms to the rul,es of the ASME Code, Section Xl.

Type Code Symbol Steep H A Certificate of Authorization Iko.. ~N'A Expiiration,Date N A J., ~'

Signed Date Yi 19 Own or wner's Designee, fitle~

CERT I IF I CATE OF'HSERVICI.=INSPECTION I , thc undersigned, holding a valid conrnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of. Dade County.and anpboycd by Arkwright. Mutual Insurance Company iof Norwood, Ma. have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief,, thc Owner has performed'examinations and taken corrective measures dcscrIibed in this Owners Rcport ini accordance with the requircnmnts of the ASME Code,Section XI. Il By signing this certificaitc neither thc Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in <<his Owner's Report. Furtlhcrnere, neither the Inspector noir his employer shall be liable in any manner fair any personal in)ury or property damage or a loss of enny Ikindl arising from or connected with ithis inspeotion.

g ~r/7 Inspcc ors SITfnature iHationaii Board'state, Providence, and Endorsemcnts Date 1I9 97-023-3

FDRH Nls-2 ouMERs REP0RT F0R REPAIRs 0R REPLAcEHENTs As Required by the Provisions of the ASHE-Code Section XI

1. Oner Florida Power 8 Lf t Date 04 09 97 700 Universe Blvd. Jwm Beech Fl. 33408 Sheet 1 of 2 Address
2. Plant Turks Point'Plant Unit QO ¹: 96023455 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Orgsnfzation P.O. No.,Job No.,etc
3. Mork Performed by VSL Cor ration Type Code Symbol Steep N A Name 'Authorization Ko. N A Expiration Date. N A 1671 Dell Ave. C ll CA 95008 Address
4. Ident ification of System: Contsfrrnent Buildi System ¹: 51 Ouslfty Croup: B
5. (a) Applicable Construction Code ACI 318-63 ACI 301-66 19-- Edition,~MA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repsfrs or Replacements 1992 Edfticn, 92 Addenda,~MA Code Case
6. Identification of Cosponents Repaired'or Replaced snd Repiscesent Ccmponents Kame N~ of (Hsnufscturer('ationsl ( Other ' (Year,( Repaired ( ASHE (

of'oqxnent Hsnufscturer ('erial No. Board dent i f i cst I on (Built( Replaced or ( Code (

I ( Replacement (Stanp (

I I I iYe~leuo (Donut Shine (Kova Hschining (N/A (N/A (ASTH A576-86 Cr. 1045. ,( 1996 (Replacement (No (2 14N Products Cor . LOT¹ 35284004

7. Descriptfon oflbrkt Added tMo 1 4> thick donut shims st Unit 3 tendon 61V27 to obtsfn orf inal \ift-off force after detensioni . Tendcn Surveillance rformed under P.O. 000f6055.

Pneumat fc: Nominal Operating Pressure

~

F 97-024-3

FORM NIS-2 (Back)

9. Remarks: Mo weldi r ired.

CERTIFICATE OF CCHPI.IANCE Ne certify that the statements medic in the ri~rt are correct and 'this re'placement conforms to, the rulles of the ASHE Code, Section XI.

Type Code Symbol Staap

~VA 0

Certificate of Authorization No. Expiration aate Signed &I ~Date Owner or Owner's Dksignee, Title CEIRTIF I CATE OF INSERVICE INSPECTION I, the undersigned, hoidirMI a valid coaeission issued by. the National" Board of Boiler and'Pressure Vessel inspectors and the state or Province of Dade Cixnty and eapihyed by'Arkkright Hutual Insurance. Company of Norwood, Ha. have inspected the c~enents described in this'Own'ers'Report during the period 09/01/96 'to and state that to the hest 'of my knowiaige and'bel'ief,'his Owner'has performed'examinations and '4/08/97 taken corrective measures described in 'this (hairs Report in accordance with the requirements of the ASHE Code,',

Section XI.

By signing this certificate neither the Inspector nor his'esp'loyer makes any warranty, expressed or Ieylied, concerning thi exminations ard corrective measures 'deslcr ibed in this'Owner's Report. Furthermbre,'e3ther the Inspector nor. his espioyer shall, be l3able in any mesmer for any personal injury or propert/

damage:or a loss of any kind arising: from or c<xnected with this inspection.

~t/ ,Commissions 'B 8230'~M~I s Sig I, e National'oard, State, Providence, and Endo)'s~tk I'nspect Date 19K.Z

-0 97.024-3

FORH NIS-2 QQERS REPORT FOR REPAIRS OR REPLACEMENTS As Requfred by the Provfsions of the ASHE Code Section XI,

1. Qner Florida P~r B Lf ht Date 700 Universe Blvd. Jtmo Beach F l. 33408 'Sheet 1 of 2 Address
2. Plant Turks Point Plant Unit QO M'6023455 9760 Su'344 Street Florida Cit Fl. 33035 Address Repair Orgsnfzatfon P.O. No.,Job No.,etc
3. Mork Perforaed by VSL Cor ration Type Code Symbol Stsap N A Nsae Authorization No N A Expiration Date N A 1671 Dell Ave. C ll CA. 95008
4. Identification, of Systea: Contsfrment Buildi Systea 0: 51 Quality Croup: 8
5. (s) Applicable Construction Code ACI 318-63 ACI 301-66 19-- Edf tfon,~NA Addenda(~NA Code Case (b) APPlicable Edftfon of Section XI Utilized for RePafrs or RePIaceaents 1992 Edftion, 92 Addenda,~NA Code Case
6. Identificstfon of Ccwponents Repaired or Replaced snd Repisceaent Coeponents

'sae of M~ of (Hsnuficturer( National ( Other (Year 'epaired,( ASHE (

Coaponent Hsrmf acturer ( Serfsl No. Board Ident f ffcation. (Built Replaced or ( Code (

I ( Replsceaent (Starp (

I I I ivesleuo (Donut. Shia (Nova Hschining (N/A (N/A '(ASTH A576-86 Gr., 1045 (1996 (Repiscenent (No (1 12s Products Co LOT B 35284002 (Donut Shia (Nova Hsctdning 'I N/A (N/A (ASTH A576-86 .Gr. 1045 (1996 (Replsceaent (Mo 1 14m Products Cor LOT M 35284004

7. Description of iJorkt Added 1 2e-snd 1 4< shia.st Unit 3 tendon 42H40 to obtain orf fnsl lift-off force after detensionf . Tendon Survefl lance rformed under P.O. 0001605.

Pneuoet 1 c t .Moainsl Operating Pressure

~

F 97-025.3

Sheet 2 of 2 FORH NIS 2 (Back)

9. Remarks: Ko ueidi r ired.

CERT IF ICATE OF COHPLIANCE Me certify that the statements eefe in, the report are correct and this rigiacesxmt conforms to the rules of 'the ASHE Code, Section XI.

Type Code Symbol Staap Cer'tificate of Authorization No. K~A Exp'iration Date '

~K A Signed thinner I

or Omer<s Desi~e, Title S <~WV '+ 'a~a 4~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid ccmnission issued by the Katicnai Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eaplbyed by'rkuright 'Hutual Insurance Coapany of Korwxd, Ha. have inspected the ceqmxnts described. in this Owners Regort during the period '09/01/9'6 'o and state that to the best of my knowledge and belief, the Oav.'r has perfonaed. examinations and '4/08/97 taken corrective measures described in this Wners Report in'ccord'anca Mith t'e requirements of the ASHE Bode,Section XI.

By signing this certificate neither the Inspector nor his erployer wakes any warranty, expressed'or concerning the examinations and corrective measures described in this Orner's Report. Furthermore,l 'mplied, neither the Inspector nor his employer shall be Liable in aQ mlrnelr fear ahy personal'njury'r propert'y damage or a loss of any kind arising from or cheated with this irkpec'tion.

Conmiss iona,','HB State, Providence, and Endorseeents 8230~K~I'atl'onalt Inspector S I gnatdre Bo'ard,,

Date 0

97.'025 3

FORH NIS-2 OWNERS REPORT'OR REPAIRS OR REPLACEHENTS As Required by the Provisfons of the ASHE Code Section XI

1. Ouner Florida Po>>er B Lf ht Date 04 09 97 700 Universe Blvd. Jwm Beach Fl. 33408 Sheet 1 of Address 2'.

Plant Turke Pofnt Plant Uni t Haec WO ¹ 96023455 9760 SW 344 Street Florida Cft Fl. 33035 Address Repair Organization P.O.'No.,lob Ko.,etc

3. Work Pcrfors>>d by VSL Cor ration Type Code Symbol Stamp N A Howe Authorization Ko. N A Expfratfon Date N A 1671 Dell Ave. C ll CA. 95008 Address
4. Idcntiffca't'fon of Systcll'ontofrn>>nt Bufldi System ¹: 51 Guai fty Group: B
5. (a) Applicable Construction Code Acl 318-63 ACI 301-66 19-- Edition,~NA. Addenda,~NA Code Case

'(b) Applicable Edition of Section XI Utilized for Repairs or.Replaces>>nts 1992 Edition, 92 Addenda,~NA Code Case,

6. Identiffcation of Coeponents Repaired.or Replaced and Replaces>>nt Coeponents Noee of Kam of (Harufacturer Kational ( Other (Year Repaired ( ASHE

( (

Coeponent Hanuf actur er ( Serial No. Board ldentif fcatfon (guilt( Replaced or ( Code (

( Rcpfoceaent (Stoep (

I I iY~es Xo (Donut shim (Kova Nachining (N/A I N/A (ASTH A576-86 Gr. 1045 (1996 (Replaceeent (No (1 14>> Products Cor . LOT ¹ 35284004

7. Description of Work: Added 1 4" donut shia at Unit 3 tendon 3016 to obtain orf fnal lift-off force after detensioni . Tendon surveillance rfors>>d under P.O. 00016055.

Pnaaetfct Nosfnal Operating Pressure

'F 97-026-3

Sheet 2 of 2 4l FORH NIS-2 (Back)

9. Remarks: No weldi r Ired.

CERTIFICATE OF COHPLIANCE Ile certify that the statemiwts axle in the report are correct 'and'hi's replacemeint conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Starp Certificate of Authorization No. Exp'irat,ion Date

't N~A Signed /A ~~~~i~~~+~D~ ate "-~ lO

'

Owner or Owner's Designee, Title il CERT I FI CATE OF IKSERVICE IIISPECT ION g

I, the undersigned, holding a valid comslsslon issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and eapL'oyed by'rkwright Hutual Insurance Carpany of Norwood, Ha. have 3nspected the components descril~ in this'wners'eltort'ue"ing'he per'3od '09/01/96 'o and state that to the 'best of my kntwledge and bel,ief', the Owner has performed examinations and '4/08/97 taken corrective measures described in thiis Seers Report in accordance with the requirements of the ASHE Code',

Section XI.

By signing this certificate neltiher the Inspector nor h3s employer makes any. warranty, expressed'r concerning the examinations arxi corrective measures'escribed 'in (his Owner's Report., Furthermore,,'mplied, neither the Inspector nor his esployer shall bie Liable in any manneir fair any personal .3njiury or prolpe'rty damage or a Loss of any kind arising from or c~.'cted with this Inspectiexo.

+7 Inspectors Signatt

~seissions -

NB 8230~K'~I e National Baarde State Provlclence, and Endorsecflents Dote 97-026-3

FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASHE Code Section XI

1. (haM,r Florida Poaer 8 Li ht Date 04 09 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t PMO ¹:63/2949 MO ¹: 97008380 9760 SU 344 'Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization Mo. M A Expiration'Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: C nent Coolin Mater System ¹: 30 Quality Group:
5. (a) Applicable Construction Code B31.1 1955 Edition, MA Addenda,~MA Code Case (b> Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edftion,~MA Addenda,~MA Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Canponents Name of Name of iHanufactureri National Other iYear,[, Repaired i ASHE )

Component Manufacturer i Serial No. Board Identification iguiit( Replaced or i Code f

,i Replacement,iStaap i I I J~res se IRELIEF VALVE IORESSER ITH 18076 IN/A 11 1/2" RELIEF VLV iUMK 'iReplaced )Mo INDUSTRIES IRELIEF VALVE IDRESSER 1TH 18073 IM/A Il 1/2" RELIEF VLV iUNK iReplacement iNo INDUSTRIES STK CODE 53514

7. DescriPtion of Mork: REPLACED RV-3-1424 FOR CCM TO "Ca ECC.

t 8. Tests Conducted: Hydrostatic:

Other VT-2 Pneuaatic:

gressure~rg ig Nominal Operating Pressure test Tesuersture 88 X

~

F 97.027-3

Sheet 2 of 2 FORH,"HIS-2 (Back) 0

9. Remarks: THIS Is A NECNANICAL CONNECTION NO uELDINC REDUIRED CERTIFICATE OF COHPLIANCE I

Ne certify that the statements madh in the report are correct and this replacement confonas to the kulak of'hai ASNE Code,Section XI.

Type Code Sytrbol Staay Certificate of Authorization No.- ~HA Expiration Date Signed CV I . "QJ'~/ c~ nay ~4~~@~ Date 19 7 - ~

Own r or er's Designee, tie CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid camnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eeployed by Arkwright NutuaL In urance Compariy of Norwood, Ha. have inspected the coaponents described in thi's 0&or's Rapport during th'e period '4706/97 and state that'to'he best of my knowledge and belief, the Owner has perf<}rmed examinations and 'o'4/09/97 taken corrective measures described in this Cheers Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Irepector nor hid ~Lo)er makes any >carrantli, expressed concerning the examinations and corrective measure's ddscribed in this Owner's Report. Further'morc, or'mplied, neither the Inspector nor his enployer shall be Liable iin any manner for any per. onal injury or property damage or a Loss of any kind arising from or connected with'his ihspection.

~ f Cocmissions NB 823~ON~I~

Inspec rs S~iture National Board, State, Providence, and Endorsments Date 97-027-3

FORH NIS 2 OMHERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASKE Code Section XI

1. Owner'lorida Power 8 Li ht Date 04 14 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t

, Kame PMO ¹:63/5765 MO ¹:. 96005866 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc

3. Mock Performed by Florida Power Z Li ht Type Code Synhol Stamp N A Name Authorization Ko. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address

'

4. Identification. of System: FEED'MATER System ¹: 74 aualfty Croup:

5~ (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacenents 1989 Edftfon,~HA Addenda,~MA Code Case

6. Identification of Conyonents Repaired, or Replaced snd Replacement Components Name of )Manufacturers Kationsl Other ,(Year ) Repaired ) ASHE (

Hsnufacturer i Serial No. Board Identification ,igufiti Replaced or .i Code i I i Replacement istanp )

I. I J~Yes Ho ISTUDS (14) (H/A iH/A i FCV-3-498, UTC 407914 (UMK i Replacement iKo I ASTH A-193 (NUTS (14) 'IN/A iM/A, /H/A iFCV-3-498, Ul'C 408129 JH/A [Replacement /Mo I ASKE SA-194 iBOLT (1) I H/A I N/A I FCV-3-498, UTC 397774 iH/A iRepiacement iMo HEAVY KEX ASTH A193

7. Description of Mork: REPLACED FOURTEEN 14 STUDS AHD HUTS AHD OME 1 BOLT OM FCV-3-498 S C wC" KAIN FM FLOM CONTROL 'VALVE.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT-1 NA 4F 97-028-3

Sheet 2 of 2 FORN NIS-2 (Back)

9. Remarks: THls ts A NEcHANtcAI. cohrHEGTIow No llELGING REQUIRED.

I CERTIF ICATE OF COMPLIANCE Me certify that the statenents made in the report are correct arxf this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Steep ~HA Certificate of Authorization No. ~NA Expiration Date NrrA Signed r or

+i/FS 'gA~~~~m~~

Owrrer's Oesfgir~re, Tft4P OSta

+ 19 +g CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a 'valid cicrrrnfssion issued by the Nstisnal'oard of Boiler snd Pres'surd and the state or. Province of l)ade County and errrployed by Arkwrfght Mutual'nsurance Corpany of Ve!sseL'nspectors Horwood, Na. have inspected 'the components described in this Owners Report during the period 03/13/96 to 04/10/97 and state that to the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described .in this Owners Report 'in accordance with the requirements of the 'ASNF Code,Section XI.

By signing this certificate neither the Inspector,nor his rleployer makes any warranty, expressed ar implied, concerning the examfrratfons and corrective measures tiescribcd in this Owner's Reports, Furthermore, neither the Inspector rror his errployer shall be Liable in sny'manner'for'any personal Injury or property damage or s Loss of sny kind arising from or connected wfth this fnspection.

~~~c~ / 'omrrfssfons HB 8230 ~H~I Inspector Sigrqgcfre National Board, State, Providence, and Endoraements'ate 1.~Z 97-028-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI e 1. Owner Florida Power 8 Li ht Date 04 16 97 700'Universe Bl'vd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t PWO ¹:63/0472 WO ¹: 96026892 PCH ¹: 96-070 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stamp M A Name Authorization No. N A Expiration Date M A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Primar Water Hakeu S tern System ¹: 20 Quality Group: '8
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addendas~NA Code Case (b) Applicable Edition of Section XI Utilized'or Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Coeponents Meme of Name of )Manufacturer),National .J' 'Other ]Year J Repaired ] ASHE f Coeponent Hanufacturer Serial No. Board Identification '/Built/ Replaced or / Code /

/ Replacement )Stamp f CV-3-519A I N/A'M/A IM/A 'I5610-P-900S I

(UNK I

,]Repaired

/~tes ue

/Mo

7. Description of Work:,CUT RE WELD THE DOWMSTREAH PORTIOM OF CV-3 519A VERTICAL RUN.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT-2 pressure~220 im test Temperature 80 F 97-029.3

Sheer: 2 of 2 FORH NIS-2 (Back)

Cl

9. Remarks:

CERTIIF I CATE OF COHPLIANCE Me certify that the statements made in the report are correct rind this repair conforms to the rul,es of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate of Authori'!atjon No. - ~N'A Fxpi'ration Oatc Signed

>I

'i . gfc~, 4Q/NYi+~~rgc/ gate Qg~r/

44'~A Owner or Owner'sg4signcc, Title CENTI F, I CATE OF INSERVI CE INSPEC'T IOII I, the undersigned, holding a valid comriissiion issued Iby the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dadle County and crriployed by Arkwright Hutual Insurance C~ny bf Norwood, Ha. have inspected the compionents described in this 'owners 'Report during the period IO/09/96 to 04/16/97 and state that to the hest of my knowledge and belief, the Owner has performed examinaitiofrs and taken corrective measures described in this Owners Report'n 'accbrda'nce'with the requiirements of the ASHE Code;,

Section XI.

By signing this certificate neither ithe Inspector nor his emplloyer makes any warranty, expressed or implied, concerning thee examinations and corrective measures 'described in this'wner's Report. Furtherrrore, neither the Inspector nor his, cm!cloyer . hall be-liable ini any mahner for any. personal injury or jprogrtj/

damage or a loss of any kind arisingi from or connected with t'hfs'ns'pcchion'.

Inspec

/>

rs Sjgg ture ComrriSSionS NB 8230 N I National Board, State, Providence, arnd Endorsements Date 97-029.3

FORK NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI 1 ~ Owner Florida Power 8, Li ht Date 06 04 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t Name PMO ¹:63/8810 MO ¹: 96022773 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc 3 ~ Mark Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Oate N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COKPOMEHT COOLING MATER System ¹: 30 Qual I ty Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addendag~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer) National Other ]Year Repaired / ASKE J /

Component Manufacturer f Serial No. Board Identification )guilt[ Replaced or f Code /

I / Replacement (Stamp J I I I ]~res se (CCM HX VALVE IN/A [H/A [H/A f3-50-377 1-1/2" GATE /UMK ]Replacement /Mo I UTC 407835 R62776 ISTUOS (160) IN/A IH/A (UTC 409288 (UMK [Replacement [No ISTUOS 40 UTC 409357 iBOLTS (40) iN/A (N/A IUTC 409330 (UHK (Replacement (Ho I

IHUTS (320) JUTC 409358, ASTK A-194 )UHK (Replacement (Ho I HEAVY HEX INUTS (120) [H/A (UTC 409356, ASTM SA-194 JUNK )Replacement (No I EAVY HEX

7. Oescription of Mork: REPLACE BOLTIHG OM 3E207A COMPONENT COOLING MATER HEAT EXCMAHGER AHO THE REPLACEKEHT OF VALVE 3-50-331.
8. Tests Conducted: Hydrostatic: Pneunatict Nominal Operating Pressure X Other VT-2 eressure~stu tg Test Testrereture MOK 4F 97-030-3

Sheet 2 of 2 FOHN NIS-2 (Back)

9. Remarks: THIS IS A HECHANICAL CONNECTION NO MELDING MAS REOUIRED.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct'nd this replacement conforms to the rules'f 'the'SHE Code, Section XI.

Type Code Sychol Stamp H A Certif icate of Authorization NoN~A Signed >~4/~

/7 0 or er'4 Designee, Tit~le CERTIFICATE, OF INSLRVICE INSPECTION I, the undersigned, holcling a valid comnission issued by the Hational Board of Boiler and Pressure 'Vessel',

inspectors and the state or Province of Dade County and employed by Arkwright Nutual In urance Company Na. have inspected the ccaponents described in this Oanerls Raport during the period 04/IS/97 to of,'orwood, 06/04/97 and state that to the best of my knowledge and belie'f, the Owner has performed examinations, 'and taken corrective measures described in this Owners Report i'n accordance with the requirements of the ASHE'ode,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in'his Owner,'s Report. Furthermore, I neither the Inspector nor his employer shall be liable in any manner for any'personal injury or property I or a loss of'ny kirxi arising from or connected with this ilnsgcti'on.', 'amage

'I z7 Inspect s SLEDa re Conmi ssions

,

Ng 8230 N National Board, State, Providence, and Endorsements Date 19 II 97-030-3

FORK HIS-2 OWHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI

1. OMner Florida Power & Li ht Date 06 04 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant ;Uni t PWO" ¹:63/1859 WO ¹: 97002428 CR ¹: 97-0070 9760 SW 344 Street Fior ida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Work Performed by Florida-Po<<er & Li ht Type Code Symbol Staap N A Name Authorization No.

Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address 4 Identification of System'OMPONENT COOLING WATER System ¹: 30 Duality Group: C t

5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addendas~HA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~MA Addenda,~NA Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Components.

Name of Haec of [Manufacturers.'National i Other )Year ( Repaired ) ASHE J Component Manufacturer i Serial No. Board Identification iguiit/ Replaced or ( Code /

/ Replacement istaap J I I )~tes ue 3E207A i WESTINGHOUSE (N/A (047 (Component Cooling Water i1968 (Repaired i Yes Heat Exchan er <<A<<

7., Description. of Work: CUT 6<<X 9" ACCESS'HOLE 'FOR FORIEGM HATERIAL RETRACTIOH. CODE'CASE M-416 1'AS BEEN ENVOKED FOR THIS REPAIR ACTIVITY.

Pneunatic: Hominal Operating Pressure Other VT-2 Pressure~Yes sis Test Tsssersture 91 oF 97-031-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarkst Code Case NC16-1 was envod'ed for this~reEair activl~t., Al,l weldIndI was rfornod tn accordanca otth tt roc t td c trot~anno CERTliFICATE OF COMPLIANCE Ne certify that'the statements made in the report are correct and 'this repair conferms to the'ul'es of the ASME Code, Section Xl.

Type Code Symbol Steap N A Certificate f Authori cation (o. ~N'A Fxpiration Date Signed ra Ac . cd pd oh .

to Date~~~ /'~

Owner or Owner's Desi'IInee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cemsission issued by the',National Board of BoiLer and Preksur'e Vksse'I inspectors and the state or Province of Datie County and dnplbyed by~Arkuright Mutual Insurance Company bf Norwood, Ha. have inspected the ceq~ents described in this'Own'ers 'Repbrt 'during the period 01/29/9/ to 06/04/97 and state that to the best of my knowledge and belief, the Owner.has performed examinations and taken corrective measures, described in this O~ners Report in'acc'ordance with the requiirements of the ASME Code, Section Xl..

By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed or implied, concerning the examinations and corrective measures'described in this'wner's Report. Furtherax>re, neither the Inspector nor his employer shai,l. be Liable In'i any ma'nner'oir ady personal injury or property, damage or a loss of any kind arising from or connected with thisi inspection.

d'oemissions lnspec rs~SI tore i NB 8230~N ~I Nati'onal'oard, State, 'Providence, and Endorsements Date 97-031-3

TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations

L 0

~ ~

~ ~ i

~ s

~ ~ ~ ~ ~

~ ~ e ~ ~

I '.

~ a geog@/Q~Q ~ ~

g@Qgg RE W

~

=W R5 ggggg s s s ~

J

~ ~ ~ ~ ~ ~ ~ ~ r ~ ~

4 ~ t C ~

I~ ~~ ~ ~

~ t

II e CUMULATIVE DISTRXBUTION

SUMMARY

TURKEY POINT UNIT g .3 03/97 COMPONENT  : S/G A Page:

05/12/97 1'ate Examination .Dates  : 03/13/97 thru 03/19/97 Total Number of Tubes Xnspected 3197 Total Indicati'ons Between 20% and 39% 6 (1)'

Greater than or equal to 40%

Total Corrosion. type Indications "VOL" 2 Total Tubes Plugged as Preventive Maint 1 Total Tubes Plugged 3 Location Of Xndications, 20% to, 100% & "VOL" Hot. Leg Cold Leg TSH .5 to 01H -2.1 TSC .'5 to 01C -2.1 '. 0 01H -'2.0 to 06H'2.0 01C'2.0 to 06C +F 0 0 06H i2.1 to AVl -3.1 0 06C +2.1 to AV4 -3,.1 0 AV1 -3.0 to AV4 -3.0  : 6 (1)

INDICATIONS/TRENDING REPORT PTN 3 OUI'AGE  : 03/97 CONPONENT  : S/G A Page : 1 DESCRIPTION :t ALL 40% to 100%, VOI.' PTP INDICATIONS Date : 5/12/97 Time : 10:00:00

+ ~ ~

I Extent 03/97 I I N/A I (Row(Col(Leg(***(Tst/Note( Reel I Probe Location Ivoltsloeg(CI I % (Diff( Location (voltslocg(CI x

'---I---I---I---I--- I . --I I

-.-- .-.- I---- "-I-- I I I I

- I--.-.--------I--".I- I".

I I--'19(

I 13( I H ICNRIBAHTSHPLIAH002 (HRPC680.3C ITSH 3.8 I 1.4( 1 IP'IP I I I I I I

( 31( 18(. H I (06H SCIAH039 IMPRC720-3C '(06H 1. 1 ( 1.0( ,64 I 1(VOL ( ( I I I I I I 44I 36( c I I (AH037 IHPRc720.3c I I I I IPTPI I I I I I I

( ( C (CHR(TSH GY(AH037 'INPRC720.3C (TSH .7 ( 1.2( 14( 1(VOI I ( I I I '( I

'- -'I---I---I---I--------I- I

- I.

I

.--I -I---l--.l.--.l--------.----l-----l-.-l---l--+

Number of RECORDS Selected .from Current Outage  : 4 Naker of, TUBES Selected .from Current Outage : 3

II 0

Ik

INDICATIONS/TRENDING REPORT PTN-3 OUTAGE  : 03/97 CNIPONENT : S/G A Page  : 1 DESCRIPTION : ALL 20K TO 39K IHDICATIONS Date : 5/12/97 I Extent (Row(Col(Leg(*~*(Tst/Note( Reel

'---I-- I---I---I-( Probe ( I.ocation 03/97 (Volts(Deg(Ch ( X

- -I-----I---I---I-"

I I

'/A fDiff( Location Time : 10:00:00 fVolts(Deg(ch (

+

I X (

I I I I--- I-- --- --- - I---- l.--l---l---+

33( 41( C ITEH PS(AC006 (A-720-M/ULC IAY1 .0 .9(. IP 2( 24(

I I I I C I

(

ITEH P (AC006 IA-720-M/ULC IAV3 .0 f'9(

I (P 2( 25(

I I

I I

I I

I I

I I

I 38( 45( C I ITEH PSIAC007 IA-720-M/ULC (AvZ .0 (. 1.5( IP 2( 30( I I I I I

( 37( 47( C I (TEH PS(AC012 IA-720.M/ULC (AV3 .0 ( .8( fP 2( 22( ( I I I I I

'( 30( 52( H ( (TEC PC(AH034 IA-720 M/ULC IAv3 .0 ( ~ 4( (P 2('0( I I I I I

( 28( 59( H ITEC PS(AH021 (A-720 M/ULC IAY2 .0 .6( IP 2(,26(

(

'---I---I---I---I--------I- I I I

I. I I I I

- I".--".--.-.I"" I--- I--- I---+

I I I I I Number of RECORDS Selected .from Current Outage '6 Number of TUBES Selected .from Current Outage : 5

0 0

CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT g 3 03/97 COMPONENT : S/G B Page : 1 Date : 05/12/97 Examination Dates  : 03/13/97 thru 03/19/97 Total Number of Tubes Inspected .....: 3196 Total Indications Between 20% and'9% (1)

Greater than or equal to 40% 1 Total Corrosion type Indications "VOL" 9 (2)

Total Tubes Plugged as Preventive Maint 2 Total Tubes Plugged 9 (2)

Location Of Indications 20~ to 100~ 6 "VOL" Hot Leg Cold Leg TSH .5 to 01H -2.1 TSC .5 to 01C -2.1 01H -2.0 to 06H +2.0 01C -2.0 to 06C +2.0 06H +2.1 to AV1 -3. 1 0 06C +2.1 to AV4 -3.1 AV1 -3.0 to AV4 -3 0

0 INDICATIONS/'TRENDING REPOR I PTN 3 OUTAGE : '03/97 COMPONENT  : S/G 8 Page  : 1 DESCRIPTION : ALL 40% to 100%, VOL & PTP INDICATIONS 'Date  : 5/12/97 Time : 10:00:00

+ ~ ~ +

I Extent ( 03/97 N/A I (Rou(col(Lcg(***(Tst/Note( Reel I probe ,( Location (volts(oeg(Ch (

% '(Diff( Location (volts(oeg(Ch I / I I- -I---l---l------.-l--------l------------l-------------l-----l---l---l- -I----I-- ---."----I--- -I-- I---I---+

I I I H'cMRITsH'LIBH002 IHRPc680 c ITsH ~ 4 I 1 (10 I 1(voL( I I I I I

( 42( 38( H ICHR(01HTSKPLIBH004 IMRPC680-3C '(TSH 1.5 ,( 1.2( 87( 1(VOL( I I I I I I 39( 39( c IcMR(osK PLIBH043 IMRPc680 3c (05H .8 I 2.3(125( l(voLI I I I I- I

( 44( 40(. C,(CMR(TSH PI. (BH043 (MRPC680-3C (TSH .3 ( 1.3( 46( 1(VOL,( I I I I I

( c (PITITsH PL'(BH043 IHRPc680-3c (TsH 1.8 ( .4( 6o( P1( 82( ( I I I I I

( 23( 41( C (CMR(03C PCfBC031 (MRPC680-3C (03C .'5 ( .4( 93( 1(VOL( I I I I

( 44( 41( c (cMRITsH',PLIBK043 (HRPc680-3c ITsK .2 ( 1'.5(122( 1(vol.( I I I I I I I I'C IcHRITsK PL(BH043 IHRPC680 3C ITsH .4 I \ 1( 90( llvoLI I I I I I I c (cMRITsK ILIBK043 (MRPc680 3c ITsK .5 I .9( 83( .1(voLI I I I I I I 45( 41(' ILPHITEH PL(BC009 (A-720-M/ULC (TsK .6 I I I II TPI I I I I I I

( 45( 42( c ILPM(TEK PL(gc009 (A-720.M/ULc ITsK 1.3 I .( (PT I I'

'- I. " I.-.I---I-I 41( 44 I C ICMR ITEH GY IBH043 (HRPC680-3C ITSH .6,(- .3 I 52(

I 1(YOL I

--" I. -I-.-I.-.I-I I I I I I

I I

I I I -I. I -I- .-- .--- I.-- -I-- I.--I---

Number of RECORDS Selected from Current Outage : 12

,Number of TUBES Selected from Current Outage : 9

0' IHDlCATlOHS/TREHDlNG REPORT PTH-3 OUTAGE : 03/97 COHPONENT : S/0 8 Page  : 1 DESCRIPTlON :t ALL 20% TO 39% IHDlCATIONS Date : 5/12/97 Time : 10:00:00

+ +

I I Extent 03/97 .I I N/A 'I IR "I [Leg[***[Tst/Hotel Reel I Probe I Location IVolts[Deglch I % [Diff[ l.ocation ,IVolts[Deg[Ch I % I

+---I---I---I- I

--- I - -.-I "----------I----- -.-----I --I I I I I I I I I I 32[ 34[ C f,[TEH PSIBC019 [A-720-N/ULC IAV1 .0 I .7[ IP 2[ 23[ I I I I I I I' C I ITEH .Ps[BC019 [A 720 H/ULC IAV3 -.1 I 1.3[ [P 2[ 31f f I I I I I I c I ITEH Ps[Bc019 IA-720-H/ULC IAv4 -.2 I .7[. [r 2[ 22[ I I I I I I 34f 46[ C I ITEH PCIBC009 '[A-720-N/ULC fAV2 .0 I 1.0[ fP Zf 28f, f ,I I I I

'I' I C 'I ITEH PCIBc009 IA-720-N/ULc IAv3 ~ 0 I 1.5[ IP Zl 35[ 'I I I I I [

I 34f 51[ C I ITEN PSIBC011 IA-720-N/ULC IAV2 .0 f 1.2f IP 2[ 29f I I I I I I 42[ 55[ c I: ITEH PCIBC012 'IA 720 H/ULC IAv3 -.3 I 1.7[ .IP Zl 31[ I I I I I

+--- I--- I- I--- I--------I--------I---------. I--- --I-----I-- I---I---I----I- "---.----I--"-I"-l.--[--.+

Number of RECORDS Selected from Current Outage  : 7 Number of, TUBES Selected from Current Outage : 4

0 CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT ¹ 3 03/97 r

COMPONENT : S/G C Page  : 1 Date  : 05/12/97 Examination Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Inspected 31'81 Total Indications Between 20> and 39% 20 (1)

Greater than or equal to 40% 1 Total Corrosion type Indications "VOL" 0

'Total Tubes Plugged, as Preventive Maint 1 Total Tubes Plugged 2 Location Of Indications 20~ to 100: & "VOL" Hot Leg Cold Leg TSH 5~ to 01H -2.1 1 TSC .5 to 01C -2.1  : 0 01H -2..0 to 06H +2.0 0 01C -2.0 to 06C +2.0  : 0 06H +2.1 to AV1 -3.1 0 06C +2.1 to AV4 -3.1  : 0 AV1 -3.0 to AV4 -3.0 20 '(1)

0 0

INDICATIONS/TRENDING REPORT PTH-3 OUTACE  : 03/97 COHPONEHT ~ S/0 C Page : 1 DESCRIPTION : ALL 40/~ to 100/, VOL 8 PTP INDICATIONS Oat e: 5/12/97 Time: 10:00:00 I Extent I 03/97 I I H/A I (Row(CoI(Leg(***(Tst/Note( Reei Probe Location (Voits(oeg(Ch,f 7.'(oiff( Location (Volts(oeg(cb

'-I- I

.-I- -I---- ---I --

(

. I- - -

(

---'I- I I -I -I. I. I I I I

( X (

--I---'

( 30( 48( N ('TEC PL(CH009 (A 720 H/ULC (AV3 -0 I I IPTP( ( ( (

I 33( 66( C IPITITSH PLICH047 IHRPC680-3C ITSH .6 .4(103(P 1( 58( I I I I I

---I---I- -I---I--.-----I-----".I- I ( I I I

(' - --( ( ( I Humber of RECOROS Seiected from Current Outage : 2

,Number of TUBES Selected from. Current Outage : 2

0 INDICATIONS/TRENDING REPORT PTN-3 OUTAGE  : 03/97 COMPONENT  : S/G C Page  : 1 DESCRIPTION : ALL 20/ TO 39/i INDICATIONS Date : 5/12/97 Time : 10:00:00

+

I Extent I 03/97 I I N/A I (Row(col(Leg(**"JTst/Note( Reel I Probe I Location (Volts(Deg(Ch (.X (Diff( Location (Voltsfgeg(Ch (

X f

+-- I-- I---I---I----.--I- -I- I -I -(-.-I-.-I- I I +

I ( I I I 30( '17( H I ITEC Ps(CH006 IA.720 M/ULC IAvl .0 I -5( JP 2( 20( I I I I I I 34(31( H I ITEC PS(CH027 IA-7?O.M/ULC IAV2 .0 I -5I IP 2( 21( i I I I I I I I H I (TEC PS(CH027 IA-720-M/ULC IAV3 .0 I -5l l>>l 20( I I I I I I I 43( 33( H I JTEC PSiCH026 iA 720-M/ULC IAV3 .0 I Cl I>>I ZZI,I I I I I I I 35( 36( H I iTEC PSiCH028 .IA-720.H/ULC iAV2 .0 I .5( I>>I >>I I I I I I I (34(41f H I fTEC PS(CH029 (A 7ZO.M/ULC (AVI .0 I 6( (P 2( 22( I I I JTEC PSiCH029 JA 720-M/ULC,JAV3 .0 .6( JP Zf 22( I I I I I I I IHI ITEC PSICH029 :IA-720-M/ULC IAV4 ~ 0 I .71 I>>l Zcl I I I I I I I 33( 43( H ( JTEC PC(CH030 (A-720 M/ULC IAV3 .0 ( 6( iP Zl 27i I I I I I I 35J 43J H I ITEC PCICH030 IA.720-M/ULC IAVZ .0 J .8( J>>I >>I I I I I I I I I (H( .ITEC PC(CH030 IA-720 M/ULC IAV3 .0 I.C( IP Zl 32( I I I I I I I I IHJ ITEC PCICH030

'A IA-720-M/ULC IAV4 .0 I "9( l>>l >>I I I I I I

( 35( 4CJ H ( IT C PCICH 720 M/ULC (AV 1.5( I>>l 34( I I I I I I ITEC PCICHO IA ?0 M/ULC IAV 1.6( -(P 2( 35( I I I I I I I 301 48I H I i'IEC (CH009 iA.720-M/ULC (AV2 .0 fi 2( 32f f I ( I I I I I I H I JTEC PCICH009 JA-720 M/ULC 'JAV3 .0 1.5 f I>>l 37l ( I I I I I 35( 49( C ( ITEN PSJCC009 (A-720-M/ULC JAVC .0 .6( I>>( 25( I I I I I I I 26( 48( H

( ITEC (CH009 JA.720-M/ULC IAVZ .0 I ~ 5I I>>I 20( I I I I I (30(61f H f (TEC PS(CH009 (A.720.M/ULC JAV2 .0 I 5l (P 2( 20( I I I I I (38(71J C( iTEN PS(CCOll JA 720-H/ULC JAVC ..2 I ~ 6( I>>I >>I I I I I I I

-I- I I I I

-I" Number of RECORDS Selected from Current Outage  : 20 Number of TUBES Selected from Current Outage : 13

Il TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers

0 0

MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 3

'1997 SPRING REFUELING'UTAGE

'Commercial Service Date: December 14, 1972 Prepared By:

Inservice Inspection Group Florida Power & Light Turkey Point Nuclear 9760'.'W. 344 St.

Florida City, Fl 33035 Originated by: M. Campbell D te

~z1 97 Reviewed by: A. Pauleuc Date M. Blew Date

0 Mechanical shock arrestors (snubbers) were visually inspected/handstroked under purchase order B94536-40012 by Ratheon inspectors in accordance with the following plant procedures:

0-CMM-105 '

O-OSP-105.1 Implementing plant work orders were as follows:

PWO WO 96014408 SNUBBER VISUAL/HANDSTROKE INSPECTION 3-1032, 3-1033, 3-1034, 3-1035, 3-1036, 3-1037/ 3-1038/ 3-1039/

3-1041, 3-1043, 3-1044, 3-1045, 3-1046, 3-1048/ 3-1050/ 3-1051/

3-1052, 3-1054/ 3-1057, 3-1058, 3-1060, 3-1069, 3-1070/ 3-1071/

3-1072/ 3-1073, 3-1074, 3-1075/ 3-1077, 3-1078, 3-1079, 3-1080/

3-1081, 3-1082, 3-1083, 3-1091, 3-1092, 3-1093, 3-1094, 3-1095/

3-1096/ 3-1099, 3-1100, 3-1101, 3-1102, 3-1103, 3-1104, 3-1105, 3-1106, 3-1110, 3-1111, 3-1112, 3-1121, 3-1136 & 3-1137 PWO WO 96014408 VISUAL INSPECTION (NO HANDSTROKE) FOR FUNCTIONAL TESTING; 3 1009/ 3 1011/ 3 1019/ 3 1023/ 3 1026/ 3 1031/ 3 1040/ 3 1042/

3 1047/ 3 1049/ 3 1053/ 3 1055/ 3 1076/ 3 1084/ 3 1097/ 3 1098

& .3-1120 PWO WO 96024188 REPLACE LOAD PIN WITH LOAD STUD; 3 1007/ 3 1008/ 3 1009 & 3 1012 PWO WO 96024216 REPLACE LOAD PIN WITH LOAD STUD; 3-1084 PWO WO 96016705 - DISLODGED BEARING & LOAD STUD REPLACEMENT/

3-1005, 3-1006 & 3-1010 PWO WO 97006613 REMOVE SNUBBER 3-1009 IMPLEMENTATION OF CR 97-399/

/ 3-MSHX-15 3-1005, 3-1006, 3-1009 & 3-1010 Mechanical shock arrestors (snubbers) were functionally tested under purchase order B95691-50102 by Basic PSA personnel in accordance with the following plant/vendor procedures:

0-CMM-105.1 O-OSP-105.2

il Implementing plant work orders were as follows:

PWO WO'6024408 FUNCTIONALLY TEST SNUBBERS LISTED BY ISI 3 1009'g 3 101 1 ' 1019' 1023 ' 1026' 1031 g 3 1040' 1042' 1047. g 3 1049 g 3 1053 ~ 3 1055 / 3 1076 g 3 1084 g 3 1097 ( 3 1098

& 3-1120 PWO WO'6024412 REBUILD 10 SNUBBERS 10172 16253 J 10174 ~ 1 1 1 10 '2377 ( 12392 ~ 16232 g 16238'g 16242 g 16252 &

0 il

MECHANICAL SHOCK ARRESTOR FINAL REPORT SECTION I

0 PAGE NO. 1 05/22/97 Turkey Point Outage Surmary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A 4L4 A Number Number Date T Test T Dimension T Visual Sunnary Ftmctional Sunnary 3-1005 10035 03/10/97 P 03/20/97 P 26.5000 P Visual inspection - sat, "L4 diemsnion acceptable, A factional test was performed with the following handstroke - sat, replaced load pins with load studs acceptable results under NO 97006613 and CR 97-399:

per IO 96016705, lubricated load studs and spherical bearings on both ends with neolube - 24982-3. Pre Rebuild - S/N 10035 Replaced snubber S/N 10035 with snubber S/N 10579 per Tension Compression Criteria CR 97-399. Snubber S/N 10035 was rebuilt under NO 97006613 by Basic-PSA and NRH back into stores. Test 1) 164.88 74.26 2500.00 Test 2) 223.57 165.57 2500.00 Test 3) 0.001 0.012 0.02g's Test 4) 182.49 149.63 2500.00 The Pre Rebuild fextionai test was performed at Engineering direction per CR 97-399.

Post Rebuild - S/N 10035 Tension Ccepression Criteria Test 1) 161.38 138.78 2500.00 Test 2) 232.46 452.13 2500.00 Test 3) 0.004 0.008 0,02gls Test 4) 224.31 397.34 2500.00 The following parts were installed as part of the rebuild of snubber S/N 10035:

(4) Drive Screws - 0015673-3 (1) Clutch Spring - 0015346-1 (1) Torque Carrier - 0015343-1 (1) Capstan Spring - 0015729-1

PAGE KO. 2 05/22/97 Turkey Point Outage Smasry Report Unit 3/4 S Date S S Visual T of T I T Serial Inspection "i." A Functional Tag A Fmctional A Nwher Kumber Date T Test T Dimension T Visual Suanary Swmary After rebuild and successful post rebuild factional test, snubber S/H 10035 uas KRH back into stores.

3-1006 6521 03/08/97 P 03/20/97 P 26.7500 P Visual inspection - sat, "l." dimension acceptable, A fwetionaL test Mas performed uith the foLLouing handstroke - sat, lubricated spherical bearings and acceptable results under lO 97006613 and CR 97-399:

load studs on both ends.

Pre Rebuild - S/H 6521 Installed Load studs in place of load pins per lO 96016705. Tension Cocpression Criteria Replaced snubber S/H 6521 with snubber S/N 6494 per Test 1) 152.21 195.31 2500.00 CR 97-399. Snubber 6521 Mas rebuilt under lO 97006613 Test 2) 131.37 224.07 2500.00 by Basic PSA and NRH back into stores. Test 3) 0.005 0.039 0.02g's Test 4) 127.82 207.67 2500.00 This test Mas performed at Engineering direction per CR 97-399.

Post Rebuild - S/H 6521 Tension Coapression Criteria Test 1) 250.32 172.07 2500.00 Test 2) '50.32 317.51 2500.00 Test 3) 0.002 0.007 0.02g's Test 4) 234.70 291.81 2500.00 The foLLcwing parts uere used during the rebuild of snubber S/K 6521 under LO 97006613:

(4) Drive Screws 0015673-3

PAGE NO. 3 05/22/97 Turkey Point Outage Slscsry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fumtional A "L" A Nwher Number Date T Test T Dimension T Visual Summary Factional Soanary (1) inertia Hass 0015344-1 (1) Capstan Spring 0015729.1 (1) Thrust Bearing Assembly - 0215049-1 Upon rebuild and successful fmctional testing the snubber was HRH back into stores.

3-1007 4590 03/10/97 P / / 28.0000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under MO 96016705.

Replaced load pins with load studs per MO 96016705.

3-.1008 8084 03/08/97 P / / 27.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under MO 96016705.

Replaced load pins with load studs per lN 96016705.

3-1009 1203 03/10/97 P 03/16/97 F 26.5000 P Visual inspection - sat, 4L4 dimension acceptable, A fuetional test was performed with the following no handstroke performed, snubber is part of the unacceptable results under NO 96024408:

initial OR sample.

Pre Rebuild - S/N 1203 The snubber could not be unpinned. CR 97-399 was written for this snubber to determine the method of Tension Coapression Criteria removal. A hydraulic ram was utilized to move the main steam pipe to facilitate snubber removal. Test 1) 7390.62 0.00 2500.00 Test 2) 7390.62 0.00 2500.00 Test 3) 0.00 0.00 0.02g's

~

~

~ I ~

0 PAGE NO. 4 05/22/97 Turkey Point Outage Scenery Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A F~tional A ".i." A Naker Nether Date T Test T Dimension T Visual granary Fact iona( Summary Test 4) 0.00 7836.54 2500.00 This QR snubber was tested as part of the initial saapie. CR 97-399 was initiated for a QR fmctionai test failure and per engineering disposition, snubbers 3-1005, 3-1006 and 3-1010 sere fmtionally tested, no saapte expansion is required for a OR failed snubber; Snubber S/N 1203 was rebuilt Mith the follouing acceptable test results under MO 97006613 and CR 97.399:

Post Rebuild - S/N 1203 Tension Coapress ion Cri teria Test 1) 244.85 308.48 2500.00 I'est 2) 244.85 707.74 2500.00 Test 3) 0.005 0.008 0.02g's Test 4) 455.77 615.54 2500.00 The foiiouing parts Mere replaced during rebuild of snubber S/N 1203 under UO 97006613:

(4) Drive Scram 0015673-3 (1) Inertia Ness 0015344-1 (1) Torque Carrier 0015343.1 (1) Capstan Spring 0015729-1 Upon rebuild and successful fmctionai testing the snubber was HRN back into stores.

~

~

/ I ~

/Qi I~

4

PAGE NO. 5 05/22/97 Turkey Point Outage Stellary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A FLmctional A "L" A Nunber Kosher Date T Test T Dimension T Visual Smmary Fuetional Suansry 3-1010 11931 03/08/97 P 03/14/97 P 25.5000 F Visual inspection - sat, aL" dimension unacceptable, . A fuetional test uas performed uith the folloMing condition report 97-0398 uas Mritten to address the acceptable results under N 97006613 & CR97-399; "L" dimension uhich uas .5000" under the miniszza alloued. Snubber 3-1009 uas found frozen and per Pre rebuild - S/N 11931 condition report 97-399, Engineering directed that snubber 3-1010 be removed, fmctionally tested, Tension Coapressi on Criteria disassembled for Engineering revieM. Upon disasseahly Test 1) 105.93 286.57 2500.00 of snubber 3-1010, Engineering directed that the subject Test 2) 160.27 307.04 2500.00 snubber be rebuilt, as uell as snubbers 3-1005 & 3-1006. Test 3) 0.002 0.0'i4 0.02g's Test 4) 148.42 22e.47 2500.00 Replaced load pins Kith load studs (2) 0214245-3 per lO 96016705, lubricated load studs and spherical This test uas performed at Engineering direction bearings with neolube - 024982-3. installed neM nuts per CR 97-399 in place of snubber 3-1009.

(8) 0209608-3, installed (4) spacer Mashers 197329-3 and torqued to 125 ft lbs, torque urench 85188, Post Rebuild - S/N 11931 cal due 03/30/97. Restaked spherical bearing.

Tension Coapression Criteria Test 1) 212.70 161.34 2500.00 Test 2) 388.96 245.62 2500.00 Test 3) 0.002 0.007 0.02g's Test 4) 24e.57 403.70 2500.00 The follouing parts Vere used during the rebuild of sakber S/N 11931 under ll 97006613:

(4) Drive ScreMs 0015673-3 (1) Clutch Spring 0015346.1 (1) Capstan Spring 0015729-1 (1) Torque Carrier 0015343-1 (1) Thrust Bearing Asseahly 0215049.1

~

~ i ~

0 IO it

PAGE KO. 6 05/22/97 Turkey Point Outage Story Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Fisictional A >>L" A Nisnber Number Date T Test T Dimension T Visual Smeary Fisictional Surmsry After rebuild and successful fisictionai testing, the snubber Mas NRH back into stores.

3-1011 12376 03/10/97 P 03/13/97 P 20.2500 P Visual inspection - sat. "L>> dimension acceptable, A fwctional test was performed uith the fotlouing no handstroke performed, lubricated spherical bearings acceptable results under N0 96024408; and load pins Mith neolube - 24982-3 under M0 960241M.

Snubber S/N - 12376 Tension Coapression Criteria Test 1) 99.74 56.18 750.00 Test 2) 138.07 53.35 750.00 Test 3) 0.004 0.004 0.02g>L>> dimension acceptable, Handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube' 24982-'3.

Load pin on building attachment (rear bracket) uas not replaced uith a load stud due to a 2" horizontal pipe risi 1>> above the rear bracket, not enough room for the stud to fit and be double nutted per lO 96024188. Replaced 3 nuts on the coaponent pipe clamp side.

3-1019 2889 03/14/97 P 03/14/97 P 17.2500 P Visual inspection sat, >>L>> dimension acceptable, A fwetionai test was performed Mith the folioiiing

~

i I~

0 0

0 0

GE NO. 7

/22/97 Turkey Point Outage Srmmsry Report Unit 3/4 S Date S S Visual T of T I T ag Serial inspection A Frarctional A ~

. "L" A r Number Date T Test T Dimension T Visual SrlrrMrry Frnctional SrmrrMrry no handstroke performed, lubricated spherical acceptable results under IN 96024408r r

bearings and load studse Snubber S/N - 2889 No iD tag installed. Snubber was changed out with S/N 17425 due to unit 4 LCO. Mork was performed under Tension Ccapression Criteria IN 96014408.

Test 1) 29.92 13.06 300.00 Test 2) 30.87 22.91 300.00 Test 3) 0.007 0.0'17 0.02g's Test 4) 25.00 27.36 300.00 This SR snubber was tested as part of th6 initial saaple.

1023 23273 03/13/97 P 03/13/97 P 12.7500 P Visual inspection - sat, "L4 dimension acceptable, A frarctional test was performed witli the following no handstroke, lubricated spherical bearings and acceptable results under MO 96024408; load studs with neolube - 24982-3 under MO 96014408.

Snubber S/N - 23273 Tesnion Coapressi on Criteria Test 1) 11.87 8.23 75.00 Test 2) 16.58 9.61 75.00 Test 3) 0.007 0.007 0.02grs Test 4) 13.94 17.01 75.00 This SR snubber was tested as part of the initial saaple.

1026 12394 03/13/97 P 03/13/97 P 19.5000 P Visual inspection - sat, "L" dimension acceptable, A frarctional testing was performed with the following

~ ~

r 1

0 0

0

PAGE NO. 8 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A fmctionaL A "L" A Number Nwher Date T Test T Dimension T Visual Sumery fmctionaL Swmsry handstroke - sat, lubricated spherical bearings and acceptable results under NO 960244M:

load pins on both ends Nith neolube - 24982-3 under MO 96014408. Snubber S/N - 12394 Torqued TTA bolts to 450 ft lbs 4706 - 07/07/97 Tension Ccapression Criteria Lock uired the TTA bolts.

Test 1) 57.58 37.52 750.00 Test 2) 71.83 39.95 750.00 Test 3) 0.014 0.009 0.02g's Test 4) 68.12 60.49 750.00 This SR snubber uas tested as a previous rebuild.

3-1031 27M6 03/13/97 P 03/15/97 P 17.8750 P Visual inspection - sat, <<L<< dimension acceptable, A fuetionaL test Mas performed uith the foLLouing no handstroke, Lubricated spherical bearings and acceptable results under LN 96024408; load pins uith neolube - 24982-3 under NO 96014408.

Snubber S/N - 27086 No LD tag installed.

Tension Coapression Criteria Test 1) 18.35 14.06 300.00 Test 2) 20.33 21.07 300.00 Test 3) 0.006 0.006 0.02g's Test 4) 21.24 20.08 300.00 This SR snubber uas tested as part of the initial saaple.

3-1032 24410 03/12/97 P / / 14.0625 P Visual inspection - sat, "L<<dimension acceptable, handstroke - sat, Lubricated spherical bearings and

'

~

i f ~

0 PAGE KO. 9 05/22/97 Turkey Point Outage Sumery Report Unit 3/4 S Oate S S Visual T of T I T Tag Serial inspection A Fmctfonal A 4L" A Kunber Number Oate T Test T Dimension T Visual Smeary Flax:tional Suanary load pins on both ends with neolube - 24982-3 under IJO 96014408.

3-1033 19328 03/13/97 P / / 16.3750 P Visual inspection - sat, "i." dimension acceptable, handstroke; sat, lubricated spherical bearings and Load pins on both ends with neolube -. 24982-3 under iJO 96014408.

No LD tag installed.

3-1034 24429A 03/16/97 P / / 13.8750 P Visual inspection = sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under lO 96014408.

3-1035 19330 03/15/97 P / / 16.6250 P Visual inspection - sat, "L'! dimension acceptable, handstroke - sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under MO 96014408.

Ko LD tag fnstallede 3.1036 27100 03/15/97 P / / 16.3750 P Visual inspection - sat, "L" dimension acceptable, ~

handstroke -, sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under QO 96014408.

No LO tag lnstalfedr

~

/ f ~

PAGE NO. 10 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fuetional A 4L4 A Number Neer Date T Test T Dimension T Visual Suanary Fmetional Sunnary 3-1037 11922 03i14/97 P / / 26.6250 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under IQ 96014408.

3-1038 11934 03/14/97 P / / 26.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.

3-1039 16241 03/14/97 P / / 20.0625 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.

3-1040 16239 03/13/97 P 03/15/97 P 20.5000 P Visual inspection - sat, "L" dimension acceptable, A fwetional test was performed with the following handstroke - sat, lubricated spherical bearings and acceptable results under IQ 96024408; load pins on both ends with neolube - 24982-3 under IQ 96014408. Snubber S/N - 16329 Tension Compression Cr i teria Test 1) 73.67 79.67 750.00 Test 2) 113.91 52.08 750.00 Test 3) 0.012 0.010 0.02g's Test 4) 122.59 202.88 750.00 This SR snubber was tested as a previous rebuild.

~

~ i ~

0 0

ll

PAGE NO. 11 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A "L" A Number NLNScr Date T Test T Dimension T Visual Suanary Fweti ona I Suanary 3-1041 16234 03/11/97 P / / 20.3750 P Visual inspection - sat, "L" dimension acceptable, handstroke sat, light rust on spherical bearings and load pins on both ends. Cleaned spherical bearings and load pins Nlth scotch bright and lubricated spherical bearings and load pins on both ends Mith neolube 24982-3 under NO 96014408.

Installed black ID tag to snubber TTA.

3-1042 12365 03/12/97 P 03/15/97 P 20.7500 P Visual inspection - sat, "L4 dimension acceptable, A fwxtional test uas performed Mith the foiioMing handstroke - sat, lubricated spherical bearings and acceptable results under NO 96024408; load pins on both ends Nith neolube - 24982-3 under NO 96014408. Snubber S/N - 12365 No ID tag installed. Tension Coepression Criteria Test 1) 158.38 59.09 750.00 Test 2) 162.40 120.08 750.00 Test 3) 0.009 0.002 0.02g's Test 4) 358.28 146.08 750.00 This SR snubber Nas tested as a previous rebuild.

3-1043 17899 03/14/97 P / / 22.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Mith neolube - 24982-3 under lJO 96014408.

~

~

[ I~

il ll

AGE NO. 12 5/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fwetlonal A "L4 A r Number Date T Test T Dimension T Visual Suanary Fuetional Suanary

-1044 17900 03/14/97 P / / 21.5000 P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under IO 96014408.

1045 17189 03/14/97 P / / 21.5000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under lQ 96014408.

1046 17903 03/14/97 P / / 20.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under 10 96014408.

1047 17902 03/14/97 P 03/15/97 P 20.5000 P Visual inspection - sat, "L" dimension acceptable, A factional test was performed with the following no handstroke performed (initial sac@le), lubricated acceptable results under lS 96024408; spherical bearings and load pins on both ends with neolube - 24982-3 under N 96014408. Snubber S/N - 17902 Drilled load pin per STD-C-011 for installation of Tension Compression Criteria cotter pin (M29146-3) installed lock wire on TTA bolts and torqued to 450 in lbs, 8-4701 - Cal Due Date: 07/07/97. Test 1) 60.77 19.34 750.00 Test 2) 100.32 26.59 750.M Test 3) 0.007 0.002 0.02g's Test 4) 87.42 115.18 750.M This SR snubber was tested as part of the initial saaple.

0 0

PAGE NO. 13 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A "L" A Nuaber Kumber Date T Test T Dimension T Visual Suanary Fuetional Suanary 3-1048 17904 03/14/97 P / / 19.5000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under IJO 96014408.

3-1049 16245 03/14/97 P 03/15/97 P 20.5000 P Visual inspection - sat, 4L4 dimension acceptable, A fmctional test uas performed with the follcwing handstroke - sat, lubricated spherical bearings and acceptable results under MO 96024408; load pins on both ends Kith neolube - 24982-3 under iO 96014408. Snubber S/K - 16245 Tension Ccepression Criteria Test 1) 79.24 50 ~ 53 300.00 Test 2) 128.31 166.94 300;00 Test 3) 0.013 0.007 0.02g's Test 4) 125.92 151.03 300.00 This SR snubber Nas tested as a previous rebuild.

3-1050 17906 03/14/97 P / / 22.0000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Kith neolube - 24982-3 under MO 96014408.

3.1051 16249 03/12/97 P / / 21.5000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

~

~

~ I~

0 PAGE NO. 14 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Ftsx:tional A "La.A Neer Number Date T Test T Dimension T Visual Spermary factional Sunnary 3-1052 16233 03/12/97 P / / 21.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bear ings and load pins on both ends with neolube - 24982-3 under MO 96014408.

No ID tag installed.

3-1053 2462 03/14/97 P 03/15/97 P 20.0000 P Visual inspection - sat, 4L" dimension acceptable, A fmctfonal test was performed with the following no handstroke (previous rebuild), lubricated acceptable results under NO 96024408; spherical bearfngs and load studs on both ends with neolube - 24982-3 under MO 96014408. Snubber S/K - 2462 Tension Compression Criteria Test 1) 32.11 56.25 750.00 Test 2) 68.78 77.39 750.00 Test 3) 0.010 0.010 0.02g's Test 4) 106.53 90.31 750.00 This OR snubber was tested as a previous rebuild.

3-1054 16248 03/12/97 P / / 20.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982.3 under MO 96014408.

3-1055 13697 03/14/97 P 03/15/97 P 20.7500 P Visual inspection - sat, "Lw dimension acceptable, A functional test was performed with the following no handstroke (initial san@le), lubricated acceptable results under lN 96024408; spherical bearings and load studs on both ends

~ ~

~ 1

il 0

PAGE NO. 15 0

05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fuetional A "L" A Nunber Number Date T Test T Dimension T Visual Smeary Functional Suaaary with neolube - 24982-3 under N 96014408. Snubber S/N - 13697 Tension Compression Criteria Test 1) 69.00 62.64 750.00 Test 2) 88.54 85.69 750.00 Test 3) 0.012 0.013 0.02g's Test 4) 87.91 85.73 750.00 This QR snubber was tested as pert of the initial sample.

3-1057 27106 03/15/97 P / / 16.2500 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 960144M.

3.1058 27102 03/16/97 P / / 16.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube . 24982-3 under lO 96014408.

3-1060 19329 03/14/97 P / / 18.5000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Mith neolube - 24982-3 under lQ 96014408.

3-1069 27072 03/13/97 P / / 16.7500 P Visual inspection - sat, "L" dimension acceptable,

~

( i ~

0 Ib Ik

PAGE NO. 16 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fmctional A "La A Number Number Date T Test T Dimension T Visual Smeary Fwetional Sumery handstroke - sat, lubricated spherical bearings and load studs on both ends kith neolube - 24982-3 under lO 96014408.

Condition report 97-398 Mas Mritten to address boric acid on the snubber. The inspector found no boric acid uhen the snubber Mas inspected. Condition report 97-398 directed that herculite be put over the snubber before reload and removed prior to startup. The herculite Mas removed on 03/29/97.

3-1070 27079 03/13/97 P / / 17.6250 P Visual inspection - sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 960144M.

3-1071 27069 03/13/97 P / / 15.8125 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Nith neolube - 24982-3 under IQ 96014408.

No 10 tag installed. Load pin Nas ssmhroomed, filed pin for reinstallation in accrodance Nith STD-C-011.

3-1072 27073 03/15/97 P / / 16.0625 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under MO 96014408.

0 I~

0 0

PAGE NO. 17 05/22/97 Turkey Point Outage Senary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fuetional A 4La A ether Naker Date T Test T Dimension T Visual Suanary Fact iona l Stsmary No iD tag installed. Removed paint and rust on housing and indicator tube Mith scotch brite.

-1073 27090 03/15/97 P / / 17.0000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

-1074 27104 03/15/97 P / / 17.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends uith neolube - 24982-3 under 1JO 96014408.

-1075 18074 03/15/97 P / / 8.1250 F Visual inspection - sat, "L" dimension macceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

CR 97-0478 Mas issued for rusted rear plate and "L" dimension bale+ miniaua by .254. NO 97006948 Nas implemented to correct the conditions.

-1076 19725 03/13/97 P 03/15/97 P 17.5000 P Visual inspection - sat, "L" dimension acceptable, A fuetional test Nas performed Mith the follming no handstroke (initial sample), lubricated acceptable results under lO 96024408; spherical bearings and load pins on both ends Mith neolube - 24982-3 under NO 96014408. Snubber S/N - 19725

'Tension Coopression Criteria

~

~

~

i ~

Ib PAGE MO. 18 05/22/97 Turkey Point Outage SulNlary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Flmctfonal A "L" A Mmher Mumber Date T Test T Dimension T Visual Sundry Factional Stannary Test 1) 16 44 32 ~ 15 300.00 Test 2) 16.79 32.21 300.00 Test 3) 0.012 0.009 0.02g's Test 4) 17.19 31.28 300.00 This QR snubber was tested as part of the'initial saaple.

3-1077 16230 03/13/97 P / / 20.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IN 96014408.

installed black ID tag on TTA end.

3-1078 16244 03/12/97 P / / 20.5000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherfcal bearfngs and load pins on both ends with neolube - 24982-3 under IN 96014408.

3-1079 10176 03/12/97 P / / 22.0000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends vfth neo' 24982-3 under IN 96014408.

3-1080 12396 03/11/97 P / / 21.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and

~ '

~

i f~

IS IS 0

0

PAGE NO. 19 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A "L" A Number Number Date T Test T Dimension T Visual Smeary Fwetional Suaasry load pins on both ends with neolube - 24982-3 under lO 96014408.

3-1081 11921 03/12/97 P / / 25.5000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under MO 96014408.

No iD tag installed.

Replaced 1 spacer washer - 0197329-3 Replaced 1 cotter pin - 0029146.3 3.1082 11932 03/12/97 P / / 26.5000 P Visual inspection - sat, 4La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.

No ID tag 'installedo 3-1083 11925 03/15/97 P / / 25.1250 P Visual inspection - sat, aL" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.

3-1084 7000 03/14/97 P 03/16/97 P 24.7500 P Visual inspection - sat, "L" dimension acceptable, A fmctional test Mas performed Mith the folloMing no handstroke (initial saaple), lubricated acceptable results under MO 96024408; spherical bearings and load pins on both ends

~

)

~

i ~

il Il il

PAGE NO. 20 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A "L'l A Naker Kumber Date T Test T Dimension T Visual Suanary Functional Suanary ui th neolube 24982-3 under KO 96024216. Snubber S/N - 7000 Ko ID tag installed. installed 4 spacer Mashers- Tension Coapressi on Criteria 197329-3, installed neu load stud - 15329-1 and 4 nuts - 209608-3 and torqued to 125 ft lbs on Test 1) 504.13 154.54 2500.00 snubber end under lJO 96024216. Test 2) 504.13 407.02 2500 F 00 Test 3) 0.002 0.009 0.02g's Test 4) 217.05 225.69 2500.00 This SR snubber Nas tested as part of the initial searle.

3-1091 27087 03/13/97 P / / 19.0000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Kith neolube - 24982-3 under MO 96014408.

3-1092 27105 03/13/97 P / / 18.0000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Kith neolube - 24982-3 under lO 96014408.

No iD tag installed.

3-1093 27091 03/15/97 P / / 18.1250 P Visual inspection . sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under QO 96014408.

~ ~

~ 1

II 0

PAGE NO. 21 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A <<L<< A Number Number Date T Test T Dimension T Visual Summary Fact i one l Sumery 3.1094 4388 03/16/97 P / / 15.2500 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 96014408.

3-1095 16733 03/14/97 P / / 8.5000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.

3-1096 11993 03/18/97 P / / 8.5000 F Visual inspection - sat, <<L<<dimension macceptable, condition report 97-531 written to address the <<L<<

dimension which is -.3750<< below minim!a, handstroke

- sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under NO 96014408.

Snubber 3-1096 was swapped with tag 3-1097 from a previous installation. Reinstalled in the correct tag location.

3-1097 16724 03/13/97 P 03/15/97 P 9.0000 P Visual inspection - sat, "L" dimension acceptable, A factional test was performed with the following no handstroke, lubricated spherical bearings and acceptable results under NO 960244M; load pins on both ends with neolube - 24982-3 under lQ 96014408. Snubber S/N - 16724 Snubber was previously installed in the sister Tension Compression Criteria (3-1096) location. Reinstalled in the proper location.

~

/ 1

~

IO il il

PAGE NO. 22 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Functional A "L" A Naker Number Date T Test T Dimension T Visual Suanary Fuetional Smmary Test 1) 1.98 2.63 32.50 Test 2) 3.28 3.76 32.50 Test 3) 0.010 0.011 0.02g's Test 4) 3.03 3.75 32.50 This SR snubber vas tested as part of the initial sample.

-1098 33628 03/16/97 P 03/15/97 P 10.3750 P Visual inspection - sat, "L" dimension acceptable, A fmctionaL test was performed with the foLLouing no handstroke (lnitaL sample), lubricated spherical acceptable results under NO 96024408; bearings and load pins arith neolube - 24982-3 on building end only under 1JO 96014408. Snubber S/N - 33628 No ID tag installed. Tension Conpression Criteria Test 1) 2.10 5.21 17.50 Test 2) 4.80 5.21 17.50 Test 3) 0.011 0.010 0.02g's Test 4) 6.52 8.60 17.50 This SR snubber was tested as part of the initial saspleo

-1099 38481 03/16/97 P / / 11.7500 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, Lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under MO 96014408.

No ID tag installed.

II IJ il

PAGE NO. 23 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Flmctfonal A "L" A Naker Nwhtr Date T Test T Dimension T Visual Suansry Fuctfonal Summary 3-1100 17819 03/16/97 P / / 8.3125 P Visual inspection - sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1101 33626 03/16/97 P / / 11.5625 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1102 29451 03/16/97 P / / 11.2500 P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends sfth neolube - 24982-3 under IO 96014408.

Ko ID tag installed.

3-1103 '11996 03/17/97 P / / 8.5000 P Visual inspectfon - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pfns on both ends elth neolube - 24982-3 under IO 96014408.

3-1104 24412 03/17/97 P / / 13.5000 P Visual inspection - sat, "L" dimension acceptable,

~

/ I ~

0 PAGE NO. 24 05/22/97 Turkey Point Outage Suansry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A fmctional A "L4 A Number Nmher Date T Test T Dimension T Visual Suanary fuctionai Suanary Handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neoide - 24982-3 under IO 96014408.

3-1105 16134 03/15/97 P / / 13.1250 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on ccmponent end due to piping and scaffold limitations on building end Mith neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1106 38479 03/15/97 P / / 11.3125 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IO 96014408.

No ID tag installed.

3-1110 16136 03/15/97 P / / 12.7500 P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1111 2875 03/15/97 P / / 17.0000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and

~ ~

~

i I ~

I~

PAGE NO. 25 05/22/97 Turkey Point Ou'tage SISllllbry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A "i" A Number Nmher Date T Test T Dimension T Visual Suanary Factional Suanary load studs on both ends with neolube - 24982-3 under lO 96014408.

3-1112 27083 03/16/97 P / / 16.2500 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, Lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lJO 96014408.

3-'1120 18325 03/16/97 P 03/15/97 P 8.6250 P Visual inspection - sat, "L4 dimension acceptable, A fmctionaL test Mas performed with the foLLouing no handstroke (initiaL sample), Lubricated spherical acceptable results under NO 96024408; bearings and Load pins on both ends with neolube 24982-3 under NO 960144M. Snubber S/N - 18325 No ID tag Installedo Tension Coapress ion Criteria Test 1) 5.91 11.90 32.50 Test 2) 8.31 23.94 32.50 Test 3) 0.017 0.015 0.02g's Test 4) 8.07 5.54 32.50 This SR snubber vas tested as part of the initial sea@le.

3-1121 24430 03/16/97 P / / 12.7500 P Visual inspection - sat, "l." dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.

~

~ I~

0

~ ~

PAGE NO. 26 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fwetional A <<L<< A Neer Naker Date T Test T Dimension T Visual Suanary Fmctional Suaaary No ID tag installed.

3-1136 19M4 03/16/97 P / / 9.0000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neotube - 24982-3 under NO 96014408.

3-1137 19885 03/15/97 P / / 9.0000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under NO 96014408.

3-1005 10579 03/21/97 P 03/20/97 P 26.5000 P Visual inspection - sat, <<L<<dimension acceptable, A fmctional test Mas performed Mith the following no handstroke, lubricated spherical bearings and acceptable results under NO 97006613:

load studs on both ends with neolube - 24982-3 under QO 97006613. Snubber S/N 10579 Snubber S/N 10579 is a replacement per CR 97-399. Tension Coapression Criteria Snubber S/N 10035 was rebuilt under NO 97006613 and HRN back into stores. Test 1) 93.16 56.95 2500.00 Test 2) 171.37 92.16 2500.00 Test 3) 0.005 0.007 0.02g's Test 4) 153.93 135.11 2500.00 This OR snubber was tested as a replacement snubber.

3-1006 6494 03/21/97 P 03/20/97 P 26.7500 P Snubber S/N 6494 is the replacement snubber for snubber A fmctional test was performed Mith the follouing S/N 6521 per CR 97-399. Load studs and spherical bearings acceptable results under NO 97006613 and CR 97-399:

uere lubricated with neolube 24982-3 under NO 97006613.

~

~

/ I ~

0 PAGE NO. 27 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A "La A Neer Nmher Date T Test T Dimension T Visual Summary Factional Showery installed 2 square washers 30263-3 and 8 spacer washers Snubber S/N - 6494 197329-3.

Tension Cospression Criteria Test 1) 132.16 65.10 2500.00 Test 2) 190.20 102.84 2500.00 Test 3) 0.016 0.020 0.02g's Test 4) 220.84 87.87 2500.00 This test was performed as a replacement test.

3-1009 10542 03/17/97 P 03/14/97 P 26.8750 P Snubber S/N 10542 is a replacement snubber for A fmctional test was performed with the following snubber S/N 1203. The as left inspection was sat. acceptable results; under MO 97024188.

Tension Coepression Criteria Load studs and spherical bearings were lubricated with neolube 24982-3. 'Test 1) 41.56 128.27 2500.00 Test 2) 90.30 146.42 2500.00 Test 3) 0.006 0.008 0.02g's Test 4) 86.96 115.11 2500.00 This factional test was performed on snubber 10542 which is a replacement snubber for srabber 1203.

3-1010 6530 03/21/97 P 03/20/97 P 26.5000 P An as-left visuaL inspection was performed under A fuetional test was performed with the following lO 97006613 on replacement snubber 6530. Visual acceptable results under IO 97006613 and CR 97-399:

inspection was sat. Snubber 11931 was taken to the Basic-PSA trailer for tear down, Engineering Tension Coepression Criteria inspection and subsequent rebuild. The rebuilt snubber tested sat and was HRH into stores. Test 1) 132.54 . 90.78 2500.00 Test 2) 198.87 119.78 2500.00

~

~

~

i ~

il it

PAGE NO. 28 05/22/97 Turkey Point Outage Sumsry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A 4L" A Number Nwher Date T Test T Dimension T Visual Sunnary Fuetional Sunnary Test 3) 0.004 0.008 0.02g's Test 4) 220.20 104.52 2500.00 This test uas performed as a replacement test.

3-1019 17425 03/14/97 P 03/14/97 P 17.2500 P Visual inspection - sat, "L4 dimension acceptable, A factional test Mas performed with the follouing no handstroke performed, lubricated spherical bearings acceptable results under NO 96024408; and load pins with neolube - 24982-3 under MO 960144M.

Snubber S/N - 17425 Snubber S/N 2889 uas changed out with snubber S/N 19425 due to a LCO condition on unit 4. Tension Ccepresion Criteria Test 1) 29.92 13.06 300.00 Test 2) 30.87 22.91 300.00 Test 3) 0.007 0.017 Oe02g~s Test 4) 25.00 27.36 300.00 This SR snubber Mas tested as as a r'eplacement for snubber S/N 2M9 due to a LCO on unit 4.

~ ~ ~

~

I

0 TURKEY'OINT UNIT 3 1997 REFUELING OUTAGE Summary of Inservice Inspection Examinations

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 1 IHSERVICE INSPECTION SUMNARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 1'CBEAR,'STATUS Components

.Nil, 0 Zone Number,: 3-001 ASNE S ON'G T SEC. XI T RSEH Summary-Examination Area Catgy Exam A. 'E I 0 E Remarks Number Identification :Item Ho Hethod , Procedure T, C G M R <<* Calibration Block **

003200 VESSEL TO CLOSURE HEAD HATING B-N-1 VT-3 NDE 4.3-28 X - - - 03/22/97 - VT-'3. complete, examination SURFACE OH .HEAD B13.10 performed with remote camera

-J e: 06/13/97 TURKEY POINT NUCLEAR,PLANT UNIT 3 :Page: 2 IHSERVI CE INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND 'PERIOD, FIRST OUTAGE (97RF)

Class 1 CBEAR STATUS Components N I 0 Zone Number: 3-057 ,ASME S ONGT SEC. XI T RSEH Sunnary, Examination Area Catgy Exam A' I O,E Remarks Number Identification Item No Method Procedure T C G M R <<* Calibration Block **

202700 3-RCP-8-FLYWHEEL RG 1.14UT NDE 5.15-1 X- 03/27/97 - UT complete, examined from Flywheel the periphery surface, examinations performed in accordance with Technical Specifications

    • FLYWHEEL *>>

II

~ (

J

e: 06/13/97 ,TURKEY POINT NUCLEAR'PLANT UNIT 3 Page 3 INSERVICE INSPECTIOH

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class '2 CBEAR STATUS Components

.N I 0 Zone Number:,3-063 ASME S ONGT SEC., XI T 'R:SE H

'Smeary Examination Area Catgy ,Exam A E I,O,E Remarks Number Identification Item No'Method'rocedure T C G M.,R ** Calibration Block **

214900'R-252 F-A VT-3 .HDE 4.3-9' X - - - 03/12/97 - VT-3 complete, light rust SPRING, HANGER F,1.20C found inside of spring can

'215000 C-F-1 X- 3/12/97 - complete, two acceptable 14"-RHR-2301-9'IPE.

TO ELBOM C5.11'T PT 45

,HDE 3.3-20'DE 5.4-2 X---

- X'-

round PT indications, 3/14/97 - UT UT 60 complete, root. geometry, limited UT 70 --X- voiunetric examination from the elbow side due to 'its configuration, limited examination from the pipe side due to support 'interference

215050 14"-RHR-2301-9LD I C-F-1'T HDE 3;3-'20. X - - - 3/12/97 - PT complete, 3/14/97 - UT' LOHG SEAM 'DOHHSTREAM. INSIDE C5.',12 UT 45 HDE'5.4'-2 - X - complete, beam redirection due to RADIUS ,dendretics, inside surface geometry

215100 14"-RHR-2301-9LDO C-F-1 PT HDE 3.3-20 X - - - 3/12/97 - PT complete, 3/14/97'- UT LONG. SEAM. DOHHSTREAM OUTSIDE C5 ~ 12 UT'5 'DE'.4-2 - - X - complete, beam redirection due to RADIUS dendretics, inside surface geometry UT 33 4*

215180 .14a-.RHR-2301-10LUI, C-F-1 PT HDE 3.3-1 X - - - 03/12/97 - PT complete, 3/14/97 - UT LOHG SEAM UPSTREAM INSIDE C5 ~ 12 'UT 45 HDE 5.4-2 - - X - complete, beam redirection due to RADIUS dendretics, inside surface geometry.

~*:UT-33 **

215190 14a-RHR-2301-10LUO C-F-1 PT NDE X - - - 03/13/97 - PT,complete, 3/14/97 - UT LONG SEAM UPSTREAM OUTSIDE C5.12 U'I 45 3.3-1'HDE 5.4-2 -. - X.- 'complete, beam redirection due to RADIUS dendretics, inside:surface geometry

  • 'T-33 **

0 0

=J

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page 4 IHSERVICE INSPECTION

SUMMARY

.THIRD INTERVAL, SECOND PERIOD, FIRST'OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Heber:,3-063 ASME S ONGT SEC. XI T'SEH 'I Swmary Examination. Area Catgy Exam A E O,E Remarks

-

Number Identification Item No Method Procedure T C G M R ** Calibration Block **

215200 14>> RHR 230'I '10 C-.F-1 PT NDE 3.3-1 ---X X--- 3/13/97 - PT,complete, cresecent shaped ELBOW TO PIPE C5 ~ 11 PT indication at toe of weld, determined,to, CR PTH-97-0432 be a surface anomoly,'3/14/97 - UT WO 9706743 complete, root geometry,'3/17/97 - PT UT 45 NDE'.4-2 X- completed after .weld. cleanup UT 60 X- ** UT-33 **

UT  ; ND E 5'. 18-1 X-215250 14"-RHR-2301-25 C-F-1 SUR NDE.3.3 06/09/97 - weld found during 1997 Pipe to Pipe C5 ~ 11'OL NDE 5.4 outage, no examination required during this outage

    • UT-33 <<>>

215300 14<<-RHR-2301-11 C-F-1 PT NDE 3.3-13 X - - - 03/14/97 - PT and.UT complete, root PIPE TO ELBOW C5.11 UT 45 HDE 5.4-3 X - - - geometry UT 60 - - X-

C-F-1 3.3-13 - - - 03/14/97 -,PT and complete 215400 14"-RHR-2301-11LS LONG SEAM DOWNSTREAM INSIDE C5 ~ 12 PT UT 45 HDE NDE 5.4-3 X---

X UT RADIUS

<<* UT-33 *>>

C-'F-1 NDE'3.3-.13, X'- - - 03/14'/97 - PT and:UT complete 215410 14"-RHR-2301-.11LDO LONG SEAM DOWNSTREAM OUTSIDE C5.12'T PT 45 ,NDE 5.4-3 X---

RADIUS

<<>> UT-33 >>*

0 0

e:t 06/13/97 ,TURKEY POINT NUCLEAR PLANT'UNIT 3 Page: 5 INSERVICE .INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Corryonents N I 0

'Zone Number: ASHE S- ONGT 3-063'cenery SEC. XI T RSEH Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item Ho Nethod Procedure T .C G N R *>> Calibration Block **

215480 C-F-1 PT NDE X - - - 03/14/97 - PT and UT, complete 14"-RHR-2301-12LUI'OHG SEAN'.UPSTREAN INSIDE C5.12 UT 45 3.3-13'DE 5.4-3 X'-

RADIUS

    • UT-33 **

215490 14"-RHR-2301-12LUO C-F-1 PT NDE 3.3-13 X - - - 03/14/97 - PT and UT coaplete LONG SEAN UPSTREAH'OUTSIDE C5 ~ 12 UT 45 NDE 5.4-3 X-RADIUS

>>* O'I 33 **

215500 14"-RHR-2301.-12 C- F- 'I P.T NDE 3.3-13 X - - - 03/14/97 - PT;and UT complete, root ELBOM TO PIPE UT 45 NDE 5.4-3 X - - - geometry e

CS ~ 11 UT 60 - - X-

<<>> UT-33 **

C-F-1 3.3-13 - - - 03/14/97 - and UT complete 215520 14"-RHR-2301-12LD Long i tudinal.'Seam Held C5.12 PT UT 45 NDE NDE 5.4-3 X---

X PT Downstream

    • UT-33 **

216500 14"-RHR-2301-18 C-F-1 PT NDE 3.3-12 ---X X--- 03/12/97, - PT coeplete, 2 acceptable C5'.'I1 5.4-11 round indications, 3/13/97 - UT VALVE 3-752A TO PIPE UT 45 UT 60 NDE

--X-

--X- complete, root geometry, no volunntric UT 70 examination from, the weld crown and from valve side due to their configuration

    • UT-33 **

216520,, 14"-RHR-2301-'18LD

'Long Seam Downstream C- F-.1 C5.12

'T UT 45 NDE 3.3-12 NDE"5.4-11 X

X

- - - 03/12/97 -

- - - complete PT complete, 3/13/97 - UT

ll e: 06/13/97. TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 6 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Number: 3-063 ASME S ONGT SEC. XI T RSEH Sumery Examination Area Catgy Exam A E I 0 E Remarks Nunber Ident ification Item No Method Procedure T C G M R ** Calibration Block **

, 216580 14"-RHR-2301-19LU C-F-1 PT NDE 3.3-19 X - - - 03/12/97 - PT cceplete, 3/13/97 - UT Long Seam Upstream CS ~ 12 UT 45 HDE 5.4-11 X - - - conplete

    • UT-33 **

216600 14"-RHR-2301-19 C-F-1 PT HDE 3.3-19 X- 03/12/97 - PT complete, 3/13/97 - UT C5.11'T 5.4-11 X-- coaplete, root geometry PIPE TO .TEE 45 UT 60 HDE X---

X---

UT 70

    • UT 33 *0 216620 14"-RHR-2301-19LD1 C-F-1 PT HDE 3.3-.19 X - - - 03/12/97 - PT complete, 3/13/97 - UT Long Seam Meld, Inside of Tee CS ~ 12 UT 45 HDE 5.4-11 X - - - coaplete
    • UT-33 **

0 14"-RHR-2301-19LD2 C-F-1 PT HDE 3.3-19 X - - - 03/12/97 - PT cceplete, 3/13/97 - UT Long Seam'Weld Outside of Tee C5.12 Ul'5 HOE 5.4-11 X - - - complete

++ UT-33 **

217480 14"-RHR-2301-24LU C-F-1 PT HDE 3.3-11 X - - - 3/14/97 - PT complete, 3/15/97 - UT Long Seam Upstream C5 ~ 12 UT 45 NDE 5.4-10 X - - - coaplete

    • UT-33 **

217500 14"-RHR-2301-24 C-F-1 PT HOE 3.3-11 X--- 3/12/97. - PT complete, 3/15/97 - UT PIPE TO PUMP CASING C5.11 UT 45 HDE 5.4 10 coaplete, root geometry, no volunetric UT 60 examination from the pump side and on UT 70 the weld due to their configuration

    • UT-33 **

217550 RHR PUMP 3P210A VT-3 HOE 4.3-5 X 03/12/97 - VT-3 coaplete, bent bolt on PUMP SUPPORT CR 97-0431 support plate, accepted as-is by engineering evaluation, support is part of building structure and is outside the scope of Secion XI

ll

!I 0

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 7 INSERV ICE INSPECT ION'UMMARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Coaponents N I. 0 Zone Number: 3-064 ASME S ONGT SEC. XI T RSEH Showery Examination Area Catgy Exam A E 'I 0;E Remarks Number Identification 'Item No Method Procedure T C G M R ** Calibration Block **

217800 14!'-RHR-2303-1 C-F-1 PT NDE 3.3-10 X' - - 03/14/97 - PT complete, 3/15/97 - UT 45 5.4-4 - - - coapiete, root geometry TEE TO TEE C5.11 UT UT 60 NDE

--X-X

  • << UT-33 **

217900 14"-RHR-2303-1LD1 C-F-1 PT NDE 3.3-10 X - - - 03/14/97 - PT. complete, 3/15/97 -.UT Long Seam-Downstream Inside of C5.12 UT 45 HDE 5.4-4 X -, - - complete Tee

217920 14"-RHR-2303-1LD2 C-F-1 PT NDE 3.3-10 X - - - 03/'19/97 - PT complete, 3/15/97 - UT Long Seam DoMnstream.Outside C5.12 UT 45 HDE 5.4-4 X - - - complete of Tee

217980 14a-RHR-2303-2LU1 C-F-1 'PT NDE 3.3-10 X -"- - 03/14/97 - PT complete, 3/15/97 - UT Long Seam Upstream Inside of 'C5 ~ 12 UT 45 HDE 5.4-4 X - - - complete Tee

<<* UT-33 <<*

217990 '14"-RHR-2303-2LU2 C-F-1 HDE 3.3'-'10: X - - - 03/14/97 -.PT complete, 3/15/97 - UT Seam Upstream Outside. of C5.12 PT'ong UT 45 NDE 5.4-4 X - - - complete Tee

  • << UT-33 <<<<

218000 14"-RHR-2303-2 C-F-1 PT NDE 3.3-10 - - - X 03/14/97 - PT cotlpiete, 3/15/97 - UT 5.4-4 - - - coeplete, root geometry TEE TO PIPE C5.11 UT 45'T 60

NDE

--X-X

--X-UT 70

0 0

e: 06/13/97 TURKEY POINT "NUCLEAR PLANT UNIT 3 Page: 8 INSERVI CE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Heber: 3-064 ASME S ONGT SEC. XI T R.SE H Swmary Examination Area Catgy Exam A E I 0 E Remarks Nunber Identification Item No Method Procedure T C G M'R <<>> Calibration Block **

'218020 14>>-RHR-2303-'2LD Long Seam Downstream C- F-'1 C5.12 PT UT 45'DE 3.3-10NDE 5.4-4 X'

'X

- - '03/14/97 -

- - - complete PT complete, 3/15/97 - UT

  • >> UT-33 **

218080 14"-RHR-2303-2ALU C-F-1, PT NDE 3.3-10 X - - - 03/14/97 - PT complete, 3/15/97 - UT Long Seam Upstream 'C5.12 UT 45 NDE 5.4-4 X - - - complete

.218100 14"-RHR-2303;2A, C-F-1 PT. NDE 3.3-10 ---X X--- 03/14/97 - 'PT complete, one acceptable UT 45 5.4-4 round indication, 3/15/97 - UT coaplete, PIPE TO PIPE C5.11 UT 60 NDE

--X- root geometry

33 0 14>>-RHR-2303-2ALD C-F-1 PT NDE 3.3-10 X - - - 03/14/97 - PT complete, 3/15/97 - UT Long Seam Downstream C5.12'T 45 NDE 5.4-4 X - - - complete

    • UT-33 **

218380 14"-RHR-2303-4LUI C-F-1 PT NDE. 3.3-5 X'- - - 3/12/97 - PT complete, 3/13/97 - UT

.LONG SEAM UPSTREAM~ INSIDE C5;12 UT, 45 NDE'5;4-5 X - - - complete RADIUS

218390 14"-RHR-2303-4LUO C-F-1 PT ,NDE 3.3-5 X - - - 3/12/97 - PT complete, 3/13/97 - UT Long Seam Upstream Outside C5.12 UT 45 NDE 5.4-5 X - - - complete Radius UT 33 *>>.

218400 14"-RHR-2303-4 C-F-1 PT NDE 3.3-5 - - - X 03/12/97 -.PT complete, one. acceptable ELBOM TO:VALVE 3-7528 C5.11 UT 45 NDE 5.4-5 X - - - round indication, 3/13/97 - UT UT 60, - -.X - ccepiete, .root geometry,, no voiunctric UT 70 X - - - examination from the valve side due to its configuration

  • >>'UT-33 <<>>

0 0

e:r 06/13/97 TURKEY POINT 'NUCLEAR PLANT UNIT 3 'Page: 9 INSERVICE INSPECTION

SUMMARY

THIRD 'INTERVAL, SECOND PERIOD, FIRST OUTAGE,(97RF)

Class 2 CBEAR STATUS Components N I 0

,2one. Number: 3-064 .ASME S 0 N'G,T

'SEC. XI T RSEH SunnaryExamination Area Catgy Exam A E I 0 E Remarks Number Identification 'Item No Method Procedure T C G M.R '** Calibration Block **-

210550 14"-RHR-2303-12 06/13/97 -;Neid does not'xist, removed'ode, PIPE TO TEE category and item number, from.

database

  • 4 UT 33 **

219400 PS-54 F-A VT-3 NDE 4.3-13 X - - - 03/12/97 - VT-3 complete, light rust DUAL SPRING HANGERS F1.20C noted on the inside of both spring, cans 219550 RHR PUMP 3P210B 3/12/97 - support is part of building PUHP SUPPORT structure and is outside the scope of Section XI e

0 0

Cl

e: 06/13/97 TURKEY POINT'NUCLEAR PLANT UNIT 3 'Page: 10

'INSERVICE 'INSPECTION SUHHARY THIRD INTERVAL, SECOND,PERIOD, FIRST OUTAGE '(9?RF)

.Class. 2.CBEAR STATUS Coaponents N I 0' Zone Heber: 3-066 ASHE OHGT SEC. 'XI T RS'EH Surmary Examination Area Catgy Exam. A E I O'E. Remarks Number Identification Item No Hethod Procedure T C G H'R <<>> Cal3bration Block **

222080 14"-RKR-2305-3LU C-F-1 PT HDE 3.3-4 X - - - 03/12/97 - PT complete,, 3/13/97 - UT Longitudinal Weld C5.12;UT 45 HDE 5.4 1 X - - - coaplete

<<*

UT-33'**'222100 14>>-RHR-2305-3 C-F,-1 PT 'DE'.3-4 ---X X--- 03/12/97 - PT complete, one acceptable 5.4 round indication, 3/13/97. - UT complete PIPE TO VALVE HOV-3-860A C5 ~ 11 UT 45 UT, 60 HDE 1

--X-

--X- root geometry, no voiunetric examination

'UT 70 from the valve side due to 3ts configuration

    • UT-33 *>>

222860 .14>>-RKR-2305-10LUI C-F-1 PT NDE 3.'3-2 X - - - 03/12/97 - PT complete, 3/13/9? - UT Long:Seam Ins3de Radius of C5 ~ 12 UT 45 HDE 5.4-9 X - - - complete Elbow UT 33 **

222880 ,14"-RHR-2305-10LUO -C-F-1 PT HDE';3..2 'X - - - 03/12/97 -. PT complete, 3/13/97 - 'UT Long Seam Outside Radius of C5.12 UT 45 HDE 5'.4-9 'X - - - coaplete

-Elbow

222900 14"-RHR-2305-10 C-F-1 PT NDE, 3.3.-2'DE X---

X--- 03/12/97 - PT coaplete, 3/13/97 - UT C5.1'1 5.4-9 complete, root geometry, limited ELBOM TO PIPE UT 45 UT'60 --X- volunetric examination due to the weld UT 70 --X- crown

<<* UT-33 *>>

configuration 222920 14<<-RKR-2305-10LD C-F-1 .PT NDE 3.3.2 X - - - 03/12/97 - PT coaplete, 3/13/97 - UT Long Seam Downstream C5.12 UT 45 'NDE 5.4-9 X - - - complete

0 0

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 11 INSERVICE INSPECTION SUNNARY THIRD INTERVAL, SECOND'PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I '0 Zone Number: 3-066 . ASHE S ONGT SEC. XI T RS'EH Suanary Examination Area Catgy Exam A E I 0 E .Remarks Number Identification Item,No Nethod Procedure T C G N R ** Calibration Block **

222980 14"-RHR-2305-11LU C-F-1 PT 'NDE 3.3-2 X - - - 03/12/97 - PT complete, 3/13/97 - UT.

Long Seam Upstream C5.12 UT 45 NDE 5.4-9 - - X - complete, beam redirection due to dendretics, inside surface geometry

    • UT-33 *~

.223000 14"-RHR-2305-'ll C- F.-1 3.3'-2 X---

--X- ,03/12/97 - PT complete, 3/13/97 - UT PIPE TO VALVE NOV-3-861A

'PT'5.11 UT 45 UT 60 70'DE HDE 5.4-9

--X-

--X-complete, root geometry, limited volwetric examination due to the valve and,weld crown. configuration, lleld ID UT

'tag in examination area. at .top of pipe

  • + UT-33 **

0 0

il

e: 06/13/97- TURKEY. POINT NUCLEAR PLANT UNIT 3 Page: 12

.INSERVICE INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone 'Number: 3-090 ASHE S 'ONGT SEC. XI T R S:E N SumMry Examination Area 'Catgy Exam. ,A E I O.E Remarks Number Identification Item No Hethod Procedure T C G H R ** Calibration Block **

- - - 03/14/97 - PT and complete, root 274100. 8"-SI-.2308-19 ELBOW TO PENETRATION P-11 C-F-1 PT 60'DE 3.3-14 C5.11 iUT 45 UT NDE 5.4-6 X

X - - - geometry

- - X-UT

    • 'UT-41 **

0 II II

e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 Page: 13 I HSERVI CE 'NSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Heber: 3-095 ASME S ONGT SEC. XI T R'SEH Sumery Examination Area Catgy Exam ,A E I 0 E Remarks Number Identification Item No.Method P,rocedure T C G M R <<* Calibration Block **

288506 3-SIN-139 IA ,05/13/97 - pipe saddle cut back to 1" INTEGRAL'TTACHMENT and abondoned 'in place,,removed code category.and Item number from database 288519 4"-SI-2303-31 thru 49 06/05/97 - Existing Molds removed 'from service during 1997, outage per PC/M 96-012 288520 6"-S1-2306-1 thru 2 06/05/97 - 'Welds removed-from service during '1997 outage per PC/M 96-012 06/05/97 - Boron Injection Tank and support abandoned in place and removed

,from:service during '1997 outage per PC/M 96-012 288522 6"-SI-2307-1 thru 2 06/05/97 - Netds removed from service during 1997 outage per.PC/M 96-012 288523 4"-SI-2305-1 thru 11 '06/05/97 - Nelds removed, from service during 1997 outage per PC/M 96-012 288524 4"-SI.-2303-31 C-F-1 HDE 3.3 ,03/24/97 - neM veld installed per PC/M PIPE TO PIPE C5.21 HDE 5.4 '.96-012, FW7

    • TO BE DETERMINED *>>

0 0

e: 06/13/97 TURKEYPOINT NUCLEAR'PL'AHT UNIT 3 Page:. '14

'INSERVICE INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)

Cl'ass 2 CBEAR STATUS Components

.H. I 0 Zone Number: 3-095 ASHE S ONGT SEC; XI T RSEH Sunnnry Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item Ho Hethod Procedure T C'G H R ** Calibration Block <<*

288525 4"-S1-2303-32'IPE

'C-F-1 ,'HDE 3'.3 03/24/97 - new weld installed'pcr PC/H TO ELBOW C5.2'I NDE 5.4 96-012, FW8

    • TO BE OETERHIHED **

288533 4"-S1-2303-35 C-F-1 NDE 3.3 .03/24/97 - ncw weld installed pcr PC/H Elbow 'to Valve 3-867 C5.21 NDE 5.4 96-012

  • <<TO BE DETERHIHED *>>

288536 4<<SI 2303 36 C-F-1 NDE'.3 03/24/97 - ncw weld installed pcr PC/H Valve 3-867 to Elbow, C5.21 HDE 5.4 96'-012( FW9'*

TO BE DETERHINED **

9 4"-S1-2303-37 C-F-1 NDE 3.3 03/24/97 - new weld installed:per PC/M ELBOW TO PIPE C5.21 :NDE 5.4 96-012, FW10

<<<<TO'BE DETERHIHEO **

288542 4"-S1-2303-38'IPE C-F-'1 'NDE 3.3 03/24/97 - new weld installed per PC/M TO ELBOW: C5.21 NDE'5.4 96-012( FW11

<<<<TO BE DETERHIHEO **

288545 4"-SI-2303-39 C-F-1 NDE 3.3 03/24/97, - new. weld installed per PC/H ELBOW TO PIPE C5.21 'NDE 5.4 96-012, FW12

    • TO BE DETERHIHED **

288548 4"-SI-2303-40 C-F-1 ,HDE'3.3'NDE 03/24/97 - ncw weld.installed per.'PC/H Pipe to Tee C5.21 5.4 96-012, FW14

    • TO BE DETERMINED,**

0 0

e:. 06/.13/97 'TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 15 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)'lass 2 CBEAR STATUS Cocponcnts, N I 0 Zone 'Number 3-095 ASHE S 'ONGT SEC. XI T RSEH Stannary Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item No Method Procedure T C G H R ** Calibration, Block, **

288551 4"-SI -2303-41'ee C-F-1 NDE'.3 03/24/97 - new weld installed per PC/H to Pipe C5.21 NDE 5 4 96-012, FM31

    • TO BE DETERHINED **

288554 4<< SI-2303-42'ipe C-F-1 NDE 3.3 03/24/97 - new weld installed per PC/N to,valve MOV-3-843A c5.21 NDE 5;4 96-012, FU30

    • TO-BE DETERHINED *>>

288578 4"-SI-2303-46 C-F-1 SUR NDE 3.3 03/24/97 - ncw weld installed per PC/H TEE TO PIPE C5.21. VOL NDE: 5'.4 96-012, FW15

    • TO BE DETERNINED **

'I 4"-Sl-2303-47 C- F-1'UR HDE 3.3'DE 03/24/97 - new weld'nstalled per PC/M, PIPE TO,ELB(N C5.21 VOL 5.4 96-012, FN16

<<* TO BE DETERNINED <<>>

.288584 4"-Sl -2303-48 ELBSI TO'IPE'-F-1 C5.21 SUR VOL NDE NDE 3.3 5.4 03/24/97 - new weld installed per PC/H 96-012, FW17

    • TO BE DETERNIHED'**

28S586 8080-H-007-01 IA 05/13/97 - Removed from pipe pcr PC/H INTEGRAL ATTACHHENTS96-012, no longer, performs a support function, removed code category and item neer from database 288587, 4"-SI-2303-49 C-F-1 PT NDE 3.3 03/24/97 - new, weld installed'per PC/H Pipe to Valve HOV-3-843B C5.21 UT NDE .5.'4 '96-012, FM25

<<>>'O BE DETERHINED **

0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page:

'IHSERVICE INSPECTION SUNNARY THIRD'INTERVALED SECOND PERIOD, FIRST OUTAGE,(97RF)~

Class 2 CBEAR STATUS Components 16'one N.I 0 Number.: 3-095 ASNE ONGT SEC. XI RS EH Stannary Examination Area Catgy Exam E I 0 E Remarks Number Identification Item Ho,'Hethod Procedure C 0 N R ** Calibration Block "~

288604 8080-R-007-01 F-A PT HDE 4'.3-20'X - - - 03/15/97 - VT-3 complete DOUBLE 'ACT ING 'ESTRAINT F1.20B 288820'080-H-004-01'OUBLE F-A VT-3 'NDE 4.3-18 X - - - 03/14/97 - VT-3 complete ACTING RESTRAINT F1.20B 288865 8080-H-007-07 'F-A 'VT-3 HDE 4.3-17 ,X - - - 03/15/97 - VT-3 complete DOUBLE, ACTING RESTRAINT F1.208 8 8080-H-007-10 F-A'VT-3 HDE 4.3-16 X - - - 03/15/97 - VT-3 complete DOUBLE ACTING RESTRAINT F1.208 288896 8080-H-005-02 F-.A, VT-3 HDE 4.3-15 X 03/15/97, - VT-3'complete, bottom lug is, DOUBLE .ACTING,RESTRAINT F1.208 CR 97-0485 missing, welds, possible drawing PMA I 'PH97-03-210 discrepancy, accepted as-is by engineering evaluation, drawing will be rev'ised,to show as built condition 288911 8080-H-005-01. 'F-A VT-3 HDE 4.3-19 X - - - 03/15/97 -'T-3 complete DOUBLE ACTING. RESTRAINT .F1'.208

0' il

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 a Page: '17

'NTERVALED INSERVI CE INSPECTION'UMMARY THIRD SECOND PERIOD ~ F I RST OUTAGE (97RF ) ~

Class 2'CBEAR STATUS Components N I 0

,Zone Number: 3-096 'ASME S ONG,T SEC.'I T'S*EH

'Sugary Examination Area Catgy 'Exam A 'E I 0 E Remarks Number Identification Item No:Method Procedure T C G.M R ** Calibration Block ~*

289298 SR-123 F-A VT-3 HDE 4.3-4 ---X 03/12/97 - VT-3 complete, chipped SINGLE AHD DOUBLE ACTING F1.20ABCR 97-0433 concrete,. accepted as-is by engineering RESTRAINT evaluation, drawing will be updated to show.spelled concrete 289301 SR-123 I A C-C PT NDE 3.3-3 X - - - 03/12/97 - PT complete INTEGRAL ATTACHMENTS C3.20

0 e: 06/13/97 TURKEY, POINT NUCLEAR PLANT UNIT 3 Page: 18 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL', SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 'CBEAR STATUS Components N I 0 Zone Number: 3-100 ASME S ONGT SEC. XI T R S, E 'N Sumury Examination. Area Catgy Exam A E I 0 E Remarks Naker Identification Item No Hethod -Procedure -T C G M R ** Calibration'Block **

301700 26"-HSA-2304-17 C-F-2 HT, NDE 2.2-3 X---

--X- 03/14/97 - HT complete, 3/16/97 - UT PIPE TO VALVE POV-3-2604 5.2-2 complete, root geometry, limited C5 F 51: UT UT 45 60 NDE

--X-

--X- volunetric examination from the. valve UT 70 side due to its configuration

<<* UT-2'I **

301800 26"-MSA-2304-17LU C-F-2 HT NDE 2.2-3 X - - - 03/14/97 - HT complete, 3/16/97 - UT PIPE LONG SEAH UPSTREAH C5.52 UT 45 NDE 5.2-2 X - - - complete

    • UT-21 **

0 0

4I

e:r 06/13/97 TURKEY POINT NUCLEAR. PLANT UNIT 3 .Page: 19 INSERVICE'INSPECTIONSUMHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I. 0 Zone Number: 3-109 ASHE S 0 N.G,T SEC. XI T RS-EM' Swmary Examination Catgy Exam E I 0 E Remarks Identification Arear'wher Item No Method Procedure T C G H.R ** Calibration 'Block **

330500 AUGHENTED EXAMINATION AUG UT NDE 5.16-1' - X X 03/13/97 -.UT complete, root and chill FROH NOZZLE.RAHP TO 1 DIAHETER ring geometry, acceptable"slag ON ELBOW 'indication at weld FW1

    • UT-20( UT-29'~*

II e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 Page: 20 INSERVICE,IHSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, 'FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Number: 3-110 ASME S O.NGT SEC. XI T RSEH Sugary'Examination Area Catgy Exam A E I 0 E Remarks Nunber Identification Item.'Ho Method Procedure T C G M: R ** Calibration Block **

330700 14"-FWB-2304-1 C-F-2 MT NDE X---

X--- :03/10/97 - MT and UT coeplete, root geometry, limited volunetric-examination 2.2-1'DE'5.2-1 VALVE CV-3-2901 TO PIPE C5.51 UT 45 UT 60 --X- on the veld and the valve side due to X---

UT 70 their configuration

331100 14"-FWB-2304-3 C-F-2 MT NDE 2.2-2 - - -'X 03/10/97 - MT complete, acceptable PIPE TO ELBOW C5.51 UT 45 NDE 5.2-1 X - - - linear indication, UT complete, backing, UT 60 - - X - ring geometry

    • UT-20 **

333800 AUGMEHTED EXAMINATION AUG UT NDE 5.16-2 - - X - 03/12/97 - UT complete, root and FROM NOZZLE RAMP .TO 1 DIAMETER backing ring geometry ON'LBOW

    • UT-20,'UT-29 <<~

0 e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 Page:,21 INSERVICE INSPECTION

SUMMARY

THIRD ilNTERVAL, SECOND PERIOD, .FIRST OUTAGE '(97RF)

Class. 2 CBEAR STATUS Components N I~ 0 Zone Nwher: 3-111 ASME S ONGT SEC. XI T RSEK Swmary Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item Ho Method Procedure T C G,M R ** Calibration Block *>>

338200 'AUGMENTED EXAMINATION AUG UT HDE '5.16-3 - - X'X 03/12/97 - UT complete, root and FROM'NOZZLE RAMP TO .1 DIAMETER backing, ring geometry, acceptable slag OH ELBOW inclusion and Internali undercut

<<* UT-20( UT-29 <<>>

0

~ '

e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 Page: 22 INSERVICE INSPECT I OH

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Nwher: ASME 'S ONGT 3-115'ugary SEC. XI T RS'EH Examination. Area Catgy Exam A 'E I 0 E Remarks Nunber Identification 'Item No Method Procedure T C G M R>>>> Calibration Block **

341200 3-RHE-A1 HEAD TO SHELL'-A 'C1.20 UT, UT 45 60 NDE 5.4-7 X X

- - -

- - -

03/15/97 - UT complete, limited examination due to nozzles and reinforcement plates

341300 3-RHE-A2 C-A UT 45 NDE 5.4-7 X - - - 03/15/97 - UT complete, limited SHELL TO FLANGE C1.10 UT 60 X - - - examination due to nozzles and reinforcement plates

  • >> UT;55 **

341800 3-RHE.-A7 C-B PT 'NDE 3.3.1B X - - - 03/15/97 - PT complete REINFORCEMENT PLATE TO SHELL C2.31 0 3-RHE-AB C-B PT. NDE 3.3-18 X - - - 03/15/97 - PT complete REINFORCEMENT PL'ATE TO NOZZLE C2;31 342000'-RHE-A9 C-B PT NDE 3.3-.17 X, - - - 03/15/97 -"PT complete REINFORCEMENTi PLATE TO SHELL C2.31 342100 '3-RHE-A10 REINFORCEMENT PLATE TO NOZZLE C2.31'DE C-B PT 3.3-17 X - - - 03/15/97 - PT complete 342400 3-RHE-SPA-1 SUPPORT F-A VT-3 NDE 4.3.,11',X - - - 03/12/97 -,VT-3 complete Heat Exchanger Lo~er Support F1.40H 342500 3-RHE-SPA-2,IA C-C PT. NDE 3.3-9 ---X 03/15/97 - PT complete, one rejectabie Integral Attachment 97-0479 round indication, engineering evaluation

- --

C3.10 CR VT-1 NDE 4.1-6 X determined cover weld on partial penetration weld was not conpietely around end.of lug', 3/19/97 -

examination performed to VT-1'omplete, docunent final condition

e: .06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page 23 INSERVICE,INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND PERIOD; FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I Zone Number:, 3-115 0NGT

.ASME SEC. XI T RSEH Suwery Examination Area Catgy Exam A E,I 0 E Remarks Number Identification Item'No Method Procedure T O'G M R ** Calibration Block **

342600 3-RHE-SPA-2 'SUPPORT F-A VT-3 ,NDE 4.3-10 X - - - 03/12/97 - VT-3 complete Heat Exchanger. Lower Support F1.40H,

~ ~~

i5~

il 0

TUR I NT

p' J

NRC / FPL ENGINEERING INTERFACE MEETING JULY 15, 1SS7

il~

il~

il~

ENGINEERING DEPARTMENT

@PL AGENDA INTRODUCTION R.S. KUNDALKAR

- PLANT INDICATORS

- ENGINEERlNG ORGANIZATION TURKEY POlNT ENGINEERING ORGANIZATION E.A. THOMPSON SAFETY SYSTEM PERFORMANCE SYSTEM ENGINEERING D.J. TOMASZEWSKI ROD CONTROL SYSTEM ENHANCEMENTS CCW HEAT EXCHANGERS EFFECTIVE USE OF PSA OUTAGE SUPPORT PLANT ENGINEERING W.A. SKELLEY 50.54(f} RESPONSE DRAFT NUREG '1 606 SOFTWARE CONTROL SAFETY / RELIABILITYUPGRADES ST. LUClE ENGINEERING ORGANIZATION C.R., BIBLE SAFETY SYSTEM PERFORMANCE SOFTWARE CONTROL REACTIVITY MANAGEMENT C.A. PELL CONTROL ROD PERFORMANCE SAFETY / RELIABILITY,IMPROVEMENTS J.R. 'HOFFMAN 50.54(f} RESPONSE

'R.S. iKUNDALKAR rrcl.wpd Page 1

il

~ i IS)

~ g 0

~

~ ~ F ~ ~

~ 1 C Cg C C C CC C

' C r C C C C

~ C

~ C

'

~C ~

P~ ' ~ ~

~ 0 C P C

~ ~

~ C

0 ili

ENGINEERING DEPARTMENT FPL U%7 CAPABIUTYFACTOR TURKEY POINT P YR RUNNING AVERAGE+ 1997 AVG -THROUGH MAYJ 90; 80a  :-,:,;34

+i3~~4+5~

75 70 1994 1995 1996 1997 02GIG UNITS~'UNIT4 INDUSTRYAVG WANOYR2000GOAL UNIT CAPABILITYFACTOR ST. LUCIE

'+

(S YR RUNNINQ AVERAGE 1997 AVQ1HROUQH MAY) 90 -"

W H W  % W  % W & W 0 Q ~

~4i 75 ' (Qk'j'g wg~yge'll 70

~

G 1994 1995 1996 1997 322--.G UNIT l UNIT2 INDUSl1lYAVG WANOYR2000GOAI Page 3

~ ~

Oi

ENGINEERING DEPARTMENT APL UNPLANNED'AUTO TRIPS PER 7000 HOURS CRITICAL TURKEY POINT YR RUNNING AVERAGE+ 1997 AVG THROUGH MA 1.75 1.5 1.25 0.75 0.5 0.25

'. ': ke?@

0 UNIT 3 ~

1994 UNIT 4 1995 INDUSTRY AVG 1996

~

1997 WAND YR 2000 GOAL UNPLANNED AUTO TRIPS PER 7000 HOURS CRITICAL ST. LUCIE YR RUNNING AVERAGE+1997AVGTHROUGH MA 1.75 1.5 1.25 4k',:gg RGB)322)+$ ~ ~ ~~ '33( 2423I;fi ~a N4%~~9 0.75  ; 5?$4<,

'c'!

k%~N+I" I2 0.5 Awe 1994 1995 1997

~SS UNIT2 INDUSTRYAVG WANOYR2000GOAL 'SS.UNIT4 Page 4

ik i

il~

ENGINEERING DEPARTMENT EPL THERMAL PERFORMANCE

. TVRKEY-POINT It12 MONTH RUNNING AVERAGE) 101 1~>, %'4~%>>

Si

"'9 I j'O';'Aj, 98 --'

l Qjh@jgh g~+>

(jPQk,.'00 1

97 .

I p

95 1994 1995 1996 1997

~

~~AS UNITS ~mc UNIT 4 .INOUSTRYAVG WANQ YR 2000 GOAL THERMALPERFORMANCE ST. LVCIE (12 MONTH RUNNINQ AVERAGE) 101 100 99

, m".11 98 I I

97 "---'

1

~~~'~~4l!

96: . V.(i'c

'ii&piki4h

%4m, 95: S

~>>:" UNIT I 1994

~ UNIT2 1995 INOUSTNYAVG 1996 1997 i WANQ YR 2000 GOAL Page 5

0 Oi

'

~ g 0

~

.4,a~ h~.

g~.oy f,y.

ah+( i4glt lp i+

,.-.a

. f,()i \ III

il 0

Oi

+op TURKEY POINT ENGINEERING DEPARTMENT P(P+T Q TURKEY POINT'ENGINEERING ORGANIZATION p

KA. THOMPSON J.BALAGUERO E. LYONS W. SKELLEY D. TQMASZEWSIQ PLANT OPS SUPPORT ADIIINIYTRAYIVE PIANTENOWEERWO SYSTEMS ENOWEERWQ K; REMINQTON D. BAKER P. BANASZAK

, SYS PERFORMANCE DESKIN BASS SUPV ELB4SC SYSTEMS B. OUNN RX ENO MECH SYSIENS J. CAOOOAN Q. KUHN llECH DESKN PROC ENGR T. SWEENEY MC DESKN

+ FIRST LINE SUPERVISORS HAVE OVER 12 YEARS EXPERIENCE

+ SYSTEM AND COMPONENT SUPERVISORS ARE SRO CERTIFIED AfCp'th.Wpd Page 7

ii

<I~

Pop TURKEY POINT ENGINEERING DEPARTMENT

+ OgGSSr + oi UNIT 3 SAFETY INJECTION AVAILABILITY

,(18 MONTH CUMULATIVEAVERAGE)

~ SASI~.SSSI AVAILABIUTY(4/e)

PERFORMANCECRITERIA WANOYRS000GOAIS 100%

SS%

S&%

97%

96%

95%

12-95 02-96 04-96 06-96 0&-96 10-96 1248'2-97 04.97 UNIT a SAFETY INJECTION AVAILABILITY 4A Sl AVAILABlLAY

~

(44()

40 Sl (18 MONTH CUMULATIVEAVERAGE)

PERFORLIANCE CRITERIA 'ANG YR 0000 GOALS 100%

I 99%

98%

S7%

96%

950/i 12-S5 '2-S6 04-96 06-96 08-96 10-S6 12-S6 02-97 Page 8 M'NSPTILWPG

0 lli

Dog TURKEY POINT ENGINEERING DEPARTMENT

+ o>ear e ao~

UNIT,3 EDG AVAILABILITY

~

AVAILABIIJTY BA EOG ~, (18 MONTH CUMULATIVEAVERAGE) 88 EOG PERFORMANCE CRITERIA WANG YR 2000 GOALS 100%

'99%

88%

97%

96%

S5%

94%

S3%

92%

91%

90%

01-96 03-96 05-96 07-96 09-96 11-96 01-97 03-97 05-97 Note: SB EDG placed In a(1) 2@6; returned to a(2) 11/86.

UNIT 4 EDG AVAILABILITY

~ ~ 4A EOG AVAILABILITY 48 EM (18 MONTH CUMULATIVEAVERAGE)

PERFORMANCE CRITERIA WANG YR 8000 GOALS 100%

9S%

SS%

97%

96%

85%

94%

93%

82%

91%

808le. I 01-96 03-86 05-86 07-96 09-M 11-96 01-97'3-97 05-97 LVCOLn.WOd Page 9

ili O

~ r~

4'URKEY ENGINEERING DEPARTMENT POINT EMERGENCY FEEDWATER AVAILABILITY

~

(1 8 MONTH CUMULATIVEAVERAGE)

AVAlLABlUTY('/0)

KRRHI U3 TRAIN A PERFORMANCE CRITERIA USTRAINS WANG YR 2000 GOALS 100%

ss/

88%

87%

,86%

85%

84/.

93%

820/i 81%

80%

01-96'3-96 05.96 07~ SH}6 1146 01~ 0347 0$ 47 EMERGENCY FEEDWATER AVAILABILITY

~

(16 MONTH CUMULATIVEAVERAGE)

~ U4TRAINA PERFORMANCE CRITERIA:

U4TRAIN8 WANOYR2000GOALS AVAILABIUlY 100%

99%

S8'/0 97%

960/i 950/0 S4%

93%

820/0 91%

80%

01-96 03-96 05-96 07-96 09-96 1'1-97 084'5-97 Page 10

0 ill

>op Op TURKEY POINT Q

~r ENGINEERING DEPARTMENT

+a clear ~ao ROD CONTROL SYSTEM ENHANCEMENTS.

+ -

SYSTEM EVENT

SUMMARY

.,

OCTOBER 1995 TO MARCH 1997 7 UNIT 3 EVENTS 4 FORCED OUTAGES 3 EVENTS INITIATED BY DROPPED RODS NO UNIT 4 EVENTS MAY 1995 THROUGH DECEMBER 1995 UNIT 3 ROD CONTROL ROOM A/C DEGRADED AIR HANDLER OBSOLETE AND INACCESSIBLE

~ EXTENSIVE INVESTIGATION FOLLOWING EVENTS SYSTEM TESTING CONDUCTED NO COMMON PROBLEMS IDENTIFIED

+ CAUSE PRINTED CIRCUIT CARD FAILURES DUE TO HIGHER AMBIENT ROOM TEMPERATURES DURING 1995 nrcptn.wpd Page 11

0 i

ii)

0

~ g P

~

~ ~ ~ ~ ~ ~

~ ~

iN i

~ ~

~lee Pyg TURKEY POINT ENGINEERING DEPARTMENT.

+o+o(Jgg goo~

ROD CONTROL SYSTEM ENHANCEMENTS

+ CORRECTIVE ACTIONS

~ RESET ROOM TEMPERATURE ALARM FROM 102 F TO 75 F ROOM AIR HANDLER REPLACED 0 VERIFICATION OF THE ROD CONTROL SYSTEM OPERATION:

POWER SUPPLIES LOGIC CABINET TIMING DYNAMICTESTING

~ REPLACED EXISTING FIRING CARDS FORCED COOLING ADDED TO POWER CABINETS DYNAMIC'TESTING AT EXPECTED ELEVATED TEMPERATURES REPLACED SELECTED COMPONENTS DC HOLD CABINET

+ CORRECTIVE ACTIONS COMPLETED ON UNIT 3 IN SPRING, 1997 REFUELING OUTAGE

~ NO EVENTS SINCE RESTART

+ CORRECTIVE ACTIONS PLANNED FOR UNIT 4 1997 FALL OUTAGE Page 13

il

~i

0 I

<<+6

.4

~ (<

gt

~ - .(i'<1 I ~

4J IIIII."'!,

it

,I I

, 'll, II'R

(~1 "I ;l

<~

I I

I'$  !

III. cI g3 '..

II

( (Iig'Ig (

gl Ni '4 *

(f~jh

((

(4 ~I T

'

I j j,><(i((,j <<il(iii::< ~<

jg:I I~"

((( I ~I 4 I((I I l

I f I

441LN ..

~ <~ '( ( ( ~ II 4

<Q((

4

~v<< II II

!I W~~

I

~

~ I tA

~ <

'v, 4f l

~ I

(

I' gii)I Il

~teak f4'!PP!++

j r."<<3 (I I f<

V

. Ti I(l

~j

,=~~A~

g pI I << i II l~, gi

<I I S

j

( ~

!Ii i( (

wiL;j<'. f' Wf

~

I ' '

PQ (e

Vi' I'(

p',< (

jI!444(

I 4

0 iS~

il~

5 I ~ ~

1 1

~ <

'1 ~ '(( ~

IW ~"

r ICI 1

~ ~(rrr 'I j~ I ~ I

~ 'I ~

~ C

$1 (, )~Lgd6((<<<~ I ~I (

  • r It 1

s

'

( j

ill UNIT 3

~dr f.;

~

~ '

Tip UNIT 4

=x F ~ F

0

~ ~

~co~ >op Op TURKEY POINT e + o~

ENGINEERING DEPARTMENT CCW HEAT EXCHANGER IMPROVEMENTS CCW HEAT EXCHANGER FOULING FACTOR IMPROVEMENT

+ COMPREHENSIVE PERFORMANCE TESTING PROGRAM TO ENSURE CAPABILITY OF REMOVING DESIGN BASIS HEAT LOAD

+ FREQUENT TESTING, TRENDING AND CLEANING OF CCW HEAT EXCHANGERS WAS REQUIRED

~ TESTING AT LEAST WEEKLY

~ CLEANING AT LEAST ONE HEAT EXCHANGER/UNIT WEEKLY

~ CLEANING SIGNIFICANTLY MORE OFTEN DURING SUMMER

+ UPRATING,EFFORT TARGETED IMPROVING THE MAXIMUMALLOWABLE FOULING FACTOR OF CCW HEAT EXCHANGERS 0 ~

~

IVIASS &. ENERGY RELEASES RECALCULATED CONTAINMENT RESPONSE RECALCULATED CCW THERMAL HYDRAULIC CASES RECALCULATED, HIGHER ALLOWABLEFOULING FACTOR ASSUMED' PIPING STRESSES AND SUPPORT LOADS ASSESSED

~ MODIFICATIONS IMPLEMENTED ECC AUTO-START MODIFICATION CCW PIPE SUPPORTS UPGRADE ON UNIT 4

+ CHANGES RESULTED'IN SIGNIFICANTLY REDUCED FREQUENCY FOR HEAT EXCHANGER CLEANING

~ REDUCED CLEANING FREQUENCY FROM ONCE PER WEEK TO ONCE

'EVERY 6 WEEKS

~ REDUCES "WEAR" ON TUBES DUE TO CLEANING

+ OTHER RELATED INITIATIVES

~ IMPROVED TESTING METHOD

~ 'RETUBED UNIT 3 CCW HEAT EXCHANGERS Page 17

0 45~

~i

iso/0 TURKEY POINT ENGINEERING DEPARTMENT

+o ofotrr +eo PSA AND ON LINE ACTIVITIES

+ PSA TECHNOLOGY USED IN PLANT ON LINE MAINTENANCE

~ RISK SIGNIFICANT EQUIPMENT/COMPONENT LIST,

~ MULTIPLE COMPONENT MATRIX

~ GUIDELINES FOR WHEN PSA SHOULD BE USED

~ ON LINE MONITOR IN TRIAL USE 0 ADM-210 On-Une Malntcnaneei Wortt Coordination ATI'ACHhfENT S fpagc l of 3)

RISK SIGNIFICANTEQUIPMENT ILST

'Dte foliowing Tce)micd Spccificatitm components have each been cvdu sted as flat exceeding PSA risk limits when mnovcd from service individually for a duration of up to thc following tt mes for Mode I oecautions.

ABowed OOS Tllne Accumulator A Accumulator B Accumulator C AFW Pump A I2 Ttshts digaed) 30 days AFW Pump B I2 Trsias aligaed) 30 days AFW Pump C f2 Trains aligned) 30 days AFW Train I AFW Trdn 2 72 hts Botic Acid-BAST to Charging CCW Pump A 30 days CCW Pump B 30 days CCW Pump C 30 days Containment Spray Pump A Containment Spay Pump B ECC A ECC B ECC C 72 hrs EDG B Opposuc Unit EDG A 72 hrs 0 ite Unit EDG 8 mcptn.wpd Page 18

0 O~

IS~

~c>o f'o/Ots TURKEY POINT e O OJ4C T

44 ENGINEERING DEPARTMENT PSA AND ON LINE ACTIVITIES IOCCCXXO TC4l Coordination POOL'7 APpvovtr Oxloc 0-ADM-210 On-Line Maintenance/ Work I/14/97 Tae DUAL COMP8lHNS IN-KEhVh5k5NNCE MATRIX

~ e easer Isetosw seasasas er t etarwtaee aoaa ease aea laewee oaa wws aa eo lw taws lw sN etatwwa Tls aoatw ase d es NN 4 oll ol w ttNA QC tatto TVta AC olWI

~

el t eeeavws ossa ao soaewa ow wwe ~ awasawr sa ewwww la t oalsaatw essa oaal eeet waotN oNI saws ateasaav slap os ew aellalee ael leavettstilt aw NNAAN or IvIAC cela Tall teaewss owwwwa oaN aeaaa cess oaoetvte xxxx w ATW FCV ATTVIIWAO AFW tvaO ATW T4enp lit 4W A Q Tlsw ~ n TNew C C Tloes ATW TNII AtxV Tlaa elva oe so so tt aaeo ete sswsteae os oa AN scatww Uel St 4 C TTITLt AOOAet) Axttwxr I t Ataaawa 4 tsataava C Aow scvatealTWH, t ASW saw A IT 'I vs A XXXX AIWOtas 4 rtvs Car~

ASW lvs t t saws sat voa t allset sel 'ltw

~ eetatwaaor v Ctw I ~ A CCW V 1 ~

CCW V'I C CCW A CCw ww 4 CCW Iaset C Cw lots ~

Cw law as ~

Oaw OIN I tOOA 1 1XX TOO O

~ IW A tOO

~ vv 4 eoo l sow cesw A tw CAW Cwa 4

~ Ios A teal eo owov s Itv ~ INN Icw a ICW ~

~ cwccwovw a was ICwCCWOvw 4 awa xxxx vtsvws st Ctver IA Cattetsl lot CO XXXX sxa Ia ~ CO la

~ arv lass xxxx asov.lass XXXX vovaasl XXXX vovealo atavess

~ OAVVs

~ claws

~ sas svN a wa svw o

~ s <<av ss o lava a 4 avast lwvasw

~ vw Isa oeasav Isle A XXXX

)I XXX XXX1

'lI ~BATVdVbvC IVCOTIIAVOd Page 19

il ill

~cICo >oI 4p TURKEY POINT L3 rr ENGINEERING DEPARTMENT OUTAGE SUPPORT PREPLANNING EARLY MODIFICATIONIDENTIFICATION AND ISSUANCE SAFE ON-LINE MAINTENANCE EFFECTIVE PSA USAGE HIGH EQUIPLIENT AVAILABILIIY JOB COVERAGE/PAOBLELI RESOLUTION SAFEIY AND AEUABIUTYFOCUSED SCOPE SAFETY . ACTIVE PARllCIPATION RLSK ASSESSMENT OF SCHEDULE BREAKER TO BAEAKEACOVERAGE CONSERVATiVE SHUTDOWN DESIGN ENGINEER INVOLVEMENT OPERATIONS SYSTEM ENGINEERS LIANAGETASK FULL CORE OFFLOAD ENGINEERS ROTATE TO OTHER HO REDVCED INVENTORY DEPARTMENTS REUABLE ONCffEiOFFCITE POWER RESPONSIVE MAINTENANCE IMPROVED SUPPORT OUTAGE EFFECTIVE STEALI GENERATOR ERFOR INSPECTION/LWNTENANCE auALnY ELIABI SELF ASSESSMENT REACTOR ENGINEERING INIATIVES RELOAD SEQUENCE 70 MINIMIZEFUEL HANDUNQ INPUT TO OVTAGE MAHAGELIENT OPTIMIZED LOW POWEA PHYSICS TESTING IMPROVEMENT TEAMS ADDmONALBORON CHANGE CUAVESITABLES SYSTEM WINDOW REVIEW BEITER PREDICTED AOD WORTHS(AFD DATA IMPROVED FLUX MAP PERFORMANCE CONSISTENT ERFORMANCE wCCth.WDd Page 20

ik~

ili

~cWe >op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f) RESPONSE, DESIGN BASIS AND FSAR REVIEW

+ 50.'54(f) REQUESTED 0 ADEQUACY OF DESIGN BASIS INFORMATION

~ AVAILABILITYAND CONTROL OF DESIGN BASIS INFORMATION

+ OVERVIEW OF PTN 50.54(f) RESPONSE

~ DESCRIBED THE FPL/PTN CONFIGURATION MANAGEMENT PROCESSES

~ DESCRIBED FPL PROGRAMS AND INITIATIVES

~ FOCUSED ON MAJOR PROGRAMS AND PLANT BETTERMENT PROJECTS SINCE 1985 0 IMPROVED CONTROL PROCEDURES FOR DESIGN BASIS INFORMATION IMPROVED. QUALITY OF DESIGN BASIS INFORMATION Page 21

Ik 0

>op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f) RESPONSE, DESiGN. BASIS FSAR REVIEW IMPROVED TECHNICAL RPS SYSTEM SPECIPICATIONS UPGRADE 1001 1001 PROCEDURE ENHANCEMENT PROJECTS STANDS Y APW 'AJORPROGRAMSAND UPGRADE BETTERMENT PROJECTS 1005 REQUIRING ELECTRIC POWER DESIGN BASIS SYSTEM UPGRADE REVIEW AND RECONSTITlmON 1091 INSTRUMENT AIR THERLIALPOWER

, UPGRADE UPRATE PROJECT 1095 1009 DESIGN BASIS RECONSTITUTION PROGRAM

- FIRST PLANT TO COMPLETE MAJOR PROGRAM

- 18 PLANT SYSTEMS REVIEWED

- 19 DESIGN BASIS DOCUMENTS (DBD) CREATED

- DBD's REVISED ON FSAR REVISION CYCLE

- WORKING ON NEW ACCIDENTANALYSIS DBD Page 22

0

~cW~ >op Op TURKEY POINT ENGINEERING DEPARTMENT

+~+ogear ~o~

50.54(f) RESPONSE, DESIGN BASIS FSAR REVIEW 50.54(f) FSAR REVIEW COMMITMENT

+ FSAR SELF ASSESSMENTS AND NEI 96-06 REVIEW COMPLETED AT PTN

~ SELF ASSESSMENT (3/96)

~ FSAR OPERATIONAL REVIEW (1994 - 1996)

~ NEI REVIEW (3/97)

+ RESULTS

~ NO SAFETY SIGNIFICANT DESIGN BASIS ISSUES IDENTIFIED

~ FSAR ADMINISTRATIVEAND INCONSISTENCY CHANGES IDENTIFIED AND RESOLVED BY RECENT FSAR REVISIONS

+ COMPLETE A "GRADED" FSAR REVIEW

~ REVIEW PRIORITIZED RISK SIGNIFICANCE

~ LEVEL OF REVIEW GRADED TO CONSIDER COMPLETED PROGRAMS COMPLETED DESIGN BASIS PROGRAMS RECENT PLANT BETTERMENT PROJECTS

~ WILL USE FPL INHOUSE RESOURCES DESIGN AND SYSTEM ENGINEERS OTHER PLANT DEPARTMENTS AS REQUIRED 8 COMPLETE REVIEW BY 10/98

~ COMPUTER. NETWORK FOR USERS IMPROVED SEARCH CAPABILITY PLANT PROCEDURES ON LAN Page 23

il~

>op Op TURKEY POINT e + +>oar +~O ENGINEERING DEPARTMENT FPL COMMENTS ON DRAFT NUREG - 1606, PROPOSED REGULATORY GUIDANCE RELATED TO IMPLEMENTATION OF 10CFR50.59

+

GENERAL COMMENT

S AND CONCERNS N

8 NEED TO WORK WITH INDUSTRY TO DEFINE COMPLIANCE VIA NEI 96-07

~ IMPORTANT THAT NRC/INDUSTRY RESOLVE ISSUES PRIOR TO IMPLEMENTING NEW REQUIREMENTS'AND PROCEDURES

+ DEFINITION OF "CHANGE." TO INCLUDE ANY INFORMAT~ION IN THE FSAR

~ WOULD REQUIRE ADDITIONAL50.59 SAFETY EVA'LUATIONS

~ NOT CONSISTENT WITH PAST PRACTICE

+ COMPONENT REPLACEMENT DURING ROUTINE MAINTENANCE

~ EQUIVALENT BUT NOT IDENTICAL COMPONENT VS DRAFT NUREG 1606 EXPANDED DEFINITION OF "MALFUNCTIONOF A DIFFERENT TYPE"

~ NEED TO DEFINE NEW FAILURE MODES AT THE SYSTEM OR FUNCTIONAL LEVEL

~ ROUTINE COMPONENT REPLACEMENTS COULD INVOLVE USQs

+ USE OF MANUALACTIONS

~ COULD RESULT IN ADDITIONALPLANT SHUT DOWN TRANSIENTS

~ NOT CONSISTENT WITH PAST INDUSTRY PRACTICE

+ APPLICATION OF 50.59 TO DEGRADED AND NONCONFORMING CONDITIONS I

~ TS AND OPERABILITY EVALUATIONS ADDRESS DEGRADED CONDITIONS

~ PLANT RESTARTS COULD BE PROHIBITED 0

Page 24

4l 0

~C+ +O/~

TURKEY POINT ENGINEERING DEPARTMENT

+q O>ear >~O NEW AND REVISED SOFTWARE ISSUED BY DESIGN ENGINEERING (QUALITYINSTRUCTION 3.7 COMPUTER SOFTWARE CONTROL)

NON-PROCESS SOFTWARE PROCESS SOFTWARE PROCESS SOFTWARE PROCESS'SOFTWARE (NEW) (PRE-EXISTING)

- IMPLEMENTED BY FORMAL PLANT - 'MPLEMENTED BY FORMAL PLANT CHANGE PROCESS CHANGE PROCESS

- REQUIREMENTS SPECIFICATION PREPARED ~ ORIGINALVIVREQUIREMENT AS MINIMUM

~ SOFTWARE DESIGN DESCRIPTlON

- 'ADDmONALVILVREQUIREMENTS ON VENDOR

- VIVIVPLAN PREPARED - ADDITIONALBLACK BOX TESTING ON

~ USE GUIDANCE OF IEEE STD 1012 RECEIPT FROM VENDOR

- VERIFICATlON REQUIREMENTS - USE OF TRAINING SIMULATOR

~ TEST PLAN

- INDEPENDENT REVIEW

- PERIODIC VAUDATIONREQUIREMENTS

-- SOFTWARE VERIFICATIONREPORT

- INDEPENDENT REVIEW PROCESS SOFTWARE IMPLEMENTATIONTESTING

- CONTROL AND STORAGE PROCEDURES nrcptn.wpd Page 25

4k 0

~,

~c+ +OI Op TURKEY POINT ENGINEERING DEPARTMENT

+~+Ogp~p Q4~o~

DDPS / ERDADS SOFTWARE CONTROL (NON-PROCESS SOFTWARE) 0-ADM401 SOFlWARE CHANGE REQUEST SOFTWARE CHANGE PRODUCTION SOFTWARE CHANGE COORD ACCEPTANCE TESTING OF SOFTWARE ASSIGN SOFlWARE CHANGE CHANGE TRACKING 0 OPERATIONS SUPPORT SUPERVISOR APPROVAL IMPLEMENTATIONCHECKUST

- VENDOR MANUALS COMPUTER ENGINEER - I&C CAUBRATIONPROC

- SPECIFY PRETEST - DATA POINT UBRARY BENCHMARK REQM'TS

~ SPECIFY SOFlWARE CHANGE

~ SPECIFYV&V ACCEPTANCE CRITERIA CONTROL RM SIMUIATOR DISPLAY CHANGE? CHANGES?

INDEPENDENT VERIFICATION OF PROPOSED CHANGE TRANSMIT DOCUMENTATION TO DOCUMENT CONTROL wcplh.wpd Page 26

0 0

i

TURKEY POINT ENGINEERING DEPARTMENT

++egecr eo~

P%o PLANT SAFETY / RELIABILITYIMPROVEMENTS CONTINUE TO IMPLEMENTMODIFICATIONS TO IMPROVE EQUIPMENT RELIABILITY AGGRESSIVE ROOT CAUSE ANALYSIS AGGRESSIVE MANAGEMENTCONTROL OF MODIFICATIONPROCESS SPECIFIC IMPROVEMENTS REACTOR PROTECTION RELAY DESIGN IMPROVEMENTS INDICATIONS OF SUCCESS ROD CONTROL IMPROVEMENTS

- POWER SUPPUES

- REDUCED OPERATOR WORK AROUNDS FORCED COOUNG

- LOW NUMBER OF CONTROL ROOM, DEFICIENCIES - BRING CARDS

- REDUCED NUMBER OF SECONDARY LEAKS - ROOM HVAC

- EXCELLENT PLANTAVAILABILITY

- SMAlLBORE PIPING MODIFICATIONS SAFEGUARDS RACK IMPROVEMENTS C BUS MODIRCATIONS

~ BIT BYPASS MODIFICATlONS

- REACTOR HEAD GUIDE FUNNEL MODIFICATIONS

- CRDM CANOPY SEAL PREVENTATIVE CIAMPING REACTOR HEAD GUIDE - SOURCE RANGE NUCLEAR INSTRUMENTS FUNNEL MODIRCATIONS - FEEDWATER PUMP RECIRCULATION PIPING SUPPORT UPGRADES Page 27

0

~cV+ >op Op TURKEY POINT e ++Off~~ p%~a~

ENGINEERING DEPARTMENT REACTOR HEAD GUIDE FUNNEL lVIODIFICATIONS

+ INDUSTRY FAILURE FOR REACTOR VESSEL GUIDE FUNNELS FUNNEL FAILURE AT ZION (1984)

SEVERAL PLANTS REPORT PIN AND FUNNEL FAILURES (1994)

~ WESTINGHOUSE ISSUES NSAL 94-002

~ NO FAILURE HISTORY AT TURKEY POINT

+ FAILURE MODE

~ VIBRATION INDUCED FAILURE OF RETAINING PIN

~ POTENTIAL TO BLOCK/JAM CRDM

+ PLANT, RELIABILITYAND POTENTIAL SAFETY ISSUE

+ TURKEY POINT CORRECTIVE ACTION

,REPAIR OF 45 CRDM GUIDE TUBES

~ REPAIRS COMPLETE ON BOTH UNITS 3 AND 4

~ - LEAD PLANT FOR PLANTS WITHOUT PREVIOUS FAILURES

~ NO INDICATION OF FAILURE ONSET NOTED DURING REPAIR Page 28

0

'Io TURKEY POINT ENGINEERING DEPARTMENT REACTOR MEAD GUIDE FUNNEL MODIFICATIONS I

I I I

Thernocouple Control Rod Colunn Drive ShaF t Pene tro tion Penetr a tlon Thernol Reoctor Sleeve Vessel Heoa T/C Colunn Thernal Housing Sleeve Guide Guide Page 29

0 0

~tl~o >o(4p TURKEY POINTi ENGINEERING DEPARTMENT oo(oo REACTOR HEAD GUIDE FUNNEL MODIFICATIONS Fillet Weld VIEW A-A lttcpttLttttpd Page 30

4l 0

il~

ST. LUCIE ENGINEERING DEPARTMENT Ivc ps l.wpd Page 31

0'l~

ST..LUCIE

,c/

ENGINEERING DEPARTMENT

+v lc>i ENGINEERING ORGANIZATION

+ ORGANIZATIONALSTRENGTHS

~ AVERAGE NUMBER OF YEARS OF NUCLEAR EXPERIENCE (PER ENGINEER)

IS 17 YEARS DIRECT SUPPORT TO OPERATIONS AND MAINTENANCECONTINUES TO BE A STRENGTH

~ 23 ENGINEERS HAVE OPERATIONS TRAINING

+ IMPROVEMENT / GROWTH PLANS DEVELOPMENT OF SYSTEMS ENGINEERING PROGRAM

~ STRENGTHENING OF SYSTEM HEALTH MONITORING AND TRENDING OF EQUIPMENT DATA

~ SYSTEM ENGINEERS TRAINING rvcpsl.w pd Page 32

0 il~

1 ST. LUCIE fe ENGINEERING DEPARTMENT SAFETY )HJECTION AVABABILllY 5.YEAR RUNNING AVERAGE 100%

I+ i I I1 i I P1 ~ ~ SIf SS'/0 j

1 i' ('I i

!I li 98%- ~0 I ~0 0>>M>> ~0 00 OJ 00 97% .

I 96%-

95% I I

I 94%

9/96 11/96 1/97 0/97 EI97 OMIT I UMII'2 PERFORMANCE CRCERIA 'AMOYR2000GOALS EMERGENGY DIESEL GENERATORS 2 YEAR RUNNING AVERAGE AVAIIABILIIV 100%

I k

I >>

I II 99%

li I I

>>

~

i I

I i

I I I

Ii j 98% ,.

I . I I

(

0 ~ IDM JA I'7~xi 7

I I

ll 96%

5/96 7/96 9/96 11/96 1/97 3/97 5/97 UNIT I UNIT2 PERFORMANCECRffERIA " WANG YR 20M GOALS IMCPSI.WPC Page 33

i NR y.',

0

~ ~

~Xiii"'~ ~ g

~ ~

ll

,"g Pj Y

N gx a>

g 5

.~a

~ g ~

S '4 jj

@0

~

~ i ~ ~ e ~ .

Q

Ik

~ i

ST. LUCIE ENGINEERING DEPARTMENT UNIT 1 DDPS SOFTWARE ERROR

+ A 1994 SOFTWARE ERROR RESULTED IN UNIT ¹1 OPERATION WITH A 0.63%

NONCONSERVATIVE REACT'OR POWER CALORIMETRIC ERROR Vendor deaspwd sonttwe change lor Deacon was assed on late a copy mainunad hy vendor The new scasng onscaras were nct permanency saved tt revision et gN eolhtate wee Itao iho naster pmgrsm or laassed Ihat dld fwt Indedo Inveattgstinn BN now FW flow connsras

~ ella lo aontmro vendor Results Chsnnology leal PWCy ctnnged span of I PCIM 0020 f00 provided the Fw now Itsnsmalers ltom Hew FVfliow scawtg conaant t deapn fot ltleie'Ietten of The Ipse ctangea lo ON 0~ vahws were swered Sao OOF feodtmwr aow connancs were Beacon syaem ant ns T00.0'0 ccnstwa IocetavN ovwwrts wc

0. 00IP ccntNctka to DOFS TIN Beeoen PCat scope wss ttsttad Io 0N INtottwo snd DO HOT Incktse SN ecossacy Chang ee Io BN OOPS eonewe Forts Oio HOT Ptevido cancskwl dal dN post modncacon Iecgng Boo sea!no cnnststas were ler Invsstlgation teovtrsnwtcs ler tae OOPS BN ¹I 0 ~ fetes'Ssnttntecr sensate Results Chronology Shy tong Tera The sothtwe Vay s perfntd hy DNOO tspotts lo a FW Bat I

sothmre vender natenged Devaaa genena Vay Iteontsnn', Ical towtd Iha nenwnenks Io cnasenpo as sw BoNa ostpas hca tered Reader wallop Iel tttdt dl 0 c¹ssaed reactor Io ctwrk sitar asperse of IIN Cycle SIS cnand eeraacee wltttn sech i level wac lower teen ocntef Vnlot srd ttrkst DOPSlet Dops soteewe sech os IIN poww ey Odats. l secondary plate caatnrtNcnc. ~ taonaseaNnHS 1 I

7-2M 2-2l 97 tvcpsI.vvpd Page 35

il

/

ST. LUCIE 4

I ENGINEERING DEPARTMENT

'UNIT 2 DDPS SOFTWARE ERROR

+ A 1997 SOFTWARE'ERROR.WAS DISCOVERED DURING UNIT ¹2 REACTOR POWER CALORIMETRIC VERIFICATION 6 VALIDATIONTESTING PDrM reterence4 pen>>la V 5 v plan eveloped as ooneccrve eccl>>l lo Irnu

~ I evsnL Dvanap between ponionc ef lest fran ares nadectuete.

Invusti0stion

'estdts Inactoctuste I@croute DDP5 oobrare exporuce to oatccc verldv vrul'.

pent ~

pDfII4ld not pruvtfs edoduare tecttn0 fvDDP5 ochwwe chcnden pc/at eoo 1 c T.

0~

supplemonc1 provtfcd deride foc rarcaans of 000'DP5 pw pow crsnsnvuv span from 600'O vendor oorcraccod lo revtre software.

FW now Beuavetrs Value Procasev scarard wes nol roe!red.

New 0enerlo V5V of atitcal DDP5 ettctatos was pedonaed.

Did not detect Ihoonert PW Crow scaaad cnctants In ptaroou DDp5 ~

Al Sdta power oaoenclon Oetntlnkned tO Pe 0% IOwer pwn rnenual onnatrto ffÃs npaatssmwesa

~ padded pert of V5Vptaa) uec ed 'ovstce Value Procecav.

0 ~

5-17-97 rvcpst.wod 'Page 36

0 0

0

ST. LUCIE ENGlNEERING, DEPARTMENT SOFTWARE VERIFICATION 6 VALIDATIONPROGRAM IMPROVEMENTS

+ DEVELOPED PROCEDURE '"MAINTENANCE'DEPARTMENTALCONTROL OF COMPUTER SOFTWARE" IN FEBRUARY 1996

+ CONVEYED "LESSONS LEARNED" FROM THE RECENT SOFTWARE EVENTS TO ENGINEERING AND MAINTENANCE PERSONNEL

+ MADE ORGANIZATIONALCHANGES TO PROVIDE MORE INTERACTION BETWEEN SOFTWARE ENGINEERS AND DESIGN / SYSTEM ENGINEERS

+ IDENTIFIED ADDITIONALPROCEDURE / PROGRAM ENHANCEMENTS IN THE FOLLOWING AREAS:

~ IN-DEPTH TRAINING IN VERIFICATION AND VALIDATIONFOR ENGINEERING / IS.C MAINTENANCE

~ UPGRADE OF EXISTING SOFTWARE CONTROL PROCEDURES (MASTER

&. BACKUP COPIES)

DEVELOPMENT OF DETAILED SOFTWARE VERIFICATION 5 VALIDATIONON SELECTED COMPUTER SYSTEMS Page 37

45 Ik

ST. LUCIE ENGINEERING DEPARTMENT REACTIVITYMANAGEMENT REACTOR ENGINEERING PROGRAIVIS

+ INSTRUCTIONS PROVIDED. FOR POWER MANEUVERING

+, ENGINEERS ON SHIFT, DURING POWER:MANEUVERS

+ BEACON REAL TIME MONITOR MODE

+ CORE OPERATING HISTORY ASSESSMENT

+ ECC VERIFICATIONS

+ REACTIVITY MANAGEMENTASSESSMENTS

+ REACTIVITY MANAGEMENTTRAINING PROVIDED TO OPERATIONS DURING REQUAL

+ RE PROCEDURE REVIEW PROGRAM

'RE PROCEDURE REVIEW PROGRAM

+ PERFORMED A TECHNICAL REVIEW OF 26 PROCEDURES

+ REVIEW TEAM CONSISTED OF 2 ENGINEERS EACH FROM:

REACTOR ENGINEERING (ON SITE)

NUCLEAR FUELS (JUNO)

~ ABB/CE (NSSS VENDOR)

PROCEDURE REVIEW RESULTS

+ THE REACTOR ENGINEERING PROCEDURES WERE FOUND TO BE TECHNICALLY ACCURATE AND CONSISTENT WITH TECHN)CAL SPECIFICATIONS AND DESIGN ANALYSIS.

+ THE MOST SIGNIFICANTPROCEDURE CHANGES FOCUSED ON CLARITYIN THE AREA OF SHUTDOWN MARGIN VERIFICATION ENSURING COMPLI'ANCE WITH T.S., AND 'PROVIDING CONSISTENCY WITH OFF-NORMAL CEA PROCEDURE GUIDANCE.

Page 38

0 ST. LUCIE ENGINEERING DEPARTMENT w 0 ~ ~. pe Wv&

Qr. e wa REACTIVITY MANAGEMENT Equipment GR 14 Design E3 Human 12 H 10 XX~~K Events CEA's.(U1) 66.6%

12.5%

Design 12.5%

Equip.(U2) 6.3%

OVERVIEW

+ NEARLY ALL EVENTS WERE ON UNIT 1(15 OF '16)

+ MOST WERE CEA EVENTS (11 OF 16)

+ HIGHER POWER THAN EXPECTED FOR PLANT CONDITIONS (2 OF 16)

Page 39

0 ST. LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM ANALYSIS

+ DROPS RELATED TO:

~ MECHANICAL SLUGGISH GRIPPERS

~ TIMING MODUL'E FAILURE SYSTEM ASSESSMENT (ONE YEAR REVIEW)

+ OTHER FAILURES REED SWITCH POSITION INDICATIONS

~ DDPS POSITION INDICATIONS CEA FAILURES TO MOVE DURING FLCEA CEA Drops

@~ Unit 1 QUnit2 S.

i'>

7/96 8/96 9/96 10/96 11/96 12/96 1/97 2/97 3/97 4/97 5/97 6/97 7/97 IvcDsl.wpd 'Page 40

il~ '

ST. LUCIE ENG! NEERING DEPARTMENT CONTROL .ROD ELEMENT DRIVE SYSTEM SYSTEM ANALYSIS

+ DROPSiSLIPS ON UNIT 1 CAN BE ATTRIBUTED TO'LUGGISH CEDM GRIPPER ENGAGEMENTS, INADEQUATE DESIGN OF TIMING MODULES (NO CEA GRIPPER ENGAGEMENT FEEDBACK) AND POWER SWITCH FAILURES

+ ACTMS ON UNIT 2 PREVENT MOST PROBLEMS FROM MANIFESTING THEMSELVES AS DROPPED CEAS CORRECTIVE ACTIONS TAKEN

+ PERFORM CEDM COIL RESISTANCE TESTS EACH OUTAGE AND TREND DATA WITH PREVIOUS OUTAGES TO DETERMINE IF DETERIORATING COILS CAN BE IDENTIFIED 0 +

+

IDENTIFIED SLUGGISH GRIPPERS, TIMING MODULE AND POWER SWITCH FAILURES AS PRIMARY CAUSE OF UNIT 1 CEA DROPS AND SLIPS CEA REED SWITCH REPLACEMENTS SCHEDULED EACH'OUTAGE CORRECTIVE ACTIONS PLANNED

+ IN-HOUSE REFURBISHMENT OF UNIT 1 COIL POWER SWITCH MODULES

+ IMPLEMENTATIONOF UNIT 1 ACTM MODIFICATION (REFUELING 1997)

+ ENHANCE SCHEDULE FOR REPLACEMENT OF REED SWITCH ASSEMBLES IN UNIT 2 Page 41

0 O~

". ST. LUCIE (p ENGINEERlNG DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 CONTROL ELEMENT DRIVE.NIECHANISNI UPPER PRESSURE REED SWITCH HOUSING ASSEMBLY ASSEMBLY REED SWITCH ACTUATING MAGNET OMEGA, SEAL OPERATlNG RCD ELECTRICAL CONDUIT ANTI.EJECTION GRIPPER LIFT COll.

LlFT AND PUL'L DOWN MAGNET ASSEMBLY UPPER GRIPPER COIL WIRE TROUGH DRIVE SHAFT PULL DOWN COIL LOAD TRANSFER COIL L.OAD TRANSFER MAGNET ASSEMBLY LOWER GRIPPER COiL LOWER GRIPPER MOTOR HOUSING ASSEMBLY REACTOR NOZZLE CONNECTION THERMAI.SLEEVE OMEGA SEAL.

(PAQQPTI l40$ .FhAtf Ivcpsl.wpd Page 42

0 ST. LUCIE ENGINEERING DEPARTlVIENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 ACTIVI UPGRADE AUTOMATIC CEDM TIMER MODULE (ACTM)

+ MICRO PROCESSOR BASED CONTROL ROD DRIVE SYSTEM CONTROLLER

+ REPLACES THE CPP TIMER DURING THE UPCOMING UNIT 1 REFUELING OUTAGE

+ CURRENTLY INSTALLED ON UNIT 2 (AND OTHER CE PLANTS)

+ CONTROLS CEA MOTION UTILIZING POSITIVE FEEDBACK VIA CURRENT SENSORS

+ EXPECTED TO REDUCE OR MITIGATE UNIT 1 CEA DROP EVENTS CONTROL ELEMENT DRIVE SYSTEM NSSS MG SET 240 VAC RPS TRIP BREAKERS CEAPDS (ADS)

RSPT INHIBIT REACTOR CEDS MAG JACK REG. CPP CEDM CEDMCS)

RSTP OPERATOR EQRJHD PlANT COMPUTER Page 43

i ST. LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT.DRIVE'SYSTEM L(FTfNG 3/4" ANTl EJECT/ON GRIPPER (Not In Unit 2)

L C

UPPER GRIPPER P

0 LOWER GRIPPER fFAIOOOtl>ASJ'Pelt) rvcpal.wpd Page 44

0 ST. LUCIE

>4'r.>c ENGINEERING 'DEPARTMENT PLANT SAFETY / RELlABILlTYlMPROVEMENTS ENGINEERING EMPHASIS FOCUSED ON SAFETY AND RELIABILITYMODIFICATIONS NEW MANAGEMENTREVIEW PROCESS ADOPTED INDICATIONSOF SUCCESS SPECIFIC IMPROVEMENTS-

- REDUCED OPERATOR WORK AROUNDS 199T UNIT20

- LOW NUMBER OF CONTROL ROOM DEFICIENCIES

- PRESSURIZER SAFETY VALVESCUD BLOCK

- EXCELLENT PLANT AVAILABILITY Y DESIGN

-'EACTOR VESSEL (HUNG REPLACEMENT DIESEL GENERATOR RELAY REPLACEMENT

- QUICKLOC INCORE INSTRUMENT FLANGE DESIGN

- 2C AFW PUMP WARMUP UNE MATERIAL CHANGE DUT

- SIT FILLVALVEACTUATOR UPGRADE PRESSURIZER SAFETY VALVE - TCW PUMP DISCHARGE CHECK VALVE ENHANCEMENT SOLID BLOCK BODY DESIGN IvccsLwcd Page 45

4I (o

".'T.

/~fss .

ENGINEERING DEPARTMENT OPERATOR WORKAROUNDS LUCIE caus ts) OPEN I

s Operator Work Around: . A problem that 40 Impedes an operator ln performing duties I

I wlthln the approved procedures or ln 35, "I Walked down plant accordance with the Intended design.

30" 'WAs to Identify nevr 25" last Updated:

I July S, 1SS7 20 I

I 15 l

10" "'

Year End Target 4 0

12/95 9/96 10/96 11/96 12/I 1/97 2/97 3/97 4/97 5/97 6/97 7/97 8/97 9/97 10/97 11/97 12/97 Time (Month)

OPEN nrcpsl.wpd Page 46

il i~

~

$

4-r vp

'I v ~

8 Ya

.

)v~si'*

v'~~<j~

<

nggg~

I

~) ~wqgPi-.

cc.

C v

a)g t.

~ v. M~

P~ 'c-.-.

I I

0 I

g F ~

r I

,A 0 C 1

4 JW w~

e

O~

ST. LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITYIMPROVEMENTS SPECIFIC UNIT 2 OUTAGE ACCOMPLISHMENTS

+ REVISED INTEGRATED SAFEGUARDS TEST PROCEDURE

~ NEW 'PROCEDURE TESTS EACH TRAIN INDEPENDENTLY

~ ENSURES ONE COMPLETE TRAIN AVA'ILABLEFOR CORE COOLING

+ ON-LINE TESTING OF MSSVs

+ FULL CORE OFFLOAD ANALYSIS

+ VALVE OVERHAUL SUPPORT

+ AGGRESSIVE FLOW ACCELERATED CORROSION INSPECTION PROGRAM

+ MSIV REFURBISHMENT SUPPORT

+ COATINGS PROGRAMS nrepal.wpd P.age 49

il ST. LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITYIMPROVEMENTS MODIFICATIONS PLANNED FOR UPCOMING 1997 UNIT I OUTAGE

+ STEAM GENERATOR REPLACEMENT

+ PRESSURIZER HEATER SLEEVE NICKEL PLATING

+ QUICKLOC INCORE INSTRUMENT FLANGE DESIGN

+ CEDMCS ACTM UPGRADE

+ SIT FILL VALVE ACTUATOR UPGRADE

+ TCW PUMP DISCHARGE CHECK VAI VE ENHANCEMENT

+ REFUELING TRANSFER TUBE VALVE OPERATOR TORQUE LIMITER nrcpal.wpd Page 50

0 ST. LUCIE ENGINEERING. DEPARTMENT Pressurizer Heater Nozzle Nickel Plated Region Weld

{4" Long, 0.008" Thick)

Lower Head internal Cfadding

.$ 25" Pressurizer Lower Head

.S05" Typical Heater Nozzle Typical Nickel Plated t4ozzte Page 51

ik ST. LUCIE ENGINEERING DEPARTMENT HEATER, SLEEVE END EFFECTOR VPP=R SEAL vPPEP. gEA0 N I CKEL ANOOE LOWER SEAL SOLuT!0~ OVTLET nr col.wpd Page 52

ST.. LUCIE ENGINEERlNG DEPARTMENT DESIGN BASIS 50.54.(f) RESPONSE

SUMMARY

AND ACTIONS CURRENT AND FUTURE ACTIONS

+ FSAR/OPERATING CONSISTENCY REVIEW

~ FINDINGS TO BE RESOLVED OVER NEXT TWO YEARS

+ NEI INITIATIVE

+ ANNUNCIATOR

SUMMARY

REVIEW COMPLETION DATE OF DECEMBER 1998

+ NRC A/E INSPECTION

~ NRC INSPECTION REPORT ISSUED 3/25/97

~ DESIGN OF INSPECTED SYSTEMS GOOD WITH ADEQUATE DESIGN MARGINS. IMPLEMENTATIONOF DESIGN ADEQUATE.

~ FPL RESPONDED TO INSPECTION REPORT ON 5/27/97 AND PROVIDED ACTIONS PLANNED FOR FOLLOW-UP AND UNRESOLVED ITEMS rvCpol.wpd Page 53

iS~

0

ST. LUClE ENGINEERlNG DEPARTMENT c v <0

~ VOLUNTARY FSAR REVIEW INITIATIVE

+ ST. LUCIE HAS COMMITTED.TO A GRADED REVIEW OF THE UNIT 1 Bc 2 FSAR

+ REVIEW PRIORITIZED TO RISK SIGNIFICANT SYSTEMS

+ CREDIT TAKEN FOR PREVIOUSLY INSPECTED SYSTEMS

+ FOUR PRIORITY LEVELS ESTABLISHED

+ PLANT FIRE PROTECTION SECTIONS INCLUDED WITH PRIORITY 2 REVIEW

+ DISCOVERY PHASE FOR PRIORITY 1, 2, 5 3 TO BE COMPLETE BY OCTOBER 18,1998

+ SELECTED CHAPTER 15 ACCIDENT ANALYSES TO BE UPDATED nrcpsl.wpd Page 54

~ ~

il

ENGINEERING DEPARTMENT

@PL CHALLENGES

+ MAINTAININGAND IMPROVING CURRENT LEVEL OF PERFORMANCE

+ RETAINING TALENTED PERSONNEL

+ DEVELOPMENT OF ST. LUCIE SYSTEM ENGINEERING PROGRAM

+ IMPROV)NG EQUIPMENT PERFORMANCE MONITORING AND TRENDING

SUMMARY

+ STRONG DIRECT OPERATIONS AND MAINTENANCE.SUPPORT

~ RESPONSIVE TO OPERATIONS PRIORITIES AND REQUESTS GOOD TEAMWORK AND COMMUNICATION

+ GOOD FOCUS ON PLANT SAFETY AND EQUIPMENT, PERFORMANCE Page 55

0' 0