FP&L Turkey Point Nuclear Plant Unit 3 Refueling Outage 1994 Siemens Power Corp Final Rept.
ML17352A777
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/10/1994
From:
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
Shared Package
ML17352A775 List:
References
NUDOCS 9408260160
Download: ML17352A777 (37)


Text

F H.ORIDA POWER 8c LIGHT COMPAXED TURKEY POINT NUCLEAR POWER PLANT, UNIT 3 CL'IExiT'S P. O. k B92691-01146 SPC JOB CODE N3403 cubi Prepared by: Date:

Reviewed by: Date:

+~T 94082b0ib0 940815 PDR ADQCK 05000250,i l g PDR

Certificate of Coxnpliance Activities described in this Final Report were conducted in accordance with the applicable requirements of Florida Power 8z Light Purchase Order 4 89269I-05146.

1 canape f ality Assurance

To satisfy the requirements of ASME,Section XI, ancl FPI. Plant Turkey Point (PTN) Technical Specifications, snubber surveillance services were performed during I

PTN Spring Rehxe1ing Outage 1994. Visual examinations, functional testing, and snubber rehxrbishrnent activities were accomplished on those snubbers designated by FPL's site representative. Functional testing, using Siemens Povrer Corporation (SPC) on-site mobile test equipment determined the as-found condition of those snubbers se1ected for test.

5 FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT INTRODUCTION:

Siemens Power Corporation (SPC) was contracted to provide snubber test equipment and visual examination personnel under the direction of Florida Power and Light Co. (FPL) during Turkey Point Unit 3's Spring Refueling Outage. The work was scheduled for performance 4 April 1994 through 30 April 1994 at the Turkey Point's Unit No.3 Nuclear Facxlity.

It 1

This narrative summarizes the significant aspects of the activity.

contains summary tables of visual examination results, functionalvisual test results, disassembly evaluations and deviation reports. Original examination documentation, functional test plots, deviation reports, disassembly evaluations and the Project Plan (which are incorporated in this report by reference) were turned over to the customer's representative prior to the conclusion of on-site activities.

The initial work scope included the visual examination of 111 mechanical shock arrestors, the functional testing of 12 snubbers as part of the original sample plan and eight (8) snubbers as part of augmented testing.

Functional test activities required as-found testing of test sample plan and augmented snubber and as-left testing of specifxc mechanical snubbers after cleaning and reassembly.

Functional testing activities identified one (1) consisted snubber which deviated of twenty-three from the specified criteria. Functional testing divxded into four categories:

functional tests, the tested snubbers are Sample 1, Augmented, Post cleaning and Spares.

Visual examination, functional testing and evaluation the activities were performed at Turkey Point Unit 3 under the direction of Turkey Point site representative. Work performed was in accordance with the above referenced FP&L procedures and in accordance with the SPC Quality Assurance Program.

Visual examination of 109 mechanical shock arrestors identified thirty one (31) shock arrestors deviating for the examination criteria. These conditions were determined to be maintenance items. summary Therefore, none of these conditions constituted visual failures. A of Visual Examination Results is provided in the summary section of this report.

Functional testing of the twelve(12) original sample snubbers (Sample 1 3-1070/ 3-1071/

3-1000/ 3-1038/ 3-1043/ 3-1044/ 3-1046/ 3-1048/ 3-1057/

3-1081, 3-1106 and 3-1137) identified no snubbers deviating from the specified criteria. Augmented functional testing of three (3) snubbers (3-1045 3-1094 and 3-1110) was performed. The snubber installed at tag location 3-1094 failed to meet the specified criteria for initial drag.

Snubbers installed at tag locations 3-1054, 3-1077, 3 1078/ 3 1079/ and 3-1080 were functionally tested after cleaning and all met the specified criteria.

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT Three (3) spare snubbers were functionally tested to be used as replacement snubbers. Spare 1 was installed at, tag location 3-1080. Spare 2 was installed at tag location 3-1078. Spare 3 was installed at tag location 3-1094.

Summaries of functional test results for Sample 1, Augmented Tests, Post cleaning tests and testing of Spares are provided in the summary section of this report.

Thirty one (31) Deviation Reports were generated as result of Visual examination and functional testing'ctivities. These reports were submitted to the site representative for disposition intructzons. Upon instructions were completed and receipt of disposition instructions, the summary verified, thus closing the report. A of'eviation Reports is provided in the summary section of this report.

The purchase order required that snubbers installed at tag locations 3-1054, 3-1077, 3-1078, 3-1079 and 3-1080 be partially disassembled (only as far as required to remove excess grease from the capstan area), cleaned, evaluated and reassembled, snubber condition permitting. A summary of the conditions found upon disassembly is provided in the summary section of this report.

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT PROGRAM SUMMARIES VISUAL EXAMINATION

SUMMARY

TAG SERIAL 4 VT-3DATE VTRSLT A/F DEVO ~

3-1000 18015 04/15/94 PASS 3-1001 27095 04/12/94 PASS 3-1002 104 04/12/94 DEV. 3-TPN-94-3-1002 3-1003 29625 04/12/94 DEV. 4-TPN-94-3-1003 3-1004 101 04/12/94 PASS 3-1005 10035 04/08/94 DEV. 2-TPN-94-3-1005 3-1006 3051 04/12/94 DEV. 5-TPN-94-3-1006 1 3-1007 3-1008 3-1009 4590 8084 1203 04/13/94 04/13/94 04/13/94 PASS PASS DEV. 6-TPN-94-3-1009 3-1010 11931 04/13/94 DEV. 7-TPN-94-3-1010 3-1011 12376 04/13/94 DEV. 8-TPN-94-3-1011 3-1012 8086 04/07/94 PASS 3-1013 33624 04/22/94 PASS 3-1014 1722 04/22/94 'ASS 3-1015 18009 04/22/94 PASS 3-1016 18012 04/22/94 PASS 3-1017 18003 04/22/94 PASS 3-1018 18013 04/22/94 PASS 3-1019 2889 04/13/94 DEV. 9-TPN-94-3-1019 3-1020 103 04/13/94 DEV. 10-TPN-94-3-1020 3-1021 16725 04/22/94 DEV. 32-TPN-94-3-1021

r . ~

~ i ~

~ * ~

I TAG SERIAL 0 FLORIDA POWER VT-3DATE

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT VTRSLT A/F DEVO ~

3-1022 18006 04/22/94 PASS 3-1023 23273 04/22/94 PASS 3-1024 17427 04/22/94 PASS P

3-1025 100 04/22/94 PASS 3-1028 11135 04/22/94 PASS 3-1029 11330 04/22/94 PASS 3-1030 11121 04/22/94 PASS 3-1031 27086 04/14/94 PASS 3-1032 24410 04/14/94 DEV. 16-TPN-94-3-1032 3-1033 19328 04/14/94 PASS 3-1034 24429 04/14/94 PASS 3-1035 19330 04/14/94 PASS 3-1036 27100 04/14/94 PASS 3-1037 11922 04/16/94 PASS 3-1038 11934 04/15/94 PASS 3-1039 16241 04/15/9 4 DEV. 17-TPN-94-3-1039 3-1040 16239 04/15/94 DEV. 18-TPN-94-3-1040 3-1041 16234 04/15/94 DEV. 19-TPN-94;3-1041 3-1042 12365 04/15/94 PASS 3-1043 17899 04/18/94 PASS 3-1044 17900 04/18/94 PASS 3-1045 17189 04/18/94 PASS 3-1046 17903 04/18/94 PASS 3-1047 17902 04/18/94 PASS 3-1048 17904 04/18/94 PASS 16245 04/18/94 PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG ¹ SERIAL ¹ VT-3DATE VTRSLT A/F DEVO 3-1050 17906 04/18/94 PASS 3-1051 16249 04/19/94 PASS 3-1052 16233 04/19/94 PASS 3-1053 2462 04/19/94 PASS 3-1054 16248 PASS '4/19/94 3-1055 13697 04/19/94 PASS 3-1057 27106 04/18/94 PASS 3-1058 27102 04/18/94 PASS 3-1060 19329 04/18/94 PASS 3-1069 27072 04/18/94 PASS 3-1070 27079 04/18/94 PASS 3-1071 27069 04/19/94 PASS 3-1072 27073 04/19/94 DEV. 29-TPN-94-3-1072 3-1073 27090 04/19/94 PASS 3-1074 27104 04/18/94 PASS 3-1075 18074 04/16/94 DEV. 24-TPN-94-3-1075 3-1076 19725 04/16/94 DEV. 25-TPN-94-3-1076 3-1077 16230 04/15/94 DEV. 15-TPN-94-3-1077 3-1078 16229 04/15/94 DEV. 14-TPN-94-3-1078 3-1079 10176 04/15/94 DEV. 13-TPN-94-3-1079 3-1080 10173 04/15/94 DEV. 12-TPN-94-3-1080 3-1081 11921 04/15/94 PASS 3-1082 11932 04/15/94 PASS 3-1083 11925 04/21/94 PASS 3-1084 7000 04/20/94 PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG SERIAL 4 VT-3DATE VTRSLT A/F DEVO ~

3-1091 27087 04/16/94 DEV. 21-TPN-94-3-1091 3-1092 27105 04/16/92 DEV. 22-TPN-94-3-1092 3-1093 27091 04/1 6/94 DEV. 23-TPN-94-3-1093 3-1094 27074 04/19/94 DEV. 28-TPN-94-3-1094 3-1095 16733 04/14/94 PASS 3-1096 11993 04/19/94 PASS 3-1097 16724 04/19/94 PASS 3-1098 33628 04/15/94 PASS 3-1099 38481 04/15/94 PASS 3-1100 17819 04/15/94 PASS 3-1101 33626 04/15/94 DEV. 20-TPN-94-3-1101 29451 04/15/94 PASS 3-1103 11996 , 04/19/94 PASS 3-1104 24412 04/19/94 PASS 3-1105 16134 04/14/94 PASS 3-1106 29495 04/14/94 DEV. 11-TPN-94-3-1106 3-1110 16136 04/14/94 PASS 3-1111 2875 04/19/94 PASS 3-1112 27083 04/19/94 PASS 3-1120 18325 04/19/94 PASS 3-1121 24430 04/15/94 PASS 3-1123 12988 ~

04/07/94 DEV. 1-TPN-94-3-1123 3-1124 12991 04/07/94 PASS 3-1125 12986 04/08/94 PASS 3-1126 12989 04/08/94 PASS 3-1127 12990 04/08/94 PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG SERIAL 4 VT-3DATE VTRSLT A/F DEVO.

3-1128 12985 04/08/94 PASS 3-1129 12987 04/13/94 PASS 3-1130 17840 04/11/94 PASS 3-1131 17837 04/11/94 PASS 3-1132 17838 04/11/94 PASS 3-1133 13695 04/11/94 PASS 17836 04/11/94 PASS 3-1134'-1135 17839 04/12/94 PASS 3-1136 19884 04/16/94 PASS 3-1137 19885 04/16/94 PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT FUNCTIONAL TEST SUMMARIES SAMPLE 1 Functus.onal Test Summary TAG 4: 3-1000 MODEL: PSA-1 FTRSLT: PASS FDATE: 04/14/94 SERIAL g: 18015 TBKAWY: 6.1 CBKAWY: 12.7 BKAWY RSLT: PASS TIDRAG: 10.8 CIDRAG: 13.6 IDRAG RSLT: PASS TAIDRAG: 6.1 CADRAG: 9.1 AVDRAG RSLT: PASS TTST LOAD: 1411.6 CTST LOAD: 1440.3 TEST LOAD RSLT: PASS TACTV.: 0.009 CACTV.: 0.009 ACTV. RSLT: PASS TFDRAG: 11.9 CFDRAG: 14.7 FDRAG RSLT: PASS TFADRAG: 6.6 CFADRAG: 9.2 TFADRAG RSLT: PASS TAG 8: 3-1038 MODEL: PSA-35 FTRSLT: PASS FDATE: 04/16/94 SERIAL 4 11934 TBKAWY: 363. 5 CBKAWY: 205.4 BKAWY RSLT: PASS TXDRAG: 626. 5 CXDRAG: 447.2 IDRAG RSLT PASS TAIDRAG: 248 ' CADRAG: 194 0 AVDRAG RSLT: PASS TTST LOAD: 44650 CTST LOAD: 47290 TEST LOAD RSLT: PASS TACTV.: 0.017 CACTV.: 0.016 ACTV. RSLT: PASS TFDRAG: 554.1 CFDRAG: 602.2 FDRAG RSLT: PASS TFADRAG: 259.3 CFADRAG: 225.4 TFADRAG RSLT: PASS TAG 5: 3-1044 MODEL: PSA-10 FTRSLT: PASS FDATE: 04/19/94 SERIAL g: 17900 TBKAWY: 46.2 CBKAWY: 54 ' BKAWY RSLT: PASS TXDRAG: 55.4 CXDRAG: 86.1 IDRAG RSLT: PASS TAIDRAG: 40.0 CADRAG: 65.7 AVDRAG RSLT: PASS

TTST LOAD: 13456.4 CTST LOAD: 13484.6 TEST LOAD RSLT: PASS TACTV.: 0.019 CACTV.: 0.013 ACTV. RSLT: PASS TFDRAG: 66.5 CFDRAG: 58.6 FDRAG RSLT: PASS TFADRAG: 53.6 CFADRAG: 42.3 TFADRAG RSLT: PASS TAG 5: 3-1046 MODEL: PSA-10 FTRSLT: PASS FDATE: 04/ 19/94 SERIAL 4: 17903 TBKAWY: 26.5 CBKAWY: 35 .5 BKAWY RSLT PASS TIDRAG: 53.9 CXDRAG: 47 ~ 3 IDRAG RSLT: PASS TAIDRAG: 36.7 CADRAG: 27 .9 AVDRAG RSLT: PASS TTST LOAD: 14690.0 CTST LOAD: 14090. 3 TEST LOAD RSLT: PASS TACTV.: 0.017 CACTV.: 0. 009 ACTV. RSLT: PASS TFDRAG: 62.0 CFDRAG: 63 .3 FDRAG RSLT: PASS TFADRAG: 37.7 CFADRAG: 3 1.0 TFADRAG RSLT: PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT SAMPLE 1 Functional Test Summary (continued)

TAG 4: 3-1048 MODEL: PSA-10 FTRSLT: PASS FDATE: 04/19/94 SERXAL g: 17904 TBKAWY: 42.1 CBKAWY: 43.3 BKAWY RSLT: PASS TIDRAG: 81.3 CIDRAG: 57.7 XDRAG RSLT: PASS TAIDRAG: 41.2 CADRAG: 30.3 AVDRAG RSLT: PASS TTST LOAD: 13636 ' CTST LOAD: 13268.3 TEST LOAD RSLT: PASS TACTV.: 0.019 CACTV.: 0.011 ACTV. RSLT: PASS TFDRAG: 39.7 CFDRAG: 54.9 FDRAG RSLT: PASS TFADRAG: 29.5 CFADRAG: 32.1 TFADRAG RSLT: PASS TAG 5: 3-1057 MODEL: PSA-3 FTRSLT: PASS FDATE: 04/19/94 SERXAL g: 27106 TBKAWY: 2 1. 9 CBKAWY: 22.2 BKAWY RSLT: PASS TIDRAG: 41. 0 CXDRAG: 33.4 IDRAG RSLT: PASS TAIDRAG: 22.6 CADRAG: 18.6 AVDRAG RSLT: PASS TTST LOAD: 5831.8 CTST LOAD: 5721.8 TEST LOAD RSLT: PASS TACTV.: 0.010 CACTV.: 0.005 ACTV. RSLT: PASS TFDRAG: 47.6 CFDRAG: 35.9 FDRAG RSLT: PASS TFADRAG: 23.1 CFADRAG: 19.5 TFADRAG RSLT: PASS TAG 5 '-1070 MODEL: PSA-3 FTRSLT: PASS FDATE: 04/19/94 SERIAL g: 27079 TBKAWY: 39. 0 CBKAWY: 31.0 BKAWY RSLT: PASS TIDRAG: 51. 8 CIDRAG: 56.2 IDRAG RSLT: PASS TAIDRAG: 29.5 CADRAG: 33.5 AVDRAG RSLT: PASS TTST LOAD: 5535.2 CTST LOAD: 5363.4 TEST LOAD RSLT: PASS TACTV.: 0.011 CACTV.: 0.006 ACTV. RSLT: PASS TFDRAG: 55.5 CFDRAG: 49.1 FDRAG RSLT: PASS TFADRAG: 30.9 CFADRAG: 29.0 TFADRAG RSLT: PASS TAG 4: 3-1071 MODEL: PSA-3 FTRSLT: PASS FDATE: 04/19/94 SERIAL g: 27069 TBKAWY: 30. 1 CBKAWY: 14.1 BKAWY RSLT PASS TXDRAG: 37.7 CIDRAG: 34.5 IDRAG RSLT: PASS TAXDRAG: 22.3 CADRAG: 20.3 AVDRAG RSLT: PASS TTST LOAD: 5727.2 CTST LOAD: 5534.8 TEST LOAD RSLT: PASS TACTV.: 0.012 CACTV.: 0.008 ACTV. RSLT: PASS TFDRAG: 34.7 CFDRAG: 26.3 FDRAG RSLT: PASS TFADRAG: 20.6 CFADRAG: 12.2 TFADRAG RSLT: PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT SAMPLE 1 Functional Test Summary (continued)

TAG I: 3-1081 MODEL: PSA-35 FTRSLT: PASS FDATE: 04/15/94 SERIAL g: 11921 TBKAWY: 398.1 CBKAWY: 372.8 BKAWY RSLT: PASS TIDRAG: 494.9 CIDRAG: 372.8: IDRAG RSLT: PASS TAIDRAG: 251.9 CADRAG: 173.9 AVDRAG RSLT: PASS TTST LOAD: 43990 CTST LOAD: 48440 TEST LOAD RSLT: PASS TACTV.: 0.015 CACTV.: 0.014 ACTV. RSLT: PASS TFDRAG: 536.5 CFDRAG: 479.1 FDRAG RSLT: PASS TFADRAG: 157.7 CFADRAG: 254.3 TFADRAG RSLT: PASS TAG 4: 3-1106 MODEL: PSA-1/4 FTRSLT: PASS FDATE: 04/15/94 SERIAL g: 29495 TBKAWY: 4.9 CBKAWY: 6.6 BKAWY RSLT: PASS TIDRAG: 8.9 CIDRAG: 8.0 IDRAG RSLT: PASS TAIDRAG: 6.1 CADRAG: 3 ' AVDRAG RSLT: PASS TTST LOAD: 337.4 CTST LOAD: 310.5 TEST LOAD RSLT: PASS TACTV.: 0.007 CACTV.: 0.006 ACTV. RSLT: PASS t

TFDRAG: 8.3 CFDRAG: 6.5 FDRAG RSLT: PASS TFADRAG: 5.7 CFADRAG: 3.4 TFADRAG RSLT: PASS TAG I 3-1137 MODEL: PSA-1/2 FTRSLT: PASS FDATE: 04/16/94 SERIAL g: 19885 TBKAWY: 2.3 CBKAWY: 3.9 BKAWY RSLT: PASS TIDRAG: 3.7, CIDRAG: 4.4 IDRAG RSLT: PASS TAIDRAG: 2.4 CADRAG: 3.1 AVDRAG RSLT: PASS TTST LOAD: 624.2 CTST LOAD: 629.1 TEST LOAD RSLT: PASS TACTV.: 0.014 CACTV.: 0.012 ACTV. RSLT: PASS TFDRAG: 4.7 CFDRAG: 4.0 FDRAG RSLT: PASS TFADRAG: 3.1 CFADRAG: 2.7 TFADRAG RSLT: PASS

FLORIDA POWER & LIGHT Co.

TURKEY POXNT NUCLEAR PLANT UNXT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATXON FINAL REPORT Augmented Functus.onal Test summary TAG 8 3-1045 MODEL: PSA-10 FTRSLT: PASS FDATE: 04/19/94 SERIAL 8: 17189 TBKAWY: 24 ' CBKAWY: 46.8 BKAWY RSLT: PASS TIDRAG: 36.9 CIDRAG: 65.0 IDRAG RSLT: PASS TAIDRAG: 22.5 CADRAG: 48.2 AVDRAG RSLT: PASS TTST LOAD: 13892.2 CTST LOAD: 13239.6 TEST LOAD RSLT: PASS TACTV.: 0.019 CACTV.: 0.011 ACTV. RSLT: PASS TFDRAG: 49.0 CFDRAG: 46.5 FDRAG RSLT: PASS TFADRAG: 32.3 CFADRAG: 32.7 TFADRAG RSLT: PASS TAG 8: 3-1094 MODEL: PSA-3 FTRSLT: FAIL FDATE: 04/19/94 SERIAL g: 27074 TBKAWY: 165.3 CBKAWY: 158.4 BKAWY RSLT: PASS TIDRAG: 208.4 CIDRAG: 343.2 IDRAG RSLT: FAIL TAIDRAG: 114.9 CADRAG: 138.6 AVDRAG RSLT: PASS TTST LOAD: 5887.0 CTST LOAD: 5827.7 TEST LOAD RSLT: PASS TACTV.: 0.012 CACTV.: 0.007 ACTV. RSLT: PASS TFDRAG: 155.3 CFDRAG: 192.0 FDRAG RSLT: PASS TFADRAG: 73 ' CFADRAG: 93.1 TFADRAG RSLT: PASS TAG g: 3-1110 MODEL: PSA-1 FTRSLT: PASS FDATE: 04/15/94 SERIAL 4: 16136 TBKAWY: 5.8 CBKAWY: 3.2 BKAWY RSLT: PASS TXDRAG: 8.7 CIDRAG: 6.8 XDRAG RSLT: PASS TAIDRAG: 6.0 CADRAG: 3.2 AVDRAG RSLT: PASS TTST LOAD: 1402.7 CTST LOAD: 1424.4 TEST LOAD RSLT: PASS TACTV.: 0.009 CACTV.: 0.008 ACTV. RSLT: PASS TFDRAG: 7.7 CFDRAG: 7.9 FDRAG RSLT: PASS TFADRAG: 4.8 CFADRAG: 4.4 TFADRAG RSLT: PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT Post Cleaning Funotional Test Summary TAG 4 3-1054 MODEL: PSA-10 A/L FTRSLT: PASS A/L FDATE: 04/19/94 SERIAL 4: 16248 TBKAWY: 22.7 CBKAWY: 35.8 BKAWY RSLT: PASS TIDRAG: 38.9 CIDRAG: 55.9 IDRAG RSLT: PASS TAIDRAG: 20.4 CADRAG: 36.0 AVDRAG RSLT: PASS TTST LOAD: 13832.7 CTST LOAD: 13256.4 TEST LOAD RSLT: PASS TACTV.: 0. 017 CACTV.: 0.017 ACTV. RSLT: PASS TFDRAG: 39.8 CFDRAG: 47.4 FDRAG RSLT: PASS TFADRAG: 22.3 CFADRAG: 30.5 TFADRAG RSLT: PASS TAG 4 3-1077 MODEL: PSA-10 A/L FTRSLT: PASS A/L FDATE: 04/16/94 SERIAL g: 16230 TBKAWY: 44.3 CBKAWY: 39.4 BKAWY RSLT: PASS TIDRAG: 44.3 CIDRAG: 58.0 IDRAG RSLT: PASS TAIDRAG: 22.6 CADRAG: 36.5 AVDRAG RSLT: PASS TTST LOAD: 14507.4 CTST LOAD: 13683.9 TEST LOAD RSLT: PASS TACTV.: 0.017 CACTV.: 0 '10 ACTV. RSLT: PASS TFDRAG: 37.6 CFDRAG: 52.2 FDRAG RSLT: PASS TFADRAG: 21.9 CFADRAG: 32.6 TFADRAG RSLT: PASS TAG g: 3-1078 MODEL: PSA-10 A/L FTRSLT: PASS A/L FDATE: 04/18/94 SERIAL 8: 16229 TBKAWY: 16. 6 CBKAWY: 34.3 BKAWY RSLT: PASS TIDRAG: 34.0 CIDRAG: 47.7 IDRAG RSLT: PASS TAIDRAG: 14.9 CADRAG: 31.1 AVDRAG RSLT: PASS TTST LOAD: 14313.1 CTST LOAD: 13148.8 TEST LOAD RSLT: PASS TACTV.: 0.018 CACTV.: 0.011 ACTV. RSLT: PASS TFDRAG: 45.8 CFDRAG: 32.5 FDRAG RSLT: PASS TFADRAG: 29.1 CFADRAG: 17.1 TFADRAG RSLT: PASS TAG 4: 3-1079 MODEL: PSA-10 A/L FTRSLT: PASS A/L FDATE: 04/16/94 SERIAL g: 10176 TBKAWY: 17.1 CBKAWY: 29.5 BKAWY RSLT: PASS TIDRAG: 29. 8 CIDRAG: 39.1 IDRAG RSLT: PASS TAIDRAG: 16.6 CADRAG: 23.6 AVDRAG RSLT: PASS TTST LOAD: 14036.6 CTST LOAD: 13728.1 TEST LOAD RSLT: PASS TACTV.: 0.019 CACTV.: 0.010 ACTV. RSLT: PASS TFDRAG: 29.2 CFDRAG: 42.0 FDRAG RSLT: PASS TFADRAG: 14 ' CFADRAG: 25.8 TFADRAG RSLT: PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNXT 3 REFUELXNG OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT Post Cleaning Functional Test Summary Cont.

TAG g 3-1080 MODEL: PSA-10 A/L FTRSLT: PASS A/L FDATE: 04/18/94 SERIAL 8: 10173 TBKAWY: 15.4 CBKAWY: 27.6 BKAWY RSLT: PASS TIDRAG: 39. 4 CIDRAG: 47.9 IDRAG RSLT: PASS TAXDRAG: 18.0 CADRAG: 15.6 AVDRAG RSLT: PASS TTST LOAD: 13637.2 CTST LOAD: 13072.4 TEST LOAD RSLT: PASS TACTV.: 0.017 CACTV.: 0.009 ACTV. RSLT: PASS TFDRAG: 60.6 CFDRAG: 23-1 FDRAG RSLT: PASS TFADRAG: 26.2 CFADRAG: 8.8 TFADRAG RSLT: PASS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT Spare Functional Test summary TAG g: Spare 1 MODEL: PSA-10 A/L FTRSLT: PASS A/L FDATE: 04/18/94 SERIAL g: 12396 TBKAWY: 15.4 CBKAWY: 27.6 BKAWY RSLT: PASS TIDRAG: 39.4 CIDRAG: 47.9 IDRAG RSLT: PASS TAIDRAG: 18.0 CADRAG: 15.6 AVDRAG RSLT- PASS TTST LOAD: 13637.2 CTST LOAD: 13072.4 TEST LOAD RSLT: PASS TACTV.: 0.017 CACTV.: 0.009 ACTV. RSLT: PASS TFDRAG: 60.6 CFDRAG: 23.1 FDRAG RSLT: PASS TFADRAG: 26.2 CFADRAG: 8.8 TFADRAG RSLT: PASS TAG g: Spare 2 MODEL: PSA-10 A/L FTRSLT: PASS A/L FDATE: 04/18/94 SERIAL 5: 16244 TBKAWY: 16.6 CBKAWY: 34.3 BKAWY RSLT: PASS TIDRAG: 34.0 CIDRAG: 47.7 IDRAG RSLT: PASS l

TAIDRAG: 14.9 CADRAG: 31.1 AVDRAG RSLT: PASS TTST LOAD: 14313.1 CTST LOAD': 13148.8 TEST LOAD RSLT: PASS TACTV.: 0.018 CACTV.: 0.011 ACTV. RSLT: PASS TFDRAG: 45.8 CFDRAG: 32.5 FDRAG RSLT: PASS TFADRAG: 29.1 CFADRAG: 17.1 TFADRAG RSLT: PASS TAG 5: Spare 3 MODEL: PSA-3 FTRSLT: PASS FDATE: 04/19/94 SERIAL 4: 4388 TBKAWY: 16.9 CBKAWY: 10.4 BKAWY RSLT: PASS TIDRAG: 20.8 CIDRAG: 21.3 IDRAG'SLT- PASS

~ TAIDRAG: 10 ' CADRAG: 10.7 AVDRAG RSLT: PASS TTST LOAD: 5301.1 CTST LOAD: 5378.4 TEST LOAD RSLT: PASS TACTV.: 0.011 CACTV.: 0.008 ACTV. RSLT: PASS TFDRAG: 20.1 CFDRAG: 21.2 FDRAG RSLT: PASS TFADRAG: 10.0 CFADRAG: 11.2 TFADRAG RSLT: PASS

FLORXDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELXNG OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT DEVIATION REPORT

SUMMARY

TAG g: 3-1002 DEVXATION g: 03-TPN-93-,3-1002 INT DATE 4/12/94 CLOSE DATE: 4/12/94 CONDITION: Transition tube assembly mounting bolts are flush with with snubber housing flange. The existing bolts are 5/16>> dia 7/16>> thread engagement.

1 DISPOSITION: ACCEPTABLE AS IS.

TAG 5 3-1003 DEVIATION 4: 04-TPN-94-3-1003 INT. DATE: 4/12/94 CLOSE DATE: 4/12/94 Transition tube assembly mounting bolts are flush withwith snubber housing flange. Existing bolts are 5/16>> dia.

7/16>> engagement. Thread engagement > 1 bolt dia.

t DISPOSITION:

TAG 4: 3-1005 ACCEPTABLE AS XS DEVIATXON 4: 02-TPN-94-3-1005 CONDITION:

XNT. DATE: 4/11/94

1) Both load pins on this MSA show wear.

CLOSE DATE: 4/11/94

2) Load pin holes in holes in the structural attachment appear to be elongated approximately 1/32>>.

DISPOSITION: 1) Replaced load pins. g 4/ ~c/i ++p84cEk

2) CR written on holes. c rC P~l-A5'4 TAG g: 3-1006 DEVXATION 8: 05-TPN-94-3-1006 INT. DATE: 4/12/94 CLOSE DATE: 4/23/94 CONDXTION: 1) Load pin holes in structural attachment appear to be elongated approximately 1/16>>, load pin holes in the pipe attachment appear to be elongated approximately 1/32>>
2) Snubber end load pin shows excessive wear.
3) Snubber could not be hand stroked.

DISPOSITION: 1 & 2) CR written

3) Stroked snubber in test bench at default pressure.

c'Abir~A <Ci oW cd p~g- RF4 s>>4egrrc$ . r ~ 5'Q-oV/

gyp'.Hc @ Ja~8><5 c Los< +~8 f4 9w gaza'c-. Xp us srH vzsr h &4~

~ L FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 4: 3-1009 DEVIATION 4: 06-TPN-94-3-1009 INT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDXTION: 1) Load pin holes in structural attachment appear to be elongated approximately 1/32", load pin holes in the pipe attachment appear to be elongated approximately 1/16>>

2) Load pin xn the strut end shows excessive wear.
1) Replaced load pin on strut end.

~~

DXSPOSITION:

2) CR written Pg-gQ,, Pen 99- o'/I I~4(Cb (44882&

E'La&~ TE5 /9<4 c.mF TAG 4 3-1010 DEVIATION 0: 07-TPN-94-3-1010 INT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION: 1) Load pin holes in structural attachment appear to be elongated approximately 1/16", load pin holes in the pipe attachment appear to be elongated approximately 1/32"

2) Load pin xn the structural attachment shows excessive wear.

DISPOSITION: 1) Replaced load pin on structural end. '8-o~l I

2) CR written ~g Pc~ p,gg . Pgg $

+50+&8 Ii& ~~~~ g4g c. ~~ i r

DEVIATION,g: 08-TPN-94-3-1011 XNT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION: Transition tube assembly mounting bolts are 1/2" flush with snubber housing flange. Existing bolts are dia. with 5/8" engagement. Thread engagement > 1 bolt dia.

DXSPOSITION: ACCEPTABLE AS XS TAG 5'-1019 DEVIATION 4: 09-TPN-94-3-1019 INT- DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION Transition tube assembly mounting bolts are 5/16" flush with snubber housing flange. Existing bolts are dia. with 1/2" engagement. Thread engagement > 1 bolt dia.

DISPOSITION: ACCEPTABLE AS IS

FLORIDA POWER & LZGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SXEMENS POWER CORPORATION FINAL REPORT TAG g: 3-1020 DEVIATION 8: 10-TPN-94-3-1020 INT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION: Transition tube assembly mounting bolts are flush withwith snubber housing flange. Existing bolts are 5/16" dia.

1/2" engagement. Thread engagement > 1 bolt dia.

DISPOSITION: ACCEPTABLE AS IS TAG 4 3-1021 DEVIATION I: 32-TPN-94-3-1021 INT. DATE: 4/25/94 CLOSE DATE: 4/25/94 CONDITION: The "L" dimension for this MSA is 1/8" below the specified

>billion, min.

l DISPOSITION: No further action by Siemens. T~ bMuiai'bid-/f"SP5 ski *l Pg)~a=>sc>

gugnirr 34 i<~.elo'w + cAa rz

~PEcibi+'0

~~<r s~~cfwg +ovz<~;

o> a cu4$ irioA 4~PovzT.

v8~. ~

TAG 8: 3-1022 DEVIATION I: 30-TPN-94-3-1022 INT. DATE: 4/23/94 CLOSE DATE: 4/23/94 CONDITION: The U bolt and trapeze assembly has rotated on the pipe. The angularity is less then 6 deg. However, the snubber housing flange is in contact with the pipe insulation.

. <~~ni>>

- 9Y-5SP DISPOSITION: No further action by Siemen gii'0i ~&bI7~~~.

gbb~ss~W ccAbirib~. g~o 0o&w yZE+4I~Q TAG I: 3-1032 DEVIATION I: 16-TPN-94-3-1032 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION: The "L" dimension for this MSA is 1/4" below the specified min.

DISPOSITION: No further action by Siemens. <o~birio~ Her'~ ~->'l->4'f 4bWgcW coah irio4. c.o alai ri < co~<~ PcA rerg 9'p oqg TAG I'-1039 DEVXATION I: 17-TPN-94-3-1039 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION: Transition tube assembly mounting bolts are 1/2" flush with snubber housing flange. Existing bolts are dia. with 1/2" engagement. Thread engagement > 1 bolt dia.

DXSPOSITION: ACCEPTABLE AS IS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 4: 3-1040 DEVIATION 4: 18-TPN-94-3-1040 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION: Transition'ube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 1/2" dia. with 1/2" thread engagement. Thread engagement > 1 bolt dia.

DISPOSITION: ACCEPTABLE AS IS TAG g: 3-1041 DEVIATION 0: 19-TPN-94-3-1041 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION: Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 1/2" dia. with 5/8" thread engagement. Thread engagement > 1 bolt dia.

DISPOSITION: ACCEPTABLE AS .IS TAG 8: 3-1057 DEVIATION 0: 26-TPN-94-3-1057 INT. DATE: 4/19/94 CLOSE DATE: 4/21/94 CONDITION: 1) Transition tube assembly mounting bolts are flush with the snubber housing flange. Ex>sting bolts are 5/16" dia.

thread engagement. Thread engagement > 1 bolt dia.

with'/16"

2) The pipe clamp for this MSA is rotated, The clamp is not binding on the snubber. However, the pipe insulation is tom.

DISPOSITION: 1) ACCEPTABLE AS IS

2) No further action by Siemens.

TAG 5: 3-1070 DEVIATION 4: 27-TPN-94-3-1070 INT. DATE 4/19/94 CLOSE DATE: 4/21/94 CONDITION: 1) Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement. Thread engagement > 1 bolt dia.

2) Two base plate anchor bolts are loose.

DISPOSITION: 1) ACCEPTABLE AS IS

2) No further action by Siemens.

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 0: 3-1072 DEVIATION 4: 29-TPN-94-3-1072 INT. DATE: 4/20/94 CLOSE DATE: 4/21/94 CONDITION: The "L" dimension for this MSA is 1/8" less than the min.

DISPOSITION: Adjusted the turnbuckle on transition tube assembly to bring the "L" dimension to 16.0".

I TAG 5 3-1075 DEVIATION 4: 24-TPN-94-3-1075 INT. DATE: 4/18/94 CLOSE DATE: 4/21/94 CONDITION: The "L" dimension for this MSA is'ess than the specified min.

DISPOSITION: No further action bv Siemens.

p- p-oboe Tu gpyrzS~4 OAZ<~

~~a ir(o> r b c<CPaWV P<4 ~3>>4 Co>d r rial. ++5 I S~~ eh C ~ S TAG 8 3-107 6 DEVIATION 4 25-TPN-94-3-1076 INT. DATE: 4/18/94 CLOSE DATE: 4/2 1/94 Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement. Thread engagement ) 1 bolt dia.

DISPOSITION: ACCEPTABLE AS IS TAG 0: 3-1077 DEVIATION g: 15-TPN-94-3-1078 INT. DATE: 4/15/94 CLOSE DATE: 4/21/94 CONDITION Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement. Thread engagement ) 1 bolt dia.

DISPOSITION: ACCEPTABLE AS IS

FLORIDA POWER & LIGHT Co TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 8: 3-1078 DEVIATION 4: 14-TPN-94-3-1078 INT. DATE: 4/15/94 CLOSE DATE: 4/23/94 CONDITION: 1) Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement. Thread engagement > 1 bolt dia.

2) Spherical bearing on strut end is dislodged 1/8".

I DISPOSXTION: 1) ACCEPTABLE AS IS

2) Restaked spherical bearing.

TAG 4'-1079 DEVIATION 0: 13-TPN-94-3-1079 INT. DATE: 4/15/94 CLOSE DATE: 4/21/94 CONDXTION: Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement. Thread engagement > 1 bolt dia.

DISPOSITION: ACCEPTABLE AS IS TAG 8: 3-1080 DEVXATXON g: 12-TPN-94-3-1080 ZNT. DATE: 4/15/94 CLOSE DATE: 4/21/94 CONDXTZON: Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement. Thread engagement, > 1 bolt dia.

DZSPOSITXON: ACCEPTABLE AS ZS TAG 4: 3-1091 DEVIATION 4: 21-TPN-94-3-1091 INT DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION: Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement.

\

Thread engagement > 1 bolt dia.

DISPOSXTXON: ACCEPTABLE AS IS

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 4: 3-1092 DEVXATION g: 22-TPN-94-3-1092 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION: Transition tube assembly mounting bolts are flush withwith the snubber housing flange. Existing bolts are 5/16" dia.

7/16" thread engagement. Thread engagement > 1 bolt dia.

DISPOSITION: ACCEPTABLE AS XS TAG 4: 3-1093 DEVIATION 4: 23-TPN-94-3-1093 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION: Transition tube assembly mounting bolts are flush withwith the snubber housing flange. Existing bolts are 5/16" dia.

7/16" thread engagement. Thread engagement > 1 bolt dia.

DISPOSITION: ACCEPTABLE AS XS t TAG 4: 3-1094 DEVIATION 4: 28-TPN-94-3-1094 CONDITION:

DXSPOSITION:

This MSA INT. DATE: 4/20/94 could not be hand. stroked.

Replaced with tested spare s/n 4388.

CLOSE DATE: 4/2 1/94 TAG g: 3-1101 DEVIATXON g: 20-TPN-94-3-1101 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 During review of VT exam results it was identified that the specified "L" max. on dwg. 5613-H-671/54A RO exceeds the maximum stroke of the MSA by 1/2".

No further action by Siemens. coup i7-.om w~go~ o~ cW-M-9l>

DXSPOSITION:

Bhb<~SScC c5 T C.O~Q(7)g&. ~

~zo~&~MRTm

~~+Ger~<

~r ~ )~g~/QQ C.g g$ /$ /g gp f

~odZ~~ruy-SmrSMs7) bi~e~S' R5 br ac-)<>+2 oA cogpiy-~oA <ePo~y-,

TAG 5: 3-1106 DEVXATXON 0: 11-TPN-94-3-1106 INT. DATE: 4/15/94 CLOSE DATE: 4/21/94 CONDXTION: This snubber required more force than normal(for a PSA 1/4) to hand stroke.

DISPOSITION: Functionally tested snubber.

FLORXDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG g: 3-1123 DEVIATION 8: 01-TPN-94-3-1123 INT. DATE: 4/8/94 CLOSE DATE: 4/23/94 CONDITION: MSA could not be hand stroked in the field.

DISPOSITION: Stroked with test bench at default pressure.

TAG g: n/a DEVIATION g: 31 XNT. DATE: 4/23/94 CLOSE DATE: 4/23/94 CONDITION: Daily velocity verification was performed on 4/14 & 4/15 using velocities outside the specified 2-3XPM.

DISPOSITXON: Use As Xs: Paragraphs 6.4.3 & 6.5.3 do not so specifically state that velocities given are nominal, however, the specified 2 3 IPM velocities are nominal velocities. Any velocity between 1 and 5 XPM is acceptable for verifying the test machines ability to calculate velocity.

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT OVERHAUL

SUMMARY

TAG'-1054 Overhaul Report g: TPN-94-3-1054 Serial I: 16248

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

Remarks: This snubber was partially disassembled (only as far as require to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

TAGN 3-1077 Overhaul Report I: TPN-94-3-1077 Serial I: 16230

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with'xcess grease.

This snubber was partially disassembled (only as far as recpxired to remove excess grease from the capstan area),

cleaned, evaluated and reassembled. 4 TAGN 3 1078 Overhaul Report I: TPN-94-3-1078 Serial g: 16229

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

Remarks: This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned and evaluated. Evaluation identified that the capstan spring and capstan were severely worn. The snubber was replaced and turne over to the customer for future overhaul.

FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG¹ ~ 3-107 9 Overhaul Report ¹: TPN-94-3-1079 Serial ¹: 10176

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

Remarks: This snubber was partially disassembled (only as far as recpxired to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

TAG¹'-1080 Overhaul Report ¹: TPN-94-3-1080 Serial ¹: 10173

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

Remarks: This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned and evaluated. Evaluation identified that the capstan spring and capstan were severely worn. The snubber was replaced and turned over to the customer for future overhaul.

TAG¹: SPARE 1 Overhaul Report ¹: TPN-94-3-SPARE 1 Serial ¹: 12396

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

Remarks: ', This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

h TAG¹: SPARE 2 Overhaul Report ¹: TPN-94-3-SPARE 2 Serial ¹:

This MSA was manufactured during the time period 16244'escription:

when PSA 10 snubbers were shipped with excess grease.

Remarks: This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

JP FLORXDA POWER & LIGHT Co.

TURKEY POXNT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT This completed the scope of the SPC's visual examination, functional testing and evaluation activities.

PERSONNEL AND EQUIPMENT USED:

PERSONNEL NAME POSITION FUNCTION M. L. Miller Q.C. Supervisor Q.C. & Site Lead D. E. Moore Visual Examiner Lead VT Examiner T.W. Marshall Visual Examiner VT Examiner F.W. Musgrove Technician Machine Operator E.R. Simmons Technician Test Technician Personnel performing examination'and testing activities were qualified and certified xn accordance with SPC's Quality Assurance Program. A copy of personnel certifications is provided in the. Project Plan.

TEST EQUXPMENT Equipment used in support of testing activities was calibrated in accordance with SPC's Quality Assurance Program. Copies of equipment calibration certificates are included in the Project Plan.

REFERENCES:

FPL Procedures:

FPL ADM 0190.83 Mechanical Shock Arrestors Surveillance Program FPL OP 0209.9 Visual Examination of Mechanical Shock Arrestors FPL ADM 0190.85 Functional Testing of Mechanical Shock Arrestors FPL O-CMM-105.1 Snubber Removal and Replacement TPN General Maintenance items for MSA SPC Procedures:

SPC Quality Assurance Manual Rev. 14 SNPS-PP-3319-TPN Project Plan SNPS-CAL-1.2, REV. 1 Daily Verification of Test.

Ecpxipment SNPS-EXM-1.1, REV.0 Visual Examination of Mechanical SNPS-TST-F 1, REV. 0 Functional Testing of Pacific Scientific Mechanical Snubbers Snubbers Disassembly and Repair of PSA

0 FLORIDA POWER & LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3

4 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT MATERIAL SUPPLIED BY FPL
1) Replacement Spacer washers and load pins
2) Safety Wire for Forward Brackets and Transition Tube Assemblies on PSA Snubbers
3) Washers, retainer rings, keeper rings & NRRG 159
4) Spare PSA 3's, 10's & 35's

1