ML17354A576

From kanterella
Jump to navigation Jump to search
Refueling Outage ISI Rept.
ML17354A576
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/10/1997
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17354A575 List:
References
NUDOCS 9707160096
Download: ML17354A576 (352)


Text

0 TURKEY POINT PLANT UNIT 3 1997 REFUELING OUTAGE INSERVICE INSPECTION REPORT The required examinations scheduled during the Turkey Point Unit 3 refueling outage were completed. This completes the ISI requirements for the first refueling outage of the second period

.of the third inspection interval.

100% of the A, B, and C steam generator tubes were eddy current tested. 14 tubes were plugged during this outage.

The. NIS-2 forms discuss the repairs and replacements which took place since the previous Unit 3 submittal and during the 1997 refueling/ maintenance outage.

Visual examination and functional testing of snubbers was completed in accordance with ASIDE Section XI and Technical Specifications. Visual examinations did not reveal any failures.

There were no snubber failures in the, safety related functional test sample.

The inservice inspection summary tables detail the examinations

~ ~ ~ ~

performed during the first outage of the second period of the

~ ~

third ten-year interval.

~ ~

~

Selected Class 1 and 2 piping and supports were examined with surface, volumetric, and visual examination techniques in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and the Turkey Point Units 3 and 4 ISI Program.

0 9707fh0096 9707i0 PDR ADQCK 05000250 8 PDR

0 TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-1 Owners'ata Report-for Inservice Inspections

0 FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 6

1. Owner: Florida Power and Light Company, 700 Universe Blvd. juno Beach, Florida 33408
2. Plant: Florida Power & Light Company, Turkey Point Nuclear Power Plant, 9760 S.W. 344th Street, Florida City, Florida 33035 3 ~ Plant Unit:~

Owner Certificate of Authorization (if recpxired)

Commercial Service Date 6 National Board Number for Unit:

7 ~ Components Inspected:

Manufacturer State o Nat'l Component or Manufacturer or Installer Province Board Appurtenance or Installer Serial No. No. No.

Reactor Pressure Vessel Babcock and 3PSRV1 N/A N-160 Wilcox Reactor Coolant Pump B Westinghouse 3P200B N/A N/A Regenerative Heat Westinghouse 3E200 N/A N/A Exchanger RHR Heat Exchan er A Atlas 3E206A N/A N/A Safety In'ection System Bechtel N/A N/A N A Residual Heat Removal -Bechtel N/A N/A N A Main Feedwater System Bechtel N/A N/A N/A Main Steam System Bechtel N/A N/A N/A

.8 ~ Examination Dates  : From to 9 ~ Inspection Period Identification  : Second Period 10 'nspection Interval Identification: Third Interval, from

11. Applicable Edition of Section XI ~39 Addenda ~ug
12. Date/Revision of Inspection Plan:

NIS-1 Report (continued) Page 2 of 6

1. Owner: Florida Po~er 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 2e Plant: Turkey Point Nuclear Power Plant, 9760 S.W. 344th Street, Florida City, Florida 33035 3~ Plant Unit:~
4. Owner Certificate of Authorization (if required)
5. ComInercial Service Date :
6. National Board Number for Unit:
13. Abstract of examinations and test. Include a list of examinations and tests and a statement concerning status of work required for the inspection plan.

An Inservice Examination of selected Class 1 and 2 components and piping systems of Florida Power and Light's Turkey Point Unit 3 was performed during the 1997 Refueling Outage. This. outage March and ended on April 16, 1997. This was the first outage of3,the second period of the third ten year interval.

began on 1997 The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the ASME Section XI, 1989 Edition.

Manual ultrasonic, visual, magnetic particle, and liquid penetrant non-destructive techniques were used to examine components, piping, and their supports. The examinations were performed'y FPL personnel, supported by examiners supplied by Raytheon Engineers & Constructors.

Eddy Current testing was conducted on the three Steam Generators.

A total of 9574 tubes were examined. Fourteen tubes required plugging. See the NIS-BB for details of the examinations.

Several Class 1, 2, 3, MC, and CC areas were repl'aced or repaired since the last Summary Report was submitted. See the attached NIS-2 reports for a summary.

The Steam Generator Feedwater Nozzle piping augmented examinations were conducted during this outage on all three loops. The entire area from the nozzle ramp to a point one pipe diameter out on the far side of the elbow was examined with ultrasonics. No reportable indications were noted.

Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Technical Specifications as allowed under Relief Request number 4.

Examinations were performed by Raytheon, Inc. and testing services were supplied by Basic-PSA, Inc.

System -Pressure testing was conducted by the plant to ASME Section XI and applicable Plant Procedures.. One thimble tube was found to have a through wall leak. It was replaced and retested.

Several mechanical connections were found to have leaks. These were all corrected. Leakage was detected at 2 RHR valve bonnets.

0 0

0

NIS-l Report .(continued) Page 3 of 6 e,, '4 ~

5.

Owner: Florida Power S Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Po~er Plant, 9760.S.M. 344th, Street, Florida City, Florida Plant Unit:~

O~ner Certificate of Authorization (if required)

Comnercial'Service Date .:

33035

6. National Board Number for Unit:

The bolt nearest the source of leakage was VT-l examined'nd found to be acceptable. During, the outage, the bolting on- the two valves;was removed,and examined. No other .leakage was reported.

All Quality Group A, B, and C pressure tests required for the.

first period of the third inservice inspection interval were completed.

A listing of examinations performed is attached to this summary.

The examinations performed during the outage meet the requirements of the Inspection Plan.

14. Abstract of Results of Examinations and Tests.

The seal surface on the Reactor Pressure Vessel head was examined using remote Visual techniques. No reportable indications were noted.

Eddy Current testing was conducted on all three Steam Generators.

See the 'NIS-BB for details.

A 'VT-3 examination was, performed near the beginning of the outage to look for accumulated, boron crystals and evidence of leakage.

A VT-2 examination was,performed during the system pressure test at plant startup. These .examinations were performed to meet the approved alternative requirements in Relief Request No. 3. No reportable indications were detected.

t The "B" R'eactor Coolant Pump Flywheel was examined with Technical Specifications. ,No reportable indications in accordance were.

'f NIS-1 Report (continued) Page 4 of 6 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.W; 344th Street, Florida City, Florida 33035 Plant Unit:~

4~ Owner Certificate of Authorization (if required)

5. Comnercial Service Date :
6. National Board. Number for Unit:

noted.

Residual Heat Exchanger A was examined using surface and volumetric techniques. A round indication was found on the end of one of the integral attachments with Liquid Penetrant. An engineering evaluation determined the indication to be a manufacturing process deficiency. The attachment has a partial penetration weld on the front side, and a cover weld on the back side. The indication was a result of the two welds not being joined at the end of the attachment, and was an acceptable condition. It was not a material or welding flaw, and is outside the scope of Section XI. No other indications were noted.

The support on RHR Pump 3P210A was examined .with visual techniques. A bent bolt was found and accepted as-is by engineering evaluation. An engineering evaluation determined the support was outside the scope of Section XI. It is part of the building structure, with the pump body allowed to slide on top of an embedded plate. Both RHR pump supports have been removed from the ISI Program.

Residual Heat Removal piping welds and supports were examined using visual, surface and volumetric techniques. Acceptable round and geometric indications were noted. No reportable indications were. noted.

Safety Injection piping and .supports were examined using visual, surface and volumetric techniques. No reportable indications were noted.

During the outage, the Boron Injection Tank was bypassed and

~ ~ ~

abandoned in place. The piping welds to the tank were removed

~ ~ ~

~

il ik

NIS-1 Report (continued) Page- 5 of 6 Owner: Florida. Power S Light ComPany, 700'Universe Blvd. Juno Beach, Florida 33408 Plant:. Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035 Plant Unit:~

4~ O~ner Certificate of Authorization (if required)

5. Conmercial Service Date:
6. National Board Number for Unit:

from service and several new welds were added to bypass the tank.

See the examination tables for information on which-welds- and components were affected.

Main Steam piping, was examined using surface and volumetric techniques. Acceptable geometric indications were noted. No reportable indications were noted.

Augmented volumetric examinations were performed on the feedwater piping out from the Steam Generator nozzle. Acceptable geometric and slag indications were found. No reportable indications were noted.

15. Abstract of Corrective Measures There were no corrective actions required as. a result of ISI examinations. Several acceptable rounded indications were removed for maintenance reasons as part of additional, surface preparation.

0 il ib

NIS-1 Report (continued) of

'Page 6 6 Owner: Florida Power 8 Light Company, 700 Universe Blvd.'uno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, 9760 S.M. 344th Street, Florida City, Florida 33035 Plant Unit:~

4~ Owner Certificate of Authorization (if required>

5~ Comnercial Service Date :

6. National Board Number for Unit:

We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No.

Expiration Date Date: Signed:

By:

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 3/3/97 to 4/16/97, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data .Report in accordance with'he Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

spect 's S'ature National Board, State, Province, and .Endorsements Date: 8 r~

0 Eg lt ~

ii, 4

TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-2 Owners'ata Report of Repairs and Replacements

0 FORH NIS 2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 12 06 95 700 Universe Blvd. Juno Beach Fl'. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t 3 Name PWO ¹:4229/63 WO ¹: 95032858 9700 S'W 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. 'No.,Job No.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING MATER System ¹: 19 Qual I ty Group: C
5. (a) Applicable Construction Code 831.1'955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer) National Other [Year J. Repaired J ASHE t Cocponent Hanufacturer f Serial Ho. J Board Identification [Built( Replaced or ) Code J I I f Reptacement JSterp (

I I I I /~Yes llo

[ INTAKE COOLING .IJONHSTOH [N/A )H/A iHOOEL 33 CHC I ST-5 /UNK~ (Replaced iNo IMATER PUHP PUHP 3P9A J

INTAKE COOLING IJOHNSTOH IH/A fH/A [MODEL 33 CHC IST-2 JUNK. ]Replacement ]Ho CWATER PUHP PUHP 3P9A IBOLTS (40) iH/A IN/A ]H/A (R90-0831 ASHE SA-307 GR 8 fUNK. /Replacement )Ho

/

1-1 4"-7-UN-2A 3P9A 7.'Description of Mork: 3A INTAKE COOLING WATER PUHP IST-5 REPLACED WITH SPARE IST-2.

Pneunatict Hominal Operating Pressure X Pressure 15 psig Test Temperature 76 ;F 95-064-3

Sheet 2 of 2 FORM NIS-2 (Back) 4l

9. Remarks: HEcMAMIcAL coNNEGTIoM No 'WELDING REoUIRED.

CERTIFI~CATE OF COMPLIANCE Me certify that the. statements made in the report are correct and this replacenmnt confonas to the r'ules of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate Signed

/

thori tion No OwnerOesignee, M~A

.'+M~jPcl Title

~~N~ix.'QP-'wner'or

~

Expiration Date Oate ~/I~

~NA 19

'0 CERTIFICATE OF INSLRVICE I',NSPECTIOM I, the undersigned, holding a valid caanission issued by'hLI Na'tional Boar'd of Boiler and Pressure Vessel inspectors and the state or Province of, Onde County and.employed by Arkwright.Hutual Insurance Company of Norwood, Ha. have inspected the components described'n this owners Report during the period 12/06/95 arid state that to the best of my knowledge and balief, t'e Owner has performed examihations'nd 11/21/95 'o taken corrective measures described in this Owners Report i'n adcordande with the requirements of the ASHE'ode, Section Xt.

By signing this certi'ficate neither the Inspector nor his enpioyer makes any warranty, expressed or implied, concerning the examinations and corrective measurea doser'ibed in'hi's.Owner's Repo'rt.'Fur'thekmore, neither the Inspector nor his eeployen shall be liable in ariy amnnier for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions '

MB'23~0II~I~

Inspector SignQa,ure ~

Nationhi Board, State, Providence, and Endorsements

'I9 95-064-3

FORM HIS ~ 2 OWNERS REPORT FOR REPAIRS OR REPLACEHEN'IS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 12 05 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PWO ¹:63/4109 WO ¹: .95032545 9700 SW 344 Street 'Florida Cit .Fl. 33034 Address Repair Organization P.O. No.,Job Mo.,etc
3. Work Performed by Florida Power 8 Li ht 'Iype Code Symbol Stamp N A Name Authorization Ho. M A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COMPONENT COOLING WATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~M A Code Case (b) Applicable Edition of Section XI 'Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of /Manufacturer/ National )

Other. ]Year [ Repaired ] ASME f Component Manufacturer. J Serial'No. 'Board Identification 'JBui It] Replaced or J Code /

f Replacement )Stamp f I I ./Y~es No

)BOLTS (4) IH/A IH/A iH/A )UTC349851 R94-4185 CHUNK. [Replacement )No 3E207C HX SA 193 GR 87

7. Description of Work: FOUR 4 HX'ANWAY BOLTS REPLACED ON UMIT-3 'COMPONENT 'COOLING WATER HX 3C 3E207C .

t 8. Tests Conducted: Hydrostatic:

Other Pneuaatic:

Pressure psig Nominal Operating Pressure Test Temperature 'F 95 '63.3

'Sheet 2 of 2 FORH NIS-2', (Back)

Ik

9. Remarks: MECHANICAL CONNECTION ~NO uELDING REQUIRED..

CERTIFICATE OF COHPLIANCE lie certify that the stater<ents made iin the report are correct and thiis replacement conforms to the r&ies of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certific e f Autho ation No N~A Expiration Date N A 7z('0 i~sR'A~4<.g.

Signed 42 O~ner or Owner+ Designee, Titl'.e 0

CERTIFICATE'OF INSERVICE INSPECTION I, the undersigned, holding a valid cor<mission issued by the National Board of Boiler and pressure vessel and the state or Province of Dade.County. and employed by Arkwriight.Hutual Insurance Company of 'nspectors Ha. have inspected the co<nponents descriibed in this Owners Report during the period 12/05/95 'orwood,

~

to~

12/05/95 and state that to the best of my knowledge and belle<I, the O~ner has perfdrmed examinati'ons'and taken corrective measures described in this Owners Report in accordance wiith the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed concerning, the examinations and correctiive measures described in this Owner's Report. Furthermore, or'mplied, neither the Inspector nor his employer shall be i,iable in any mann<'.r for any peraonal injury or'raper'ty or a loss of any kind arising from or connected with this inspection. 'amage 7

C<x<missions NB 823~ON~I~ I Inspect s Si ature ~

Nat<ionsi 8'oard, state, providence, and Endorsements Date 19 95.063.3 4l

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 LI ht Date 03 04 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PMO ¹:2579/63 MO ¹: 95024075 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Mork Performed by Florida Po~er 8, Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SPENT FUEL COOLING System ¹: 33 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case t

(b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,~N A Code Case

6. Identification of Components Repaired or Replaced and-Replacement Components Hame of Name of [Hanufacturer( National Other ]Year J Repaired ,] ASHE (

Component Hanufacturer ], Serial No. Board Identification [Built) Replaced or ) Code J

( Replacement )Stamp f I I /~res ue (HINGE PIH PLUGS (2) H/A iH/A IH/A IR91-5196 IUHK I Replacement I Ho

7. Description of Mork: CHECK VALVE HINGE PIN PLUGS REPLACED.

t 8. Tests Conducted: Hydrostatic:

Other VT-1 Pneunatic:

Pressure~sig Hominal Operating Pressure Test iempereture 'F 96.001-3

Sheet 2 of 2',

FORH NIS-2 (Back) 9.'.Remarks: THls Is A MEcHANIcAL coHHEcTIDN No.uELDING'REO IR D.

CERTIFICATE OF COHPI.IANCE Me certify that the statements made in,.the. report are correct and this replacement conforms to the rules ~of the

.ASHE Code, Section XI.

Type Code Symbol Stamp

'Certificate of Authorization No. ~H 'A Expiration Date N A O~ner or-Owner's Designee, Title CERT II'ICATE OF INSERVICI'. INSPECTION I, the undersigne'd, holding a, valid comaission issued by "the Hatiional Board.of'Boiler and Prdssule'less'.L

,inspectors and the state or Province of Dade'County ahd &rplbyed.by'Arkwrilbht.HutiiaL Insurance Coapany,'of Norwood, Ha.:have inspected the caqmnents described in this Owners Report during. the period 09/l)5/95 and.state that to the Imst of my knowledge and belief the (hner has performed examinations and to'3/04/96 taken corrective measures described in this Owners Report in'accordance with, the requirements of .the ASHE Code,Section XI.

By signing this ceirtificate neither 'the Inspector nor~hisI~Loylr stakes any warranty,'xpressed or impLied, concerning the examinations and corrective measures described in this Owner.'s Report. Furtheraere n'either the.Inspector nor his erployer shaLL be Liable in any manner for any personal injury, or',property damage or a loss of any k,ind arising from, or connected with this inspection.

Ccmmissi&s ,NB 8230~N'~I Inspectors S nature National Board State, Providence, alnd PndcIrsMnth Da 96-001-3

FORM HIS-2 OVNERS REPORT FOR 'REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Ouner Fior ida Po22er & Li ht Date 03 25 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit lo ¹: 95031214 PCH ¹: 95.103 9700 SV 3CC Street Florida Cit Fl. 3303C Address Repair Organization P.O. Ho.,Job No.,etc
3. Vork Performed by Florida Power & Li ht Type Code Symbol Staap Hame Authorization Ho. M A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification. of 'System: COMPONENT COOLING VATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Hame of )Hanufacturer) National ) Other )year ) Repaired ) ASHE )

Coaponent Hanufacturer ) Serial Ho. Board Identification )Built) Replaced or ) Code )

') Replacement )Staap )

I I I~PPP pp

)

1" BLIHD FLANGE I IDEAL )N/A )H/A )UTC 390755, 3E207A,B,C )UHK. )Replacement ,)Mo

) 6 HX'S

)3" BLIND FLAMGE ) IDEAL )N/A )H/A )UTC 390756, 3E207A,B,C )UNK. )Replacenent )Ho

)6 HX'S

)BOLTS (24) &r H/A IH/A )H/A )R94-2667 BOLTS, R93-2122 )UMK. )Replacement )Mo

)HUTS NUTS 3E207A B C HX'S

)HUTS (46) )H/A )H/A ')UTC351943 (15) UTC391981 )UHK. )Replacement )Ho I 31 3E207A B C

)STUDS (24) )M/A )H/A )U93.2949, 3E207A,B,C )UHK. )Replacement )Ho I HX'S

7. Description of Vork: REHOVED PIPING AHERTAP PIPING FROH'UNIT 3 CCV HX'S.AND INSTALL BLIND FLANGES P
8. Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure X Pressure~2 ig Test Temperature 72 ~

F'I 96-002-3

Sheet 2 of 2 FORK NIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION HO WELDIHB REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to 'the rules of the ASKE Code, Section XI.

Type Code Syahoi Stamp ~HA Certttioate Aothoritattoo No. ~N A Expiration Date M'IAA Signed rtha .Jgl '9.Q/

CERTIFICATE OF IHSERVI'CE INSPECTION I, the undersigned, holding a valid comnission issued by the Hational Board of Boileii and Pressure, Vessel, inspectors and the state or Province of Oade County and employ< by Arkwright Kutual Insurance Compan)I of Norwood, Ka. have inspected the components described in'his OImerp Rapport during the, period 11/09/96 to 03/24/96 and state that to the best of my knowledge and Qiief, the O~ner has performed examinations, and taken corrective measures described in this Owners Report in accordance with the requirements of tl)e ASKE Cod'e,Section XI.

By signing this certificate neither the Inspector nor his eapioyer makes any warranty, express'r icy\led, concerning. the examinations and rorrective measures described in this Owner's Report. Furl'her~re, neither the Inspector nor hiis employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or conrected with this inspection.

Commissions HB 8235~M~I Inspect rs S ature National Board, Statet Providence, and Endorsements 9z 96.002-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS

'As Required by the-Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 05 23 96 Name 700,Universe Blvd. Juno,Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:6177/63 WO ¹: 96008678 CR ¹: 96-696 9700 SW 344 Street Florida Cit .Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc 3 ~ Work Performed by Florida Power S, Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton 'Fl. 33032 Address
4. Identification of System: CHEMICAL 8 VOLUME CONTROL System ¹: 47 Quality"Group:

B'.

(a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable. Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case

6. Identification of Components Repaired, or Replaced and Replacement Components Name of Name of 'iHanufactureri National i Other iYear J Repaired f ASHE (

Component Hanufacturer ,i Serial No. Board Identification igui Iti Replaced or ] Code (

i Replacement igtamp J I I Yes No iCharging-Pump "8" iUnion I N52216 I N/A J3P2108 JUnk iReplacement No

7. Description of Work: REPLACED FLUID CYLINDER ASSEHBLY.
8. Tests Conducted: Hydrostatic: Pnewetic: Nominal Operating Pressure X Other VT-2 Pressure~gggg stg test temperature 114 ~

F 96.003.3

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: No weldin r uired.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in t'e report aire correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate Authorization No. N~A 'Expiration Date, z.x..: j N

Date ' 43> . 19 O~ner or Owner's Designee, Title gd'ERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdi,'ng,a valid cccmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or province of Dade county and empl'oyed by Arkwright'Hutual'Insurance Company'of Ha. have inspected the components described in thiS Owners'eport during the period 04/11/96 'orwood, and state that to the best of my knowlwige and beli6f, the Owner has performed examinlatilns and'(

'o'5/20/96 taken corrective measures described in this Owners Report in accord'ance with the requirenents of the ASHE 'Code,Section XI.

By signing this certificate neither the Inspector nor his ef3pioyer makes any warranty, expressed or is@lied, concerning the examinations and corrective measures descri'bed'in this owner's Report. Furthermore, neither the Inspector nor his erpioyer shall be liable in any manner, for'ny personal injury or property damage or a loss of any Ikind arising from or connected with 'thiS inspertioh.

I s~ N tanoiasiorls NB s23h~s~t Inspecto s Sig~n are Nattonslt Board, State, Providence, and Bndtrsetnnts Date ~ .C 19~+4 96.003e3

FORM NIS 2 OWNERS REPORT FOR REPAIRS OR'REPLACEMEHTS As Required by the Provisions of the ASME Code SectIon XI

1. Owner Florida Power B Li ht Date 07 01 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant 'Turke Point Plant Unit PWO ¹!5113/63 WO ¹: 96002325 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Work Performed by Florida Power B Li ht Type Code Symbol'tsap N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Intake Coolin Water S stem System ¹: 19 Duality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b)'pplicable Edition of'ection XI Utilized for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Cocponents Name of Name'f IManufacturerI'ational I Other IYear I Repaired I ASHE I Component Manufacturer I Serial No. Board Identification IBuiltI Replaced or I Code I I Replacement ISterp I it~et se IICW CHECK VALVE IUNK I41195 IH/A I3-50-331 IH/A IReplaced IHo IICW CHECK VALVE IUHK I85223 'IH/A I3-50-331 IH/A 'IRepiacement ISTUDS(20)' 1/8" IUNK IH/A IN/A IUTC 383150 IN/A IReplacement IHo IHUTS 40
7. Description of Work: REPLACED ICW CHECK VALVE 3-50-331. REPLACED 20 STUDS AHD 40 NUTS .
8. Tests Conducted: Hydrostatic: Pnasast ic: Noainal Operating Pressure X Sressure~tg ig Test teegereture 91 ~

F 96-004-3

Sheet 2 of 2

9. Remarks: MECHANICAL CONNECTION~NO llELDING REQUIRED, FORM NIS-2 (Back)

Il CERTIFICATE OF COMPLIANCE Ne certify that the statee!ents made in the ireport lire correct'nd th'is replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol StaaT! N A Certificate of A thorizaticp No., N~A Expiration Date N Signed wner o

/gA n/,.-'~( ~~g~,

Owner'.s Des ignee, Title Date i~lr CERTIFICATE OF INSERVI CE 'INSPIECT ION I, the undersigned, holding a valid caanission issued by'he National Board of Boiler'nd Pressure 'Vesael and the state or Province of Dade County and .employed by Arkwright.Mutual..insurance.Ceqjany 'nspectors Ma. have inspected the co!Txwents described in thi's Owners Report during the period 01/29/96 of'orwood, to 06/27/96 and state that to the best of my knowledge and belief, the o~ner has performed examinati'ons'and taken corrective measures described in this 0 rners Report iih accordance with the requirements of the ASME'ode,Section XI ~

By signing this certiificate'neither the Inspector nor hi's eepioyer 'makes any isarrant5i, expressed or implied, concerning 'the examinations and corrective measurea descr'ibed in'hi's Owner's Report. Further'more, the Inspector nor his employer shall be Liable in any a'mnner for any peraonal injury or'roperty .'either damage or a loss of any kind arising from or connected with'his inspection.

r o' C(aaisslans ~HB 82 0 II~I!

Inspec r4 S nature National Board, State, Providence, and Endorse!!ents Dat )y .7-4 96-004-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASNE Code Section XI Florida Power & Li ht Date 07 01 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1. of 2 Address

2. Plant Turke Point Plant Unit 3 PQO ¹:63/3C05 IO ¹: 95028392 9700 SM 34C Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job No.,etc
3. Ilork Performed by Florida Power & Li ht Type Code Symbol Stamp Name .Authorization No. N A Expiration Date M A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Intake Coolin lister S stem System ¹: '19 Duality Group: C 5~ (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iNanufactureri National ) Other iYear i Repaired [ ASNE i Component Nsnufacturer ] Serial Ho. Board, Identification /Builti Replaced or i Code /

'i Replacement (Stamp /

I I J~res ue iIHTAKE COOLIHG MATER PUMP i JOHNSTON PUMP (H/A )MODEL 33 CNC IST-7 3P9C (UNK. iRepiaced iHo I

IIHTAKE COOLING MATER"PUNP IJOHHSTOH PUMP IH/A IH/A iNODEL 33 CNC IST-1 3P9C "iUNK. iRepiacement iHo

7. DescriPtion of Horkt INTAKE COOLING IIATER PUMP 3C 'IST-7 REPLACED IIITH REBUILT SPARE IST-1.
8. Tests Conducted: Hydrostatic: Pneusst i c: Nominal Operating Pressure X rressure~tr sig test teegersture 86 ~

F 96-005-3

I Sheet 2 of 2 FORH HIS-2 .(Back)

9. Remarks: HECHAHICAL CONNElCTICIN NO MELOIING REOUIRED.

CERl'IFICAYE OIF CCHPLIAHCE Me certify that the statenents made in the report are correc't aFrd this 'replacement conforms to the rules oF the ASHE Code, Section XI ~

Type Code Symbol Stanp

~ga t -X4,.g~/

Certificate of uthorization No. ~NA gaiorat Toogate tamer or ter'a TIeaigoee,

/

Title 19 CERTIFICATE OF IHSIERVICE INSPECT IOH I, the undersigned, hollding a valid conrnission issued by the Nhtidnal'Boa'rd 6f Boiler snd preshure'essel' (

inspectors and the state or Province of Oade County and entPLoged,bya A'rkuright.HutuaL, Insurance Co(rpany of Norrrood, Ha. have inspected the conpcnents described in this OMners Report during the period 'FI/10'/95'l 07/01/96 and state that to thte best of my knowledge and belief, the Ogner has performed examinat'Ion~ snd taken corrective measures Tdescrib< in this thnM'.rs Report in accordance'with the requirements of the 'ASHE Code,Section XI. I By signing this cert',ificate neither the Inspector nor, his employer makes any lrsrranty, expressed or, I implied, concerning the examinations snd corrective measurleS described in this Cnrnergs Report. FuI'thermor e, neither the Inspector rror his enployer shall be Liable 'in Sny manner for 'any'er'sorel 1'njury or property damage or a Loss of any kind arising from or connected Mith this inspection.

Inspect s Si ature Natiorurl Board, State, Providence, and Endorsements Oats 19 +&~

96.005-3

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACENENTS As Required by the Provisions of the ASNE Code Section XI Florida PoMer & .Li ht Date 08 27 96 700 Universe Blvd. Jwm Beach Fl-. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit PlJO ¹:7951/63 MO ¹: 96018245 9700 SM 344 Street Flor ida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Hork Performed by Florida PoMer & Li ht Type Code Symbol Staap N A Name - Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: 'CCM System ¹: 30 Quality Group: C 5~ (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized. for Repairs or Replacements 1989'Edition,~NA Addenda,~NA Code Case
6. Identification of Conponents Repaired or Replaced and Replacement Components Hane of Nane of (Hanufacturer( National Other (Year (

~

Repaired ( ASNE (

Conponent Hanufacturer ( Serial Ho. ~ Board Ident Ification (Built( Replaced or ( Code (

( Replacement (Stanp (

I I /~Yes Mo 13E207C HUTS, HEAVY HEX (8 IH/A (H/A (N/A (UTC.393249 R 35113048 (UHK (Replacement (Ho I ASTN A-194 GR7 (3E207C BOLTS (85) IN/A (H/A (UTC 398167 (N/A'Replacement (Ho

. H 81990

7. Description. of Mork: CLEAN DIRTY CONPONENT COOLING HEAT EXCHANGER TUBES REPLACED OUTLET DOOR iSTUDS AND BOLTIHG
8. Testa.ConductedI .Hydrostatict Pneunat ic: Hominal Operating Pressure Other Pressure~ig Test Telpereture ~

F 96-006-3

Sheet 2 of 2 I;"ORK HIS-2 (Back) 0

9. Remarks: THIS IS A KECHANICAL CONNECTION HO 4'ELDING REOLIIRE6.

CERTIFICATE, OF C(NPLIAHCE Me certify that the statements made in the report are co'rredt ahd t'hisepair conforms to the 'ru!Ls df the ASKE Code, Section XI.

Type Code Symbol Stanp Certificate of Authori atj< o. ~HA Expiration Date H~A

/l~

Signed Owner Q

or Owner's De 1

knee,, Title oate S 19~

p CERTIF!CATIE OF IHSERVICE INSPECTION I, the undersigned, holding a val!d cocmission issued by the Haticnal- Board of Boiler and Preshurd and the state or Province of Dade Catty and employed by hrkwright Kutual Insurance Cchpady of, Veksel'nspectors Norwood, Ka. have inspected the caqxxients c!escribed in this-Owners Report during the period O'/19/96o  !

08/07/96 and state that to the best of my knowledge and belief, 'the'Owner has performed examinations and taken corrective measures described in this Owxtrs Report 'in accordance with the requirements of the 'ASKL XI.

.Co'de,'ection By signing this certificate neither the Insixmtor nor his ~lawyer'akes 'any warranty, expressed or Implied, concerning the exam!nations and corrective measures described in this (!wner's Report. FuJ.thermo)a, neither the Inspector nor his esployer shall be liable in any 'manner 'for any persona'l Injury or property damage-or a loss of any kind arising from or corrected with this iinspectfon.

Cannissions LL 8250 H i Inspec rs Si~ ure Hatiorml Board, State, Prov!derma, and Endorsemeats Date 19 Q>

96.006.3 0

FORH HIS-2 ONMERS REPORT FOR REPAIRS OR REPLACEHEHTS

'As Required by the Provisions of the ASNE Code Section XI

1. OMner Florida Poser 8 Li ht Date 08 07 96 700 Universe Blvd. Jum Beach Fl. 33COS Sheet 1 of 2 Address
2. Plant Turks Point Plant Unit PNO ¹:5127/63 MO ¹: 96002326 9700 SM 34C Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ko.,Job Ko.,etc
3. 'llork,Performed by Florida Pc~sr 8 Li ht Type Code Syshol Steep N A Kame Authorization Mo. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Intake-Coolin Mater S tern System,¹: 19 Quality Group: C
5. (a) Applicable Ccestruction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Coeponents>>Repaired or Replaced snd Replacement Coeponents Kame of Kame of IHsnufacturerI Mational I Other I "ear I Repaired I ASKE I Coaponent Manufacturer ,I Serial No. Board Identification IBuiltI Replaced or I Code I Replacement I St8flp I I [~res se IBOLTS (20) IK/A IK/A IN/A IR 87-5164, '1-1/C"x5" IUKK IReplacement IMo UTC 351875 XJ-3-1COS I

IHUTS (20) IN/A IH/A IH/A IR 87-5164s 1 1/4" IUHK I Replacement I Ho UTC 351885 393251

7. Description of Nark: EXPANSION JOINT XJ-3-1408 REPLACED AT'3C ICM-PUMP DISCHARGE.

Pneusst 1 c: ,Nominal Operating Pressure X Pressure~tr te test Teeeeersture 91 ~

F 96.007-3

Sheet 2 of 2 FORH HIS1-2 (Back)

9. Remarka: THIS IS A HECHANICAIL CONNECTION HO NELDING REOUIREIDa CERTIIF ICATE OF COHPLIANCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol StanTD N A Certificate of Authoris i Owner 9

io or OImer's Designees, 7

jN 'A Title 9'7 Expiration Date H A CERI'IF I CATE CIF INSERVICE INSPECTION I, the undersigned, holding a, valiid cNImission-issued by the National Board of Boiler and pressui e Vessel inspectors and the state or province of Dade County and employed by Arkwright IKutual Insurance Company iof Horwood, Ha. have inspected the caqDonents descrit>>d in thisi OwnersiReport during the period 01/30/96 to 08/07/96 and state that to the IDest of my knowledge and belief the 099ner has performed examinations and taken corrective measures described in this Owners Report inI accordance with the requirements of the AsHE code,Section XI.

By signing this certificate neither the Inspector'nor'his'mployer makes any warranty, expressed or implied, concerning the examinations and corrective measuresi described. in <<his Ownercs Report. Furthersiores neither the Inspector nor his eeiployer shalll be liiable in any manner for any personal, injury or'roperty damage or a loss of any kind arising from oreconnected wi'th this inspection. Il ZA aHi ss 8999 cetasissieas II Inspecto s Si ndture National Beard, State providence, Snd Enddrsements Date 8'DZ 7 19 ?C 96-007e3

FORK NIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI Florida Pogger & Li ht Date 08 22 96 700 Universe Slvd. Juno Seach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit PMO ¹:63/8384 lO ¹: 96020299

.9700 SK 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job'Mo.,etc 3.'Mark Performed. by Florida Power & Li ht Type Code Syahol'tan@ N A Name Authorization Mo. H A Expiration Date P.O. Sox 4332 Princeton Fl. 33032 Address

4. Identification of System: COMPONENT COOLIMG MATER System ¹: 30 Guality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 19S9 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or. Replaced and Replacement Components Kame of Name of (Kanufacturer[ National ) Other lYear ) Repaired I ASKE I Component Kanufacturer (

Serial No. 'Board .Identification (Guilt( Replaced or J Code J

) Replacement (St~ (

I I i Teereue (NUTS (2) HX OUTLET DOOR iH/A IH/A )H/A (3E207C UTC 393249'STK JUNK (Replacement [Ho A-194 GR 7

'I'STUDS (2) NX OUTLET DOOR IH/A (H/A )H/A (3E207C UTC 398167 (UHK )Replacement [Mo

7. Description of 'Mork: 2 STUDS AND NUTS REPLACED OH 3C CCll HEAT EXCHANGER ACCESS DOOR.
8. Tests Conducted: Hydrostatic: Pneumat i c: Hominal Operating Pressure 0 Other Pressure~tg test turgereture '.F 96.008-3

Sheet 2 of 2 FORM NIS.2 (IIack)

9. Remarks: THIS IS A MECNNICAL CONN'ECTION. NO NELOING REOUIRED'ERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct an'd this replacement conforms to the kuieh of the ASME Code, Section XI.

Type Code Symbol Ste~

~o'e 'I Certificate of Authorlzeltie Signed Owner or Owner .>>

Ho.

Oessgnee,

~HA Title ecol tete ~2~

tetlee oete 19 j I CERTIFICATE OF INSERVICE IHSF'ECTIOH I, the undersign9<, holding a valid ccemission issued by the National Board of Boiler and Pressurel'Vessell inspectors and 'the eetate or Province of Oade County and employ'ed by Airkwright'Mutual Insur~nce Coo@any,of Norwood, Ma. have inspected the conponents described in this Owners Report during the period 08/07/96 to 08/22/96 and state that to the best of my knowledg'e ahd b'eliaf, the Owner has performed examinations and taken corrective measures ciescritxxl in this Owners Report in accordance with the rmiuirements bf the ASME Code,Section XI. I By signing this certificate.neiither the Inspectoi ndr hiis elnpiayer'makes any warranty, expriessad ol.

iayli'ed, concerning the examinaticxm and corrective mea'suras d'escribed in this owneros,Report.'urthermore, neither the Inspector nor his employer shall be liable 'in any inner for 'any personal injury o'r pr'operty or a loss of any kind arisiing from or connected with th'is .Inspactfon. 'amage Comniissions NB 823~0~HI~

Inspe ors~SI nature Naltiodal Boar'd, State, Providence, anci Endorsements 19~~+

96;008-3 0

FORM HIS-2 OVHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 09 26 96 700 Universe Blvd. J~o Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PlO'¹:63/7082 lO ¹: 96014602 9700 SM 344 Street Florida Cit Fl. 33034 Address 'Repair Organization P.O'Ho.,dob Ho.,etc
3. Ilork Performed by Florida Power 8 Li ht .

Type Code Synodal Sterp N A Kame Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: .'CHEMICAL 8 VOLUME CONTROL System ¹: 47 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized.for Repairs or Replacements '1989 Edition,~HA Addenda,~NA Code Case 6.. Identification of Ccgponents Repaired or Replaced*and Replacement Cooponents kame of iHanufactureri National 'J' Other /Year ( Repaired i ASHE (

Manufacturer Serial Ko. Board Identification )guilt/ Replaced or ( Code i i Replacement JStsnp (

I I i~res s iRELIF VALVE ICROSBY VALVE T I51300 IH/A IRV-3-203 (UHK. (Replaced iKo l2ttX 3 'AGE iRELIEF VALVE ICROSBY VALVE 8 IN82705 IH/A (UTC 371565, RV-3-203 '/UNK. (Replacement iKo 12tt X 3 GAGE 0003 UP.O¹C95677-90722 C 0

,(STUDS (8) IH/A iH/A JUTC 378831, 5/8" X 11 UHC iUNX. (Replacement iMo I

(HUTS (16) iM/A N/A (UTC 391981, ASTM A-194 iUNK. iReplacement iHo GR 2H

7. Description of Uork: RELIEF VALVE RV-3-203 REPLACED UITH TESTEO SPARE. EIGHT 8 STUDS AHD sIXTEEN 16 HUTS REPLACED.

Pneumat ic: Hominal Operating Pressure X Pressure~270 tp Test Temperature 137 F 96-009-3

Sheet'2 of 2 FORH NIS-2 (Back)

9. Remarks: HECHAMICAL CONHECTION. MO llELDIMG REOliJIRED.

CERT IF I CA1'E OF COINPLIANCE Me certify that the statements made in the report are correct and this replacement confome to the rules,,of the ASHE Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorizat on Ho.

I

~NA gee'-wM-Etpitettetl tete ~ee Signed 3'>yre~ss Ouner or-Owmr's Designee,, Title tete 19 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a'valid cannission issued by, the Khtiohal 'Board of Boiler and Pressure Vessel.

inspectors and the state or Province of Dadh Cunty and ~loyjed by Arkuright Hutual Insurance Caiman'y Ha. have instated the compaeents d'escribed in this OMners R'epor t daring the period '6/05'/96o of'oruood, 09/26/96 and state that to the best of my knouledge and belief, the Ower has performed examiinat'ionf, and taken corrective measures describ< in this OMners Report in a'ccordan'ce with'he requirements of the,hSHE Code,Section XI.

By signing this-certificate neither the Inspector nor h'is eaployer makes any werranty, expressed o' IsT!I(ed, concerning the examinations and corrective measures described in this 0 eer's Reix!rt. Furthermore; neither the Inspector nor his employer shall be liable in any manr!er for any personal injury or or a loss of any kind arising from or coraected Mith this inspection. pkope'rty'amage M,'orAniss fons ,,NB

'a'tfohal 823~0~HI~'ure Inspect rs Si Board, State, Provider!ce, and Endorsemeits Date 9'6-009-3

FORM HIS-2 (NHERS REPORT- FOR REPAIRS OR REPLACEHEHTS As Required'by the Provisions of the ASNE Code Section XI

1. Owner Florida Po~er S Li ht Date 10 28 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address
2. Plant Turke Point Plant Unit

,PMO ¹:63/0522 MO ¹: 96027062 9700 SN 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job.No.,etc

3. Nark Performed by Florida Power B Li ht Type Code Syshol Stamp N A Name Authorization Ho. iH A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONENT COOLING llATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components Repaired or Replaced and Replacement Coaponents 0IHUTS (30)

Mane of Coaponent CCM HX Meme of Manufacturer

'[Manufacturer[ Mational

( Serial JN/A Ho.

iH/A Board Other Identification

,i3E2078 UTC 393249

[Year

/Built/

I

[

/

I Repaired [ ASNE Replaced or / Code Replacement (Stanp

/~tes ue

[

/

(

(UMK )Replacement (Mo (OUTLET DOOR ASTH A-194 GR 7 (BOLTS (30)'CM HX IN/A (N/A [3E2078 UTC 398167 JUNK [Replacement ]Ho lOUTLET DOOR

7. Description of Mork: CCM HX 3B ACCESS'DOOR'TUDS AMD HUTS REPLACED.
8. Tests Conducted: Hydrostatic: Pneunatfc: Hominal Operating Pressure Other Pressure~sig test tesgersture oF 96.010.3

Sheet 2 of 2

9. Remarks: THIS IS A NECNAHICAL CONNECTIOH.

PORN, NO MELOIHG HIS-2 (Back)

REOUIRED.

0 CERTIFICATE OF CONPLIAhlCE Me certffy that the statements made fn the repor't are correct and,this replacement conforer to the rules of the ASHE Code, Section XI.

Type Code Syrrhol Steep le A Certificate of Authorization,No. N~A Expiration gate N A

/

Sfgned Date pl/ 4 owner or owr3IrF's Designee, Tftle CERTIFICATE OF IHSERVICE I,NSPECTIOH I, the unders3gned, holding s valid conraissfon issuer( by, the Haf:fonaL Board of'oiler and Pressure VesseL inspectors and.the state or Province of Oade County and ettThloyed by Arkwright Nutual, Insurance CtxtTpanyi of Norwood, Na. have inspected the cortTxhnents de'scribed fri this Owners Report during che period 10/11/96 to 10/28/96 and state that to the best of my krewlcdgp and belief, the Owner has performed examinations and taken corrective measures described fn thiis Owners Report fn accordance wiith the requfreox.nts of the ASNE,Code,Section XI ~

By sfgn3ng this certificate neither the Inspector norI hiP eriployer Pmkgs any warranty, expressed or, I implied, concerning the examinations end corrective measures describedl in this Owner's Report. Furthermore, ,

(

neither the Inspector nor his eoployer shall be LiabLe in sny manner for any per..onal injury or prpperIty, damage or a Loss of,any kind arising from or connected fifth, th(s ipspectfpn.,

Cotrmfssions,, HB, 823~0M~I Inspectors'fgrwhr.ure ,

Hatfonpl EIoard, State, P'rovidence, and Endorsements 19 96-010-3

FORM NIS-2 OWNERS REPORT 'FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1 ~ Owner Florida Power & Li ht Date 01 02 97 Name 700:Universe Blvd. Juno Beach Fl. 33408 Sheet .1 of 2 Address

2. Plant Turke Point Plant Unit

,PHO ¹:1204/63 lJO ¹: 96031833 9700 SM 344 street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc

3. Hork"Per formed by Florida Power &'Li ht. Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COMPONENT COOLING HATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA'ode Case
6. fdentification of CoJJJponents Repaired or Replaced-and Replacement Components Name of Name of (Manufacturers. National ( Other iYear f Repaired [ ASME i Component Manufacturer i Serial No. Board Identification (Builti Replaced or / Code (.

( Replacement .]Stamp i I I J~Y*s u IHUT (1) 'i H/A iN/A iH/A )HEAVY HEX ASTM A-194 (UNK (Replacement (Ho UTC 393249 H CV333 7.,Description of Ilork: REPLACED ONE HUT ON COMPONENT COOLING HEAT EXCNANGER

8. Tests Conducted: Hydrostatic: Pnewetic: Hominal Operating Pressure Other Pressure~rg Test Teegersture 4F 97-001-3

Sheet 2 of' FORH HIS 2 (Back) 0

9. Remarks: THIS HAS A HECHNICAL CONHECTIOH. HO WELDIHG REOUIRED'.

CERTIFICATE OF COHPLIANCE Me certify that the statnnents made in the report are correct and this repl,aceaent conforms <<o the rule's of the ASME Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorizat3on Ho. ~NA Exp3ration Date r7 Owner or

/~, /ig Owner~s Designee, 0

Tif le Q&gyr~"6"C. t4A..o.~. /6 ,

19',

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding,a valid cixrmission issued by the National Board of Boiler and Pressur'e Vessel inspectors and the state or Province of Dade County"and employed by"Arkwrigh>> Hutual Insuran/e Con@any of Norwood, Ha. have inspected the components described in this Owners Report during the period 12/11/96 to 01/02/97 and state tha't to the best of my knowledge and belief, 'the Owner has performed examinations and taken corrective measures descrlh< in this Owners Report in accordance with the reciuirements of the ASHE Code,Section XI.

By signing this, cert.ificate neither the inspector nor his employer makes any warranty, express&1 o3 I

implied, concerning the examinations and corrective measures describe3 in this Owner's,Report. Furthermore, I ne3ther the Inspector nor his employer shall be liable in any manner for any personal i,njury or pdopel ty 'I or a loss of any kind arising from or connected with this inspection. 'amage

+ ~r/~ ~)

Comnissions HB 8230 N I Inspector Si ture 'atiodal Board, .State, Prov3dence, and Endorsements Date 19 P~'7-001-3

FDRH Nis-2 ouNERs REpoRT F0R REpAIRs 0R REpLAcEHENTs As Required by the Provisions of the ASHE Code Section XI Florida Power S Li ht Date 02 03 97 700 Universe Blvd. Jwa Beach Fl. Sheet 1 of 2 33408'ddress

'2. Plant Turke Point Plant Unit PQO ¹:63/1638 MO ¹: 97001635 CR ¹: 96-0070

'9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc'.

Mork Performed by Florida Power S Li ht Type Code Syshol Stamp N A

,Kame Authorization No. N A Expiration Date M A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: COHPOMENT COOLING MATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA AddendaP~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,NC16-1Code Case
6. Identification of'omponents Repaired or Replaced and Replacement Coaponents Kame of Name of )Manufacturer Kational i Other ,iYear.,l Repaired' ASHE I Component Manufacturer i Serial No. Board Ident ification iguiltl Replaced or I Code 'I

,i Replacement. JStasp Yes No 3E2078 Mestinghouse JN/A 047 iComponent Cooling Mater i1968 iRepaired Yes Neat Excha er >>B>>

7. Description of Mork: CUT 6>> X 8>> 'ACCESS MOLE FOR FORIEGM HATERIAL RETRACTION. CCOE CASE M-416-1 NAS BEEN ENVIED FOR THIS REPAIR ACTIVITY.
8. Tests Conducted: Hydrostatic: Pneunat i c. Nominal Operating Pressure X Other HT ROOT pressure~use is Test Tespereture MOH 'F 97.002-3

Sheet ',2 oi 2 FORM NIS-2 (Back)

Ik B. Rnnerks: cede case gala-1 vas en oknl for this ~ra ifr a~etlvit A.ll veld~i~as rforaecf in accordance with the FPL Weld Control Manual.

CERTIFICATE OF COHPLI ANCE We certify that the statements made in the report are correct and this l repair 'onforms to the rules of the ASHE Code, Section Xl ~ I I

Type Code Symbol,Stamp N A Certificate of Authorization No. 'NA Expiration Bate ~B'A S 1 gned Oat. ~4:>~~ Y I r or Ownerks Oekignee, Titi&

)CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holtiing a valid cccmlssicn I sued by tha National.Board of Boiler and pressure'es'sel and the state or province iof Blade county and,~>loyed by Arkwright Mutual, Insurance'ompany 'nspectors Ha. hive inspected the ccImpoients described. in this bkers Repoit during the period 01~/22/97 of'orwood,

~

tfkd 02/03/97 and state that to the best of my knowledge aQ bI.Iiif, khe Owner has performed exami'nations'nd taken corrective measures ciescribcxi in thiis Owners Report in aecordanee with the requirements of the ASHE Code, '

Section XI. I By signing this certificate neither the Inspector nor his enployer, makes any warranty, expressed or implied, concerning the exeainat3cfns and corrective measures descr'ibed in'his OWnerks Report.'urthermore, neither the 'Inspector nor his employer shall be liable in any sender for any personal Injury or property damage or a loss of any kird arising-froaf or connected with th/s ins~tion.'

Inspector S Ig re Rational Board, Stateproviden, ce, and Enllorstnedts 9'7 I

Oat 19 97-002-3

FORM HIS-2 OMNERS REPORT FOR 'REPAIRS OR REPL'ACEMEH'IS As Required by the Provisions of the ASHE Code Section XI O 1. Owner Florida Po~er 8 Li ht Name Date 02 11 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t 3 Name puo ¹:63/8809 uo.¹: 96020605 9700 Su 344 Street Florida Cit Fl. 33034 ~

.Address Repair Organization P.O. Ho.,Job Ho.,etc 3~ Ilork Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Name Authorization No. M A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032'ddress

4. Identification of System: COMPONENT COOLING HATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~M A 'Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of'Components Repaired or Replaced and Replacement Components Name of Name of rIHanufacturerI National Other IYear;I Repaired I ASME .I Coaponent Manufacturer I Serial Ho. Board Identification .'IBuiltI Replaced or I Code I

'I Replacement IStamp I

I I [~<<s ue I STUDS (160) I IH/A IN/A ITHREADED ROO JUNK IReplacement IHo I3 4" X 8 1 2" H/A'H/A 'TC 406446-1 406518-1 IHUTS (320) IN/A IH/A INUTS, ASME SA-194 GR 7 JUNK IRepiacement INo l3 4<<g UTC 393249-1 406514-1 ISTUDS (40) IH/A IN/A IH/A ,ITHREADED .ROOg IUNK IReplacement IHo 1 1 8" X 8 UTC 400981-1 INUTS (80) IH/A IN/A <<,IH/A INUTS, ASHE SA-194 GR 7 IUNK IReplacement IMo 11 1 Ba UTC 351807 398260 399264 I I I

7. Description of llorkt REPLACE 'BOLTING ON CCM HEAT 'EXCHANGER "8" CHANNEL HEAD ANO ELBOU.

t 8. Tests Conducted: 'Hydrostatic:

Other Pneunatict Pressure~erg Nominal Operating Pressure test Temperature 'F 97.003-3

Sheet 2 of 2 FORH HIS-2 (Back)

II

9. Remarks: NO MELDING REOUIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements macle in the report are correct and ~thia re'placement conform to the rules of the Code, Section XI. 'SIDE Type Code Synhol Steap I A Certificate of Authorization Ho. ~N(A Expiration Date ~HA Ouner or 99nerds IPesignee, Title D.te 99 7

~

CERTII ICATE OF IHSERVICIE INSPECTIOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Prc':ssu're VessB'nl inspectors and the state or Province of Dade County and Anplbyed by~Arkuright Mutual Insurance Carphny 'of Ma. have inspected the coeimnents described in this'09dners'Rep'ort'dur'ing the period 01/09/97 to

'orgood, 02/10/97 and state that to the est of my knoMledge and belief the Ihdner has performed examinations and taken corrective measures, described in this Ogners Report in~ accordance uith the requirements of the ASHE Code,Section XI ~ ,

By signing this certificate neither the Inspector nor~his~ eeglloykr makes any warranty, expressed or implied, concerning tlhe examinations and corrective measures'es'cribed in this Omar's Report. Furthersored neither the Inspector nor his erployer shalli be liable in an'y ma'nnet for any personal injury or ,'property damage or a loss of any kind arising from or connected with this inspection.

Coomissiorls -NB 230 N' Inspect s QShature Mationat Board, state araviden,oe, dnd Bnddraednnta Dat 97-003.3

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section,XI

1. Owner Fioridh Power & Li ht Date 02 11 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PNO ¹:63/8809 MO ¹: 96020605 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Mork'Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. 'N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONENT COOLING lJATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Coeponents Repaired or Replaced and Replacement CoJJTJonents Name of Name of (Hanufacturer( National ( Other (Year ( Repaired -( ASHE (

Component Hanufacturer (

Serial No. Board Identification (Built( Replaced or '( Code (

( Replacement (Stamp (

I' J~Ves me (SQUARE HEAD BOLT IN/A IN/A (H/A'UTC 406513 HEAT 54333 (UHK (Replacement (Ho

(

20 1 1 8" DI A (HEAVY HEX NUTS IH/A (N/A (H/A (UTC,399624 (UHK ,(Replacement (No I

20'1 1 8" DIA

7. Description of llork: REPLACED 20 SQUARE HEAD BOLTS & NUTS ON CDI HEAT EXCHANGER' CHANNEL HEAD.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other Pressure~stg Test Temperature ~

F 97-004-3

.Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: NO MELDING REOOIRED.

CERTIFICATE OF iCOHPLIANCE Me certify that the statem>ants made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate of uthorizatlon No. N~A Expiration Date ~NA r~/ 8+ to9Z Owner r Owne! 's 6esiignee, 4! t'le >d>

CERTIIFICATE OF INSERVICE INSPECTICIN I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Provincie of Dade County and &rplbyed by'rkwright 'Hutual 'Insurance Company of Norwood, Ha. have ins!pected the co>ponents 'descriimS in this'wr>ers'eport during the period 01/09/97 to 02/11/97 and state .that to the best; of my, knowledge and bei,ief, thie 0>dner has perfo>oned examinations and taken corrective measiures described in this Owners Report 16 ace>ord!>>nce with the requirements of the ASHE Code,Section XI.

By signing this certificate rieither the Inspector nor'his'm'>>loyler >aakea any warranty,; expressed or i>>plied, concerning the examinations ard corrective measdres'eslcribed 'in this'wner's Report. Furt'hera>ores neither the Inspector nor his ee>ployer shall be liable ir'> an'y awinneir for any, personal Injury or'pro'perty damage or a loss of any kind arising from or connected with this inspection.

II

~

r+g cease>asians,aa > vd~s~t Inspec s nature sat>anat Board state prov>denee, dnd'dnddrsedents I

D.t. M. '7 10++

97-004-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida'Power S Li ht Date 03 20 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of. 2 Address
2. Plant Turke Point Plant Unit Name PMO ¹:63/2502 WO ¹: 97006743 CR ¹: 97-0432 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. 'Mork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization No. H A Expiration Date N A P;O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: RESIDUAL HEAT REHOVAL System ¹: 50 Quality Group: B
5. (a) Applicable Construction Code 831. 1 1955 Edition, NA Addendas~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Conponents Repaired or Replaced and Replacement Coaponents Name of Hame of /Hanufacturer/ National ( Other (Year )

Repaired ( ASHE )

Component Hanufacturer /, Serial Ho. Board Identification )guilt] Replaced or ( Code f f Replacement [Stamp f I I /~Yes se IPIPE TO ELBOW MELD IN/A IN/A [H/A (14gg-RHR-2301-10 [UHK [Repaired ]Ho

7. Description. of Mark: INDICATION BUFFED OUT THAT MAS FOUND DURING ROUTINE ISI INSPECTION.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure pressure~is rest Temperature ~

F 97-005.3

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks<< NO WELDING REaUIRED CERTIFICATE OF COHPLIANCE We certify that the statements made in the, rcport: are correct and <<his repair conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp Certificate of A thorization No. ~NA r

Signed wner Qp)WQg~i6 cs~y or wner" s Designee, Title Date /WF/ZA 1ll ~~

0 CERTIF,lCATE OF INSERVICE INSPECTION I, thc undersigned, holding a valid comnission issued by the Iiatidnai Bohrd 'of Boiler and Pressure Vessel inspectors and the state or province, of Dade County and ecyloyed'by ArkWright Hutual Insurance-Company of Norwood, Ha. have inspected the comp>nents descrilxxl in. this bwndrs kepdrt durihg the period '3/17/97 to 03/20/97 and state that to the best of my knowledge and belief, the O~ner has perforated examinations and taken corrective measures descriked in this Owners Report in 4ccdrdahcc with the requirements of the'SME XI. Cade,'ection By signing this certificate neither the-inspector nor. his ampl'oyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any~ manner~for any personal injury or property damage or a loss of any kind arising from or connected with this ~inspect~ion,,

Cocmissions , NB 8230,~N I Inspe ors gnature Naticnai'Boa'rd,'State, proVidence, and Endorsements'ot~

A 19 97-005-:3'

FORM NIS-2 OVNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1 ~ Owner Florida Power 8 Li ht Date 03 25 97 700 'Universe Blvd. 'Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Name PNO ¹:63/2531 MO ¹: 97006917 CR ¹: 97-479 9760 SU 3CC Street Florida Cit FI. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by 'Florida Power 8'i ht Type-Code Symbol Stamp N A Name, Authorization No.

Expiration Date N A P.O. Box 4332 Princeton FI. 33032 Address

4. Identification of System: RESIDUAL HEAT REMOVAL System ¹: 50 Duality Group: B
5. (a) Applicable Construction Code ASME SECTION III 1965 Edition,~N A Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of /Manufacturer('ational Other -

Iyear I Repaired I ASME I Coeponent Manufacturer i Serial No. Board 'Identification iguiiti Replaced or i Code i

( Replacement istaep (

I I Joyce ge 13A RHR HEAT EXCHANGER IATLAS INDUSTRIAL I877 I727 13E206A i1968 iRepaired iYes MANUFACTURING

7. Description of cwork:. GRIND OUT LIQUID PENETRANT INDICATION IDENTIFIED DURING ROUTINE 'INSERVICE IHSPECT I OH.
8. Tests conducted: gydrostettc: Pneunatic: Nominal Operating Pressure Other PT Pressure~sic test yeepcreture 4F 97-006-3

Sheet 2 of 2 FOHN HIS-2 (Back)

9. Remarksi NO lIELDIHG REQUIRIED CERTIFICATE OF COHPLIANCE

'Me certify that the statenents made in the report are cori ect and this repair conforms to the rules, of the ASIDE Code, Section XI.

Type Code Symbol Stamp 'N of Authorization No., IN~A A'ertificate Expiration Date ~N A s;g,~ W6QÃ Owner r Owner's Designee, Titlk Date CERTIFICATE OF IHSERVICE IHSPECTION I, the undersigned,.holding a,valid ceiiaission issued by the National Board of Boiler and Pressure Vessel.

inspectors and the state or province" of Dade County and"'employed by'Arkwright Hutual 'Insurance Corqpany of Norwood, Ha. have inspected the cavponents described in(this owners Report during the period and state that to the best of my knowledge and belief, the owner has performed examinati'ons'and

'03/19/97 'o 03/21/97 taken corrective measures descr3bed in .this owners Report ih accordance with the requirements af the AsNE~code,Section XI.

By signing this. certiificate neither the Inspector nor his ecpioyer makes any warranty, exprassed od implied, concerning the examinations and corrective meakurels ddscr/bed in'this Oinieris Report. 'Furthermora, neither the Inspector nor his employer shall. be, liable i'n any manner for any personal injury od praperty ~

damage or a loss of any kind arising, from or connected with~ thiis iiispection.

Cocmiasions,, HB, 823~ON~I,~,

Inspec ors Si ture ~

Hationhi B'oard, State, Providence, and Endorsanents wag

'ate P-7 97-006-3

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 03 25 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit kame PWO ¹:63/8991 WO ¹: 96024216 CR ¹: 96-776 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date H A P.O. Box 4332 Princeton 'Fl. 33032 Address
4. Identification of System: MAIN STEAM System ¹: 72 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer[ Hational Other lYear f Repaired I ASME I Component Manufacturer (

Serial Ho. Board Identification ]guilt] Replaced or f Code ]

f Replacement JStasp f I I [r~es ue

)LOAD STUD (1) FOR PSA-35 )H/A IN/A )N/A )STOCK CODE ¹0197328 17-4 )UHK. [Replacement ]Ho iSNUBBER TAG ¹ 3-1084 SS ASME SA-564

[HUTS (4) FOR PSA-35 [N/A IH/A fH/A ]STOCK CODE ¹0209608 ASME fUHK. [Replacement [Ho (SNUBBER TAG ¹ 3-1084 A-194 GRADE 8

7. Description of Work: REPLACED LOAD PIN ON PACIFIC SCIENTIFIC MODEL PSA-35 'SHUBBER TAG ¹ 3-1084 WITH LOAD STUD.
8. Tests Conducted: Hydrostatic: Pneuaatic: Hominal Operating Pressure Other VT-3 Pressure~sig Test teegereture 97-007-3

Sheet 2 of 2 FORH HIS"2 (IBack)

9. Remarks: HECHANICAL COHHECTIOIN HIO M=LDIHG REOU'IREO.

CERTIFICATIE OF COHPLIANCI Ne certify that the statements made in the report are correct and this replacement conforms to thc rule's of thIc ASHE Code, Section XI.

Type Code Symbol Stamp Certificate Authorization No. ~NA Expiration Date ~N 'A Signed Owner r Owner'sVesignee, p~

Title

+>>pn ~~4:,I Pi+.~~; Oate,+~iiX4~/ 2.9'; 19Q I I

CERTIFICATE OF INSERVICE IHSP'ECTIOH I, the undersigned, Iholcling a valid coamission issued by thh Haltiohal Board of Boiler arxl Preslurc,'Ves'sel '

inspectors and the state or Province of Dade County and.employed-by Arkwright Hutual, Insurance'oalpanV 03/24/97 Ha. have inspected the ccraponents described in this Oianers Report d<rring tire period 09/18/96 and state that: to the best of my knowl.edge arkf &tieIf, thc O~ner has performed exami'nations'nd of'orwood,

'6 taken corrective measures described in this Owners Report in abcor'danke with the requirements of t'e ASHE'ode, '(

Section XI.

I By signing this c'crtificate neither the Irtspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measure's dLscr'ibad in'his Owners Repart. Fur'thelmor'c, neither the Inspector nor his employer shall be liable in alny 6rann'er for 'eny personal injury or property damage or a loss of any kfr>>d arising from or connected wlthl this insgctibn. '

Coaraissions NB 823~0M~I~

Inspec rs S ature National Board, State, Providence, and Erx/orsIemedts '(

Date 19 QP O

97-007-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1 ~ O~ner Florida Power & Li ht Date 03 24 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Hame PWO ¹:63/7603 WO ¹: 96016980 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization Ho. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: AUX FEEDWATER System ¹: 75 Quality Group: C
5. (a) Applicable Construction. Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iManufactureri National i Other iYear,i Repaired i ASHE (

Component Hanufacturer i Serial No. Board Identification iguilti Replaced or i Code J i Replacement [Stamp i I

'I [~res se iHUTS (14) IN/A IN/A fN/A iSTK CODE 00278361 iUHK iReplacement iHo I

ICAP SCREWS (14) IN/A JH/A JH/A iSTK CODE 00271201 iUNK )Replacement )Ho

7. Description of Work: DISASSEMBLE INSPECT REASSEMBLE 3-20-401 t 8. Tests Conducted: Hydrostatic:

Other Pneunatic:

pressure~tg Hominal Operating Pressure test testsereture oF 97-008-3

Sheet 2 of 2 FORM HIS 2 (Back)

9. Remarks: MEcHANIcAL col<NEcTIDM~MO MELDING REOUIRED.

CERTIFICATE OF COMPLIANCE Ile certify that the sicstements maCk in the report are correct and this replscecnent conforms to the cules of the ASME Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorization No. ~NA Ex'piration Date '

A l S i gned ~ l+A+Y~fi Si~ggJA~P pace W~ ~+ '

'sy'~~ I Owner or OwnelC/s Designee, Tit.le iCERTIFI CATE OF INSERVI CE INSPECTilOH I, the undersign<4, holding s valid cccimission issued by the National Board of Boiler snd Piiessurc'Vessel inspectors and the state or province of.'D~sde'County'and employed by Arkwright Mutual', Insurance Company of Norwood, Ma. have inspected the ccimponents described in'his owners Report-cfuring the period 07/01/96 to 03/24/97 snd state that to thc; best of my knowLedge snd belief, the owner hss Ferformed elcsmi'nations'nd taken corrective measures. described in thiis Owners Repo'rt .in secor'danre With'the'equirements of the ASME Cocle, Section XI'y signing this certificate neitheir,the Inspector nor his emplcyer makes any warranty, expressed. or implied, concerning the exciminations and corrective measures described in this Owner's Report.'ur'thermor'e, neither the Inspector nor his employcir.shall be Liable 'in any manner for any personal injury or pr'opei ty i damage or s loss of any kind arising from or connected with,this iinspecti'on.'nspec Canmissions Hll 828~0I~IQ orsyS" nature i Hstiocial Board, State, Providence, snd Endorsements Date + ~ ~ 19 7~~

97-008-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power S Li ht Date 03 24 97 Name 700.Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PWO ¹:0991/63 WO ¹: 96030528

'9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc

3. Work Performed by Florida Power. S Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration'Date P.O. Box 4332 Princeton 'Fl. 33032 Address 4~ Identification of System: CHEHICAL 8 VOLUHE CONTROL System ¹: 47 Quality, Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components 'Repaired or. Replaced and Replacement Components Name of Name of /Hanufacturer) National Other [Year ] Repaired i ASHE i Component Hanufacturer )

Serial Ho. Board Identification iguilt) Replaced or i Code (

( f Replacement igtaap i I I James se ITHREADED ROO iN/A iH/A iN/A [UTC 398161 ASHE SA-193 iUHK. iRepiacement (Ho I8 STUDS FABRICATED GRADE 87 IHEAVY HEX HUTS (16) iN/A iN/A iH/A iUTC 399723 ASME SA-194 iUHK. ]Replacement iNo GRADE 2H

7. Description of Work: REPLACED EIGHT 8 STUDS AND SIXTEEN 16 NUTS ON NON-REGENERATIVE HEAT EXCHANGER 3E201 FABRICATED BY ATLAS-COPCO INC. HOOEL 0-1503-7.

t 8. Tests Conducted: Hydrostatic:

Other Pneunatic:

Pressure~erg Hominal Operating Pressure Test Tempereture oF 97-009-3

Sheet 2 o,f 2 FiDRH NIS-2 (Back)

9. Remarks: HECNANICAL CONNECTION NO WELDING REOUIRED.

CERT IF I CATE OIF COHPL I ANCE Me certify that the statenents made in the report are,correc't and this ireplscement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate of Authorization No. ~N A Ekpiriation D'ate si ~r 2. ~z Owner' Owner'O'DesigneeTitle r

CERT IF ICATI-: OF INSERVICE INSIPECT ION I, the undersigned, holding a valiid cnrmiSsion issued b'y thc National Board of Boiler and Presaurci Veaseli inspectors and the state or Province of Dade County and employed by Arkwright Hutual'nsurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 1'I/25/96 to 03/24/97 and state that to the best of my Iknowicdge a'nd belief, 'the Owner has performed examlnat'iona an'd taken corrective measures described in,.tlhis Owniers Report in accordance with the requirements 'of the.iASHF. Code, i Section XI.

By signing this certificate ncithcr tlhe Inspector nor hiis Cmplbyed makes 'any warranty, expressad or implied, concerning thie examinations snd correc'tive measures desciribed in this Owner's Rcport. Furthcrmore, thc Inspector nor his employer slhall be liable in any manner for any personal injury or property 'either damage or a loss of any kind arising from or connected with this inspection.

,Corrrriirssiions, NB 8230 ~N~I Inspector SigniitFre 'ational 'Board, State, Iprovidence, and Enkioraements Date 97-009-3I

FORH HIS-2 OWERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE,Code Section XI

1. Owner Florida Power 8 Li ht Date 04 18 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit

,PNO ¹:63/0124 .WO ¹: 96025060 PCH ¹: 96-012 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Mo.,Job Ho.,etc

3. Nark Performed by Florida Power 8 Li ht Type Code Syahoi Stamp N A Name Authorization Ho.

Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: Safet In ection S tern System ¹: 62 Quality Group: 8
5. (a) Applicable Construction Code 831.1 1955 Edi t i on,~MA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,M416-1Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Components Name of Name of (Manufacturer[ National Other ]Year f Repaired / ASHE )

Component Hanufacturer f Serial Ho. Board Identification (Built) Replaced or ( Code ]

I ] Replacement ')Stoep (

I I I ]~res rre 13T208 BOROH INJECTION I N/A IN/A (H/A )PC/H.96-012 BORON IHJ TK )UHK [Replacement )Mo ITAHK HOD IF I CATION

7. Description of llork: PIPING HOOIFICATIONtOF SAFETY IMJECTIOM LINE TO BYPASS THE BORON INJECTION TANK.

THE FOLLOMING HATERIAL llAS USED: 2 90 DRG 4" SCH 80 ELBONS UTC 398779 4" SCH 316 'ASME SA 312 SCH

,80 UTC 398561 4 SOCKOLET 'SS ASHE 'SA182 UTC 406901 2 45 DRG 4" SCH 80 ELBONS UTC 406833 1 "4" SS TEE SCH 80 ASHE SA403 UTC 407413. FOR SUPPORTS 3-SIH-23 8 H IC-248B-1 THE FOLLONIMG MATERIAL llAS USED: 2 4" PIPE CLAHPS UTC 405948 2 NELDLESS EYE 'NUTS UTC 405946 2 llELDED BEAN ATTACHMENTS UTC 405945 2 MELDED EYE RODS UTC 405947 AHD 2 PLATES 1 2X6X7 UTC 390858.

Pneunatic: Hominal Operating Pressure X tressure~1550 iu test Tsetsereture 83 4F 97-010-3

Sheet 2 of 2 FORH NIS-2 (Back)

9. Rcmarkse SUPPORT 3-SIH-139 THE FOLLOWING HATERIAL 'MAS.USED' 4" PIPE L1-BOLT LITC 400433 1 4" PIPE SADDLE UTC'405949'. SUPPORT 8080-H-007-1 THE F I.LNIIN'ATER AL AS USED: 1 CHANNEL'Y TEEL UTC 407359 2 CLAHP!>> UTC 374568  !~2NUT SPRING UTC 3932C7 ANGLE C.S.ASTH A36 UTC 403958. TH REOUIREHNTS OF CODE CASE NC16-1 HAVE BEEN HET FOR THIS R-PL CEH:NT ACT VITY.

iCERTIFICATE OF COHPLIANCE lie certify that the statcneehts made in the report are, correct and this repiaccnent conforms to the rules of the ASHE Code, Section XI.

Type Cade Symbol S'tamp N A Certif icate Author)zation No- I~!A Expireition Date ~NA

>>i>>.~. u~PQ~M Owner or

/

OwnqPs Designed, 5~+~~~~-,

Title 4

~~~>>s~e ,~gad, i A CERTIFICATE OF INSERVICE INSPIECTION I, thc undersigned, holding a valicl connission issued by thc National Board o'f Boiler and Pressure Vessel inspectors and the state or province of Dade county and~cap~layed by Arkwright Hutual'nsurance company of Norwood, Ha. have inspected the caqmnents described in thils OWnerd Report during the periad 04/07/96 ta 04/18/97 and state that to the best of my knowledga and baiicf, t'e O~ner has performed examinations'nd taken corrective measures dcscribeid in this owners Report ih adcordanc'e with 'the requirements.6f the ABHE~ code,Section XI.

By signing this certificate neither the Inspector nor hi!s employer 'makes any warranty, expressed or inpiied, concerning the exmninations aind correct!ive meaaures described .ln,this Owner's Report. Furthermore, neither the Inspectoir nor his eeyioyer shall be liable iin any sunnier far any personal injury ot pr~opci ty ~

damage or a loss of any kind arising from or connect'ed with this inspection.

Comni as 1 ons, NB 823~ON~I,~,

Inspe ors'nature National Board, State, Proviidence, and Endorsements Date .'I9 97-010-3

FORM HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. O~ner Florida Power & Li ht Date 03 30 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Nsne PIIO ¹:3648/63 IIO ¹: .95028815 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization'P.O. Ho.,Job Ho.,etc
3. llork Perforned by Florida Power & Ci ht ,Type Code Symbol Stamp N A Name Authorization.Ho. N A Expiration.Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: CHEMICAL AND VOLUME CONTROL System ¹: 47 Quality Group: C
5. (a) Applicable-Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section.XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired-or Replaced snd'Replacement Components Name of Mane of (Manufacturer( National Other (Year ( Repaired ( ASME (

Component Manufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

( Replacement (Stamp (

I I i~res ge (STUDS (24) (H/A IN/A I3E201 (UHK. (Replacenent I

(HUTS (48)

(H/A'N/A (H/A (H/A (3E201 (UMK. (Replacement (Ho (Ho

7. Description of Ilorkt REPLACED 24 STUDS AND 48tNUTS ON THE NON-REGENERATIVE HEAT EXCHANGER ENDBELL ASSEHBLY.

t 8. Tests Conducted: Hydrostatic:

Other Pneunatic:

pressure~stg Nominal Operating Pressure Test Tespersture 4F 97-011-3

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: MECHANICAL CONNECTIOM MO MELOIMG REOUIRED.

CERTIFICATE OF COMPLIANCE

'Me certify that thc staterents made in the report are correct and ttais rcpiacenent conforms <<o the rules of the ASHE Code,Section XI'. I Type Code Symbol Stamp Certificate of+uthorization Ho. ~HA Expiration Ilste ~NA slgn~ 842 19

'Tlf.le

~%~~M'wner 0

o Owner" s4'esigne'e, CERTIF ICAYE OF IHSERVICE IHSPECTIOH I, thc undersigned, holding a valid caw>ission issued by the Hational Board of Boiler and Prepsure Vessel inspectors and the state or Province. of Oade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha. have inspect'ed the components described in this Owners,Rcp'ort'during the period '10/L3/95 'to and state that to thc best of my knowledge and belief the Amer has perfo'rmed examinations and '3/27/97 taken corrective measure." described in this Owners Report in accordance with the requirenwnts of thc ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed'or II implied, concerning the examinations and corrective measures described in this Owner's Rcport. Furthernere,

,neither the Inspector nor his eayloyer shall be liable in any manner for any personal'nJury or;properiy damage or a loss of any kind arising from or connected with,thi;s inspection. 1 Cceeissidns '

NB i823O~H~I~

Inspec rs Si ature ,'Nat,'io~i Board, State, Providence, and Endorsenents gate 97'01

FORN NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

~ .1.. Owner Florida Power 8 Li ht Date 04 07 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Name PWO ¹:63/7853 WO ¹: 96012069 9760 SW 344 Street 'Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc 3.,llork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of, System: REACTOR COOLANT System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code 831.1'955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification. of Components Repaired or Replaced.and Replacement Components Name of Name of )Nanufacturerf National Other )Year ) Repaired ( ASHE Component Hanufacturer ) Serial Ho. Board Identification [guilt) Replaced or J Code (

J Replacement (Stamp J I I JYesreue, IPRESSURIZER RELIEF VALVE ICROSBY IH51249-1580 IN/A IRV-3-551A )UNK. )Replaced (Ho (PRESSURIZER RELIEF VALVE (CROSBY IH51249-1362 IN/A IRV 1A (UNK. (Replacement )Ho

7. Description of llork: REHOVE PRESSURIZER SAFETY VALVE RV-3-'551A AHD INSTALL SPARE.

Pneunatic: Hominal Operating Pressure X pressure~2280 siu test Temperature 535 'F 97-012-3

Sheet 2 of 2 FORH, HIS-2 (Back)

9. Remarks: HECHANICAL CONNECTION NO 'WELOIHG REOUIREO.

CERTIFICATE OF OOHPLIANCE lie certify that the statements made in the report are correct and this'eplacement conforms to thol rulles of the ASIDE 'Code, Section XI.

Type Code Symbol Stamp N A

-Certif icate of Authori".ation No. ~HA I

Signed cfar +ivw~~P(<~

Own r or wner's Oesignee, T>tl'e CERTIFICATE OF IHSERVICE INSPECTIOH I, the undersigned,, holding a valid co>r>>>issiion issued by the National Board of Boiler and Pressure Vessel inspectors and the state or F'rovince of Dadle County and employed by Arkwright Hutual Insure'nce Cempany.*f Norwood, Ha. lieve inspected the comF>onents described in this 'Owners 'Report during the period 07/14/96 to 03/27/97 and state that to the best of my knowledge and belief, the Owner has perfors>ed examinations and taken corrective measures described in this Owners Report'n 'accords'nce'with tHe requirements. of the ASHE Code,Section XI.

By signing this certificate neither the Inspector r>or his employer makes any warranty, expressed or implied, concerning the examinations and corrective measui os 'described in this Owner's Report. Furthermore, neither the Inspector nor his e>qpioyer shall be liable in'ny manner for any personal injury or property damage or a loss of any kind ari:sing from or connected with this'ns'pection'.

Inspe tors >gnature National~ Board, State, Providence, ahd &do>>sMnts Date 97-O12-3

FORM NIS-2 OLINERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power B Li ht Date 04 16 97 700:Universe Blvd. Juno Beach Fl. 33408 Sheet of 2 Address 2; .Plant Turke Point Plant Unit Name PNO ¹:63/2645 NO ¹: 97007310 CR ¹: 97-53l 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ko.,etc 3'., llork Performed by Florida Power I Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration, Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: C onent Coolin Hater S stem System ¹: 30 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case
6. Identification of Components Repaired or Replaced,and Replacement Components Name of Name of, ')Manufacturer) National ( Other, (Year .( Repaired ) ASME ]

Coayonent Manufacturer [ Serial Ho. Board Identification [Built( Replaced or ] Code J

/ Replacement JStaap f I I [~Yes No ITRANSITION TUBE N/A iH/A [FOR MSA TAG ¹3-1096 [UHi( (Repaired )Ho IASSEMBLY

7. Description of llork: TRANSITION TUBE OH SNUBBER 3-1096 MAS SHORTENED BY REMOVING EXISTING HELD AHD RENELDING.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-3 4F 97-013-3

Sheet 2 of 2 FORH MIS.2 (Back)

9. Remarks: ALL MELDING PIERFORHED IN ACCORDANCE MITH APPROVED PLANT 'PROCEDURES.',

CERTIFICATE OF COHPLIAHCI lie certify that the statements made in the report are cor'rect and this 'epair 'onfor'ms to the i;utels oP th' ASHE Code, Section Xl.

Type Code Symbol StrmTo Certificate of Author'fzatfon Ho. ~NA Expiration Date ~NA

'9~

Owner or OwnerBdl/Designee/ Title p.

CERTIFICATE OF INSIERVICE INSPECTION I, the undersigned, hoidling a valid comrrfssfon fssuk bg th2I. Ma'tfohai 'Board o'f Boiie'r and and the state or Province of Dade County,and empfoy2% by Arkwright Kutuai, Insurance'oripnnl/ of P'resdure'essel'nspectors I

Norwood, Ha. have inspectedl the corrponents described in this Owners Report during the, period 03/25/97 tio I 04/16/97 and staIte that to the best of my knowledge and belief, the owner has F2erformed ekamfnatfo& and I

taken corrective measures dlescribed in this Owners Report in accordance with the requirements IOf the.ASME Code,Section XI.

By sigriing this certilficate neither the InspeICtcr nor his eccployer makes any warranty, expressed or implied, concerning the examinations and corrective measure's drl.scribed fn'his Owner's Report. Furthermore, neither the Inspector nor his qaployer'hall be liable in any rtranner for,any personal injury or property damage or a loss of any kind arising from or connected with'hfs I'nspection.

BnmnIssInns MB 823~08~12 Inspect rs Si ature 'affon'nl Board, State8 ProvidenIce, andi Endorsements Date iP 19 97-01,3-3

FORH NIS-2 OHHERS REPORT FOR REPAIRS OR REPL'ACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 04 08 97 700 Universe. Blvd. Juno Beach Fl. 33COB 'Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PQO ¹:63/2418 HO ¹: '97006494 9760 Su 3CC Street Florida.Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job No.,etc
3. Hork Performed by Florida-Power & Li ht Type Code Symbol Staap N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: RHR System ¹: 50 Quality Group: 8
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~M A Code Case
6. Identification of ConTxinents Repaired or Replaced and Replacement Conponents Kame of Name of iHanufacturer( National Other iyear i Repaired i ASHE i Conponent Hanufacturer i Serial No. Board Identification /Built( Replaced or,/ Code i I / Replacement /Steap J l I [~Yes ue IPLUGS (4) H/A iH/A iH/A PRO-3-1469 UTC 406038 ASHE iUNK. /Replacement /No SA-182 F316 SS
7. Description of Ilork: REPLACED PLUGS ON RESTRICTING ORIFICE RO-3-1469'FLANGES.

8 . Tests Conducted: Hydrostatic: PneLInat 1 c I 'Hominal Operating Pressure Other Pressure~g A ig Test teepereture 97.014-3

Sheet 2 of 2 FORH NIS.2 (Back)

9. Remarks: HECKANICAL CONNECTION~NO MELDING REOUIRED.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are carr'ect'and'his replacement conforms to the ru'les of the ASHE Code, Section XI.

Type Code Symbol St~>

Certificate of Authorization No. N~A Expiration Date Signed .

Dune

~~+,) i I or O~rrk's Designee, Ti

~~~ AAe i~~

e Data CERl'l I'ICATE OF INSERVI CIE IIIISPECT ION J

I, the undersigned, holding s valid clxtmission issued by the National Beard of Boiler and pressure Vessel inspectors and the state. or Province. of Dade County and emp)<vyeai'by Arkuright l<utual 'Insurance C'cxrphny of NorMOOd, Hs. have inspected the caqmnents descriked in this Owners Report during .the period i03/14/97 to 04/08/97 snd state that <<o the best of my knox)edge snd belief,, the Darner has performed examinations and taken corrective messue es described .in this owaers Report in accordance Hith the. requirements of the ABHE code,Section XI.

By signing this certificate neither the Inspectot nor his'esp)oyer makes sny Msrranty,.expressed or implied, concerning the exsmiinations and corrective messu'res'descritied 'in t'his (Incr's Report. Furthermore, neither the Inspector nor his,employer shall be liablo in sn)~ manner for any personal injury or )~rcport)<

damage or s loss of sny kind arising fries or connected Hith this inspection.

Comsissions NB 8230 ~N LII Inspectors'gnatlxhf National Board, State, Providence, snd Endorsements Date 197 7 9?. CI14-3

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section Xt 1 ~ Owner Florida Power & Li ht Date 04 01 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address 2~ Plant Turke Point Plant Unit PWO ¹:63/6231 WO ¹: 96009195 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp M A Name Authorization Ho.

Expiration Pate N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: CHEMICAL & VOLUME COMTROL System ¹: 47 Quality Group: B 5~ (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~MA Code Case
6. Idgntification of Components Repaired or Replaced and Replacement Components Name of Name of iHanufacturer National i Other (Year i Repaired i ASHE (

Component Manufacturer i Serial No. Board Identification JBuilti Replaced or i Code i J

Replacement JStarp (

I I JYesreue i4" BUTTERFLY VALVE I FISHER IN/A IN/A 13-269 UTC 407522 iUNK. (Replacement iMo (STUDS (8) ,(N/A I H/JI )H/A i3-269 UTC 378831 iUNK. iReplacement iHo I

IHUTS (16) ,iN/A (H/A IH/A I3-269 UTC 405142 iUNK. /Replacement /No

7. Description of Work: CHARGING PUMP 38 INLET ISOLATION VALVE 3-269 REPLACEHENT.

'e

8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X Pressure~20 te Test tespereture 89 'F 97-015-3

Sheet 2 of',2 FORN NIS-2 (Back)

9. Remarks: NECKANICAL CONNECTION~NO MELDING RI=QUIRED, CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct andi.thiis replacement conforms to the r)iles of the ASHE Code, Section XI.

Type Code Symbol Stamp ~NA Certificate of Authorization No. N~A Expirsiion Date ~ii A

'ate Ili Signed ',19 Owner or Owners Designee, Tsti.e CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdiing a valid conmission issued by the National Board of Boiler-and Pressure 'Vessel inspectors and the state or province of. Dade County:andiempf.oyed by. Arkwright. Hutual Insurance. Company'f v g Norwood, Na. have inspected the conyonents described in thiis Owners Report during the period '4/07/96 ')

/

I/ I 9q and state that to the best of my knowiixige and belief, the Owner has performed examinations and 'o'jiX taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE 'Code,Section XI.

By signing this certificate, neither the Inspector nor his eciployer makes any warranty, expressed or implied, concerning the examinations and corriective measures described in this Owner~s. Report. Furthermore, neither the Inspector nor hiis employer shall be liablie in any manner for any personali injury or property damage or a loss of any kind arising from or connected with this inspection.

+i~'.n Inspe ors Si ture National Boardl, State, Providence, and Endorsements Date 97-01'I-3

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 30 97 Name 700 Universe Blvd.'uno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:2508/63 WO ¹: 97006766 CR ¹: 97-0466 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Work Performed by Florida. Power 8 Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: i62 Quality Group: 8
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Components Name of Name of (Hanufacturer] National Other. (Year ( Repaired J ASHE (

Component Hanufacturer J Serial Ho. Board Identification ,]guilt( Replaced or J Code f J

Replacement ]Stamp I l I /t~es ee ISUPPORT 8080-R-007-01 IN/A fN/A 'fN/A [DRWG ¹ 5613-H-823 SHT 17 ,(UNK. [Repaired (No

7. Description of Work: GROUND PT IHDICATIONS UNTIL INDICATIONS WERE AN ACCEPTABLE SIZE OR WERE ACCEPTABLE AS-IS PER CONDITION REPORT CR97-0466.

8.,Tests, Conducted: Hydrostatic:I Pneunatic: Nominal Operating Pressure Other PT eressure~ig test resgereture 4F 97-016-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks:- NO MELDING IJAS PERFORMED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correc't and this 'repair conforms to the hule's of th' ASME Code, Section XI.

Type Code Symbol Stamp Certificate f Authorization No. ~NA Eilpiratldn Ohta ~NA s.g.~ cfD ~@A'.'~4~

Owner' Owners Designee,&itic

~~w~~gg~ ngive zl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cermission issued by the,Natio'nal Board of Boiler and and the state or Provi:nce of Dade County and employed by Arkwright Mutual Insurance Cori@an'y of Presaure'easel'nspectors Norwood, Ma. have inspected the components described in this Owners Report during the period 03/18'/97'b 03/30/97 and state that to the best of my knowledge and belief, the O~ner has performed examiinat'Iona and taken corrective measures described in this Owners Report in accoi danae with'hd r+uir'ements of, the 'ASME Code,Section XI.

By signing this certificate neither the Inspector nor his,employer makes any warranty, expressed or implied, concerning the examinatiions and corrective measures d'escribed in this Owner's Report. Fukthermo/e, neither the Inspector nor,his employer shall 'be liable-in any 'manner 'for any personal injury or property 1 damage or a loss of any kind arising from or connected with this inspection.

7 P'.

Comnissions NB 823~0 ~N I Inspector Si iture National Board, State, Providence, and Endorsements 19 97-0'I6-3 0

FORM NIS-2 OWNERS REPORT'FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 30 97 Name 700 Universe Blvd. Juno Beach Fl. 33C08 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PWO ¹:2507/63 WO ¹: 97006765 CR ¹: 97-0465 9760 SW 3C4 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Ho.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name. Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: 62 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and'Replacement Components Name of Name of ,fHanufacturerf National Other fYear f Repaired f ASHE f Component Nanufacturer f Serial No. Board Identification fBui ltf Replaced or f Code f f Replacement fsterp f I I /~rs Ile .

fSUPPORT 8080-H-007-07 fN/A IH/A fH/A fDRWG ¹ 5613-H-823 SHT 11 fUNK. fRepaired fNo

7. Description of Work: GROUND PT INDICATIONS UNTIL THEY WERE AN'ACCEPTABLE SI2E'OR WERE ACCEPTABLE FOR USE AS-IS IAW CONDITION REPORT CR97-0465.

t 8. Tests Conducted: Hydrostatic:

Other PT Pneunatic:

Pressure~sip Nominal Operating Pressure test Temperature oF

'97-017-3

Sheet 2 of 2 FORH NIS-2 (Back)

,9. Remarks: NO IIELDING llAS PERFORMEI).

CERTIFICATE OF COMPLI ANCIE lre certify that the ststmrents made in the report are correct and this 'epai'r conforms to the rules of th'e ASHE Code, Section XI.

Type Code Symbol Stamp Certificate o Authorization No. ~H A Expiration Date ~N A Signed Qc~ /fY~ ~ Date ~/~g~ aP/

O~ner. r Owrer/K Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding s valid conmlssion issued by tHe Hatiohai Board of Boiler and.pres! ure.Vessel inspectors snd the state or province of-Dade County and employed by~Arkwright Hutual Insurance Coriipan'y of Norwood, Ha. have inspected the components described in this owners R'eport during the period '3/18'/97'tb 03/30/97 and state that to .the best of my knowledge and belief, the O~ner has perforaed exsmiinat'iong and taken corrective measures describNI in this Owners Report in a'ccordan'ce With'he requirements of the-ASHE Code,Section XI.

By signing this certificate neither the Inspector nor h'is employer makes any warranty, expressed, or implied, concerning the, examinations and corrective aeasures described in this Owner's Report. Furthermore, neither the Inspector.nor his empiloycr shall be liable in any manner for, any personal injury or pkopei ty ~

damage or a loss of any kind aris'ing frora or corrnected with this !inspection.

Ins pec rs iture

-;I..i....r B~r~oSCu Hatiorral Board, State, S Providence, and Endorserrer)ts Date 9'7-0'I7-3 0

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 03 30 97 Name 700'Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:2506/63 WO ¹: 97006764 CR ¹: 97-0464 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc
3. Work Performed by 'Florida. Power & Li ht Type Code Symbol Stamp M A Name Authorization No. N A Expiration'Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: 62 Quality Group: B 5~ (a) Applicable Construction Code B31.1 1955 Edition, MA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of IHanufacturerI National I, Other I"ear I Repaired I ASHE I Component Manufacturer I Serial No. Board Identification IBuiltI Replaced or I Code I I Replacement IStamp I I I /~res ue ISUPPORT 8080-H-007-10 I H/A IN/A IN/A IDRWG ¹ 5613-H-823 SHT 15 IUMK. IRepaired INo
7. Description of Work: GROUND PT INDICATIONS UNTIL ACCEPTABLE SI2E OR WERE ACCEPTABLE FOR'USE AS-IS PER CONDITION REPORT CR97-0464.

t 8. Tests Conducted: Hydrostatic:

Other PT Pneunatic:

Pressure~sig Nominal Operating Pressure Test temperature 4F 97-018-3

Sheet 2 of 2 FORM NIS-2 (Back) 0

9. Remarks: NO WELDINB WAS PERFORMED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and t'his repair conforms to the Irules df the ASHE Code,Section XI'ype Code Symbol Stamp N 'A j

Certificate o Authorization No. ~NA E'xpfration Date N~A cC~ ~P Z/

Omar r Orner'&Oesignee, 7 Title 19 ~~

0 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler eind Predsurk Vessel inspectors and the state or pirovince of Dade County.and employed ~by Arkuright.Mutual Insurance Company af Norwood, Ha. have inspected the components described in this Owners Repo'rt during the period '3/18/97 fo, 03/30/97 and state that to the best of my knowledge and beii'ef,'he'gner has perforced exadinakiods aQ taken corrective measures descrited in this ogners Report'in accordance with the requirements of ~the~AsHE,cade,Section XI. I By signing this certifi,cate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures descriix< in this Owner's Reporti Furthermore,~

neither the Inspector,nor his empioyer shall be tiabte in~any~ man'ner,~for any personal injury or property damage or a toss .of any ki'nd arising from or connected With this inspection.,

Camni ssions ~B80~30 II 'I Inspec rs natur e N'atia'nai 'oard, State, Providence, arid Endor'semants Date 19%2 97-018-,'3

FORH HIS-2 OWNERS REPORT FOR'REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date OC 08 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PIS ¹:63/2528 IS ¹: 97006902 9760 SW 3C4 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job No.,etc 3 ~ Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Nsae Authorization Mo. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: CHEHICAL 8 VOLUHE CONTROL System ¹: 47 Quality Group: A
5. (a) Applicable. Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case

<b),Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case

6. Identification of Components Repaired or Replaced snd Replacement Components Name of Name of iHanufactureri National i Other iYear,i Repaired i ASHE i Component Hsnufscturcr i Serial Ho. Board Identification igui lti Replaced or i Code i i Replacement iStsap i I I i~res se iSTUDS (4) IN/A iN/A iH/A iUTC 352606 ASHE SA-19,iUHK 'iReplacement iHo I STK CODE ¹28253 R95-0154 iNUTS <4) IH/A IN/A iN/A 'UTC 393252 ASTH A-19C iUNK iReplacement iHo I

STK CODE

¹27963'VALVE BONNET iVELAH iN/A iH/A i3-312A UTC¹ 331592 'iUNK. iReplacement iNo STK CODE ¹52C97

7. Description of 'Work: REPLACED 4 STUDS AND 4 NUTS ON BODY TO BONNET. REMOVED BONNET FROM SPARE VALVE IN STORES AND REPLACED EXISTIHG BONNET ON CHECK VALVE 3-312A.

Pneunst 1 c I Hominal Operating Pressure X pressure~gggg sig rest Temperature 535 oF 97-019-3

Sheet,2 of 2 FORH NIS 2 (Back)

9. Remarks: HECNANICAL CONNECTIOlk NO WELDINO REOUIRED.

CERTIFICATE OF COHPLIANCE Ne certify that the statements made in the rcport are cor'rect and th'is replacement conforms to the rule., of the ASHE Code, Section XI.

Type Code Symbol Stamp Certificate of Author ization Ho,. N~A Expiration Date ~HA Signed '19 O~ner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid catmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employe'd b)'I Arkwright Hutual Insurance C~ny of Norwood, Ha. have inspected the conponents descri'bed inIthik OwInerk Report during the period, 03)19/97 to 03/30/97 and state that to thc best of my knowledgeI and be'Iiei', the Owner has performed examinations 'and taken corrective measures deScribof in thiis Owners Reposit id ac'cordanc'e with the requirements.of the ASHE Code,Section XI ~

By signing this certificate neither the Inspector nor'i.">> emplo)e'er smokes any warranty, expressed or implied, concerning the examinations and corrective measures described in this owner"s Report. Furthermore, neither the Inspector nor his employer shall be -Liable in any manner for any personal..injury or property damage or a loss of any kind arising from or connected with this inspection.

P Conmisslons NB 8230 H I Inspe ors Sii ture National Board, State, Providence, and Endorsements Date <<9 )

97 019'-3

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS

'As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 03 0 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address 2., Plant Turke Point Plant Unit PWO ¹:63/7857 WO ¹: 96014466 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho.

Expiration Date N A P.O. Box 4332 Princeton Fl. 33032'ddress

4. Identification of System: MAIN STEAM System ¹: 72 Quality Group: 8
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of CoJJponents Repaired or Replaced and Replacement Conponents Hame of Name of lManufacturer[ National Other, ]Year ] Repaired ( ASME ]

Component Manufacturer ) Serial Ho. Board Identification (Built/ Replaced or / Code (

I / Replacement /Steep /

I I I J~Ys ue

)STUDS (4) fN/A i N/A iUTC 393207 (UHK [Replacement (No I STK CODE ¹28047 IHUTS (24) IH/A (N/A IUTC 408254 (UHK 'J Replacement ]No STK CODE ¹27869 R87-6134

7. Description of Work: REPLACEMEHT OF 4 STUDS AHD 24 HUTS ON BODY TO BONNET VALVE POV-3-2606.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other Pressure~pig Test Temperature DF 97-020-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: THIS IS HECHANICAL CONMECTIOM MO WELDINB REOUIREDz CIERT IF I CATE OF COHPLIAh1CE I We certify that the statements made in thc report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

I' Type Code Symbol Stamp M A Certificate f Authorization No. Expiration Date A Zl,,

M~A M I Signed n sr~. 4k~~ <<Date pn~i5 119 f2 I Owner r Ctwner'Vbesignee, Title CERTIFICATE OF INSERVICE IHSPECT ION I, the undersigned, holding s valid commis! ion issued by the National Boarcl of Boiler andi Pressure Vessel inspectors snd the state or Province of Dade County and enpboyed by'Arkwright*Hutual Insurance Company of Norwood, Ha. hive inspected the corponcnts descrilbed in this Owners: Report during the period 07/'IB/96, to 03/30/97 and state tlhat to the best of my knowledge: and beltief,, the Owner has performed exhminlatibns corrective measures dcscribecl in this Owners Report in accordance with the requirements of the ASHE Code, land'aken Section XI.

By signing this certificate neither the Inspector nor his employer.makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspe'ctor nor his enploycr shall be liabi,e in any manner for sny personal injury ori property damage or s loss of any kincl arising from or connected with this inspection.

conmissioins NB 8230 N I Inspec ors ~ nature National Board, State, Providence,. and Endorscmcnts Date 119++

97-020-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR'REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 04 02 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 3 PIN ¹:63/7086 QO ¹: 96014408

'9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization-P.O., No.,Job Ho.,etc

3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Name Authorization,No. N A Expiration. Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION System ¹: 62 Quality Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Idgntification of Components Repaired or Replaced'and Replacement 'Components Name of Name of (Hanufacturer( National J Other [Year ) Repaired J ASNE J Component Nanufacturer [ Serial No. Board Identification [guilt] Replaced. or ( Code ']

I f, Replacement JStanp J

I I I ~Ves ue IPSA-3 IPACIFIC [2889 IN/A !3-1019, 3-PRWH-I (UHK (Replaced Yes

'JSMUBBER SCIENT IF IC IPSA-3 IPACIFIC 117425 .I3-1019, 3.PRWHu1 )UHK [Replacement )Yes iSHUBBER SCIENT I F IC

7. Description of Mork: SNUBBER REPL CED DUE TO'LCO ON UNIT 4
8. Tests Conducted: Hydrostatic: Pneuaatic: Hominal Operating Pressure Other VT-3 pressure~u S is test Temperature S S 'F 97-021.3

Sheet 2 of 2 FORK HIS-2 (Back) 0

9. Remarks: HECHAMICAL COHNECTIOM, MO WELDINB REOUIIRED.

CERTIFICATE OF COHPLIAHCE Me certify that the statements mode in the report src correct iandi this rcplalcemcnt conforms to the rules of the ASHE,Code, Section XI ~

Type Code Symbol Stamp N A Certificate of Authorization Signed Owner

z No.

giWgrf'+i'~ r Ownerr+Designee, 'title N~A di~A n.c:> ~l~~ ~

i Expiration Date OnCe "0

CI.=RT IF I CATE OF I'NSERVICE IMSPECTIOM I, the undersigned, holding a valid crxrmission issued by the Mstlio&l Board of Boiler and Pressure Vessel inspectors snd thc state or province of Dade County snd employed by Arkwright Hutusl Insurance ComFrsny'f Hs. have inspected thc crxrponcnts de! cribed .in thia Ownera Report dur'ing'ha pe'riod '9/18/96 toi

'orwood, i

04/01/97 and state tibet to 'the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described 'in this Orrners Report .in sccordlancc with the requirerrrents of this ASHE iCode,Section XI. I By signing this certificate neither the In, pector nor hiS emfrioyer rlrskes sny warranty, expressed orl implied, concerning the examinations and corrective measurea deacri'bed'.in 'thia Owner's Report. Furtherraord, neither the Inspector nor his errpioyer shall be liabl.e in any manner for sny personal, injury or property damage or a loss of any Ikincl arising from or connects with 'thiS irispct;Cion.

I Coerrrissions, HB 8230~M~I Inspe ors:S nature -iNstionell Bayard, State, Providcnc'e, snd Endorsements Date i4'9~$

97-021-3 0

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEH'IS As Required by .the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 04 07 97 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet .1 of 2 Address
2. Plant Turke Point Plant Unit Name PNO ¹:63/7855 lO ¹ 96012072 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. Ho.,Job No.,etc 3 ~ Nork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: REACTOR COOLANT System ¹: 41 Quality Group: 'A
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of /Manufacturer/ National ( Other [Year J Repaired J ASME ]

Component Manufacturer J'Serial Ho. Board Identification )guilt) Replaced or ) Code ]

] Replacement [Stamp [

I I J~res ue IPRESSURIZER RELIEF VALVE I CROSBY IH69877-01 IN/A IRV-3-551C /UHK. /Replaced /Ho I

-0009 IPRESSURIZER RELIEF VALVE ICROSBY (

N51249e 1361 I H/A I RV 551C JUNK. )Replacement ]Ho

7. Description, of Mark: REMOVE PRESSURIZER SAFETY VALVE RV-3-551C AHD INSTALL SPARE.

Pneunatic: Hominal Operating, Pressure X Pressure~22SD sig Test Tesuereture 535 'F 97.022-3

Sheet 2 of 2 FORM NIS-2 (Back) 0

9. Remarks: MECHANICAL CONNECTION HO MELDING REOOIREO.

CERTIFICATE OF COMPLIANCE lie certify that the statements made in the report are correct and-,this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Stamp H A Certificate of Authorization Ho. ~M A Expi,ration Date H A Signed Date 19 Own r or wner's Designee, Tiitie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, ho'lding a valid comnlsslon issued by the Hationai, Board of Boiler and Pressure Vessel inspectors and.the state or Province of Dade County and enpioyed by Arkwright Mutual Insurance Company of Norwood, Na. have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief, the Owner has performed examinations.and taken corrective measures descril)ed in this Owners Report in accordance with the requirements of the ASl{E Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his em!cloyer: hall be liable ini any manners for any personal injury or prop'ert)~

damage or a loss of any kind arising from or connected with this'ins'pection.

/y7 Commissiona NB 8230 N I Inspect s Sigr ture National Board, State, Providence, ahd Ehdoi'seaknts Date go 97-022.3

FORM NIS-2" OWNERS REPORT FOR" REPAIRS OR TREPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. O~ner Florida Power & Li ht Dote 04 08 97 Name 700'Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turks Point Plant Unit Name. PNO.¹:63/7854 MO ¹ 96012071 9760 SM 344 Street Florida Cit Fl..33035 Address .Repair Organization P.O. No.,Job No.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization No. N A Expiration,Date N A P."O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: REACTOR COOLANT System ¹: 41 Quality Group: A
5. (s) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name Name of )Manufacturer) National ) Other ]Year ) Repaired / ASME [

of'omponent Manufacturer J Serial Ho. Board Identification ]guilt] Replaced or / Code /

/ Replacement (Stamp /

'I I /~res ue IPRESSURIZER RELIEF VALVE I CROSBY i N69877 i N/A (

RV-3-5518 /UHK. (Replaced (Ho I

0008 IPRESSURIZER RELIEF VALVE ICROSBY i 51249-1360 ( H/A f RV-3-5518 fUNK. (Replacement ]Ho

7. Description of Mork: REMOVE PRESSURIZER SAFETY VALVE RV-3-5518 AND INSTALL SPARE.

t 8'. Tests Conducted: Hydrostatic:

Other VT-2 Pneunatic:

Pressure~2280 sig Hominal'perating Pressure Test Temgereture 535 X

DF 97.023-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONHECTIiO~NHO IAELDING REQUIRED.

CERT I IF I CATE OF COMPLIANCE Ne certify. that the statements made in the report are correct and this replacement conforms to the rul,es of the ASME Code, Section Xl.

Type Code Symbol Steep H A Certificate of Authorization Iko.. ~N'A Expiiration,Date N A J., ~'

Signed Date Yi 19 Own or wner's Designee, fitle~

CERT I IF I CATE OF'HSERVICI.=INSPECTION I , thc undersigned, holding a valid conrnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of. Dade County.and anpboycd by Arkwright. Mutual Insurance Company iof Norwood, Ma. have inspected the components described in this Owners Report during the period 07/14/96 to 04/07/97 and state that to the best of my knowledge and belief,, thc Owner has performed'examinations and taken corrective measures dcscrIibed in this Owners Rcport ini accordance with the requircnmnts of the ASME Code,Section XI. Il By signing this certificaitc neither thc Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in <<his Owner's Report. Furtlhcrnere, neither the Inspector noir his employer shall be liable in any manner fair any personal in)ury or property damage or a loss of enny Ikindl arising from or connected with ithis inspeotion.

g ~r/7 Inspcc ors SITfnature iHationaii Board'state, Providence, and Endorsemcnts Date 1I9 97-023-3

FDRH Nls-2 ouMERs REP0RT F0R REPAIRs 0R REPLAcEHENTs As Required by the Provisions of the ASHE-Code Section XI

1. Oner Florida Power 8 Lf t Date 04 09 97 700 Universe Blvd. Jwm Beech Fl. 33408 Sheet 1 of 2 Address
2. Plant Turks Point'Plant Unit QO ¹: 96023455 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Orgsnfzation P.O. No.,Job No.,etc
3. Mork Performed by VSL Cor ration Type Code Symbol Steep N A Name 'Authorization Ko. N A Expiration Date. N A 1671 Dell Ave. C ll CA 95008 Address
4. Ident ification of System: Contsfrrnent Buildi System ¹: 51 Ouslfty Croup: B
5. (a) Applicable Construction Code ACI 318-63 ACI 301-66 19-- Edition,~MA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repsfrs or Replacements 1992 Edfticn, 92 Addenda,~MA Code Case
6. Identification of Cosponents Repaired'or Replaced snd Repiscesent Ccmponents Kame N~ of (Hsnufscturer('ationsl ( Other ' (Year,( Repaired ( ASHE (

of'oqxnent Hsnufscturer ('erial No. Board dent i f i cst I on (Built( Replaced or ( Code (

I ( Replacement (Stanp (

I I I iYe~leuo (Donut Shine (Kova Hschining (N/A (N/A (ASTH A576-86 Cr. 1045. ,( 1996 (Replacement (No (2 14N Products Cor . LOT¹ 35284004

7. Descriptfon oflbrkt Added tMo 1 4> thick donut shims st Unit 3 tendon 61V27 to obtsfn orf inal \ift-off force after detensioni . Tendcn Surveillance rformed under P.O. 000f6055.

Pneumat fc: Nominal Operating Pressure

~

F 97-024-3

FORM NIS-2 (Back)

9. Remarks: Mo weldi r ired.

CERTIFICATE OF CCHPI.IANCE Ne certify that the statements medic in the ri~rt are correct and 'this re'placement conforms to, the rulles of the ASHE Code, Section XI.

Type Code Symbol Staap

~VA 0

Certificate of Authorization No. Expiration aate Signed &I ~Date Owner or Owner's Dksignee, Title CEIRTIF I CATE OF INSERVICE INSPECTION I, the undersigned, hoidirMI a valid coaeission issued by. the National" Board of Boiler and'Pressure Vessel inspectors and the state or Province of Dade Cixnty and eapihyed by'Arkkright Hutual Insurance. Company of Norwood, Ha. have inspected the c~enents described in this'Own'ers'Report during the period 09/01/96 'to and state that to the hest 'of my knowiaige and'bel'ief,'his Owner'has performed'examinations and '4/08/97 taken corrective measures described in 'this (hairs Report in accordance with the requirements of the ASHE Code,',

Section XI.

By signing this certificate neither the Inspector nor his'esp'loyer makes any warranty, expressed or Ieylied, concerning thi exminations ard corrective measures 'deslcr ibed in this'Owner's Report. Furthermbre,'e3ther the Inspector nor. his espioyer shall, be l3able in any mesmer for any personal injury or propert/

damage:or a loss of any kind arising: from or c<xnected with this inspection.

~t/ ,Commissions 'B 8230'~M~I s Sig I, e National'oard, State, Providence, and Endo)'s~tk I'nspect Date 19K.Z

-0 97.024-3

FORH NIS-2 QQERS REPORT FOR REPAIRS OR REPLACEMENTS As Requfred by the Provfsions of the ASHE Code Section XI,

1. Qner Florida P~r B Lf ht Date 700 Universe Blvd. Jtmo Beach F l. 33408 'Sheet 1 of 2 Address
2. Plant Turks Point Plant Unit QO M'6023455 9760 Su'344 Street Florida Cit Fl. 33035 Address Repair Orgsnfzatfon P.O. No.,Job No.,etc
3. Mork Perforaed by VSL Cor ration Type Code Symbol Stsap N A Nsae Authorization No N A Expiration Date N A 1671 Dell Ave. C ll CA. 95008
4. Identification, of Systea: Contsfrment Buildi Systea 0: 51 Quality Croup: 8
5. (s) Applicable Construction Code ACI 318-63 ACI 301-66 19-- Edf tfon,~NA Addenda(~NA Code Case (b) APPlicable Edftfon of Section XI Utilized for RePafrs or RePIaceaents 1992 Edftion, 92 Addenda,~NA Code Case
6. Identificstfon of Ccwponents Repaired or Replaced snd Repisceaent Coeponents

'sae of M~ of (Hsnuficturer( National ( Other (Year 'epaired,( ASHE (

Coaponent Hsrmf acturer ( Serfsl No. Board Ident f ffcation. (Built Replaced or ( Code (

I ( Replsceaent (Starp (

I I I ivesleuo (Donut. Shia (Nova Hschining (N/A (N/A '(ASTH A576-86 Gr., 1045 (1996 (Repiscenent (No (1 12s Products Co LOT B 35284002 (Donut Shia (Nova Hsctdning 'I N/A (N/A (ASTH A576-86 .Gr. 1045 (1996 (Replsceaent (Mo 1 14m Products Cor LOT M 35284004

7. Description of iJorkt Added 1 2e-snd 1 4< shia.st Unit 3 tendon 42H40 to obtain orf fnsl lift-off force after detensionf . Tendon Survefl lance rformed under P.O. 0001605.

Pneuoet 1 c t .Moainsl Operating Pressure

~

F 97-025.3

Sheet 2 of 2 FORH NIS 2 (Back)

9. Remarks: Ko ueidi r ired.

CERT IF ICATE OF COHPLIANCE Me certify that the statements eefe in, the report are correct and this rigiacesxmt conforms to the rules of 'the ASHE Code, Section XI.

Type Code Symbol Staap Cer'tificate of Authorization No. K~A Exp'iration Date '

~K A Signed thinner I

or Omer<s Desi~e, Title S <~WV '+ 'a~a 4~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid ccmnission issued by the Katicnai Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eaplbyed by'rkuright 'Hutual Insurance Coapany of Korwxd, Ha. have inspected the ceqmxnts described. in this Owners Regort during the period '09/01/9'6 'o and state that to the best of my knowledge and belief, the Oav.'r has perfonaed. examinations and '4/08/97 taken corrective measures described in this Wners Report in'ccord'anca Mith t'e requirements of the ASHE Bode,Section XI.

By signing this certificate neither the Inspector nor his erployer wakes any warranty, expressed'or concerning the examinations and corrective measures described in this Orner's Report. Furthermore,l 'mplied, neither the Inspector nor his employer shall be Liable in aQ mlrnelr fear ahy personal'njury'r propert'y damage or a loss of any kind arising from or cheated with this irkpec'tion.

Conmiss iona,','HB State, Providence, and Endorseeents 8230~K~I'atl'onalt Inspector S I gnatdre Bo'ard,,

Date 0

97.'025 3

FORH NIS-2 OWNERS REPORT'OR REPAIRS OR REPLACEHENTS As Required by the Provisfons of the ASHE Code Section XI

1. Ouner Florida Po>>er B Lf ht Date 04 09 97 700 Universe Blvd. Jwm Beach Fl. 33408 Sheet 1 of Address 2'.

Plant Turke Pofnt Plant Uni t Haec WO ¹ 96023455 9760 SW 344 Street Florida Cft Fl. 33035 Address Repair Organization P.O.'No.,lob Ko.,etc

3. Work Pcrfors>>d by VSL Cor ration Type Code Symbol Stamp N A Howe Authorization Ko. N A Expfratfon Date N A 1671 Dell Ave. C ll CA. 95008 Address
4. Idcntiffca't'fon of Systcll'ontofrn>>nt Bufldi System ¹: 51 Guai fty Group: B
5. (a) Applicable Construction Code Acl 318-63 ACI 301-66 19-- Edition,~NA. Addenda,~NA Code Case

'(b) Applicable Edition of Section XI Utilized for Repairs or.Replaces>>nts 1992 Edition, 92 Addenda,~NA Code Case,

6. Identiffcation of Coeponents Repaired.or Replaced and Replaces>>nt Coeponents Noee of Kam of (Harufacturer Kational ( Other (Year Repaired ( ASHE

( (

Coeponent Hanuf actur er ( Serial No. Board ldentif fcatfon (guilt( Replaced or ( Code (

( Rcpfoceaent (Stoep (

I I iY~es Xo (Donut shim (Kova Nachining (N/A I N/A (ASTH A576-86 Gr. 1045 (1996 (Replaceeent (No (1 14>> Products Cor . LOT ¹ 35284004

7. Description of Work: Added 1 4" donut shia at Unit 3 tendon 3016 to obtain orf fnal lift-off force after detensioni . Tendon surveillance rfors>>d under P.O. 00016055.

Pnaaetfct Nosfnal Operating Pressure

'F 97-026-3

Sheet 2 of 2 4l FORH NIS-2 (Back)

9. Remarks: No weldi r Ired.

CERTIFICATE OF COHPLIANCE Ile certify that the statemiwts axle in the report are correct 'and'hi's replacemeint conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Starp Certificate of Authorization No. Exp'irat,ion Date

't N~A Signed /A ~~~~i~~~+~D~ ate "-~ lO Owner or Owner's Designee, Title il CERT I FI CATE OF IKSERVICE IIISPECT ION g

I, the undersigned, holding a valid comslsslon issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and eapL'oyed by'rkwright Hutual Insurance Carpany of Norwood, Ha. have 3nspected the components descril~ in this'wners'eltort'ue"ing'he per'3od '09/01/96 'o and state that to the 'best of my kntwledge and bel,ief', the Owner has performed examinations and '4/08/97 taken corrective measures described in thiis Seers Report in accordance with the requirements of the ASHE Code',

Section XI.

By signing this certificate neltiher the Inspector nor h3s employer makes any. warranty, expressed'r concerning the examinations arxi corrective measures'escribed 'in (his Owner's Report., Furthermore,,'mplied, neither the Inspector nor his esployer shall bie Liable in any manneir fair any personal .3njiury or prolpe'rty damage or a Loss of any kind arising from or c~.'cted with this Inspectiexo.

+7 Inspectors Signatt

~seissions -

NB 8230~K'~I e National Baarde State Provlclence, and Endorsecflents Dote 97-026-3

FORM NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASHE Code Section XI

1. (haM,r Florida Poaer 8 Li ht Date 04 09 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t PMO ¹:63/2949 MO ¹: 97008380 9760 SU 344 'Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization Mo. M A Expiration'Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: C nent Coolin Mater System ¹: 30 Quality Group:
5. (a) Applicable Construction Code B31.1 1955 Edition, MA Addenda,~MA Code Case (b> Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edftion,~MA Addenda,~MA Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Canponents Name of Name of iHanufactureri National Other iYear,[, Repaired i ASHE )

Component Manufacturer i Serial No. Board Identification iguiit( Replaced or i Code f

,i Replacement,iStaap i I I J~res se IRELIEF VALVE IORESSER ITH 18076 IN/A 11 1/2" RELIEF VLV iUMK 'iReplaced )Mo INDUSTRIES IRELIEF VALVE IDRESSER 1TH 18073 IM/A Il 1/2" RELIEF VLV iUNK iReplacement iNo INDUSTRIES STK CODE 53514

7. DescriPtion of Mork: REPLACED RV-3-1424 FOR CCM TO "Ca ECC.

t 8. Tests Conducted: Hydrostatic:

Other VT-2 Pneuaatic:

gressure~rg ig Nominal Operating Pressure test Tesuersture 88 X

~

F 97.027-3

Sheet 2 of 2 FORH,"HIS-2 (Back) 0

9. Remarks: THIS Is A NECNANICAL CONNECTION NO uELDINC REDUIRED CERTIFICATE OF COHPLIANCE I

Ne certify that the statements madh in the report are correct and this replacement confonas to the kulak of'hai ASNE Code,Section XI.

Type Code Sytrbol Staay Certificate of Authorization No.- ~HA Expiration Date Signed CV I . "QJ'~/ c~ nay ~4~~@~ Date 19 7 - ~

Own r or er's Designee, tie CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid camnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eeployed by Arkwright NutuaL In urance Compariy of Norwood, Ha. have inspected the coaponents described in thi's 0&or's Rapport during th'e period '4706/97 and state that'to'he best of my knowledge and belief, the Owner has perf<}rmed examinations and 'o'4/09/97 taken corrective measures described in this Cheers Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Irepector nor hid ~Lo)er makes any >carrantli, expressed concerning the examinations and corrective measure's ddscribed in this Owner's Report. Further'morc, or'mplied, neither the Inspector nor his enployer shall be Liable iin any manner for any per. onal injury or property damage or a Loss of any kind arising from or connected with'his ihspection.

~ f Cocmissions NB 823~ON~I~

Inspec rs S~iture National Board, State, Providence, and Endorsments Date 97-027-3

FORH NIS 2 OMHERS REPORT FOR REPAIRS OR REPLACEKENTS As Required by the Provisions of the ASKE Code Section XI

1. Owner'lorida Power 8 Li ht Date 04 14 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t

, Kame PMO ¹:63/5765 MO ¹:. 96005866 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job Mo.,etc

3. Mock Performed by Florida Power Z Li ht Type Code Synhol Stamp N A Name Authorization Ko. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification. of System: FEED'MATER System ¹: 74 aualfty Croup:

5~ (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacenents 1989 Edftfon,~HA Addenda,~MA Code Case

6. Identification of Conyonents Repaired, or Replaced snd Replacement Components Name of )Manufacturers Kationsl Other ,(Year ) Repaired ) ASHE (

Hsnufacturer i Serial No. Board Identification ,igufiti Replaced or .i Code i I i Replacement istanp )

I. I J~Yes Ho ISTUDS (14) (H/A iH/A i FCV-3-498, UTC 407914 (UMK i Replacement iKo I ASTH A-193 (NUTS (14) 'IN/A iM/A, /H/A iFCV-3-498, Ul'C 408129 JH/A [Replacement /Mo I ASKE SA-194 iBOLT (1) I H/A I N/A I FCV-3-498, UTC 397774 iH/A iRepiacement iMo HEAVY KEX ASTH A193

7. Description of Mork: REPLACED FOURTEEN 14 STUDS AHD HUTS AHD OME 1 BOLT OM FCV-3-498 S C wC" KAIN FM FLOM CONTROL 'VALVE.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT-1 NA 4F 97-028-3

Sheet 2 of 2 FORN NIS-2 (Back)

9. Remarks: THls ts A NEcHANtcAI. cohrHEGTIow No llELGING REQUIRED.

I CERTIF ICATE OF COMPLIANCE Me certify that the statenents made in the report are correct arxf this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Steep ~HA Certificate of Authorization No. ~NA Expiration Date NrrA Signed r or

+i/FS 'gA~~~~m~~

Owrrer's Oesfgir~re, Tft4P OSta

+ 19 +g CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a 'valid cicrrrnfssion issued by the Nstisnal'oard of Boiler snd Pres'surd and the state or. Province of l)ade County and errrployed by Arkwrfght Mutual'nsurance Corpany of Ve!sseL'nspectors Horwood, Na. have inspected 'the components described in this Owners Report during the period 03/13/96 to 04/10/97 and state that to the best of my knowledge and belief, the Owner has performed examinations snd taken corrective measures described .in this Owners Report 'in accordance with the requirements of the 'ASNF Code,Section XI.

By signing this certificate neither the Inspector,nor his rleployer makes any warranty, expressed ar implied, concerning the examfrratfons and corrective measures tiescribcd in this Owner's Reports, Furthermore, neither the Inspector rror his errployer shall be Liable in sny'manner'for'any personal Injury or property damage or s Loss of sny kind arising from or connected wfth this fnspection.

~~~c~ / 'omrrfssfons HB 8230 ~H~I Inspector Sigrqgcfre National Board, State, Providence, and Endoraements'ate 1.~Z 97-028-3

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI e 1. Owner Florida Power 8 Li ht Date 04 16 97 700'Universe Bl'vd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t PWO ¹:63/0472 WO ¹: 96026892 PCH ¹: 96-070 9760 SW 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stamp M A Name Authorization No. N A Expiration Date M A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Primar Water Hakeu S tern System ¹: 20 Quality Group: '8
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addendas~NA Code Case (b) Applicable Edition of Section XI Utilized'or Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Coeponents Meme of Name of )Manufacturer),National .J' 'Other ]Year J Repaired ] ASHE f Coeponent Hanufacturer Serial No. Board Identification '/Built/ Replaced or / Code /

/ Replacement )Stamp f CV-3-519A I N/A'M/A IM/A 'I5610-P-900S I

(UNK I

,]Repaired

/~tes ue

/Mo

7. Description of Work:,CUT RE WELD THE DOWMSTREAH PORTIOM OF CV-3 519A VERTICAL RUN.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT-2 pressure~220 im test Temperature 80 F 97-029.3

Sheer: 2 of 2 FORH NIS-2 (Back)

Cl

9. Remarks:

CERTIIF I CATE OF COHPLIANCE Me certify that the statements made in the report are correct rind this repair conforms to the rul,es of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate of Authori'!atjon No. - ~N'A Fxpi'ration Oatc Signed

>I

'i . gfc~, 4Q/NYi+~~rgc/ gate Qg~r/

44'~A Owner or Owner'sg4signcc, Title CENTI F, I CATE OF INSERVI CE INSPEC'T IOII I, the undersigned, holding a valid comriissiion issued Iby the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dadle County and crriployed by Arkwright Hutual Insurance C~ny bf Norwood, Ha. have inspected the compionents described in this 'owners 'Report during the period IO/09/96 to 04/16/97 and state that to the hest of my knowledge and belief, the Owner has performed examinaitiofrs and taken corrective measures described in this Owners Report'n 'accbrda'nce'with the requiirements of the ASHE Code;,

Section XI.

By signing this certificate neither ithe Inspector nor his emplloyer makes any warranty, expressed or implied, concerning thee examinations and corrective measures 'described in this'wner's Report. Furtherrrore, neither the Inspector nor his, cm!cloyer . hall be-liable ini any mahner for any. personal injury or jprogrtj/

damage or a loss of any kind arisingi from or connected with t'hfs'ns'pcchion'.

Inspec

/>

rs Sjgg ture ComrriSSionS NB 8230 N I National Board, State, Providence, arnd Endorsements Date 97-029.3

FORK NIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI 1 ~ Owner Florida Power 8, Li ht Date 06 04 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t Name PMO ¹:63/8810 MO ¹: 96022773 9760 SM 344 Street Florida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc 3 ~ Mark Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Oate N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COKPOMEHT COOLING MATER System ¹: 30 Qual I ty Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addendag~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer) National Other ]Year Repaired / ASKE J /

Component Manufacturer f Serial No. Board Identification )guilt[ Replaced or f Code /

I / Replacement (Stamp J I I I ]~res se (CCM HX VALVE IN/A [H/A [H/A f3-50-377 1-1/2" GATE /UMK ]Replacement /Mo I UTC 407835 R62776 ISTUOS (160) IN/A IH/A (UTC 409288 (UMK [Replacement [No ISTUOS 40 UTC 409357 iBOLTS (40) iN/A (N/A IUTC 409330 (UHK (Replacement (Ho I

IHUTS (320) JUTC 409358, ASTK A-194 )UHK (Replacement (Ho I HEAVY HEX INUTS (120) [H/A (UTC 409356, ASTM SA-194 JUNK )Replacement (No I EAVY HEX

7. Oescription of Mork: REPLACE BOLTIHG OM 3E207A COMPONENT COOLING MATER HEAT EXCMAHGER AHO THE REPLACEKEHT OF VALVE 3-50-331.
8. Tests Conducted: Hydrostatic: Pneunatict Nominal Operating Pressure X Other VT-2 eressure~stu tg Test Testrereture MOK 4F 97-030-3

Sheet 2 of 2 FOHN NIS-2 (Back)

9. Remarks: THIS IS A HECHANICAL CONNECTION NO MELDING MAS REOUIRED.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct'nd this replacement conforms to the rules'f 'the'SHE Code, Section XI.

Type Code Sychol Stamp H A Certif icate of Authorization NoN~A Signed >~4/~

/7 0 or er'4 Designee, Tit~le CERTIFICATE, OF INSLRVICE INSPECTION I, the undersigned, holcling a valid comnission issued by the Hational Board of Boiler and Pressure 'Vessel',

inspectors and the state or Province of Dade County and employed by Arkwright Nutual In urance Company Na. have inspected the ccaponents described in this Oanerls Raport during the period 04/IS/97 to of,'orwood, 06/04/97 and state that to the best of my knowledge and belie'f, the Owner has performed examinations, 'and taken corrective measures described in this Owners Report i'n accordance with the requirements of the ASHE'ode,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in'his Owner,'s Report. Furthermore, I neither the Inspector nor his employer shall be liable in any manner for any'personal injury or property I or a loss of'ny kirxi arising from or connected with this ilnsgcti'on.', 'amage

'I z7 Inspect s SLEDa re Conmi ssions Ng 8230 N National Board, State, Providence, and Endorsements Date 19 II 97-030-3

FORK HIS-2 OWHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASKE Code Section XI

1. OMner Florida Power & Li ht Date 06 04 97 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant ;Uni t PWO" ¹:63/1859 WO ¹: 97002428 CR ¹: 97-0070 9760 SW 344 Street Fior ida Cit Fl. 33035 Address Repair Organization P.O. No.,Job No.,etc
3. Work Performed by Florida-Po<<er & Li ht Type Code Symbol Staap N A Name Authorization No.

Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address 4 Identification of System'OMPONENT COOLING WATER System ¹: 30 Duality Group: C t

5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addendas~HA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~MA Addenda,~NA Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Components.

Name of Haec of [Manufacturers.'National i Other )Year ( Repaired ) ASHE J Component Manufacturer i Serial No. Board Identification iguiit/ Replaced or ( Code /

/ Replacement istaap J I I )~tes ue 3E207A i WESTINGHOUSE (N/A (047 (Component Cooling Water i1968 (Repaired i Yes Heat Exchan er <<A<<

7., Description. of Work: CUT 6<<X 9" ACCESS'HOLE 'FOR FORIEGM HATERIAL RETRACTIOH. CODE'CASE M-416 1'AS BEEN ENVOKED FOR THIS REPAIR ACTIVITY.

Pneunatic: Hominal Operating Pressure Other VT-2 Pressure~Yes sis Test Tsssersture 91 oF 97-031-3

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarkst Code Case NC16-1 was envod'ed for this~reEair activl~t., Al,l weldIndI was rfornod tn accordanca otth tt roc t td c trot~anno CERTliFICATE OF COMPLIANCE Ne certify that'the statements made in the report are correct and 'this repair conferms to the'ul'es of the ASME Code, Section Xl.

Type Code Symbol Steap N A Certificate f Authori cation (o. ~N'A Fxpiration Date Signed ra Ac . cd pd oh .

to Date~~~ /'~

Owner or Owner's Desi'IInee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cemsission issued by the',National Board of BoiLer and Preksur'e Vksse'I inspectors and the state or Province of Datie County and dnplbyed by~Arkuright Mutual Insurance Company bf Norwood, Ha. have inspected the ceq~ents described in this'Own'ers 'Repbrt 'during the period 01/29/9/ to 06/04/97 and state that to the best of my knowledge and belief, the Owner.has performed examinations and taken corrective measures, described in this O~ners Report in'acc'ordance with the requiirements of the ASME Code, Section Xl..

By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed or implied, concerning the examinations and corrective measures'described in this'wner's Report. Furtherax>re, neither the Inspector nor his employer shai,l. be Liable In'i any ma'nner'oir ady personal injury or property, damage or a loss of any kind arising from or connected with thisi inspection.

d'oemissions lnspec rs~SI tore i NB 8230~N ~I Nati'onal'oard, State, 'Providence, and Endorsements Date 97-031-3

TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Form NIS-BB Owners'ata Report of Eddy Current Examinations

L 0

~ ~

~ ~ i

~ s

~ ~ ~ ~ ~

~ ~ e ~ ~

I '.

~ a geog@/Q~Q ~ ~

g@Qgg RE W

~

=W R5 ggggg s s s ~

J

~ ~ ~ ~ ~ ~ ~ ~ r ~ ~

4 ~ t C ~

I~ ~~ ~ ~

~ t

II e CUMULATIVE DISTRXBUTION

SUMMARY

TURKEY POINT UNIT g .3 03/97 COMPONENT  : S/G A Page:

05/12/97 1'ate Examination .Dates  : 03/13/97 thru 03/19/97 Total Number of Tubes Xnspected 3197 Total Indicati'ons Between 20% and 39% 6 (1)'

Greater than or equal to 40%

Total Corrosion. type Indications "VOL" 2 Total Tubes Plugged as Preventive Maint 1 Total Tubes Plugged 3 Location Of Xndications, 20% to, 100% & "VOL" Hot. Leg Cold Leg TSH .5 to 01H -2.1 TSC .'5 to 01C -2.1 '. 0 01H -'2.0 to 06H'2.0 01C'2.0 to 06C +F 0 0 06H i2.1 to AVl -3.1 0 06C +2.1 to AV4 -3,.1 0 AV1 -3.0 to AV4 -3.0  : 6 (1)

INDICATIONS/TRENDING REPORT PTN 3 OUI'AGE  : 03/97 CONPONENT  : S/G A Page : 1 DESCRIPTION :t ALL 40% to 100%, VOI.' PTP INDICATIONS Date : 5/12/97 Time : 10:00:00

+ ~ ~

I Extent 03/97 I I N/A I (Row(Col(Leg(***(Tst/Note( Reel I Probe Location Ivoltsloeg(CI I % (Diff( Location (voltslocg(CI x

'---I---I---I---I--- I . --I I

-.-- .-.- I---- "-I-- I I I I

- I--.-.--------I--".I- I".

I I--'19(

I 13( I H ICNRIBAHTSHPLIAH002 (HRPC680.3C ITSH 3.8 I 1.4( 1 IP'IP I I I I I I

( 31( 18(. H I (06H SCIAH039 IMPRC720-3C '(06H 1. 1 ( 1.0( ,64 I 1(VOL ( ( I I I I I I 44I 36( c I I (AH037 IHPRc720.3c I I I I IPTPI I I I I I I

( ( C (CHR(TSH GY(AH037 'INPRC720.3C (TSH .7 ( 1.2( 14( 1(VOI I ( I I I '( I

'- -'I---I---I---I--------I- I

- I.

I

.--I -I---l--.l.--.l--------.----l-----l-.-l---l--+

Number of RECORDS Selected .from Current Outage  : 4 Naker of, TUBES Selected .from Current Outage : 3

II 0

Ik

INDICATIONS/TRENDING REPORT PTN-3 OUTAGE  : 03/97 CNIPONENT : S/G A Page  : 1 DESCRIPTION : ALL 20K TO 39K IHDICATIONS Date : 5/12/97 I Extent (Row(Col(Leg(*~*(Tst/Note( Reel

'---I-- I---I---I-( Probe ( I.ocation 03/97 (Volts(Deg(Ch ( X

- -I-----I---I---I-"

I I

'/A fDiff( Location Time : 10:00:00 fVolts(Deg(ch (

+

I X (

I I I I--- I-- --- --- - I---- l.--l---l---+

33( 41( C ITEH PS(AC006 (A-720-M/ULC IAY1 .0 .9(. IP 2( 24(

I I I I C I

(

ITEH P (AC006 IA-720-M/ULC IAV3 .0 f'9(

I (P 2( 25(

I I

I I

I I

I I

I I

I 38( 45( C I ITEH PSIAC007 IA-720-M/ULC (AvZ .0 (. 1.5( IP 2( 30( I I I I I

( 37( 47( C I (TEH PS(AC012 IA-720.M/ULC (AV3 .0 ( .8( fP 2( 22( ( I I I I I

'( 30( 52( H ( (TEC PC(AH034 IA-720 M/ULC IAv3 .0 ( ~ 4( (P 2('0( I I I I I

( 28( 59( H ITEC PS(AH021 (A-720 M/ULC IAY2 .0 .6( IP 2(,26(

(

'---I---I---I---I--------I- I I I

I. I I I I

- I".--".--.-.I"" I--- I--- I---+

I I I I I Number of RECORDS Selected .from Current Outage '6 Number of TUBES Selected .from Current Outage : 5

0 0

CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT g 3 03/97 COMPONENT : S/G B Page : 1 Date : 05/12/97 Examination Dates  : 03/13/97 thru 03/19/97 Total Number of Tubes Inspected .....: 3196 Total Indications Between 20% and'9% (1)

Greater than or equal to 40% 1 Total Corrosion type Indications "VOL" 9 (2)

Total Tubes Plugged as Preventive Maint 2 Total Tubes Plugged 9 (2)

Location Of Indications 20~ to 100~ 6 "VOL" Hot Leg Cold Leg TSH .5 to 01H -2.1 TSC .5 to 01C -2.1 01H -2.0 to 06H +2.0 01C -2.0 to 06C +2.0 06H +2.1 to AV1 -3. 1 0 06C +2.1 to AV4 -3.1 AV1 -3.0 to AV4 -3 0

0 INDICATIONS/'TRENDING REPOR I PTN 3 OUTAGE : '03/97 COMPONENT  : S/G 8 Page  : 1 DESCRIPTION : ALL 40% to 100%, VOL & PTP INDICATIONS 'Date  : 5/12/97 Time : 10:00:00

+ ~ ~ +

I Extent ( 03/97 N/A I (Rou(col(Lcg(***(Tst/Note( Reel I probe ,( Location (volts(oeg(Ch (

% '(Diff( Location (volts(oeg(Ch I / I I- -I---l---l------.-l--------l------------l-------------l-----l---l---l- -I----I-- ---."----I--- -I-- I---I---+

I I I H'cMRITsH'LIBH002 IHRPc680 c ITsH ~ 4 I 1 (10 I 1(voL( I I I I I

( 42( 38( H ICHR(01HTSKPLIBH004 IMRPC680-3C '(TSH 1.5 ,( 1.2( 87( 1(VOL( I I I I I I 39( 39( c IcMR(osK PLIBH043 IMRPc680 3c (05H .8 I 2.3(125( l(voLI I I I I- I

( 44( 40(. C,(CMR(TSH PI. (BH043 (MRPC680-3C (TSH .3 ( 1.3( 46( 1(VOL,( I I I I I

( c (PITITsH PL'(BH043 IHRPc680-3c (TsH 1.8 ( .4( 6o( P1( 82( ( I I I I I

( 23( 41( C (CMR(03C PCfBC031 (MRPC680-3C (03C .'5 ( .4( 93( 1(VOL( I I I I

( 44( 41( c (cMRITsH',PLIBK043 (HRPc680-3c ITsK .2 ( 1'.5(122( 1(vol.( I I I I I I I I'C IcHRITsK PL(BH043 IHRPC680 3C ITsH .4 I \ 1( 90( llvoLI I I I I I I c (cMRITsK ILIBK043 (MRPc680 3c ITsK .5 I .9( 83( .1(voLI I I I I I I 45( 41(' ILPHITEH PL(BC009 (A-720-M/ULC (TsK .6 I I I II TPI I I I I I I

( 45( 42( c ILPM(TEK PL(gc009 (A-720.M/ULc ITsK 1.3 I .( (PT I I'

'- I. " I.-.I---I-I 41( 44 I C ICMR ITEH GY IBH043 (HRPC680-3C ITSH .6,(- .3 I 52(

I 1(YOL I

--" I. -I-.-I.-.I-I I I I I I

I I

I I I -I. I -I- .-- .--- I.-- -I-- I.--I---

Number of RECORDS Selected from Current Outage : 12

,Number of TUBES Selected from Current Outage : 9

0' IHDlCATlOHS/TREHDlNG REPORT PTH-3 OUTAGE : 03/97 COHPONENT : S/0 8 Page  : 1 DESCRIPTlON :t ALL 20% TO 39% IHDlCATIONS Date : 5/12/97 Time : 10:00:00

+ +

I I Extent 03/97 .I I N/A 'I IR "I [Leg[***[Tst/Hotel Reel I Probe I Location IVolts[Deglch I % [Diff[ l.ocation ,IVolts[Deg[Ch I % I

+---I---I---I- I

--- I - -.-I "----------I----- -.-----I --I I I I I I I I I I 32[ 34[ C f,[TEH PSIBC019 [A-720-N/ULC IAV1 .0 I .7[ IP 2[ 23[ I I I I I I I' C I ITEH .Ps[BC019 [A 720 H/ULC IAV3 -.1 I 1.3[ [P 2[ 31f f I I I I I I c I ITEH Ps[Bc019 IA-720-H/ULC IAv4 -.2 I .7[. [r 2[ 22[ I I I I I I 34f 46[ C I ITEH PCIBC009 '[A-720-N/ULC fAV2 .0 I 1.0[ fP Zf 28f, f ,I I I I

'I' I C 'I ITEH PCIBc009 IA-720-N/ULc IAv3 ~ 0 I 1.5[ IP Zl 35[ 'I I I I I [

I 34f 51[ C I ITEN PSIBC011 IA-720-N/ULC IAV2 .0 f 1.2f IP 2[ 29f I I I I I I 42[ 55[ c I: ITEH PCIBC012 'IA 720 H/ULC IAv3 -.3 I 1.7[ .IP Zl 31[ I I I I I

+--- I--- I- I--- I--------I--------I---------. I--- --I-----I-- I---I---I----I- "---.----I--"-I"-l.--[--.+

Number of RECORDS Selected from Current Outage  : 7 Number of, TUBES Selected from Current Outage : 4

0 CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT ¹ 3 03/97 r

COMPONENT : S/G C Page  : 1 Date  : 05/12/97 Examination Dates: 03/13/97 thru 03/19/97 Total Number of Tubes Inspected 31'81 Total Indications Between 20> and 39% 20 (1)

Greater than or equal to 40% 1 Total Corrosion type Indications "VOL" 0

'Total Tubes Plugged, as Preventive Maint 1 Total Tubes Plugged 2 Location Of Indications 20~ to 100: & "VOL" Hot Leg Cold Leg TSH 5~ to 01H -2.1 1 TSC .5 to 01C -2.1  : 0 01H -2..0 to 06H +2.0 0 01C -2.0 to 06C +2.0  : 0 06H +2.1 to AV1 -3.1 0 06C +2.1 to AV4 -3.1  : 0 AV1 -3.0 to AV4 -3.0 20 '(1)

0 0

INDICATIONS/TRENDING REPORT PTH-3 OUTACE  : 03/97 COHPONEHT ~ S/0 C Page : 1 DESCRIPTION : ALL 40/~ to 100/, VOL 8 PTP INDICATIONS Oat e: 5/12/97 Time: 10:00:00 I Extent I 03/97 I I H/A I (Row(CoI(Leg(***(Tst/Note( Reei Probe Location (Voits(oeg(Ch,f 7.'(oiff( Location (Volts(oeg(cb

'-I- I

.-I- -I---- ---I --

(

. I- - -

(

---'I- I I -I -I. I. I I I I

( X (

--I---'

( 30( 48( N ('TEC PL(CH009 (A 720 H/ULC (AV3 -0 I I IPTP( ( ( (

I 33( 66( C IPITITSH PLICH047 IHRPC680-3C ITSH .6 .4(103(P 1( 58( I I I I I

---I---I- -I---I--.-----I-----".I- I ( I I I

(' - --( ( ( I Humber of RECOROS Seiected from Current Outage : 2

,Number of TUBES Selected from. Current Outage : 2

0 INDICATIONS/TRENDING REPORT PTN-3 OUTAGE  : 03/97 COMPONENT  : S/G C Page  : 1 DESCRIPTION : ALL 20/ TO 39/i INDICATIONS Date : 5/12/97 Time : 10:00:00

+

I Extent I 03/97 I I N/A I (Row(col(Leg(**"JTst/Note( Reel I Probe I Location (Volts(Deg(Ch (.X (Diff( Location (Voltsfgeg(Ch (

X f

+-- I-- I---I---I----.--I- -I- I -I -(-.-I-.-I- I I +

I ( I I I 30( '17( H I ITEC Ps(CH006 IA.720 M/ULC IAvl .0 I -5( JP 2( 20( I I I I I I 34(31( H I ITEC PS(CH027 IA-7?O.M/ULC IAV2 .0 I -5I IP 2( 21( i I I I I I I I H I (TEC PS(CH027 IA-720-M/ULC IAV3 .0 I -5l l>>l 20( I I I I I I I 43( 33( H I JTEC PSiCH026 iA 720-M/ULC IAV3 .0 I Cl I>>I ZZI,I I I I I I I 35( 36( H I iTEC PSiCH028 .IA-720.H/ULC iAV2 .0 I .5( I>>I >>I I I I I I I (34(41f H I fTEC PS(CH029 (A 7ZO.M/ULC (AVI .0 I 6( (P 2( 22( I I I JTEC PSiCH029 JA 720-M/ULC,JAV3 .0 .6( JP Zf 22( I I I I I I I IHI ITEC PSICH029 :IA-720-M/ULC IAV4 ~ 0 I .71 I>>l Zcl I I I I I I I 33( 43( H ( JTEC PC(CH030 (A-720 M/ULC IAV3 .0 ( 6( iP Zl 27i I I I I I I 35J 43J H I ITEC PCICH030 IA.720-M/ULC IAVZ .0 J .8( J>>I >>I I I I I I I I I (H( .ITEC PC(CH030 IA-720 M/ULC IAV3 .0 I.C( IP Zl 32( I I I I I I I I IHJ ITEC PCICH030

'A IA-720-M/ULC IAV4 .0 I "9( l>>l >>I I I I I I

( 35( 4CJ H ( IT C PCICH 720 M/ULC (AV 1.5( I>>l 34( I I I I I I ITEC PCICHO IA ?0 M/ULC IAV 1.6( -(P 2( 35( I I I I I I I 301 48I H I i'IEC (CH009 iA.720-M/ULC (AV2 .0 fi 2( 32f f I ( I I I I I I H I JTEC PCICH009 JA-720 M/ULC 'JAV3 .0 1.5 f I>>l 37l ( I I I I I 35( 49( C ( ITEN PSJCC009 (A-720-M/ULC JAVC .0 .6( I>>( 25( I I I I I I I 26( 48( H

( ITEC (CH009 JA.720-M/ULC IAVZ .0 I ~ 5I I>>I 20( I I I I I (30(61f H f (TEC PS(CH009 (A.720.M/ULC JAV2 .0 I 5l (P 2( 20( I I I I I (38(71J C( iTEN PS(CCOll JA 720-H/ULC JAVC ..2 I ~ 6( I>>I >>I I I I I I I

-I- I I I I

-I" Number of RECORDS Selected from Current Outage  : 20 Number of TUBES Selected from Current Outage : 13

Il TURKEY POINT UNIT 3 1997 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snubbers

0 0

MECHANICAL SHOCK ARRESTOR FINAL REPORT TURKEY POINT UNIT 3

'1997 SPRING REFUELING'UTAGE

'Commercial Service Date: December 14, 1972 Prepared By:

Inservice Inspection Group Florida Power & Light Turkey Point Nuclear 9760'.'W. 344 St.

Florida City, Fl 33035 Originated by: M. Campbell D te

~z1 97 Reviewed by: A. Pauleuc Date M. Blew Date

0 Mechanical shock arrestors (snubbers) were visually inspected/handstroked under purchase order B94536-40012 by Ratheon inspectors in accordance with the following plant procedures:

0-CMM-105 '

O-OSP-105.1 Implementing plant work orders were as follows:

PWO WO 96014408 SNUBBER VISUAL/HANDSTROKE INSPECTION 3-1032, 3-1033, 3-1034, 3-1035, 3-1036, 3-1037/ 3-1038/ 3-1039/

3-1041, 3-1043, 3-1044, 3-1045, 3-1046, 3-1048/ 3-1050/ 3-1051/

3-1052, 3-1054/ 3-1057, 3-1058, 3-1060, 3-1069, 3-1070/ 3-1071/

3-1072/ 3-1073, 3-1074, 3-1075/ 3-1077, 3-1078, 3-1079, 3-1080/

3-1081, 3-1082, 3-1083, 3-1091, 3-1092, 3-1093, 3-1094, 3-1095/

3-1096/ 3-1099, 3-1100, 3-1101, 3-1102, 3-1103, 3-1104, 3-1105, 3-1106, 3-1110, 3-1111, 3-1112, 3-1121, 3-1136 & 3-1137 PWO WO 96014408 VISUAL INSPECTION (NO HANDSTROKE) FOR FUNCTIONAL TESTING; 3 1009/ 3 1011/ 3 1019/ 3 1023/ 3 1026/ 3 1031/ 3 1040/ 3 1042/

3 1047/ 3 1049/ 3 1053/ 3 1055/ 3 1076/ 3 1084/ 3 1097/ 3 1098

& .3-1120 PWO WO 96024188 REPLACE LOAD PIN WITH LOAD STUD; 3 1007/ 3 1008/ 3 1009 & 3 1012 PWO WO 96024216 REPLACE LOAD PIN WITH LOAD STUD; 3-1084 PWO WO 96016705 - DISLODGED BEARING & LOAD STUD REPLACEMENT/

3-1005, 3-1006 & 3-1010 PWO WO 97006613 REMOVE SNUBBER 3-1009 IMPLEMENTATION OF CR 97-399/

/ 3-MSHX-15 3-1005, 3-1006, 3-1009 & 3-1010 Mechanical shock arrestors (snubbers) were functionally tested under purchase order B95691-50102 by Basic PSA personnel in accordance with the following plant/vendor procedures:

0-CMM-105.1 O-OSP-105.2

il Implementing plant work orders were as follows:

PWO WO'6024408 FUNCTIONALLY TEST SNUBBERS LISTED BY ISI 3 1009'g 3 101 1 ' 1019' 1023 ' 1026' 1031 g 3 1040' 1042' 1047. g 3 1049 g 3 1053 ~ 3 1055 / 3 1076 g 3 1084 g 3 1097 ( 3 1098

& 3-1120 PWO WO'6024412 REBUILD 10 SNUBBERS 10172 16253 J 10174 ~ 1 1 1 10 '2377 ( 12392 ~ 16232 g 16238'g 16242 g 16252 &

0 il

MECHANICAL SHOCK ARRESTOR FINAL REPORT SECTION I

0 PAGE NO. 1 05/22/97 Turkey Point Outage Surmary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A 4L4 A Number Number Date T Test T Dimension T Visual Sunnary Ftmctional Sunnary 3-1005 10035 03/10/97 P 03/20/97 P 26.5000 P Visual inspection - sat, "L4 diemsnion acceptable, A factional test was performed with the following handstroke - sat, replaced load pins with load studs acceptable results under NO 97006613 and CR 97-399:

per IO 96016705, lubricated load studs and spherical bearings on both ends with neolube - 24982-3. Pre Rebuild - S/N 10035 Replaced snubber S/N 10035 with snubber S/N 10579 per Tension Compression Criteria CR 97-399. Snubber S/N 10035 was rebuilt under NO 97006613 by Basic-PSA and NRH back into stores. Test 1) 164.88 74.26 2500.00 Test 2) 223.57 165.57 2500.00 Test 3) 0.001 0.012 0.02g's Test 4) 182.49 149.63 2500.00 The Pre Rebuild fextionai test was performed at Engineering direction per CR 97-399.

Post Rebuild - S/N 10035 Tension Ccepression Criteria Test 1) 161.38 138.78 2500.00 Test 2) 232.46 452.13 2500.00 Test 3) 0.004 0.008 0,02gls Test 4) 224.31 397.34 2500.00 The following parts were installed as part of the rebuild of snubber S/N 10035:

(4) Drive Screws - 0015673-3 (1) Clutch Spring - 0015346-1 (1) Torque Carrier - 0015343-1 (1) Capstan Spring - 0015729-1

PAGE KO. 2 05/22/97 Turkey Point Outage Smasry Report Unit 3/4 S Date S S Visual T of T I T Serial Inspection "i." A Functional Tag A Fmctional A Nwher Kumber Date T Test T Dimension T Visual Suanary Swmary After rebuild and successful post rebuild factional test, snubber S/H 10035 uas KRH back into stores.

3-1006 6521 03/08/97 P 03/20/97 P 26.7500 P Visual inspection - sat, "l." dimension acceptable, A fwetionaL test Mas performed uith the foLLouing handstroke - sat, lubricated spherical bearings and acceptable results under lO 97006613 and CR 97-399:

load studs on both ends.

Pre Rebuild - S/H 6521 Installed Load studs in place of load pins per lO 96016705. Tension Cocpression Criteria Replaced snubber S/H 6521 with snubber S/N 6494 per Test 1) 152.21 195.31 2500.00 CR 97-399. Snubber 6521 Mas rebuilt under lO 97006613 Test 2) 131.37 224.07 2500.00 by Basic PSA and NRH back into stores. Test 3) 0.005 0.039 0.02g's Test 4) 127.82 207.67 2500.00 This test Mas performed at Engineering direction per CR 97-399.

Post Rebuild - S/H 6521 Tension Coapression Criteria Test 1) 250.32 172.07 2500.00 Test 2) '50.32 317.51 2500.00 Test 3) 0.002 0.007 0.02g's Test 4) 234.70 291.81 2500.00 The foLLcwing parts uere used during the rebuild of snubber S/K 6521 under LO 97006613:

(4) Drive Screws 0015673-3

PAGE NO. 3 05/22/97 Turkey Point Outage Slscsry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fumtional A "L" A Nwher Number Date T Test T Dimension T Visual Summary Factional Soanary (1) inertia Hass 0015344-1 (1) Capstan Spring 0015729.1 (1) Thrust Bearing Assembly - 0215049-1 Upon rebuild and successful fmctional testing the snubber was HRH back into stores.

3-1007 4590 03/10/97 P / / 28.0000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under MO 96016705.

Replaced load pins with load studs per MO 96016705.

3-.1008 8084 03/08/97 P / / 27.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under MO 96016705.

Replaced load pins with load studs per lN 96016705.

3-1009 1203 03/10/97 P 03/16/97 F 26.5000 P Visual inspection - sat, 4L4 dimension acceptable, A fuetional test was performed with the following no handstroke performed, snubber is part of the unacceptable results under NO 96024408:

initial OR sample.

Pre Rebuild - S/N 1203 The snubber could not be unpinned. CR 97-399 was written for this snubber to determine the method of Tension Coapression Criteria removal. A hydraulic ram was utilized to move the main steam pipe to facilitate snubber removal. Test 1) 7390.62 0.00 2500.00 Test 2) 7390.62 0.00 2500.00 Test 3) 0.00 0.00 0.02g's

~

~

~ I ~

0 PAGE NO. 4 05/22/97 Turkey Point Outage Scenery Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A F~tional A ".i." A Naker Nether Date T Test T Dimension T Visual granary Fact iona( Summary Test 4) 0.00 7836.54 2500.00 This QR snubber was tested as part of the initial saapie. CR 97-399 was initiated for a QR fmctionai test failure and per engineering disposition, snubbers 3-1005, 3-1006 and 3-1010 sere fmtionally tested, no saapte expansion is required for a OR failed snubber; Snubber S/N 1203 was rebuilt Mith the follouing acceptable test results under MO 97006613 and CR 97.399:

Post Rebuild - S/N 1203 Tension Coapress ion Cri teria Test 1) 244.85 308.48 2500.00 I'est 2) 244.85 707.74 2500.00 Test 3) 0.005 0.008 0.02g's Test 4) 455.77 615.54 2500.00 The foiiouing parts Mere replaced during rebuild of snubber S/N 1203 under UO 97006613:

(4) Drive Scram 0015673-3 (1) Inertia Ness 0015344-1 (1) Torque Carrier 0015343.1 (1) Capstan Spring 0015729-1 Upon rebuild and successful fmctionai testing the snubber was HRN back into stores.

~

~

/ I ~

/Qi I~

4

PAGE NO. 5 05/22/97 Turkey Point Outage Stellary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A FLmctional A "L" A Nunber Kosher Date T Test T Dimension T Visual Smmary Fuetional Suansry 3-1010 11931 03/08/97 P 03/14/97 P 25.5000 F Visual inspection - sat, aL" dimension unacceptable, . A fuetional test uas performed uith the folloMing condition report 97-0398 uas Mritten to address the acceptable results under N 97006613 & CR97-399; "L" dimension uhich uas .5000" under the miniszza alloued. Snubber 3-1009 uas found frozen and per Pre rebuild - S/N 11931 condition report 97-399, Engineering directed that snubber 3-1010 be removed, fmctionally tested, Tension Coapressi on Criteria disassembled for Engineering revieM. Upon disasseahly Test 1) 105.93 286.57 2500.00 of snubber 3-1010, Engineering directed that the subject Test 2) 160.27 307.04 2500.00 snubber be rebuilt, as uell as snubbers 3-1005 & 3-1006. Test 3) 0.002 0.0'i4 0.02g's Test 4) 148.42 22e.47 2500.00 Replaced load pins Kith load studs (2) 0214245-3 per lO 96016705, lubricated load studs and spherical This test uas performed at Engineering direction bearings with neolube - 024982-3. installed neM nuts per CR 97-399 in place of snubber 3-1009.

(8) 0209608-3, installed (4) spacer Mashers 197329-3 and torqued to 125 ft lbs, torque urench 85188, Post Rebuild - S/N 11931 cal due 03/30/97. Restaked spherical bearing.

Tension Coapression Criteria Test 1) 212.70 161.34 2500.00 Test 2) 388.96 245.62 2500.00 Test 3) 0.002 0.007 0.02g's Test 4) 24e.57 403.70 2500.00 The follouing parts Vere used during the rebuild of sakber S/N 11931 under ll 97006613:

(4) Drive ScreMs 0015673-3 (1) Clutch Spring 0015346.1 (1) Capstan Spring 0015729-1 (1) Torque Carrier 0015343-1 (1) Thrust Bearing Asseahly 0215049.1

~

~ i ~

0 IO it

PAGE KO. 6 05/22/97 Turkey Point Outage Story Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Fisictional A >>L" A Nisnber Number Date T Test T Dimension T Visual Smeary Fisictional Surmsry After rebuild and successful fisictionai testing, the snubber Mas NRH back into stores.

3-1011 12376 03/10/97 P 03/13/97 P 20.2500 P Visual inspection - sat. "L>> dimension acceptable, A fwctional test was performed uith the fotlouing no handstroke performed, lubricated spherical bearings acceptable results under N0 96024408; and load pins Mith neolube - 24982-3 under M0 960241M.

Snubber S/N - 12376 Tension Coapression Criteria Test 1) 99.74 56.18 750.00 Test 2) 138.07 53.35 750.00 Test 3) 0.004 0.004 0.02g>L>> dimension acceptable, Handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube' 24982-'3.

Load pin on building attachment (rear bracket) uas not replaced uith a load stud due to a 2" horizontal pipe risi 1>> above the rear bracket, not enough room for the stud to fit and be double nutted per lO 96024188. Replaced 3 nuts on the coaponent pipe clamp side.

3-1019 2889 03/14/97 P 03/14/97 P 17.2500 P Visual inspection sat, >>L>> dimension acceptable, A fwetionai test was performed Mith the folioiiing

~

i I~

0 0

0 0

GE NO. 7

/22/97 Turkey Point Outage Srmmsry Report Unit 3/4 S Date S S Visual T of T I T ag Serial inspection A Frarctional A ~

. "L" A r Number Date T Test T Dimension T Visual SrlrrMrry Frnctional SrmrrMrry no handstroke performed, lubricated spherical acceptable results under IN 96024408r r

bearings and load studse Snubber S/N - 2889 No iD tag installed. Snubber was changed out with S/N 17425 due to unit 4 LCO. Mork was performed under Tension Ccapression Criteria IN 96014408.

Test 1) 29.92 13.06 300.00 Test 2) 30.87 22.91 300.00 Test 3) 0.007 0.0'17 0.02g's Test 4) 25.00 27.36 300.00 This SR snubber was tested as part of th6 initial saaple.

1023 23273 03/13/97 P 03/13/97 P 12.7500 P Visual inspection - sat, "L4 dimension acceptable, A frarctional test was performed witli the following no handstroke, lubricated spherical bearings and acceptable results under MO 96024408; load studs with neolube - 24982-3 under MO 96014408.

Snubber S/N - 23273 Tesnion Coapressi on Criteria Test 1) 11.87 8.23 75.00 Test 2) 16.58 9.61 75.00 Test 3) 0.007 0.007 0.02grs Test 4) 13.94 17.01 75.00 This SR snubber was tested as part of the initial saaple.

1026 12394 03/13/97 P 03/13/97 P 19.5000 P Visual inspection - sat, "L" dimension acceptable, A frarctional testing was performed with the following

~ ~

r 1

0 0

0

PAGE NO. 8 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A fmctionaL A "L" A Number Nwher Date T Test T Dimension T Visual Sumery fmctionaL Swmsry handstroke - sat, lubricated spherical bearings and acceptable results under NO 960244M:

load pins on both ends Nith neolube - 24982-3 under MO 96014408. Snubber S/N - 12394 Torqued TTA bolts to 450 ft lbs 4706 - 07/07/97 Tension Ccapression Criteria Lock uired the TTA bolts.

Test 1) 57.58 37.52 750.00 Test 2) 71.83 39.95 750.00 Test 3) 0.014 0.009 0.02g's Test 4) 68.12 60.49 750.00 This SR snubber uas tested as a previous rebuild.

3-1031 27M6 03/13/97 P 03/15/97 P 17.8750 P Visual inspection - sat, <<L<< dimension acceptable, A fuetionaL test Mas performed uith the foLLouing no handstroke, Lubricated spherical bearings and acceptable results under LN 96024408; load pins uith neolube - 24982-3 under NO 96014408.

Snubber S/N - 27086 No LD tag installed.

Tension Coapression Criteria Test 1) 18.35 14.06 300.00 Test 2) 20.33 21.07 300.00 Test 3) 0.006 0.006 0.02g's Test 4) 21.24 20.08 300.00 This SR snubber uas tested as part of the initial saaple.

3-1032 24410 03/12/97 P / / 14.0625 P Visual inspection - sat, "L<<dimension acceptable, handstroke - sat, Lubricated spherical bearings and

~

i f ~

0 PAGE KO. 9 05/22/97 Turkey Point Outage Sumery Report Unit 3/4 S Oate S S Visual T of T I T Tag Serial inspection A Fmctfonal A 4L" A Kunber Number Oate T Test T Dimension T Visual Smeary Flax:tional Suanary load pins on both ends with neolube - 24982-3 under IJO 96014408.

3-1033 19328 03/13/97 P / / 16.3750 P Visual inspection - sat, "i." dimension acceptable, handstroke; sat, lubricated spherical bearings and Load pins on both ends with neolube -. 24982-3 under iJO 96014408.

No LD tag installed.

3-1034 24429A 03/16/97 P / / 13.8750 P Visual inspection = sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under lO 96014408.

3-1035 19330 03/15/97 P / / 16.6250 P Visual inspection - sat, "L'! dimension acceptable, handstroke - sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under MO 96014408.

Ko LD tag fnstallede 3.1036 27100 03/15/97 P / / 16.3750 P Visual inspection - sat, "L" dimension acceptable, ~

handstroke -, sat, lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under QO 96014408.

No LO tag lnstalfedr

~

/ f ~

PAGE NO. 10 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fuetional A 4L4 A Number Neer Date T Test T Dimension T Visual Suanary Fmetional Sunnary 3-1037 11922 03i14/97 P / / 26.6250 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under IQ 96014408.

3-1038 11934 03/14/97 P / / 26.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.

3-1039 16241 03/14/97 P / / 20.0625 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.

3-1040 16239 03/13/97 P 03/15/97 P 20.5000 P Visual inspection - sat, "L" dimension acceptable, A fwetional test was performed with the following handstroke - sat, lubricated spherical bearings and acceptable results under IQ 96024408; load pins on both ends with neolube - 24982-3 under IQ 96014408. Snubber S/N - 16329 Tension Compression Cr i teria Test 1) 73.67 79.67 750.00 Test 2) 113.91 52.08 750.00 Test 3) 0.012 0.010 0.02g's Test 4) 122.59 202.88 750.00 This SR snubber was tested as a previous rebuild.

~

~ i ~

0 0

ll

PAGE NO. 11 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A "L" A Number NLNScr Date T Test T Dimension T Visual Suanary Fweti ona I Suanary 3-1041 16234 03/11/97 P / / 20.3750 P Visual inspection - sat, "L" dimension acceptable, handstroke sat, light rust on spherical bearings and load pins on both ends. Cleaned spherical bearings and load pins Nlth scotch bright and lubricated spherical bearings and load pins on both ends Mith neolube 24982-3 under NO 96014408.

Installed black ID tag to snubber TTA.

3-1042 12365 03/12/97 P 03/15/97 P 20.7500 P Visual inspection - sat, "L4 dimension acceptable, A fwxtional test uas performed Mith the foiioMing handstroke - sat, lubricated spherical bearings and acceptable results under NO 96024408; load pins on both ends Nith neolube - 24982-3 under NO 96014408. Snubber S/N - 12365 No ID tag installed. Tension Coepression Criteria Test 1) 158.38 59.09 750.00 Test 2) 162.40 120.08 750.00 Test 3) 0.009 0.002 0.02g's Test 4) 358.28 146.08 750.00 This SR snubber Nas tested as a previous rebuild.

3-1043 17899 03/14/97 P / / 22.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Mith neolube - 24982-3 under lJO 96014408.

~

~

[ I~

il ll

AGE NO. 12 5/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fwetlonal A "L4 A r Number Date T Test T Dimension T Visual Suanary Fuetional Suanary

-1044 17900 03/14/97 P / / 21.5000 P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under IO 96014408.

1045 17189 03/14/97 P / / 21.5000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under lQ 96014408.

1046 17903 03/14/97 P / / 20.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under 10 96014408.

1047 17902 03/14/97 P 03/15/97 P 20.5000 P Visual inspection - sat, "L" dimension acceptable, A factional test was performed with the following no handstroke performed (initial sac@le), lubricated acceptable results under lS 96024408; spherical bearings and load pins on both ends with neolube - 24982-3 under N 96014408. Snubber S/N - 17902 Drilled load pin per STD-C-011 for installation of Tension Compression Criteria cotter pin (M29146-3) installed lock wire on TTA bolts and torqued to 450 in lbs, 8-4701 - Cal Due Date: 07/07/97. Test 1) 60.77 19.34 750.00 Test 2) 100.32 26.59 750.M Test 3) 0.007 0.002 0.02g's Test 4) 87.42 115.18 750.M This SR snubber was tested as part of the initial saaple.

0 0

PAGE NO. 13 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A "L" A Nuaber Kumber Date T Test T Dimension T Visual Suanary Fuetional Suanary 3-1048 17904 03/14/97 P / / 19.5000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under IJO 96014408.

3-1049 16245 03/14/97 P 03/15/97 P 20.5000 P Visual inspection - sat, 4L4 dimension acceptable, A fmctional test uas performed with the follcwing handstroke - sat, lubricated spherical bearings and acceptable results under MO 96024408; load pins on both ends Kith neolube - 24982-3 under iO 96014408. Snubber S/K - 16245 Tension Ccepression Criteria Test 1) 79.24 50 ~ 53 300.00 Test 2) 128.31 166.94 300;00 Test 3) 0.013 0.007 0.02g's Test 4) 125.92 151.03 300.00 This SR snubber Nas tested as a previous rebuild.

3-1050 17906 03/14/97 P / / 22.0000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Kith neolube - 24982-3 under MO 96014408.

3.1051 16249 03/12/97 P / / 21.5000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

~

~

~ I~

0 PAGE NO. 14 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Ftsx:tional A "La.A Neer Number Date T Test T Dimension T Visual Spermary factional Sunnary 3-1052 16233 03/12/97 P / / 21.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bear ings and load pins on both ends with neolube - 24982-3 under MO 96014408.

No ID tag installed.

3-1053 2462 03/14/97 P 03/15/97 P 20.0000 P Visual inspection - sat, 4L" dimension acceptable, A fmctfonal test was performed with the following no handstroke (previous rebuild), lubricated acceptable results under NO 96024408; spherical bearfngs and load studs on both ends with neolube - 24982-3 under MO 96014408. Snubber S/K - 2462 Tension Compression Criteria Test 1) 32.11 56.25 750.00 Test 2) 68.78 77.39 750.00 Test 3) 0.010 0.010 0.02g's Test 4) 106.53 90.31 750.00 This OR snubber was tested as a previous rebuild.

3-1054 16248 03/12/97 P / / 20.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982.3 under MO 96014408.

3-1055 13697 03/14/97 P 03/15/97 P 20.7500 P Visual inspection - sat, "Lw dimension acceptable, A functional test was performed with the following no handstroke (initial san@le), lubricated acceptable results under lN 96024408; spherical bearings and load studs on both ends

~ ~

~ 1

il 0

PAGE NO. 15 0

05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fuetional A "L" A Nunber Number Date T Test T Dimension T Visual Smeary Functional Suaaary with neolube - 24982-3 under N 96014408. Snubber S/N - 13697 Tension Compression Criteria Test 1) 69.00 62.64 750.00 Test 2) 88.54 85.69 750.00 Test 3) 0.012 0.013 0.02g's Test 4) 87.91 85.73 750.00 This QR snubber was tested as pert of the initial sample.

3-1057 27106 03/15/97 P / / 16.2500 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 960144M.

3.1058 27102 03/16/97 P / / 16.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube . 24982-3 under lO 96014408.

3-1060 19329 03/14/97 P / / 18.5000 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends Mith neolube - 24982-3 under lQ 96014408.

3-1069 27072 03/13/97 P / / 16.7500 P Visual inspection - sat, "L" dimension acceptable,

~

( i ~

0 Ib Ik

PAGE NO. 16 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Fmctional A "La A Number Number Date T Test T Dimension T Visual Smeary Fwetional Sumery handstroke - sat, lubricated spherical bearings and load studs on both ends kith neolube - 24982-3 under lO 96014408.

Condition report 97-398 Mas Mritten to address boric acid on the snubber. The inspector found no boric acid uhen the snubber Mas inspected. Condition report 97-398 directed that herculite be put over the snubber before reload and removed prior to startup. The herculite Mas removed on 03/29/97.

3-1070 27079 03/13/97 P / / 17.6250 P Visual inspection - sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 960144M.

3-1071 27069 03/13/97 P / / 15.8125 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Nith neolube - 24982-3 under IQ 96014408.

No 10 tag installed. Load pin Nas ssmhroomed, filed pin for reinstallation in accrodance Nith STD-C-011.

3-1072 27073 03/15/97 P / / 16.0625 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under MO 96014408.

0 I~

0 0

PAGE NO. 17 05/22/97 Turkey Point Outage Senary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fuetional A 4La A ether Naker Date T Test T Dimension T Visual Suanary Fact iona l Stsmary No iD tag installed. Removed paint and rust on housing and indicator tube Mith scotch brite.

-1073 27090 03/15/97 P / / 17.0000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

-1074 27104 03/15/97 P / / 17.7500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends uith neolube - 24982-3 under 1JO 96014408.

-1075 18074 03/15/97 P / / 8.1250 F Visual inspection - sat, "L" dimension macceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

CR 97-0478 Mas issued for rusted rear plate and "L" dimension bale+ miniaua by .254. NO 97006948 Nas implemented to correct the conditions.

-1076 19725 03/13/97 P 03/15/97 P 17.5000 P Visual inspection - sat, "L" dimension acceptable, A fuetional test Nas performed Mith the follming no handstroke (initial sample), lubricated acceptable results under lO 96024408; spherical bearings and load pins on both ends Mith neolube - 24982-3 under NO 96014408. Snubber S/N - 19725

'Tension Coopression Criteria

~

~

~

i ~

Ib PAGE MO. 18 05/22/97 Turkey Point Outage SulNlary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial inspection A Flmctfonal A "L" A Mmher Mumber Date T Test T Dimension T Visual Sundry Factional Stannary Test 1) 16 44 32 ~ 15 300.00 Test 2) 16.79 32.21 300.00 Test 3) 0.012 0.009 0.02g's Test 4) 17.19 31.28 300.00 This QR snubber was tested as part of the'initial saaple.

3-1077 16230 03/13/97 P / / 20.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IN 96014408.

installed black ID tag on TTA end.

3-1078 16244 03/12/97 P / / 20.5000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherfcal bearfngs and load pins on both ends with neolube - 24982-3 under IN 96014408.

3-1079 10176 03/12/97 P / / 22.0000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends vfth neo' 24982-3 under IN 96014408.

3-1080 12396 03/11/97 P / / 21.2500 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and

~ '

~

i f~

IS IS 0

0

PAGE NO. 19 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A "L" A Number Number Date T Test T Dimension T Visual Smeary Fwetional Suaasry load pins on both ends with neolube - 24982-3 under lO 96014408.

3-1081 11921 03/12/97 P / / 25.5000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under MO 96014408.

No iD tag installed.

Replaced 1 spacer washer - 0197329-3 Replaced 1 cotter pin - 0029146.3 3.1082 11932 03/12/97 P / / 26.5000 P Visual inspection - sat, 4La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.

No ID tag 'installedo 3-1083 11925 03/15/97 P / / 25.1250 P Visual inspection - sat, aL" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.

3-1084 7000 03/14/97 P 03/16/97 P 24.7500 P Visual inspection - sat, "L" dimension acceptable, A fmctional test Mas performed Mith the folloMing no handstroke (initial saaple), lubricated acceptable results under MO 96024408; spherical bearings and load pins on both ends

~

)

~

i ~

il Il il

PAGE NO. 20 05/22/97 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A "L'l A Naker Kumber Date T Test T Dimension T Visual Suanary Functional Suanary ui th neolube 24982-3 under KO 96024216. Snubber S/N - 7000 Ko ID tag installed. installed 4 spacer Mashers- Tension Coapressi on Criteria 197329-3, installed neu load stud - 15329-1 and 4 nuts - 209608-3 and torqued to 125 ft lbs on Test 1) 504.13 154.54 2500.00 snubber end under lJO 96024216. Test 2) 504.13 407.02 2500 F 00 Test 3) 0.002 0.009 0.02g's Test 4) 217.05 225.69 2500.00 This SR snubber Nas tested as part of the initial searle.

3-1091 27087 03/13/97 P / / 19.0000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Kith neolube - 24982-3 under MO 96014408.

3-1092 27105 03/13/97 P / / 18.0000 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Kith neolube - 24982-3 under lO 96014408.

No iD tag installed.

3-1093 27091 03/15/97 P / / 18.1250 P Visual inspection . sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under QO 96014408.

~ ~

~ 1

II 0

PAGE NO. 21 05/22/97 Turkey Point Outage SLINNry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A <<L<< A Number Number Date T Test T Dimension T Visual Summary Fact i one l Sumery 3.1094 4388 03/16/97 P / / 15.2500 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 96014408.

3-1095 16733 03/14/97 P / / 8.5000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IQ 96014408.

3-1096 11993 03/18/97 P / / 8.5000 F Visual inspection - sat, <<L<<dimension macceptable, condition report 97-531 written to address the <<L<<

dimension which is -.3750<< below minim!a, handstroke

- sat, lubricated spherical bearings and load studs on both ends with neolube - 24982-3 under NO 96014408.

Snubber 3-1096 was swapped with tag 3-1097 from a previous installation. Reinstalled in the correct tag location.

3-1097 16724 03/13/97 P 03/15/97 P 9.0000 P Visual inspection - sat, "L" dimension acceptable, A factional test was performed with the following no handstroke, lubricated spherical bearings and acceptable results under NO 960244M; load pins on both ends with neolube - 24982-3 under lQ 96014408. Snubber S/N - 16724 Snubber was previously installed in the sister Tension Compression Criteria (3-1096) location. Reinstalled in the proper location.

~

/ 1

~

IO il il

PAGE NO. 22 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Functional A "L" A Naker Number Date T Test T Dimension T Visual Suanary Fuetional Smmary Test 1) 1.98 2.63 32.50 Test 2) 3.28 3.76 32.50 Test 3) 0.010 0.011 0.02g's Test 4) 3.03 3.75 32.50 This SR snubber vas tested as part of the initial sample.

-1098 33628 03/16/97 P 03/15/97 P 10.3750 P Visual inspection - sat, "L" dimension acceptable, A fmctionaL test was performed with the foLLouing no handstroke (lnitaL sample), lubricated spherical acceptable results under NO 96024408; bearings and load pins arith neolube - 24982-3 on building end only under 1JO 96014408. Snubber S/N - 33628 No ID tag installed. Tension Conpression Criteria Test 1) 2.10 5.21 17.50 Test 2) 4.80 5.21 17.50 Test 3) 0.011 0.010 0.02g's Test 4) 6.52 8.60 17.50 This SR snubber was tested as part of the initial saspleo

-1099 38481 03/16/97 P / / 11.7500 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, Lubricated spherical bearings and Load pins on both ends with neolube - 24982-3 under MO 96014408.

No ID tag installed.

II IJ il

PAGE NO. 23 05/22/97 Turkey Point Outage Sunnary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial Inspection A Flmctfonal A "L" A Naker Nwhtr Date T Test T Dimension T Visual Suansry Fuctfonal Summary 3-1100 17819 03/16/97 P / / 8.3125 P Visual inspection - sat, 4L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1101 33626 03/16/97 P / / 11.5625 P Visual inspection - sat, 4L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1102 29451 03/16/97 P / / 11.2500 P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends sfth neolube - 24982-3 under IO 96014408.

Ko ID tag installed.

3-1103 '11996 03/17/97 P / / 8.5000 P Visual inspectfon - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pfns on both ends elth neolube - 24982-3 under IO 96014408.

3-1104 24412 03/17/97 P / / 13.5000 P Visual inspection - sat, "L" dimension acceptable,

~

/ I ~

0 PAGE NO. 24 05/22/97 Turkey Point Outage Suansry Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A fmctional A "L4 A Number Nmher Date T Test T Dimension T Visual Suanary fuctionai Suanary Handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neoide - 24982-3 under IO 96014408.

3-1105 16134 03/15/97 P / / 13.1250 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on ccmponent end due to piping and scaffold limitations on building end Mith neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1106 38479 03/15/97 P / / 11.3125 P Visual inspection - sat, "L" dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under IO 96014408.

No ID tag installed.

3-1110 16136 03/15/97 P / / 12.7500 P Visual inspection - sat, "La dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lO 96014408.

No ID tag installed.

3-1111 2875 03/15/97 P / / 17.0000 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, lubricated spherical bearings and

~ ~

~

i I ~

I~

PAGE NO. 25 05/22/97 Turkey Point Ou'tage SISllllbry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fmctional A "i" A Number Nmher Date T Test T Dimension T Visual Suanary Factional Suanary load studs on both ends with neolube - 24982-3 under lO 96014408.

3-1112 27083 03/16/97 P / / 16.2500 P Visual inspection - sat, "L4 dimension acceptable, handstroke - sat, Lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under lJO 96014408.

3-'1120 18325 03/16/97 P 03/15/97 P 8.6250 P Visual inspection - sat, "L4 dimension acceptable, A fmctionaL test Mas performed with the foLLouing no handstroke (initiaL sample), Lubricated spherical acceptable results under NO 96024408; bearings and Load pins on both ends with neolube 24982-3 under NO 960144M. Snubber S/N - 18325 No ID tag Installedo Tension Coapress ion Criteria Test 1) 5.91 11.90 32.50 Test 2) 8.31 23.94 32.50 Test 3) 0.017 0.015 0.02g's Test 4) 8.07 5.54 32.50 This SR snubber vas tested as part of the initial sea@le.

3-1121 24430 03/16/97 P / / 12.7500 P Visual inspection - sat, "l." dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neolube - 24982-3 under QO 96014408.

~

~ I~

0

~ ~

PAGE NO. 26 05/22/97 Turkey Point Outage Suaaary Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fwetional A <<L<< A Neer Naker Date T Test T Dimension T Visual Suanary Fmctional Suaaary No ID tag installed.

3-1136 19M4 03/16/97 P / / 9.0000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends Mith neotube - 24982-3 under NO 96014408.

3-1137 19885 03/15/97 P / / 9.0000 P Visual inspection - sat, <<L<<dimension acceptable, handstroke - sat, lubricated spherical bearings and load pins on both ends with neolube - 24982-3 under NO 96014408.

3-1005 10579 03/21/97 P 03/20/97 P 26.5000 P Visual inspection - sat, <<L<<dimension acceptable, A fmctional test Mas performed Mith the following no handstroke, lubricated spherical bearings and acceptable results under NO 97006613:

load studs on both ends with neolube - 24982-3 under QO 97006613. Snubber S/N 10579 Snubber S/N 10579 is a replacement per CR 97-399. Tension Coapression Criteria Snubber S/N 10035 was rebuilt under NO 97006613 and HRN back into stores. Test 1) 93.16 56.95 2500.00 Test 2) 171.37 92.16 2500.00 Test 3) 0.005 0.007 0.02g's Test 4) 153.93 135.11 2500.00 This OR snubber was tested as a replacement snubber.

3-1006 6494 03/21/97 P 03/20/97 P 26.7500 P Snubber S/N 6494 is the replacement snubber for snubber A fmctional test was performed Mith the follouing S/N 6521 per CR 97-399. Load studs and spherical bearings acceptable results under NO 97006613 and CR 97-399:

uere lubricated with neolube 24982-3 under NO 97006613.

~

~

/ I ~

0 PAGE NO. 27 05/22/97 Turkey Point Outage Smeary Report Unit 3/4 S Date S S Visual T of T i T Tag Serial inspection A Fmctional A "La A Neer Nmher Date T Test T Dimension T Visual Summary Factional Showery installed 2 square washers 30263-3 and 8 spacer washers Snubber S/N - 6494 197329-3.

Tension Cospression Criteria Test 1) 132.16 65.10 2500.00 Test 2) 190.20 102.84 2500.00 Test 3) 0.016 0.020 0.02g's Test 4) 220.84 87.87 2500.00 This test was performed as a replacement test.

3-1009 10542 03/17/97 P 03/14/97 P 26.8750 P Snubber S/N 10542 is a replacement snubber for A fmctional test was performed with the following snubber S/N 1203. The as left inspection was sat. acceptable results; under MO 97024188.

Tension Coepression Criteria Load studs and spherical bearings were lubricated with neolube 24982-3. 'Test 1) 41.56 128.27 2500.00 Test 2) 90.30 146.42 2500.00 Test 3) 0.006 0.008 0.02g's Test 4) 86.96 115.11 2500.00 This factional test was performed on snubber 10542 which is a replacement snubber for srabber 1203.

3-1010 6530 03/21/97 P 03/20/97 P 26.5000 P An as-left visuaL inspection was performed under A fuetional test was performed with the following lO 97006613 on replacement snubber 6530. Visual acceptable results under IO 97006613 and CR 97-399:

inspection was sat. Snubber 11931 was taken to the Basic-PSA trailer for tear down, Engineering Tension Coepression Criteria inspection and subsequent rebuild. The rebuilt snubber tested sat and was HRH into stores. Test 1) 132.54 . 90.78 2500.00 Test 2) 198.87 119.78 2500.00

~

~

~

i ~

il it

PAGE NO. 28 05/22/97 Turkey Point Outage Sumsry Report Unit 3/4 S Date S S Visual T of T I T Tag Serial Inspection A Fuetional A 4L" A Number Nwher Date T Test T Dimension T Visual Sunnary Fuetional Sunnary Test 3) 0.004 0.008 0.02g's Test 4) 220.20 104.52 2500.00 This test uas performed as a replacement test.

3-1019 17425 03/14/97 P 03/14/97 P 17.2500 P Visual inspection - sat, "L4 dimension acceptable, A factional test Mas performed with the follouing no handstroke performed, lubricated spherical bearings acceptable results under NO 96024408; and load pins with neolube - 24982-3 under MO 960144M.

Snubber S/N - 17425 Snubber S/N 2889 uas changed out with snubber S/N 19425 due to a LCO condition on unit 4. Tension Ccepresion Criteria Test 1) 29.92 13.06 300.00 Test 2) 30.87 22.91 300.00 Test 3) 0.007 0.017 Oe02g~s Test 4) 25.00 27.36 300.00 This SR snubber Mas tested as as a r'eplacement for snubber S/N 2M9 due to a LCO on unit 4.

~ ~ ~

~

I

0 TURKEY'OINT UNIT 3 1997 REFUELING OUTAGE Summary of Inservice Inspection Examinations

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 1 IHSERVICE INSPECTION SUMNARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 1'CBEAR,'STATUS Components

.Nil, 0 Zone Number,: 3-001 ASNE S ON'G T SEC. XI T RSEH Summary-Examination Area Catgy Exam A. 'E I 0 E Remarks Number Identification :Item Ho Hethod , Procedure T, C G M R <<* Calibration Block **

003200 VESSEL TO CLOSURE HEAD HATING B-N-1 VT-3 NDE 4.3-28 X - - - 03/22/97 - VT-'3. complete, examination SURFACE OH .HEAD B13.10 performed with remote camera

-J e: 06/13/97 TURKEY POINT NUCLEAR,PLANT UNIT 3 :Page: 2 IHSERVI CE INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND 'PERIOD, FIRST OUTAGE (97RF)

Class 1 CBEAR STATUS Components N I 0 Zone Number: 3-057 ,ASME S ONGT SEC. XI T RSEH Sunnary, Examination Area Catgy Exam A' I O,E Remarks Number Identification Item No Method Procedure T C G M R <<* Calibration Block **

202700 3-RCP-8-FLYWHEEL RG 1.14UT NDE 5.15-1 X- 03/27/97 - UT complete, examined from Flywheel the periphery surface, examinations performed in accordance with Technical Specifications

    • FLYWHEEL *>>

II

~ (

J

e: 06/13/97 ,TURKEY POINT NUCLEAR'PLANT UNIT 3 Page 3 INSERVICE INSPECTIOH

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class '2 CBEAR STATUS Components

.N I 0 Zone Number:,3-063 ASME S ONGT SEC., XI T 'R:SE H

'Smeary Examination Area Catgy ,Exam A E I,O,E Remarks Number Identification Item No'Method'rocedure T C G M.,R ** Calibration Block **

214900'R-252 F-A VT-3 .HDE 4.3-9' X - - - 03/12/97 - VT-3 complete, light rust SPRING, HANGER F,1.20C found inside of spring can

'215000 C-F-1 X- 3/12/97 - complete, two acceptable 14"-RHR-2301-9'IPE.

TO ELBOM C5.11'T PT 45

,HDE 3.3-20'DE 5.4-2 X---

- X'-

round PT indications, 3/14/97 - UT UT 60 complete, root. geometry, limited UT 70 --X- voiunetric examination from the elbow side due to 'its configuration, limited examination from the pipe side due to support 'interference

215050 14"-RHR-2301-9LD I C-F-1'T HDE 3;3-'20. X - - - 3/12/97 - PT complete, 3/14/97 - UT' LOHG SEAM 'DOHHSTREAM. INSIDE C5.',12 UT 45 HDE'5.4'-2 - X - complete, beam redirection due to RADIUS ,dendretics, inside surface geometry

215100 14"-RHR-2301-9LDO C-F-1 PT HDE 3.3-20 X - - - 3/12/97 - PT complete, 3/14/97'- UT LONG. SEAM. DOHHSTREAM OUTSIDE C5 ~ 12 UT'5 'DE'.4-2 - - X - complete, beam redirection due to RADIUS dendretics, inside surface geometry UT 33 4*

215180 .14a-.RHR-2301-10LUI, C-F-1 PT HDE 3.3-1 X - - - 03/12/97 - PT complete, 3/14/97 - UT LOHG SEAM UPSTREAM INSIDE C5 ~ 12 'UT 45 HDE 5.4-2 - - X - complete, beam redirection due to RADIUS dendretics, inside surface geometry.

~*:UT-33 **

215190 14a-RHR-2301-10LUO C-F-1 PT NDE X - - - 03/13/97 - PT,complete, 3/14/97 - UT LONG SEAM UPSTREAM OUTSIDE C5.12 U'I 45 3.3-1'HDE 5.4-2 -. - X.- 'complete, beam redirection due to RADIUS dendretics, inside:surface geometry

  • 'T-33 **

0 0

=J

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page 4 IHSERVICE INSPECTION

SUMMARY

.THIRD INTERVAL, SECOND PERIOD, FIRST'OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Heber:,3-063 ASME S ONGT SEC. XI T'SEH 'I Swmary Examination. Area Catgy Exam A E O,E Remarks Number Identification Item No Method Procedure T C G M R ** Calibration Block **

215200 14>> RHR 230'I '10 C-.F-1 PT NDE 3.3-1 ---X X--- 3/13/97 - PT,complete, cresecent shaped ELBOW TO PIPE C5 ~ 11 PT indication at toe of weld, determined,to, CR PTH-97-0432 be a surface anomoly,'3/14/97 - UT WO 9706743 complete, root geometry,'3/17/97 - PT UT 45 NDE'.4-2 X- completed after .weld. cleanup UT 60 X- ** UT-33 **

UT  ; ND E 5'. 18-1 X-215250 14"-RHR-2301-25 C-F-1 SUR NDE.3.3 06/09/97 - weld found during 1997 Pipe to Pipe C5 ~ 11'OL NDE 5.4 outage, no examination required during this outage

    • UT-33 <<>>

215300 14<<-RHR-2301-11 C-F-1 PT NDE 3.3-13 X - - - 03/14/97 - PT and.UT complete, root PIPE TO ELBOW C5.11 UT 45 HDE 5.4-3 X - - - geometry UT 60 - - X-

C-F-1 3.3-13 - - - 03/14/97 -,PT and complete 215400 14"-RHR-2301-11LS LONG SEAM DOWNSTREAM INSIDE C5 ~ 12 PT UT 45 HDE NDE 5.4-3 X---

X UT RADIUS

<<* UT-33 *>>

C-'F-1 NDE'3.3-.13, X'- - - 03/14'/97 - PT and:UT complete 215410 14"-RHR-2301-.11LDO LONG SEAM DOWNSTREAM OUTSIDE C5.12'T PT 45 ,NDE 5.4-3 X---

RADIUS

<<>> UT-33 >>*

0 0

e:t 06/13/97 ,TURKEY POINT NUCLEAR PLANT'UNIT 3 Page: 5 INSERVICE .INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Corryonents N I 0

'Zone Number: ASHE S- ONGT 3-063'cenery SEC. XI T RSEH Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item Ho Nethod Procedure T .C G N R *>> Calibration Block **

215480 C-F-1 PT NDE X - - - 03/14/97 - PT and UT, complete 14"-RHR-2301-12LUI'OHG SEAN'.UPSTREAN INSIDE C5.12 UT 45 3.3-13'DE 5.4-3 X'-

RADIUS

    • UT-33 **

215490 14"-RHR-2301-12LUO C-F-1 PT NDE 3.3-13 X - - - 03/14/97 - PT and UT coaplete LONG SEAN UPSTREAH'OUTSIDE C5 ~ 12 UT 45 NDE 5.4-3 X-RADIUS

>>* O'I 33 **

215500 14"-RHR-2301.-12 C- F- 'I P.T NDE 3.3-13 X - - - 03/14/97 - PT;and UT complete, root ELBOM TO PIPE UT 45 NDE 5.4-3 X - - - geometry e

CS ~ 11 UT 60 - - X-

<<>> UT-33 **

C-F-1 3.3-13 - - - 03/14/97 - and UT complete 215520 14"-RHR-2301-12LD Long i tudinal.'Seam Held C5.12 PT UT 45 NDE NDE 5.4-3 X---

X PT Downstream

    • UT-33 **

216500 14"-RHR-2301-18 C-F-1 PT NDE 3.3-12 ---X X--- 03/12/97, - PT coeplete, 2 acceptable C5'.'I1 5.4-11 round indications, 3/13/97 - UT VALVE 3-752A TO PIPE UT 45 UT 60 NDE

--X-

--X- complete, root geometry, no volunntric UT 70 examination from, the weld crown and from valve side due to their configuration

    • UT-33 **

216520,, 14"-RHR-2301-'18LD

'Long Seam Downstream C- F-.1 C5.12

'T UT 45 NDE 3.3-12 NDE"5.4-11 X

X

- - - 03/12/97 -

- - - complete PT complete, 3/13/97 - UT

ll e: 06/13/97. TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 6 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Number: 3-063 ASME S ONGT SEC. XI T RSEH Sumery Examination Area Catgy Exam A E I 0 E Remarks Nunber Ident ification Item No Method Procedure T C G M R ** Calibration Block **

, 216580 14"-RHR-2301-19LU C-F-1 PT NDE 3.3-19 X - - - 03/12/97 - PT cceplete, 3/13/97 - UT Long Seam Upstream CS ~ 12 UT 45 HDE 5.4-11 X - - - conplete

    • UT-33 **

216600 14"-RHR-2301-19 C-F-1 PT HDE 3.3-19 X- 03/12/97 - PT complete, 3/13/97 - UT C5.11'T 5.4-11 X-- coaplete, root geometry PIPE TO .TEE 45 UT 60 HDE X---

X---

UT 70

    • UT 33 *0 216620 14"-RHR-2301-19LD1 C-F-1 PT HDE 3.3-.19 X - - - 03/12/97 - PT complete, 3/13/97 - UT Long Seam Meld, Inside of Tee CS ~ 12 UT 45 HDE 5.4-11 X - - - coaplete
    • UT-33 **

0 14"-RHR-2301-19LD2 C-F-1 PT HDE 3.3-19 X - - - 03/12/97 - PT cceplete, 3/13/97 - UT Long Seam'Weld Outside of Tee C5.12 Ul'5 HOE 5.4-11 X - - - complete

++ UT-33 **

217480 14"-RHR-2301-24LU C-F-1 PT HDE 3.3-11 X - - - 3/14/97 - PT complete, 3/15/97 - UT Long Seam Upstream C5 ~ 12 UT 45 NDE 5.4-10 X - - - coaplete

    • UT-33 **

217500 14"-RHR-2301-24 C-F-1 PT HOE 3.3-11 X--- 3/12/97. - PT complete, 3/15/97 - UT PIPE TO PUMP CASING C5.11 UT 45 HDE 5.4 10 coaplete, root geometry, no volunetric UT 60 examination from the pump side and on UT 70 the weld due to their configuration

    • UT-33 **

217550 RHR PUMP 3P210A VT-3 HOE 4.3-5 X 03/12/97 - VT-3 coaplete, bent bolt on PUMP SUPPORT CR 97-0431 support plate, accepted as-is by engineering evaluation, support is part of building structure and is outside the scope of Secion XI

ll

!I 0

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 7 INSERV ICE INSPECT ION'UMMARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Coaponents N I. 0 Zone Number: 3-064 ASME S ONGT SEC. XI T RSEH Showery Examination Area Catgy Exam A E 'I 0;E Remarks Number Identification 'Item No Method Procedure T C G M R ** Calibration Block **

217800 14!'-RHR-2303-1 C-F-1 PT NDE 3.3-10 X' - - 03/14/97 - PT complete, 3/15/97 - UT 45 5.4-4 - - - coapiete, root geometry TEE TO TEE C5.11 UT UT 60 NDE

--X-X

  • << UT-33 **

217900 14"-RHR-2303-1LD1 C-F-1 PT NDE 3.3-10 X - - - 03/14/97 - PT. complete, 3/15/97 -.UT Long Seam-Downstream Inside of C5.12 UT 45 HDE 5.4-4 X -, - - complete Tee

217920 14"-RHR-2303-1LD2 C-F-1 PT NDE 3.3-10 X - - - 03/'19/97 - PT complete, 3/15/97 - UT Long Seam DoMnstream.Outside C5.12 UT 45 HDE 5.4-4 X - - - complete of Tee

217980 14a-RHR-2303-2LU1 C-F-1 'PT NDE 3.3-10 X -"- - 03/14/97 - PT complete, 3/15/97 - UT Long Seam Upstream Inside of 'C5 ~ 12 UT 45 HDE 5.4-4 X - - - complete Tee

<<* UT-33 <<*

217990 '14"-RHR-2303-2LU2 C-F-1 HDE 3.3'-'10: X - - - 03/14/97 -.PT complete, 3/15/97 - UT Seam Upstream Outside. of C5.12 PT'ong UT 45 NDE 5.4-4 X - - - complete Tee

  • << UT-33 <<<<

218000 14"-RHR-2303-2 C-F-1 PT NDE 3.3-10 - - - X 03/14/97 - PT cotlpiete, 3/15/97 - UT 5.4-4 - - - coeplete, root geometry TEE TO PIPE C5.11 UT 45'T 60

NDE

--X-X

--X-UT 70

0 0

e: 06/13/97 TURKEY POINT "NUCLEAR PLANT UNIT 3 Page: 8 INSERVI CE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Heber: 3-064 ASME S ONGT SEC. XI T R.SE H Swmary Examination Area Catgy Exam A E I 0 E Remarks Nunber Identification Item No Method Procedure T C G M'R <<>> Calibration Block **

'218020 14>>-RHR-2303-'2LD Long Seam Downstream C- F-'1 C5.12 PT UT 45'DE 3.3-10NDE 5.4-4 X'

'X

- - '03/14/97 -

- - - complete PT complete, 3/15/97 - UT

  • >> UT-33 **

218080 14"-RHR-2303-2ALU C-F-1, PT NDE 3.3-10 X - - - 03/14/97 - PT complete, 3/15/97 - UT Long Seam Upstream 'C5.12 UT 45 NDE 5.4-4 X - - - complete

.218100 14"-RHR-2303;2A, C-F-1 PT. NDE 3.3-10 ---X X--- 03/14/97 - 'PT complete, one acceptable UT 45 5.4-4 round indication, 3/15/97 - UT coaplete, PIPE TO PIPE C5.11 UT 60 NDE

--X- root geometry

33 0 14>>-RHR-2303-2ALD C-F-1 PT NDE 3.3-10 X - - - 03/14/97 - PT complete, 3/15/97 - UT Long Seam Downstream C5.12'T 45 NDE 5.4-4 X - - - complete

    • UT-33 **

218380 14"-RHR-2303-4LUI C-F-1 PT NDE. 3.3-5 X'- - - 3/12/97 - PT complete, 3/13/97 - UT

.LONG SEAM UPSTREAM~ INSIDE C5;12 UT, 45 NDE'5;4-5 X - - - complete RADIUS

218390 14"-RHR-2303-4LUO C-F-1 PT ,NDE 3.3-5 X - - - 3/12/97 - PT complete, 3/13/97 - UT Long Seam Upstream Outside C5.12 UT 45 NDE 5.4-5 X - - - complete Radius UT 33 *>>.

218400 14"-RHR-2303-4 C-F-1 PT NDE 3.3-5 - - - X 03/12/97 -.PT complete, one. acceptable ELBOM TO:VALVE 3-7528 C5.11 UT 45 NDE 5.4-5 X - - - round indication, 3/13/97 - UT UT 60, - -.X - ccepiete, .root geometry,, no voiunctric UT 70 X - - - examination from the valve side due to its configuration

  • >>'UT-33 <<>>

0 0

e:r 06/13/97 TURKEY POINT 'NUCLEAR PLANT UNIT 3 'Page: 9 INSERVICE INSPECTION

SUMMARY

THIRD 'INTERVAL, SECOND PERIOD, FIRST OUTAGE,(97RF)

Class 2 CBEAR STATUS Components N I 0

,2one. Number: 3-064 .ASME S 0 N'G,T

'SEC. XI T RSEH SunnaryExamination Area Catgy Exam A E I 0 E Remarks Number Identification 'Item No Method Procedure T C G M.R '** Calibration Block **-

210550 14"-RHR-2303-12 06/13/97 -;Neid does not'xist, removed'ode, PIPE TO TEE category and item number, from.

database

  • 4 UT 33 **

219400 PS-54 F-A VT-3 NDE 4.3-13 X - - - 03/12/97 - VT-3 complete, light rust DUAL SPRING HANGERS F1.20C noted on the inside of both spring, cans 219550 RHR PUMP 3P210B 3/12/97 - support is part of building PUHP SUPPORT structure and is outside the scope of Section XI e

0 0

Cl

e: 06/13/97 TURKEY POINT'NUCLEAR PLANT UNIT 3 'Page: 10

'INSERVICE 'INSPECTION SUHHARY THIRD INTERVAL, SECOND,PERIOD, FIRST OUTAGE '(9?RF)

.Class. 2.CBEAR STATUS Coaponents N I 0' Zone Heber: 3-066 ASHE OHGT SEC. 'XI T RS'EH Surmary Examination Area Catgy Exam. A E I O'E. Remarks Number Identification Item No Hethod Procedure T C G H'R <<>> Cal3bration Block **

222080 14"-RKR-2305-3LU C-F-1 PT HDE 3.3-4 X - - - 03/12/97 - PT complete,, 3/13/97 - UT Longitudinal Weld C5.12;UT 45 HDE 5.4 1 X - - - coaplete UT-33'**'222100 14>>-RHR-2305-3 C-F,-1 PT 'DE'.3-4 ---X X--- 03/12/97 - PT complete, one acceptable 5.4 round indication, 3/13/97. - UT complete PIPE TO VALVE HOV-3-860A C5 ~ 11 UT 45 UT, 60 HDE 1

--X-

--X- root geometry, no voiunetric examination

'UT 70 from the valve side due to 3ts configuration

    • UT-33 *>>

222860 .14>>-RKR-2305-10LUI C-F-1 PT NDE 3.'3-2 X - - - 03/12/97 - PT complete, 3/13/9? - UT Long:Seam Ins3de Radius of C5 ~ 12 UT 45 HDE 5.4-9 X - - - complete Elbow UT 33 **

222880 ,14"-RHR-2305-10LUO -C-F-1 PT HDE';3..2 'X - - - 03/12/97 -. PT complete, 3/13/97 - 'UT Long Seam Outside Radius of C5.12 UT 45 HDE 5'.4-9 'X - - - coaplete

-Elbow

222900 14"-RHR-2305-10 C-F-1 PT NDE, 3.3.-2'DE X---

X--- 03/12/97 - PT coaplete, 3/13/97 - UT C5.1'1 5.4-9 complete, root geometry, limited ELBOM TO PIPE UT 45 UT'60 --X- volunetric examination due to the weld UT 70 --X- crown

<<* UT-33 *>>

configuration 222920 14<<-RKR-2305-10LD C-F-1 .PT NDE 3.3.2 X - - - 03/12/97 - PT coaplete, 3/13/97 - UT Long Seam Downstream C5.12 UT 45 'NDE 5.4-9 X - - - complete

0 0

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 11 INSERVICE INSPECTION SUNNARY THIRD INTERVAL, SECOND'PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I '0 Zone Number: 3-066 . ASHE S ONGT SEC. XI T RS'EH Suanary Examination Area Catgy Exam A E I 0 E .Remarks Number Identification Item,No Nethod Procedure T C G N R ** Calibration Block **

222980 14"-RHR-2305-11LU C-F-1 PT 'NDE 3.3-2 X - - - 03/12/97 - PT complete, 3/13/97 - UT.

Long Seam Upstream C5.12 UT 45 NDE 5.4-9 - - X - complete, beam redirection due to dendretics, inside surface geometry

    • UT-33 *~

.223000 14"-RHR-2305-'ll C- F.-1 3.3'-2 X---

--X- ,03/12/97 - PT complete, 3/13/97 - UT PIPE TO VALVE NOV-3-861A

'PT'5.11 UT 45 UT 60 70'DE HDE 5.4-9

--X-

--X-complete, root geometry, limited volwetric examination due to the valve and,weld crown. configuration, lleld ID UT

'tag in examination area. at .top of pipe

  • + UT-33 **

0 0

il

e: 06/13/97- TURKEY. POINT NUCLEAR PLANT UNIT 3 Page: 12

.INSERVICE INSPECTION SUHHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone 'Number: 3-090 ASHE S 'ONGT SEC. XI T R S:E N SumMry Examination Area 'Catgy Exam. ,A E I O.E Remarks Number Identification Item No Hethod Procedure T C G H R ** Calibration Block **

- - - 03/14/97 - PT and complete, root 274100. 8"-SI-.2308-19 ELBOW TO PENETRATION P-11 C-F-1 PT 60'DE 3.3-14 C5.11 iUT 45 UT NDE 5.4-6 X

X - - - geometry

- - X-UT

    • 'UT-41 **

0 II II

e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 Page: 13 I HSERVI CE 'NSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Heber: 3-095 ASME S ONGT SEC. XI T R'SEH Sumery Examination Area Catgy Exam ,A E I 0 E Remarks Number Identification Item No.Method P,rocedure T C G M R <<* Calibration Block **

288506 3-SIN-139 IA ,05/13/97 - pipe saddle cut back to 1" INTEGRAL'TTACHMENT and abondoned 'in place,,removed code category.and Item number from database 288519 4"-SI-2303-31 thru 49 06/05/97 - Existing Molds removed 'from service during 1997, outage per PC/M 96-012 288520 6"-S1-2306-1 thru 2 06/05/97 - 'Welds removed-from service during '1997 outage per PC/M 96-012 06/05/97 - Boron Injection Tank and support abandoned in place and removed

,from:service during '1997 outage per PC/M 96-012 288522 6"-SI-2307-1 thru 2 06/05/97 - Netds removed from service during 1997 outage per.PC/M 96-012 288523 4"-SI-2305-1 thru 11 '06/05/97 - Nelds removed, from service during 1997 outage per PC/M 96-012 288524 4"-SI.-2303-31 C-F-1 HDE 3.3 ,03/24/97 - neM veld installed per PC/M PIPE TO PIPE C5.21 HDE 5.4 '.96-012, FW7

    • TO BE DETERMINED *>>

0 0

e: 06/13/97 TURKEYPOINT NUCLEAR'PL'AHT UNIT 3 Page:. '14

'INSERVICE INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)

Cl'ass 2 CBEAR STATUS Components

.H. I 0 Zone Number: 3-095 ASHE S ONGT SEC; XI T RSEH Sunnnry Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item Ho Hethod Procedure T C'G H R ** Calibration Block <<*

288525 4"-S1-2303-32'IPE

'C-F-1 ,'HDE 3'.3 03/24/97 - new weld installed'pcr PC/H TO ELBOW C5.2'I NDE 5.4 96-012, FW8

    • TO BE OETERHIHED **

288533 4"-S1-2303-35 C-F-1 NDE 3.3 .03/24/97 - ncw weld installed pcr PC/H Elbow 'to Valve 3-867 C5.21 NDE 5.4 96-012

  • <<TO BE DETERHIHED *>>

288536 4<<SI 2303 36 C-F-1 NDE'.3 03/24/97 - ncw weld installed pcr PC/H Valve 3-867 to Elbow, C5.21 HDE 5.4 96'-012( FW9'*

TO BE DETERHINED **

9 4"-S1-2303-37 C-F-1 NDE 3.3 03/24/97 - new weld installed:per PC/M ELBOW TO PIPE C5.21 :NDE 5.4 96-012, FW10

<<<<TO'BE DETERHIHEO **

288542 4"-S1-2303-38'IPE C-F-'1 'NDE 3.3 03/24/97 - new weld installed per PC/M TO ELBOW: C5.21 NDE'5.4 96-012( FW11

<<<<TO BE DETERHIHEO **

288545 4"-SI-2303-39 C-F-1 NDE 3.3 03/24/97, - new. weld installed per PC/H ELBOW TO PIPE C5.21 'NDE 5.4 96-012, FW12

    • TO BE DETERHIHED **

288548 4"-SI-2303-40 C-F-1 ,HDE'3.3'NDE 03/24/97 - ncw weld.installed per.'PC/H Pipe to Tee C5.21 5.4 96-012, FW14

    • TO BE DETERMINED,**

0 0

e:. 06/.13/97 'TURKEY POINT NUCLEAR PLANT UNIT 3 Page: 15 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)'lass 2 CBEAR STATUS Cocponcnts, N I 0 Zone 'Number 3-095 ASHE S 'ONGT SEC. XI T RSEH Stannary Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item No Method Procedure T C G H R ** Calibration, Block, **

288551 4"-SI -2303-41'ee C-F-1 NDE'.3 03/24/97 - new weld installed per PC/H to Pipe C5.21 NDE 5 4 96-012, FM31

    • TO BE DETERHINED **

288554 4<< SI-2303-42'ipe C-F-1 NDE 3.3 03/24/97 - new weld installed per PC/N to,valve MOV-3-843A c5.21 NDE 5;4 96-012, FU30

    • TO-BE DETERHINED *>>

288578 4"-SI-2303-46 C-F-1 SUR NDE 3.3 03/24/97 - ncw weld installed per PC/H TEE TO PIPE C5.21. VOL NDE: 5'.4 96-012, FW15

    • TO BE DETERNINED **

'I 4"-Sl-2303-47 C- F-1'UR HDE 3.3'DE 03/24/97 - new weld'nstalled per PC/M, PIPE TO,ELB(N C5.21 VOL 5.4 96-012, FN16

<<* TO BE DETERNINED <<>>

.288584 4"-Sl -2303-48 ELBSI TO'IPE'-F-1 C5.21 SUR VOL NDE NDE 3.3 5.4 03/24/97 - new weld installed per PC/H 96-012, FW17

    • TO BE DETERNIHED'**

28S586 8080-H-007-01 IA 05/13/97 - Removed from pipe pcr PC/H INTEGRAL ATTACHHENTS96-012, no longer, performs a support function, removed code category and item neer from database 288587, 4"-SI-2303-49 C-F-1 PT NDE 3.3 03/24/97 - new, weld installed'per PC/H Pipe to Valve HOV-3-843B C5.21 UT NDE .5.'4 '96-012, FM25

<<>>'O BE DETERHINED **

0 e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page:

'IHSERVICE INSPECTION SUNNARY THIRD'INTERVALED SECOND PERIOD, FIRST OUTAGE,(97RF)~

Class 2 CBEAR STATUS Components 16'one N.I 0 Number.: 3-095 ASNE ONGT SEC. XI RS EH Stannary Examination Area Catgy Exam E I 0 E Remarks Number Identification Item Ho,'Hethod Procedure C 0 N R ** Calibration Block "~

288604 8080-R-007-01 F-A PT HDE 4'.3-20'X - - - 03/15/97 - VT-3 complete DOUBLE 'ACT ING 'ESTRAINT F1.20B 288820'080-H-004-01'OUBLE F-A VT-3 'NDE 4.3-18 X - - - 03/14/97 - VT-3 complete ACTING RESTRAINT F1.20B 288865 8080-H-007-07 'F-A 'VT-3 HDE 4.3-17 ,X - - - 03/15/97 - VT-3 complete DOUBLE, ACTING RESTRAINT F1.208 8 8080-H-007-10 F-A'VT-3 HDE 4.3-16 X - - - 03/15/97 - VT-3 complete DOUBLE ACTING RESTRAINT F1.208 288896 8080-H-005-02 F-.A, VT-3 HDE 4.3-15 X 03/15/97, - VT-3'complete, bottom lug is, DOUBLE .ACTING,RESTRAINT F1.208 CR 97-0485 missing, welds, possible drawing PMA I 'PH97-03-210 discrepancy, accepted as-is by engineering evaluation, drawing will be rev'ised,to show as built condition 288911 8080-H-005-01. 'F-A VT-3 HDE 4.3-19 X - - - 03/15/97 -'T-3 complete DOUBLE ACTING. RESTRAINT .F1'.208

0' il

e: 06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 a Page: '17

'NTERVALED INSERVI CE INSPECTION'UMMARY THIRD SECOND PERIOD ~ F I RST OUTAGE (97RF ) ~

Class 2'CBEAR STATUS Components N I 0

,Zone Number: 3-096 'ASME S ONG,T SEC.'I T'S*EH

'Sugary Examination Area Catgy 'Exam A 'E I 0 E Remarks Number Identification Item No:Method Procedure T C G.M R ** Calibration Block ~*

289298 SR-123 F-A VT-3 HDE 4.3-4 ---X 03/12/97 - VT-3 complete, chipped SINGLE AHD DOUBLE ACTING F1.20ABCR 97-0433 concrete,. accepted as-is by engineering RESTRAINT evaluation, drawing will be updated to show.spelled concrete 289301 SR-123 I A C-C PT NDE 3.3-3 X - - - 03/12/97 - PT complete INTEGRAL ATTACHMENTS C3.20

0 e: 06/13/97 TURKEY, POINT NUCLEAR PLANT UNIT 3 Page: 18 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL', SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 'CBEAR STATUS Components N I 0 Zone Number: 3-100 ASME S ONGT SEC. XI T R S, E 'N Sumury Examination. Area Catgy Exam A E I 0 E Remarks Naker Identification Item No Hethod -Procedure -T C G M R ** Calibration'Block **

301700 26"-HSA-2304-17 C-F-2 HT, NDE 2.2-3 X---

--X- 03/14/97 - HT complete, 3/16/97 - UT PIPE TO VALVE POV-3-2604 5.2-2 complete, root geometry, limited C5 F 51: UT UT 45 60 NDE

--X-

--X- volunetric examination from the. valve UT 70 side due to its configuration

<<* UT-2'I **

301800 26"-MSA-2304-17LU C-F-2 HT NDE 2.2-3 X - - - 03/14/97 - HT complete, 3/16/97 - UT PIPE LONG SEAH UPSTREAH C5.52 UT 45 NDE 5.2-2 X - - - complete

    • UT-21 **

0 0

4I

e:r 06/13/97 TURKEY POINT NUCLEAR. PLANT UNIT 3 .Page: 19 INSERVICE'INSPECTIONSUMHARY THIRD INTERVAL, SECOND PERIOD, FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I. 0 Zone Number: 3-109 ASHE S 0 N.G,T SEC. XI T RS-EM' Swmary Examination Catgy Exam E I 0 E Remarks Identification Arear'wher Item No Method Procedure T C G H.R ** Calibration 'Block **

330500 AUGHENTED EXAMINATION AUG UT NDE 5.16-1' - X X 03/13/97 -.UT complete, root and chill FROH NOZZLE.RAHP TO 1 DIAHETER ring geometry, acceptable"slag ON ELBOW 'indication at weld FW1

    • UT-20( UT-29'~*

II e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 Page: 20 INSERVICE,IHSPECTION

SUMMARY

THIRD INTERVAL, SECOND PERIOD, 'FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Number: 3-110 ASME S O.NGT SEC. XI T RSEH Sugary'Examination Area Catgy Exam A E I 0 E Remarks Nunber Identification Item.'Ho Method Procedure T C G M: R ** Calibration Block **

330700 14"-FWB-2304-1 C-F-2 MT NDE X---

X--- :03/10/97 - MT and UT coeplete, root geometry, limited volunetric-examination 2.2-1'DE'5.2-1 VALVE CV-3-2901 TO PIPE C5.51 UT 45 UT 60 --X- on the veld and the valve side due to X---

UT 70 their configuration

331100 14"-FWB-2304-3 C-F-2 MT NDE 2.2-2 - - -'X 03/10/97 - MT complete, acceptable PIPE TO ELBOW C5.51 UT 45 NDE 5.2-1 X - - - linear indication, UT complete, backing, UT 60 - - X - ring geometry

    • UT-20 **

333800 AUGMEHTED EXAMINATION AUG UT NDE 5.16-2 - - X - 03/12/97 - UT complete, root and FROM NOZZLE RAMP .TO 1 DIAMETER backing ring geometry ON'LBOW

    • UT-20,'UT-29 <<~

0 e: 06/13/97 TURKEY POINT NUCLEAR PLAHT UNIT 3 Page:,21 INSERVICE INSPECTION

SUMMARY

THIRD ilNTERVAL, SECOND PERIOD, .FIRST OUTAGE '(97RF)

Class. 2 CBEAR STATUS Components N I~ 0 Zone Nwher: 3-111 ASME S ONGT SEC. XI T RSEK Swmary Examination Area Catgy Exam A E I 0 E Remarks Number Identification Item Ho Method Procedure T C G,M R ** Calibration Block *>>

338200 'AUGMENTED EXAMINATION AUG UT HDE '5.16-3 - - X'X 03/12/97 - UT complete, root and FROM'NOZZLE RAMP TO .1 DIAMETER backing, ring geometry, acceptable slag OH ELBOW inclusion and Internali undercut

<<* UT-20( UT-29 <<>>

0

~ '

e: 06/13/97 TURKEY'POINT NUCLEAR PLANT UNIT 3 Page: 22 INSERVICE INSPECT I OH

SUMMARY

THIRD INTERVAL, SECOND PERIOD, FIRST, OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I 0 Zone Nwher: ASME 'S ONGT 3-115'ugary SEC. XI T RS'EH Examination. Area Catgy Exam A 'E I 0 E Remarks Nunber Identification 'Item No Method Procedure T C G M R>>>> Calibration Block **

341200 3-RHE-A1 HEAD TO SHELL'-A 'C1.20 UT, UT 45 60 NDE 5.4-7 X X

03/15/97 - UT complete, limited examination due to nozzles and reinforcement plates

341300 3-RHE-A2 C-A UT 45 NDE 5.4-7 X - - - 03/15/97 - UT complete, limited SHELL TO FLANGE C1.10 UT 60 X - - - examination due to nozzles and reinforcement plates

  • >> UT;55 **

341800 3-RHE.-A7 C-B PT 'NDE 3.3.1B X - - - 03/15/97 - PT complete REINFORCEMENT PLATE TO SHELL C2.31 0 3-RHE-AB C-B PT. NDE 3.3-18 X - - - 03/15/97 - PT complete REINFORCEMENT PL'ATE TO NOZZLE C2;31 342000'-RHE-A9 C-B PT NDE 3.3-.17 X, - - - 03/15/97 -"PT complete REINFORCEMENTi PLATE TO SHELL C2.31 342100 '3-RHE-A10 REINFORCEMENT PLATE TO NOZZLE C2.31'DE C-B PT 3.3-17 X - - - 03/15/97 - PT complete 342400 3-RHE-SPA-1 SUPPORT F-A VT-3 NDE 4.3.,11',X - - - 03/12/97 -,VT-3 complete Heat Exchanger Lo~er Support F1.40H 342500 3-RHE-SPA-2,IA C-C PT. NDE 3.3-9 ---X 03/15/97 - PT complete, one rejectabie Integral Attachment 97-0479 round indication, engineering evaluation C3.10 CR VT-1 NDE 4.1-6 X determined cover weld on partial penetration weld was not conpietely around end.of lug', 3/19/97 -

examination performed to VT-1'omplete, docunent final condition

e: .06/13/97 TURKEY POINT NUCLEAR PLANT UNIT 3 Page 23 INSERVICE,INSPECTION

SUMMARY

THIRD'NTERVAL, SECOND PERIOD; FIRST OUTAGE (97RF)

Class 2 CBEAR STATUS Components N I Zone Number:, 3-115 0NGT

.ASME SEC. XI T RSEH Suwery Examination Area Catgy Exam A E,I 0 E Remarks Number Identification Item'No Method Procedure T O'G M R ** Calibration Block **

342600 3-RHE-SPA-2 'SUPPORT F-A VT-3 ,NDE 4.3-10 X - - - 03/12/97 - VT-3 complete Heat Exchanger. Lower Support F1.40H,

~ ~~

i5~

il 0

TUR I NT

p' J

NRC / FPL ENGINEERING INTERFACE MEETING JULY 15, 1SS7

il~

il~

il~

ENGINEERING DEPARTMENT

@PL AGENDA INTRODUCTION R.S. KUNDALKAR

- PLANT INDICATORS

- ENGINEERlNG ORGANIZATION TURKEY POlNT ENGINEERING ORGANIZATION E.A. THOMPSON SAFETY SYSTEM PERFORMANCE SYSTEM ENGINEERING D.J. TOMASZEWSKI ROD CONTROL SYSTEM ENHANCEMENTS CCW HEAT EXCHANGERS EFFECTIVE USE OF PSA OUTAGE SUPPORT PLANT ENGINEERING W.A. SKELLEY 50.54(f} RESPONSE DRAFT NUREG '1 606 SOFTWARE CONTROL SAFETY / RELIABILITYUPGRADES ST. LUClE ENGINEERING ORGANIZATION C.R., BIBLE SAFETY SYSTEM PERFORMANCE SOFTWARE CONTROL REACTIVITY MANAGEMENT C.A. PELL CONTROL ROD PERFORMANCE SAFETY / RELIABILITY,IMPROVEMENTS J.R. 'HOFFMAN 50.54(f} RESPONSE

'R.S. iKUNDALKAR rrcl.wpd Page 1

il

~ i IS)

~ g 0

~

~ ~ F ~ ~

~ 1 C Cg C C C CC C

' C r C C C C

~ C

~ C

~C ~

P~ ' ~ ~

~ 0 C P C

~ ~

~ C

0 ili

ENGINEERING DEPARTMENT FPL U%7 CAPABIUTYFACTOR TURKEY POINT P YR RUNNING AVERAGE+ 1997 AVG -THROUGH MAYJ 90; 80a  :-,:,;34

+i3~~4+5~

75 70 1994 1995 1996 1997 02GIG UNITS~'UNIT4 INDUSTRYAVG WANOYR2000GOAL UNIT CAPABILITYFACTOR ST. LUCIE

'+

(S YR RUNNINQ AVERAGE 1997 AVQ1HROUQH MAY) 90 -"

W H W  % W  % W & W 0 Q ~

~4i 75 ' (Qk'j'g wg~yge'll 70

~

G 1994 1995 1996 1997 322--.G UNIT l UNIT2 INDUSl1lYAVG WANOYR2000GOAI Page 3

~ ~

Oi

ENGINEERING DEPARTMENT APL UNPLANNED'AUTO TRIPS PER 7000 HOURS CRITICAL TURKEY POINT YR RUNNING AVERAGE+ 1997 AVG THROUGH MA 1.75 1.5 1.25 0.75 0.5 0.25

'. ': ke?@

0 UNIT 3 ~

1994 UNIT 4 1995 INDUSTRY AVG 1996

~

1997 WAND YR 2000 GOAL UNPLANNED AUTO TRIPS PER 7000 HOURS CRITICAL ST. LUCIE YR RUNNING AVERAGE+1997AVGTHROUGH MA 1.75 1.5 1.25 4k',:gg RGB)322)+$ ~ ~ ~~ '33( 2423I;fi ~a N4%~~9 0.75  ; 5?$4<,

'c'!

k%~N+I" I2 0.5 Awe 1994 1995 1997

~SS UNIT2 INDUSTRYAVG WANOYR2000GOAL 'SS.UNIT4 Page 4

ik i

il~

ENGINEERING DEPARTMENT EPL THERMAL PERFORMANCE

. TVRKEY-POINT It12 MONTH RUNNING AVERAGE) 101 1~>, %'4~%>>

Si

"'9 I j'O';'Aj, 98 --'

l Qjh@jgh g~+>

(jPQk,.'00 1

97 .

I p

95 1994 1995 1996 1997

~

~~AS UNITS ~mc UNIT 4 .INOUSTRYAVG WANQ YR 2000 GOAL THERMALPERFORMANCE ST. LVCIE (12 MONTH RUNNINQ AVERAGE) 101 100 99

, m".11 98 I I

97 "---'

1

~~~'~~4l!

96: . V.(i'c

'ii&piki4h

%4m, 95: S

~>>:" UNIT I 1994

~ UNIT2 1995 INOUSTNYAVG 1996 1997 i WANQ YR 2000 GOAL Page 5

0 Oi

~ g 0

~

.4,a~ h~.

g~.oy f,y.

ah+( i4glt lp i+

,.-.a

. f,()i \ III

il 0

Oi

+op TURKEY POINT ENGINEERING DEPARTMENT P(P+T Q TURKEY POINT'ENGINEERING ORGANIZATION p

KA. THOMPSON J.BALAGUERO E. LYONS W. SKELLEY D. TQMASZEWSIQ PLANT OPS SUPPORT ADIIINIYTRAYIVE PIANTENOWEERWO SYSTEMS ENOWEERWQ K; REMINQTON D. BAKER P. BANASZAK

, SYS PERFORMANCE DESKIN BASS SUPV ELB4SC SYSTEMS B. OUNN RX ENO MECH SYSIENS J. CAOOOAN Q. KUHN llECH DESKN PROC ENGR T. SWEENEY MC DESKN

+ FIRST LINE SUPERVISORS HAVE OVER 12 YEARS EXPERIENCE

+ SYSTEM AND COMPONENT SUPERVISORS ARE SRO CERTIFIED AfCp'th.Wpd Page 7

ii

<I~

Pop TURKEY POINT ENGINEERING DEPARTMENT

+ OgGSSr + oi UNIT 3 SAFETY INJECTION AVAILABILITY

,(18 MONTH CUMULATIVEAVERAGE)

~ SASI~.SSSI AVAILABIUTY(4/e)

PERFORMANCECRITERIA WANOYRS000GOAIS 100%

SS%

S&%

97%

96%

95%

12-95 02-96 04-96 06-96 0&-96 10-96 1248'2-97 04.97 UNIT a SAFETY INJECTION AVAILABILITY 4A Sl AVAILABlLAY

~

(44()

40 Sl (18 MONTH CUMULATIVEAVERAGE)

PERFORLIANCE CRITERIA 'ANG YR 0000 GOALS 100%

I 99%

98%

S7%

96%

950/i 12-S5 '2-S6 04-96 06-96 08-96 10-S6 12-S6 02-97 Page 8 M'NSPTILWPG

0 lli

Dog TURKEY POINT ENGINEERING DEPARTMENT

+ o>ear e ao~

UNIT,3 EDG AVAILABILITY

~

AVAILABIIJTY BA EOG ~, (18 MONTH CUMULATIVEAVERAGE) 88 EOG PERFORMANCE CRITERIA WANG YR 2000 GOALS 100%

'99%

88%

97%

96%

S5%

94%

S3%

92%

91%

90%

01-96 03-96 05-96 07-96 09-96 11-96 01-97 03-97 05-97 Note: SB EDG placed In a(1) 2@6; returned to a(2) 11/86.

UNIT 4 EDG AVAILABILITY

~ ~ 4A EOG AVAILABILITY 48 EM (18 MONTH CUMULATIVEAVERAGE)

PERFORMANCE CRITERIA WANG YR 8000 GOALS 100%

9S%

SS%

97%

96%

85%

94%

93%

82%

91%

808le. I 01-96 03-86 05-86 07-96 09-M 11-96 01-97'3-97 05-97 LVCOLn.WOd Page 9

ili O

~ r~

4'URKEY ENGINEERING DEPARTMENT POINT EMERGENCY FEEDWATER AVAILABILITY

~

(1 8 MONTH CUMULATIVEAVERAGE)

AVAlLABlUTY('/0)

KRRHI U3 TRAIN A PERFORMANCE CRITERIA USTRAINS WANG YR 2000 GOALS 100%

ss/

88%

87%

,86%

85%

84/.

93%

820/i 81%

80%

01-96'3-96 05.96 07~ SH}6 1146 01~ 0347 0$ 47 EMERGENCY FEEDWATER AVAILABILITY

~

(16 MONTH CUMULATIVEAVERAGE)

~ U4TRAINA PERFORMANCE CRITERIA:

U4TRAIN8 WANOYR2000GOALS AVAILABIUlY 100%

99%

S8'/0 97%

960/i 950/0 S4%

93%

820/0 91%

80%

01-96 03-96 05-96 07-96 09-96 1'1-97 084'5-97 Page 10

0 ill

>op Op TURKEY POINT Q

~r ENGINEERING DEPARTMENT

+a clear ~ao ROD CONTROL SYSTEM ENHANCEMENTS.

+ -

SYSTEM EVENT

SUMMARY

OCTOBER 1995 TO MARCH 1997 7 UNIT 3 EVENTS 4 FORCED OUTAGES 3 EVENTS INITIATED BY DROPPED RODS NO UNIT 4 EVENTS MAY 1995 THROUGH DECEMBER 1995 UNIT 3 ROD CONTROL ROOM A/C DEGRADED AIR HANDLER OBSOLETE AND INACCESSIBLE

~ EXTENSIVE INVESTIGATION FOLLOWING EVENTS SYSTEM TESTING CONDUCTED NO COMMON PROBLEMS IDENTIFIED

+ CAUSE PRINTED CIRCUIT CARD FAILURES DUE TO HIGHER AMBIENT ROOM TEMPERATURES DURING 1995 nrcptn.wpd Page 11

0 i

ii)

0

~ g P

~

~ ~ ~ ~ ~ ~

~ ~

iN i

~ ~

~lee Pyg TURKEY POINT ENGINEERING DEPARTMENT.

+o+o(Jgg goo~

ROD CONTROL SYSTEM ENHANCEMENTS

+ CORRECTIVE ACTIONS

~ RESET ROOM TEMPERATURE ALARM FROM 102 F TO 75 F ROOM AIR HANDLER REPLACED 0 VERIFICATION OF THE ROD CONTROL SYSTEM OPERATION:

POWER SUPPLIES LOGIC CABINET TIMING DYNAMICTESTING

~ REPLACED EXISTING FIRING CARDS FORCED COOLING ADDED TO POWER CABINETS DYNAMIC'TESTING AT EXPECTED ELEVATED TEMPERATURES REPLACED SELECTED COMPONENTS DC HOLD CABINET

+ CORRECTIVE ACTIONS COMPLETED ON UNIT 3 IN SPRING, 1997 REFUELING OUTAGE

~ NO EVENTS SINCE RESTART

+ CORRECTIVE ACTIONS PLANNED FOR UNIT 4 1997 FALL OUTAGE Page 13

il

~i

0 I

<<+6

.4

~ (<

gt

~ - .(i'<1 I ~

4J IIIII."'!,

it

,I I

, 'll, II'R

(~1 "I ;l

<~

I I

I'$  !

III. cI g3 '..

II

( (Iig'Ig (

gl Ni '4 *

(f~jh

((

(4 ~I T

I j j,><(i((,j <<il(iii::< ~<

jg:I I~"

((( I ~I 4 I((I I l

I f I

441LN ..

~ <~ '( ( ( ~ II 4

<Q((

4

~v<< II II

!I W~~

I

~

~ I tA

~ <

'v, 4f l

~ I

(

I' gii)I Il

~teak f4'!PP!++

j r."<<3 (I I f<

V

. Ti I(l

~j

,=~~A~

g pI I << i II l~, gi

<I I S

j

( ~

!Ii i( (

wiL;j<'. f' Wf

~

I ' '

PQ (e

Vi' I'(

p',< (

jI!444(

I 4

0 iS~

il~

5 I ~ ~

1 1

~ <

'1 ~ '(( ~

IW ~"

r ICI 1

~ ~(rrr 'I j~ I ~ I

~ 'I ~

~ C

$1 (, )~Lgd6((<<<~ I ~I (

r It 1

s

( j

ill UNIT 3

~dr f.;

~

~ '

Tip UNIT 4

=x F ~ F

0

~ ~

~co~ >op Op TURKEY POINT e + o~

ENGINEERING DEPARTMENT CCW HEAT EXCHANGER IMPROVEMENTS CCW HEAT EXCHANGER FOULING FACTOR IMPROVEMENT

+ COMPREHENSIVE PERFORMANCE TESTING PROGRAM TO ENSURE CAPABILITY OF REMOVING DESIGN BASIS HEAT LOAD

+ FREQUENT TESTING, TRENDING AND CLEANING OF CCW HEAT EXCHANGERS WAS REQUIRED

~ TESTING AT LEAST WEEKLY

~ CLEANING AT LEAST ONE HEAT EXCHANGER/UNIT WEEKLY

~ CLEANING SIGNIFICANTLY MORE OFTEN DURING SUMMER

+ UPRATING,EFFORT TARGETED IMPROVING THE MAXIMUMALLOWABLE FOULING FACTOR OF CCW HEAT EXCHANGERS 0 ~

~

IVIASS &. ENERGY RELEASES RECALCULATED CONTAINMENT RESPONSE RECALCULATED CCW THERMAL HYDRAULIC CASES RECALCULATED, HIGHER ALLOWABLEFOULING FACTOR ASSUMED' PIPING STRESSES AND SUPPORT LOADS ASSESSED

~ MODIFICATIONS IMPLEMENTED ECC AUTO-START MODIFICATION CCW PIPE SUPPORTS UPGRADE ON UNIT 4

+ CHANGES RESULTED'IN SIGNIFICANTLY REDUCED FREQUENCY FOR HEAT EXCHANGER CLEANING

~ REDUCED CLEANING FREQUENCY FROM ONCE PER WEEK TO ONCE

'EVERY 6 WEEKS

~ REDUCES "WEAR" ON TUBES DUE TO CLEANING

+ OTHER RELATED INITIATIVES

~ IMPROVED TESTING METHOD

~ 'RETUBED UNIT 3 CCW HEAT EXCHANGERS Page 17

0 45~

~i

iso/0 TURKEY POINT ENGINEERING DEPARTMENT

+o ofotrr +eo PSA AND ON LINE ACTIVITIES

+ PSA TECHNOLOGY USED IN PLANT ON LINE MAINTENANCE

~ RISK SIGNIFICANT EQUIPMENT/COMPONENT LIST,

~ MULTIPLE COMPONENT MATRIX

~ GUIDELINES FOR WHEN PSA SHOULD BE USED

~ ON LINE MONITOR IN TRIAL USE 0 ADM-210 On-Une Malntcnaneei Wortt Coordination ATI'ACHhfENT S fpagc l of 3)

RISK SIGNIFICANTEQUIPMENT ILST

'Dte foliowing Tce)micd Spccificatitm components have each been cvdu sted as flat exceeding PSA risk limits when mnovcd from service individually for a duration of up to thc following tt mes for Mode I oecautions.

ABowed OOS Tllne Accumulator A Accumulator B Accumulator C AFW Pump A I2 Ttshts digaed) 30 days AFW Pump B I2 Trsias aligaed) 30 days AFW Pump C f2 Trains aligned) 30 days AFW Train I AFW Trdn 2 72 hts Botic Acid-BAST to Charging CCW Pump A 30 days CCW Pump B 30 days CCW Pump C 30 days Containment Spray Pump A Containment Spay Pump B ECC A ECC B ECC C 72 hrs EDG B Opposuc Unit EDG A 72 hrs 0 ite Unit EDG 8 mcptn.wpd Page 18

0 O~

IS~

~c>o f'o/Ots TURKEY POINT e O OJ4C T

44 ENGINEERING DEPARTMENT PSA AND ON LINE ACTIVITIES IOCCCXXO TC4l Coordination POOL'7 APpvovtr Oxloc 0-ADM-210 On-Line Maintenance/ Work I/14/97 Tae DUAL COMP8lHNS IN-KEhVh5k5NNCE MATRIX

~ e easer Isetosw seasasas er t etarwtaee aoaa ease aea laewee oaa wws aa eo lw taws lw sN etatwwa Tls aoatw ase d es NN 4 oll ol w ttNA QC tatto TVta AC olWI

~

el t eeeavws ossa ao soaewa ow wwe ~ awasawr sa ewwww la t oalsaatw essa oaal eeet waotN oNI saws ateasaav slap os ew aellalee ael leavettstilt aw NNAAN or IvIAC cela Tall teaewss owwwwa oaN aeaaa cess oaoetvte xxxx w ATW FCV ATTVIIWAO AFW tvaO ATW T4enp lit 4W A Q Tlsw ~ n TNew C C Tloes ATW TNII AtxV Tlaa elva oe so so tt aaeo ete sswsteae os oa AN scatww Uel St 4 C TTITLt AOOAet) Axttwxr I t Ataaawa 4 tsataava C Aow scvatealTWH, t ASW saw A IT 'I vs A XXXX AIWOtas 4 rtvs Car~

ASW lvs t t saws sat voa t allset sel 'ltw

~ eetatwaaor v Ctw I ~ A CCW V 1 ~

CCW V'I C CCW A CCw ww 4 CCW Iaset C Cw lots ~

Cw law as ~

Oaw OIN I tOOA 1 1XX TOO O

~ IW A tOO

~ vv 4 eoo l sow cesw A tw CAW Cwa 4

~ Ios A teal eo owov s Itv ~ INN Icw a ICW ~

~ cwccwovw a was ICwCCWOvw 4 awa xxxx vtsvws st Ctver IA Cattetsl lot CO XXXX sxa Ia ~ CO la

~ arv lass xxxx asov.lass XXXX vovaasl XXXX vovealo atavess

~ OAVVs

~ claws

~ sas svN a wa svw o

~ s <<av ss o lava a 4 avast lwvasw

~ vw Isa oeasav Isle A XXXX

)I XXX XXX1

'lI ~BATVdVbvC IVCOTIIAVOd Page 19

il ill

~cICo >oI 4p TURKEY POINT L3 rr ENGINEERING DEPARTMENT OUTAGE SUPPORT PREPLANNING EARLY MODIFICATIONIDENTIFICATION AND ISSUANCE SAFE ON-LINE MAINTENANCE EFFECTIVE PSA USAGE HIGH EQUIPLIENT AVAILABILIIY JOB COVERAGE/PAOBLELI RESOLUTION SAFEIY AND AEUABIUTYFOCUSED SCOPE SAFETY . ACTIVE PARllCIPATION RLSK ASSESSMENT OF SCHEDULE BREAKER TO BAEAKEACOVERAGE CONSERVATiVE SHUTDOWN DESIGN ENGINEER INVOLVEMENT OPERATIONS SYSTEM ENGINEERS LIANAGETASK FULL CORE OFFLOAD ENGINEERS ROTATE TO OTHER HO REDVCED INVENTORY DEPARTMENTS REUABLE ONCffEiOFFCITE POWER RESPONSIVE MAINTENANCE IMPROVED SUPPORT OUTAGE EFFECTIVE STEALI GENERATOR ERFOR INSPECTION/LWNTENANCE auALnY ELIABI SELF ASSESSMENT REACTOR ENGINEERING INIATIVES RELOAD SEQUENCE 70 MINIMIZEFUEL HANDUNQ INPUT TO OVTAGE MAHAGELIENT OPTIMIZED LOW POWEA PHYSICS TESTING IMPROVEMENT TEAMS ADDmONALBORON CHANGE CUAVESITABLES SYSTEM WINDOW REVIEW BEITER PREDICTED AOD WORTHS(AFD DATA IMPROVED FLUX MAP PERFORMANCE CONSISTENT ERFORMANCE wCCth.WDd Page 20

ik~

ili

~cWe >op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f) RESPONSE, DESIGN BASIS AND FSAR REVIEW

+ 50.'54(f) REQUESTED 0 ADEQUACY OF DESIGN BASIS INFORMATION

~ AVAILABILITYAND CONTROL OF DESIGN BASIS INFORMATION

+ OVERVIEW OF PTN 50.54(f) RESPONSE

~ DESCRIBED THE FPL/PTN CONFIGURATION MANAGEMENT PROCESSES

~ DESCRIBED FPL PROGRAMS AND INITIATIVES

~ FOCUSED ON MAJOR PROGRAMS AND PLANT BETTERMENT PROJECTS SINCE 1985 0 IMPROVED CONTROL PROCEDURES FOR DESIGN BASIS INFORMATION IMPROVED. QUALITY OF DESIGN BASIS INFORMATION Page 21

Ik 0

>op Op TURKEY POINT ENGINEERING DEPARTMENT 50.54(f) RESPONSE, DESiGN. BASIS FSAR REVIEW IMPROVED TECHNICAL RPS SYSTEM SPECIPICATIONS UPGRADE 1001 1001 PROCEDURE ENHANCEMENT PROJECTS STANDS Y APW 'AJORPROGRAMSAND UPGRADE BETTERMENT PROJECTS 1005 REQUIRING ELECTRIC POWER DESIGN BASIS SYSTEM UPGRADE REVIEW AND RECONSTITlmON 1091 INSTRUMENT AIR THERLIALPOWER

, UPGRADE UPRATE PROJECT 1095 1009 DESIGN BASIS RECONSTITUTION PROGRAM

- FIRST PLANT TO COMPLETE MAJOR PROGRAM

- 18 PLANT SYSTEMS REVIEWED

- 19 DESIGN BASIS DOCUMENTS (DBD) CREATED

- DBD's REVISED ON FSAR REVISION CYCLE

- WORKING ON NEW ACCIDENTANALYSIS DBD Page 22

0

~cW~ >op Op TURKEY POINT ENGINEERING DEPARTMENT

+~+ogear ~o~

50.54(f) RESPONSE, DESIGN BASIS FSAR REVIEW 50.54(f) FSAR REVIEW COMMITMENT

+ FSAR SELF ASSESSMENTS AND NEI 96-06 REVIEW COMPLETED AT PTN

~ SELF ASSESSMENT (3/96)

~ FSAR OPERATIONAL REVIEW (1994 - 1996)

~ NEI REVIEW (3/97)

+ RESULTS

~ NO SAFETY SIGNIFICANT DESIGN BASIS ISSUES IDENTIFIED

~ FSAR ADMINISTRATIVEAND INCONSISTENCY CHANGES IDENTIFIED AND RESOLVED BY RECENT FSAR REVISIONS

+ COMPLETE A "GRADED" FSAR REVIEW

~ REVIEW PRIORITIZED RISK SIGNIFICANCE

~ LEVEL OF REVIEW GRADED TO CONSIDER COMPLETED PROGRAMS COMPLETED DESIGN BASIS PROGRAMS RECENT PLANT BETTERMENT PROJECTS

~ WILL USE FPL INHOUSE RESOURCES DESIGN AND SYSTEM ENGINEERS OTHER PLANT DEPARTMENTS AS REQUIRED 8 COMPLETE REVIEW BY 10/98

~ COMPUTER. NETWORK FOR USERS IMPROVED SEARCH CAPABILITY PLANT PROCEDURES ON LAN Page 23

il~

>op Op TURKEY POINT e + +>oar +~O ENGINEERING DEPARTMENT FPL COMMENTS ON DRAFT NUREG - 1606, PROPOSED REGULATORY GUIDANCE RELATED TO IMPLEMENTATION OF 10CFR50.59

+

GENERAL COMMENT

S AND CONCERNS N

8 NEED TO WORK WITH INDUSTRY TO DEFINE COMPLIANCE VIA NEI 96-07

~ IMPORTANT THAT NRC/INDUSTRY RESOLVE ISSUES PRIOR TO IMPLEMENTING NEW REQUIREMENTS'AND PROCEDURES

+ DEFINITION OF "CHANGE." TO INCLUDE ANY INFORMAT~ION IN THE FSAR

~ WOULD REQUIRE ADDITIONAL50.59 SAFETY EVA'LUATIONS

~ NOT CONSISTENT WITH PAST PRACTICE

+ COMPONENT REPLACEMENT DURING ROUTINE MAINTENANCE

~ EQUIVALENT BUT NOT IDENTICAL COMPONENT VS DRAFT NUREG 1606 EXPANDED DEFINITION OF "MALFUNCTIONOF A DIFFERENT TYPE"

~ NEED TO DEFINE NEW FAILURE MODES AT THE SYSTEM OR FUNCTIONAL LEVEL

~ ROUTINE COMPONENT REPLACEMENTS COULD INVOLVE USQs

+ USE OF MANUALACTIONS

~ COULD RESULT IN ADDITIONALPLANT SHUT DOWN TRANSIENTS

~ NOT CONSISTENT WITH PAST INDUSTRY PRACTICE

+ APPLICATION OF 50.59 TO DEGRADED AND NONCONFORMING CONDITIONS I

~ TS AND OPERABILITY EVALUATIONS ADDRESS DEGRADED CONDITIONS

~ PLANT RESTARTS COULD BE PROHIBITED 0

Page 24

4l 0

~C+ +O/~

TURKEY POINT ENGINEERING DEPARTMENT

+q O>ear >~O NEW AND REVISED SOFTWARE ISSUED BY DESIGN ENGINEERING (QUALITYINSTRUCTION 3.7 COMPUTER SOFTWARE CONTROL)

NON-PROCESS SOFTWARE PROCESS SOFTWARE PROCESS SOFTWARE PROCESS'SOFTWARE (NEW) (PRE-EXISTING)

- IMPLEMENTED BY FORMAL PLANT - 'MPLEMENTED BY FORMAL PLANT CHANGE PROCESS CHANGE PROCESS

- REQUIREMENTS SPECIFICATION PREPARED ~ ORIGINALVIVREQUIREMENT AS MINIMUM

~ SOFTWARE DESIGN DESCRIPTlON

- 'ADDmONALVILVREQUIREMENTS ON VENDOR

- VIVIVPLAN PREPARED - ADDITIONALBLACK BOX TESTING ON

~ USE GUIDANCE OF IEEE STD 1012 RECEIPT FROM VENDOR

- VERIFICATlON REQUIREMENTS - USE OF TRAINING SIMULATOR

~ TEST PLAN

- INDEPENDENT REVIEW

- PERIODIC VAUDATIONREQUIREMENTS

-- SOFTWARE VERIFICATIONREPORT

- INDEPENDENT REVIEW PROCESS SOFTWARE IMPLEMENTATIONTESTING

- CONTROL AND STORAGE PROCEDURES nrcptn.wpd Page 25

4k 0

~,

~c+ +OI Op TURKEY POINT ENGINEERING DEPARTMENT

+~+Ogp~p Q4~o~

DDPS / ERDADS SOFTWARE CONTROL (NON-PROCESS SOFTWARE) 0-ADM401 SOFlWARE CHANGE REQUEST SOFTWARE CHANGE PRODUCTION SOFTWARE CHANGE COORD ACCEPTANCE TESTING OF SOFTWARE ASSIGN SOFlWARE CHANGE CHANGE TRACKING 0 OPERATIONS SUPPORT SUPERVISOR APPROVAL IMPLEMENTATIONCHECKUST

- VENDOR MANUALS COMPUTER ENGINEER - I&C CAUBRATIONPROC

- SPECIFY PRETEST - DATA POINT UBRARY BENCHMARK REQM'TS

~ SPECIFY SOFlWARE CHANGE

~ SPECIFYV&V ACCEPTANCE CRITERIA CONTROL RM SIMUIATOR DISPLAY CHANGE? CHANGES?

INDEPENDENT VERIFICATION OF PROPOSED CHANGE TRANSMIT DOCUMENTATION TO DOCUMENT CONTROL wcplh.wpd Page 26

0 0

i

TURKEY POINT ENGINEERING DEPARTMENT

++egecr eo~

P%o PLANT SAFETY / RELIABILITYIMPROVEMENTS CONTINUE TO IMPLEMENTMODIFICATIONS TO IMPROVE EQUIPMENT RELIABILITY AGGRESSIVE ROOT CAUSE ANALYSIS AGGRESSIVE MANAGEMENTCONTROL OF MODIFICATIONPROCESS SPECIFIC IMPROVEMENTS REACTOR PROTECTION RELAY DESIGN IMPROVEMENTS INDICATIONS OF SUCCESS ROD CONTROL IMPROVEMENTS

- POWER SUPPUES

- REDUCED OPERATOR WORK AROUNDS FORCED COOUNG

- LOW NUMBER OF CONTROL ROOM, DEFICIENCIES - BRING CARDS

- REDUCED NUMBER OF SECONDARY LEAKS - ROOM HVAC

- EXCELLENT PLANTAVAILABILITY

- SMAlLBORE PIPING MODIFICATIONS SAFEGUARDS RACK IMPROVEMENTS C BUS MODIRCATIONS

~ BIT BYPASS MODIFICATlONS

- REACTOR HEAD GUIDE FUNNEL MODIFICATIONS

- CRDM CANOPY SEAL PREVENTATIVE CIAMPING REACTOR HEAD GUIDE - SOURCE RANGE NUCLEAR INSTRUMENTS FUNNEL MODIRCATIONS - FEEDWATER PUMP RECIRCULATION PIPING SUPPORT UPGRADES Page 27

0

~cV+ >op Op TURKEY POINT e ++Off~~ p%~a~

ENGINEERING DEPARTMENT REACTOR HEAD GUIDE FUNNEL lVIODIFICATIONS

+ INDUSTRY FAILURE FOR REACTOR VESSEL GUIDE FUNNELS FUNNEL FAILURE AT ZION (1984)

SEVERAL PLANTS REPORT PIN AND FUNNEL FAILURES (1994)

~ WESTINGHOUSE ISSUES NSAL 94-002

~ NO FAILURE HISTORY AT TURKEY POINT

+ FAILURE MODE

~ VIBRATION INDUCED FAILURE OF RETAINING PIN

~ POTENTIAL TO BLOCK/JAM CRDM

+ PLANT, RELIABILITYAND POTENTIAL SAFETY ISSUE

+ TURKEY POINT CORRECTIVE ACTION

,REPAIR OF 45 CRDM GUIDE TUBES

~ REPAIRS COMPLETE ON BOTH UNITS 3 AND 4

~ - LEAD PLANT FOR PLANTS WITHOUT PREVIOUS FAILURES

~ NO INDICATION OF FAILURE ONSET NOTED DURING REPAIR Page 28

0

'Io TURKEY POINT ENGINEERING DEPARTMENT REACTOR MEAD GUIDE FUNNEL MODIFICATIONS I

I I I

Thernocouple Control Rod Colunn Drive ShaF t Pene tro tion Penetr a tlon Thernol Reoctor Sleeve Vessel Heoa T/C Colunn Thernal Housing Sleeve Guide Guide Page 29

0 0

~tl~o >o(4p TURKEY POINTi ENGINEERING DEPARTMENT oo(oo REACTOR HEAD GUIDE FUNNEL MODIFICATIONS Fillet Weld VIEW A-A lttcpttLttttpd Page 30

4l 0

il~

ST. LUCIE ENGINEERING DEPARTMENT Ivc ps l.wpd Page 31

0'l~

ST..LUCIE

,c/

ENGINEERING DEPARTMENT

+v lc>i ENGINEERING ORGANIZATION

+ ORGANIZATIONALSTRENGTHS

~ AVERAGE NUMBER OF YEARS OF NUCLEAR EXPERIENCE (PER ENGINEER)

IS 17 YEARS DIRECT SUPPORT TO OPERATIONS AND MAINTENANCECONTINUES TO BE A STRENGTH

~ 23 ENGINEERS HAVE OPERATIONS TRAINING

+ IMPROVEMENT / GROWTH PLANS DEVELOPMENT OF SYSTEMS ENGINEERING PROGRAM

~ STRENGTHENING OF SYSTEM HEALTH MONITORING AND TRENDING OF EQUIPMENT DATA

~ SYSTEM ENGINEERS TRAINING rvcpsl.w pd Page 32

0 il~

1 ST. LUCIE fe ENGINEERING DEPARTMENT SAFETY )HJECTION AVABABILllY 5.YEAR RUNNING AVERAGE 100%

I+ i I I1 i I P1 ~ ~ SIf SS'/0 j

1 i' ('I i

!I li 98%- ~0 I ~0 0>>M>> ~0 00 OJ 00 97% .

I 96%-

95% I I

I 94%

9/96 11/96 1/97 0/97 EI97 OMIT I UMII'2 PERFORMANCE CRCERIA 'AMOYR2000GOALS EMERGENGY DIESEL GENERATORS 2 YEAR RUNNING AVERAGE AVAIIABILIIV 100%

I k

I >>

I II 99%

li I I

~

i I

I i

I I I

Ii j 98% ,.

I . I I

(

0 ~ IDM JA I'7~xi 7

I I

ll 96%

5/96 7/96 9/96 11/96 1/97 3/97 5/97 UNIT I UNIT2 PERFORMANCECRffERIA " WANG YR 20M GOALS IMCPSI.WPC Page 33

i NR y.',

0

~ ~

~Xiii"'~ ~ g

~ ~

ll

,"g Pj Y

N gx a>

g 5

.~a

~ g ~

S '4 jj

@0

~

~ i ~ ~ e ~ .

Q

Ik

~ i

ST. LUCIE ENGINEERING DEPARTMENT UNIT 1 DDPS SOFTWARE ERROR

+ A 1994 SOFTWARE ERROR RESULTED IN UNIT ¹1 OPERATION WITH A 0.63%

NONCONSERVATIVE REACT'OR POWER CALORIMETRIC ERROR Vendor deaspwd sonttwe change lor Deacon was assed on late a copy mainunad hy vendor The new scasng onscaras were nct permanency saved tt revision et gN eolhtate wee Itao iho naster pmgrsm or laassed Ihat dld fwt Indedo Inveattgstinn BN now FW flow connsras

~ ella lo aontmro vendor Results Chsnnology leal PWCy ctnnged span of I PCIM 0020 f00 provided the Fw now Itsnsmalers ltom Hew FVfliow scawtg conaant t deapn fot ltleie'Ietten of The Ipse ctangea lo ON 0~ vahws were swered Sao OOF feodtmwr aow connancs were Beacon syaem ant ns T00.0'0 ccnstwa IocetavN ovwwrts wc

0. 00IP ccntNctka to DOFS TIN Beeoen PCat scope wss ttsttad Io 0N INtottwo snd DO HOT Incktse SN ecossacy Chang ee Io BN OOPS eonewe Forts Oio HOT Ptevido cancskwl dal dN post modncacon Iecgng Boo sea!no cnnststas were ler Invsstlgation teovtrsnwtcs ler tae OOPS BN ¹I 0 ~ fetes'Ssnttntecr sensate Results Chronology Shy tong Tera The sothtwe Vay s perfntd hy DNOO tspotts lo a FW Bat I

sothmre vender natenged Devaaa genena Vay Iteontsnn', Ical towtd Iha nenwnenks Io cnasenpo as sw BoNa ostpas hca tered Reader wallop Iel tttdt dl 0 c¹ssaed reactor Io ctwrk sitar asperse of IIN Cycle SIS cnand eeraacee wltttn sech i level wac lower teen ocntef Vnlot srd ttrkst DOPSlet Dops soteewe sech os IIN poww ey Odats. l secondary plate caatnrtNcnc. ~ taonaseaNnHS 1 I

7-2M 2-2l 97 tvcpsI.vvpd Page 35

il

/

ST. LUCIE 4

I ENGINEERING DEPARTMENT

'UNIT 2 DDPS SOFTWARE ERROR

+ A 1997 SOFTWARE'ERROR.WAS DISCOVERED DURING UNIT ¹2 REACTOR POWER CALORIMETRIC VERIFICATION 6 VALIDATIONTESTING PDrM reterence4 pen>>la V 5 v plan eveloped as ooneccrve eccl>>l lo Irnu

~ I evsnL Dvanap between ponionc ef lest fran ares nadectuete.

Invusti0stion

'estdts Inactoctuste I@croute DDP5 oobrare exporuce to oatccc verldv vrul'.

pent ~

pDfII4ld not pruvtfs edoduare tecttn0 fvDDP5 ochwwe chcnden pc/at eoo 1 c T.

0~

supplemonc1 provtfcd deride foc rarcaans of 000'DP5 pw pow crsnsnvuv span from 600'O vendor oorcraccod lo revtre software.

FW now Beuavetrs Value Procasev scarard wes nol roe!red.

New 0enerlo V5V of atitcal DDP5 ettctatos was pedonaed.

Did not detect Ihoonert PW Crow scaaad cnctants In ptaroou DDp5 ~

Al Sdta power oaoenclon Oetntlnkned tO Pe 0% IOwer pwn rnenual onnatrto ffÃs npaatssmwesa

~ padded pert of V5Vptaa) uec ed 'ovstce Value Procecav.

0 ~

5-17-97 rvcpst.wod 'Page 36

0 0

0

ST. LUCIE ENGlNEERING, DEPARTMENT SOFTWARE VERIFICATION 6 VALIDATIONPROGRAM IMPROVEMENTS

+ DEVELOPED PROCEDURE '"MAINTENANCE'DEPARTMENTALCONTROL OF COMPUTER SOFTWARE" IN FEBRUARY 1996

+ CONVEYED "LESSONS LEARNED" FROM THE RECENT SOFTWARE EVENTS TO ENGINEERING AND MAINTENANCE PERSONNEL

+ MADE ORGANIZATIONALCHANGES TO PROVIDE MORE INTERACTION BETWEEN SOFTWARE ENGINEERS AND DESIGN / SYSTEM ENGINEERS

+ IDENTIFIED ADDITIONALPROCEDURE / PROGRAM ENHANCEMENTS IN THE FOLLOWING AREAS:

~ IN-DEPTH TRAINING IN VERIFICATION AND VALIDATIONFOR ENGINEERING / IS.C MAINTENANCE

~ UPGRADE OF EXISTING SOFTWARE CONTROL PROCEDURES (MASTER

&. BACKUP COPIES)

DEVELOPMENT OF DETAILED SOFTWARE VERIFICATION 5 VALIDATIONON SELECTED COMPUTER SYSTEMS Page 37

45 Ik

ST. LUCIE ENGINEERING DEPARTMENT REACTIVITYMANAGEMENT REACTOR ENGINEERING PROGRAIVIS

+ INSTRUCTIONS PROVIDED. FOR POWER MANEUVERING

+, ENGINEERS ON SHIFT, DURING POWER:MANEUVERS

+ BEACON REAL TIME MONITOR MODE

+ CORE OPERATING HISTORY ASSESSMENT

+ ECC VERIFICATIONS

+ REACTIVITY MANAGEMENTASSESSMENTS

+ REACTIVITY MANAGEMENTTRAINING PROVIDED TO OPERATIONS DURING REQUAL

+ RE PROCEDURE REVIEW PROGRAM

'RE PROCEDURE REVIEW PROGRAM

+ PERFORMED A TECHNICAL REVIEW OF 26 PROCEDURES

+ REVIEW TEAM CONSISTED OF 2 ENGINEERS EACH FROM:

REACTOR ENGINEERING (ON SITE)

NUCLEAR FUELS (JUNO)

~ ABB/CE (NSSS VENDOR)

PROCEDURE REVIEW RESULTS

+ THE REACTOR ENGINEERING PROCEDURES WERE FOUND TO BE TECHNICALLY ACCURATE AND CONSISTENT WITH TECHN)CAL SPECIFICATIONS AND DESIGN ANALYSIS.

+ THE MOST SIGNIFICANTPROCEDURE CHANGES FOCUSED ON CLARITYIN THE AREA OF SHUTDOWN MARGIN VERIFICATION ENSURING COMPLI'ANCE WITH T.S., AND 'PROVIDING CONSISTENCY WITH OFF-NORMAL CEA PROCEDURE GUIDANCE.

Page 38

0 ST. LUCIE ENGINEERING DEPARTMENT w 0 ~ ~. pe Wv&

Qr. e wa REACTIVITY MANAGEMENT Equipment GR 14 Design E3 Human 12 H 10 XX~~K Events CEA's.(U1) 66.6%

12.5%

Design 12.5%

Equip.(U2) 6.3%

OVERVIEW

+ NEARLY ALL EVENTS WERE ON UNIT 1(15 OF '16)

+ MOST WERE CEA EVENTS (11 OF 16)

+ HIGHER POWER THAN EXPECTED FOR PLANT CONDITIONS (2 OF 16)

Page 39

0 ST. LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM ANALYSIS

+ DROPS RELATED TO:

~ MECHANICAL SLUGGISH GRIPPERS

~ TIMING MODUL'E FAILURE SYSTEM ASSESSMENT (ONE YEAR REVIEW)

+ OTHER FAILURES REED SWITCH POSITION INDICATIONS

~ DDPS POSITION INDICATIONS CEA FAILURES TO MOVE DURING FLCEA CEA Drops

@~ Unit 1 QUnit2 S.

i'>

7/96 8/96 9/96 10/96 11/96 12/96 1/97 2/97 3/97 4/97 5/97 6/97 7/97 IvcDsl.wpd 'Page 40

il~ '

ST. LUCIE ENG! NEERING DEPARTMENT CONTROL .ROD ELEMENT DRIVE SYSTEM SYSTEM ANALYSIS

+ DROPSiSLIPS ON UNIT 1 CAN BE ATTRIBUTED TO'LUGGISH CEDM GRIPPER ENGAGEMENTS, INADEQUATE DESIGN OF TIMING MODULES (NO CEA GRIPPER ENGAGEMENT FEEDBACK) AND POWER SWITCH FAILURES

+ ACTMS ON UNIT 2 PREVENT MOST PROBLEMS FROM MANIFESTING THEMSELVES AS DROPPED CEAS CORRECTIVE ACTIONS TAKEN

+ PERFORM CEDM COIL RESISTANCE TESTS EACH OUTAGE AND TREND DATA WITH PREVIOUS OUTAGES TO DETERMINE IF DETERIORATING COILS CAN BE IDENTIFIED 0 +

+

IDENTIFIED SLUGGISH GRIPPERS, TIMING MODULE AND POWER SWITCH FAILURES AS PRIMARY CAUSE OF UNIT 1 CEA DROPS AND SLIPS CEA REED SWITCH REPLACEMENTS SCHEDULED EACH'OUTAGE CORRECTIVE ACTIONS PLANNED

+ IN-HOUSE REFURBISHMENT OF UNIT 1 COIL POWER SWITCH MODULES

+ IMPLEMENTATIONOF UNIT 1 ACTM MODIFICATION (REFUELING 1997)

+ ENHANCE SCHEDULE FOR REPLACEMENT OF REED SWITCH ASSEMBLES IN UNIT 2 Page 41

0 O~

". ST. LUCIE (p ENGINEERlNG DEPARTMENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 CONTROL ELEMENT DRIVE.NIECHANISNI UPPER PRESSURE REED SWITCH HOUSING ASSEMBLY ASSEMBLY REED SWITCH ACTUATING MAGNET OMEGA, SEAL OPERATlNG RCD ELECTRICAL CONDUIT ANTI.EJECTION GRIPPER LIFT COll.

LlFT AND PUL'L DOWN MAGNET ASSEMBLY UPPER GRIPPER COIL WIRE TROUGH DRIVE SHAFT PULL DOWN COIL LOAD TRANSFER COIL L.OAD TRANSFER MAGNET ASSEMBLY LOWER GRIPPER COiL LOWER GRIPPER MOTOR HOUSING ASSEMBLY REACTOR NOZZLE CONNECTION THERMAI.SLEEVE OMEGA SEAL.

(PAQQPTI l40$ .FhAtf Ivcpsl.wpd Page 42

0 ST. LUCIE ENGINEERING DEPARTlVIENT CONTROL ROD ELEMENT DRIVE SYSTEM UNIT 1 ACTIVI UPGRADE AUTOMATIC CEDM TIMER MODULE (ACTM)

+ MICRO PROCESSOR BASED CONTROL ROD DRIVE SYSTEM CONTROLLER

+ REPLACES THE CPP TIMER DURING THE UPCOMING UNIT 1 REFUELING OUTAGE

+ CURRENTLY INSTALLED ON UNIT 2 (AND OTHER CE PLANTS)

+ CONTROLS CEA MOTION UTILIZING POSITIVE FEEDBACK VIA CURRENT SENSORS

+ EXPECTED TO REDUCE OR MITIGATE UNIT 1 CEA DROP EVENTS CONTROL ELEMENT DRIVE SYSTEM NSSS MG SET 240 VAC RPS TRIP BREAKERS CEAPDS (ADS)

RSPT INHIBIT REACTOR CEDS MAG JACK REG. CPP CEDM CEDMCS)

RSTP OPERATOR EQRJHD PlANT COMPUTER Page 43

i ST. LUCIE ENGINEERING DEPARTMENT CONTROL ROD ELEMENT.DRIVE'SYSTEM L(FTfNG 3/4" ANTl EJECT/ON GRIPPER (Not In Unit 2)

L C

UPPER GRIPPER P

0 LOWER GRIPPER fFAIOOOtl>ASJ'Pelt) rvcpal.wpd Page 44

0 ST. LUCIE

>4'r.>c ENGINEERING 'DEPARTMENT PLANT SAFETY / RELlABILlTYlMPROVEMENTS ENGINEERING EMPHASIS FOCUSED ON SAFETY AND RELIABILITYMODIFICATIONS NEW MANAGEMENTREVIEW PROCESS ADOPTED INDICATIONSOF SUCCESS SPECIFIC IMPROVEMENTS-

- REDUCED OPERATOR WORK AROUNDS 199T UNIT20

- LOW NUMBER OF CONTROL ROOM DEFICIENCIES

- PRESSURIZER SAFETY VALVESCUD BLOCK

- EXCELLENT PLANT AVAILABILITY Y DESIGN

-'EACTOR VESSEL (HUNG REPLACEMENT DIESEL GENERATOR RELAY REPLACEMENT

- QUICKLOC INCORE INSTRUMENT FLANGE DESIGN

- 2C AFW PUMP WARMUP UNE MATERIAL CHANGE DUT

- SIT FILLVALVEACTUATOR UPGRADE PRESSURIZER SAFETY VALVE - TCW PUMP DISCHARGE CHECK VALVE ENHANCEMENT SOLID BLOCK BODY DESIGN IvccsLwcd Page 45

4I (o

".'T.

/~fss .

ENGINEERING DEPARTMENT OPERATOR WORKAROUNDS LUCIE caus ts) OPEN I

s Operator Work Around: . A problem that 40 Impedes an operator ln performing duties I

I wlthln the approved procedures or ln 35, "I Walked down plant accordance with the Intended design.

30" 'WAs to Identify nevr 25" last Updated:

I July S, 1SS7 20 I

I 15 l

10" "'

Year End Target 4 0

12/95 9/96 10/96 11/96 12/I 1/97 2/97 3/97 4/97 5/97 6/97 7/97 8/97 9/97 10/97 11/97 12/97 Time (Month)

OPEN nrcpsl.wpd Page 46

il i~

~

4-r vp

'I v ~

8 Ya

)v~si'*

v'~~<j~

nggg~

I

~) ~wqgPi-.

cc.

C v

a)g t.

~ v. M~

P~ 'c-.-.

I I

0 I

g F ~

r I

,A 0 C 1

4 JW w~

e

O~

ST. LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITYIMPROVEMENTS SPECIFIC UNIT 2 OUTAGE ACCOMPLISHMENTS

+ REVISED INTEGRATED SAFEGUARDS TEST PROCEDURE

~ NEW 'PROCEDURE TESTS EACH TRAIN INDEPENDENTLY

~ ENSURES ONE COMPLETE TRAIN AVA'ILABLEFOR CORE COOLING

+ ON-LINE TESTING OF MSSVs

+ FULL CORE OFFLOAD ANALYSIS

+ VALVE OVERHAUL SUPPORT

+ AGGRESSIVE FLOW ACCELERATED CORROSION INSPECTION PROGRAM

+ MSIV REFURBISHMENT SUPPORT

+ COATINGS PROGRAMS nrepal.wpd P.age 49

il ST. LUCIE ENGINEERING DEPARTMENT PLANT SAFETY AND RELIABILITYIMPROVEMENTS MODIFICATIONS PLANNED FOR UPCOMING 1997 UNIT I OUTAGE

+ STEAM GENERATOR REPLACEMENT

+ PRESSURIZER HEATER SLEEVE NICKEL PLATING

+ QUICKLOC INCORE INSTRUMENT FLANGE DESIGN

+ CEDMCS ACTM UPGRADE

+ SIT FILL VALVE ACTUATOR UPGRADE

+ TCW PUMP DISCHARGE CHECK VAI VE ENHANCEMENT

+ REFUELING TRANSFER TUBE VALVE OPERATOR TORQUE LIMITER nrcpal.wpd Page 50

0 ST. LUCIE ENGINEERING. DEPARTMENT Pressurizer Heater Nozzle Nickel Plated Region Weld

{4" Long, 0.008" Thick)

Lower Head internal Cfadding

.$ 25" Pressurizer Lower Head

.S05" Typical Heater Nozzle Typical Nickel Plated t4ozzte Page 51

ik ST. LUCIE ENGINEERING DEPARTMENT HEATER, SLEEVE END EFFECTOR VPP=R SEAL vPPEP. gEA0 N I CKEL ANOOE LOWER SEAL SOLuT!0~ OVTLET nr col.wpd Page 52

ST.. LUCIE ENGINEERlNG DEPARTMENT DESIGN BASIS 50.54.(f) RESPONSE

SUMMARY

AND ACTIONS CURRENT AND FUTURE ACTIONS

+ FSAR/OPERATING CONSISTENCY REVIEW

~ FINDINGS TO BE RESOLVED OVER NEXT TWO YEARS

+ NEI INITIATIVE

+ ANNUNCIATOR

SUMMARY

REVIEW COMPLETION DATE OF DECEMBER 1998

+ NRC A/E INSPECTION

~ NRC INSPECTION REPORT ISSUED 3/25/97

~ DESIGN OF INSPECTED SYSTEMS GOOD WITH ADEQUATE DESIGN MARGINS. IMPLEMENTATIONOF DESIGN ADEQUATE.

~ FPL RESPONDED TO INSPECTION REPORT ON 5/27/97 AND PROVIDED ACTIONS PLANNED FOR FOLLOW-UP AND UNRESOLVED ITEMS rvCpol.wpd Page 53

iS~

0

ST. LUClE ENGINEERlNG DEPARTMENT c v <0

~ VOLUNTARY FSAR REVIEW INITIATIVE

+ ST. LUCIE HAS COMMITTED.TO A GRADED REVIEW OF THE UNIT 1 Bc 2 FSAR

+ REVIEW PRIORITIZED TO RISK SIGNIFICANT SYSTEMS

+ CREDIT TAKEN FOR PREVIOUSLY INSPECTED SYSTEMS

+ FOUR PRIORITY LEVELS ESTABLISHED

+ PLANT FIRE PROTECTION SECTIONS INCLUDED WITH PRIORITY 2 REVIEW

+ DISCOVERY PHASE FOR PRIORITY 1, 2, 5 3 TO BE COMPLETE BY OCTOBER 18,1998

+ SELECTED CHAPTER 15 ACCIDENT ANALYSES TO BE UPDATED nrcpsl.wpd Page 54

~ ~

il

ENGINEERING DEPARTMENT

@PL CHALLENGES

+ MAINTAININGAND IMPROVING CURRENT LEVEL OF PERFORMANCE

+ RETAINING TALENTED PERSONNEL

+ DEVELOPMENT OF ST. LUCIE SYSTEM ENGINEERING PROGRAM

+ IMPROV)NG EQUIPMENT PERFORMANCE MONITORING AND TRENDING

SUMMARY

+ STRONG DIRECT OPERATIONS AND MAINTENANCE.SUPPORT

~ RESPONSIVE TO OPERATIONS PRIORITIES AND REQUESTS GOOD TEAMWORK AND COMMUNICATION

+ GOOD FOCUS ON PLANT SAFETY AND EQUIPMENT, PERFORMANCE Page 55

0' 0