Refueling Outage,Form NIS-1 Owners Data Rept for Inservice Insps.
ML17353A777
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 06/20/1996
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17353A776 List:
References
NUDOCS 9607170079
Download: ML17353A777 (470)


Text

TURKEY POINT PLANT UNIT 4 1996 REFUELZNG OUTAGE ZNSERVZCE ZNSPECTXON REPORT The required examinations scheduled for the first period were completed during the Turkey Point Unit 4 outage. This completes the first period ISI requirements for the third inspection interval.

There was no eddy current testing performed on the steam generator tubes during this outage.

The NIS-2 forms discuss the repairs and replacements which took place since the previous Unit 4 submittal and during the 1996 refueling/

maintenance outage.

Visual examination and functional testing of snubbers was completed in accordance with ASME Section XI and Technical Specifications. Visual examinations did not reveal any failures. There were no snubber failures in the functional test sample.

The inservice inspection summary, tables detail the examinations performed during the second outage of the first period of the third ten-year interval.

i Selected class 1 and 2 piping and supports were examined with surface, volumetric, and visual examination techniques in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and the Turkey Point Units 3 and 4 ISI Program.

TURKEY POINT UNZT 4 1996 REFUELING OUTAGE Form NZS-1 Owners'ata Report for Znsezvice Inspections 9607i70079 96070i l PDR ADQCK 0500025i Q PDR, i

'I FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS Page 1 of 7 1~ Owner: Florida Power and Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 2 ~ Plant: Florida Power & Light Company, Turkey Point Nuclear Power Plant, P.O. Box 4332, Princeton, Florida 33032 3 ~ Plant Unit:

4 ~ Owner Certificate of Authorization (if required) 5 Commercial Service Date 6 ~ National Board Number for Unit:

7 ~ Components Inspected:

Manufacturer State or Nat'l Component or Manufacturer or Installer Province Board Appurtenance or Installer Serial No. No. No.

Reactor Pressure Babcock and 610-0116 N/A N-161 Vessel Wilcox 4PSRV1 Steam Generator A Westinghouse 16A-6341-1 N/A N-774 FSGT-2991 4E210A Pressurizer Westinghouse HTPT-0021 N/A N-68-1 4T200 Reactor Coolant Pump Westinghouse 4P200B N/A N/A B

Regenerative Heat Westinghouse 4E200 N/A N/A Exchanger RHR Heat Exchanger A Atlas 4E206A N/A N-729 RHR Heat Exchanger B Atlas 4E206B N/A N-730 Reactor Coolant Bechtel N/A N/A N/A System Safety Injection Bechtel N/A N/A N/A System Chemical and Volume Bechtel N/A N/A N/A Control System Residual Heat Bechtel N/A N/A N/A Removal

,l 1

0, 2.

30 4.

Owner:

NIS-1 Report (continued)

Plant: Turkey Point Nuclear Power Plant, P.O. Box 4332, Princeton, Florida 33032 Plant Unit:~

Owner Certificate of Authorization (if required)

Page 2 Florida Power 8 Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 of 7

5. Comnercial Service Date :
6. National Board Number for Unit:

Manufacturer State or Nat'l Component or Manufacturer or Installer Province Board Appurtenance or Installer Serial No. No. No.

Steam Generator Bechtel N/A N/A N/A Blowdown System Main Feedwater Bechtel N/A N/A N/A System

8. Examination Dates  : From to 9 ~ Inspection Period Identification  : First Period
10. Inspection Interval Identification: Third Interval, from
11. Applicable Edition of Section XI ~99 Addenda

~ ~ ~

~~

12. Date/Revision of Inspection Plan:

~ ~

13. Abstract of examinations and test. Include a list of examinations 'and tests and a statement concerning status of work required for the inspection plan.

An Inservice Examination of selected Class 1 and 2 components and piping systems of Florida Power and Light's Turkey Point Unit 4 was performed during the 1996 Refueling Outage. This outage began on March 3, 1996 and ended on April 8, 1996. This was the second outage of the first period of the third ten year interval.

The components and piping systems examined were selected in accordance with the Third Ten Year Inservice Inspection Program, which was prepared in accordance with the requirements of the ASME Section XI, 1989 Edition.

Manual ultrasonic, visual, magnetic particle, and liquid penetrant non-destructive techniques were used to examine components, piping, and their supports. The examinations were performed by FPL personnel, supported by examiners supplied by Raytheon Engineers & Constructors.

There were no examinations performed on Steam Generator tubing during this outage.

NIS-1 Report (continued) Page 3 of 7 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408 Plant: Turkey Point Nuclear Power Plant, P.O. Box 4332, Princeton, Florida 33032

3. Plant Unit:~

Owner Certificate of Authorization (if required)

5. Commercial Service Date
6. National Board Number for Unit:

Several areas were replaced or repaired since the last Summary Report was submitted. See the attached NIS-2 reports for a summary.

The Feedwater Nozzle piping augmented examinations were conducted during this outage on all three Steam Generators. The entire area from the nozzle ramp to a point one pipe diameter out on the far side of the elbow was examined with ultrasonics. No reportable indications were noted.

Snubber functional testing and visual examinations were conducted in accordance with ASME Section XI and Turkey Point Plant Technical Specifications. Examination and testing services were supplied by PSA, Inc.

System Pressure testing was conducted by the plant to ASME Section XI and applicable Plant Procedures.

A listing of examinations performed is attached to this summary.

The number of examinations performed meets the requirements for the first period. This meets the requirements of Program B of Section XI.

14. Abstract of Results of Examinations and Tests.

Cla.'~

Three Control Rod Drive housing welds were examined using penetrant techniques. No reportable indications were noted.

An inner radius examination was performed on the pressurizer surge nozzle. No reportable indications were noted.

The flywheel of Reactor Coolant Pump 4B was examined in accordance with Regulatory Guide 1.14 and Technical Specifications. No reportable indications were noted.

~ ~ ~

~

'k 0

NIS-1 Report (continued) Page 4 of 7 1.~ Owner:t Florida Power B Light Company, 700 Universe Blvd. Juno B each, Florida 33408 2e Plant: Turkey Point Nuclear Power Plant, P.O. Box 4332, Princeton, Florida 33032

3. Plant Unit:~

4, Owner Certificate of Authorization (if required)

5. Conmerciat Service Date :
6. National Board Number for Unit:

e A VT-3 examination was performed near the beginning of the outage to look for accumulated boron crystals and evidence of leakage.

A VT-2 examination was performed during the system pressure test at plant startup. No reportable indications were detected.

a t Reactor Coolant piping welds and supports were examined using surface, volumetric, and visual techniques. No reportable indications were detected.

Safety Injection piping welds and supports were examined using

~ ~

surface, volumetric, and visual techniques. No reportable

~

indications were detected.

~ ~

~

e eat e Residual Heat Removal piping welds and supports were examined using surface, volumetric, and visual techniques. One penetrant indication was noted. Additional light surface preparation with a flapper wheel removed the indication. A thickness reading at the area showed minimum wall was maintained. No reportable indications were detected.

e d e Chemical and Volume Control piping welds and supports were examined using surface and visual techniques. No reportable indications were detected.

t e During the 1994 Unit 3 outage, it was determined that FPL had not branch connection welds on the been correctly examining the large Reactor Coolant system. These welds had been examined with UT techniques developed for "set-in" branch connections. The actual configuration was "set-on". The corrective action was to, examine

P s- (

NIS-1 Report (continued) Page 5 of 7 Owner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408

2. Plant: Turkey Point Nuclear Power Plant, P.O. Box 4332, Princeton, Florida 33032
3. Plant Unit:~
4. Owner Certificate of Authorization (if required)
5. Comrercial Service Date :
6. National Board Number for Unit:

those branch connection welds that. had not been correctly examined by the end of the period. This action has been completed.

Two Steam Generator circumferential welds were examined using volumetric techniques. No reportable indications were noted.

eat c e RHR heat Exchanger welds and supports were examined using surface, volumetric, and visual techniques. During the VT-2 examination of one heat exchanger nozzle to shell weld, boron crystals were noted at a tell-tale hole (welds are covered by reinforcement plates.) Additional VT-2 examinations were performed to determine the origin of the crystals. The additional test showed the nozzle was leaking underneath the reinforcement plate. The nozzle was removed and replaced.

Baseline examinations were performed on the new nozzle to shell weld. No other reportable indications were observed.

es' eat e o Residual Heat Removal piping welds and supports were examined using surface, volumetric, and visual techniques. No reportable indications were detected.

a et

'ect'afety Injection piping welds and supports were examined using surface, volumetric, and visual techniques. No reportable indications were detected.

A section of the 40 safety injection line was removed and modified to abandon the Boron Injection Tank. Baseline examinations were performed on two welds (7.5% as required by Table IWC-2500-1, Examination Category C-F-1, Note (1)).

0 NIS-1 Report (continued) Page 6 of 7 Owner: Florida Power a Light Company, 700 Universe Blvd. Juno Beach, Florida 33408

2. Plant: Turkey Point Nuclear Power Plant, P.O. Box 4332, Princeton, Florida 33032
3. Plant Unit:~
4. Owner Certificate of Authorization (lf required)
5. Commercial Service Date
6. National Board Number for Unit:

Steam Generator Blowdown piping welds were examined using surface and volumetric techniques. No reportable indications were detected.

Main Feedwater piping welds and supports were examined using surface, volumetric, and visual techniques. No reportable indications were detected.

Augmented examinations were performed on the piping off the Steam Generator Feedwater nozzles on all three loops. No reportable indications were noted.

Three sections of the Main Feedwater line were removed and replaced due to Flow Accelerated Corrosion. Baseline examinations were performed on one weld (7.5% as required by Table IWC-2500-1, Examination Category C-F-2, Note (1)).

15. Abstract of Corrective Measures Corrective measures were required on the RHR heat exchanger.

The leaking nozzle was removed from the heat exchanger and replaced. Baseline examinations were performed on the new nozzle to shell weld. Every indication exceeding the acceptance criteria was evaluated by FPL Engineering to determine acceptable for continued service. There were no other if it was indications that would preclude further service.

0 NIS-1 Report (continued) Page 7 of 7 O~ner: Florida Power & Light Company, 700 Universe Blvd. Juno Beach, Florida 33408

2. Plant: Turkey Point Nuclear Po~er Plant, P.O. Box 4332, Princeton, Florida 33032 3~ Plant Unit:~
4. Owner Certificate of Authorization (if required)
5. Conmercial Service Date :
6. National Board Nunber for Unit:

We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No.

Expiration Date Date: '& /8 Signed:

By:

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Dade County, Florida, and employed by Arkwright Mutual Insurance Company of Norwood, Massachusetts, have inspected the components described in this Owner's Report during the period 3/3/96 to 4/8/96, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Data Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

@ SXsc nspecto 5 gnature National Board, State, Province, and Endorsements Date:

I

~l I.

r

TURKEY POINT UNIT 4 1996 REFUELING OUTAGE Form NIS-2 Owners'ata Report oZ Repairs and Replacements

)A I

NIS-2 Reports Report No. Date 95-001-4 1/27/95 95-002-4 2/3/95 95-003-4 2/15/95 95-004-4 2/21/95 95-005-4 3/1/95 95-006-4 3/6/95 95-007-4 3/23/95 95-008-4 3/16/95 95-009-4 3/16/95 95-010-4 3/23/95 95-011-4 3/23/95 95-012-4 3/24/95 95-013-4 3/27/95 95-014-4 3/27/95 95-015-4 4/24/95 95-016-4 5/1/95 95-017-4 5/17/95 95-018-4 7/28/95 95-019-4 8/10/95 95-020-4 11/9/95 96-001-4 3/4/96 96-002-4 3/4/96 96-003-4 3/25/96 96-004-4 3/7/96 96-005-4 3/16/96 96-006-4 4/4/96 96-007-4 3/28/96 96-008-4 3/25/96 96-009-4 3/21/96

NIS-2 Reports Report No. Date 96-010-4 4/5/96 96-011-4 3/25/96 96-012-4 3/25/96 96-013-4 3/25/96 96-014-4 3/25/96 96-015-4 3/26/96 96-016-4 3/27/96 96-017-4 3/29/96 96-018-4 4/3/96 96-019-4 3/28/96 96-020-4 3/28/96 96-021-4 3/29/96 96-022-4 3/30/96 96-023-4 4/1/9 6

~ 96-024-4 4/5/96 96-025-4 4/5/96 96-026-4 3/31/96 96-027-4 3/31/96 96-028-4 3/31/96 96-029-4 4/1/9 6 96-030-4 4/5/96 96-031-4 4/5/96 96-032-4 4/5/96 96-033-4 4/5/96 96-034-4 4/8/96 96-035-4 4/5/96 96-036-4 4/10/96 96-037-4 4/10/96 96-038-4 4/10/96

4 NZS-2 Reports Report No. Date 96-039-4 6/7/96 96-040-4 6/12/96 96-041-4 6/18/96

FORN HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACENEH'IS As Required by the Provisions of the ASNE Code Section XI

1. O~ner Florida Power 8 Li ht Date 01 27 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t Name PHO ¹:7182/64 MO ¹: 94031614 CR ¹: 94-838 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: FEEDIIATER System ¹: 74 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iHanufactureri National Other iYear i Repaired ( ASHE i Component Hanufacturer J Serial Ho. Board Identification )guilt] Replaced or i Code J i Replacement Jstanp J I I ]~res Ne iBARN FLAT IN/A iN/A iH/A JR93-3922 ASTM-A-36-91 iUHK. iReplacement )No i1 4" X 4a CS MARK¹4-80117-H-341-18 (THREADED ROD (1) IBERGEN IH/A iH/A JR95-0133 BP PART¹5000 JUNK. JReplacement )Ho J3 4~ X 11g-Z 1 2TT PATERSON HARK¹4-80117-N-341.18 IHUT 3/4 10 iN/A iH/A IH/A IR92-5511 JUNK. (Replacement JNo iUHC-2B 4 MARK¹4-80117-H-341-18
7. Description of llork: HANGER PLATE REPOSITIONED AHD HANGER ROO REPLACED.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-3 gressure~ig Test Temperature ~

F 95.001-4

kN4'J ~ W fAKOo>> ~ tp Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: ALL llELDIHG PERFORHED IH ACCORDANCE llITH APPROVED PLANT PROCEDURES.

CERTIFICATE OF COHPLIANCE Me certify that the statements'made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate of Authorization No. N A Expiration Date N A Signed 19 7b Owner or 0 er's D ignee, Title CERTIFICATE OF INSERVICE INSPECT IOH I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and enyloyed by Arkwright Hutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 12/20/94 to 01/27/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirementsiof "the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his eaployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Hutual Eng. Assoc.

Comnissions NB 8230 N I Inspec rs S nature Hational Board, State, Providence, and Endorsements Date coZ 95-001-4

0 E I

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8 Li ht Date 02 03 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:7092/64 WO ¹: 94026056 CR ¹: 94-7092 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. 'Work Performed by Florida Power & Li ht Type Code Syahoi Stamp N A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. 'Identification of System: COMPONENT COOLING WATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~MA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of )Manufacturer[ Hational Other (Year ( Repaired ( ASHE (

Component Manufacturer (

Serial Ho. Board Identification [Built) Replaced or ( Code J J

Replacement (Stamp f I I /~res ue ITHREADED ROD 3/4" IN/A (H/A iH/A JR93-2362 SA-193 GR B7 /UNK. /Replacement /Ho I 15 3 4"-10UNC-2A X iHUTS 3/4" (30) IH/A IH/A IH/A JR94-3949 SA-194 GR 2H JUNK.,(Replacement ]No 3 4"-10UMC-28 6'.

Description of Work: FIFTEEN 15 STUDS AHD THIRTY 30 HUTS OH HEAT EXCHANGER DOOR REPLACED DUE TO EXCESSIVE CORROSIOM.

8. Tests Conducted: Hydrostatic: Pnewutic: Hominal Operating Pressure Other Pressure~rig test Testsereture ~

F 95-002-4

FORM HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1 ~ Owner Florida Power & Li ht Date 02 15 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address 2~ Plant Turke Point Plant Unit PMO ¹:3318/64 MO ¹: 94012631 CR ¹: 92-0086 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc

3. Mork Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING MATER System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of'Section XI Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,~H A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of )Manufacturer[ National Other )Year ( Repaired ( ASME ]

Coaponent Manufacturer ) Serial Ho. Board Identification JBui Itf Replaced or f Code J f Replacement (Sterp J I I J~tes ge i INTAKE COOL IHG IJOHHSTOH IH/A IH/A l4P9 MODEL 33 CMC (UNK. )Replacement ]No IMATER PUMP SPARE PUMPS

7. Description of 'Mork: SPARE INTAKE COOLING MATER PUMP OVERHAULED. THE FOLLOMIHG PARTS MERE REPLACED:

BOLTS M&S 031364004 7 R86-5207 17 R95-0326 M&S 031348017 20 R94-1999 M&S 031364501 5 R95-0059 3 R94-1893 9 R95-0326 M&S 097142565 20 R95-0326 NUTS M&S 03096199 10 R94-2988 M&S 030660602 12 R91-4523 PIPE COLUMN M&S 626752017 2 R91-4770 M&S 62673013 1 R94-0471 DISCM. BOML M&S 097103101 1 R95-0058 BASE PLATE M&S 626754109 R89-2922 BAR ROUND M&S 032652364 R93-1439. PRESSURE TEST VT-2 MILL BE PERFORMED UPON PUMP INSTALLATION.

8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other VT-1 Pressure~sig Test Temperature 'F 95-003-4

'lly$ J ~g 0

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION HO WELDIHG REQUIRED.

CERTIFICATE OF COMPLIANCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Syahol Stamp H A Certificate of Authorization Ho. H A Expiration Date H A Signed < , 0 Date />

Owner or Owner's Designee, Title I

~y CERTIFICATE OF IHSERVICE INSPECTIOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Horwood, Ma. have inspected the coayonents described in this Owners Report during the period 05/19/94 to 02/10/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance 'with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his empLoyer makes 'any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be Liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Mutual Eng. Assoc.

Carmissions HB 8230 H Inspe tors gnature Hational Board, State, Providence, and Endorsements Dated ~~ A 95-003.4

a < Iv FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASNE Code Section XI

1. Owner Florida Power 8, Li ht Date 02 21 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PWO ¹:5401/64 WO ¹: 94022918 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stanp Name Authorization Mo. N A Expiration Oats N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COMPONENT COOL IHG WATER System ¹: 30 Quality Croup: C
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~M A Code Case (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,~N A Code Case
6. Identification of Coaponents Repaired or Replaced snd Replacement Components Name of Naae of (Kanufacturer( National ( Other (Year ( Repaired ( ASHE (

Component Manufacturer ( Serial Mo. Board Identification (Built( Replaced or ( Code (

( Replacement (Sterp (

I t (~Yes Ho NUT (1) H/A (N/A (H/A (

1J-0019 4E207C CCW HX (UHK. (Replacement (Ho SA 194 GR 2H 3 4"10UNC-2B

7. Description of Work: OHE NUT REPLACED OH COMPONENT COOLIHG MATER HEAT EXCHANGER C SOUTH SIDE ACCESS DOOR.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other Pressure~is Test Teegersture ~

F 95-004-4

~ '@ '"n -'< v+ 'V 'P, y

0

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: HECNANICAL COHNECTION NO MELDING REOUIRED.

CERTIFICATE OF CONPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASNE Code,Section XI.

Type Code Symbol Stamp N A Certificate of Authorization Ho N A Expiration Date H A Signed Date ~ +/

Owner or Owner's Designee, Title CERTIFICATE OF IHSERVICE IHSPECTIOH I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eaployed by Arkwright Hutual Insurance Company of Norwood, Ha. have inspected the carponents described in this Owners Report during the period 09/08/94 to 02/21/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his eayioyer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Nutuai Eng. Assoc.

Comnissions NB 8230 N I Inspectors Signature National Board, State, Providence, and Endorsements Date ~

95-004-4

1

'4 i V

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 01 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit rift, Haec

~, err PWO ¹:8009/64 WO ¹: 95004961 9?00 SW 34C Street Florida Cit Fl. 3303C Address Repair Organization P.O. No.,Job Ho.,etc

3. Work Performed by Florida Po~er 8 Li ht Type Code Symbol Stamp N A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address 4~ Identification of System: INTAKE COOLING WATER System ¹: ~ 19 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of IHanufactureri Hational Other IYear I Repaired I ASHE I Conyonent Hanufacturer I Serial Ho. Board Identification Iguilti Replaced or I Code I I Replacement isterp I I I I~Yes Noi i1 1/2" GATE VALVE IJENKINS BROS. iN/A IH/A I4-50-374 IUNK. IReplaced IHo I1 1/2" GATE VALVE I lIALWORTH IN/A IN/A IR92-0271 4-50-374 IUHK. IReplacement IHo
7. Description of Work: VALVE REPLACED DUE TO SEAT LEAKAGE.
8. Tests Conducted: Hydrostatic: Pneuaatic: Hominal Operating Pressure X Other VT.2 pressure~3 ig Test Temperature 'F 95-005.4

lit'go A, 1fJb, y t I" I

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: MECHANICAL CONNECTIOH NO MELDING REOUIRED.

CERT IF I CATE OF COMPLIANCE Ne certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Syshot Stamp N A Certificate of Author zat Ion 1 Ho. N A Expiration Date N A Signed Date 19 ~+

Owner. or Owner's Designee, Title CERTIFICATE OF IHSERVICE IHSPECTIDH I, the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have inspected the components described in this Owners Report during the period 02/17/95 to 03/01/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements. of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or la@lied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Mutual Eng. Assoc.

Comnissions NB 8230 N I Ins tor Signature National Board, State, Providence, and Endorsements Date 95-005.4

~ 'h yW - %'l II lg

FORM HIS 2 DNNERS REPORT FOR REpAIRS OR REpLAGEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 06 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:8865/69 IN ¹: 95004245 CR ¹: 95-115 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Ilork Performed by Florida Power II Li ht Type Code Syrbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: BORIC ACID TRANSFER System ¹: 46 Duality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Ceqmnents Repaired or Replaced and Replacement Components Hame of Name of (Hanufacturer( National Other (Year ( Repaired ( ASHE (

Component Manufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

(

Replacement (Stamp (

I I i~res ue (PIPE 2" (H/A (H/A (H/A (R95-0403 ASHE SA-312 (UHK. (Replacement (Ho (304 SS SCH 10S NC-2 (H/A - (N/A (H/A ((3)R95-0403 ASHE SA-182 (UHK. (Replacement (Ho 1304 SS 3 GR 304F NC-2 (TEE'S 2" (H/A IH/A (H/A ((2)R95-0403 ASHE SA-182 (UNK. (Replacement (Ho (304 SS 2 GR 304F I,~

IDIAPHRAH VALVE ( ITT GRIHNELL (Hy'0 + (N/A ((1)R95-0435 ASHE SA-351 (IJQEk(Replacement /leal' (2" 1 VALVE //0'/-+ Q GR CF8 VLV ¹ 376 F76 y~

I I I I I

7. Description of IIork: PIPING 2 TEE'S 3 ELBNIS AND OHE VALVE REPLACED DUE TO THROUGH IIALL LEAKAGE.
8. Tests Conducted: Hydrostatic: X Pneunatic: Nominal Operating Pressure Other VT-2 Pressure~l90 stg test temperature gg uF 95-006.4

~ @Pm t, P$ Pl h

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: ALL MELDING PERFORNED IN ACCORDANCE MITH APPROVED PLANT PROCEDURES.

CERTIFICATE OF CONPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Stamp H A 0

Certificate of Authorization Signed Owner

- /'i~

Ho.

or Owner's Designee, H

Title A Expiration Date Date 9 N A CERTIFICATE OF INSERVICE IHSPECTIOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Nutual Insurance Cerpany of Horwood, Ha. have inspected the components described in this Owners Report during the period 02/11/95 to 03/06/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Hutual Eng. Assoc.

Comnissions HB 8230 N I Ins cto Signature Hational Board, State, Providence, and Endorsements Date cP 95-006.4

At r 0' ~

N',t 't

'I II'

FORM HIS-2 ONERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. O~ner Florida Po~er 8 Li ht Date 03 23 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t Hame PNO ¹:8321/64 HO ¹: 95006940 CR ¹: 94-1027 9700 Sll 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ko.,Job No.,etc
3. Nork Performed by Florida Power F Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: REATOR COOLANT System ¹, 41 Ouality Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer( National Other ]Year J Repaired ) ASME )

Component Manufacturer (

Serial Ho. Board Identification )guilt] Replaced or f Code J

[ Replacement (Staay J I I [Yes/eHo IBOHHET EXTEHSIOH ICOPES VULCAN IN/A IH/A IR92-0746 PCV-4-455A [UNK. [Replacement (Ho iFOR VLV PCV-4-455A PART ¹ 137519

7. Description of llork: BONNET EXTENSION REPLACED.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X

~

Pressure~230D lg Test Tenperature 533 F 95-007-4

"~ I Sheet 2 of 2 FORN NIS-2 (Back)

9. Remarks: NECHANICAL COONECTION NO MELDING REQUIRED.

CERTIFICATE OF COHPLIANCE

'Ne certify that the statements made in the report are correct and this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Stamp N A Certificate of,Authorization No. H A Expiration Date N A

/t p'igned re/) c.~< Af rc <~ Date >/i~<<7 Z 7 19'+

Owner or Owner'p Designee, Title CERTIFICATE OF IHSERVICE IHSPECTION I, the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Con@any of Norwood, Ha. have inspected the components described in this Owners Report during the period 03/07/95 to 03/23/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code, Section XI'y signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a toss of any kind arising from or connected with this inspection.

Factory mutual Eng. Assoc.

Conmissions HB 8230 H I lns ctor Signature National Board, State, Providence, and Endorsements I

Date e

95-007.4

h C

I I~ f I 0

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONHECTIOH NO WELDIHG REQUIRED.

CERTIFICATE OF COMPLIAHCE

'We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp H A Certificate of Authorization No. H A Expiration Date H A Signed Owner 4 or Owner's Designee, Title Date A->

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid conmission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have inspected the components described in this Owners Report during the period 12/15/94 to 02/03/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

'Factory Mutual Eng. Assoc.

Comnissions HB 8230 N I Inspec rs nature National Board, State, Providence, and Endorsements Date X 95-002-4

ll

't'Q A

~>

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 16 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 4 PHO ¹:8236/64 WO ¹: 95006718 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Nork Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Name Authorization Ho. H A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: CVCS System ¹: 47 Quality Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Cerponents Kame of Name of iHanufactureri National ) Other iYear i Repaired i ASKE i Coaponent Hanufacturer i Serial Ho. Board Identification iguiitJ Replaced or i Code i i Replacement istany i I I JYesrege lVALVE BONNET COPES-VULCAN iH/A iH/A iR90-1109 CV-4-200A ]UNX. iRepiacement iHo PART ¹131456
7. Description of Hork: BONNET REPLACED. VI'-1 PERFORHED ON EXISTING BODY TO BONNET BOLTIHG.
8. Tests Conducted: Hydrostatic: Pnewetic: Nominal Operating Pressure X pressure~gggg tg test temgereture 533 'F 95-008-4

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: MECHANICAL COHHECTIOH HO HELOING REQUIRED.

CERTIFICATE OF COMPLIANCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp H A Certificate of Authorization Ho. H A Expiration Date H A r.

rr .4'igned Date ~>A</~ Z 7 19 Owner or Owner'esigne, Title CERTIFICATE OF I NSERV ICE INSPECTION I, the undersigned, holding a valid coneission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Coapany of Horwood, Ma. have inspected the components described in this Owners Report during the period 03/05/95 to 03/16/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Mutual Eng. Assoc.

Coamissions HB 8230 N I Inspec ors 'ature National Board, State, Providence, and Endorsements Date +

95-008-4

V I

I 0

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 16 95 700 Universe'lvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:9107/69 WO ¹: 95006457 CR ¹: 95-115 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job Mo.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stanp N A Hame Authorization Ho. N A Expiration Date M A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: BORIC ACID TRANSFER System ¹: 46 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Conponents Repaired or Replaced and Replacement Conponents Name of Name of (Manufacturer( Hational ( Other (Year (

Repaired ( ASHE (

Component Manufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

( Replacement (Stanp (

I I (~Yes Mo (PIPE 2'304 IH/A (M/A, (R95-0403 ASHE SA-312 (UHK. (Replacement (Ho SS SCH 10 HC.2 (ELBOWS 2" (N/A (N/A (N/A ((3) R95-0403 ASNE SA-182 (UHK. (Replacement (Mo (304 SS 3 GR 304F NC.2

7. Description of Work: PIPIHG AHD 3 ELBOWS REPLACED DUE TO THROUGH WALL LEAKAGE.
8. Tests Conducted: Hydrostatic: X Pneunatic: Nominal Operating Pressure Other VT-2 gressure~l90 stg test teegersture 80 ~

F 95-009-4

I, Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: ALL lIELDIHc PERF0RNED IN AccoRDANcE UITH APPRovED PLANT PRocEDUREs.

CERTIFICATE OF CONPLIAKCE

'Lle certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Steep N A Certificate of iluthorization Ho. N A Expiration Date H A Date /CrM'C'//' 7 19 Owner or/Owner's. signee, Title CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a valid ccxnnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and erpioyed by Arkwright Hutual Insurance Cocpany of Norwood, Ha. have inspected the components described in this Owners Report during the period 03/02/95 to 03/16/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his ecpioyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Kutual Eng. Assoc.

Carmissions HB 8230 H I Inspectors Signa re National Board, State, Providence, and Endorsements I9 95 95-009-4

I, ar I

(

FORH HIS-2 OWHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 03 23 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PMO ¹:7863/64 MO ¹: 95004256 CR ¹: 95-115 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stan@ N A Name Authorization Ho.

Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: BORIC ACID TRANSFER System ¹: 46 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Hame of tHanufactureri National i Other )Year J Repaired i ASHE )

Component Hanufacturer i Serial Ho. Board Identification Jguilti Replaced or ( Code i

( Replacement iStamp )

I I i~res uu I PIPE IH/A iH/A iN/A JR95-0518, R95-0403 ASHE iUNK. iRepiacement [Ho 1304 Ss SA--312 SCH 10 HC-2 LELBOM 2" IH/A iN/A 1N/A 1R95 0530 ASHE SA 182 IUHK 1Repiacement IHo I304 Ss 1 GR 304F NC-2

)TEETS 2" iN/A iH/A JH/A (R95-0403 ASHE SA-182 iUHK. (Replacement (Ho i304 SS 2 GR 304F I COUPL I HG IH/A IH/A iH/A iR91-51SS ASHE SA-182 iUNK. )Replacement iNo I304 Ss 1 GR 304F iDIAPHRAH VALVE BLITT GRIHHELL i75-4104-30-7/N/A /R95-0435 ASHE SA-351 i1979 iRepiacement iYes i

299 R CFB VLV ¹ 4-348

7. Description of Work: PIPING 1 ELBOM 2 TEETS 1 COUPLIHG AHD 1 VALVE REPLACED DUE TO THROUGH MALL LEAKS.
8. Tests Conducted: Hydrostatic:

Other VT-2 X Pneunatic:

Pressure~190 919 Test Turuuruture '8 Hominal Operating Pressure

'F 95-010.4

1 t

A

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: ALL lJELDING PERFORNED IH ACCORDANCE IJITH APPROVED PLANT PROCEDURES.

CERTIFICATE OF COHPLIAHCE lie certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI ~

Type Code Symbol Staap N A Certificate of Au orization Ho. N A Expiration Date H A Signed I~'f>> ",s'm .f'ia,c~J ~~+-.' 19 Owner or 0 ner's Dphgnee, T tie CERTIFICATE OF IHSERVICE 'INSPECTION I, the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eapioyed by Arkwright Hutual Insurance Company of Norwood, Ha. have inspected the carponents described in this Owners Report during the period 02/11/95 to 03/23/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his eaployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Hutual Eng. Assoc.

Cermissions NB 8230 N I Inspec ors >gnature National Board, State, Providence, and Endorsements Dat 19 5S 95-010-4

"~

FORM MIS-2 ONNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section Xl

1. O~ner Florida Power 8 Li ht Date 03 23 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PNO ¹:9106/69 NO ¹: 95006448 CR ¹: 95.115 9700 SN 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job Mo.,etc
3. work Performed by Florida Power 8 Li ht Type Code Symbol Stan@ H A Name Authorization No. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: BORIC ACID TRANSFER System ¹: 46 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Cbde Case
6. Identification of Ccayonents Repaired or Replaced and Replacement Components Name of Name of iHanufactureri National Other IYear I Repaired I ASNE I Component Manufacturer i Serial No. Board Identification igui Iti Replaced or i Code i i Replacement iStamp J I I [~reu uu iPIPE 2" JH/A IH/A iH/A [R95-0518,R95-0403 SCH 10 iUMK. /Replacement (Ho 1304 SS R94-3934 ASNE SA-312 HC-2 iELBOM 2" IH/A JH/A iH/A i(2)R95-0403 ASHE SA-182 [UNK. iReplacement iMo 1304 SS 2 GR 304F HC-2 iTEETS 2" IH/A JM/A /N/A J(2)R95-0579, (1)R95-0403 /UHK. /Replacement iHo i304 SS ASNE SA-182 GR 304F IOIAPNRAH VALVE BLITT GRIHHELL i75-4104.30-5iH/A iR95-0435 ASHE SA-351 [1976 iReplacement iYes i

222 1 GR CF8 VLV ¹374

7. Description of Mork: PIPING 2 ELBOWS 3 TEE'S AND 1 VALVE REPLACED DUE TO THROUGH MALL LEAKS.
8. Tests Conducted: Hydrostatic:

Other X Pnewetic:

Pressure~192 tu Hominal Operating Pressure Test Tuuperuturu 78 'F 95-011-4

%'C P

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: ALL MELDING PERFORMED IN ACCORDANCE lJITH APPROVED PLANT PROCEDURES.

CERTIFICATE OF COMPLIANCE Ne certify that the statements made in the report are correct and this repair conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stan@ N A Certificate of A thorization Ho. N A Expiration Date N A Signed A 7Y'i-i ~ s)>i~c e Date ~~4+ ~ > 19 Owner or owner's Designee, Title CERTIFICATE OF IHSERVICE IHSPECTIOH 0

I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have inspected the conponents described in this Owners Report during thc period 03/03/95 to 03/23/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or iaplied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Mutual Eng. Assoc.

4 Comnissions HB 8230 N I Inspect s Signature National Board, State, Providence, and Endorsements Date 95-011-4

~ q, 0

FORH NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASNE Code Section Xl

1. Owner Florida Power & Li ht Date 03 24 95 Name 700 Universe Blvd. Juno Beach Ft. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PMO ¹:8478/64 MO ¹: 95007031 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Mork Performed by Florida Po~er B Li ht Type Code Symbol Stanp N A Name Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING MATER System ¹: 19 Quality Group: C 5~ (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Nanufacturer[ National Other (Year ] Repaired [ ASNE Component Hanufacturer ( Serial Ho. Board Identification Replaced or f Code J'guilt/

/

I J Replacement [Stamp (

I I I Jresrege JPUHP 4P9C IJOHHSTOH IH/A /H/A /4P9C IST-6 HOOEL 33-CHC /UHK. /Replaced /Ho I

jPUHP 4P9C IJOHHSTOH IH/A /H/A /4P9C IST.-3 HOOEL 33-CHC /UHK. )Replacement /Ho ISTUDS (20) (H/A IH/A /N/A JR95-0662 1.1/4"-BUH-2A /UNK. /Replacement /Ho I

SA-193 GR 87

)HUTS <40) IH/A /N/A /<2)R91-5767,(38)R94-1956 /UHK. /Replacement /Ho I

1-1 4"-BUN-2B SA-194 GR 7 iEXPAHSIOH JOIHT IGARLOCK INC IH/A fN/A JR94-2921 XJ-4-1408 JUNK. JReplacement [Ho I

ART ¹ 204HP

7. DescriPtion of Mork: REPLACED INTAKE COOLING MATER PUNP 4P9C IST-6 MITH SPARE IST-3 .

8 ~ Tests Conducted: Hydrostatic: Pneuaatic: Hominal Operating Pressure X Pressure~tg ig Test Tssgereture 86 95.012-4

I 4

4 W4 ~ "

0'

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: MECHANICAL COOHECTIDH HD WELDIHG REOUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp H A Certificate of Authorization Ho. N A Expiration Date H A J

Signed Wd~ ~/~ / Date ~ >A~ ~ ~

Owner or Ownen s Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comaission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eayioyed by Arkwright Mutual Insurance Ccepany of Norwood, Ma. have inspected the components described in this Owners Report during the period 03/13/95 to 03/24/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Mutual Eng. Assoc.

Comnissions HB 8230 N I Ins ctor Signature National Board, State, Providence, and Endorsements Date 95-012-4

0

'I 't 4

FORN NIS-2 ONIERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1 ~ Owner Florida Power & Li ht Date 03 27 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Name . . PNO II:8479/64 lQ ff: 95007038 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.;etc
3. Ilork Performed by Florida Power 8 Li ht Type Code Symbol Stance H A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING llATER . System fI: 19 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case JUNKED
6. Identification of Components Repaired or Replaced and Replacement Cocyonents Name of Name of ]Hanufacturer) National Other I"ear I Repa<<ed I ASHE I Component Hanufacturer )

Serial Ho. Board Identification ]guilt] Replaced or J Code f f Replacement )Stamp J I I /~res me ICHECK VALVE J HI SS ION VLV ( 27073 ( H/A (4-50.331 DUO. CHEK [Replaced ]No I

ICHECK VALVE (HISSIOH VLV -

(73404 fH/A ]R95-0451 4-50-331 (UHK. )Replacement ]No I

DUO-CHEK ASTN-B-148 iSTUDS (20) IH/A [N/A /R95-0646 ASTH A193-90 /UHK. /Reptacement (No

)1.1 8"-8 UN-2A X 18" GR B7 iNUTS (40) (H/A (N/A JH/A /R95-0646 ASTH A194-88 /UHK. '/Replacement (Ho II 1 8" 8 UN-2 GR 2H

7. Description of llork: CHECK VALVE AND BOLTIHG FOR ICM PUHP C REPLACED.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X

~

Pressure~18 ig Test temperature 86 F 95-013.4

0 (g,

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: HECHAHICAL CONNECTION HO MELDING REQUIRED.

CERTIFICATE OF CONPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp H A Certificate of Aughorization Ho. N A Expiration Date N A Signed gi Li~./ V~~ ..! WZ/~..-.i (dC,~,-~ Date W 2~4F >7 Owner or 0 er's esignea, Title CERTIFICATE OF INSERVICE INSPECT IOH I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eaployed by Arkwright Hutual Insurance Company of Norwood, Na. have inspected the components described in this Owners Report during the period 03/13/95 to 03/2//95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or inplied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his ca@layer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Hutual Eng. Assoc.

Cermissions NB 8230 N I Ins tor ignature National Board, State, Providence, and Endorsements Date 19~5 95-013-4

t FORH HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner'lorida Power & Li ht Date 03 27 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t PMO ¹:8999/69 MO ¹: 95005581 CR ¹: 95-115 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Steep H A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: BORIC ACID TRANSFER System ¹: 46 Duality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Coeponents Repaired or Replaced and Replacement Cocqonents Name of Name'f (Hanufacturer( National Other (Year I Repaired I ASHE I Component Hanufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

( Replacement (Stamp (

I I (~Yes Ho (PIPING 2" (H/A (H/A (H/A (R95-0518 ASHE SA-312 (UHK. (Replacement (Ho (304 SS SCH 10 NC-2 (ELBOM 2" IH/A IN/A (H/A (R95-0530 ASHE SA-182 (UHK. (Replacement (No (304 SS 1 GR 304F NC-2 (COUPLIHG 2" IH/A (H/A (H/A (R91-4532 ASHE SA-182 (UHK. (Replacement (Ho (304 SS GR 304F (DIAPNRAN VALVE (ITT GRIHNELL (93-060644-2-(H/A (R95-0032 ASHE SA-351 (1994 (Replacement (Ho (2s' GR CF8 VLV ¹ 3980

7. Description of Mork: PIPING 1 ELBOM 1 COUPLIHG AND 1 VALVE REPLACED OUE TO THROUGH MALL LEAKS.
8. Tests Conducted: Hydrostatic: X Pneunatic: Hominal Operating Pressure Other VT-2 Pressure~168 ie Test tuspereture 82 'F 95.014-4

t~i Sheet 2 of 2 FORK HIS-2 (Back)

9. Remarks: ALL WELDIHG PERFORKED IH ACCORDANCE MITK APPROVED PLANT PROCEDURES.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate of Au horization No. H A Expiration Date N A Signed Date W~~+~~ + 7 19 . ~I ner o Owner s Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 02/23/95 to 03/27/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE Code,Section XI.

makes any warranty, expressed or By signing this certificate neither the Inspector nor his erployer implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Mutual Eng. Assoc.

Comni ss i ons HB 8230 H I Inspectors Signature National Board, State, Providence, and Endorsements Date 95-014.4

P 1

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Qtner Florida PoIIer 8 Li ht Date 04 24 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit" 4 Name PIJO ¹:8841/64 lJO ¹: 95010061 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Kame Authorization No. N A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONENT COOL INC System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Conponents Hame of Name of (Hanufacturer( National Other (Year ( Repaired ( ASIDE (

CNIponent Hanufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

( Replacement (StaTTp (

I I /~Tee ue (THREADED ROO (5) (H/A (H/A (H/A ((1)R93-2362,(2)1J0091 (UHK. (Replacement (Ho (3 4II 2 1J0043 4E207A SA-193 (NUTS (80) (H/A (H/A (H/A ((80)R94-3949, SA-194 (UHK. (Replacement (Ho (3 4II GR 2H 4E207A

7. Description of llork: STUDS AND NUTS REPLACED ON CCII HX ACCESS DOOR.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other Preeeure~eti Teei Teettereture 'F 95-015.4

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: HECHANICAL CONNECTION NO WELDIHG REOUIRED.

CERTIFICATE OF COHPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code,Section XI ~

Type Code Symbol Stamp N A Certificate of Authorization Ho. N A Expiration Date H A C

Signed 19 Ow r or wner's Design , Title CERTIFICATE OF INSERVICE IHSPECTIOH I, the undersigned, holding a valid cennission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Company of Horwood, Ha. have inspected the components described in this Owners Report during the period 04/07/95 to 04/24/95 and state that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his erpioyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any'personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Hutual Eng. Assoc.

Coamissions NB 8230 N I Inspect rs S ture National Board, State, Providence, and Endorsements Date 95-015-4

'LV

,,t ilia IK P Vz

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 05 01 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:8960/69 WO ¹: 95004931 CR ¹: 95.115 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Syxhol Stamp M A Name Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: BORIC ACID TRANSFER System ¹: 46 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized fof Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Hame of JManufactureri National Other [Year i Repaired i ASHE i Coaponent Manufacturer i Serial Ho. Board Identification iBuilt( Replaced or i Code i

/ Replacement [Staap i I I i~res ue IPIP IHG IH/A IN/A IH/A iR91-2814, ASHE SA-312 iUHK. )Replacement iHo SCM 40 304 SS iTEE IH/A . iH/A IM/A iR95-0533, ASHE SA-403 JUNK. iRepiacement iHo I3II SCH 40 304 SS IELBOW (2) IH/A IN/A IH/A JR95-0533, ASHE SA-403 iUHK. iReplacement /Mo II SCH 40 304 SS i3 IBALL VALVE EHD iAHCHOR DARLING /N/A IH/A iR95-0708, ASTH A240 iUNK. iRepiacement [Ho I PIECES 3 VALVE CO. 316 SS SCH 40

7. Description of Work: PIPING REPLACED BETWEEM VALVES 373 391 AND 393 DUE TO THROUGH WALL LEAKS.
8. Tests Conducted: Hydrostatic: X Pneunatic: Hominal Operating Pressure

~

Other VT-2 gressure~225 ig Test resgereture 77 F 95-016-4

% ~

' ~

l'

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: ALL llELDING PERFORHED IN ACCORDANCE MITH APPROVED PLANT PROCEDURES.

CERTIFICATE OF COMPLIANCE lie certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Staap H A Certificate of uthorization Ho. N A Expiration Date H A Signed Owner or r's esig ee,

<~.C.

Title

<>> -. ~ D.t.

CFRT IF ICATE OF 'IHSERVICE INSPECT IOli I, the undersigned, holding a valid coomission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eapioyed by Arkwright Hutuai Insurance Coapany of Horwood, Ha. have inspected the components described in this Owners Report during the period 02/27/95 to 04/26/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Hutuai Eng. Assoc.

Carmisstons HB 8230 N I Inspectors ignat e National Board, State, Providence, and Endorsements I

aase K 5 19 F5 I

95.016-4

l' FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner - Florida Power 8 Li ht Date 05 17 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Hame PNO ¹:64/8831 NO ¹: 95010014 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Ilork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: CCW System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Coaponents Name of Name of [Manufacturer) National Other ]Year J Repaired ( ASME J Component Manufacturer (

Serial Ho. Board Identification (Built) Replaced or f Code )

J Replacement (Stamp /

I I JYesreue ITHREADED ROO )N/A IH/A iH/A iR93-2015, 1J0091 (UNK. )Replacement [Ho I 29 STUDS 4E207C COI NX JHUTS IH/A iH/A LH/A (R94-3949 4E207C CCN HX /UNK. ]Replacement /Ho f 58 NUTS

7. Description of Norkl REPLACED 29 STUDS AHD 58 NUTS ON COMPONENT COOLING lIATER HEAT EXCHANGER 4E207C.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other Pressure~stg Test Temperature uF 95-017-4

I~i p 'Arl I

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION NO WELDIHG REOUIRED.

CERTIFICATE OF COMPLIANCE He certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp H A Certificate of uthorization Ho. Expiration Date N A Signed Date Owner or Owner's D igne , Title CERTIFICATE OF INSERVICE IHSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Horwood, Ma. have inspected the components described in this Owners Report during the period 04/07/95 to 05/16/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Factory Mutual Eng. Assoc.

Comnissions HB 8230 N I Inspecto Signa e National Board, State, Providence, and Endorsements Dat 19 FS 95-017-4

FORH NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1 ~ Owner Florida Power & Li ht Date 07 28 95 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Uni t PMO ¹:3303/64 MO ¹: 94012558 CR ¹: 92-0086 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Mo.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Coaponcnts Repaired or Replaced and Replacement Coaponents Name of Name of (Hanufacturer[ National Other (Year J Repaired J ASHE J Ccaponent Hanufacturer J Serial Ho. Board Identification (Built[ Replaced or ( Code /

I f Replacement (Staap (

I I I [Terse, I INTAKE COOL IHG iJOHHSTOH (H/A IN/A 14P9 HCOEL 33 CHC (UNK. ]Replacement ]Ho IMATER PUHP SPARE PUHP IST-2

7. Description of Mark: INTAKE COOLING MATER PUMP SPARE IST-2 OVERHAULED. THE FOLLOMING PARTS MERE REPLACED: BOLTS H& S 030-16115-1 10 R91-1708 H&S 031-36400-4 7 R95-0326 H&S 031-36450.1 8 R95-0326 BASE PLATE H&S 626.75410-9 1 R89-2922 IHPELLER H&S 006.00512.8 1 R91 0471 SUCT IOM BELL H&S 097-08928-1 1 R93-0960 COLUMN PIPE H&S 626-75301-3 1 R91-4713. PRESSURE TEST VT-2 MILL BE PERFORMED UPON PUMP INSTALLATIOH.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-1 Pressure~is Test Testsersture 'F 95-018-4

I V

e

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: NECHANICAL CONNECTION NO MELDING REQUIRED.

CERTIFICATE OF CONPLIANCE Me certify that the statements made in the rcport are correct and this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Syrrbol Stamp H A Certificat f uthori tion No. H A Expiration Date N A Signed Date Owner or Owner' csfgneci Tf tlc h

CERTIFICATE OF INSERVICE INSPECTION

'1, the undersigned, holding a valid comnissfon issued by the Hatfonal Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and capfoyed by Arkwright Mutual Insurance Coo@any of Norwood, Ka. have inspected the components described in this Owners Report during the period 05/19/94 to 07/28/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his erployer makes any warranty, expressed or fspficd, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his ccpfoyer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising free or connected wfth this inspection.

Factory Nutual Eng. Assoc.

Coamissfons HB 8230 N I Ins ctor Signature National Board, State, Providence, and Endorsements Date >> CjS 95.018-4

FORN HIS-2 OMMERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. Oner Florida PoMer S Li ht Date 08 10 95 700 Universe Blvd. Jun Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PQO ¹:7643/64 MO ¹: 95002394 CR ¹: 94-.861 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Nork Performed by Florida Power 4 Li ht Type Code Symbol Staap H A Name Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING 'MATER System ¹: 19 Duality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identif ication of Coaponents Repaired or Replaced and Replacement Cottponents Name of Name of [Hanufacturer( National Other (Year ( Repaired i ASHE i Component Hanufacturer [ Serial No. Board Identification igui It) Replaced or ( Code i J

Replacement )Stanp i I I i~res ue ISTUDS (20) IH/A IH/A IN/A iR95-1020, VLV 4-50-321 (N/A iReplacement /Mo I

1-1 8"-BUN-2A ASTH A-193 iMUTS (40) IN/A IH/A IH/A )R95-1020g VLV 4-50-321 iH/h fReptacement iHo ASTH A-194 GR.2H

7. Description of llork: REHOVED ALL THREAD BOLTS AND REPLACED lJITH SMOOTH SHANKED BOLTS THREADED AT EACH EHD. TllEHTY 20 STUDS AHD 40 MUTS REPLACED.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure Other Pressure~tg Test Tesgereture ~

F 95-019.4

sC I 4V Vl I

Sheet 2 of 2 FORK NIS"2 (Back)

'I

9. Remarks: KECHANICAL CONNECTION NO MELDING REQUIRED.

CERTIFICATE OF COIPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASKE Code, Section XI.

Type Code Syshol Steep H A Certificate uthorizaaion No. N A Expiration Date N A w)

Si 'ned 7~K ~fj flan;)f ~ )-,P ab

~i'j'=~ Date ibad ~ 19 Ouner or Owner's De~i'nee, Title Orner CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid comn3ssion issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and eayloyed by Arkuright Kutual Insurance Coapany of HorMood, Ka. have inspected the components described in this Owners Report during the period 01/25/95 to 08/10/95 and state that to the best of my knoMledge and belief, the Ouner has performed examinations and taken corrective measures described in this Seers Report in accordance Kith the requirements of the ASKE Code,Section XI.

By signing th3s certif3cate neither the Inspector nor his eayioyer makes any warranty, expressed or imp l I ed/ concerning the examinations and correct i ve measures described In this ' Report. Furthermore i neither the Inspector nor his eaployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected Kith this inspection.

Factory Kutual Eng. Assoc.

Comalssions NB 8230 N I Inspec rs Si ture National Board, State, Providence, and Endorsements Dale P~ +~ l9 95-019-4

S H

l II J

~ +5 l t

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power 8, Li ht Date 11 09 95 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 4 PWO ¹:8733/64 MO ¹: 95009238 9700 SW 34C Street Florida Cit Fl. 3303C Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date P.O. Box C332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING MATER System ¹: 19 Duality Group: C
5. (a) Applicable Construction Code B31. 1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case

/

6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of )Manufacturer( National Other )Year ) Repaired ) ASME )

Component Manufacturer )

Serial No. Board Identification )Built) Replaced or ( Code )

( )

Replacement (Stamp )

I ) it~es ue

)INTAKE COOLING (JOHNSTON IH/A )H/A )4P9 MODEL 33 CMC JUNK. )Replacement )No

)'MATER PUMP SPARE PUMP IST-6

7. Description of Work: INTAKE COOLING MATER PUMP SPARE IST-6 OVERHAULED. THE FOLLOWIHG PARTS MERE REPLACED: BOLTS 17 1 1 4"-8" R95-1021 7 1 1 C"-6 1 4" 368663 13 1 1 4"-6 1 C" 373272 HUTS 54 315936 6 R91-0526 DISCHARGE BOWL 1 M3155095 DISCHARGE TEE 1 R9C-3646.

PRESSURE TEST VT 2 WILL BE PERFORMED UPON PUMP INSTALLATION.

8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-1 Pressure~slg test Teegereture 'F 95.020/4

~ t I, N Sheet 2 of 2 0 FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION HO WELDING REQUIRED.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp N A Certificat Auth ization Ho. N A Expiration Date H A Signed W/SAC, P7 A&4<~ Date 19 O~ner or Own 's Designee, Title (I IQ I CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid cocmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Cerpany of Norwood, Ma. have inspected the components described in this Owners Report during the period 03/29/95 to 11/09/95 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising fram or connected with this inspection.

Cermissions HB 8230 N I Insp tor ignature National Board, State, Providence, and Endorsements Date r'/'. 19 P'S 95 020

0 Ql

~ a'- we'~ ~ a 1p <~1' P

4 w l

' t"

~ 4

FORH HIS-2 OHNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 03 04 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 4 PHO ¹:64/7720 MO ¹: 95003154 9700 SIJ 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Hork Performed by Florida Power 8 Li ht Type Code Syahoi Stan@ N A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SPENT FUEL SYSTEH System ¹: 33 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Cerponents Repaired or Replaced and Replacement Components Name of Name of [Hanufacturer[ National Other /Year f Repaired / ASHE f Component Hanufacturer (

Serial Ho. Board Identification /Built( Replaced or J Code f

/ Replacement /Stash [

I I /t~es ue (VALVE BONNEt ITT GRINHELL JH/A i H/A [

R89. 1471 JUNK [Replacement )Ho

7. Description of Hork: REPLACED BONHET ASSEHBLY-STOCK CODE 0058642 e 8. Tests Conducted: Hydrostatic:

Other VT-2 Pneunatic:

Pressure~63 ig Nominal Operating Pressure test Temperature 86 X

~

F 96.001-4

g'l% V ~ i(

Sheet 2 of 2 FORM HIS-2 (Ba'ck)

9. Remarks: MECHANICAL CONNECTION NO HELOIHG REOUIRED CERTIFICATE OF COMPLIANCE Me certify that the, statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp H A 0 signea / ~

Certificatjgf Authorization Owner

'LJ Ho. H A or Owner's Designee, Title Expiration Date Date ~ ~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Coo@any of Norwood, Ma. have inspected the components described in this Owners Report during the period 02/02/95 to 03/04/96 and state that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comai ss I ons NB 8230 N I Inspecto s Sig ure National Board, State, Providence, and Endorsements 96-001-4

P FORM HIS 2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner 'lorida Power & Li ht Date 03 04 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Hame PMO ¹:5374/64 NO ¹t 96005782 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Ilork Performed by Florida Power & Li ht Type Code Synhoi Stamp M A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SPENT FUEL PIT PUMP HX System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Cerponents Repaired or Replaced and Replacement Components Name of Name of ]Manufacturer[ National Other lYear I Repaired I ASHE I Component Manufacturer ( Serial Mo. Board Identification ]guilt] Replaced or )

Code )

J Replacement (Stanp J I I /~res se i3/4gg BOLT IN/A IN/A IH/A IR91 5140 [UNX ]Replacement JMo I

JHEX HUTS (2) IH/A IH/A IH/A I R91-1555 (UMK )Replacement (Ho

7. Description of llork: REPLACED BOLT AND 2 NUTS
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-1 Pressureless test Tuspereture 'F 96.002.4

0 I

~ &(~ t '4 0

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: THIS IS A HECMANICAL CONNECTION NO WELDING REDUIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Syrrkol Stamp N A Certificate of thorization Ho. H A Expiration Date H A Signed Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid coamission issued by the National Board of Boiler and Pressure'Vessel inspectors and the state or Province of Dade County and employed by Arkwright Nutual Insurance Company of Norwood, Ha. have inspected the conyonents described in this Owners Report during the period 03/01/96 to 03/04/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 N I Inspec ors nature National Board, State, Providence, and Endorsements

...<p 96.002-4

l i

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. Owner Florida Power & Li ht Date 03 25 96 Hame 700 Universe Blvd. Juno Beach Fi. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit WO ¹: 95031215

'CM ¹: 95-104 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Hame Authorization No. H A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address 4~ Identification of System: COMPONENT COOLING WATER System ¹: 30 Duality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Home of Name of iManufactureri Hational Other iYear i Repaired i ASME i Component Manufacturer i Serial Ho. Board Identification iguilti Replaced or J Code i J

Replacement istanp J I I [~Yes Ho l1" BLIND FLANGE I IDEAL [N/A iH/A [UTC 390755, 4E207A,B,C iUNK. iRepiacement iHo I 6 HX'S i3" BLIHD FLANGE I IDEAL [H/A iN/A [UTC 390756, 4E207A,B,C iUHK. iReplacement iHo 6 HX'S I

IBOLTS (24) iN/A IH/A iH/A iR94-2667 BOLTS, R93-2122 JUNK. iReplacement (Ho 24

&'HUTS NUTS 4E207A B C

[NUTS (48) IH/A iH/A iH/A iuTC351943 (15) UTC391981 iUHK. iReplacement (Ho I

33 4E207 A B C ISTUOS (24) IH/A fN/A (H/A iUTC 352864, 4E207A,B,C iUHK. iRepiacement LNo I

7. Description of Work: REMOVED PIPIHG AMERTAP PIPIHG FROM UNIT 4 CCW HX'S AND INSTALLED BLIND FLAHGES
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X Other VT-2 Pressure~5.5 te Test Tesuereture 68 'F 96-003-4

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: HECHAHICAL CONNECTION NO MELDING REQUIRED.

CERTIFICATE OF CONPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Stamp H A Certificate of horization No. N A Expiration Date N A Signed Date 197 4 Owner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I', the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Kutual Insurance Company of Norwood, Na. have inspected the cotyonents described in this Owners Report during the period 11/09/95 to 03/25/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his eapioyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his erpioyer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Coenissions NB 8230 N I Inspect rs Sig ure National Board, State, Providence, and Endorsements Date 19 96-003-4

0 FORH NIS-2 ONHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI 1., Owner Florida PoMer & Li ht Date 03 07 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit Hams PNO ¹:0421/64 MO ¹: 95015120 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. llork Performed by Florida PoMer II Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Coeponents Repaired or Replaced and Replacement Cerponents Name of Name of IHsnufscturerI National Other IYear I Repaired I ASHE I Component Hsnufacturer I Serial Ho. Board Identification IBui ltI Replaced or I Code I I Replacement Istanp I I I /~res ge INUTS (2) IN/A IH/A IH/A IASHE SA-19II GR 7 IUHK IReplaced IHo U R95-1143
7. Description of Mork: CLEAN ECT CCM HX PLUGGIHG ANY IDENTIFIED TUBES
8. Tests Conducted: Hydrostatic: Pneunat i c: Hominal Operating Pressure Other Pressure~ig test Temperature ~

F 96.004.4

i4 C

Sheet 2 of 2 FORN NIS-2 (Back)

9. Remarks: THIS IS A NECKAHICAL CONNECTION NO NELDING llAS REQUIRED.

CERTIFICATE OF CONPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASNE Code,Section XI'ype Code Symbol Stamp H A Certificate of Authorization Ho. N A Expiration Date H A Signed Owner or Owner's Designee, Title

~/ s- 19~4 CERTIFICATE OF IHSERVICE IHSPECTIOH I, the undersigned, holding a valid co<<mission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Company of Horwood, Ha. have inspected the components described in this Owners Report during the period 08/11/95 to 03/07/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Co<<missions ,. NB 8230 H I Inspect rs S gnature National Board, State, Providence, and Endorsements 19 ~+

96-004-4

FORH HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 16 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PNO ¹:64/2589 NO ¹: 95026180 9700 SII 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Ilork Performed by Florida Power 8 Li ht Type Code Syrrhoi Steep N A Name Authorization No. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONEHT COOLING IIATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components Repaired or Replaced and Replacement CJxrponents Name of Name of "(Nanufacturer( National Other (Year ( Repaired ( ASHE (

Component Hanufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

( Replacement (StaJJJp (

I I J~Yes se (STUDS IH/A IH/A (UTC 375752 4E207A JUNK ~ (Replacement (Ho (3 4"-10UHC-2A ASHE SA-193 GR B7 (HUTS (31) (H/A (H/A (UTC 373667 4E207A (UHK. (Replacement (Ho (3 4u 10UHC 2B ASTH A-194 GR 7

7. Description of llork: STUDS AND NUTS REPLACED OH CCM HX 4A.
8. Tests Conducted: Hydrostatic: Pneunat 1 c: Nominal Operating Pressure e Other Pressure~is Test Testsereture ~

F 96-005-4

I 0

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: MECHANICAL CONNECTION NO IJELDING REDUIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI'ype Code Symbol Stamp H A Certificate o uthorization No. N A Expiration Date N A Signed Owner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid comnlssion issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and erpioyed by Arkwright Mutual Insurance Company of Horwood, Ma. have inspected the components described in this Owners Report during the period 09/22/95 to 03/16/96 and state that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section XI'y signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his eaployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 H I Ins tor )gnature National Board, State, Providence, and Endorsements Date 19 P+

96.005-4

~4 4 ~

FORM HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. O~ner Florida Power B Li ht Date 04 04 96 Haec 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PHO ¹:7450/64 lJO ¹: 94027542 CR ¹: 94-995 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. llork Performed by Florida Poaer B Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: FeedMater S stem System ¹: 74 4uai ity Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,416-1 Code Case
6. Identification of Components Repaired or Replaced and Replacement Cocyonents Kame of Hame of (Hanufacturer( National Other )Year ) Repaired ) ASHE [

Coaponent Hanufacturer ( Serial Ko. Board Identification [Built) Replaced or [ Code J

( Replacement (Stamp f I I [~ies ue I PIPE IH/A IH/A IH/A iuTC 393392,R94-0075 (UNK. ]Replacement [Ho 1IFB-Pe19 ASHE SA 106 GR B SCH 60

7. Description of cwork: REPLACED FEEDHATER PIPE TO 4B STEAN GENERATOR. POST HAIHTEHAHCE VISUAL LEAK INSPECTION VT-2 TO BE PERFORKED UNDER. HORK ORDER IKH6005293.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X Other VT-2 Pressure~tete ig rest Tesgereture 547 'F 96-006-4

P

~ I, 1I

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: WELDING PERFORMED IN ACCORDANCE 'WITH FPL WELD CONTROL MANUAL WPS-P 24 REV.4.

The r irements of Code Case N416-1 have been met for this re ir re lacement activit CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI ~

Type Code Symbol Stamp N A Certificate o Authorization No. N A Expiration Date H A Signed Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Cot@any of Norwood, Ma. have inspected the components described in this Owners Report during the period 02/20/96 to 03/24/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Caanissions HB 8230 N I Inspect s Si ture National Board, State, Providence, and Endorsements Date 96.006.4

L'I 1

C')

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACENEHTS As Required by the Provisions of the ASNE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 28 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant . Unit 4 Name PMO ¹:0670/64 MO ¹: 95000628 NPIL: 96.003 PCN ¹: 94-131 9700 Sll 34C Street Florida Cit Fl. 3303C Address Repair Organization P.O. Ho.,Job Ho.,etc
3. cwork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Author i zat ion Ho.

Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: ICM System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Coaponents Name of Haec of iHanufactureri National Other iYear ( Repaired ( ASNE i

( Serial Ho. Identification Component Hanufacturer Board Jguilti Replaced or i Code i J

Replacement JStaap i I I iYeslese, IHEAVY HEX BOLTS(32) IH/A iH/A iH/A iUTC352458 (9) UTC393094 /UHK. iRepiacement iNo I 23

)PLUG HEX (2) iH/A IH/A )UTC 393094 iUHK. )Replacement iNo iSHIK PLATE 1" FOR IH/A iH/A JH/A iUTC 376466 iUHK. iRepiacement iHo iSUPPORT 8046-H-190-3 e ISHIH PLATE 3/4a FOR IH/A IH/A IH/A IUTC 391077 (UNK. iRepiacement iHo ISUPPORT 8046-H-190-3 iPIPE SPOOL 30" DIA. fN/A iH/A iH/A iUTC 393142 iUNK. iRepiacement (No I

7. Description of llork: REPLACE VLV CV-4-2202 llITH PIPE SPOOL PIECE.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X

~

Pressure~C ig Test Temperature 68 F 96-007.4

'E Sheet 2 of 2 FORK NIS-2 (Back)

9. Remarks: ALL MORK PERFORKED IH ACCORDANCE MITH PC K 9C-131.

CERTIFICATE OF COKPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASKE Code, Section XI.

Type Code Symbol Stamp H A Certificate o+f uthorization Ho. H A Expiration Date N A Signed 19~C Reer or OMner's Designee, Title CERTIFICATE OF INSERVICE IHSPECT ION I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Kutual Insurance Coapany of Norwood, Ka. have inspected the conyonents described in this Ihrners Report during the period 02/17/96 to 03/28/96 and state that to the best of my knowledge and belief, the IK9ner has performed examinations and taken corrective measures described in this OMners Report in accordance Hith the requirements of the ASKE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any Harranty, expressed or implied, concerning the examinations and corrective measures described in this Omer9s Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

issions HB 8230 N I Inspect s Sig re National Board, State, Providence, and Endorsements Date H cubi 96-007-C

C" FORN HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code, Section XI

1. O~ner Florida Power 8 Li ht Date 03 25 96 Hame 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name IQ ¹: 96007206 CR ¹: 96-372 9700 S'M 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Mork Performed by Florida Po~er & Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: RESIDUAL HEAT REHOVAL System ¹: 50 Quality Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Cerponents Repaired or Replaced and Replacement Components Name of Name of iHanufactureri National ( Other iYear i Repaired i ASHE i Cerponent Hanufacturer i Serial Ho. Board Identification iguiiti Replaced or i Code J i Replacement (Stanp f I I J~res ge IPIPIHG TEE i N/A iH/A JH/A i8tg RHR-1402-7 JUNK J ~<<~ i No
7. Description of Hork: INDICATIOH BUFFED OUT THAT HAS FOUND DURING ROUTINE ISI IHSPECTIOH.

Pneuaatict Hominal Operating Pressure Pressure~tg test tesgersture 'F 96.008-4

)

~V

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: SURFACE INDICATION WAS ADDRESSED UNDER COHDITIOH REPORT CR96-0372.

CERTIFICATE OF COMPLIAHCE We certify that the statements made in the report are correct and this repair conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp N A Certificate of uthorization Ho. N A Expiration Date N A Signed 8nA ~-

Title g Date ~h~ 19g I Owner or Owner's Designee, Ir CERTIFICATE OF INSERVICE IHSPECT ION I, the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have inspected the components described in this Owners Report during the period 03/17/96 to 03/25/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his erployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Ccamissions HB 8230 H I Inspect s Si ure Hational Board, State, Providence, and Endorsements 19 96-008-4

t

.Vt

FORH HIS 2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHI'S As Required by the Provisions of the ASHE Code Section XI

1. O~ner Florida Power & Li ht Date 03 21 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PHO ¹:00/0000 IQ ¹: 96007320 CR ¹: 96-317 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Uork Performed by Florida Power & Li ht Type Code Symbol Staap H A Name Authorization Ho. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address 4.. Identification of System: REACTOR COOLAHT SYSTEH System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda, Code Case I
6. Identification of Coaponents Repaired or Replaced and Replacement Components Name of Name of iHanufacturer( National Other iYear i Repaired i ASHE f Coaponent Hanufacturer (

Serial No. Board Identification iguiit/ Replaced or i Code i i Replacement /Steep i I I iresreue SHUTS (2) IH/A IH/A (H/A iUTC 394256 4E200 iUNK /Replacement /No I ASTH A-563 GRADE A IU.BOLT IN/A iH/A IH/A IUTC 392141 4E200 /UNK /Replacement iNo CARBON STEEL 836

7. Description of Uork: REPLACED BROKEN U-BOLTS AND NUT ON REGEN HEAT EXCHANGER.
8. Tests Conducted: Hydrostatic: Pneunatict Hominal Operating Pressure Other VT-3 pressure~ tg rest Teepereture 'F 96.009-4

a Ss ~

Sheet 2 of 2 FORM HIS-2 (Back)

. 9. Remarks: THIS IS A MECHANICAL COHNECTION.

CERT IF I CATE OF COMPLIANCE Ne certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp Certificate of thorization No. N A Expiration Date Signed Owner or Owner's Designee, Title I II CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have inspected the components described in this Owners Report during the period 03/18/96 to 03/21/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Coamissions NB 8230 N I Inspecto s Sig ure National Board, State, Providence, and Endorsements Date 19'6-009.4

a e> C ~ U +1 ~ ~

.g

FORN HIS 2 OMHERS REPORT FOR REPAIRS OR REPLACENEHTS As Required by the Provisions of the ASNE Code Section XI

1. Owner Florida Power 8 Li ht Date 04 05 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PIN ¹:1370/64 MO ¹: 95020945 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Ilork Performed by Florida Power 8 Li ht Type Code Symbol Stanp H A Name Authorization Ho.

Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: Reactor Coolant S stem System ¹: 41 Quality Group: A
5. (a) Applicable Construct,ion Code B31.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Repiacenent Coaponents kame of Name of i (Nanufacturer( National Other (Year Repaired ( ASNE

( (

Component Kanufacturer (

Serial Ho. Board Identification (Built( Replaced or ( Code (

I ( Replacement (Starry (

I I J~tes ue (CAP SCREIIS (12) H/A IH/A IUTC 350630 AHSI 818.3 IUNK (Replacement INo 4P200A

7. DescriPtion of Mork: PUMP SEAL BOLTING REPLACENEHT OH 4A REACTOR COOLANT PUNP.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X Pressure~gggg sig Test tsegereture 525 'F 96-010.4

+ a b q ~ I,, 4

/ '

Sheet 2 of 2 FORN HIS-2 (Back)

9. Remarks: HECKANICAL CONNECTION NO WELDIHG REOUIRED.

CERTIFICATE OF CONPLI ANCE lie certify that the statements made in the report are correct and this replacement conforms to the rules of the ASKE Code, Section XI.

Type Code Symbol Stamp N A Certificate of horization No. N A Expiration Oat H A Signed ner or Owner's Designee, T tie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Cocpany of Norwood, Ha. have inspected the cerponents described in this Owners Report during the period 08/07/95 to 04/05/96 and stage that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions HB 8230 N I Inspect rs 'ature National Board, State, Providence, and Endorsements Date /O 96-010 4

0%k' FORN HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASNE Code Section XI

1. Owner '

Florida Power & Li ht Date 03 25 96 700 Universe Blvd. Jum Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit PMO ¹:3300/64 IQ ¹: 95030558 CR ¹: 95-0974 9700 Sll 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Ilork Performed by 'Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho. H A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identificatiog of System: INTAKE COOLING lJATER System ¹: 19 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~HA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Coaponents Name of Name of iHanufactureri Hational i Other iYear i Repaired i ASHE i Cosponent Hanufacturer i Serial Ho. Board Identification iguilti Replaced or i Code /

/ Replacement (Stamp [

I Yes Ho I STUDS (14) IKAYIIARD IH/A iN/A iUTC 372070 ASTH A-193 UNK. iReplacement iHo iI<<-8 UNC-2A GR 87 BS-4-1403 IHUTS (14) IH/A IH/A iN/A "

iUTC 352051 ASNE SA-194 UNK. [Replacement (Ho GR 2H BS-4-1403

7. Description of Hork: STUDS AHD NUTS REPLACED OH BASKET STRAINER BS-4-1403.
8. Tests Conducted: Hydrostatic: Pneunat i c: Hominal Operating Pressure Other Pressure~it test Tsettereture 'F 96-011-4

Sheet 2 of 2 FORN NIS-2 (Back)

,9. Remarkst NECHAHICAL COHNECTION NO lJELDING REQUIRED.

CERTIFICATE OF CONPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Syshoi Steep N A Certificate of Authorization No. N A Expiration Date H A sig~ L A 2 Date '3l z- S 19 7+

Osrner or Orner's Designee, Title I

I CERTIFICATE OF INSERVICE INSPECTION I I, the undersigned, holding a valid coamission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Cuaty and erpioyed by Arkuright Nutual Insurance Company of ~T-~4 i Horuood, Na. have inspected the coaponents described in this Owners Report during the period 10/27M@ to 03/25/96 and state that to the best of my kawiedge and belief, the Amer has performed examinations and taken corrective measures described in this Owners Report in accordance Nith the requirements of the AsIIE code,Section XI.

By signing this certificate neither the Inspector nor his eaployer makes any Marranty, expressed or iapiied, concerning the examinations and corrective, measures described in this Orner's Report. Furthermore, neither the Inspector nor his erployer shall be liable in any manner for any personal injury or property j damage or a loss of any kind arising from or connected uith this inspection. I I

I Conmi ss 1 ons NB 8230 N I Inspec s ture National Board, State, Providence, and Endorsements I

I at 96-011.4

FORH NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI 1 ~ Owner Florida Power & Li ht Date 03 25 96 Name 700 Universe Blvd. Jwm Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit PQO ¹:4988/64 QO ¹: 96003538 PCH ¹: 95-172 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job No.,etc
3. llork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization No. N A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION SYSTEH System ¹: 62 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~MA Addenda,~MA Code Case
6. Identification of Components Repaired or Replaced and Replacement Carponents Name of Name of iHanufacturer National Other iYear i Repaired ] ASHE (

Caqxment Hanufacturer i Serial No. Board Identification iBuilt( Replaced or J Code J

( Replacement iStaap (

I i~Yes lie ISTUDS IM/A IN/A iUTC 393327 HOV-4-843B iUNK. Replacement iMo I

INUTS (20) iM/A N/A [UTC 393965 HOV-4-8438 iUNK. IReplacement (No

7. Description of llork: VALVES BOLTING REPLACED FOLLOMING REASSEMBLY.
8. Tests Conducted: Hydrostatic: Pneunat i c: Nominal Operating Pressure X Other VT-2 Pressure~tsrs ts Test Teepereture 80 'F 96-012-4

il -~

Sheet 2 of 2 FORK HIS-2 (Back)

9. Remarks: MECHANICAL CONHECTIOM MO llELDIHG REOUIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of'the ASHE Code,Section XI.

Type Code Symbol Stamp N A Certificate of Authorization Ko. N A Expiration Date N A Signed /Q2 Pug. A.~ 19 ~4 Owner or Owner's Designee, Title

~i4.

CERTIFICATE OF IHSERVICE IHSPECTIOH I

I, the urxfersigned, holding a valid comaission issued by the Kational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Catty and employed by Arkwright Kutual Insurance Company of i Norwood, Ha. have inspected the cocponents described in this Owners Report during the period 02/09/96 to 03/25/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or 1 Implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or canected with this inspection. I I

I Cannissions HB 8230 H I Inspectors Sig Cure National Board, State, Providence, and Endorsements  !

19 9 96.012.C

II P

J

\

C 0

FORM NIS 2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI 1..Owner Florida Power 8 Li ht Date 03 25 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2

't Address

2. Plant Turke Point Plant Unit PMO ¹:4985/64 lJO ¹: 96003525 PCH ¹: 95-172 9700 SH 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Hame Authorization Ho. H A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: SAFETY INJECTION SYSTEM System ¹: 62 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition,~HA Addenda,~MA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~MA Code Case
6. Identification of Coaponents Repaired or Replaced and Replacement Components Name of Name of (Manufacturers Hational Other iYear ( Repaired i ASHE Component Manufacturer ] Serial No. Board Identification iguliti Replaced or ) Code i i Replacement fstaap J I I I i ~re s Ho

/STUDS iN/A iUTC 393327 HOV-4-843A (UHK. (Reptacement /Ho I

iMUTS (20) IH/A IH/A /UTC 393965 HOV-4-843A iUNK. (RepiaccfocAt iNO

7. Description of Horkt VALVES BOLTING REPLACED FOLLOMIHG REASSEMBLY.
8. Tests Conducted: Hydrostatic: Pneunat i c: Hominal Operating Pressure X Other VT-2 pressure~tgrg tg Test Tespereture 80 ~

F 96-013-4

4 AI Sheet 2 of 2 FORK HIS-2 (Back)

9. Remarks: KEcNANIcAL coNNEcTIDN No MELDING REDUIRED.

CERTIFICATE OF COKPLIANCE Ile certify that the statements made in the report are correct and this replacement conforms to the rules of the ASKE Code, Section XI.

Type Code Symbol Stamp N A Cer tificate of Authorization No. Expiration Date N A I

Big~ L~ Date 19~~ I, Owner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eaployed by Arkwright Kutual Insurance Company of Norwood, Ma. have inspected the cccponents described in this Owners Report during the period 02/09/96 to 03/25/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE Code, Section Xl.

By signing this certificate neither the Inspector nor his enpioyer makes any warranty, expressed or Iaplied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his eaployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

I Comnissions NB 8230 N I Inspec rs nature National Board, State, Providence, and Endorsements Date 96-013.4

'I 0

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMEHTS As Required by the Provisions of the ASME Code Section XI

1. O~ner Florida Power & Li ht Date 03 25 96 Name 700 Universe Blvd. Juno Beach Fl. 33COB Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 4 PWO ¹:64/3050 WO ¹: 95029355 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Work Performed by Florida Po~er & Li ht Type Code Syshol Stamp H A Hame Authorization No. N A Expiration Date N A P.O. Box C332 Princeton Fl. 33032 Address
4. Identification of System: CVCS System ¹: 47 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Coayonents Name of Name of [Manufacturer) National Other [Year J Repaired f ASME f CoaTxxwnt Manufacturer (

Serial Ho. Board Identification )Built) Replaced or f Code f J

Replacement ]stamp [

I I JYes/ege iCtg BUTTERFLY IPOSI SEAL 168745-1A IH/A IUTC 335279 4 270 (UHK. [Replacement [Ho IVALVE MODEL A31A

]STUDS iH/A (N/A (H/A )UTC 378831, 4-270 (UNK. ]Replacement [No

]5 8 tX 11 UHC 2 IHUTS (16) IH/A iH/A iH/A iUTC 391981, 4-270 [UHK. )Replacement ]Ho

7. Description of Work: REPLACED CHARGING PUMP C INLET ISOLATION VALVE
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X Pressure~2C ig test Temperature 82 ~

F 96-014-4

~ c'o J

Sheet 2 of 2 e FORM HIS-2 <Back)

9. Remarks: MECHANICAL CONNECTION HO NELDING REOUIRED.

CERTIFICATE OF COHPLIAHCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp H A Certificate of Authorization Ho. H A Expiration Date H A od: Date Owner or Owner's Designee, Title CERTIFICATE OF IHSERVICE IHSPECTIOH I, the undersigned, holding a valid coamission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright mutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 10/17/95 to 03/25/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code, Section XI'y signing this certificate neither the Inspector nor his eapioyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 H I Inspect s ture Hational Board, State, Providence, and Endorsements Date 96.014-4

II i

l I 0

FORK NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASNE Code Section XI Florida Power 8 Li ht Date 03 26 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit MO ¹: 95032562 PCH ¹: 95-089 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Mork Performed by Florida Power & Li ht Type Code Symbol Stenp N A Name Authorization Ho. H A Expiration Date H A P.O. Box 4332 Princeton Ft. 33032 Address
4. Identification of System: COHPONEHT COOLING MATER System ¹: 3 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of tNanufactureri National i Other iYear i Repaired i ASHE i Component Hanufacturer f Serial Ho. Board Identification iguiiti Replaced or (

Code /

/ Replacement (Stanp i I I i~Yes ue (HARK-1 DP-6 JH/A (H/A /5614-H-518 SHT 1 JUNK. iRepiacement iNo i4-ACH-64 iH/A IH/A IH/A I5614-H-518 SHT 19 iUNK. /Replacement [No I4-ACH-196 IH/A IH/A I5614-H-518 SHT 26 iUHK. iRepiacement (No i4-ACH-53 5614-H-518 SHT 23 I4-ACH-195 IN/A IH/A JH/A (5614-H-518 SHT 27 iUHK. )Replacement iHo I

ISR-678 IH/A IH/A IH/A 15614-H-518 SHT 32 iUNK. iRepiacement )Ho I

7. Description of Mork: THE FOLLOMIHHG SUPPORTS MERE RENOVED SUPPORT HARK HO. 1 NODE 158 SR-672 SR-675 SR-679 AHO SUPORT NARK HO. 1 NODE 6 LOMER BRACKET MAS REMOVED. THE FOLLOMING SUPPORT MERE HOOIFIEO Je-ACH-64 UPI.IFT RES'TRAIHT ADDED 4 ACH63 8 4-ACH 196'BRACE'ND'U-BDLT ADDED 4-ACH-195 BASEPLATE STIFFEHERS ADDED SR-678 BRACE ADDED.
8. 1'ests Conducted: Hydrostatic: Pneuna t c:

1 Nominal Operating Pressure Other VT-3 Pressure~tg Test Tesgereture 'F 96-015-4

tf Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: ALL IJORK PERFORMED IN ACCORDANCE MITN PC M 95-089 "MODIFICATION OF COMPONENT COOLING IJATER SUPPORTS ON ECC RETURN LINE STRESS PROBLEM CCll-14w.

CERTIFICATE OF COMPLIANCE Ne certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Syahoi Stamp H A Certificate of u orization Ho. H A Expiration Date N A Signed 19 Owner or Owner's Designee, Title n

I CERTIFICATE OF IHSERVICE IHSPECTIOH I, the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Horwood, Ma. have inspected the coaponents described in this Owners Report during the period II /~'9 9S to 03/26/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his enployer makes any warranty, expressed or in@lied, concerning the examinations and corrective. measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions HB 8230 H I Inspecto s Si ure National Board, State, Providence, and Endorsements Osage 96-015.4

lg 0

FORN NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 03 27 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2

, Address

2. Plant Turke Point Plant Uni t PHO ¹:00/0000 IN ¹: 96007194 CR ¹: 96-321 9700 SII 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Symbol Stamp N A Name Authorization Ho.

Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: HAIH STEAM System ¹: 72 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of JHanufactureri National Other JYear J Repaired J ASHE J Component Hanufacturer i Serial Ho. Board Identification Jguilti Replaced or J Code J J

Replacement JStany J J J

/~Yes ue JBOLTS ~ HEAVY HEX (6) JH/A , JH/A iN/A iUTC 394186 1-1/4" JUNK JReplacement JHo J STOCK ¹0197413 iNUTS, HEAVY HEX (8) "

JN/A JH/A JH/A JUTC 351876 JUHK JReplacement JNo JSA-194 GR7 R 93.2362 JSTUDS (2) JN/A JN/A JH/A JUTC 374284 JUNK J Replacement JNo R 93-2086

7. Description of llork: REPLACED HEAVY HEX BOLTS AND HUTS ON SNUBBER 4-1039.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT Pressure~stg test Tesgersture ~

F 96.016-4

'I

~ ~ tl ~

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: THIS IS A MECHANICAL CONNECTION.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Synbol Stamp N A Certificate uthorization No. N A Expiration Date H A Signed v g7 19 ONner or ONner's Designee, Title lg CERTIFICATE OF IHSERVICE IHSPECT ION I, the undersigned, holding a valid ccemission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and emptoyed by Arkwright Mutual Insurance Company of Norwood, Ma. have inspected the components described in this Owners Report during the period 03/17/96 to 03/27/96 and state that to the best of my knogledge and belief, the Ogner has performed examinations and taken corrective measures described in this thrners Report in accordance With the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any Warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected With this inspection.

issions NB 8230 N I Inspector Si n re National Board, State, Providence, and Endorsements96-016.4

I, ~

P

FORM HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE,Code Section XI

1. Owner Florida Power & Li ht Date 03 29 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 4 PWO ¹:8163/64 WO ¹: 94022263 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Work Performed by Florida Power & Li ht Type Cade Symbol Stamp N A Mane Authorization Ho. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: INTAKE COOLING WATER System ¹: '19 Quell ty Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components Repaired or Replaced and Replacement Conponents Hame of Mane of (Hanufacturer( Hational Other (Year ( Repaired ( ASHE (

Conponent Hanufacturer ( Serial Ho. Board Identification (Built( Replaced or ( Code (

( Replacement (Stanp (

I I i~res Se (30<< BUTTERFLY VALVE (HENRY PRATT IH/A (H/A (UTC 378215 4-50-329 (UMK. (Replacenent (Ho (NUTS HEAVY HEX (6) IN/A IN/A (H/A IUTC 393965 4.50.329 (UHK. (Replacement (No I

(STUD BOLT (3) IH/A (N/A IN/A IUTC 393467 4-50.329 (UHK. (Replacement (No I

(STUD BOLT (2) (H/A (N/A IN/A IUTC 352877 4-50-329 (UHK. (Replacement (Ho

7. Description of Work: REPLACED <<A<< ICW CCW BASKET STRAINER OUTLET VALVE.
8. Tests Conducted: Hydrostatic: Pneunat ic: Hominal Operating Pressure X Pressure~s ig Test Temperature 82 ~

F 96.017.4

4 Apl I F 1

Sheet 2 of 2 FORH HIS-2 lgack)

9. Remarks: HECHANICAL CONHECTIOH NO HELDING REQUIRED.

CERTIFICATE- OF COHPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp H A e

Certificate of thorization Ho. H A Expiration Date N A e I O~ner or Owner's Designee, 7a.g Title pate +/3 >

CERTIFICATE OF IHSERVICE IHSPECTIOH I, the undersigned, holding a valid cermission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Conpany of Horwood, Ha. have inspected the carponents described in this Owners Report during the period 02/28/96 to 03/29/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in .this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 N I Inspector gnature Hational Board, State, Providence, and Endorsements Date 96-017-4

t4 0 Wb

FORH HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 04 03 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit uo ¹: 96004425 PCH ¹: 95-172 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization No. H A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Safet In ection S stem System ¹: 62 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,416-1 Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Hanufacturer/ National Other ]Year ) Repaired ( ASHE i Component Kanufacturer i Serial Ho. Board Identification [Built) Replaced or i Code i i Replacement )Steep i I I i~res se (4T208 BORON IH/A IH/A IH/A )PC/K 95-172 BORON IHJ ~ iUHK. iReplacement iHo ilHJECTION TANK TANK BYPASS MODIFICATION
7. Description of 1Iork: PIPING HOOIFICATIOH OF SAFETY INJECTION LINE TO BYPASS THE BORON INJECTIOH TANK.

SUPPORT 4-SI 31 4<<U-BOLT REPLACED. SUPPORT SR-662 RIGID STRUT PIPE CLANP 3 4<<PLATE & 1 2<<HILTI BOLTS REPLACED. SUPPORT SR-664 1<<HILTI-BOLTS 4X4X1 4 3 4<<PLATE & 2X2X1 4 ANGLE REPLACED. SUPPORT 8081-H-003-06 LUGS REPLACED. SUPPORT 8081-H-003-07 2<<PIPE 3 4<<PLATE & 1-1 2X1-1 2X1 4 ANGLE REPLACED. SUPPORT 8081-H-003-08 3X3X3 8 ANGLE REPLACED. 2<<-SI-2501R 2<<SCH 160 PIPE & 2<<6000¹ FULL CPLG REPLACED. 4<<-SI-1501R 4<< SCH 80 PIPE 4<< SCH 80 ELBSI 90 DEG 4<< SCH 80 ELBSI 45 DEG REPLACED.

8.~ Tests Conducted: I Hydrostatic: Pneumatic: Hominal Operating Pressure X Other vT-2 'reshsure~1575 ts test Temperature 80 'F 96-018.4

0 Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: 419-Sl-2501R 4<< SCH 120 PIPE 4<< SCH 120 TEE 4<< SCH 120 ELBOM 90 DEC REPLACED.

THE REQUIREMENTS OF CODE CASE H416-1 HAVE BEEH MET FOR THIS REPAIR REPLACEMENI'CTIVITY.

CERTIFICATE OF COMPLIANCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp N A Certificate of Authorization No. H A Expiration Da e N A Signed Date Ownel'l'llnel'ls Designee Title I

CERTIFICATE OF IHSERVICE INSPECTIOH I, the undersigned, holding a valid coImission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade CoIxlty and eIIpioyed by Arkwright Mutual Insurance CoIpany of Horwood, Ma. have inspected the components described in this Owners Report during the period 02/28/96 to 04/03/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his eIIyloyer shall be liable in any manner for any personal injury or property damage or a toss of any kind arising from or connected with this inspection.

Cormissions NB 8230 N I Inspecto s Si ure National Board, State, Providence, and Endorsements Date 96-018-4

FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 03 28 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PWO ¹:64/6983 MO ¹: 93014754 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Work Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho. H A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONEHT COOLING MATER System ¹: 30 QuaLity Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of IHanufacturerI National Other IYear I Repaired I ASHE I Component Hanufacturer I Serial Ho.

Board Identification IBuiltI Replaced or I Code I I Replacement Istamp I I I i~ree ee IRELIEF VALVE ICROSBY VLV I 1031J02 IH/A IRV 4 747A IUHK. IReplaced INo

& GAGE SPEC B IRELIEF VALVE ICROSBY VLV IH69955 IH/A IUTC 386042 RV-4-747A IUHK. IReplacement IHo

& GAGE 0003

7. Description of Work: REPLACED RV-4-747A WITH TESTED SPARE.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X Other VT-2 Preeeere~ee ig Test Tenperature 74 'F 96.019-4

xa (*q

~

  • 4p' 4 II

Sheet 2 of 2 FORH HIS 2 (Back)

9. Remarks: HECNAHICAL COHHECTIOH HO HELDIHG REQUIRED.

CERTIFICATE OF COHPL I ANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code,Section XI'ype Code Symbol Staap H A Certificate o thorization Ho. H A Expiration Date H A Owner

~~. J or Owner's Designee, Title

/~Q i ~h.

I CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid cannission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Company of Norwood, Ka. have inspected the components described in this Owners Report during the period 02/05/96 to 03/28/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code, Section Xl.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Cermissions HB 8230 H I Inspectors Signature National Board, State, Providence, and Endorsements 96-019-4

I FORK HIS-2 owNERS REpoRT F0R REpAIRS OR REPLAcEHENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner . Florida Power &, Li ht Date. 03 28 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit I%0 ¹:64/1351 MO ¹: 95020831 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P;0. Ko.,Job No.,etc
3. Ilork Performed by Florida Power !L Li ht Type Code Symbol Starp N A Kame Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: COHPONENT COOLING HATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Consonants Repaired or Replaced and Replacement Components Kame of Hame of (Hanufacturer) National Other (Year J Repaired J ASHE (

Component Hanufacturer )

Serial No. Board Identification [Built( Replaced or ( Code J

) Replacement ]Stamp f I I /~Ves ge IRELIEF VALVE IDRESSER I TH18079 IN/A I RV-4-1423 IUNK~ IRepiaced 1 Yes INDUSTRIES RELIEF VALVE IDRESSER (TH18072 JH/A JUTC 343245, RV-4-1423 (1988 (Replacement )Yes INDUSTRIES

7. Description of llork: REPLACED EHERGENCY COHTAIHHENT COOLER "8" RELIEF VALVE WITH TESTED SPARE.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X Other VT-2 pressure~58 sig rest Temperature 70 ~

F 96-020-4

t

~ *'

1 t

Sheet 2 of 2

. FORH NIS 2 (Back)

9. Remarks: NECHANICAL CONNECTION NO NELDING REQUIRED.

CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Synhol Stanp M A Certificate of ~orization Ho. H A Expiration Date N A S I gned as1e ~/3 "

Owner or Owner's Designee, Title CERT IF I CATE OF IHSERVI CE. INSPECT ION I, the undersigned, holding a valid comnission issued by the'National Board of Boiler and Pressure Vessel . g+

inspectors and the state or Province of Dade Catty and eaployed by Arkwright Hutual Insurance Conpany of f Norwood, Ha. have inspected the cocponents described in this Owners Report during the period 08/18/98'o ~

03/28/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any .kind arising or connected with this inspection.

Ccmnisslons NB 8230 H I Inspecto Signature National Board, State, Providence, and Endorsements 19 B 96-020-4

I 1

t

FORK HIS-2 ONNERS REPORT FOR REPAIRS OR REPLACENEHTS As Required by the Provisions of the ASNE Code Section XI

1. Oaner Florida PoMer 8 Li ht Date 03 29 96 Name 700 Universe Blvd. Juno Beach Ft. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PHO ¹:64/1361 iQ ¹: 95020903 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by Florida Pouer 8 Li ht Type Code Symbol Stamp H A Name Authorization Ho.

Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: CONPONENT COOLING HATER System ¹: 30 Duality Group: C
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Conponents Kame of (Hanufacturer[ National Other ]Year Repaired [ ASHE f f Hanufacturer [ Serial Ho. Board Identification (Built) Replaced or J Code f J

Replacement JStaap /

I I iYeslese IRELIEF VALVE IDRESSER ITH18072 IH/A IRV-4-1424 JUNK. [Replaced (Yes INDUSTRIES IRELIEF VALVE IDRESSER iTH18077 JH/A (RV-4-1424 (1988 )Replacement [Yes INDUSTRIES

7. Description of llorkt REPLACED EHERGENCY CONTAINHENT COOLER "C" RELIEF VALVE RV-4-1424.
8. Tests Conducted: Hydrostatic: Pnewetict Hominal Operating Pressure X Other VT-2 Pressure~58 is Test Testlrsture 72 ~

F 96.021-4

l 4

I 4

0

Sheet 2 of 2 FORK HIS-2 (Back)

9. Remarks: HEcKAMIcAL coHHEGTIDN No MELDING REDUIRED.

CERTIFICATE OF COMPLIANCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Ster@ H A Certificate of thorization No. Expiration Date Signed Date 38 Owner or Owner's Designee, Title I

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid ccnmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and erployed by Arkwright Mutual Insurance Cccpany of Norwood, Ha. have inspected the caqxnents described in this Owners Report during the period 07/31/95 to 03/29/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code, Section XI'y signing this certificate neither the Inspector nor his esployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall'e liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions HB 8230 N I Inspec ors 'ature National Board, State, Providence, and Endorsements Date ~ <~

96-021-4

I" .lf

~ + ='c< E'ig 4

FORH HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. O~ner Florida Power & Li ht Date 03 30 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 s

Address .

2. Plant Turke Point Plant Unit PMO ¹:64/5690 N ¹: 96007317 CR ¹: CR96.395 9700 Su 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Mark Performed by Florida Power 8 Li ht Type Code Synhoi Staap N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address 4, Identification of System: BORIC ACID System ¹: 46 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~H A Addenda,~H A Code Case
6. Identification of Components Repaired or Replaced and Replacement Coayonents of of (Hanufactureri Hational C~t Name Name Hanufacturer i Serial Ho. Board Other Identification iYear JBuilti i Repaired i ASHE i Replaced or J Replacement )Stamp i Code i i

I I /~Yes No

)STUDS (4) IH/A IH/A iUTC 372415 FCV-4-113A ZUNI(. iRepiacement /Ho I

IHUTS (4) IH/A IH/A IH/A JUTC 370708 FCV-4-113A /UHK. /Replacement /Ho

7. Description of llorkt REPLACED 4 STUDS AND 4 NUTS ON VALVE FCV-4-113A.
8. Tests Conducted: Hydrostatic: Pneunat i c: Hominal Operating Pressure 0 Other VT-1 Pressure~tg test tesgereture ~

F 96-022uc

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: INSPECTION OF VALVES BOLTING HAS REOUIRED DUE To LEAK FDUHD DURING C0NDUCT OF ASME SECTION XI PRESSURE TEST NO. OA-CVCS.4628-N-01. VT-1 OF VALVES EXISTING BOLTIHG MAS UNSATISFACTORY THEREFORE VALVES BOLTIHG I!AS REPLACED.

CERTIFICATE OF COHPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate of horization Ho. N A Expfratfoh Date Signed 19~/.

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECT IOH I, the undersigned, holding a valid conmfssfon issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and enployed by Arkwright Hutual Insurance ConTMny of Norwood, Ha. have inspected the components described in this Owners Report during the period 03/18/96 to 03/30/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate 'neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

issions NB 8230 N I Inspe tors ignature Hational Board, State, Providence, and Endorsements Date 96.022.4

rg FORM NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Ovner Florida Pcwer 8 Li ht Date 04 01 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PWO ¹:1543/69 WO ¹: 96002857 CR ¹: 96-029 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job Mo.,etc
3. Work Performed by Florida Po~er 8 Li ht Type Code Symbol Stamp H A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: BORIC ACID TRANSFER System ¹: 46 Quality Group: B
5. (a) Applicable Construction Code B31.1 'l955 Edition, NA Addenda,~HA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Manufacturer( National ( Other ]Year f Repaired f ASNE f Component Manufacturer ) Serial Ho. Board Ident I f 1 cat 1 on [guilt( Replaced or f Code f

/ Replacement [Stamp f I I [~res ue IHEAVY HEX NUTS (4) IH/A IH/A IN/A IASTH A194 R94-41 JUNK ]Replacement JMo UTC 349696

]THREADED ROO (H/A IM/A JR95-0632 [UHK ]Replacement )Ho UTC 356415

7. Description of Work: REPLACE HISSIMG 3 8" THREADED ROO AHD 4 HUTS
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-3 pressure~tg Test Tesgereture 'F 96-023-4

Bl U Sheet 2 of 2 FORH HIS.2 (Back)

9. Remarks: THIS IS A HECNANICAL CONNECTION HO HELDIHG REOUIRED.

CERTIFICATE OF COHPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp H A Certificate of Au rization Ho. N A Expiration Date Signed Date Owner or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Ilutuai Insurance Con@any of Norwood, Na. have inspected the components described in this Owners Report during the period 02/07/96 to 04/01/96 and state that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his eaployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Coma>ssions NB 8230 H I Inspectors Sig ure National Board, State, Providence, and Endorsements Date 96-023-4

  • t 0

FORH NIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASNE Code Section XI

1. O~ner Florida Power & Li ht Date 04 05 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PNO ¹:94/6048 HO ¹: 96008951 CR ¹: 96-0549 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. llork Performed by Florida Po~er II Li ht Type Code Symbol Sterp H A Hame Authorization No.

Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: STEAN GEHERATOR System ¹: 71 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of iHanufactureri National Other )Year i Repaired ASHE J )

Component Nanufacturer ( Serial Ho. Board Identification iguiltf Replaced or J Code i J

Replacement (Stamp [

I I [~res ue IHEAVY HEX HUTS(24) IH/A IH/A iN/A )CARBON STEEL R 2J-0761 [UNK iReplacement )No UTC 395385 iTHREADED RCO (H/A JH/A JH/A JUTC 389581 ASME SA-193 JUNK ]Replacement iNo

7. Description of llork: REPLACED 24 STUDS AND 24 HEAVY HEX NUTS.
8. Tests Conductedt Hydrostatic: Pneunnt I e t Hominal Operating Pressure Other rreesure~ig test tesgersture ~

F 96-024-4

p ~

Sheet 2 of 2 e FORII HIS-2 (Back)

9. Remarks: THIS IS A MECHANICAL CONNECTION NO WELDIHG REOUIRED.

CERTIFICATE OF COHPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate f Authorizat3on No. H A Expiration Date H A Signed Date Owner or Owner's Designee, Title Il CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eapioyed by Arkwright Hutual Insurance Company of Norwood, Ha. have inspected the carponents described in this Owners Report during the period 04/04/96 to 04/05/96 and stale that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his eapioyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Coamissions NB 8230 N I Inspector Sig ure Hational Board, State, Providence, and Endorsements 19 Pd 96-024.4

8g 1 '%

FORM HIS-2 (MIERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASNE Code Section XI

1. Owner Florida Power 8 Li ht Date 04 05 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PMO ¹:0596/64 HO ¹: 94026176 CR ¹: 94-1016 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Mo.,Job Ho.,etc
3. llork Performed by Florida Power 8 Li ht Type Code Symbol Stsap M A Name Auth ori zat i on Ho.

Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: Reactor Coolant S stem System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code 831.1 1955 Edition, MA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Replacement Coaponents Hame of Name of )Manufacturer( Hational ] Other )Year ] Repaired )

ASNE )

Component Kanufacturer ( Serial Ho. Board Identification [Built] Replaced or )

Code (

/ Replacement ]St~ /

I l /~res ue BIVALVE BONNET IVELAN [M/A fH/A JUTC 393297 3" 1500 CLASS JUNK. (Replacement )Ho NOV-4-535 ISTUDS (12) IH/A IH/A fH/A JUTC 393483 ASTN A-193 JUNK. )Replacement )No I GR 87 NOV-4-535 INUTS (12) iH/A IH/A JH/A JUTC 393252 ASTN A-194 (UMK. [Replacement )No GRADE 2H NOV-4-535

7. Description of Hork: REPLACED PRESSURIZER PORV BLOCK VALVE NOV-4-535 VALVE BONNET AMD BODY TO BONNET STUDS AND NUTS.
8. Tests Conducted: Nydrostatic: Pneuaatic: Hominal Operating Pressure X Pressure~2280 ig test Tesgersture 525 ~

F 96.025-4

P Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: NECNAHICAL CONNECTION NO NELDIHG REOUIRED.

CERTIFICATE OF CONPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Staap H A Certificate o uthorization Ho. H A Expiration Oat Signed or Owner's Designee, Title y / 19'wner CERTIFICATE OF IHSERVICE IHSPECTIOH 1, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Cocpany of Norwood, Ma. have inspected the components described in this Owners Report during the period 06/06/95 to 04/05/96 and sta>e that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Carmissions HB 8230 N I Inspec ors 'ture Hational Board, State, Providence, and Endorsements Date 96.025-4

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner . Florida Power & Li ht Date 03 31 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit MO ¹: 95034014 9700 SII 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Ilork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address 4.. Identification of System: REACTOR COOLANT System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case I
6. Identification of Components Repaired or Replaced and Replacement Components Name of Home of (Hanufacturer( National ) Other )Year ] Repaired ) ASHE )

Coayonent Hanufacturer (

Serial Ho. Board Identification )guilt[ Replaced or f Code f f Replacement (Steep /

I I )~res me iBOLTS (8) [N/A [H/A )H/A )UTC 393568 4E210C ASHE (UHK. (Replacement )Ho SA-193 3 4<<-10.UHC-2A

7. Description of llorkt STEAN GENERATOR <<C<< INSPECTION PORT <<A<< BOLTS REPLACED.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-1 pressure~ig rest Temperature ~

F 96-026.4

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: HECNANICAL CONNECTION NO MELDING REQUIRED.

CERI'IFICATE OF COHPLIANCE Ne certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Staap Certificate of Author tion No. N A Expiration Date N A Signed O~ner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and eayloyed by Arkwright Hutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 02/10/96 to 03/31/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his eayloyer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Conmissions NB 8230 N I Inspect rs Si ure National Board, State, Providence, and Endorsements Date 19 0 96-026-4

P FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner . Florida Power & Li ht Date 03 31 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit MO ¹: 96007008 CR ¹: CR96-293 9700 SU 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. llork Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization Ho. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address 4: Identification of System: AUX FEEDWATER SYSTEN System ¹: 75 Duality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~HA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case I
6. Identification of Cerponents Repaired or Replaced and Replacement Components Hame of Name of (Hanufacturer] National i Other iYear i Repaired ( ASHE i Component Hanufacturer i Serial No. Board Identification iguiiti Replaced or J Code i I i Replacement )Steep /

I I i~res Ne iPSA-3 TAG ¹4-1020 IPACIFIC i27101 iN/A iUTC 368327 PSA PART HO. iUHK. (Replacement iHo ILOAD PIH SCIEHT I F IC 1801341-05 iPSA-3 TAG ¹4-1021 IPAC IF I C i128 iH/A iUTC 368327 PSA PART HO. iUHK. JReplacement iHo

] LOAD P IH SCIENTIFIC 1801341-05

7. Description of llork: REPLACED HECHAHICAL SHOCK ARRESTOR TRANSITION TUBE LOAD PINS ON SNUBBER TAG ¹TS 4-1020 AHD 4-1021.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure Other VT-3 Pressure~ ig Test Testssrsture ~

F 96-027-4

Sheet 2 of 2 FORN HIS-2 (Back)

9. Remarks: HECHANICAL CONHECTIOH NO MELDIHC REDUIRED.

CERTIFICATE OF COMPLIANCE Ne certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp H A Certificate of A horization Ho. N A Expiration Date H A Signed oate ZJ 19~8 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECT IOH I, the undersigned, holding a valid coamission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and erpioyed by Arkwright mutual Insurance Coapany of Horwood, Ha. have inspected the components described in this Owners Report during the period 03/14/96 to 03/31/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Coamissions HB 8230 N I Inspectors ig ure National Board, State, Providence, and Endorsements Date 19 ~+

96-027.4

~ I 1

Qr C~%

4 v

FORN HIS.2 OMNERS REPORT FOR REPAIRS OR REPLACENENTS As Required by the Provisions of the ASNE Code Section XI su

'g

1. O~ner Florida Power II Li ht Date 03 31 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PMO ¹:64/5644 MO ¹: 96007153 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Symbol Stamp Name Authorization Ho. N A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address 4.. Identification of 'System: - COMPONENT COOLING MATER System ¹: 30 Quality Group: C
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case I
6. Identification of Components Repaired or Replaced and Replacement Components Name of Haec of iHanufactureri National Other iyear I Repaired I ASHE I Caqxment Hanufacturer i Serial Ho. Board Identification iguiiti Replaced or i Code (

i Replacement igtamp )

I I J~res se ICAP SCREMS (4) iH/A IH/A (N/A iUTC 323662 4.721C iUNK. iRepiacement iNo SAE J429 G

7. Description of Mork: REPLACED 4 CAP SCREM BOLTS ON CHECK VALVE 4-721C.
8. Tests Conducted: Hydrostatic: Pneunat i c: Hominal Operating Pressure Other VT-1 rressure~tg Test Tesgersture 'F 96-028-4

'I I

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: NECNAHICAL CONNECTION NO NELDING REOUIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Stamp Cert ifi cate o uthorizati on Ho. H A Expiration Date N A D.te OMner or oner's Designee, Title CERTIFICATE OF IHSERVICE INSPECT IOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and erployed by Arkuright Hutual Insurance Cerpany of Norwood, Ha. have inspected the coaponents described in this OMners Report during the period 03/16/96 to 03/31/96 and state that to the best of my knowledge and belief, the OMner has performed examinations and taken corrective measures described in this OMners Report in accordance Mith the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any Marranty, expressed or implied, concerning the examinations and corrective measures described in this ONner's Report. Furthermore, neither the Inspector nor his erployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected uith this inspection.

issions HB 8230 N I Inspectors S gnatu National Board, State, Providence, and Endorsements Date 96-028-4

1 t

r 0

FORH HIS.2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power !L Li ht Date 04 01 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address 2~ Plant Turke Point Plant Unit Name PMO ¹,64/1365 MO ¹: 95020920 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Syaboi Stanp N A Name Authorization No. N A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. ~

Identification of System: COHPOHENT COOLING MATER System ¹: 30 Quality Group: C

5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case I
6. Identification of Components Repaired or Replaced and Replacement Coaponents Name of Name of (Hanufacturer) Hational J Other (Year f Repaired [ ASHE f Cerponent Kanufacturer f Serial Ho. Board Identification ]guilt] Replaced or f Code )

'J Replacement )stamp (

J~Ves ue IRELIEF VALVE IDRESSER ITH18081 IH/A I RV-4e 1425 )1988 (Replaced (No I INDUSTR IES IRELIEF VALVE IDRESSER ITH18084 IN/A IRV-4m 1425 )1988 JRepiacement )Ho INDUSTRIES

7. Description of 'Mork: REPLACED EHERGENCY CONTAIHHEHT COOLER "A" RELIEF VALVE RV-4-1425.
8. Tests Conducted: Hydrostatic: Pneuaatlc: Nominal Operating Pressure X

'I Other Pressure~39 ig test Temgereture 71 'F 96-029-4

'I II L

Sheet 2 of 2 FORK NIS-2 (Back)

9. Remarks: HECKANICAL CONNECTION NO NELDING NEEDED.

XI' CERTIFICATE OF CONPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section .

Type Code Symbol Stamp N A Certificate o uthorization No. N A Expiration Date N A Signed Owner or Owner's Designee, Title CERT IF I CATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Nutual Insurance Company of Horwood, Ma. have inspected the cceponents described in this Owners Report during the period 07/31/95 to 04/01/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his eayloyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Conmissions NB 8230 N I Inspector Signa re National Board, State, Providence, and Endorsements Date 96-029.4

I P

FORH HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASIDE Code Section XI

1. O~ner Florida Power & Li ht Date 04 05 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit '

PWO ¹:0866/91 " WO ¹: 95023053 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc

3. Work Performed by Florida Power II Li ht Type Code Symbol Stamp H A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address 4 Identification of System: Reactor Coolant S stem System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~HA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacement Conponents Name of Hame of JHanufacturer[ National ) Other (Year J Repaired J ASNE J Cerponent Hanufacturer )

Serial Ho. Board Identification [Built) Replaced or J Code J f Replacement (Staap J I I /~res ue IPRESSURIZER RELIEF VALVE IH/A I H51249-1362 I N/A I RV-4-551A (UHK. )Replaced [Ho IPRESSURIZER RELIEF VALVE IN/A IH51249-1579 IH/A IRV-4-551A fUNK. [Replacement (No

7. Description of Work: PRESSURIZER SAFETY RV-4-551A REPLACED WITH SPARE.

Pneumatic:

8. Tests Conducted: Hydrostatic: Hominal Operating Pressure X tressure~2M ig Test testtersture 525 ~

F 96-030-4

~ g Sheet 2 of 2 FORN HIS-2 (Back)

9. Remarks: NECNANICAL CONNECTION HO llELDING REOUIRED.

CERTIFICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms 'to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp H A Certificate uthorization Ho. N A Expiration Date N A Signed l,4 a fA Date wner or Owner's Designee, Title CERTIFICATE OF IHSERVICE IHSPECTION 1, the undersigned, holding a valid comaission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Carpany of Horwood, Ha. have inspected the components described in this Owners Report during the period 09/07/95 to 04/05/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his eaployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 H I Inspec o'rs gnature National Board, State, Providence, and Endorsements Date 19 94 96-030.4

FORM HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASNE Code Section XI

1. Owner" Florida Power & Li ht Date 04 05 96 700 Universe Blvd; Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name PIN ¹:8866/91 MO ¹: 95023054 9700 SII 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Mork Performed by Florida Power & Li ht Type Code Syaboi Stamp H A Name Authorization No. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Reactor Coolant S stem System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code B31.1 1955 Edition, MA Addenda,~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~MA Code Case
6. Identification of Carponents Repaired or Replaced and Replacement Components Name of Hame of iNanufacturer/ National f Other I<<<< I Repaired I ASNE I Component Manufacturer i Serial Mo. Board Identification iguiiti Replaced or i Code (

i Replacement JStaap /

I I i~see ue IPRESSURIZER RELIEF VALVE IH/A iH51249-'1360 (H/A IRV-4-5518 iUHK. iReplaced (No I

IPRESSURIZER RELIEF VALVE IH/A iN69877 /N/A IRV-4-5518 JUNK. iReptacement iHo 004

7. Description of llorkt PRESSURIZER SAFETY VALVE RV-4-551B REPLACED IIITM SPARE.
8. Tests Conducted: Hydrostatic: Pneumt ic: Hominal Operating Pressure X Pressure~2280 tg test Teegersture 525 uF 96-031-4

r, Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: HECHANICAL COHNECTIOH NO MELDING REQUIRED.

CERTIFICATE OF COHPL IANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stan N A Certificate of thorization Ho. N A Expiration H A ate Signed .A .j Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid cornnission issued by the Hational Board of Boiler and Pressure Vessel gJ inspectors and the state or Province of Dade Ccxnty and employed by Arkwright Hutual Insurance Company of 4~

Norwood, Ha. have inspected the coaponents described in this Owners Report during the period 09/OQ&59+to 04/05/96 and stat. that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 N I Inspec rs S'ature Hational Board, State, Providence, and Endorsements Date 96.031-4

4a S

C

FORH NIS-2 OWNERS REPORT FOR REPAIRS OR REPLACENEHTS As Required by the Provisions of the ASNE Code Section XI

1. Owner Florida Power & Li ht Date 04 05 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t 4 PIG ¹:8866/91 ~

MO ¹: 95023055 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc

3. Hork Performed by Florida Power & Li ht Type Code Syahot Stamp N A Hene Authorization Ho. H A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Reactor Coolant S stem System ¹: 41 Quality Group: A
5. (a) Applicable Construction Code B31. 1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacenents 1989 Edition,~HA Addenda,~NA Code Case
6. Identification of Components Repaired or Replaced and Replacenent Conyonents Nane of Hane of iKanufactureri National ( Other iYear i Repaired i ASNE i Component Hanufacturer J Serial No. Board Identification iguilti Replaced or ( Code i I ( Replacenent JStanp /

I I I i~tet uu IPRESSURIZER RELIEF VALVE IH/A I H51249.1361 IH/A IRV.4-551C (UHK. /Replaced )Ho I

IPRESSURIZER RELIEF VALVE IH/A )H51249-1580 JH/A JRV-4-551C iUNK. iRepiacement iNo

7. Description of llork: PRESSURIZER SAFETY VALVE RV-4-551C REPLACED IIITH SPARE.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X Pressure~2280 ill Test Tttptrature 525 'F 96-032.4

I Sheet 2 of 2 FORH HIS-2 !Back)

9. Remarks: HECNAHICAL CONNECTION NO MELDING REOUIRED.

CERTIFICATE OF COHPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Starp H A Certificate N A Expiration Date H A Signed Date l

OMner or (orner's Designee, Title CERTIFICATE OF INSERVICE INSPECTIOH I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade Ccxmty and eaployed by ArkHright Nutual Insurance Cceyany of Nor~, Ha. have inspected the carponents described in this Runners Report during the period 09/07/86yy'to I 04/05/96 and stato that to the best of my ktxwiedge and belief, the Ovner has performed examinations and taken corrective measures described in this OMners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his enyioyer makes any Harranty, expressed or implied, concerning the examinations and corrective measures described in this Cx9ner's Report. Furtheraore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 H I Inspectors ig re National Board, State, Providence, and Endorsements ate 19 7+

96-032-4

.C ~

ksQx v, d

FORH HIS-2 OMHERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 04 05 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit PHO ¹:64/4765 MO ¹: 96001912 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Ilork Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization Ho. H A Expiration Date P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Containnent S ra S stem System ¹: 68 Duality Group: 8
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~NA Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~HA Addenda,~HA Code Case
6. Identification of Components Repaired or Replaced and Repiacenent Conyonents Name of Hame of iHanufacturer] National i Other (Year i Repaired i ASHE (

Conyonent Nanufacturer i Serial No. Board Identification iguiit( Replaced or i Code i i Replacement /Stan@ )

I I it~et ue IPUHP NODEL 3736 GOULDS i2178871 & iH/A i4A COHTAINHEHT SPRAY i1986 iRepiacement iNo 416929 PUHP

7. Description of Ilork: REPLACED 4A CONTAINHENT SPRAY PUHP MITH REBUILT SPARE.
8. Tests Conducted: Hydrostatic: Pneunatic: Nominal Operating Pressure X Other pressure~gee stg Test Tespereture 84 'F 96-033-4

P Sheet 2 of 2 FORK HIS-2 (Back)

9. Renarks: MECHANICAL CONNECTION NO MELDING REQUIRED.

CERTIFICATE OF COKPL IAHCE He certify that the statements made in the report are correct and this replacement conforms to the rules of the ASKE Code, Section XI.

Type Code Synhoi Stamp H A Certificate of Au ization Mo. A Expiration Date iW- '/

H M A Date Owner or Owner's Designee, Title I

CERTIFICATE OF IHSERVICE INSPECTION I,.the undersigned, holding a valid conmission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Kutuai Insurance Company of Norwood, Ka. have inspected the components described in this Owners Report during the period 03/18/96 to 04/05/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASKE Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his enpioyer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Conmisslons HB 8230 H I Inspec ors nature Hational Board, State, Providence, and Endorsements Date 96-033-4

I' 4 g p

FORH NIS-2 CMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power &, Li ht Date 04 08 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit 4 Name PIJO ¹:64/2509 IN ¹: 95022522 9700 SII 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. 'Mork Performed by Florida Power & Li ht Type Code Symbol Stamp H A Name Authorization No. H A Expiration Date H A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Hain Steam S stem System ¹: 72 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case
6. Identification of Conyonents Repaired or Replaced and Replacement Components Name of Name of )Nanufacturer) National Other /Year ( Repaired J,ASIDE f Component Hanufacturer (

Serial No. Board Identification )guilt] Replaced or f Code /

J Replacement /Staap J I I JYesleue (STUDS (4) H/A (N/A JH/A JUTC 370210 CS SA-193 JUNK. [Replacement ]No POV-4-2604

7. Description of Mork: OVERHAUL POV-4-2604 HAIN STEAN ISO VLV FROH S G A. REPLACED 4 BODY TO BONNET STUDS.
8. Tests Conducted: Hydrostatic: Pneunat i c: Ncminal Operating Pressure Other pressure~ig Test Tsstsereture ~

F 96.034-4

1 4

I 0

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: HECHANICAL CONNECTION HO llELDIHG REOUIRED.

CERT IF ICATE OF CONPLIAHCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate of Au o ization Ho. H A Expication Date N A Signed Date Owner or Owner's Designee, Title I

CERTIFICATE OF INSERV ICE INSPECTION I, the undersigned, holding a valid comaission issued by the Hational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha. have inspected the coayonents described in this Owners Report during the period 09/19/95 to 04/05/96 and stat'e that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his enyioyer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Conmissions HB 8230 H I Inspe ors gnature Hational Board, State, Providence, and Endorsements Date 19 96-034-4

~>> ~

FORH HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACENEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 04 05 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit

". Name PHO ¹:4678/64 IO ¹: 96000973 9700 Sll 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc

3. Hork Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Hain Steam S stem System ¹: .'72 4uality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,~NA Code Case e
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Nanufacturer[ National [ Other ]Year J Repaired J ASHE J Component kanufacturer ) Serial Ho. Board Identification )guilt[ Replaced or f Code J J

Replacement ]Stamp f I I /~tes ue (STUD IH/A )UTC 362348 SA-193 87 )UW. (Replacement [No VALVE CV-4-1607

7. Description of llorkt ONE STUD REPLACED OH VALVE CV-4-1607 BCOY TO BONNET.
8. Tests Conducted: Hydrostatic: Pneuaat i c: Hominal Operating Pressure Other tressure~it Test Teetsereture 'F 96.035-4

Sheet 2 of 2 FORN HIS-2 (Back)

9. Remarks: NECNAHICAL CONNECTION HO MELDING RECUIRED.

CERTIFICATE OF COHPLIAHCE Ne certify that the statements made in the report are correct and this replacement conforms to the rules of the ASNE Code, Section XI.

Type Code Symbol Stamp N A Certificate of A rization Ho. N A Expiration Date N A Signed Ow r or Owner's Designee, Title CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Company of Norwood, Na. have inspected the coaponents described in this Owners Report during the period 01/11/96 to 04/05/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Conmissions HB 8230 H I Inspec ors S nature National Board, State, Providence, and Endorsements Date gO 96-035-4

0

~ %.

1 J

W 4.

FORM HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

' Li ht

1. Owner Florida Power 8 Date 04 10 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit Name MO ¹: 95017742-02 CR ¹: 94-1004 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job Ho.,etc
3. Mork Performed by Florida Power 8 Li ht Type Code Symbol Steep H A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: FEEOMATER SYSTEM System ¹: 74 auality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, HA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,416-1 Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Mama of Name of (Manufacturer( Hational ] Other iYear i Repaired i ASME i Component Manufacturer (

Serial Mo. Board Identification iBuilti Replaced or / Code i

( Replacement iStamp i I I [~res ue (CONCENTRIC REDUCER IN/A iN/A iH/A iUTC 374796 ASTH A234 GR iUNK. (Replacement iMo i14" X '12" MP 22 SCH 160 IPIPE 14w DIA JH/A iM/A iUTC 375293 ASTH A335 GR iUNK. (Replacement (No P22 SCH 80 ISTUOS (4) IH/A IN/A (M/A iUTC393388(2) SA-193 GR 87 iUHK. iReplacement iMo IFOR SUPPORT 4-FMH-32 UTC393425 2 SA.193 GR 87 iNUTS (16) iH/A IN/A iN/A iuTC396373(8) A-563 GR 87 iuHK. (Replacement iNo iFOR SUPPORT 4-FMH-32 UTC393607 8 SA.194 GR 2H

7. Description of Mork: FEEDMATER PIPING REPLACED BETMEEH VALVE FCV-4-488 ANO CV-4-2901 OUE TO MALL THIHNIHG. FOUR STUDS AHD SIXTEEN HUTS REPLACED ON SUPPORT 4-FMH-32. SUPPORT MAS REMOVED TO ALLOM FOR PIPING REPI.'ACENEHT.
8. Tests Conducted: Hydrostatic: Pneunatic: Hominal Operating Pressure X Other VT-2 pressure~use iu Test Temperature 255 mF 96.036-4

~ y 0

Sheet 2 of 2 0 FORM NIS-2 (Back)

9. Remarks: ALL WELDING PERFORMED IAW FPL WELD COHTROL MAHUAL.

The r uirements of Code Case H416-1 have been met for this re ir re Iacement activit .

CERT IF I CATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Sect3on XI'ype Code Symbol Sterp N A Certificate of orization Ho. N A Expiration 0 te N A 19 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTIOH

.I, the undersigned, holding a.valid=coamission issued by the National Board of Boiler and Pressure Vesset inspectors and the state or Province of Dade County and erpioyed by Arkwright Mutuat Insurance Cocpany of Norwood, Ma. have 3nspected the components described in this Owners Report dur3ng the period 03/02/96 to 04/10/96 and state that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his erpioyer shall be liable in any manner for any personai injury or property damage or a loss of any kind ar3sing from or connected with this inspect3on.

cmss1881sss ss 8238 II I Inspec rs S nature National Board, State, Providence, and Endorsements96-036.4

I]

P C

FORH NIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power 8 Li ht Date 04 10 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit MO ¹: 95017742-02 CR ¹: 94-1004 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Mork Performed by Florida Power 8, Li ht Type Code Symbol Stamp N A Name Authorization Ho. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address s
4. Identification of System: Feedwater S stem System ¹: 74 Quality Group: 8
5. (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~NA Addenda,416-1 Code Case
6. Identification of Components Repaired or Replaced and Repiacgxnent Components Name of Name of iHanufactureri National ( Other ]Year i Repaired i ASHE i Component Hanufacturer i Serial Ho. Board Identification igui Iti Replaced or i Code i i Replacement JStany (

I I i~Ves ue ICOHCEHTRIC REDUCER IH/A IH/A iH/A iUTC 374796 ASTH A 234 GR iUHK. iReplacement )No l1400 X 12 'MP 22 SCH 160 iPIPE 14" DIA. IN/A IH/A LH/A ]UTC 375293 ASTH A335 GR iUNK. ]Replacement iHo P22 SCH 80 (STUDS (1) IH/A iH/A iUTC 393388 SA-193 GR 87 JUNK. iRepiacement ]Ho

[FOR SUPPORT 4-FMH-38 H A N A (NUTS (4) IH/A IH/A iUTC 352051 SA-194 GR 2H JUNK. iRepiacement iNo IFOR SUPPORT 4-FMH-38

7. Description of Mork: FEEDMATER PIPING REPLACED BETMEEH VALVES FCV-4-478 ANO CV-4-2900 OUE TO MALL THINNING. ONE STUD AHD FOUR HUTS REPLACED OH SUPPORT 4-FMH-38. SUPPORT MAS REHOVED TO ALLOM FOR PIPING REPLACENENT.
8. Tests Conducted: Hydrostatic: Pnewetic: Nominal Operating Pressure X Other VT-2 Pressure~ggg tg Test Tesgersture 256 9F 96-037-4

t'W,e I- A,

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: ALL MELDING PERFORMED IAM THE FPL MELD CONTROL NAHUAL.

The r uirements of Code Case NC16-I have been met for this re ir re lacement activit .

A CERTIFICATE OF COHPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate of A t rization No. N A Expiration D te 19 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECT IOH I, the undersigned, holding a valid coamission issued by the Rational Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Hutual Insurance Coapany of Norwood, Ha. have inspected the components described in this Owners Report during the period 03/02/96 to 04/10/96 and sta .a that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASNE Code,Section XI.

By signing this certificate neither the Inspector nor his eaployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Conm>ssions HB 8230 H I Inspecto Sig ure National Board, State, Providence, and Endorsements Date 96-037.4

~ >~ I:

FORM HIS-2 ONNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 04 10 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Unit NO ¹: 95017742-02 CR ¹: 94-1004 9700 Sll 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job Ho.,etc
3. IJork Performed by Florida Power & Li ht Type Code Symbol Stamp N A Name Authorization Mo. N A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: FEEDMATER SYSTEM System ¹: 74 Quality Group: B
5. (a) Applicable Construction Code 831.1 1955 Edition, MA Addenda,~M A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components Repaired or Replaced and Replacenent Coaponents Name of Name of iManufactureri National Other iyear ( Repaired i ASHE i Coaponent Manufacturer )

Serial Ho. Board Identification [Builti Replaced or J Code f

/ Replacement iStaap f I I [~Yes Mo iSTUD iH/A fH/A iUTC 393425 A-193 GR B7 iUHK. iRepiacement iNo IFOR SUPPORT 4-FWH-26

]NUTS (4) iN/A (N/A (H/A iUTC 393607 SA-194 GR 2H JUNK. JReplacement (Ho IFOR SUPPORT 4-F'jN-26

7. Description of Mork: ONE STUD AND FOUR NUTS REPLACED OH SUPPORT 4-FNH-26. SUPPORT IIAS REMOVED TO ALLOU FOR ERROSIOH CORROSION TESTING OF FEEDMATER PIPING BETNEEH VALVES FCV-4-498 AND CV-4-2902.
8. Tests Conducted: Hydrostatic: Plastic: Nominal Operating Pressure Other Pressure~tg test Teegereture ~

F 96-038-4

t 4

Sheet 2 of 2 FORH HIS-2 (Back)

9. Remarks: HECNANICAL CONNECTION NO HELDIHG REOUIRED.

CERTIFICATE OF COHPLIANCE lie certify that the statements made in the report are correct and this replacement conforms to the rules of the ASHE Code, Section XI.

Type Code,gyrrhol St Certificate of Au ization No. H A Expiration Date H A Pl ~ oats 19 S'C Owner or Owner's Designee, Title CERTIFICATE OF IHSERVICE IHSPECTIOH I, the undersigned, holding a valid cocmission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and erpioyed by Arkwright mutual Insurance Coo@any of Horwood, Ha. have inspected the components described in this Owners Report during the period 03/02/96 to 04/10/96 and state that to the best of my knowledge and belief, the O~ner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his enyioyer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions HB 8230 H I Inspectors ig e Hationat Board, State, Providence, and Endorsements Date to~ts'6-038.4

P FORN HIS-2 OMNERS REPORT FOR REPAIRS OR REPLACEHEHTS As Required by the Provisions of the ASHE Code Section XI

1. Owner Florida Power & Li ht Date 06 07 96 Name 700 Universe Blvd. Juno Beach Fl. 33408 , Sheet 1 of 2 Address 2~ Plant Turke Point Plant Unit PN ¹:5538/64 IS ¹: 96006517 CR ¹: CR96-204 PCN ¹: 96-028 9700 SM 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. No.,Job No.,etc
3. Ilork Performed by PCI Ener Services Type Code Symbol Stamp H A kame Authorization No. N A Expiration Date N A One Ener Drive Lake Bluff Ill. 60044 Address
4. Identification of System: RESIDUAL HEAT REMOVAL SYSTEH System ¹: 50 Quality Group: B 5~ (a) Applicable Construction Code ASHE Section III 1965 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,416-1 Code Case
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of (Hanufacturer( National Other IYear I Repaired I ASHE I Corponent Nanufacturer [ Serial No. Board Identification )guilt] Replaced or J Code J

[ Replacement fStarrp J I I /Yes/eue

)4A RHR Heat Excanger )Atlas Industrial )879 [

1996 [Replacement )No

)Outlet Nozzle Excha er C n

7. Description of Hark: 4A RHR HEAT EXCHANGER OUTLET N02ZLE REPLACED BY PCI ENERGY SERVICES.

e 8. Tests Conducted: Hydrostatic:

Other VT-2 Pnewmtic:

pressure~430 stg Hominal Operating Pressure Test rempereture 126 X

r

~

F 96-039-4

Sheet 2 of 2 FORM NIS-2 (Back)

9. Remarks: The r uirements of Code Case N-416-1 have been met for this re ir re Iacement act'I vl t CERT! F ICATE OF COMPLIANCE Me certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp N A Certificate of Authorization No. N A Expiration Date N A

~W e siiin~

Owner J~/i ~-~/

or Owner's Designee, Title Date ~ /3 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ma. have inspected the components described in this Owners Report during the period 03/10/96 to 06/05/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xt.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnlssions HB 8230 N I Ins ctor gnature National Board, State, Providence, and Endorsements 96-039-4

FORM NIS 2 OWNERS REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI

1. O~ner Florida Power 8 Li ht Oate 06 12 96 700 Universe Blvd. Juno Beach Fl. 33408 Sheet 1 of 2 Address
2. Plant Turke Point Plant Uni t 4 Name PWO ¹:64/13C9 WO ¹: 95020827 9700 SW 34C Street Florida Cit Fl. 3303C Address Repair Organization P.O. Ho.,Job No.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stamp H A Hame Authorization No.

Expiration Oate N A P.O. Box 4332 Princeton Fl. 33032 Address

4. Identification of System: C nent Coolin Water S stem System ¹: 30 Quality Group: C 5~ (a) Applicable Construction Code 831.1 1955 Edition, NA Addenda,~N A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~H A Code Case
6. Identification of CoJrponents Repaired or Replaced and Replacement Components Hame of Name of /Manufacturer/ National / Other (Year J Repaired ) ASME (

Component Manufacturer / Serial No. Board Identification ]Built) Replaced or J Code [

[ Replacement (Stanp ]

I I I~Yes se IRELIEF VALVE CROSBY IN/A IN/A IRV-4-7478 JN/A [Replacement )Ho

7. Description of Work: REMOVED VALVE RV-C.7478 AHD INSTALLEO SPARE VALVE.
8. Tests Conducted: Hydrostatic: c: Nominal Operating Pressure e

Pnelzaat 1 X Other VT-2 pressure~su sie rest tempereture 73 ~

F 96-040.4

Sheet 2 of 2 FORH NIS-2 (Back)

9. Remarks: NO WELDIND REOUIRED HECNANICAL CONNECTION.

CERT IF I CATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the ASHE Code, Section XI.

Type Code Symbol Stamp N A Certificate Authorization No. N A Expiration Date N A Signed CC pl Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid comnission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Company of Norwood, Ha. have inspected the components described in this Owners Report during the period 07/28/95 to 06/12/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASHE Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Comnissions NB 8230 N I Inspector Signet e National Board, State, Providence, and Endorsements Date 19 K 96.040.4

II IJ

FORH HIS-2 OWNERS REPORT FOR REPAIRS OR REPLACEHENTS As Required by the Provisions of the ASHE Code Section XI

1. O~ner Florida Pcwer 8 Li ht Date 06 18 96

?00 Universe Blvd. Juno Beech Fl. 33408 Sheet 1 of 2 Address

2. Plant Turke Point Plant Unit 4 PWO ¹:2155/64 WO ¹: 95024356 9700 SW 344 Street Florida Cit Fl. 33034 Address Repair Organization P.O. Ho.,Job No.,etc
3. Work Performed by Florida Power 8 Li ht Type Code Symbol Stan@ N A Name Authorization No. H A Expiration Date N A P.O. Box 4332 Princeton Fl. 33032 Address
4. Identification of System: Feeduater S stem System ¹: 74 Quality Group: B
5. (a) Applicable Construction Code B31.1 1955 Edition, HA Addenda,~H A Code Case (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989 Edition,~N A Addenda,~N A Code Case
6. Identification of Components Repaired or Replaced and Replacement Conponents Name of Mane of (Hanufacturer( National ( Other (Year (

Repaired ( ASHE (

Conponent Manufacturer (

Serial No. Board Identification (Built( Replaced or ( Code I

( Replacement (Stamp (

( I i~res ue (STUD (1) IH/A IN/A (UTC 393975 A-193 (UNK (Replacement (No I

CV-4-2901 (NUT (1) IN/A (H/A IH/A IUTC 391875 (UNK (Replacement (Ho CV-4-2901

7. Description of Work: OISASSEHBLED CLEANED VALVE CV-4-2901. REPLACED 1 NEW STUD AND 1 NEW NUT.

PRESSURE TEST COHPLETED UNDER WO 95017742.

8. Tests Conducted: Hydrostatic: Pneunat I c: Hominal Operating Pressure X pressure~919 Tg Test Tssgersture 255 'F 96-041.4

0 1

(4

Sheet 2 of 2 FORM HIS-2 (Back)

9. Remarks: THIS IS A MECHANICAL CONNECTION NO WELOIHG REOUIREP.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair conforms to the rules of the ASME Code, Section XI.

Type Code Symbol Stamp N A Certificate of Expiration Oate H A Signed O~ner or Owner's Oesignee, Title Da~e + /f/' 19 CERTIFICATE OF IHSERVICE INSPECTION I, the undersigned, holding a valid coamission issued by the National Board of Boiler and Pressure Vessel inspectors and the state or Province of Dade County and employed by Arkwright Mutual Insurance Coapany of Norwood, Ma. have inspected the components described in this Owners Report during the period 09/06/95 to 06/12/96 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his erployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his erployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Ccnmissions HB 8230 H Inspector Signature Hational Board, State, Providence, and Endorsements 96-041-4

l TURKEY POINT UNIT 4 1996 REFUELING OUTAGE Summary of Visual Examinations and Functional Testing of Snuhbers

l f

0

~

'I

Mechanical shock arrestor (snubbers) were inspected under purchase order B95691-50102 by Pacific Scientific in accordance with PSA Project Plan PS 412 rev. C. Original job scope was to functionally test the initial sample of 10 snubbers, rebuild and functional test 3 PSA model 10 snubbers, functionally test 10 snubbers which were rebuilt the previous outage, and visually inspect 53 snubbers.

Procedures utilized to accomplish the Pacific Scientific's tasks were as follows:

PS 412 - Project Plan for Florida Power & Light Turkey Point Contract B95691-50102, rev. C PS 406 Spc - Mechanical Surveillance Procedure for ISI VT-3 Inspection, rev. D TR 952 Operational Procedures for the API/Barker STB-200 Snubber Test System, rev. 1, Rel PS 407 Instruction Manual for Snubber Removal and Reinstallation, rev. D PS 409 - Instruction Manual for Tagging of Functional Test Specimens rev. C PS 411 - Initiation and Disposition of deviation Reports, rev. D During the implementation of this Project Plan, Pacific Scientific completed all the functional tests (20) with 2 deviations noted and corrected by rebuild/rework. The visual inspection noted several conditions that were addressed by Condition Reports for resolution or by plant work order and Engineering standard STD-C-011 rev. 0. The Turkey Point Outage Summary Report (Section I) details all visual conditions found, functional test results, parts installed, Condition Reports written and PWO's utilized to complete the scope identified,Section II contains the Ten Year Inspection Plan with the outage inspection results, and the next outage snubber selection.Section III contains the Visual inspection summary,Section IV contains the Functional Test Data Results, and Section V contains the Activity Zacation lag.

0

'1 PAGE KO. 1 04/18/96 Turkey Point Outage Su@nary Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspec't ion A Fsssctional A "L" A Nurher Ksmfser Date T Test T Dimension T Visual gunnery Fsssctional Suanaay >

4-1000 184 03/17/96 P / I 20.7500 P Sacer 4-1000 visual inspection report TP96-024 did not reveal any deviations. Load pins and spherical arith bearings uere cleaned and lubricated in accordance arith STD-C-011.

4-1001 18010 03/16/96 P 03/16/96 P 13.0625 P Snubber 4-1001 visual inspection report TP96-025 did not Snubber 4-1001 uas selected as part of the initial saaple.

reveal any deviations. Load pins and spherical bearings The snubber passed the fsssctional test Nith the follossing sere cleaned and lubricated in accordance STD-C-011. results:

Tension Cerpression Criteria Test 1 6.51 5.38 75.00 Test 2 7.93 6.26 75 ~ 00 Test 3 0.008 0.008 .02g Test 4 8.25 5.05 75.00 The snubber Mas reinstalled in tag location 4-10Q1.

4-1002 18016 03/17/96 13.0000 P Snubber 4-1002 visual inspection report TP96-026 did not reveal any deviations. Load pins and spherical bearings uere cleaned and lubricated in accordance uith STD-C-011.

Installed 1 cotter pin (R91-6050).

4-1Q03 18008 03/17I96 P I I 13.0000 P Snubber 4-1003 visual inspection report TP9&-027 did not reveal any deviations. Load pins and spherical bearings vere cleaned and lubricated in accordance Mith STD.C-011.

Installed 1 cotter pin (R91-6050).

4-1004 3168 03/09/96 P 03/10/96 F 27.6250 P Snubber 4-1004 visual inspection report TP96-008 revealed Snubber 4-1004 serial ¹ 3168 uas tested due to difficulties that during hand stroking of the snubber, it was reported encossstered during the handstroke. The snubber failed the by the vendor that the snubber uas noisy and had erratic functional test performed in tension (test ¹4). Vendor Mas motion during the handstroke as docunented on deviation directed to rebuild and regrease the snubber and perform a report TPN96002. Condition Report 96-275 Mas issued to functional test uhich uas satisfactory. The snubber was

P PAGE NO. 2 04/18/96 Turkey Point Outage Suanary Report Unct 3/4 S gate S S Visual T of T T Serial Inspection Fmctional "L4 A Tag Neer Naker Date A

T Test A

T Oisension T Visual Suanary Factional S~

address the noise and reinstalled in tag location 4-1004.

erratic motion. The vendor was directed to perform a fractional test. Load pins and spherical bearings were Tension Cospressi on Criteria cleaned and lubricated in accordance with S'IC-C-011. Replaced 4 Test 1 405.49 227.56 2500.00 cotter pins CS 031-49500-1. Test 2 1977.49 227.56 2500.00 Test 3 .011 .008 .02g Condition report 96-0223 was issued at the start of the Test 4 3790.34 372.30 2500.00 outage for load pins which were turning in the ciaap/brackets. Engineering disposition was to replace the The following parts were used during rebuild of snubber S/N load pins with load studs. Projects implemented the 3168:

condition report disposition under PMO MO 96006541 01.

Vendor ¹ Insp/Rpt Stock Cd Support Cycl inder 1801866-01 R90-1174 0015345-1 Asseahly Torque Carrier 1801867-01 R90-4890 0015343-1 Asserhly ~

Keeper Ring 1801540-01 R93-4375 Inertia Hass 180186&-01 R90-1424 Assembly

  • Capstan Spring 1801615-01 0015729-1
  • Cleaned per PTNP-92-0631 4-1004 3168 03/13/96 P 03/12/96 P 27.6250 P As left visual inspection report TP96-008 of snubbe r 4-1004 Snubbe r 4-1004 was rebuilt by the vendor and fumtionally did not reveal any deviations. tested satisfactory with the following results:

Tension Ccapression Criteria Test 1 107.02 108.49 2500.00 Test 2 137.79 122.05 2500.00

PAGE NO. 3 04/18/96 Turkey Point Outage Summary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fmctional A "L" A Nuaber Nmher Date T Test T Dimension T Visual Suanary Fumtional Suanatyi Test 3 0.004 0.005 .02g Test 4 121.79 110.22 2500.00 The snubber uas reinstalled in tag location 4-1004.

4-1005 1206 03/10/96 P 03/11/96 P 27.5000 P Snubber 4-1005 visual inspection report TP96-028 did not Snubber 4-1005 Mas selected as part of the initial saapte reveal any deviations. Load pins and spherical bearings this outage. The snubber could not be removed for transport Mere cleaned and lubricated per STD-C-011. to the test trailer without compressing the snubber as documented on deviation report TPN96008. ISI dispositioned Condition report 96-0223 was issued at the start of the the deviation by instructing the vendor to coapress the outage for load pins uhich Mere turning in the snubber for removal, transport to the test trailer and claap/bracket. Engineering disposition uas to replace the perform the functional test.

load pins uith load studs. Projects implemented the condition report disposition under PlQ lO 96006541 01. The snubber fanctional results mre acceptable.

Tension Coapression Criteria Test 1 193.00 163.33 2500.00 Test 2 253.43 198.66 2500.00 Test 3 0.012 0.015 .02g Test 4 897.94 215.25 2500.00 Snubber Mas reinstalled in tag location 4-1005.

4-1006 8087 03/08/96 P / / 26.6250 P Snubber 4-1006 visual inspection report TPQ6-009 did not reveal any deviations. Load pins and spherical bearings Mere cleaned and lubricated in accordance with STD-C-011.

4-1007 11928 03/08/96 P / / 26.5000 P Snubber 4-1007 visual inspection report TP96-010 revealed a frozen spherical bearing due to rust/corrosion as docunented on deviation report PTN96001. Vendor was instructed to continue with the inspection and after successful

I

.j,p'!

PAGE NO. 4 04/18/96 Turkey Point Outage granary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Functional A "L" A Number Neer Date T Test T Dimension T Visual Summary Fax:tional Sumeryi handstroke, install a new end cap asseahly (Stock code 0015342-1)(R90-4636C). After installation of the new end cap assembly the snubber was then reinstalled. installed 1 cotter pin (CS 031-49500-1) Condition report 96-0270 was

~ritten to address the frozen spherical bearing which engineering dispositioned to replace. Load pins and spherical bearings were cleaned and lubricated shen the snubber was reinstalled in accordance with STD-C-011.

Condition report 96-0223 was issued at the start of the outage for load pins which were turning in the claap/brackets. Engineering disposition was to replace the load pins with load studs. Projects iaplemented the condition report disposition under PIN lO 96006549 01.

4-1008 6485 03/08/96 P / / 27.5000 P Snubber. 4-1008 visual inspection report TP96-011 did not reveal any deviations. Load pins and spherical bearings were cleaned lubricated in accordance with STD-C-011 report 96-0223 was issued at the start of the

'ondition outage for load pins which were turning in the clasp/brackets. Engineering disposition was to replace the load pins with load studs. Projects implemented the condition report disposition under PMO MO 96006554 01.

Condition report 96-435 was written against snubber 4-1008 after condition report 96-223 and QO 96006554 01 were implemented for installation of load studs. During the torquing process the rear bracket bushings bottomed out against the spherical bearings. Engineering disposition of condition report 96-435 was to cut the rear bracket bushings far enough so contact with the spherical bearing

'P t

PAGE NO. 5 04/18/96 Turkey Point Outage Su@nary Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A Fmctional A 4L" A Nunber Naker Date T Test T Dimension T Visual Suanary Fact ional Suaaa+ i uould not occur after torquing. Projects implemented condition report 96-435 uith satisfactory results under PMO 10 96007854.

4-1009 1228 03/09/96 P / / 27.3750 P Snubber 4-1009 visual inspection report TP96-015 revealed a cracked spherical bearing on the snubber end as docunented on deviation report TPN96003. Vendor uas instructed to continue Mith the snubber inspection and after handstroke, transport snubber to the test trailer and replace the spherical bearing (Stock Code 0197330-1) provided from FPL stores. Condition report 96-0279 was written to address the cracked spherical bearing and the engineering disposition gas to replace the spherical bearing. Load pins and spherical bearings Mere cleaned after replacement and lubricated in accordance Mith STD-C-011.

Condition report 96-0223 was issued at the start of the ou'tage for load pins uhich Mere turning in the clasp/brackets. Engineering disposition uas to replace the load pins Mith load studs. Projects implemented the condition report disposition under PNO MO 96006555 01.

4-1010 1204 03/09/96 P / / 27.7500 P Snubber 4-1010 visual inspection report TP96-016 did not reveal any deviations. Load pins and spherical bearings vere cleaned and lubricated in accordance Mith STD-C-011.

Condition report 96-0223 uas issued at the start of the outage for load pins uhich uere turning in the clasp/brackets. Engineering disposition uas to replace the load pins with load studs. Projects implemented the condition report disposition under PlO MO 96006552 01 '

~

=

0

PAGE NO. 6 04/18/96 Turkey Point Outage Swmary Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A Fux:tionai A "L" A Nanber Nurher Date T Test T Dimension T Visual Smmsry Fmctional Suaaaty i 4-1011 10573 03/09/96 P / / 27.6250 P Snubber 4-1011 visual inspection report TP96-017 did not reveal any deviations. Load pins and spherical bearings uere cleaned and lubricated in accordance with STD-C-011.

Condition report 96-0223 was issued at the start of the outage for load pins uhich sere turning in the cianp/brackets. Engineering disposition Mas to replace the load pins uith load studs. Projects Ispteoented the condition report disposition under PWO MD 96006552 01.

4.1012 16154 03/17/96 P / / 20.6250 P Snubber 4-1012 visual inspection report TP96-046 did not reveal any deviations. Load pins and spherical bearings vere cleaned and lubricated in accordance uith STD-C-011.

Installed 1 cotter pin (CS 031-47400-4).

4-1013 17418 03/17/96 P / / 17.6250 P Snubber 4-1013 visual inspection report TP96-047 did not reveal any deviations. Load pins and spherical bearings vere cleaned and lubricated in accordance Mith STD-C-011.

Installed 4 bolts (H&S 006-70945-1/R92-0340) and 2 cotter pins (CS006-70921-4/RQ2-1049).

4-1014 17177 03/16/96 P 03/16/96 P 21.0625 P Snubber 4-1014 visual inspection report TP96-033 did not Snubber 4-1014 Mas selected as part of the initial searle reveal any deviations. Load pins and spherical bearings and passed. The fwetional test results are as follows:

vere cleaned and lubricated in accordance uith STD-C-011.

Tension Coapression Cr>ter>a Test 1 86.19 60.88 750.00 Test 2 97.72 24.34 750.00 Test 3 0.003 0.006 ~ 02g Test 4 78.84 21.87 750.00

l I '

PAGE NO. 7 04/18/96 Turkey Point Outage Swmary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fuetional A "L" A Nmher Nuaber Date T Test T Dimension T Visual Summary Fwetional Sunna' The snubber Mas reinstalled at tag location 4-1014.

4-1015 17872 03/16/96 P 03/16/96 P 19.9375 P Srxkter 4-1015 visual inspection report TP96-034 did not Snubber 4-1015 was tested this outage as a post rebuild reveal any deviations. Load pins and spherical bearings fmctional test. The snubber passed the faational test Mith sere cleaned and lubricated in accordance Mith STD-C-011. the folloMing results:

Tension Cocpressi on Criteria Test 1 21.75 38.37 750.00 Test 2 42.99 40.33 750.00 Test 3 0.009 0.004 ~ 02g Test 4 49.07 40.06 750.00 The snubber uas reinstalled at tag location 4-1015.

4-1016 122 03/16/96 P 03/17/96 P 20.1250 P Snubber 4-1016 visual inspection report TP96-035 did not Snubber 4-1016 Mas selected for rebuild this outage. The reveal any deviations. Load pins and spherical bearings following parts Mere provided by FPL and installed by the acre cleaned and lubricated in accordance Nith STD-C-011. vendor:

Installed 1 cotter pin (NFS 031-47400-4).

Qty Stock Code/RN Clutch Spring 1 0015723-3 006-74271-8 Keeper Rings 2 R93-4375 Retaining Ring 1 R93-4312 Capstan Spring 1 006-74277-7 Retaining Ring 1 0015725-1 006-74273-4 Philister Head 3 006-74262-9 ScreMs Flat Nashers 3 0015716-3 006-74263-7 Nashers 2 0015724-3 006-74272.6 Nasher 1 R93-4220 Torque Carrier 1 R90-1175

04/18/96 Turkey Point Outage Sisrmary Report unit 3/4 S Oate S S Visual T of T T Tag Serial Inspection A Fisictional A "L" h KiNher Kiter Oate T Test T Oiaens ion T Visual Smeary Fisicti one l Sumac)i Fiaictional testing uas perforiaed and passed after rebuild Mith the following results:

Tension Coepression Criteria Test 1 24.72 65.81 750.00 Test 2 8.61 101.54 750.00 Test 3 0.010 0.009 .02g Test 4 10.30 116.46 750.00 This snubber was r einstalled in tag location 4-1016.

4-10'l7 118 03/16/96 P 03/16/96 P 19.8750 P

'nubber Snubber 4-1017 visual inspection report TP96-036 did not reveal any deviations. Installed 1 cotter pin (t@S 4-1017 was tested this outage as a post rebuild fisictionai test. The snubber passed the fisictional uith the 031-47400-4). Load pins and spherical bearings Vere cleaned following results:

and lubricated in accordance with STD-C-011 Tension Compression Criteria Test 1 12.04 42.05 750.00 Test 2 29.19 52.76 750.00 Test 3 0.011 0.008 .02g Test 4 29.04 49.20 750.00 The snubber was reinstalled in tag location 4-1017.

4-1018 17420 03/08/96 P / / 17.8750 P Snubber 4-1018 visual inspection report TP96-037 did not reveal any deviations. Load pins and spherical bearings vere cleaned and lubricated in accordance with STD-C-011 ~

Installed 1 cotter pin (CS 031-47400.40).

4-1019 17426 03/16/96 P 03/16/96 P 16.3125 P Snubber 4-1019 visual inspection report TP96-038 did not Sbubber 4-1019 was selected as part of the initial saaple.

't ct It I

PAGE NO. 9 04/18/96 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A Fmctional A ~ "L" A Kmher Kunber Date T Test T Dimension T Visual Suanary Fax:t 1 one l Sunnaey i reveal any deviations. Load pins and spherical bearings The snubber passed the fmctional test with the following were cleaned and lubricated in accordance with STO-C-011 ~ results:

Installed 1 cotter pin (HES 031-47400-04).

Tension Compression Criteria Test 1 21.00 15.01 300.00 Test 2 23.06 15.01 300.00 Test 3 0.012 0.010 .02g Test 4 22.00 18.83 300.00 The snubber was reinstalled in tag location 4-1019.

4-1020 27101 03/10/96 P / / 17.6870 P Snubber 4-1020 visual inspection report TP96-006 revealed paint with heavy rust on the load pin/spherical bearing as docunented on deviation report TPN96006. Condition report 96-293 was issued to engineering for evaluation. The vendors attempt to remove the load pin were unsuccessful.

Projects implemented the condition report disposition to remove/replace the load pin and clean the spherical bearing under PNO NO 96007008 01. On the snubber end of the support the load pin and sspherical bearing were cleaned and lubricated by the vendor and the TTA end by projects in accordance with STO-C-011.

4-1021 128 03/'10/96 P / / 17.1250 P Snubber 4-1021 visual inspection report TP96-007 revealed rust and corrosion on the spherical bearing and paint on the spacer washers as docunented on deviation report TPN96007. Condition report 96-0293 was issued for rear bracket load pins/spherical bearings with heavy rust and paint. The vendors attempt to remove the load pin were unsuccessful'nstalled 3 spacers (006-70905-2 R91-4598)

1 I >

PAGE NO. 10 04/18/96 Turkey Point Outage Sclmary Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A fcsw:tionaL A "L" A Neer Ncmher Date T Test T Dimension T Visual Suanary Fcxw:tionaL Sunna+ i and 1 cotter pin (CS 031-46301-1). The load pin and spherical bearing on the component end of the support were cleaned and lubricated in accordance with STD-C-011 by the vendor. Condition report 96-293 disposition was iaplemented by projects under PNO QO 96007008 01 and the load pin was replaced (R91-5611). The load pin and spherical bearings were cleaned and lubricated in accordance with STD-C-011 by projects on the buiLding end (TTA end). As left examination did not reveal any deviations.

4-1022 21381 03/09/96 P 03/10/96 P 16.6250 P Snubber 4-1022 visual inspection report TP96-018 revealed Snubber 4-1022 was fmctionaLLy tested as a result of the snubber would not handstroke as docm>>nted on deviation difficulty in handstroking. The snubber passed the report TPN96005. The vendor was instructed to fcxx:tionaLLy fmctionaL test with the following results:

test the snubber which passed. Load pins and spherical bearings were cleaned and lubricated in accordance with Tension Ccmpression Cr iteria STD-C-011. Installed 1 cotter pin (CS 031-46500-5).

Test 1 37.04 38.07 300.00 Test 2 89.46 47.07 300.00 Test 3 0.004 0.004 .02g Test 4 90.71 62.19 300.00 The snubber was reinstalled in tag location 4-1022.

4-1032 3707 03/13/96 P 03/16/96 P 26.5000 P Snubber 4-1032 visual inspection report TP96-029 revealed Snubber 4-1032 was selected as part of the initial saaple.

the base plate pulled from the wall per deviation report The fcxw:tionaL test was performed and the snubber passed as TPN96010. Condition report 96-0335 was written to address fot Lows:

the chipped concrete and base plate seperation from the wall. The deviation report also addressed that the snubber Tension Ccmpression Criteria removaL was prohibited due to grating up against the side of the snubber. projects cut the grating around the snubber Test 1 88.83 126.37 2500.00 in order to facilitate the removal of the snubber. Load Test 2 107.75 161.57 2500.00 pins and spherical bearings were cleaned and Lubricated in Test 3 0.003 0.014 .02g

P yE pli

PAGE NO. 11 04/18/96 Turkey Point Outage Swmsry Report Unit 3/4 S Date S S Visual of Tag Serial Inspection T

A Fictional A,"I."

T T A

Number Naker Date T Test T Dimension T Visual Sumery Fwetional Suaaa+ i accordance Mith STD-C-011. 2 cotter pins uere installed Test 4 142.51 167.02 2500.00 (CS 031-49500-1). Engineering disposition of the condition report was that the snubber is acceptable for use as is. The snubber Mas reinstalled in tag location 4-1032.

4-1033 7001 03/14/96 P / / 27.3750 P Snubber 4-1033 visual inspection report TP96-053 revealed a dislodged spherical bearing, embed plate pulled from the uaLL 1/4a and snubber is hitting the floor grating as docunented on deviation report TPN96011. Condition report 96-335 uas Nritten to address the eahed plate and the snubber hitting the grating. Condition report 96-388 uas written to address the dislodged spherical bearing.

Projects modified the grating. under the existing snubber support PMO. Installed 2 cotter pins (CS 031-49500-1) ~-

Engineering disposition of the condition report 96-335 Mas the snubber is acceptable for use as is and engineering disposition of condition report 96-388 Mas to reseat and restake the spherical in accordance Mith STD-C-011 Rich was performed by the vendor.

4-1039 12988 03/13/96 P 03/13/96 P 25.5000 P Snubber 4-1039 visual inspection report TP96-030 revealed Snubber 4-1039 was tested this outage as a previous failure the a dislodged spherical bearing, 4 Loose bolts at the location. The snubber passed the functional test with the pipe clamp possibly due to bottoming out as docuaented on foLLoulng results:

deviation report TPN96009. The vendor uas instructed to remove snubber and transport to the test trailer for Tension Compression Criteria functional testing. PRIOR to fmctionaL testing, reset the spherical bearing and restake and THEN perform the Test 1 62 ~ 16 184.17 2500.00 fwetionaL test. Provide the test results to the ISI group Test 2 69.94 196.16 2500.00 and if the results are satisfactory, reinstall the snubber. Test 3 0.003 0.005 .02g The deviations identified on TPN96009 vere reported to Test 4 55.45 234.99 2500.00 engineering via condition report 96-0321. The vendor uas instructed to reseat and restake the spherical bearing in The snubber was reinstalled in tag location 4-1039.

P I'

h

PAGE NO. 12 04/18/96 Turkey Point Outage Suanary Report Unit 3/4 S Date S S Visual T of T Tag Serial Inspection A Fmctional A "L" A Naker Neer Date T Test T Dimension T Visual Suaaary Fmctionai Suanany i accordance uith STD-C-011 and fmtionaily tested the snubber. Projects implemented the pipe clamp bolting and the TTA/snubber bolting replacement in the condition report disposition under PNO lN 96007194 01. No further action was required by the vendor.

4-1044 3919 03/14/96 P 03/14/96 P 21 F 5000 P Snubber 4-1044 visual inspection report TP96-039 did not Snubber 4-1044 Mas tested this outage as a post rebuild reveal any deviations. Load pins and spherical bearings factional test. The snubber passed the fmctionai test Mith uere cleaned and lubricated in accordance uith STD-C-011. the foilouing results:

Installed 1 cotter pin (H 8 S 031-47400-4)0 (Stock Code 0029149-3). Tension Coapression Criteria Test 1 30.56 53.12 750.00 Test 2 58.95 127.19 750.00 Test 3 0.012 0.012 ~ 02g Test 4 68.93 135.42 750.00 The snubber was reinstalled in tag location 4-1044.

4-1045 3905 03/14/96 P 03/15/96 P 21.2500 P Snubber 4-1045 visual inspection report TP96-040 did not Snubber 4-1045 Has selected for rebuild this outage. The reveal any deviations. Load pins and spherical bearings foiloMing parts uere supplied by FPL and installed by the uere cleaned and lubricated in accordance uith STD-C-011. vendor.

Oty. Stock Code/R¹ N 8 S Keeper Rings 2 R93-4375 Retaining Ring 1 R93-4312 Retaining Ring 1 00157251 006-742734 Philister Head 3 00157153 006-742629 Screws Flat Mashers 3 00157163 006-742637 Nashers 2 00157243 006-742726

I PAGE NO. 13 04/18/96 Turkey Point Outage Seminary Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A Functional A "L" A Nuaber Kosher Date T Test T Dimension T Visual gunnery Fact i one l Suweryi Masher 1 R93-4220 Fwmtional testing was performed after the rebuild and passed with the following results:

Tension Coapression Criteria Test 1 17.60 32.36 750.00 Test 2 44.13 40.89 750.00 Test 3 0.010 0.007 .02g Test 4 39.64 43.63 750.00 This snubber was reinstalled in tag location 4-1045.

4-1046 187 03/15/96 P 03/15/96 P 19.2500 P Snubber 4-1046 visual inspection report TP96-041 did not Snubber 4-1046 was tested this outage as a post rebuild reveal any deviations. Load pins and spherical bearings test. The snubber was fux:tionally tested and passed with were cleaned and lubricated in accordance with STD-C-011. the following results:

Installed 2 cotter pins (H&S 031-47400-4).

Tension Cocpression Criteria Test 1 29.23 38.87 750.00 Test 2 59.39 22.50 750.00 Test 3 0.010 0.006 .02g Test 4 54.55 20.25 750.00 The snubber was reinstalled in tag location 4-1046.

4-1047 185 03/15/96 P 03/15/96 P 19.3750 P Snubber 4-1047 visual inspection report TP96-042 did not Snubber 4-1047 was selected this outage as part of the reveal any deviations. Load pins and spherical bearings initial sanple. The snubber was fmctionaliy tested and were cleaned and lubricated in accordance with STD-C-011. passed with the following results:

Installed 2 cotter pins (CS 031-47400-4).

Tension Compression Criteria

l PAGE NO. 14 04/18/96 Turkey Point Outage Summary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A fuetional A 4L4 A Number Number Date T Test T Dimension T Visual Senary Fwetional SuassrN Test 1 73.63 40.43 750.00 Test 2 73.63 34.65 750.00 Test 3 0.01 0.007 .02g Test 4 56.68 42.69 750.00 The snubber uas refnstalled in tag location 4-1047.

4-1048 4251 03/15/96 P 03/15/96 P 20.1250 P Snubber 4-1048 visual inspection report TP96-043 did not Snubber 4-1048 Mas tes'ted this outage as a post rebuild reveal any deviations. Load pins and spherical bearings functional test. The snubber passed the fmctional test arith sere cleaned and lubricated in accordance with STD-C-011. the follcwing results:

Tension Coapression Criteria Test 1 42.97 37.65 750.00 Test 2 53.24 27.54 750.00 Test 3 0.010 0.010 ~ 02g Test 4 58.47 33.26 750.00 This snubber was reinstalled in tag location 4-1048.

4-1051 11125 03/14/96 P 03/14/96 P 22.3750 P Snubber 4-1051 visual inspection report TP96-044 did not Snubber 4-1051 was tested this outage as a post rebuild reveal any deviations. installed 1 cotter pin (H&S fuetional test. The snubber passed the fmctional test uith 031-47400-4)(Stock Code 0029149-3). Load pins and spherical the folloMing results:

bearings vere cleaned and lubricated in accordance uith STD.C.011. Tension Carpression Criteria Test 1 14.55 69.26 300.00 Test 2 45.35 77.38 300.00 Test 3 0.011 0.008 .02g Test 4 51.23 75.80 300.00

as' 0

PAGE HO. 5 04/18/96 Turkey Point Outage Swmary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fmctional A "L4 A Nanber Kunber Date T Test T Dimension T Visual Summary F mcti onal Suanaryi The snubber uas reinstalled in tag location 4-1051.

4-1052 16251 03/14/96 P 03/14/96 P 21.7500 P Snubber 4-1052 visual inspection report TP96-045 did not Snubber 4-1052 Mas selected as part of the initial saepie.

reveal any deviations. 2 Cotter pins vere replaced (Stock The test results Mere acceptable as shoun belou:

Code 00291493)(H&S031-47400-4). Load pins and spherical bearings Mere cleaned and lubricated in accordance uith Tension Coapress i on Criter>a STD-C-011.

Test 1 34.78 73.23 300.00 Test 2 8.88 79.87 300.00 Test 3 0.009 0.009 .02g 1'est 4 10.1& 76.70 300.00 The snubber uas reinstalled in tag location 4-1052.

4-1053 11446 03/14/96 P 03/14/96 P 22.0000 P Snubber 4-1053 visual inspection report TP96-048 did not Snubber 4-1053 was selected for rebuild during this outage.

reveal any deviations. Load pins and spherical bearings The following parts uere provided by FPL and installed by chere cleaned and lubricated in accordance uith STD-C-011. the vendor:

item Qty. Stock Code/R¹ H 8 S Clutch Spring 00157233 006-74271-8 Keeper Rings R93-4375 Reta>ning Ring R93-4312 Retaining Ring 00157251 Philister Head 00157153 006-742629 Screus flat Masher 00157163 006-742726 Masher 00157243 006-742726 Masher R93-4220 After rebuilding the snubber uas functionally tested and passed as follows:

PAGE NO. 16 04/18/96 Turkey Point Outage Surmary Report Unit 3/4 S Date S S Visual T of T T Tag Serial inspection A Fwetional A "L" A Number Neer Date T Test T Dimension T Visual Stannary Fact ional Smest yi Tension Compression Criteria Test 1 47.20 77.85 300.00 Test 2 4.61 139.54 300.00 Test 3 0.012 0.010 .02g Test 4 6.69 172.81 300.00 This snubber was reinstalled in tag location 4-1053.

4-1055 7782 03/14/96 P 03/14/96 P 20.8750 P Snubber 4-1055 visual inspection report TP96-049 did not Snubber 4-1055 was tested this outage as a post rebuild reveal any deviations. Load pins and spherical bearings fuxtional test and a previous failure location. The snubber Mere cleaned and lubricated in accordance with STD-C-011. passed the fmctional test Mith the follouing results:

Tension Compression Criteria Test 1 28.93 24.40 750.00 Test 2 34.51 36.87 750.00 Test 3 0.011 0.009 .02g Test 4 35.25 36.79 750 F 00 The snubber Nas reinstalled in tag location 4-1055.

4-1057 27080 03/14/96 P 03/14/96 P 18.5000 P Snubber 4-1057 visual inspection report TP96-050 did not Snubber 4-1057 was selected as part of the initial saaple.

reveal any deviations. Load pins and spherical bearings The snubber passed the functional test uith the folloging stere cleaned and lubricated in accordance Mith STD-C-011. results:

installed 1 cotter pin ICS 031-47400-4 Stock code 002914934. Tension Coapression Criteria Test 1 22.22 18.26 300.00 Test 2 29.36 51.45 300.00 Test 3 ~ 002 .003 .02

PAGE NO. 17 04/18/96 Turkey Point Outage SLCRsry Report Unit 3/4 S Date S S Visue l T of T T Tag Serial Inspection A Fux:tionai A "L" A Nmher Nmher Date T Test T Dimension T Visual Smeary Fmctional Sunna~ i Test 4 52.28 65.33 300.00 The snubber was reinstalled in tag location 4-1057.

4-1063 27098 03/15/96 P 03/15/96 P 17.6250 P Snubber 4-1063 visual inspection report TP96-051 did not Snubber 4-1063 was selected as part of the initial saapie.

reveal any deviations. Load pins and spherical bearings This snubber passed the fuetionai test with the following were cleaned and lubricated in accordance with STD-C-011. results:

Installed 2 cotter pins (CS 031-46301-1).

Tension Coepression Criteria Test 1 20.56 16.65 300.00 Test 2 28.74 23.53 300.00 Test 3 0.002 0.003 .02g Test 4 29.09 23.59 300.00 This snubber was reinstalled in tag location 4-1063.

4-1071 16247 03/13/96 P 03/13/96 P 20.7500 P Snubber 4-1071 visual inspection report TP96-031 did not Snubber 4.1071 was tested this outage as a post rebuild reveal any deviations. Load pins and spherical bearings fmctional test. The snubber passed the functional test as were cleaned and lubricated in accordance with STD-C-011. follows:

Installed 2 cotter pins (Stock Code 0229149-3 H&S 031-47400-4). Tension Coepression Criteria Test 1 35.72 52.20 750.00 Test 2 51.11 69.89 750.00 Test 3 0.012 0.010 .02g Test 4 53.77 61.10 750.00 The snubber was reinstalled in tag location 4-1071 33622 03/13/96 P 03/13/96 P 10.2500 P Snubber 4-1085 visual inspection report TP96-052 did not Snubber 4-1085 was selected for functional testing as part

'-1085 reveal any deviations. Load pins and spherical bearings of the initial sample. This snubber passed the functional

It I

T. (

Ig

PAGE NO. 18 04/18/96 Turkey Point Outage Summery Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A Fmctional A "L" A Nmher Nurter Date T Test T Dimension T Visual Sunnary Fwetional Sunnart// i were cleaned and lubricated in accordance with STD-C-011. test as foLLows:

Tension Coapression Criteria Test 1 4.03 2.77 17.50 Test 2 4.77 2.93 17.50 Test 3 0.011 0.013 .02g Test 4 3.92 3.53 17.50 The snubber was reinstalled in tag location 4-1085.

4-1086 12993 03/09/96 P 03/10/96 F 27.5000 P Snubber 4-1086 visual inspection report TP96-019 revealed Snubber 4-1086 was fmctionaLLy tested due to difficulty that the snubber would not handstroke as docwented on encountered during the handstroking. The snubber failed the deviation report TPN96004. Directed the vendor to take the fmctionaL test in final drag (test N4). The results are as snubber to the test trailer and fwetionaLLy test. The load follows:

pins and the spherical bearings were cleaned and lubricated in accordance with STD-C-011. Tension Coapression Criteria Test 1 892.85 1167.19 2500.00 Test 2 2270.54 2267.69 2500.00 Test 3 0.002 0.017 ~ 02g Test 4 2751.21 2428.11 2500.00 Directed the vendor to disassesble the snubber, clean and relube, and retest.

4-1086 12993 03/12/96 P 03/11/96 P 27.5000 P As Left visual inspection report TP96-019 of snubber 4-1086 Snubber 4-1086 was retested after being reworked and passed.

did not reveal any deviations. This snubber will be tested during the next refueling outage. the results of the reworked snubber fwctionaL test are as foLLows:

Tension Coapression Criteria

0'p PAGE 19 04/18/96 Turkey point Outage Scmcsary Report Unit 3/4 S bate S S Visual T of T T Tag Serial inspection A Fmctional A "L4 A "c Naker Naker Oate T Test T Oimension T Visual Scsasary Fcaeti anal Scmcnary Test 88.85 96.52 2500.00 Test 2 107.02 127.92 2500.00 Test 3 0.008 0.008 .02g Test 4 89.95 85.16 2500.00 No replacement parts were needed at this time. The snubber was reinstalled in tag Location 4-1086.

4-1087 12994 03/09/9& P / / 27.6250 P Snubber 4-1087 visual v inspection report TP-96-020 d id not reveal any devaitions. Load pins and spherical ica be ar i ngs were cleaned aand LubLubr>cated in accordance with STO-C-011.

4.1088 12995 03/09/9& P / / 26.6250 P -1088 visual Snubber 4-1088 v inspection report TP96-001 did not reveal any deviations. Load pins and sph erica l be arings ere c ea and lubricated in accordance with STD-C-011.

installed 2 cotter pins (ICS 031-46500-5).

4.1089 12996 03/09/96 P / / 26.7500 P - 089 'vi Snubber 4-1089 'visual ua inspection report TP96-002 did not reveal any deviations. Load pins and s eri were c e and lubricated in accordance with STO-C-011.

4-1090 12997 03/09/96 P / / 27.5000 P -1090 visual inspection report TP96-003 did not Snubber 4-1090 reveal any deviations. Load pins and spherical rica beari ar ngss were cleaned and Lubricated in accordance with STO-C-011.

4-1091 12998 03/08/9& P / / 27.0000 P Snubber 4-109

-1091 visuaL inspection report TP96-004 did not 0029159 3)<H&S 031-46500-5). Spherical bearings and (oad pins were cleaned and lubricated i n accordanceda with STD-C-Ol 1

I I

%,)

J

PAGE NO. 20 04/18/96 Turkey Point Outage Suwery Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A Fax:tionai A "L" A Nmher Nwher Date T Test T Dimension T Visual Summary F~tional S~ry 4-1092 12999 03/08/96 P / / 27.0000 P t Snubber 4-1092 visual inspection repor TP96-005 did not reveal any deviations. Load pins and spherical bearings uere cleaned and lubricated in accordance Mith STD-C-011.

4-1093 17868 03/11/96 P / / 20.0000 P Snubber 4-1093 visual inspection report TP96-012 did not reveal any deviations. Load pins and spherical bearings vere cleaned and lubricated in accordance ui th STD-C-011.

Installed 2 cotter pins (H&S 006-70921-4).

4-1094 17869 03/10/96 P / / 20.0000 P Snubber 4-1094 visual inspection report TP96-013 did not reveal any deviations. Load pins and spherical bearings uere cleaned and lubricated in accordance Mith STD-C-011 ~

Installed 2 cotter pins (H&S 006-70921-4).

4-1095 17870 03/10/96 P / / 19.6250 P Snubber 4-1095 visual inspection report TP96-014 did not reveal any deviations. Load pins and spherical bearings Mere cleaned and lubricated in accordance arith STD-C-011.

Installed 2 cotter pins (H&S 006-70921-4) ~

4-1096 17871 03/10/96 P / / 19.5000 P Snubber 4-1096 visual inspection report TP96-021 did not reveal any deviations. Load pins and spherical bearings vere cleaned and lubricated in accordance with STD-C-011.

Installed 3 cotter pins (H&S 006-70921-4).

4-1097 17852 03/10/96 P 03/11/96 P 19.7500 P Snubber 4-1097 visual inspection report TP96-032 did not Snubber 4-1097 was tested as a previous failure location.

reveal any deviations. Load pins and spherical bearings The snubber passed Nith the foiloMing results:

vere cleaned and lubricated in accordance with STD-C-011.

Installed 2 cotter pins (H&S 006-70921-4). Tension Coepression Criteria Test 1 50.87 110.26 750.00 Test 2 13.40 116.86 750.00 Test 3 0.003 0.009 .02g

ji' PAGE KO. 1 04/18/96 Turkey Point Outage SUNl8ry Report Unit 3/4 S Date S S Visual T of T T Tag Serial Inspection A Fuetional A "L" A Number Number Date T Test T Dimension T Visual Seminary Fwetional Smadry Test 4 21.77 118.17 750.00 The snubber uas reinstalled in tag location 4-1097.

4-1098 17873 03/10/96 P / / 19.7500 P Snubber 4-1098 visual inspection report TP96-023 did not reveal any deviations. Load pins and spherical bearings uere cleaned and lubricated in accordance uith STD-C-011.

4-1099 17423 03/11/96 P / / 16.6250 P Snubber 4-1099 visual inspection report TP96-023 did not reveal any deviations. Load pins and spherical bearings stere cleaned and lubricated in accordance with STD-C-011.

SECTION II 1

04/Ie/96 Turkey Point Unit 4 Ten Year Functional Testing Inspection Plan Inspection Interval 3


Plan Status--------------

First Second Third Period Period Period Tag Outage, Number 1 2 3 1 2 3 4 1 2 3 4.1000 Hanger ¹: SR-619 Rated Load: 15000 Schedule Nodal ¹: 10 Code Class: 8/2 Results ASHE Category: F-A ASHE Item ¹: Status System ¹: 62 System: SI Stress Problem ¹: 031 Criteria: 750.00 Reference Drawing ¹: 5614-H-502/7 4-1001 Hanger ¹: SR-616 Rated Load: 1500 Schedule X Hodel ¹: 1 Code Class: B/2 Results P ASNE Category: F-A ASHE Item ¹: Status S System ¹: 62 System: SI Stress Problem ¹: 031 Criteria: 75.00 Reference Drawing ¹: 5614-H-502/1 4-1002 Hanger ¹: SR-655 Rated Load: 1500 Schedule Hodel ¹ 1 Code Class: 8/2 Results ASNE Category: F-A ASHE Item ¹: Status System ¹: 62 System: SI Stress Problem ¹: SI-2 Criteria: 75.00 Reference Drawing ¹: 5614-H-572/7 4-1003 Hanger ¹: SR-655 Rated Load: 1500 Schedule Nodal ¹: 1 Code Class: B/2 Results ASHE Category: F-A ASHE Item ¹: Status System ¹: 62 System: SI Stress Problem ¹: SI-2 Criteria: 75.00 Reference Drawing ¹: 5614-H-572/7 4-1004 Hanger ¹: 4-NSHX-15 Rated Load: 50000 Schedule - - - X Hodel ¹: 35 Code Class: D/4 Results ASHE Category: H/A ASHE Item ¹: N/A Status LQ-System ¹! 72 System: HS Stress Probles ¹: HSO Criteria: 2500.00 Reference Drawing ¹: 5614-H-562/52 4-1005 Hanger ¹: 4-HSHX-15 Rated Load: 50000 Schedule . X Nodel ¹: 35 Code Class: D/4 Results P ASNE Category: H/A ASHE Item ¹: H/A Status S System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drawing ¹: 5614-H-562/52 Status Code R ~ Failed - retest next outage 1 ~ First sample expansion, etc..

S ~ Initial sample O ~ Rebuilt, test after 1 fuel cycle F = Frozen, test next outage L = Handstroke failure, retest next outage

I 1k

'I!

)51

04/18/96 Turkey Point Unit 4 Ten Year Fmctional Testing Inspection Plan Inspection Interval 3


Plan Status--------------

First Second Third Period Period Period Tag Outage Nunber 1 2 3 1 2 3 4 1 2 3 4.1006 Hanger ¹: 4-HSHX-17 Rated Load: 50000 Schedule Hodel ¹: 35 Code Classt 0/4 Results ASHE Category: N/A . ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Orauing ¹: 5614-H.562/53 4.1007 Hanger ¹: 8175-R-244-02 Rated Load: 50000 Schedule X Hodel ¹: 35 Code Class: D/4 Results ASHE Category: N/A ASHE Item ¹: N/A Status S System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drawing ¹: 5614-H-562/51 4.1008 Hanger ¹: 4-HSHX-18 Rated Load: 50000 Schedule Hodel ¹: 35 Code Class: D/4 Results ASHE Category: H/A ASHE Item ¹: N/A Status SystClll ¹t 72 System: HS Stress Problem ¹: HSO Criteria: 2500 F 00 Reference Orauing ¹: 5614-H-562/54 4.1009 Hanger ¹: 8175-R-245-01 Rated Load: 50000 Schedule Hodel ¹: 35 Cade Class: D/4 Results ASHE Category: N/A ASHE Item ¹: N/A S'ta'tus System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drawing ¹: 5614-H-562/62 4-1010 Hanger ¹: 4-HSHX-13 Rated Load: 50000 Schedule X Nodal ¹: 35 Code Class: D/4 Results P ASHE Category: N/A ASHE Item ¹: N/A Status S System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drauing ¹: 5614-H.562/63 4.1011 Hanger ¹: 4-HSHX-13 Rated Load: 50000 Schedule X Hodel ¹: 35 Code Class: D/4 Results P ASHE Category: N/A ASHE Item ¹: N/A Status S System ¹: 72 Systen: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drawing ¹: 5614-H-562/63 Status Code R ~ Failed . retest next outage 1 ~ First sample expansion, etc..

S ~ Initial sample 0 ~ Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L ~ Handstroke failure, retest next outage

ji P

0 I'

04/18/96 Turkey Point Unit 4 Ten Year Fux:tionai Testing Inspection Plan Inspection Interval 3


.-Plan Status-------------.

First Second Third Period Period Period Tag Outage Nunber 1 2 3 1 2 3 4 1 2 3 4-1012 Hanger ¹: SR.638 Rated Load: 15000 Schedule Hodel ¹: 10 Code Class: 8/2 Results ASHE Category: F-A AQIE Iten ¹: Status System ¹: 50 System: RHR Stress Problem ¹: 034 Criteria: 750.00 Reference Drawing ¹: 5614-H-505/13 4-1013 Hanger ¹: PS-796 Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: 8/2 Results ASHE Category: F.A ASHE Item ¹: Status System ¹: 50 System: RHR Stress Problen ¹: 034 Criteria: 300.00 Reference Drawing ¹: 5614-H.505/12 4-1014 Hanger ¹: SR.3 Rated Load: 15000 Schedule X Hodel ¹: 10 Code Class: 8/2 Results P ASHE Category: F-A ASHE Item ¹: Status --- S-Systen ¹: 50 System: RHR Stress Problen ¹: 034 Criteria: 750.00 Reference Drauing ¹: 5614-H-505/18 4-1015 Hanger ¹: SR.3 Rated Load: 15000 Schedule X Hodel ¹! 10 Code Class: 8/2 Results P ASHE Category: F'-A AQIE Item ¹: Status 0-System ¹: 50 System: RHR Stress Problem ¹: 034 Criteria: 750.00 Reference DraMing ¹! 5614-H-505/18 4-1016 Hanger ¹: SR-2 Rated Load: 15000 Schedule X Hodel ¹: 10 Code Class: 8/2 Results ASHE Category: F-A ASHE Item ¹: Status System ¹: 50 System: RHR Stress Problem ¹: 034 Criteria: 750.00 Reference Drawing ¹: 5614-H-505/17 4.1017 Hanger ¹: SR.2 Rated Load: 15000 Schedule X X Hadal ¹: 10 Code Class: 8/2 Results F P ASHE Categoryt F-A AQIE Iten ¹: Status System ¹t 50 Systen: RHR Stress Problen ¹: 034 Criteria: 750.00 Reference OraMing ¹: 5614-H-505/17 Status Code R ~ Failed - retest next outage 1 ~ First sample expansion, etc..

S ~ Initial san@le 0 ~ Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L ~ Handstroke failure, retest next outage

IS ps II

04/18/96 Turkey Point Unit 4 Ten Year F~tional Testing Inspection Plan Inspection Interval 3


Plan Status--------------

First Second Third Period Period Period Tag Outage Nunber 1 2 3 1 2 3 4 1 2 3 4-1018 Hanger ¹: PS-726 Rated Load: 6000 Schedule X Nodal ¹ 3 Code Class: B/2 Results P ASHE Category: F.A ~ ASHE Item ¹: Status S System ¹: 50 System: RHR Stress Problem ¹: 034 Criteria: 300.00 Reference Drawing ¹: 5614-H-505/8 4.1019 Hanger ¹: PS-760 Rated Load: 6000 Schedule - X Nodal ¹: 3 Code Class: B/2 Results - P ASHE Category: F.A ASHE Item ¹: Status --- S ----

System ¹: 50 System: RHR Stress Problem ¹: 034 Criteria: 300.00 Reference Drawing ¹: 5614-H-505/10 4.1020 Hanger ¹: 80117-R-341-03 Rated Load: 6000 Schedule Nodal ¹! 3 Code Class: C/3 Results ASHE Category: F-A AQIE Item ¹: Status System ¹: 75 System: AFM Stress Problem ¹: 001/48 Criteria: 300.00 Reference Draging ¹: 5610-H-818/10 4-1021 Hanger ¹: 80117-R-341.03 Rated Load: 6000 Schedule X Nodal ¹: 3 Code Class: C/3 Results P ASHE Category: F-A AQIE Item ¹: Status S-System ¹: 75 System: AFM Stress Problem ¹: 00'I/48 Criteria: 300.00 Reference Drawing ¹: 5610-H-818/10 4-1022 Hanger ¹: 7884-R-420-02 Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: D/4 Results ASHE Category: N/A AQIE Item ¹: N/A Status System ¹: 74 System: FM Stress Problem ¹: FM-1 Criteria: 300.00 Reference Drawing ¹: 5614-H-770/51 4-1032 Hanger ¹: 80116-R-005-01 Rated Load: 50000 Schedule X Nodal ¹: 35 Code Class: 8/2 Results P AQIE Category: F-A AQIE Item ¹: Status S System ¹: 74 System: FM Stress Problem ¹: FM-7 Criteria: 2500.00 Reference Braving ¹: 5614-H-558/2

,Status Code R

  • Failed - retest next outage 1 ~ First sample expansion, etc..

S ~ In 'I t 'I a l s 8' e 0 s Rebuilt, test after 1 fuel cycle s Handstroke failure, retest next outage F s Frozen, test next outage L

0'l 04/18/96 Turkey Point Unit 4 Ten Year Fumtional Testing Inspection P lan Inspection Interval 3

.--.-----.------Plan Status--------------

First Second Third Period Period Period Tag Outage Nmher 1 2 3 'I 2 3 4 1 2 3 4-1033 Hanger ¹: 80116-R-005-01 Rated Load: 50000 Schedule X Kodel ¹: 35 Code Class: 8/2 Results P ASKE Category: F-A . ASKE Item ¹! Status S System ¹: 74 System: FM Stress Problem ¹: FM-7 Criteria: 2500.00 Reference Drauing ¹: 5614.H-558/2 4-1034 Hanger ¹: 4-FMH-19A Rated Load: 15000 Schedule Kodel ¹: 10 Code Class: 8/2 Results ASKE Category: F.A ASKE Item ¹: Status System ¹: 74 Systemt FM Stress Problem ¹: FM-6 Criteria: 750 00 F

Reference Drawing ¹: 5614.H.557/5 4.1035 Hanger ¹: 4-FMH-19A Rated Load: 15000 Schedule X Kodel ¹: 10 Code Class: B/2 Results P ASKE Category: F-A ASKE Item ¹: S tatus 4 System ¹: 74 System: FM Stress Problem ¹: FM-6 Criteria: 750.00 Reference Drawing ¹: 5614-H.557/5 4-1036 Hanger ¹: 4-FMH-198 Rated Load: 15000 Schedule Kodel ¹: 10 Code Class: 8/2 Results ASKE Category! F-A ASKE Item ¹: Status System ¹: 74 System: FM Stress Problem ¹: FM-6 Criteria: 750.00 Reference Drauing ¹: 5614-H-557/6 4-1037 Hanger ¹: 4-FMH-19C Rated Load: 50000 Schedule Kodel ¹: 35 Code Class: 8/2 Results ASKE Category: F-A ASHE Item ¹: Status System ¹: 74 System: FM Stress Problem ¹: FM-6 Criteria: 2500.00 Reference Orwing ¹: 5614-H-557/8 4-1038 Hanger ¹: PS-30A Rated Load: 350 Schedule Kodel ¹: 1/4 Code Class: A/1 Results ASKE Category: F-A ASKE Item ¹: Status S System ¹: 47 System: CVCS Stress Problem ¹: CVCS-27 Criteria: 17.50 Reference Orauing ¹: 5614.H-554/11 Status Code R ~ Failed - retest next outage 1 ~ First sarple expansion, etc..

S ~ Initial sat@le 0 ~ Rebuilt, test after 'I fuel cycle F ~ Frozen, test next outage L ~ Handstroke failure, retest next outage

l J

I

04/18/96 Turkey Point Unit 4 Ten Year Fwetional Testing Inspection Plan Inspection Interval 3


Plan Status""-------".

First Second Third Period Period Period Tag Outage Nunber 1 2 3 1 2 3 4 1 2 3 4-1039 Hanger ¹: IC-13-0901 Rated Load: 50000 Schedule X X Hodel ¹: 35 Code Class: 8/2 Results F P ASHE Category: F-A , ASHE Item ¹: Status R System ¹: 72 System: HS Stress Problem ¹: IC-13 Criteria: 2500.00 Reference Orauing ¹: 5614-H-561/2 4-1040 Hanger ¹: SR-944A Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: A/1 Results ASHE Category: F-A ASHE Item ¹: Status System ¹: C7 System CVCS Stress Problen ¹: 023 Criteria: 300.00 Reference OraMing ¹: 5614-H.782/18 4-1041 Hanger ¹: SR-924 Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: A/1 Results P AQIE Category: F-A ASHE Item ¹: Status S System ¹: 47 System: CVCS Stress Problem ¹: 023 Criteria: 300.00 Reference Drauing ¹: 561C-H-782/8 Hanger ¹: SR-923A Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: A/1 ResuLts ASHE Category: F-A AQIE Item ¹: Status S System ¹: 47 System: CVCS Stress Problem ¹: 023 Criteria: 300;00 Reference graving ¹: 5614-H-782/6 4-1043 Hanger ¹: SR-9238 Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: A/1 Results ASHE Category! F-A ASHE Item ¹: Status S System ¹: 47 System: CVCS Stress Problem ¹: 023 Criteria: 300.00 Reference DraMing ¹: 5614-H-782/5 4-1044 Hanger ¹: 4-PRH-10 Rated Load: 15000 Schedule X X Hodel ¹: 10 Code Class: 0/4 Results F P ASHE Category: F-A ASHE Item ¹: S ta'tus Systen ¹t 41 Systen: RCS Stress Problen ¹: PR-2 Criteria: 750.00 Reference Drauing ¹: 5614-H-564/8 Status Code R ~ Failed - retest next outage 1 = First sanple expansion, etc..

S ~ Initial sanple 0 = Rebuilt, test after 1 fueL cycle F ~ Frozen, test next outage L = Handstroke failure, retest next outage

fl e

04/10/96 Turkey Point Unit 4 Ten Year Functional Testing Inspection Plan Inspection Interval 3

---.-.-.-.-.----Plan Status--------------

First Second Third Period Period Period Tag Outage Munber 'I 2 3 1 2 3 4 1 2 3 4-1045 Hanger ¹: 4-PRH-8 Rated Load: 15000 Schedu'l e X Nodal ¹: 10 Code Class: D/4 Results ASHE Category: M/A . ASNE Item ¹: M/A Status Systen ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 750.00 Reference OraMing ¹: 5614-H-564/4 4-1046 Hanger ¹: MIC-&-2 Rated Load: 15000 Schedule X X Nodal ¹: 10 Code Class: D/4 Results P P ASNE Category: M/A ASNE Item ¹: M/A Status Systen ¹: 41 Systen: RCS Stress Problen ¹: PR-2 Criteria: 750.00 Reference Drawing ¹: 5614-H-564/5 4-1047 Hanger ¹: MIC-6-2 Rated Loads 15000 Schedule X Nodal ¹: 10 Code Class: 0/4 Results P ASHE Category: H/A ASNE Iten ¹: H/A Status S--

System ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 750.00 Reference Drawing ¹: 5614.H.564/5 4-1048 Hanger ¹: 4-PRH-4 Rated Load: 15000 Schedule X X Nodal ¹: 1Q Code Classt 0/4 Results P . P ASNE Category: H/A ASNE Item ¹: M/A Status System ¹: 41 Systen: RCS .

Stress Problem ¹: PR-2 Criteriat 750.00 Reference Drauing ¹: 5614-H-564/2 4-1049 Hanger ¹: 4-PRH-2 Rated Load: 15000 Schedule Nodal ¹: 10 Code Class: 0/4 Results ASNE Category: H/A ASNE Item ¹: H/A Status Systen ¹: 41 Systems RCS Stress Problem ¹: PR-2 Criteria: 750.00 Reference Drawing ¹: 5614.H.564/3 4-1050 Hanger ¹: 4-PRH-2 Rated Load: 1500Q Schedule Nodal ¹: 10 Code Class: D/4 Results ASNE Categoryt H/A ASNE Item ¹: H/A Status System ¹: 41 System: RCS Stress Problen ¹: PR-2 Criteria: 750.00 Reference graving ¹: 5614-H-564/3 Status Code R ~ Failed - retest next outage 1 ~ First sanpie expansion, etc..

S ~ Initial sample 0 ~ Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L ~ Handstroke failure, retest next outage

Ii1.

li e

04/18/96 Turkey Point Unit 4 Ten Year Fax:tional Testing Inspection P lan Inspection Interval 3


Plan Status--------------

First Second Third Period Period Period Tag Outage Munber 2 3 1 2 3 4 1 2 3 4.1051 Hanger ¹: 4-PRH-6 Rated Load: 15000 Schedule X X Hodel ¹: 10 Code Class: D/4 Results P P ASHE Category: N/A . AQlE Item ¹: H/A Status a-System ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 300.00 Reference Orauing ¹: 5614-H-564/11 4-1052 Hanger ¹: 4-PRH-6 Rated Load: 15000 Schedule - X Hodel ¹: 10 Code Class: D/4 Results - P ASHE Category: H/A ASHE Item ¹: H/A Sta'tus --- S--

System ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 300.00 Reference Orauing ¹: 5614-H-564/11 4.1053 Hanger ¹! 4-PRH-5 Rated Load: 15000 Schedule X Hodel ¹: 10 Code Class: A/1 Results AQIE Category: F-A ASHE Item ¹: Status System ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 300.00 Reference Drauing ¹: 5614-H-564/12 I

4-1054 Hanger ¹: 4-PRH.5 Rated Load: 15000 Schedule X Nodal ¹: 10 Code Class: A/1 Results P ~

ASHE Category: F-A ASIDE Item ¹: Status System ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 300.00 Reference DraMing ¹: 5614-H-564/12 4.1055 Hanger ¹: 4-PRH-5 Rated Load: 15000 Schedule X X Hodel ¹: 10 Code Class: A/1 Results F P ASHE Category: F-A ASHE Item ¹: Status R System ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 750.00 Reference Drawing ¹: 5614-H-564/12 4.1056 Hanger ¹: 4-PRH-9 Rated Load: 15000 Schedule Hodel ¹: 10 Code Class: 0/4 Results ASHE Category: H/A ASHE Item ¹: N/A Status System ¹: 41 System: RCS Stress Problem ¹: PR-2 Criteria: 750.00 Reference Drauing ¹: 5614-H-564/9 Status Code R ~ Failed - retest next outage 1 ~ First sample expansion, etc..

S ~ In'it'Ial sMple 0 ~ Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L = Handstroke failure, retest next outage

I II I

1

04/18/96 Turkey Point Unit 4 Ten Year Frmctionat Testing InspecC ion Plan Inspection Interval 3


Plan Status--------------

First Second Third Period Period Period Tag Outage Nurber 1 2 3 1 2 3 4 1 2 3 4-1057 Hanger ¹: 4-RCH-58 Rated Load: 6000 Schedule - X Hodel ¹: 3 Code Class: A/1 Results - P AQIE Category: F.A, ASNE Item ¹: Status --- S-----

Systen ¹r 41 System: RCS Stress Problem ¹: PS-2 Criteria: 300.00 Reference Drawing ¹: 5614-H-566/13 4-1058 Hanger ¹: 4-RCH-12A Rated Load: 6000 Schedule X Nodal ¹: 3 Code Class: A/1 Results ASHE Category: F-A ASHE Item ¹: Status S System ¹: 41 System: RCS Stress Problem ¹: PS-2 Criteria: 300.00 Reference Drawing ¹: 5614-H-566/6 4-1059 Hanger ¹: 4-RCH-18A Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: A/1 Results ASNE Category: F-A AQIE Iten ¹: Status System ¹: 41 System: RCS Stress Problem ¹: PS-2 300.00 Drawing ¹: 5614-H-566/9 Cl'Ital'ia'eference 4-1061 Hanger ¹r 4-RCH-36C Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: A/1 Results ASNE Category: F.A ASNE Iten ¹: S'taCus S System ¹: 41 System: RCS Stress Problen ¹: PS.2 Criteria: 300.00 Reference Dra~ing ¹: 5614-H-566/21 4-1062 Hanger ¹: 4-RCH-3682 Rated Load: 6000 Schedule Nodal ¹: 3 Code Class: A/1 Results ASHE Category: F-A AQIE Iten ¹: SCaCus System ¹: 41 Systen: RCS Stress Problen ¹: PS-2 Criteria! 300.00 Reference Drawing ¹: 5614-H-566/23 4.1063 Hanger ¹: 4-RCH-368X Rated Load: 6000 Schedule -- X Hodet ¹: 3 Code Class: A/1 Results P ASNE Category: F-A ASHE Item ¹: SCa'tus S--

System ¹: 41 System: RCS Stress Problem ¹: PS-2 Criteria: 300.00 Reference Drawing ¹: 5614-H-566/24 Status Code R ~ Failed - retest next outage 1 ~ First sarpte expansion, etc..

S ~ Initial saayte 0 ~ Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L ~ Handstroke failure, retest nexC outage

J II,

04/18/96 Turkey Point Unit 4 Ten Year Factional Testing inspection Plan inspection Interval 3


Plan Status--"--.-------

First Second Third Period Period Period Tag Outage MUTlbOr 1 2 3 1 2 3 4 1 2 3 4-1064 Hanger ¹: 4-RCH-36A Rated Load: 6000 Schedule Nodal ¹: 3 Code Class: A/1 Results ASHE Category: F-A AQIE item ¹: Status System ¹: 41 System: RCS Stress Problem ¹: PS-2 Criteria: 300.00 Reference graving ¹: 5614-H-566/25 4-1065 Hanger ¹! 4.RCH.34A Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: A/1 Results ASNE Category: F-A ASHE item ¹: Status S System ¹: 41 System: RCS Stress Problem ¹: PS-2 Criteria: 300.00 Reference graving ¹: 5614-H-566/29 4-1066 Hanger.¹: 4-RCH-32A Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: A/1 Results P AQIE Category: F-A AQIE item ¹: Status S System ¹: 41 System: RCS Stress Problem ¹: PS-2 Criteria! 300.00 Reference OraMing ¹: 5614-H-566/32 4-1067 Hanger ¹: 4-RCH-308 Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: A/1 Results AQIE Category: F-A ASHE Iten ¹t Status System ¹: 41 System: RCS Stress Problem ¹: PS.2 Criteria: 300.00 Reference Drawing ¹: 5614.H.566/34 4-1068 Hanger ¹: 4-RCH-30A Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: A/1 Results P ASHE Category: F-A AQIE item ¹: Status S System ¹: 41 System: RCS Stress Problem ¹: PS.2 Criteria: 300.00 Reference Drawing ¹: 5614-H-566/35 4-1069 Hanger ¹: 80116.R-006.01 Rated Load: 50000 Schedule X Hodel ¹: 35 Code Class: 8/2 Results P ASHE Category: F-A ASHE item ¹: Status S System ¹: 74 System: FM Stress Problem ¹: FM-8 Criteria: 2500.00 Reference Drawing ¹: 5614.H.789/3 Status Code R ~ Failed - retest next outage 1 ~ First seaple expansion, etc..

S + initial s8cpie 4 = Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L = Handstroke failure, retest next outage

4 1

t~ \

tL

04/18/96 Turkey Point Unit 4 Ten Year Fux:tional Testing Inspection P lan Inspection Interval 3

".------------.Plan Status--------------

First Second Third Period Period Period Tag Outage Number 1 2 3 1 2 3 4 1 2 3 4-1070 Hanger ¹: 80116-R-006.01 Rated Load: 50000 Schedule X Hodel ¹: 35 Code Class: 8/2 Results AQIE Category: F-A . AQIE Item ¹t Status S--

System ¹: 74 System: FII Stress Problem ¹: FM-8 Criteria: 2500.00 Reference Drawing ¹: 5614-H-789/3 4-1071 Hanger ¹: 80116-R-006-02 Rated Load: 15000 Schedule X X Hodel ¹: 10 Code Class: 8/2 Results P P ASHE Category: F-A ASHE Iten ¹: Status 0--

System ¹: 74 System: Fll Stress Problem ¹: FM-8 Criteria: 750.00 Reference Drawing ¹: 5614-H-789/4 4-1072 Hanger ¹: 80116-R-006-02 Rated Load: 15000 Schedule Hodel ¹: 10 Code Class: 8/2 Results ASNE Category: F.A ASHE Item ¹: Status Systen ¹: 74 Systen: Fll Stress Problem ¹: FM-8 Cr iteria: 750.00 Reference Orauing ¹: 5614-H-789/4 Hanger ¹: 4-FMH-13C Rated Load: 15000 Schedule X Hodel ¹: 10 Code Class: 8/2 Results AQIE Category: F-A ASHE Item ¹: S'ta'tus S--

System ¹: 74 System: FM Stress Problem ¹: Fll-8 Criteria: 750.00 Reference Drawing ¹: 5614-H-789/2 4-1074 Hanger ¹: 781028-H-420-10 Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: 8/2 Results ASNE Category: F.A ASNE Item ¹: Status System ¹: 74 System: SG Stress Problem ¹: SG8-13 Criteria: 300.00 Reference Drawing ¹: 5614-H-790/10 4.1075 Hanger ¹: 781028-R-420-01 Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: 8/2 Results ASHE Category: F-A ASHE Item ¹: Status System ¹: 74 System: SG Stress Problem ¹: SG8-13 Criteria: 300.00 Reference Drawing ¹: 5614-H-790/15 Status Code R ~ Failed - retest next outag~ 1 ~ First san@le expansion, etc..

S ~ Initial sample 0 ~ Rebuilt, test after 1 fuel cycle '

~ Frozen, test next outage L ~ Handstroke failure, retest next outage

I

,ll l,j t P'~

~S tg,

04/18/96 Turkey Point Unit 4 Ten Year F~tional Testing Inspection Plan Inspection Interval 3

.----"---------Plan Status--------------

'First Second Third Period Period Period Tag Outage Humber 1 2 3 1 2 3 4 1 2 3 4-1076 Hanger ¹: 781028-H-421-04 Rated Load: 1500 Schedule X Hodel ¹: 1 Code Class: 8/2 Results ASHE Category: F-A AQlE Iten ¹: Status S--

System ¹: 71 System: SG Stress Problem ¹: SGB-14 Criteria: 75.00 Reference Orauing ¹: 5614-H-791/4 4-1077 Hanger ¹: 781028-R-421.01 Rated Load: 1500 Schedule Hodel ¹: 1 Code Class: 8/2 Results ASHE Category: F-A ASHE Item ¹: Status System ¹: 71 System: SG Stress Problem ¹: SGB-14 Criteria: 75.00 Reference Orauing ¹: 5614-H-791/7 4-1078 Hanger ¹: 781028-R-421-01 Rated Load: 1500 Schedule Kodel ¹: 1 Code Class: 8/2 Results AQlE Category: F-A ASHE Item ¹: Status Systen ¹: 71 System: SG Stress Problem ¹: SGB-14 Criteria: 75.00 Reference Orauing ¹: 5614-H-791/7 4.1079 Hanger ¹: 781028-H-422-01 Rated Load: 1500 Schedule Hodel ¹! 1 Code Class: 8/2 Results ASHE Category: F-A AQlE Item ¹: Status System ¹: 71 System: SG Stress Problem ¹: SGB-3 Criteria: 75.00 Reference Orauing ¹: 5614-H-785/1 4-1080 Hanger ¹: 781028.H-422-04 Rated Load: 1500 Schedule Hodel ¹l 1 Code Class: 8/2 Results ASHE Category: F.A AQlE Item ¹: Status Systen ¹: 71 Systen: SG Stress Problen ¹: SGB-3 Criteria: 75.00 Reference OraMing ¹: 5614-H-785/4 4-1081 Hanger ¹: 781028-R-422-01 Rated Load: 6000 Schedule X Hodel ¹: 3 Code Class: 8/2 Results P ASHE Category: F-A AQIE Item ¹: Status S Systen ¹: 71 System: SG Stress Problen ¹: SG8-3 Criteria: 300.00 Reference OraMing ¹: 5614-H.785/8 Status Code R ~ Failed - retest next outage 1 ~ First sanple expansion, etc..

S ~ Initial sanple 0

  • Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L "-Handstroke failure, retest next outage

P 04/18/96 Turkey Point Unit 4 Ten Year Fwx:tional Testing Inspection Plan Inspection Interval 3


"------.Plan Status-------------.

First Second Third Period Period Period Tag Outage Number 1 2 3 1 2 3 4 1 2 3 4-1082 Hanger ¹: 781028-R.422-01 Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: 8/2 Results ASHE Category: F-A . ASHE ttes ¹: Status System ¹: 71 System: SG Stress Problem ¹: SGB-3 Criteria: 300.00 Reference Drawing ¹: 5614-H-785/8 4-10&3 Hanger ¹: 781028.R-422-02 Rated Load: 1500 Schedule Hodel ¹: 1 Code Class: 8/2 Results ASHE Category: F-A ASHE Item ¹: Status System ¹: 71 System: SG Stress Problem ¹: SGB-3 Criteria: 75.00 Reference Drauing ¹: 5614-H-785/9 4-1084 Hanger ¹: 781028-R-422-02 Rated Load: 1500 Schedule Hodel ¹: 1 Code Classt 8/2 Results ASHE Category: F.A ASHE Item ¹: Status System ¹: 71 System: SG Stress Problem ¹: SGB-3 Criteria: 75.00 Reference Drawing ¹: 5614-H-785/9 Hanger ¹: PS-5 TYPE A Rated Load: 350 Schedule - X Hodel ¹: 1/4 Code Class: A/1 Results - ~

P ASHE Category: F-A AQIE Item ¹: Sta'tus --- S-----

System ¹: 47 System: CVCS Stress Problem ¹: CVCS-29 Criter Ia: 17.50 Reference Drawing ¹: 5614-H-556/5 4-1086 Hanger ¹: 4-HSHX-1 Rated Load: 50000 Schedule - - - X Hodel ¹: 35 Code Class: D/4 Results ASHE Category: N/A AQIE Item ¹: N/A Status System ¹: 72 System: HS Stress Problen ¹: HSO Criteria: 2500.00 Reference graving ¹: 5614.H-562/55 4-1087 Hanger ¹: 4.HSIN-1 Rated Load: 50000 Schedule Hodel ¹: 35 Code Class: D/4 Results ASHE Category: N/A ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drawing ¹: 5614-H-562/55 Status Code R ~ failed - retest next outage 1 ~ First sample expansion, etc..

S s Initial sample 4 ~ Rebuilt, test after 1 fuel cycle F ~ frozen, test next outage L ~ Handstroke failure, retest next outage

II

% c'e e

04/18/96 Turkey Point Unit 4 Ten Year Fwetionai Testing Inspection Plan Inspection Interval 3


Plan Status--------------

First Second Third Period Period Period Tag Outage Number 1 2 3 1 2 3 4 1 2 3 4-1088 Hanger ¹: 4-HSHX-2 Rated Load: 50000 Schedule Hodel ¹: 35 Code Class: 0/4 Results ASHE Category: N/A ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drauing ¹: 5614-N-562/56 4.1089 Hanger ¹: 4-HSHX-2 Rated Load: 50000 Schedule Model ¹: 35 Code Class: 0/4 Results ASHE Category: N/A ASHE Item ¹: N/A S'tatUS System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference DraNing ¹: 5614-N-562/56 4-1090 Hanger ¹: 4-HSHX-48 Rated Load: 50000 Schedule Hodel ¹: 35 Code Class: D/4 Results ASHE Category! N/A ASHE Item ¹: N/A StatUs System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drawing ¹: 5614-N-562/57 Hanger ¹: 4-HSHX-48 4-1091 Rated Load: 50000 Schedule Hodel ¹: 35 Code Class: D/4 Results ASHE Category: N/A ASHE Item ¹: N/A StatUs System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drauing ¹: 5614-H-562/57 4.1092 Hanger ¹: 4-HSHX-4A Rated Load: 50000 Schedule Model ¹: 35 Code Class: D/4 Results ASME Category: N/A ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 2500.00 Reference Drauing ¹: 5614-H-562/58 4.1093 Hanger ¹: 4-HSNX-7 Rated Load: 15000 Schedule Hodel ¹: 10 Code Class: 0/4 Results ASME Category: N/A ASHE Item ¹: N/A StatUs System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 750.00 Reference Drauing ¹: 5614-N-562/60 Status Code R ~ Failed - retest next outage 1 ~ First saaple expansion, etc..

S ~ Initial saaple Q ~ Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L ~ Nandstroke failure, retest next outage

04/18/96 Turkey Point Unit 4 Ten Year Fux:tional Testing Inspection Plan Inspection Interval 3


Plan Status--------------

First Second Third Period Period Period Tag Outage Nurber 1 2 3 1 2 3 4 1 2 3 4-1094 Hanger ¹: 4-HSNX.7 Rated Load: 15000 Schedule Model ¹: 10 Code Class: D/4 Results ASHE Category: N/A . ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 750.00 Reference Drauing ¹: 5614-N-562/60 4.1095 Hanger ¹: 4-HSHX-8 Rated Load: 15000 Schedule Model ¹: 10 Code Class: 0/4 Results ASHE Category: N/A ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 750.00 Reference Drauing ¹: 5614.N.562/59 4-1096 Hanger ¹: 4-HSHX-8 Rated Load: 15000 Schedule Hodel ¹: 10 Code Class: 0/4 Results ASHE Category: N/A ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 750.00 Reference Drauing ¹: 5614-N-562/59 4- '1097 Hanger ¹: 4-HSNX-10 Rated Load: 15000 Schedule X X Hodel ¹: 10 Code Class: D/4 Results F' ASHE Category: M/A ASHE Item ¹: N/A Status R-System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 750.00 Reference Drauing ¹: 5614-N-562/61 4-1098 Hanger ¹: 4-HSNX-10 Rated Load: 15000 Schedule Hodel ¹: 10 Code, Class: 0/4 Results ASHE Category: N/A ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HSO Criteria: 750.00 Reference Drawing ¹: 5614-N-562/61 4-1099 Manger ¹: 3.HSRN.4A Rated Load: 6000 Schedule Hodel ¹: 3 Code Class: D/4 Results ASHE Category: N/A ASHE Item ¹: N/A Status System ¹: 72 System: HS Stress Problem ¹: HS-1 Criteria: 300.00 Reference Drauing ¹: 5614-N-563/4 Status Code R ~ Failed - retest next outage 1 = First sample expansion, etc..

S -"Initial sample 0 = Rebuilt, test after 1 fuel cycle F ~ Frozen, test next outage L ~ Handstroke fai lure, retest next outage

t 0

04/18/96 Turkey Point Unit 4 Ten Year F~tional Testing inspect i on Plan inspection interval 3

-.--------------Plan Status--------------

First Second Third Period Period Period Tag Outage Humber 1 2 3 1 2 3 4 1 2 3 4-1100 Hanger ¹: H.S. 014 Rated Load: 350 Schedule Hodel ¹: 1/4 Code Class: A/1 Results ASHE Category: F-A . ASNE item ¹: Status System ¹: 61 System: INS Stress Problem ¹: Ie-4 Criteria: 17.50 Reference Oraging ¹: 5614.H-577/16

~

1 ~

SECTION III i1 g"

P

PAGE MO. 1 04/09/96 TURKEY POIHT UMIT 3 4 4 VISUAL

SUMMARY

REPORT S Date S S Visual T of T T Tag Serial Date Inspectfon A Fux:tional A "La A kmher Hanger Mwger kurher Model Instal'led Date T Test T Dimension T 4-1000 SR-619 184 10 05/09/84 03/17/96 P / / 20.7500 P 4-1001 SR-616 18010 1 OS/09/84 03/16/Q6 P 03/16/96 13.0625 P 4-1002 SR-655 18016 1 02/12/86 03/17/96 P / / 13.0000 P 4-1003 SR-655 1eooe 1 02/12/86 03/17/96 P / / 13.0000 P 4-1004 4-HSHX-15 316S 35 02/26/86 03/09/96 P 03/10/96 27.6250 P 4-1004 4-HSHX 'l5 3168 35 03/13/96 03/13/96 P 03/12/96 27.6250 P 4-1005 4.HSHX. 15 1206 35 12/15/73 03/10/96 P 03/11/96 27.5000 P 4-1006 4-HSHX-17 8087 35 12/15/73 03/08/96 P / / 26.6250 P 4-1007 8175-R.244.02 11928 35 05/10/84 03/08/96 P / / 26.5000 P 4-1008 4-HSHX.18 6485 35 05/05/93 03/08/96 P / / 27.5000 P 4-1009 8175-R.245-01 1228 35 05/10/84 03/09/96 P / / 27.3750 P 4-1010 4-HSHX 13 1204 35 12/15/73 03/09/96 P / / 27.7500 P 4-1011 4-HSHX.13 10573 35 05/05/93 03/09/96 P / / 2F.6250 P 4.1012 SR-638 16154 10 02/OF/91 03/17/96 P / / 20.6250 P 4.1013 PS-796 17418 3 12/15/73 03/17/96 P / / 17.6250 P 4.1014 SR-3 17177 10 07/04/91 03/16/96 P 03/16/96 21.0625 P 4.1015 SR-3 17872 10 10/18/94 03/16/96 P 03/16/96 19.9375 P 4-1016 SR 2 122 10 12/15/73 03/16/96 P 03/17/96 20.1250 P.

4.1017 SR-2 118 10 12/15/73 03/16/96 P 03/16/96 19.8750 P 4.1018 PS.726 17420 3 12/15/73 03/08/96 P / / 17.8750 P 4.1019 PS-760 17426 3 12/15/73 03/16/96 P 03/16/96 16.3125 P 4.1020 80117.R-341-03 27101 3 02/19/Sb 03/10/96 P / / 17.6870 P 4.1021 80117-R-341-03 128 3 02/21/86 03/10/96 P / / 17.1250 P 4.1022 7884-R-420.02 21381 3 02/19/86 03/09/96 P 03/10/96 P . 16.6250 P 4-1032 80116.R-005-01 3707 35 02/21/86 03/13/96 P 03/16/96 P 26.5000 P 4-1033 80116-R-005.01 7001 35 02/25/86 03/14/96 P / / 27.3750 P 4-1039 IC.13.0901 12988 35 10/19/94 03/13/96 P 03/13/96 P 25.5000 P 4-1044 4-PRH-10 3919 10 04/14/86 03/14/96 P 03/14/96 P 21.5000 P 4-1045 4-PRH-8 3905 10 04/19/86 03/14/96 P 03/15/96 P 21.2500 P 4-1046 IIIC-6-2 187 10 05/11/S4 03/15/96 P 03/15/96 P 19.2500 P 4-1047 IIIC-6-2 185 10 05/11/84 03/15/96 P 03/15/96 P 19.3750 P 4.1048 4-PRH 4 4251 10 03/10/86 03/15/96 P 03/15/96 P 20.1250 P 4-1051 4-PRH-6 11125 10 05/14/84 03I14/96 P 03/14/96 P 22.3750 P 4-1052 4-PRH-6 16251 10 05/14/84 03/14/96 P 03/14/Q6 P 21.7500 P 4-1053 4-PRH 5 11446 10 05/14/84 03/14/96 P 03/14/96 P 22.0000 P 4.1055 4-PRH-5 7782 10 05/01/93 03/14/96 P 03/14/96 P 20.8750 P 4-1057 4-RCH 5S 270M 3 05/14/84 03/14/96 P 03/14/96 P 18.5000 P 4-1063 4.RCH.36BX 2?Ã8 3 05/11/84 03/15/96 P 03/15/96 P 17.6250 P 4-1071 80116.R.006.02 16247 10 10/19/94 03/13/96 P 03/13/96 P 20.7500 P 4-1085 PS-5 TYPE A 33622 1/4 05/17/84 03/13/96 P 03/13/96 P 10.2500 P 4-1086 4-HSHX.1 12993 35 03/31/89 03/09/96 P 03/10/96 F 27.5000 P 4-1086 4-HSHX-1 12993 3S 03/12/96 03/12/96 P 03/11/96 P 27.5000 P 4.1087 4-HSHX 1 12994 35 03/31/89 03/09/96 P / / 27.6250 P 4.1088 4-HSHX 2 12995 35 03/31/89 03/09/96 P / / 26.6250 P 4-1089 4-HSHX 2 12996 35 03/31/89 03/09/96 P / / 26.7500 P 4-1090 4-HSHX 48 12997 35 03/27/89 03/09/96 P / / 27.5000 P 4-1091 4-HSHX 48 12998 35 03/27/89 03/08/96 P / / 27.0000 P 4-1092 4-HSHX 4A 12999 35 03/31/89 03/08/96 P / / 27.0000 P 4-1093 4-HSHX-7 17868 10 03/27/89 03/11/96 P / / 20.0000 P 4-1094 4-HSHX-7 17869 10 03/27/89 03/10/Q6 P / I 20.0000 P 4-1095 4-HSHX 8 17870 10 03/27/eQ 03/10/96 P / / 19.6250 P 4.1096 4-HSHX-8 17871 10 03/27/89 03/10/96 P / / 19.5000 P 4-1097, 4-HSHX 10 17852 10 05/06/93 03/10/96 P 03/11/96 P 19.7500 P

II PAGE NO. 2 04/09/96 TURKEY POINt UNIT 3 4 4 VISUAL SUHHARY REPORT S Date S S Visual T of T T Tag Serial Date InsPection A Functional A "L" A Naker Hanger Nurher Neer Hodel Installed Date T Test T Dimension T 4.1098 4.HSNX-10 17873 10 03/27/89 03/10/96 P / / 19.7500 P 4.1099 3-HSRN-4A 17423 3 12/15/73 03/11/96 P / / 16.6250 P

~

'l~ Q,,L

f PAGE HO. 1 04/09/96 TURKEY P01NT UNlT 3 8 4 FUNCTIONAL TEST DATA RESULTS TAG SERIAL RATED DATE S TENS IOH TENSlOH TENS lOH COHPRE CONPRE. COHPRE. ACCEPT TENsloN caHpRE. AccEpT klNSER NUNBER LOAD OF T TEST ¹1 TEST ¹2 TEST ¹4 TEST ¹1 TEST ¹2 TEST ¹4 CRlT. TEST ¹3 TEST ¹3 CRIT.

FUNCT. A TEST T 4-1001 18010 1500 03/16I96 P 6. 51 7.93 '.25 5.38 6.26 5.05 ?5.00 0.0080 0.0080 0.02 4-1004 3168 saooa o3/lo/96 F 405.49 1977.99 3?90.34 227.56 227.56 372.30 2500.00 0.0110 0.0080 0.02 4-1004 3168 Saaoo 03/12/96 P 107.02 137.79 121.79 108.49 122.05 110.22 2500.00 0.0040 0.0050 0.02 4-1005 1206 50000 03I11/96 P 193.00 253.43 897.94 163.33 198.66 215.25 2500.00 0.0120 0.0150 a.az 4-1014 17177 15000 03/16/96 P S6.19 97.72 ?8.84 60.88 24.34 21.ar rsa.oa 0.0030 0.0060 0.02 4-1015 17872 10000 03/16/96 P 21.75 42.99 49.07 38.3T 40.33 C0.06 TSO.QO 0.0090 0.0040 0.02 4-1016 122 15000 03/1?I96 P 24.?Z 8.61 10.30 65.81 101.54 116.46 ?50.00 0.0100 0.0090 0.02 4-1017 118 15000 03/16/96 P 12.04 29.19 29.04 42.05 52.76 49.20 750.00 0.0110 0.0080 0.02 4-1019 17426 6000 03/16/96 P 21.00 23.06 22.00 15.0'1 15.01 18.83 300.00 0.0120 0.0100 0.02 4-1022 213S1 6000 03/10/96 P 37.04 89.46 90.71 38.07 47.02 62.19 300.00 0.004Q o.aoco 0.02 4-1032 3707 50000 03/16/96 P BS.83 107.75 142.51 126.38 161.5T 1&r.oZ Zsao.oo 0.0030 0.0140 0.02 4-1039 12988 50000 03/13/96 P 62.16 69.94 55A5 184.1T 196.16 234.99 2500.00 0.0030 0.0050 0.02 4-1044 3919 15000 03/14/96 P 30.56 58.95 68.93 53.12 127.19 135.42 ?50.00 0.0120 0.0120 0.02 4-'1045 3905 1saoa o3/15/96 P 17.60 44.13 39.64 32.36 40.89 43.63 750.00 0.0100 0.0070 0.02 4-1046 18? 15000 03I15/96 P 29.23 59.39 54 '5 38.87 22.50 20.25 750 F 00 0.0100 O.OQ6Q 0.02 4-1047 185 15000 03/15/96 P 73.63 73.63 56.68 40.43 34.65 42.69 ?50.00 0.0100 O.OOTO 0.02 4-10CS 4251 15000 03/15/96 P 42.97 53.24 58.47 37.65 2?.54 33.26 ?50.00 0.0100 0.0100 0.02 4-1051 11125 15000 03/14/96 P 14.55 45.35 51.23 62.25 77.38 75.80 750.00 0.0110 0.0080 0.02 4-1052 16251 1SOOO 03/14/96 P 34.78 8.88 10.18 73.23 79.87 76.70 750.00 0.0090 0.0090 0.02 4-1053 11446 15000 03/14/96 P 47.20 4.61 6.69 77.85 139.54 172.81 750.00 0.0120 0.0100 0.02 4-1055 7782 15000 03/14/96 P 28.93 34.51 35.25 24.40 36.87 36.79 750.00 Q.0110 0.0090 Q.QZ 4-1057 27080 6000 03/1C/96 P 22.22 29.36 52.28 18.26 51.45 65.33 300.00 0.0020 0.0030 0.02 4-1063 27098 6000 03/15/96 P 20 '6 28.T4 29.09 16.65 23.53 23.59 300.00 0.0020 0.0003 0.02 4-1071 16247 1500Q 03I13/96 P 35.TZ 51.11 53.?7 52.20 69.89 61.'la ?50.00 0.0120 0.0100 0.02 4-1085 33622 350 03/13/96 P 4.03 4.77 3.92 2 i?7 2.93 3.53 17.50 0.0110 0.0130 0.02 4-1086 12993 50000 03I10/96 F 892.85 2270.54 2?51 21 1167 19 2267.69 2428.1'1 2500.00 0.0020 0.01?Q 0.02 4-1086 12993 50000 03/11/96 P as.es 107.02 89.95 96.52 127.92 85.16 25oo.aa a.oosa 0.0080 0.02 4-1097 17852 15000 03/11/96 P 50.87 13.40 21.7? 110.26 116.8& 118.1T 750.00 0.0030 0.0090 0.02

SZCXXCN V skY

'I

, gl

PAGE NQ. 1 04/09/96 Turkey Point unit 3 4 4 Activity Location Log U Tag Serial Date Date Date N Nunber Nmher Insta l l ed of of l Visual Fwx:tional T Exam Test 4 4-1000 2959 12/15/73 05/09/84 P 04/13/84 4 4-1000 1S4 05/09/84 05/09/84 P 04/18/S4 4 4.1000 184 05/09/84 02/14/86 P 02/12/86 4 4-1000 184 05/09/84 06/07/87 P / /

4 4-1000 184 . 05/09/84 10/19/SS P / I 4 4-1000 184 05/09/84 04/15/89 P / /

4 4-1000 184 05/09/84 01/31/91 P 02/O'I/91 4 4.1000 184 05/09/84 05/Q1/93 P / /

4 4-1000 184 05/09/84 10/16/94 P / /

4 4.1000 184 05/09/84 03/17/96 P 4 4-1001 16139 12/15/73 05/09/84 P 04/14/84 4 4-1001 18010 05/09/84 05/22/84 P 04/14/84 4 4-1001 18010 05/09/84 02/14/86 P 02/13/86 4 4-1001 18010 05/09/84 06/06/87 P I I 4 4-1001 18010 05/09/84 10/18/88 P 10/18/88 4 4-1001 18010 05/09/84 04/15/89 P / /

4 4-1001 18010 05/09/84 02I01/91 P / /

4 4-1001 18010 05/09/84 05/01/93 P / /

4 4-1001 18010 05/09/84 10/'16/94 P / /

4 4-1001 18010 05/09/84 03/16/96 P 03/16/96 4 4.1002 23230 12/15/73 05/09/84 P 04/05/84 4 4-1002 23230 12/15/?3 02/12/86 P 02/19/86 4 4 1002 18016 02/12/86 02/18/86 P 02/18/86 4 4-1002 18016 02/12/86 06/05/87 P / /

4 4-1002 18016 02/12/86 10/18/88 P / I 4 4-1002 18016 02/12/86 04/15/89 P / I 4 4-1002 18016 02/12/86 01/31/91 P 02/04/91 4 4-1002 18016 02/12/86 05/01/93 P I I 4 4-1002 18016 02/12/86 10I16I94 P / /

4 4-1002 18016 02/12/86 03/17/9& P / /

4 4-1003 24?35 12/15/?3 05/09/84 P 04/12/84 4 4.10Q3 24735 12/15/73 02/12/86 P 02/19/86 4 4 1003 18008 02/12/86 02/19/86 P 02/18/86 4 4.1003 18008 02/12/86 06/05/87 P / /

4 4-1003 '18008 02/12/86 10/18/88 P 10/18/88 4 4.1003 18008 02/12/86 04/15/89 P / /

4 4-1003 18008 02/12/86 01/31/91 P I /

4 4 1003 1800S 02/12/26 05/01/93 P / /

4 4.1003 18008 02/12/86 10/16/94 P / /

4 4.1003 18008 02/12/86 03/17/96 P / /

4 4.1004 1282 12/15/73 05/10/84 P 04/11/84 4 4.1004 4590 05/10/84 05/10/84 P 04/11/84 4 4.1004 4590 05/10/84 Ol/31/86 P 02/12/86 4 4.1004 3168 02/26/86 02/22/86 P 02/20/86 4 4.1004 3168 02/26/86 06/06/87 P / /

4 4.1004 3168 02/26/86 10/08/88 P / /

pf PAGE MO. 2 04/09/96 Turkey Point Unit 3 4 4 Act(vity Location Log U Tag Serial Oats Oats Oate K Muser Mumber tnstalled of of I Visual Functional T Exen Test 4 4.1004 316S 02/26/86 04/14/89 P / /

4 4.1004 3168 02/26/86 01/18/91 P 01/24/91 4 4.1004 3168 02/26/86 04/21/93 P / /

4 4.1004 3168 02/26/86 10/11/94 P / /

4 4.1004 3168 02/26/86 03/09/96 P 03/10/96 4 4.1004 3168 03/'13/96 03/13/96 P 03/12/96 4 4.1005 1206 12/15/?3 05/10/84 P 04/11/84 4 4.1005 1206 12/15/73 02/14/86 P 02/06/86 4 4-1005 1206 12/15/73 06/06/87 P / /

4 4-1005 1206 12/15/73 10/06/SS P / /

4 4-1005 1206 12/1S/?3 04/14/89 P / /

4 4-1005 1206 12/15/73 01/18/91 P / /

4 4.1005 1206 12/15/73 04/21/93 P / /

4 4-1005 '1206 12/15/73 10/11/94 P / /

4 4-1005 1206 12/15/73 03/10/96 P 03/11/96 4 4.1006 8087 12/15/73 05/10/84 P 04/11/84 4 4-1006 8087 12/15/73 01/31/86 P 02/07/86 4 4-1006 8087 12/15/73 06/06/87 / /

4 4.1006 8087 12/15/73 10/06/88 P / /

4 4-1006 8087 12/15/73 04/14/89 P / /

4 4-1006 8087 12I15/73 01/18/91 P / /

4 4-1006 8087 12/15/73 04/21/93 P 05/03/93 4 4.1006 8087 12/15/73 10/11/94 P I I 4 4-1006 8087 12/15/?3 03/08/96 P / /

4 4-1007 10035 '12/15/73 05/10/84 P 04/11/84 4 4-1007 11928 05/10/84 05/10/S4 P 04/26/84 4 4-1007 11928 05/10/84 02/22/86 P 02/06/86 4 4.1007 11928 05/10/84 06/06/87 P /

4 4-1007 11928 05/10/84 10/08/8S P 10/14/88 4 4.1007 11928 05/10/84 04/14/89 P / /

4 4-1007 11928 05/10/S4 01/18/91 P / /

4 4-1007 11928 05/10/84 04/21/93 P / /

4 4.1007 11928 05/10/84 10/11/94 P / /

4 4.1007 11928 05/10/84 03/08/96 P / /

4 4-1008 1205 12/15/?3 05/11/84 P 04/11/84 4 4-1008 1205 12/15/?3 02/22/86 P 02/07/86 4 4-'1008 1205 12/15/73 06/06/87 P / /

4 4-100S 1205 12/15/73 10/06/88 P / /

4 4.1008 1205 12/15/?3 04/14/89 P / /

4 4-1008 1205 12/15/73 01/19/91 P / /

4 4.1008 1205 12/15/?3 04/21/93 P 05/03/93 4 4-1008 6485 05/05/93 05/05/93 P 10/10/92 4 4-1008 6485 05/05/93 10I11I94 P / /

4 4-1008 6485 05/05/93 03/08/96 P / /

4 4.1009 10034 12/15/?3 05/10/84 P 04I11I84 4 4.1009 1228 05/10/84 05/10/S4 P 04/20/84

yl PAGE NO.

04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag seri ~ l Da'te Date Date S N Nurher Naador installed of of T I Visual Fux:ti one l A T Exam Test T 4 4.1009 1228 05/10/84 02/14/86 02/06/86 4 4-1009 1228 05/10/84 06/06/87 / /

4 4-1009 1228 05/10/84 10/06/88 / /

4 4-1009 1228 05/10/84 04/14/89 / /

4 4-1009 1228 05/10/S4 01/18/91 01/22/91 4 4.1009 1228 05/10/84 04/21/93 / /

4 4-1009 1228 05/10/84 10/12/94 / /

4 4.1009 1228 05/10/84 03/09/96 / /

4 4-1010 1204 12/15/73 05/11/84 04/11/84 4 4.1010 1204 12/15/73 01/31/86 02/06/86 "4 4.1010 1204 12/15/73 06/07/87 / /

4 4.1010 1204 12/15/73 10/06/88 / /

4 4-1010 1204 12/15/73 04/14/89 / /

4 4-1010 1204 12/15/73 01/18/91 / /

4 4-1010 1204 12/15/73 04/21/93 / /

4 4-1010 1204 12/15/73 10/12/94 10/16/94 4 4-1010 1204 12/15/73 03/09/96 / /

4 4.1011 1281 12/15/73 05/11/84 04/11/84 4 4-1011 1281 12/15/73 02/14/S6 02/06/S6 4 4.1011 1281 12/15/73 06/06/er / /

4 4.1011 1281 12/15/73 10/06/88 / /

4 4-1011 1281 12/15/73 04/14/89 / /

4 4-1011 1281 12/15/73 01/19/91 / /

4 4.1011 1281 12/15/73 04/21/93 05/03/93 4 4.1011 10573 05/05/93 05/05/93 10/15/92 4 4-1011 10573 05/05/93 10/12/94 10/16/94 4 4-1011 10573 05/05/93 03/09/96 / /

4 4.1012 121 12/15/73 05/10/S4 04/14/84 4 4-1012 10172 05/10/84 05/10/84 04/23/84 4 4-1012 10172 05/10/84 02/12/86 02/08/86 4 4-1012 10172 05/10/84 06/07/87 / /

4 4-1012 10172 05/10/84 10/20/BS / /

4 4.1012 10172 05/10/84 04/15/89 / /

4 4.1012 10172 05/10/84 02/04/91 02/05/91 4 4-1012 16154 02/07/91 02/07/91 02/07/91 4 4.1012 16154 02/07/91 04/26/93 / /

4 4-1012 16154 02/07/91 10/16/94 / /

4 4-1012 16154 02/07/91 03/17/96 / /

4 4-1013 1r41e 12/15/73 05/10/84 P 04/14/S4 4 4-1013 17418 12/15/73 02/12/86 P 02/07/86 4 4.1013 17418 12/15/73 06/07/87 P / /

4 4.1013 1741e 12/15/73 10/25/88 / /

4 4-1013 17418 12/15/73 04/15/89 / /

4 4-1013 17418 12/15/73 02/04/91 02/04/91 4 4-1013 17418 12/15/73 04/26/93 / /

4 4.1013 17418 12/15/73 10/16/94 / /

t h

gi

PACE KO.

04/09/96 Turkey Point Unit 3 8 4 Activity Location Log U Tag Serial Date Date Date S K Kumber Kumber installed of of T i Visual Fwmtional A T Exam Test T 4 4-1013 17418 12/15/73 03/17/96 P / /

4 4-1014 116 12/15/73 05/10/84 P 04/14/84 4 4-1014 116 12/15/73 02/12/86 P 02/08/86 4 4-1014 116 12/15/73 o6/or/Br P / /

4 4-1014 116 12/15/73 10/20/88 P / /

4 4.1014 116 12/15/73 04/15/89 P / /

4 4-1014 116 12/15/73 02/04/91 P 02/05/91 4 4.1014 17177 07/04/91 07/04/91 P 02/07/91 4 4.1014 17177 07/04/91 04/26/93 P / /

4 4-1014 17177 07/04/91 10/18/94 P / /

4 4-1014 17177 07/04/91 03/16/96 P 03/16/96 4 4.1015 117 12/15/73 05/10/84 P 04/13/84 4 4-1015 117 12/15/73 02/14/86 P 02/08/86 4 4-1015 117 12/15/73 06/07/87 P / /

4 4.1015 117 12/15/73 10/20/BS P / /

4 4-1015 117 12/15/73 04/15/89 P / /

4 4.1015 117 12/15/73 02/07/91 P / /

4 4.1015 117 12/15/73 04/26/93 P / /

4 4.1015 117 12/15/73 10/12/94 P / /

4 4.1015 17872 10/18/94 10/18/94 P 05/06/93 4 4.1015 17872 10/18/94 03/16/96 P 03/16/96 4 4-1016 122 12/15/73 05/09/84 P 04/13/84 4 4-1016 122 12/15/73 02/03/S6 P 02/11/86 4 4-1016 122 12/15/73 06/07/87 P / /

4 4 1016 122 12/15/73 10/20/SS P 10/20/88 4 4-1016 122 12/15/73 04/15/89 P / /

4 4-1016 122 12/15/73 02/07/91 P / /

4 4-1016 122 12/15/73 04/26/93 P / /

4 4-1016 122 12/15/73 10/16/94 P / /

4 4-1016 122 12/15/73 03/16/96 P 03/17/96 4 4 1017 118 12/15/73 05/09/84 P 04/14/84 4 4-1017 118 12/15/73 02/12/S6 P 02/11/86 4 4.1017 118 12/15/73 06/07/87 P / /

4 4.1017 118 12/15/73 10/20/88 P / /

4 4-1017 118 12/15/73 04/15/89 P / /

4 4-1017 118 12/15/73 02/07/91 P / /

4 4-1017 118 12/15/73 04/26/93 P / /

4 4-1017 118 12/15/73 10/16/94 P 10/17/94 4 4.1017 118 12/15/73 10/18/94 P 10/18/94 4 4-1017 118 12/15/73 03/16/96 P 03/16/96 4 4.1018 17420 12/15/73 05/10/84 P 04/14/84 4 4-1018 17420 12/15/73 02/06/86 P 02/07/86 4 4-1018 17420 12/15/73 06/07/87 P / /

4 4.1018 17420 12/15/73 10/20/88 P / /

4 4.1018 17420 12/15/73 04/15/89 P / /

4 4.1018 17420 12/15/73 02/07/91 P / /

H PAGE NO.

04/09/96 Turkey Point Unit 3 S 4 Activity Location Log U Tag Serial Oate Oate Oate N Number Number lnstal led of of l Visual Fmctional T Exam Test 4 4-1018 17420 12/15/73 04/26/93 P / /

4 4-1018 17420 12/15/73

  • 10/16/94 P 10/16/94 4 4.1018 17420 12/15/73 03/08/96 P / /

4 4-1019 17426 . 12/15/73 05/10/84 P 04/14/84 4 4.1019 17426 12/15/73 02/18/S6 P 02/14/86 4 4-1019 17426 12/15/73 06/07/87 P / /

4 4.1019 17426 12/15/73 10/24/88 P / /

4 4-1019 17426 12/15/73 04/15/89 P / /

4 4-1019 17426 12/15/73 02/07/91 P / /

4 4-1019 17426 12/15/73 04/26/93 P / /

4 4-1019 17426 12/15/73 10/16/94 P / /

4 4-1019 17426 12/15/73 03/16/96 P 03/16/96 4 4-1020 17119 12/15/73 05/10/84 P 04/05/84 4 4-1020 17119 12/15/73 02/12/86 P 02/19/86 4 4.1020 27101 02/19/86 02/19/86 P 02/18/86 4 4-1020 27101 02/19/86 06/07/87 P / /

4 4-1020 27101 02/19/86 10/07/88 P 10/10/88 4 4-1020 27101 02/19/86 04/14/89 P / /

4 4.1020 27101 02/19/86 01/16/91 P / /

4 4-1020 27101 02/19/86 04/26/93 P 05/02/93 4 4-1020 27101 02/19/86 10/12/94 P / /

4 4.1020 27101 02/19/86 03/10/96 P / /

4 4.1021 4388 12/15/73 05/10/84 P 04/11/84 4 4-1021 438S 12/15/73 02/12/86 P 02/19/86 4 4-1021 128 02/21/86 02/19/86 P 02/18/86 4 4.1021 128 02/21/86 06/07/87 P. / /

4 4-1021 128 02/21/86 10/08/88 P / /

4 4.1021 128 02/21/86 04/14/89 P / /

4 4-1021 128 02/21/86 01/16/91 P / /

4 4-1021 128 02/21/86 04/26/93 P / /

4 4.1021 128 02/21/86 10/12/94 P 10/16/94 4 4-1021 128 02/21/86 03/10/96 P / /

4 4-1022 19723 12/15/73 05/10/84 P 04/12/84 4 4-1022 19723 12/15/73 02/01/86 P / /

4 4.1022 21381 02/19/86 02/19/86 P 02/18/86 4 4-1022 21381 02/19/86 06/07/87 P / /

4 4-1022 21381 02/19/86 10/07/88 P 10/10/88 4 4-1022 21381 02/19/86 04/14/S9 P / /

4 4.1022 21381 02/19/86 01/22/91 P / /

4 4-1022 21381 02/19/86 04/22/93 P 05/02/93 4 4.1022 213S1 02/19/86 10/12/94 P / /

4 4.1022 213S1 02/19/86 03/09/96 P 03/10/96 4 4.1023 29449 12/15/73 05/11/S4 P 04/07/S4 4 4-1023 33630 05/11/84 05/11/84 P 04/30/84 4 4-1023 33630 05/11/84 02/13/86 P 01/31/86 4 4-1023 33630 05/11/84 06/04/87 P / /

n x'I

PAGE NO.

04/09/96 Turkey Point Unit 3 44 Activity Location Log U Tsg Serial Oste Oste Oste N Nunber Nanher Instal Led of of I VISUBI Fmctionsl T Exen Test 4 4-1023 33630 05/11/84 10/14/88 / /

4 4-1023 33630 05/11/84 04/15/89 / /

4 4.1023 33630 05/11/84 12/19/90 / /

4 4.1024 29446, 12/15/73 05/10/84 04/07/84 4 4-1024 29446 12/15/73 02/05/86 02/01/86 4 4-1024 29446 12/15/73 06/05/87 / /

4 4.1024 29446 12/15/73 10/15/88 / /

4 4-1024 29446 12/15/73 04/15/89 / /

4 4-1024 29446 12/15/73 12/19/90 / /

4 4.1025 16729 12/15/73 05/13/84 04/07/S4 4 4-1025 11988 05/13/84 05/13/84 04/24/84 4 4-1025 11988 05/13/84 02/04/86 02/01/86 4 4-1025 11988 05/13/84 06/05/87 / /

4 4.1025 11988 05/13/84 10/14/88 / /

4 4 1025 11988 05/13/84 04/16/89 / /

4 4-1025 11988 05/13/84 12/19/90 / /

4 4.1026 29445 12/15/73 05/11/84 04/07/84 4 4-1026 33629 05/11/84 05/11/84 04/30/84 4 4-1026 33629 05/11/84 02/04/86 02/01/86 4 4.1026 33629 05/11/84 06/04/87 / /

4 4-1026 33629 05/11/S4 10/15/88 / /

4 4.1026 33629 05/11/84 04/15/89 / /

4 4-1026 33629 05/11/84 12/20/90 / /

4 4.1027 16732 12/15/73 05/12/84 04/09/84 4 4-1027 16726 05/12/84 05/12/84 04/2C/84 C 4.1027 16726 05/12/S4 02/04/86 01/31/86 4 4-1027 16726 05/12/S4 06/05/87 / /

4 4.1027 16726 05/12/84 10/15/SS / /

4 4-1027 16726 05/12/84 04/15/89 / /

4 4.1027 16726 05/12/84 12/20/90 / /

4 4.1028 29453 12/15/73 05/11/84 04/06/84 4 4-1028 29488 05/11/84 05/11/84 04/28/84 4 4.1028 29CSS 05/11/84 01/30/86 02/01/86 4 4-1028 35899 02/22/86 02/12/86 02/10/86 4 4.1028 35899 02/22/86 06/04/87 / /

4 4.1028 35899 02/22/86 10/10/88 10/17/8S 4 4-1028 35899 02/22/86 04/16/89 / /

4 4-1028 35899 02/22/86 12/20/90 / /

4 4.1029 29447 12/15/73 05/10/84 04/07/84 4 4-1029 29447 12/15/73 02/05/86 02/01/86 4 4-1029 29447 12/15/73 06/05/87 / /

4 4.1029 12/15/73 10/04/88 / /

4 4-1029 29447 12/15/73 04/15/89 / /

4 4.1029 29447 12/15/73 12/20/90 / /

4 4-1030 29C50 12/15/73 05/11/84 04/07/84 4 4.1030 29582 05/11/84 05/1'I/S4 04/28/84

~ I

($

PAGE NO.

04/09/96 Turkey Point Unit 3 f 4 Activity Location Log U Tag Serial Oate Date Oate N Nurber Niter installed of of l Visual F~t iona l T Exan Test 4 4.1030 29582 05/11/84 02/04/86 01/31/86 4 4-1030 29582 05/11/84 06/04/87 / /

4 4-1030 29582 05/11/84 10/15/88 / /

4 4-1030 29582 . 05/11/84 04/15/89 / /

4 4-1030 29582 05/11/84 12/20/90 / /

4 4-1031 11994 12/15/73 05/11/84 04/05/84 4 4-1031 11990 05/11/84 05/11/S4 04/24/84 4 4-1031 11990 05/11/84 01/30/86 02/01/86 4 4-1031 11990 05/11/S4 06/04/87 / /

4 4-1031 11990 05/11/84 10/10/88 10/18/88 4 4-1031 11990 05/11/84 04/15/89 / /

4 4-1031 11990 05/11/84 12/20/90 / /

4 4-1032 7000 12/15/73 05/12/84 04/04/84 4 4-1032 7000 12/15/73 02/07/86 02/11/86 4 4-1032 3707 02/21/86 02/18/86 02/17/86 4 4-1032 3707 02/21/86 06/05/87 / /

4 4-1032 3707 02/21/86 10/11/88 / /

4 4-1032 3707 02/21/86 04/15/89 / /

4 4-1032 3707 02/21/86 02/02/91 / /

4 4-1032 3707 02/21/86 04/28/93 / /

4 4-1032 3707 02/21/86 10/14/94 / /

4 4-1032 3707 02/21/86 03/13/96 03/16/96 4 4-1033 6996 12/15/73 05/11/84 04/10/84 4 4-1033 6996 12/15/73 02/07/S6 02/13/86 4 4-1033 7001 02/25/86 02/22/S6 '2/12/86 4 4-1033 7001 02/25/86 06/05/87 / /

4 4-1033 7001 02/25/86 10/11/88 / /

4 4-1033 7001 02/25/86 04/15/89 / /

4 4-1033 7001 02/25/86 02/02/91 / /

4 4-'1033 7001 02/25/86 04/28/93 / /

4 4-1033 7001 02/25/86 10/14/94 10/18/94 4 4.1033 7001 02/25/86 03/14/96 / /

4 4-1034 104 12/15/73 05/11/84 04/06/84 4 4-1034 104 12/15/73 03/07/86 02/19/86 4 4-1034 104 12/15/73 06/04/87 / /

4 4-1034 104 12/15/73 '10/11/88 10/20/88 4 4-1034 10174 04/01/89 04/15/89 / /

4 4-1034 10174 04/01/89 04/19/89 / /

4 4-1034 10174 04/01/89 01/30/91 01/31/91 P 4 4-1034 16243 06/27/91 06/27/91 01/31/91 P 4 4.1034 16243 06/27/91 04/29/93 / /

4 4-1034 16243 06/27/91 10/15/94 / /

4 4-1035 120 12/15/73 05/11/S4 04/06/84 4 4-1035 12395 05/11/84, 05/11/84 04/20/84 4 4.1035 12395 05/11/S4 02/01/S6 02/21/86 4 4-1035 182 03/10/86 03/10/86 01/31/86

t il

PAGE NO.

04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Serial Oate Date Oate N Number Neer Ins'Called of of I Visual Fux:t I one I T Exam Test 4 4-1035 182 03/10/86 06/04/87 P / /

4 4.1035 182 03/10/86 10/11/88 P / /

4 4.1035 182 03/10/86 04/15/89 P / /

4 4.1035 182 03/10/86 02/02/91 P / /

4 4-1035 182 03/10/86 04/28/93 P 05/01/93 4 4-1035 11439 05/10/93 05/10/93 P 05/01/93 4 4-1035 11439 05/10/93 10/15/94 P 10/18/94 4 4-1036 105 12/15/73 05/14/84 P 04/07/84 4 4.1036 11461 05/14/84 05/14/84 P 04/20/84 4 4-1036 11461 05/14/84 02/08/86 P 02/05/86 4 4-1036 11461 05/14/84 06/04/87 P / /

4 4-1036 11461 05/14/84 10/12/88 P / /

4 4-1036 11461 05/14/84 04/15/89 P / /

4 4-1036 11461 05/14/84 02/02/91 P / /

4 4-1036 11461 05/14/84 04/28/93 P 05/03/93 4 4-1036 11461 05/14/84 10/15/94 P / /

4 4-1037 00001 12/15/73 05/13/84 P 04/14/84 4 4-1037 11930 05/13/84 05/13/84 P 04/26/84 4 4-1037 11930 05/13/84 02/20/86 P 02/11/86 4 4-1037 11930 05/13/84 06/04/87 P / /

4 4-1037 11930 05/13/84 10/12/88 P / /

4 4-1037 11930 05/13/84 04/15/89 P / /

4 4.1037 11930 05/13/84 02/02/91 P / /

4 C-1037 11930 05/13/84 04/28/93 P 05/01/93 4 4-1037 ,11930 05/13/84 10/15/94 P / /

4 C-103S 29452 12/15/73 05/12/S4 P 04/07/S4 F 4 4-1038 29497 05/12/84 05/12/84 P 04/29/84 P 4 4.1038 29497 05/12/84 02/15/86 P 02/13/86 P 4 4-1038 29497 05/12/84 06/04/87 P / /

4 4-1038 29497 05/12/84 10/21/88 P / /

4 4-1038 29497 05/12/84 04/15/89 P / /

4 4-103S 29497 05/12/84 01/30/91 P 02/04/91 4 4.1038 29497 05/12/84 04/27/93 P / /

4 4-1038 29497 05/12/84 10/15/94 P / /

4 4-1039 00002 12/15/73 05/12/84 P 05/07/84 4 4-1039 4589 05/12/84 05/12/S4 P 04/19/84 4 4-1039 4589 05/12/S4 03/04/86 P 02/12/86 4 4-1039 4589 05/12/84 06/05/87 P / /

4 4-1039 4589 05/12/84 10/25/88 P / /

4 4.1039 4589 05/12/84 04/15/89 P / /

4 4-1039 CSS9 05/12/84 02/12/91 P / /

4 4-1039 4589 05/12/84 04/28/93 P 05/01/93 F 4 4-1039 699S 05/04/93 05/04/93 P 05/01/93 P 4 4-1039 6998 05/04/93 10/14/94 P 10/18/94 F 4 4-1039 12988 10/19/94 10/29/94 P 10/19/94 P 4 4-1039 12988 'IO/19/94 03/13/96 P 03/13/96 .P

E1 ilia PAGE NO.

04/09/96 Turkey Point Unit 3 t 4 Activity Location Log U Tag Serial Date Date Date N Nurser Naker Installed of of I Visual F~tional T Exam Test C C-1040 102 12/15/73 05/10/84 04/07/84 4 4-1040 21380 05/10/84 05/10/84 04/27/84 4 4-1040 21380 05/10/S4 01/30/86 01/31/86 4 4-1040 17419 02/22/86 02/20/86 02/13/86 4 4-1040 17419 02/22/86 06/05/S7 / /

4 4-1040 17419 02/22/86 10/21/88 / /

4 4-1040 17419 02/22/86 04/15/89 / /

4 4-1040 17419 02/22/86 01/30/91 / /

4 4-1040 17419 02/22/S6 04/27/93 / /

4 4-'1040 17419 02/22/86 10/15/94 / /

4 4-1041 115 12/15/73 05/11/84 04/07/84 4 4-1041 19721 05/11/84 05/11/84 04/27/84 4 4-1041 19721 05/11/84 02/15/86 02/05/86 4 4-1041 19721 05/11/84 06/05/87 / /

4 4-1041 19721 05/11/84 10/26/88 / /

4 4-1041 19721 05/11/84 04/16/89 / /

4 4-1041 19721 05/11/84 02/01/91 / /

C 4-1041 19721 05/11/84 04/29/93 / /

4 4-1041 19721 05/11/84 10/13/94 10/18/94 4 4-1042 132 12/15/73 05/10/84 04/06/S4 4 4.1042 19727 05/10/84 05/10/84 05/07/84 4 4-1042 19727 05/10/84 02/08/86 02/05/86 4 4.1042 19727 05/10/S4 06/04/87 / /

4 4.1042 19727 05/10/84 10/21/88 10/28/88 4 4-1042 19727 05/10/S4 04/16/89 / /

4 4.1042 19727 05/10/84 02/01/91 / /

4 4-1042 19727 05/10/84 04/27/93 / /

4 4.1042 19727 05/10/84 10/13/94 / /

4 4-1043 104 12/15/73 05/10/84 04/07/84 4 4.1043 27099 05/10/84 05/10/S4 04/26/84 4 4-1043 27099 05/10/84 02/22/86 02/20/86 4 4-1043 27099 05/10/84 06/04/87 / /

4 4-1043 27099 05/10/84 10/21/SS 10/28/88 4 4-1043 27099 05/10/84 04/16/89 / /

4 4-1043 27099 05/10/84 02/01/91 / /

4 4.1043 27099 05/10/84 04/27/93 / /

4 4-1043 27099 05/10/84 10/13/94 / /

C 4-1044 116 12/15/73 05/14/84 04/13/84 4 4.1044 11438 05/14/84 05/14/84 04/20/84 4 4.1044 11438 05/14/84 02/11/86 02/15/86 4 4-1044 3919 04/14/86 06/05/87 / /

4 4-1044 3919 04/14/86 10/28/SS / /

4 4-1044 3919 04/14/86 04/16/89 / /

4 4-1044 3919 04/14/86 02/13/91 / /

4 4-1044 3919 04/14/86 04/30/93 / /

4 4-1044 3919 04/14/86 10/15/94 10/18/94

II vs@

PAGE NO. 10 04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Serial Date Oate Oate S N Nunber Ntaher Insta l led of of T I Visual fmctional A T Exam Test T 4 4-1044 3919 04/14/86 10/20/94 P 10/19/94 4 4-1044 3919 04/14/86 03/14/96 P 03/14/96 4 4-1045 121 12/15/73 05/14/84 P 04/12/S4 4 4-1045 10175 05/14/S4 05/14/84 P 04/23/84 4 4-1045 10175 05/14/S4 02/11/86 P 02/14/86 4 4-1045 3905 04/19/86 04/19/86 P 02/18/S6 4 4-1045 3905 04/19/86 06/05/87 P / /

4 4-1045 3905 04/19/86 10/28/88 P 10/31/88 4 4-1045 3905 04/19/86 04/09/89 P / /

4 4-1045 3905 04/19/86 02/22/91 P / /

4 C-1045 3905 04/19/86 04/30/93 P / /

4 4-1045 3905 04/19/86 10/15/94 P / /

4 4-1045 3905 04/19/86 03/14/96 P 03/15/96 C C-1046 101 12/15/73 05/11/84 P 04/06/84 4 4-1046 187 05/11/84 05/11/84 P 04/18/84 4 4-1046 187 05/11/84 02/20/86 P 02/15/86 4 4-1046 187 05/11/84 06/05/87 P / /

4 4-1046 187 05/11/84 10/17/88 P / /

4 4-1046 187 05/11/S4 04/14/89 P / /

4 4-1046 187 05/11/S4 02/09/91 P / /

4 4-1046 187 05/11/84 04/29/93 P / /

4 4-1046 187 05/11/84 10/19/94 P 10/19/94 4 4-1046 187 05/11/84 10/15/94 P 10/18/94 4 4-1046 187 05/11/84 03/15/96 P 03/15/96 4 4-1047 102 12/15/73 05/11/84 P 04/12/84 4 4-1047 185 05/11/84 05/11/84 P. 04/18/84 4 4-1047 185 05/11/S4 02/20/86 P 02/15/86 4 4-1047 185 05/11/S4 06/05/87 P / /

4 4-1047 185 05/11/84 10/17/SS P / /

4 4-1047 185 05/11/84 04/15/89 P / /

4 C-1047 185 05/11/84 02/09/91 P / /

4 4-1047 185 05/11/84 04/29/93 P 05/01/93 C 4-1047 185 05/11/84 10/15/94 P / /

4 4-1047 185 05/11/84 03/15/96 P 03/15/96 4 4-1048 117 12/15/73 05/10/84 P 04/06/84 4 4-1048 182 05/10/84 05/10/84 P 04/18/84 4 4-104S 182 05/10/84 01/30/S6 P 01/31/86 4 4-1048 4251 03/10/86 03/10/86 P 02/08/86 4 4-1048 4251 03/10/86 06/05/87 P / /

4 4-1048 4251 03/10/86 10/17/88 P / /

4 4-1048 4251 03/10/86 04/15/89 P / /

4 4-1048 4251 03/10/86 02/09/91 P / /

4 4-1048 4251 03/10/86 04/29/93 P / /

4 4-1048 4251 03/10/86 10/19/94 P 10/18/94 4 4-1048 4251 03/10/86 10/15/94 P 10/18/94 4 4.1048 4251 03/10/86 03/15/96 P 03/15/96

I' PAGE NO.

04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Serial Date Date Date N Nunber Naker instal led of of I Visual F~tional T Exam Test 4 4-1049 104-01 12/15/73 05/10/84 04/12/84 4 4.1049 10169 05/10/84 05/10/84 04/23/84 4 4-1049 10169 05/10/84 02/14/S6 02/12/S6 4 4-1049 10169 05/10/84 06/05/87 / /

4 4-1049 10169 05/10/84 10/17/88 / /

4 4-'1049 10169 05/10/84 04/15/89 / /

4 4-1049 10169 05/10/84 02/02/91 02/05/91 4 4-1049 10169 05/10/84 04/29/93 / /

C 4-1049 10169 05/10/84 10/15/94 / /

4 4-1050 108 12/15/73 05/11/84 04/12/84 4 4-1050 12374 05/11/84 05/11/84 04/20/84 4 4-1050 12374 05/11/84 02/14/86 02/12/86 4 4-1050 12374 05/11/84 O6/OS/87 / /

4 4-1050 12374 05/11/84 10/17/88 / /

4 4-1050 12374 05/11/84 04/15/89 / /

4 4.1050 12374 05/11/84 02/02/91 02/07/91 4 4-1050 12374 05/11/84 04/29/93 / /

4 4-1050 12374 05/11/84 10/15/94 / /

4 4-1051 105 12/15/73 05/14/84 04/13/84 4 4.1051 11125 05/14/84 05/14/84 04/23/84 4 4-1051 11125 05/14/84 02/11/86 02/17/86 4 4.1051 11125 05/14/84 O6/OS/87 / /

4 4.1051 11125 05/14/84 10/28/88 / /

4 4.1051 11125 05/14/84 04/09/89 / ./

4 4-1051 11125 05/14/84 02/22/91 / /

4 4-1051 11125 05/14/S4 04/30/93 / /

4 4.1051 11125 05/14/84 10/20/94 10/18/94 4 4.1051 11125 05/14/84 10/15/94 10/18/94 4 4.1051 11125 05/1C/84 03/14/96 03/14/96 4 4-1052 111 12/15/73 05/14/84 04/12/84 4 4-1052 16251 05/14/84 05/14/84 04/25/84 4 4-1052 16251 05/14/84 02/11/86 02/14/86 4 4-1052 16251 05/14/84 06/05/87 / /

4 4-1052 16251 05/14/84 10/28/88 / /

4 4-1052 16251 05/14/84 04/16/89 / /

4 4-1052 16251 05/14/84 02/22/91 / /

4 4.1052 16251 05/14/84 04/27/93 05/01/93 4 4.1052 16251 05/14/84 10/15/94 / /

4 4-1052 16251 05/14/84 03/14/96 03/14/96 4 4-1053 113 12/15/73 05/14/84 04/12/84 4 4-1053 11446 05/14/84 05/14/84 04/23/84 4 4-1053 11446 05/14/84 02/11/86 02/15/S6 4 4-1053 11446 05/14/84 06/05/87 / /

4 4-1053 11446 05/14/84 10/28/88 10/31/88 4 4-1053 11446 05/14/84 04/09/89 / /

4 4-1053 11446 05/14/84 01/14/91 / /

'D r A'p

PAGE NO. 12 04/09/96 Turkey Point Unit 3 4 4 Activity Location log U Tag Serial Date Date Oate N Number Nudger Instal led of of Visual Fmct i one l T Exam Test 4 4-1053 11446 05/14/84 04/27/93 P I /

4 4-1053 11446 05/14/84 10/15/94 P / /

4 4.1053 11446 05/14/84 03/14/96 P 03/14/96 P 4 4-1054 125 12/15/73 05/14/84 P 04/12/S4 P 4 4-1054 16253 05/14/84 05/14/84 P 04/25/84 P 4 4.1054 16253 05/14/84 02/11/86 P 02/15/86 P 4 4.1054 16253 05/14/84 06/05/87 P / /

4 4-1054 16253 05/14/84 10/28/88 P / /

4 4-1054 16253 05/14/84 04/09/89 P / /

4 4.1054 16253 05/14/84 01/14/91 P / /

4 4-1054 16253 05/14/84 04/27/93 P 05/01/93 4 4-1054 15718 05/01/93 05/01/93 P 10/05/92 4 4-1054 15718 05/01/93 10/15/94 P 10/18/94 4 4-1055 107 12/15/73 05/14/84 P 04/12/84 4 4-1055 10171 05/14/84 05/14/84 P 04/23/84 4 4-1055 10171 05/14/84 02/11/86 P 02/19/86 4 4-1055 2465 04/12/86 04/12/86 P 02/19/86 4 4-1055 11110 04/26/86 04/19/86 P I I 4 4-1055 11110 04/26/86 06/05/87 P / /

4 4-1055 11110 04/26/86 10/28/88 P / /

4 4-1055 11110 04/26/86 04/09/89 P / /

4 4.1055 11110 04/26/86 01/14/91 P 4 4.'1055 11110 04/26/86 04/27/93 P 05/01/93 4 4-1055 7782 05/01/93 05/01/93 P 10/08/92.

4 4-1055 7782 05/01/93 10/15/94 P 10/18/94 4 4-1055 TT82 05/0'I/93 10/20/94 P 10/19/94 4 4.1055 7782 05/01/93 03/14/96 P 03/14/96 4 4.1056 119 12/15/73 05/14/84 P 04/12/84 4 4-1056 16232 05/14/S4 05/14/84 P 04/25/84 4 4-1056 16232 05/14/84 02/11/86 P 02/17/S6 4 4-1056 16232 05/14/84 06/05/87 P / /

4 4-1056 16232 05/14/84 10/28/88 P / /

4 4-1056 16232 05/14/84 04/16/89 P / /

4 4.1056 16232 05/14/S4 01/30/91 P 01/31/91 4 4.1056 17841 02/13/91 02/13/91 P 02/05/91 4 4-1056 17841 02/13/91 04/27/93 P 05/01/93 4 4.1056 17841 02/13/'91 10/15/94 P / /

4 4-1057 129 12/15/73 05/14/S4 P 04/12/84 4 4.1057 27080 05/14/84 05/14/84 P 04/26/84 4 4-1057 27080 05/14/84 02/11/S6 P 02/14/86 4 4-1057 27080 05/14/84 06/05/ST P / I 4 4-1057 2TOSO 05/14/84 10/28/88 P / /

4 4-1057 27080 05/14/84 04/09/89 P / /

4 4-1057 27080 05/14/84 01/14/91 P / /

4 4-105T 27080 05/14/84 04/27/93 P 05/01/93 4 4.1057 27080 05/14/S4 10/15/94 P / /

l life

PAGE NO. 13 04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Serial Oats Oats Oats M Mwher Nuaber instsl l ed of of i Visual F wet i one l T Exea Test 4 4.1057 27080 05/14/84 03/14/96 P 03/14/96 4 4-1058 134 12/15/73 05/11/84 P 04/07/84 4 4-105S 27070 05/11/84 05/11/84 P 04/26/84 4 4-1058 27070 05/11/84 02/06/86 P 02/07/86 4 4-1058 02/22/86 02/22/86 P 02/18/86 4 4-1058 19726'9726 02/22/86 06/04/87 P I /

4 4-1058 19726 02/22/86 10/12/88 P 10/18/88 4 4-1ose 21379 10/26/88 04/15/89 P / /

4 4.1058 21379 10/26/SS 01/23/91 P / /

4 4.1058 21379 10/26/88 04/27/93 P / /

4 4-1058 21379 10/26/88 10/13/94 P I /

4 4.1059 114 12/15/73 05/11/84 P 04/06/84 4 4-1059 27103 05/11/84 05/11/84 P 04/26/84 4 4-1059 27103 05/11/84 02/04/86 P 02/01/86 4 4-1059 27103 05/11/84 o6/04/e? P / I 4 4-1059 27103 05/11/84 10/15/88 P / /

4 4.1059 27103 05/11/84 04/15/89 P / /

4 4-1059 27103 05/11/84 01/30/91 P / /

4 4-1059 27103 05/11/84 04/29/93 P / /

4 4-1059 27103 05/11/84 10/13/94 P / /

4 C.1060 101 12/15/73 05/14/84 P 04/06/84 4 4-1060 27092 05/1C/84 05/14/S4 P 04/26/S4 4 4.1060 27092 05/14/84 01/30/86 P 02/01/S6 4 4-1061 135 12/15/73 05/10/84 P 04/05/84 4 4-1061 20873 05/10/84 05/10/84 P 04/?4/84 4 4-1061 20873 05/10/84 02/04/86 P 02/05/86 4 4.1061 19722 02/22/86 02/18/86 P 02/17/86 4 4-1061 19722 02/22/86 06/04/87 P / /

C 4.1061 19722 02/22/86 10/1C/88 P / /

4 4.1061 '19722 02/22/86 04/15/89 P / /

4 4.1061 19722 02/22/86 01/23/91 P / /

4 4-1061 19722 02/22/86 04/27/93 P / /

4 4-1061 19722 02/22/86 10/13/94 P / /

4 4.1062 137 12/15/73 05/10/84 P 04/07/84 4 4.1062 27076 05/10/84 05/10/84 P 04/26/S4 4 4-1062 270?6 05/10/84 02/08/86 P 02/05/86 4 4-1062 27076 05/10/84 06/05/8? P / /

4 C-1062 27076 05/10/84 10/14/8S P / /

4 4.1062 27076 05/10/84 04/15/89 P / /

4 4.1062 27076 05/10/84 02/09/91 P / /

4 4-1062 27076 05/10/84 04/27/93 P 05/01/93 4 4-1062 27076 05/10/84 10/13/94 P / /

4 4-1063 107 12/15/73 05/11/84 ,04/07/84 4 4.1063 27098 05/11/84 05/11/S4 04/26/S4 4 4.1063 27098 05/11/84 02/04/86 02/13/86 4 4-1063 27098 05/11/84 06/04/87 / /

lk+

1

PAGE NO. 14 04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Ser i el Oate gate Oate N Nurser N~r installed of of i Visual F~t iona l T Exan Test 4 4.1063 27098 05/11/84 10/'l4/SS P I /

4 4.1063 27098 OSI11/84 04/15/89 P I /

C 4.1063 27098 05/11/84 02/09/91 P / /

4 4.1063 27098 05/11/84 04/27/93 P I /

4 4.1063 27098 05/11/84 10I13/94 P / /

4 4.1063 27098 05/11/84 03/15/96 P 03/15/96 4 4.1064 127 12/15/73 05/13/84 P 04/07/84 4 4.1064 27077 QS/13/84 05/13/84 P 04/26/84 4 4.1064 27077 05/13/84 02/05/86 P 02/05/S6 4 4.1064 27077 05/13/84 06/04/87 P / /

4 4-1064 270?7 05/13/84 10/14/8& P / /

4 4.1064 27077 05/13/84 04/15/89 P / /

4 4.1064 27077 05/13/84 02/09/91 P I /

4 4-1064 27077 05/13/84 04/27/93 P 05/01/93 4 4-1064 27077 05/13/84 10/13/94 P / /

4 4.1065 116 12/15/73 05/10/84 P 04/09/84 4 4.1065 2Q&99 OS/10/84 05/10/84 P 04/24/84 4 4-1065 20899 05/10/84 01/30/86 P 01/31/86 4 C-1065 19724 06/03/86 06/03/86 P 02/18/86 4 4.106S 19724 06/03/86 06/04/87 P / /

4 C.1065 19724 06/03/86 10/14/88 P 10/19/88 4 4.1065 20873 03/17/89 03/17/89 P 02/05/S6 4 4-1065 208?3 03/17/89 02/13/91 P / /

4 4.1065 208?3 03/17/89 04/27/93 P / /

4 4-1065 208?3 03/17/89 10/13/94 P / /

4 4-1066 100 12/15/73 05/10/84 P 04/09/84 4 4.1066 270N 05/10/84 05/10/84 P 04/26/84 4 4-1066 270N 05/10/84 02/05/86 P 02/01/86 4 4-1066 27094 05/10/84 06/05/87 P / /

4 4-1066 27094 05/10/84 10/21/88 P / /

C 4-1066 27094 05/10/84 04/16/89 P / /

4 4-1066 27094 05/10/84 02/13/91 P / /

4 4-1066 270N 05/10/84 04/28/93 P / /

4 4.1066 27094 05/10/84 10/15/94 P 10/17/94 4 4-1067 106 12/15/?3 05/10/84 P 04/07/84 4 4-1067 27097 05/10/S4 05/10IS4 P 04/26/84 4 4-1067 2?097 05/10/84 02/04/86 P 01/31/86 4 4.1067 2T097 05/10/84 06/04/87 P / /

4 4.1067 2?097 QS/10/84 1Q/15/SS P / /

4 4-1067 27097 05/10/84 04/15/89 P / /

4 4-1067 27097 05/10/84 02/09/91 P / /

4 4-1Q67 2?097 05/10/84 04/27/93 P 05/01/93 C 4-1067 27097 05/10/84 10/13/94 P / /

4 4-1068 131 12/15/?3 05/10/84 P 04/04/84 4 4-1068 270&S 05/10/84 05/10/&4 P 04/26/84 4 4-1068 27085 05/10/84 02/04/86 P 01/31/86

N t l

PAGE MO. 15 04/09/96 Turkey Point Unit 3 & 4 Activity Location Log U Tag Serial Date Date Date S M Munbcr Muaber I ne t a l l ed of of T I Visual Fmct iona l A T Exam Test T 4 4-1068 27085 05/10/84 06/04/87 P / /

4 4-106S 27085 05/10/84 10/15/88 P / /

4 4-1068 27085 05/10/84 04/15/89 P / /

4 4-1068 27085 05/10/84 02/09/91 P / /

4 4-1068 27085 05/10/84 04/27/93 P / /

4 4.1068 27085 05/10/84 10/13/94 P 10/18/94 4 4-1069 7002 12/15/73 05/12/84 P 04/10/84 4 4.1069 10033 05/12/84 05/12/84 P 05/07/S4 4 4-1069 10033 05/12/84 02/15/S6 P 02/12/S6 4 4-1069 10033 05/12/84 06/05/87 P / /

4 4-1069 10033 05/12/84 10/2C/88 P / /

4 4-1069 10033 05/12/84 04/15/89 P / /

4 4-1069 10033 05/12/84 02/02/91 P / /

4 4-1069 10033 05/12/84 04/28/93 P / /

4 4-1069 10033 05/12/84 10/14/94 P 10/18/94 4 4-1070 6999 12/15/73 05/12/84 P 04/10/84 4 4-1070 10036 05/12/84 05/12/84 P 05/05/84 4 4-1070 10036 05/'1 2/84 02/15/86 P 02/12/86 4 4-1070 10036 05/12/84 06/05/87 P / /

4 4-1070 10036 05/12/84 10/24/88 P / /

4 4-1070 10036 05/12/84 04/15/89 P / /

4 4-1070 10036 05/12/84 01/30/91 P 01/30/91 4 4-1070 10036 05/12/S4 04/28/93 P / /

4 4-1070 10036 05/12/S4 10/14/94 P / /

4 4-1071 123 12/15/73 05/16/84 P 04/12/84 4 4-1071 11315 05/16/84 05/16/S4 P 04/20/84 4 4-1071 11315 05/16/84 02/20/86 P 02/05/86 4 4-1071 11315 05/16/84 06/04/87 P / /

4 4-1071 11315 05/16/84 10/18/88 P / /

4 4-1071 11315 05/16/84 04/15/89 P / /

4 4-1071 11315 05/16/84 01/30/91 P / /

4 4-1071 11315 05/16/84 04/29/93 P / /

4 4-1071 11315 05/16/84 10/14/94 P 10/18/94 4 4-1071 16247 10/19/94 10/19/94 P 10/18/94 4 4-1071 16247 10/19/94 03/13/96 P 03/13/96 4 4-1072 124 12/15/73 05/16/84 P 04/04/84 4 4-1072 10170 05/16/84 05/16/84 P 04/23/84 4 4.1072 10170 05/16/84 02/20/86 P 02/11/86 4 4-1072 16235 02/25/86 02/20/86 P 02/18/86 4 4-1072 16235 02/25/86 06/04/87 P / /

4 4-1072 16235 02/25/86 10/11/88 P 10/17/88 4 4-1072 16235 02/25/86 04/15/89 P / /

C 4-1072 16235 02/25/86 02/02/91 P / /

4 4-1072 16235 02/25/86 05/01/93 P 05/02/93 4 4-1072 16235 02/25/86 10/14/94 P / /

4 4-1073 104-03 12/15/73 05/11/84 P 04/12/84

0'c FS gk

PAGE NO. 16 04/09/96 Turkey Point Unit 3 T, C Activity Location Log U Tag Seri ~ l Date Date Date N Nerher Nuaber installed of of i Visual Fact ional T Exam Test 4 4.1073 12382 05/11/84 05/11/84 P 04/23/84 4 4-1073 12382 05/11/84 02/20/86 P 02/11/86 4 4.1073 3941 02/25/86 02/20/86 P 02/08/86 4 4-1073 3941 02/25/86 06/05/87 P / /

4 4-1073 3941 02/25/86 10/11/88 P 10/18/SS 4 4-1073 3941 02/25/86 04/15/89 P / /

4 4-1073 3941 02/25/86 02/02/91 P / /

4 4-1073 3941 02/25/86 05/01/93 P 05/02/93 4 4-1073 3941 02/25/86 10/14/94 P / /

4 4-1074 19298 12/15/73 05/10/S4 P 04/09/84 4 4-1074 1929S 12/15/73 02/20/86 P 02/04/86 4 4-1074 19298 12/15/73 06/05/87 P / /

4 4-1074 19298 12/15/73 10/18/88 P / /

4 4-1074 19298 12/15/73 04/15/89 P / /

4 4-1074 19298 12/15/73 02/04/91 P 02/04/91 4 4-1074 19298 12/15/73 05/03/93 P / /

4 4-1074 19298 12/15/73 10/13/94 P / /

4 4-1075 19297 12/15/73 05/10/84 P 04/09/84 4 4-1075 19297 12/15/73 02/13/86 P 02/04/86 4 4-1075 19297 12/15/73 o6/o5/e7 P / /

4 4-1075 19297 12/15/73 10/17/88 P / /

C 4-1075 19297 12/15/73 04/15/89 P / /

4 4-1075 19297 12/15/73 02/04/91 P 02/05/91 4 4.1075 19297 12/15/73 05/03/93 P / /

4 4-1075 19297 12/15/73 10/13/94 P / /

4 4-1076 20889 12/15/73 05/11/84 P 04/10/84 4 4-1076 24414A 05/10/84 05/10/S4 P 04/26/84 4 4-1076 24414A 05/10/84 02/04/86 P 02/03/86 4 4.1076 24414 A 05/10/84 06/o5/e7 P / /

4 4-1076 24414 A 05/10/84 10/18/88 P / /

4 4-1076 24414 A 05/10/84 04/15/89 P / /

4 4.1076 24414 A 05/10/84 02/12/91 P / /

4 4-1076 24414 A 05/10/S4 05/01/93 P 05/03/93 4 4-1076 24414 A 05/10/84 10/15/94 P / /

4 4-10V 20886 12/15/73 05/11/84 P 04/10/S4 4 4-1077 24413 A 05/11/84 05/11/84 P 04/26/84 4 4-1077 24413 A 05/11/S4 02/12/86 P 02/03/86 4 4-1077 18014 02/25/86 02/12/86 P 02/10/86 4 4-10V 18014 02/25/S6 06/05/87 P / /

4 4-10V 18014 02/25/86 10/12/88 P 10/17/88 4 4.1077 18014 02/25/86 04/15/89 P / /

4 4-1077 18014 02/25/86 02/12/91 P / /

4 4.1077 18014 02/25/86 05/01/93 P 05/03/93 4 4-1077 18014 02/25/86 10/13/94 P / /

4 4-1078 20884 12/15/73 05/11/84 P 04/10/84 4 4-1078 244 09A 05/11/84 05/11/84 P 04/26/84

~

'a I

PAGE NO. 17 04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Serial Date Date Date N Number Number Ins'tel ltd of of i Visual F (net iona l T Exam Test 4 4.1078 24409A 05/11/84 02/08/86 P 02/03/86 4 4-1078 24409A 05/11/84 06/05/87 P / /

4 4-107S 24409A 05/11/84 10/18/88 F 10/15/88 4 4-107S 24430A 10/20/BS 11/29/88 P / /

4 4-1078 24430A 10/20/SS 04/15/89 P / /

4 4-1078 24430A 10/20/88 01/31/91 P / /

C 4.1078 24430A 10/20/SS 05/01/93 P / /

4 4.1078 24430A 10/20/88 10/13/94 P / /

4 4.1079 23227 12/15/73 05/10/84 P 04/10/84 4 C-1079 23227 12/15/73 02/13/86 P 02/03/86 4 4-1079 23227 12/15/73 06/05/87 P / /

4 4-1079 23227 12/15/73 10/15/88 P / /

4 4-1079 23227 12/15/73 04/15/89 P / /

C 4-1079 23227 12/15/73 02/12/91 P / /

4 4.1079 23227 12/15/73 04/27/93 P 05/03/93 4 4.1079 23227 12/15/73 10/15/94 P / /

4 4-1080 2088S 12/15/73 05/11/84 P 04/05/84 4 4-1080 23228 05/11/84 05/11/84 P 04/05/84 4 4.1080 24431 11/30/S4 02/04/86 P 02/03/86 4 4-1080 24431 11/30/84 06/04/87 P / /

4 4.1080 "24431 11/30/84 10/15/88 P / /

4 4-1080 24431 11/30/84 04/15/89 P / /

4 4-1080 24431 11/30/84 02/12/91 P / /

4 4-1080 2C431 11/30/84 04/28/93 P 05/01/93 4 4-1080 24431 11/30/S4 10/15/94 P / /

4 4 1081 19295 12/15/73 05/10/84 P 04/d7/84 4 4-1081 19295 12/15/73 02/07/86 P 02/04/86 4 4.1081 19295 12/15/73 06/04/87 P / /

4 4.1081 19295 12/15/73 10/17/88 P / /

C 4-1081 19295 12/15/73 04/15/89 P / /

4 4-1081 19295 12/15/73 02/12/91 P / /

4 4.1081 19295 12/15/73 04/28/93 P / /

4 4-1081 19295 12/15/73 10/13/94 P 10/17/94 4 4.10S2 19296 12/15/73 05/10/84 P 04/09/84 4 4-1082 19296 12/15/73 02/07/86 P 02/04/86 4 4-1082 19296 12/15/73 06/04/87 P / /

4 4.1082 19296 12/15/73 10/12/88 P 10/1S/88 4 4.1082 19296 12/15/73 04/15/89 P / /

4 4.1082 19296 12/15/73 02/12/91 P / /

4 4.1082 19296 12/15/73 04/28/93 P 05/03/93 4 4.1082 19296 12/15/73 10/15/94 P / /

4 4.1083 23229 12/15/73 05/11/84 P 04/10/84 4 4.1083 24408A 05/11/84 05/11/84 P 04/26/S4 4 4.1M3 244 08A 05/11/84 02/15/86 P 02/04/86 4 4.1083 244 08A 05/11/84 06/04/87 P / /

4 4.1083 244MA 05/11/84 10/17/88 P / /

f 1

Qt r

l 1

l t

u<

PAGS MO. 18 04/09/96 Turkey Point Unit 3 4,4 Activity Location Log U Tag Serial Date Date Date S N Naker Muster installed of of T I Visual Fax:t one l 1 A T Exats Test T 4 4-1083 244 08A 05/11/84 04/15/89 P / /

4 4-1083 244MA 05/11/84 02/12/91 P / /

4 4-1083 244 08A 05/11/84 04/28/93 P 05/01/93 P 4 4-1083 244 08A 05/11/84 10/15/94 P / /

4 4-1084 20885 12/15/73 05/11/S4 P 04/10/84 P 4 4-1084 23229 05/11/84 05/11/84 P 04/10/84 P 4 4-1084 23229 05/11/84 02/07/86 P 02/03/86 P 4 4.1084 23229 05/11/84 06/04/87 P / /

4 4-1084 23229 05/11/84 10/17/88 P / /

4 4.1084 23229 05/11/84 04/15/89 P / /

4 4-1084 23229 05/11/84 02/12/91 P / /

4 4-1084 23229 05/11/84 04/28/93 P 05/03/93 P 4 4-1084 23229 05/11/84 10/15/94 P / /

4 4-1085 29448 12/15/73 05/17/84 P 04/09/84 F 4 4.1085 33622 05/17/84 05/17/84 P 04/30/84 P 4 4.1085 33622 05/17/84 02/05/S6 P 02/10/86 P 4 4-1085 33622 05/17/84 06/05/87 P / /

4 4.1085 33622 05/17/84 10/12/SS P 10/17/88 P 4 4-1085 33622 05/17/84 04/15/89 P / /

4 4-1085 33622 05/17/84 02/01/91 P / /

4 4-1085 33622 05/17/84 04/29/93 P / /

4 4-1085 33622 05/17/84 10/13/94 P / /

4 4-1085 33622 05/17/84 03/13/96 P 03/13/96 P C 4-1086 770 05/10/87 05/28/87 P / /

4 4-1086 770 05/10/87 10/06/88 P / /

4 4.1086 12993 03/31/89 03/31/89 P . / /

4 4-1086 12993 03/31/89 04/14/89 P / /

4 4-1086 12993 03/31/89 01/19/91 P 01/23/91 P 4 4.1086 12993 03/31/89 04/22/93 P / /

4 4-1086 12993 03/31/89 10/12/94 P / /

4 4.1086 12993 03/31/89 03/09/96 P 03/10/96 F 4 4-1086 12993 03/12/96 03/12/96 P 03/11/96 P 4 4.1087 772 05/10/87 05/28/87 P / /

4 4-1087 772 05/10/87 10/07/88 P / /

4 4-1087 12994 03/31/89 03/31/89 P / /

4 4-1087 12994 03/31/89 04/14/89 P / /

4 4.1087 12994 03/31/89 01/19/91 P 01/23/91 P 4 4-1087 12994 03/31/89 04/22/93 P / /

4 4-1087 12994 03/31/89 10/12/94 P / /

4 4-1087 12994 03/31/89 03/09/96 P / /

4 4-1088 686 05/10/87 05/28/87 P / /

4 4-108S 686 05/10/87 10/06/88 P / /

4 4.1088 12995 03/31/89 03/31/89 P / /

4 4.1088 12995 03/31/89 04/1C/89 P / /

4 4-1088 12995 03/31/89 01/19/91 P 01/24/91 P 4 4.1088 12995 03/31/89 04/22/93 P / /

l I

P

PACE NO. 19 04/09/96 Turkey Point Unit 3 S 4 Activity Location Log U Tag Serial Date Date Date S N Heber Nwher Insta l led of of T l Visual Functional A T Exam Test T 4 4.1088 12995 03/31/89 10/11/94 / /

4 4.1088 12995 03/31/89 03/09/96 / /

4 4-1089 6S4 05/10/87 05/28/87 / /

4 4.1089 6S4 05/10/87 10/07/88 10/11/88 4 4-1089 12996 03/31/89 03/31/89 / /

4 4-1089 12996 03/31/89 04/14/89 / /

4 4-1089 12996 03/31/89 01/21/91 01/24/91 4 4.1089 12996 03/31/89 04/22/93 / /

4 4-1089 12996 03/31/89 10/11/94 / /

4 4-1089 12996 03/31/89 03/09/96 / /

4 4-1090 773 05/10/87 05/28/87 / /

4 4-1090 773 05/10/87 10/08/88 / /

4 4.1090 12997 03/27/89 03/27/89 / /

4 4-1090 12997 03/27/89 04/14/89 / /

4 4-1090 12997 03/27/89 01/19/91 01/24/91 4 4-1090 12997 03/27/89 05/04/93 / /

4 4.1090 12997 03/27/89 10/12/94 / /

4 4-1090 12997 03/27/89 03/09/96 / /

4 4.1091 771 05/10/87 05/28/87 / /

4 4-1091 771 05/10/87 10/10/88 / /

4 4-1091 12998 03/27/89 03/27/89 / /

4 4-1091 12998 03/27/89 04/14/89 / /

4 4-1091 12998 03/27/89 01/19/91 01/23/91 4 4-1091 12998 03/27/89 05/04/93 / /

4 4-1091 12998 03/27/89 10/12/94 / /

4 4-1091 12998 03/27/89 03/08/96 / /

4 4-1092 683 05/10/87 05/28/87 / /

4 4.1092 683 05/10/87 10/08/88 / /

4 4-1092 12999 03/31/89 03/31/89 / /

4 4-1092 12999 03/31/89 04/14/89 / /

4 4.1092 12999 03/31/89 01/21/91 01/23/91 4 4.1092 12999 03/31/89 05/04/93 / /

4 4-1092 12999 03/31/89 10/11/94 / /

4 4-1092 12999 03/31/89 03/08/96 / /

4 4-1093 05/10/87 05/28/87 / /

4 4-1093 888 05/10/87 10/08/88 10/15/88 4 4-1093 17868 03/27/89 03/27/89 / /

4 4-1093 17868 03/27/89 04/14/89 / /

4 4.1093 17868 03/27/89 01/21/91 01/25/91 4 4-1093 17868 03/27/89 05/04/93 / /

4 4.1093 17868 03/27/89 10/12/94 / /

4 4-1093 17868 03/27/89 03/11/96 / /

4 4-1094 894 05/10/87 05/28/87 / /

4 4-1094 894 05/10/87 10/10/88 10/10/88 4 4-1094 17869 03/27/89 03/27/89 / /

4 4-1094 17869 03/27/89 04/14/89 / /

C%

cr ir i'~f

PAGE HO. 20 04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Serial Date Date Date S ii Hunber iiuaber instal led of of T i Visual Fweti one l A T Exam Test T 4 4.1094 17869 03/27/89 01/21/91 P 01/25/91 4 4-1094 17869 03/27/89 05/04/93 P / /

4 4-1094 17869 03/27/89 10/12/94 P / /

4 4.1094 17869 03/27/89 03/10/96 P / /

4 4-1095 M3 05/10/87 05/28/87 P / /

4 4-1095 M3 05/10/87 10/07/88 P 10/15/88 4 4-1095 '17870 03/27/89 03/27/89 P / /

4 4-1095 17870 03/27/89 04/14/89 P / /

4 4-1095 17870 03/27/89 01/21/91 P 01/25/91 4 4-1095 17870 03/27/89 05/04/93 P 05/04/93 4 4-1095 17870 03/27/89 10/12/94 P / /

4 4.1095 17870 03/27/89 03/10/96 P / /

4 4-1096 881 05/10/87 05/28/87 P / /

4 4.1096 881 05/10/87 10/07/88 P 10/14/88 4 4-'I096 17871 03/27/89 03/27/89 P / /

4 4.1096 17871 03/27/89 09/15/89 P / /

4 4-1096 17871 03/27/89 01/21/91 P 01/25/91 4 4.1096 17871 03/27/89 05/04/93 P / /

4 4-1096 17871 03/27/89 10/12/94 P / /

4 4.1096 17871 03/27/89 03/10/96 P / /

4 4-1097 891 05/10/87 05/28/87 P / /

4 4-1097 891 05/10/87 10/10/88 P 10/15/88 4 4.1097 17872 03/27/89 03/27/89 P / /

4 4-1097 17872 03/27/89 09/15/89 P / /

4 4-1097 17872 03/27/89 01/21/91 P 01/25/91 4 4.1097 17872 03/27/89 05/03/93 P 05/03/93 4 4-1097 17852 05/06/93 05/06/93 P 05/05/93 4 4-1097 17852 05/06/93 10/12/94 P 10/16/94 4 4-1097 17852 05/06/93 10/17/94 P 10/17/94 4 4-1097 17852 05/06/93 03/10/96 P 03/11/96 4 4-1098 885 05/10/87 05/28/87 P / /

4 4-1098 885 05/10/87 10/10/88 P 10/15/88 4 4-1098 17873 03/27/89 03/27/89 P / /

4 4.1098 17873 03/27/89 09/15/89 P / /

4 4-1098 17873 03/27/89 01/21/91 P 01/25/91 4 4-1098 17873 03/27/89 05/04/93 P / /

4 4-1098 17873 03/27/89 10/12/94 P / /

4 4-1098 17873 03/27/89 03/10/96 P / /

4 4-1099 17423 12/15/73 10/31/88 P 10/31/88 4 4-1099 17423 12/15/73 04/14/89 P / /

4 4.1099 17423 12/15/73 01/19/91 P / /

4 4-1099 17423 12/15/73 04/22/93 P 04/30/93 4 4-1099 17423 12/15/73 10/12/94 P / /

4 4-1099 17423 12/15/73 03/11/96 P / /

4 4-1100 29498 07/22/91 07/22/91 P 11/03/88 4 4-1100 29498 07/22/91 04/27/93 P 05/01/93

PAGE NO. 21 04/09/96 Turkey Point Unit 3 4 4 Activity Location Log U Tag Serial Date Date Date N Naker Kosher installed of of i Visual Fax:t i one l T Exam Test 4 4.1100 29498 07/22/91 10/13/94 P / /

0 TURKEY POINT UNIT 4 1996 REFUELING OUTAGE Summary of Inservice Inspection Examinations

II I

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE:

IHSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS ctor Pressure Vessel N I 0 ZONE NUMBER: 4-001 ASHE ONG T SEC. XI RSE H

SUMMARY

EXAMINATION AREA CATGY EXAM E IO E REMARKS HUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGM R **CALIBRATIOHBLOCK**

REF. D'WG. NO. 5614-M-4001 044000 4-WH-14-1 thru 65 B-O PT HDE 3.3-4 X - - - 3/13/96 - PT complete, examined 10K of CROM Housing Welds 814.'10 peripheral CRD housings, nos. 47, 53, and 65

1 DATE: 06/18/96 TURKEY POIN1'UCLEAR PLANT UNIT 4 PAGE: 2 IHSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPOHENTS ssurizer N I 0 ZONE NUMBER: 4 006 ASME ONGT SEC. XI RSEH

SUMMARY

EXAMIHATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE C G M R **CALIBRATIONBLOCK**

053600 4-SRGN IR B-D UT 30 NDE 5.13-1 X - - - 3/16/96 - UT COMPLETE, LIMITED SURGE NOZZLE IHHER RADIUS 83.120 UT 60 NDE 5.13-1 X - - - EXAMIHATIOH DUE TO HEATER PENETRATIOHS SECTION AHD INSULATION

    • O'I 8**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 3 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COHPONENTS ctor Coolent System Pressurizer Surge Line N I 0 ZONE NUHBER: 4-016 ASHE ONGT SEC. XI RSEN SUHHARY EXAHINATION AREA CATGY EXAH E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO HETNOO PROCEDURE C G M R **CALIBRATIONBLOCK*~

063100 12"-RC-1401-8 8-J PT NDE 3.3.9 X - - - 3/15/96 - PT COMPLETE, 3/16/96 - UT PIPE TO REDUCER 89.11 UT 45 NDE 5.4-7 X - - - COMPLETE( ROOT GEOHETRY UT 60 NDE 5.4-8 - X-

    • UT 34**

063200 12"-RC-1401-BA 8-J PT NDE 3.3-9 X - - - 3/15/96 - PT COMPLETE, 3/16/96 - UT NDE 5.4-4 - X -

REDUCER TO SAFE-END 89.11 UT 45 UT 60 NDE 5 '-4 X - -- COHPLETE, ROOT GEOHETRY

    • UT 30*%

063250 12"-RC-1401-9 B-F PT NDE 3.3-9 X - - - 3/15/96 - PT COHPLETE, 3/16/96 - UT SAFE-END TO NOZZLE 85.40 UT 45 NDE 5.4-4 X - - - COMPLETE

    • UT.30**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 4 INSERVICE INSPECTION SUHHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS i diary Spray Line N I 0 ZONE NUMBER: 4-035 ASHE ONG T SEC. XI RSE N

SUMMARY

EXAMINATION AREA CATGY EXAH E IO E REHARKS NUHBER IDENTIFICATION ITEM NO HETNOO PROCEDURE CGM R **CALIBRATIONBLOCK**

108900 2"-RC-1410-7 B-J PT NDE 3.3-26 X - - - 3/16/96 - PT COHPLETE ELB(N TO PIPE 89.40

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 5 INSERVICE INSPECTION SUMHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS idual Heat Removal fram RCS Loop A Hot Leg N I 0 ZONE NUHBER: 4-036 ASHE ONG T SEC. XI RSE H

SUMMARY

EXAHINATIOH AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGH R ~*CALIBRATION BLOCK**

116200 14"-RHR-1401-13 8-J PT NDE 3.3-12 X - - - 3/17/96 - PT AND UT COHPLETE 89.11 5.4-8 X-ELBOW TO PIPE UT 45 UT 60 NDE NDE 5.4-8 X---

    • UT-30""

116430 PS-3 F-A VT-3 NDE 4.3-1 X - - - 3/16/96 - VT-3 COHPLETE DOUBLE ACTING RESTRAINT F'1.10B 116470 PS-3 IA 8-K PT NDE 3.3-19 X - - - 3/16/96 - PT COMPLETE INTEGRAL ATTACHMENTS B10.10

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 6 INSERVICE INSPECTION SUHMARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COHPONENTS idual Heat Removal to RCS Loop A Cold Leg N I 0 ZONE NUMBER: 4-037 ASHE ON G T SEC. XI RSE H SUHHARY EXAHINATION AREA CATGY EXAM E I 0 E REHARKS NUHBER IDENT I F I CAT I ON ITEH NO HETMOD PROCEDURE CGM R **CALIBRATIONBLOCK"*

118000 8"-RMR-1401-6 B-J PT NDE 3.3-20 X - - - 3/16/96 - PT COMPLETE, 3/17/96 - UT VALVE 4-876E TO ELBOW 89.11 UT 45 NDE 5 '-9 X - - - COMPLETE, ROOT GEOHETRY

- - X-UT 60 NDE 5.4-9

    • UT-41**

'118400 8's-RHR-1401-10 B-J PT NDE 3.3-20 X - - - 3/16/96 - PT COMPLETE, 3/17/96 - UT PIPE TO REDUCER 89.11 UT 45 NDE 5.4-9 X - - COMPLETE( ROOT GEOHETRY UT 60 NDE 5.4-9 - - X-A*UT 41**

119100 10"-SI -1401-5 8-J PT NDE 3.3-20 X - - - 3/16/96 - PT COMPLETE, 3/17/96 - UT ELBOW TO PIPE B9.11 UT 45 NDE 5.4-10 X - - - COMPLETE, ROOT GEOMETRY UT 60 NDE 5.4-10 - - X-

'k*UT 27**

119150 8073- H-825-01 F-A VT-3 ,

NDE 4.3-2 --X 3/16/96 - VT-3 complete, lock nut flush DOUBLE ACTING RESTRAINT F 1. 10B CR 96-379 with end of bolt, accepted as-is by VT-3 96007401 X- engineering evaluation, frozen strut, bearing was lubricated

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 7 INSERVICE INSPECTION SUHHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS IDUAL NEAT REMOVAL TO RC LOOP B COLD LEG N I 0 ZONE NUMBER: 4-038 ASME ONG T SEC ~ XI RSE N SUHHARY EXAHINATION AREA CATGY EXAH E I 0 E REMARKS NUMBER IDENI'IFICATION ITEM NO HETHOD PROCEDURE CGH R **CALIBRATIONBLOCK"*

123900 8"-RHR-1402-4 B-J PT NDE 3.3-27 X - - - 3/16/96 - PT COMPLETE, 3/17/96 - UT PIPE TO TEE 89.11 UT 45 NDE 5.4-11 X - - - COMPLETE, ROOT GEOMETRY UT 60 NDE 5.4-11 - X-

    • UT 41**

124400 8"-RHR-1402-7 B-J PT NDE 3.3-1 X 3/17/96 - PT complete, linear TEE TO TEE B9.11 PT NDE 3.3-1 indication, additional surface UT THICK NDE 5.18-1 preparation required for valid CR 96-372 examination, re-examined after removal, UI'5 NDE 5.4-11 X- evaluation determined indication to be a UT 60 NDE 5 '-11 X- surface anomoly, 3/17/96 - UT complete lQ 96007206 01 **UT 41**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 8 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS IDUAL HEAT REHOVAL TO RC LOOP C COLD LEG N I 0 ZONE NUMBER: 4-039 ASME ONG T SEC. Xl RSE H SUHMARY EXAMINATION AREA CATGY EXAH E I 0 E REMARKS NUHBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGH R **CALIBRATIONBLOCK*>>

124940 SR-449 F-A VT-3 NDE 4.3 3 X - - - 3/16/96 - VT-3 COMPLETE SPRING HANGER F1.10C 125000 8"-RNR-1404-2 8-J PT NDE 3.3-22 X - - - 3/16/96 - PT COMPLETE, 3/17/96 - UT 89.11 UT 45 5.4-5 - - - COHPLETE, ROOT GEOHETRY ELBOW TO PIPE UI'0 NDE NDE 5.4-5 X

-X-. **O'I 41**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 9 IHSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS H HEAD SAFETY INJECTION LOOP A INSIDE CTMT N I 0 ZONE NUMBER: 4-040 ASME ONGT SEC ~ XI RSEN

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDEHTIFICATION ITEM HO METHOD PROCEDURE C G M R **CALIBRATIOHBLOCK**

129300 2"-SI-1401-14 B-J PT NDE 3.3.11 X - - - 3/16/96 - PT COMPLETE COUPLIHG TO PIPE 89.40 129340 WR-5 F-A VT-3 NDE 4.3.4 - - - X 3/12/96 - VT-3 complete, improper DOUBLE ACTIHG RESTRAINT F1.108 CR 96-334 clearance on top of pipe, centerline of pipe off by 2a per drawing reference, accepted as-is by engineering evaluation, drawings will be updated to shou field conditions

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 10 IHSERVICE IHSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COHPONEHTS H HEAD SAFETY INJECTION LOOP B INSIDE CTHT H I 0 20NE NUHBER: 4-041 ASHE ONG T SEC. XI R S E H SUHHARY EXAMINATION AREA CATGY EXAH E I 0 E REHARKS NUMBER IDENTIFICATIOH ITEH NO HETHOD PROCEDURE CGH R **CALIBRATIONBLOCK**

133000 2"-Sl-'l402-8 B-J PT HDE 3.3-14 X - - - 3/16/96 - PT COMPLETE ELBOM TO PIPE B9.40

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 11 INSERVICE INSPECTION SUHMARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COHPONENTS H HEAD SAFETY INJECTIOH LOOP C INSIDE CTMT N I 0 ZONE NUHBER: 4-042 ASME 0 N G T SEC. XI R S E H

SUMMARY

EXAMINATION AREA CATGY EXAH E I 0 E REMARKS NUMBER IDENTIFICATION ITEH NO METHOD PROCEDURE C G H R **CALIBRATIONBLOCK**

138200 2"-SI -1403-8 8-J PT NDE 3.3-13 X - - - 3/16/96 - PT COMPLETE VALVE 4-868C TO PIPE 89.40 138300 2"-SI-1403-9 B-J PT NDE 3.3-13 X - - - 3/16/96 - PT COMPLETE PIPE TO ELBM 89.40 138400 2"-SI-1403-10 B-J PT NDE 3.3-13 X - - - 3/16/96 - PT COMPLETE ELBSJ TO PIPE 89.40 138450 PS-2 F-A VT-3 NDE 4.3-5 - -'

3/12/96 - VT-3 COMPLETEI PIPE IS AGAINST DOUBLE ACTING RESTRAIHT F1.10B SIDE OF SUPPORT, CLEARANCES ACCEPTABLE PER,ENGINEERING STANDARD STD-C-011

4 DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 12 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS H NEAD SAFETY INJECTION LOOP A INSIDE CTHT N I 0 ZONE HUMBER: 4-043 ASME ONGT SEC. XI RSEH SUMHARY EXAHIHATION AREA CATGY EXAM E I 0 E REMARKS NUHBER IDENTIFICATION ITEM NO HETNOD PROCEDURE C G H R **CALIBRATIONBLOCK**

141500 2"-SI -1405-4 B-J PT NDE 3.3-24 X - - - 3/15/96 - PT COMPLETE PIPE TO TEE 89.40 141800 2"-SI-1405-7 B-J PT NDE 3.3-15 X - - - 3/16/96 - PT COMPLETE ELBOW TO PIPE 89.40

It II I

l.

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANI'NIT 4 PAGE: 13 INSERVICE INSPECTION SUHHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COHPONENTS N HEAD SAFETY INJECTION LOOP 8 INSIDE CTMT N I 0 ZONE NUHBER: 4-044 ASME ONG T SEC. XI RSE H SUHHARY EXAHINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO HETHOO PROCEDURE C G M R ~*CALIBRATION BLOCK**

146300 2"-SI-1406-9 8-J PT NDE 3.3-23 X - - - 3/15/96 - PT COHPLETE TEE TO PIPE 89.40 146400 2"-SI-1406-10 8-J PT NDE 3.3-23 X - - - 3/15/96 - PT COHPLETE PIPE TO ELBON 89.40 147000 2"-SI-1406-16 8-J PT NDE 3.3-16 X - - - 3/16/96 - PT COHPLETE PIPE TO COUPLING 89.40 147100 2"-SI-1406-17 8-J PT NDE 3.3-16 X - - - 3/16/96 - PT COHPLETE COUPLING TO PIPE 89.40 150 8081-8-001-12 VT-3 NDE 4.3-6 - - - X 3/12/96 - VT-3 conyiete, improper DOUBLE ACTING RESTRAINT CR 96-334 clearance on top of pipe, centerline of pipe off by 2" per drawing reference, accepted as-is by engineering evaluation, drawings will be updated to show field conditions

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 14 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONEHTS HICAL & VOLUHE CONTROL TO RC LOOP A COLD LEG N I 0 ZONE NUMBER: 4-046 ASME ONG T SEC. XI RSE H SUHHARY EXAMINATION AREA CATGY EXAM E I 0 E REHARKS NUMBER IDENTIFICATION ITEH NO METHOD PROCEDURE CGM R **CALIBRATIONBLOCK**

158900 3"-CH-1402-18A B-J PT NDE 3.3-25 X - - - 3/'16/96 - PT COMPLETE VALVE 4-310A TO REDUCER 89.40 158950 3"-CH-1402-18 8-J PT NDE 3.3-25 X - - - 3/16/96 - PT COMPLETE REDUCER TO PIPE 89.21

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 IHSERVICE INSPECTION

SUMMARY

THIRD INTERVAL,,FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS HICAL 8 VOLUME CONTROL SEAL INJECTION LOOP A N I 0 ZOHE HUMBER: 4-050 ASME ONG T XI

'EC.

RSE H

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE CGM R **CALIBRATIONBLOCK**

172500 2"-CH-1403-4 8-J PT NDE 3.3-8 X - - - 3/15/96 - PT COMPLETE PIPE TO ELBOW 89.40 172600 2"-CH-1403-5 8-J PT NDE 3.3-8 X - - - 3/15/96 - PT COMPLETE ELBOW TO PIPE 89.40 172650 PS-1 TYPE A F-A VT-3 HDE 4.3-7 X - - - 3/12/96 - VT-3 COMPLETE DOUBLE ACTING RESTRAINT F1.108 172700 2"-CH-1403-6 8-J PT NDE 3.3-8 X - - - 3/15/96 - PT COMPLETE PIPE TO ELBOW 89.40 173500 2"-CH-1403-14 8-J PT NDE 3.3-17 X - - - 3/16/96 - PT COMPLETE PIPE TO ELBOW 89.40

1 DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 16 INSERVICE INSPECTION SUHMARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 'I CBAE STATUS COMPONENTS CTOR COOLANT PUMP 8 N I 0 ZONE NUHBER: 4-057 ASME ONG T SEC. XI RSE N SUHMARY EXAHINATION AREA CATGY EXAH E IO E REHARKS NUHBER IDENTIFICATION ITEM NO HETMOD PROCEDURE CGH R **CALIBRATIONBLOCK**

198200 4-RCP-B-FLYWHEEL RG 1 ~ 14 PT SEE REMARKS 3/18/96 - UT complete, surface FLYWHEEL UT 10 NDE 5.15-1 X - - - examination not required this outage

    • FLYWHEEL**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE 17 INSERVICE INSPECT!ON

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 1 CBAE STATUS COMPONENTS MICAL 8 VOLUME CONTROL, REGENERATIVE HEAT EXCH H I 0 ZONE NUMBER: 4-059 ASME OHG T SEC. Xi RSE H

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM HO METHOD PROCEDURE C G M R **CALIBRATIONBLOCK**

199290 RGX 4E200 VT-2 NDE 4.2-2 X - - - 3/11/96 - VT-3 complete, 4/4/96 - VT-2 VISUAL FOR LEAKAGE VT-3 NDE 4.3-31 X - - - complete

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 18 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS AH GENERATOR A SECONDARY SIDE N I 0 ZONE NUMBER: 4-060 ASME ONG T SEC. XI RSE H

SUMMARY

EXAHIHATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGM R **CALIBRATIONBLOCK**

204400 4-SGA-Y C-A UT 0 NDE 5.1-2 X - - - 3/14/96 - UT COMPLETE( TUBESHEET TUBE SHEET TO STUB BARREL C1.30 UT 45 NDE 5.1-2 - X - GEOMETRY HDE 5.1-2 - - X-UT 60 UT 70 NDE 5 ~ 1-2 X - --

    • UT 7**

C-A 5.1-2 - - - 3/14/96 -

204500 4-SGA-N STUB BARREL TO LOWER SHELL C1 ~ 10 UT 0 UT 45 NDE HDE 5.1-2 X---

X X---

UT COMPLETE UT 60 5.1-2 UT 70 NDE HDE 5.1-2 X--- **UT-7**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS IDUAL HEAT REMOVAL TO REBID.HEAT REMOVAL PUMP A N I 0 ZOHE NUMBER: 4-063 ASME ONG T SEC. XI RSE H

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGM R **CALIBRATIONBLOCK**

208560 4-ACH-178 F-A VT-3 NDE 4.3-8 X - - - 3/16/96 - VT-3 COMPLETE DOUBLE ACTING RESTRAINT F1.20B

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 20 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS IDUAL HEAT REMOVAL TO REBID.HEAT REMOVAL PUMP B N I 0 ZONE NUMBER: 4-064 ONG T RSE H

SUMMARY

EXAMINATION AREA E I 0 E REMARKS NUMBER IDENTIFICATION CGM R **CALIBRATIONBLOCK**

211800 14"-RHR-2403-1 C-F-1 PT NDE 3.3-5 X - - - 3/15/96 - PT AND UT COMPLETE TEE TO TEE C5.11 UT 45 NDE 5.4-12 X-UT 60 NDE 5.4-12 X-

    • UT 33**

211900 14"-RHR-2403-2 C-F-1 PT NDE 3.3-5 X - - - 3/15/96 - PT AND UT COMPLETE, ROOT AND TEE TO PIPE C5.11 UT 45 NDE 5.4-12 X - - - INSIDE SURFACE GEOMETRY UT 60 NDE 5.4-12 - X-UT 70 NDE 5.4-12 - X-

    • UT 33**

212100 14"-RHR-2403-4 C-F-1 PT NDE 3.3-6 X- 3/15/96 - PT AND UT COMPLETE, ROOT ELBOW TO VALVE 4-7528 C5.11 UT 45 NDE 5.4-12 X- GEOMETRY UT 60 NDE 5.4-12 -X-UT 70 NDE 5.4-12 X-

%*UT 33**

K li~

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 21 INSERVICE INSPECTION SUMHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COHPONENTS IDUAL HEAT REMOVAL INSIDE & OUTSIDE CONTAINHENT N I 0 ZONE NUMBER: 4-069 ASME ONG T SEC ~ XI RSE H SUMHARY EXAHINATION AREA CATGY EXAM E I 0 E REHARKS NUMBER IDENTIFICATION ITEH NO METHOD PROCEDURE C G M R *iCALIBRATION BLOCK**

220000 12"-RHR-2402-1LU C-F-1 PT NDE 3.3-7 X - - - 3/15/96 - PT AND UT COMPLETE, ROOT LONGITUDINAL SEAM UPSTREAH C5.'12 UT 45 NDE 5.4-6 - X - GEOHETRY

    • UT 35*4 220100 12"-RNR-2402-1 C-F-1 PT NDE 3.3-7 X---

-X- 3/15/96 - PT AND UT COMPLETE, ROOT REDUCER TO PIPE C5 ~ 11 UT 45 NDE 5.4-6 GEOMETRY UT 60 NDE 5.4-6 -X-UT 70 NDE 5.4-6 -X-

  • IUT 35**

C-F-1 3.3-7 - - - 3/15/96 -

220120 12"-RHR-2402-1LD LONGITUDINAL SEAM "DONNSTREAM C5.12 PT UT 45 NDE NDE 5.4-6 X---

X PT AND UT COHPLETE

  • UT-35**

220240 SR-644 F-A VT-3 NDE 4.3-9 X - - - 3/15/96 - VT-3 COMPLETE DOUBLE ACTING RESTRAINT F1.20B 1480 12"-RHR-2402-15LU C-F-1 PT NDE 3.3-10 X - - - 3/15/96 - PT AND UT COMPLETE LONGITUDINAL SEAM UPSTREAM C5.12 UT 45 NDE 5.4-6 X-t*UT 35'kk 221500 12"-RNR-2402-15 C-F-1 PT NDE 3.3-10 X - - - 3/15/96 - PT AND O'I COMPLETE, ROOT PIPE TO FLANGE C5.11 UT 45 NDE 5.4-6 - - x - GEOMETRY UI'0 NDE 5 '-6 x

%*UT 35tt

I DATE: TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 22 06/18/96'DUAL INSERVICE INSPECTION SUMHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COHPONENTS HEAT REHOVAL SYSTEH INSIDE CONTAINMENT N I 0 ZONE NUMBER: 4-084 ASHE ONG T SEC. XI RSE H SUHMARY EXAHINATION AREA CATGY EXAM E I 0 E REMARKS NUHBER IDENTIFICATION ITEH NO METHOD PROCEDURE , C G M R **CALIBRATIONBLOCK**

234240 8073-H-809-05 F-A VT-3 NDE 4.3-10 X - - - 3/16/96 - VT-3 COMPLETE DOUBLE ACTING RESTRAiNT F1.20B

4 h

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 23 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS IDUAL HEAT REHOVAL SYSTEM INSIDE CONTAINMENT N I 0 ZONE NUMBER: 4-089 ASHE ONG T SEC. XI RSE H

SUMMARY

EXAHINATION AREA CATGY EXAH E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM NO METHOD PROCEDURE CGM R **CALIBRATIONBLOCK**

238950 CONT. PENETRATION P-11 F-A VT-3 NDE 4.3-32 X - - - 3/16/96 - VT-3 COMPLETE ANCHOR F1.20D 238960 CONT ~ PENETRATION P-11 IA C-C PT NDE 3.3-21 X - - - 3/16/96 - PT COMPLETE INTEGRAL ATTACHMENT C3.20 239200 8"-S I -2407-1 C-F-1 PT NDE 3.3-21 X - - - 3/16/96 - PT AND UT COMPLETE, ROOT PIPE TO ELBON C5.11 UT 45 NDE 5.4-3 X - - - GEOMETRY UT 60 NDE 5.4-3 - X-

""UT-41**

239400 8"-SI-2407-2 C-F-1 PT NDE 3.3-21 X - - - 3/16/96 - PT AND UT COHPLETE, ROOT ELBM TO PIPE C5.11 UT 45 NDE 5.4-3 X - - - GEOMETRY UT 60 NDE 5.4-3 - - X-

    • UT-41**

t 100 4-SI H-74 F-A VT-3 NDE 4.3-33 X - - - 3/16/96 - VT-3 COMPLETE DOUBLE ACTING RESTRAINT F1.20B 240120 4-SIH-74 IA C-C PT NDE 3.3-18 X - - - 3/16/96 - PT COMPLETE

'I INTEGRAL ATTACHMENT C3.20

t b

4 1

4 C

I~

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UHIT 4 PAGE: 24 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS H HEAD SAFETY INJECTION OUTSIDE CONTAINHENT N I 0 ZONE NUMBER: 4-097 ASME ONG T SEC. XI RSE H

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUHBER IDENTIFICATION ITEH NO HETHOD PROCEDURE CGH R **CALIBRATIONBLOCK**

257068 4"-SI-2401-35 C-F-1 PT NDE 3.3-30 X - - . 3/21/96 - BASELIHE PT AND UT COMPLETE, PIPE TO ELBOW C5.21 UT 0 NDE 5.4-14 X - - - ROO'I GEOMETRY, NEW WELD INSTALLED PER UT 45 NDE 5 '-14 X - - - PC/M 95-172 UT 60 NDE 5.4-14 - X-

    • UT-48 / PSL-61"*

257072 44-SI-2401-36 ELBOW TO PIPE C-F-1 C5.21 'TPT 0

UT 45 NDE NDE NDE 3.3-30 5.4-14 5.4-14 X

X X

3/21/96 - BASELINE PT UT COHPLETE, ROOT GEOMETRY, NEW WELD INSTALLED PER PC/H 95-172 UT 60 NDE 5.4-14 - . X-

    • UT-48 / PSL-61**

257276 3"-SI-2402-8 C-F-1 PT NDE 3.3-2 X - - 3/6/96 - PT AHD UT COHPLETE PIPE TO ELBOW C5.21 UT 45 NDE 5.4-1 X-UT 60 NDE 5.4-1 X-

    • UT 47*4 280 3"-SI-2402-9 C-F-1 PT NDE 3.3-2 X - - - 3/6/96 - PT AND UT COHPLETE PIPE C5.21 UT 45 NDE 5.4-1 X-ELBOW TO UT 60 NDE 5.4-1 X--
    • UT-47**

257292 C F-A VT-3 NDE 4.3-11 X - - - 3/6/96 - VT-3 COMPLETE DOUBLE ACTING RESTRAINT F1.20$

4"-SI -2402-1 C-F-1 3.3-2 - - - 3/6/96 - PT AHD UT COHPLETE 257304 PT NDE 5.4-2 X

REDUCER TO TEE C5.21 UT 45 UT 60 NDE NDE 5.4-2 X

X - --

    • UT-48 (PSL-61)**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 25 INSERVICE INSPEC'TION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS H HEAD SAFETY INJECTION OUTSIDE CONTAINMENT N I 0 ZONE NUMBER: 4-097 ASHE ONG T SEC. XI RSE H SUHHARY EXAHINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDEHTIFICATION ITEH NO METHOD PROCEDURE, CGM R **CALIBRATIOHBLOCK**

257328 4"-SI-2402-6 C-F-1 PT NDE 3.3-2 X - - - 3/6/96 - PT AND UT COMPLETE TEE TO PIPE C5.21 UT 45 NDE 5.4-2 X-UT 60 NDE 5.4-2 X-

    • UT-48 (PSL-61)**

257344 4"-SI-2402-9 C-F-1 PT NDE 3.3-2 X - - - 3/6/96 - PT AND UT COMPLETE) ROOT TEE TO PIPE C5.21 UT 45 NDE 5.4-2 X - - - GEOMETRY UT 60 NDE 5.4-2 - X-

    • UT-48 (PSL-61)**

257384 2"-SI-2402-4 C-F-1 PT NDE 3.3.3 X - - - 3/6/96 - PT COMPLETE PIPE TO ELBOW C5.30 257388 2"-SI-2402-5 C-F-1 PT NDE 3.3 3 X - - - 3/6/96 - PT COMPLETE ELBOW TO PIPE C5.30 4-257436 2"-SI-2403-8 C-F-1 PT NDE 3.3-2 X - - - 3/6/96 - PT COMPLETE PIPE TO ELBOW C5.30 257440 2a-SI-2403-9 C-F-1 PT NDE 3.3-2 X - - - 3/6/96 - PT COMPLETE ELBOW TO PIPE C5.30 257516 4-SIH-53 F-A VT-3 NDE 4.3-12 - - - X 3/6/96 - VT-3 complete, loose nut, DOUBLE ACTING RESTRAINT F1.20B CR 96-240 extra washers found on support, drawing will be revised to show washer, loose nut was determined by engineering evaulation to have no effect on support function, but was tightened

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 26 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OU'TAGE (96RF)

CLASS 2 CBAE STATUS COHPONENTS AM GENERATOR A BLOWDOWN INSIDE CONTAINHENT N I 0 ZONE NUHBER: 4-105 ASHE ONG T SEC. XI RSE H SUHHARY EXAMINATION AREA CATGY EXAH E I 0 E REHARKS NUMBER IDENTIFICATION ITEH NO METHOD PROCEDURE CGH R **CALIBRATIONBLOCK~>>

268700 6".BDA-2401-2 'C-F-2 MT NDE 2.2-2 X - - - 3/15/96 - HT COHPLETE, 3/16/96 - UT VALVE SGB 4-001 TO PIPE C5.51 UT 45 NDE 5.2-2 X - - - COMPLETE, ROOT GEOHETRY UT 60 NDE 5.2-2 - - X-

    • UT-22**

269100 6n-BDA-2401-6 C-F-2 MT NDE 2.2-2 X - - - 3/15/96 - HT COMPLETE, 3/16/96 - UT REDUCER TO VALVE SGB-4-002 C5.51 UT 45 NDE 5.2-2 - - X - COHPLETE, ROOT GEOMETRY UT 60 NDE 5.2-2 - - X-

    • ur-22**

269400 6"-BDA-2401-9 C-F-2 HT NDE 2.2-2 X - - - 3/15/96 - MT COMPLETE( 3/16/96 - UT ELBOW TO PIPE C5.51 UT 45 NDE 5.2-2 X - - - COMPLETE, ROOT GEOHETRY UT 60 NDE 5.2-2 - - X-

    • UT 22**

270000 6"-BDA-2401-15 C-F-2 HT NDE 2.2-2 X - - - 3/15/96 - MT COHPLETE, 3/16/96 - UT PIPE TO ELBOW C5.51 UT 45 NDE 5.2-2 X - - - COMPLETE( ROOT AND COUNTERBORE GEOMETRY UT 60 NDE 5.2-2 - - X-

    • UT-22**

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 27 INSERVICE INSPECTION SUMHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS N FEEDWATER SYSTEM LOOP A N I 0 ZONE NUHBER: 4-111 ASME ONG T SEC. XI RSE H SUHMARY EXAHINATION AREA CATGY EXAH E I 0 E REHARKS NUHBER IDENTIFICATION ITEH NO METHOD PROCEDURE CGM R **CALIBRATIONBLOCK**

281670 4-FWH-'15 F-A VT-3 NDE 4.3-13 X - - - 3/13/96 - VT-3 COMPLETE SPRING HANGER F1.20C 282700 14"-FWA-2401-21 C-F-2 HT NDE 2.2-1 X - - - 3/11/96 - MT AND UT COHPLETE, ROOT AND ELBOW TO PIPE C5.51 UT 45 NDE 5.2-1 X - - - BACKING RING GEOMETRY ur 60 NDE 5.2-1 - - X-

  • ~UT-20**

282900 14"- FWA-2401-3A C-F-2 MT NDE 2.2-1 X - - - 3/11/96 - MT AND UT COMPLETE, ROOT ELBOW TO PIPE C5 ~ 51 UT 45 NDE 5.2-1 X - - - GEOHETRY UT 60 NDE 5.2-1 - X-

    • UZ 20**

284460 AUGMENTED EXAM AUG UT 60 NDE 5.16-1 - X - 3/8/96 - UT COMPLETE, ROOT AND FROM NOZZLE RAMP TO 1 PIPE COUNTERBORE GEOMETRY DIA. ON ELBOW

"*UT-20( UT-29**

0 ll

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 28 INSERVICE INSPECTION

SUMMARY

t THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS N FEEDWATER SYSTEM LOOP B N I 0 ZONE HUMBER: 4-112 ASME ONG T SEC. Xl RSE H

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGM R **CALI BRAT I OH BLOCK**

284800 14"- FWB-2402-1A C-F-2 MT NDE 2.2-3 X - - - 3/28/96 - BASELINE MT AND UT COMPLETE, VALVE FCV-4-488 TO REDUCER C5.51 UT 0 HDE 5.2-3 X - - - INSIDE SURFACE GEOMETRY, NEW REDUCER UT 45 HDE 5.2-3 X - - - INSTALLED PER CR 96-231 UT 60 HDE 5.2-3 - X-UT 70 NDE 5.2-3 X - - - "*UT-40**

286980 AUGMENTED EXAM AUG UT 60 HDE 5 ~ 16 2 - - X X 3/8/96 - UT COMPLETE, ACCEPTABLE FROM NOZZLE RAMP TO 1 PIPE INCLUSION, ROOT, COUNTERBORE, AND CHILL DIA. OH ELBOW RING GEOMETRY, ACCEPTABLE INSIDE SURFACE ANOMOLIES

    • UT-20( UT-29*>>

0 E,

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 29 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS N FEEDWATER SYSTEH LOOP C N I 0 ZONE NUHBER: 4-113 ASHE ONG T SEC. XI RSE H SUMHARY EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUHBER IDENTIFICATION ITEH NO METHOD PROCEDURE CGH R **CALIBRATIONBLOCK**

289650 AUGHENTED EXAH AUG UT 60 NDE 5.16-3 - - X X 3/9/96 - UT COMPLETE, ROOT AND FROM NOZZLE RAMP TO 1 DIA~ ON COUNTERBORE GEOMETRY, INSIDE SURFACE ELBOW ANOMOLY

    • UT-20, UT-29**

l C

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UHIT 4 INSERVICE INSPECTION SUHMARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COHPONENTS H FEEDWATER BYPASS LOOP A H I 0 ZONE NUHBER: 4-114 ASHE ON G T SEC. XI RSE H SUHHARY EXAMINATION AREA CATGY EXAH E IO E REHARKS HUHBER IDENTIFICATIOH ITEN NO METHOD PROCEDURE CGH R **CALIBRATIONBLOCK**

290100 7884-R-014-01 F-A VT-3 NDE 4.3-14 X - - - 3/6/96 - VT-3 COHPLETE DOUBLE ACTING RESTRAINT '1.20B

Il If

'1 I

I I

f I

f 1

1 I

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UHIT 4 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOHD OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS N FEEDMATER BYPASS LOOP C N I 0 ZONE NUMBER: 4-116 ASME ONG T SEC. Xi RSE H

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENT IF ICATION ITEM NO METHOD PROCEDURE CGM R **CALIBRATIOHBLOCK**

291600 7884-R-014-03 F-A VT-3 NDE 4.3-15 X - - - 3/6/96 - VT-3 COMPLETE DOUBLE ACTING RESTRAINT F1.208

1

! P

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 32 IHSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PER!00, SECOHD OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS IDUAL HEAT EXCHANGER A N I 0 ZONE NUMBER: 4-1'l7 ASME ON 6 T SEC. Xl RSE H

SUMMARY

EXAMIHATIOH AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGM R **CALIBRATIOHBLOCK**

292400 4-RHE-A1 C-A UT 45 NDE 5.1-1 X- 3/12/96 - UT COHPLETE, LIMITED HEAD TO SHELL C1.20 UT 60 NDE 5.1-1 X- EXAMINATION DUE TO SUPPORT INTEGRAL ATTACHMENTS, WELDED ATTACHMENTS, AHD NOZZLE REINFORCEMENT PLATES

    • UT-SS**

292500 4-RHE-A2 C-A UT 45 NDE 5;1.1 -X- 3/12/96 - UT COMPLETE, BAFFLE PLATE SHELL TO FLANGE C1.10 UT 60 NDE 5.1-1 X- GEOMETRY, LIMITED EXAMINATION DUE TO SUPPORT INTEGRAL ATTACHMENTS, WELDED ATTACHMENTS, FLANGE GEOMETRY, AND NOZZLE REINFORCEMENT PLATES

    • UT-55**

292600 4-RHE-A3 C-B VT-2 4.2-1 << X - - - 2/28/96 - VT-2 COMPLETE( TELLTALE HOLE INLET NOZZLE TO SHELL C2.33 4-RHR-5027-F-01 EXAMINED 292604 4-RHE-A5 VT-2 4.2-1 - X 2/28/96 - VT-2 COHPLETE ON TELLTALE OUTLET NOZZLE TO SHELL 4-RHR-5027-F-01 - - - - HOLE, EVIDENCE OF BORIC AC!D) NOZZLE CR 96-204 REMOVED FROM SERVICE 292610 4-RHE-A7 96 - WELD REMOVED FROM SERVICE WHEN REINFORCEMENT PLATE TO SHELL LEAKAGE DETECTED AT TELLTALE HOLE 292620 4-RHE-A8 96 - WELD REMOVED FROH SERVICE WHEN REINFORCEHENT PLATE TO NOZZLE LEAKAGE DETECTED AT TELLTALE HOLE 292630 4-RHE-A9 C.B PT NDE 3.3.28 X - . - 3/12/96 . PT COHPLETE REINFORCEMENT PLATE TO SHELL C2.31

r I

t t

I I

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 33 INSERVICE INSPECTION

SUMMARY

THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS IDUAL HEAT EXCHANGER A N I 0 ZONE NUHBER: 4-117 ASME ONG T SEC. XI RSE H

SUMMARY

EXAMIHATION AREA CATGY EXAM E I 0 E REHARKS NUHBER IDENTIFICATION ITEM NO METHOD PROCEDURE CGM R "*CALIBRATIOH BLOCK~*

292640 4-RHE-A10 C-B PT NDE 3.3-28 X - - - 3/12/96 - PT COMPLETE REINFORCEMENT PLATE TO NOZZLE C2.31 292650 4-RHE-A11 C-B PT NDE 3.3-29 X- 3/19/96 - BASELINE PT COMPLETE, 3/20/96 OUTLET NOZZLE TO SHELL C2.21 UT 0 NDE 5.4-13 X- - BASELINE UT COMPLETE, LIMITED UT 45 NDE 5.4-13 X

-"- EXAHIHATION DUE TO NOZZLE CONFIGURATION, UT 60 NDE 5.4-13 X- INSTALLED PER PC/H 96-028 UT 70 NDE 5.4-13 X- **UT-55*"

292800 4-RHE-SPA-1 SUPPORT F-A VT-3 NDE 4.3-16 X - - - 3/12/96 - VT-3 COMPLETE HEAT EXCHANGER LOWER SUPPORT F1.40H 292950 4-RHE-SPA-2 SUPPORT F-A VT-3 NDE 4.3-17 X - - - 3/12/96 - VT-3 COHPLETE HEAT EXCHANGER LOWER SUPPORT F1 '0H

p'I I'

DATE: 06/18/96 TURKEY POINT NUCLEAR PLANT UNIT 4 PAGE: 34 INSERVICE INSPECTION SUMHARY THIRD INTERVAL, FIRST PERIOD, SECOND OUTAGE (96RF)

CLASS 2 CBAE STATUS COMPONENTS IDUAL HEAT EXCHANGER 8 N I 0 ZONE NUHBER: 4-118 ASHE ONGT SEC. XI RSEH

SUMMARY

EXAMINATION AREA CATGY EXAM E I 0 E REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE C G M R "*CALIBRATIOH BLOCK**

293200 4-RHE-83 C-B VT-2 4.2-1 X - - - 2/28/96 - VT-2 COMPLETE, TELLTALE HOLE INLET NOZZLE TO SHELL C2.33 4-RHR-5027-F-01 EXAMINED FOR LEAKAGE 293204 4-RHE-85 C-B VT-2 4.2-1 X - - - 2/28/96 - VT-2 COMPLETE( TELLTALE HOLE OUTLET NOZZLE TO SHELL C2.33 4-RHR-5027-F-01 EXAMINED FOR LEAKAGE

t gE I

l'~%>,.*, >

J