ML17352A777

From kanterella
Jump to navigation Jump to search
FP&L Turkey Point Nuclear Plant Unit 3 Refueling Outage 1994 Siemens Power Corp Final Rept
ML17352A777
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/10/1994
From:
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
To:
Shared Package
ML17352A775 List:
References
NUDOCS 9408260160
Download: ML17352A777 (37)


Text

F H.ORIDAPOWER 8c LIGHTCOMPAXED TURKEYPOINT NUCLEARPOWER PLANT,UNIT3 CL'IExiT'S P. O. k B92691-01146 SPC JOB CODE N3403 Prepared by:

Reviewed by:

Date:

Date:

cubi

+~T 94082b0ib0 940815 PDR ADQCK 05000250,i l

g PDR

Certificate of Coxnpliance Activities described in this Final Report were conducted in accordance with the applicable requirements of Florida Power 8z Light Purchase Order 4 89269I-05146.

1 canape f

ality Assurance

To satisfy the requirements of ASME,Section XI, ancl FPI. Plant Turkey Point (PTN) Technical Specifications, snubber surveillance services were performed during I

PTN Spring Rehxe1ing Outage 1994. Visual examinations, functional testing, and snubber rehxrbishrnent activities were accomplished on those snubbers designated by FPL's site representative.

Functional testing, using Siemens Povrer Corporation (SPC) on-site mobile test equipment determined the as-found condition of those snubbers se1ected for test.

5 FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT INTRODUCTION:

Siemens Power Corporation (SPC) was contracted to provide snubber test equipment and visual examination personnel under the direction of Florida Power and Light Co.

(FPL) during Turkey Point Unit 3's Spring Refueling Outage.

The work was scheduled for performance 4 April 1994 through 30 April 1994 at the Turkey Point's Unit No.3 Nuclear Facxlity.

1 This narrative summarizes the significant aspects of the activity.

It contains summary tables of visual examination

results, functional test
results, disassembly evaluations and deviation reports.

Original visual examination documentation, functional test

plots, deviation
reports, disassembly evaluations and the Project Plan (which are incorporated in this report by reference) were turned over to the customer's representative prior to the conclusion of on-site activities.

The initial work scope included the visual examination of 111 mechanical shock arrestors, the functional testing of 12 snubbers as part of the original sample plan and eight (8) snubbers as part of augmented testing.

Functional test activities required as-found testing of test sample plan and augmented snubber and as-left testing of specifxc mechanical snubbers after cleaning and reassembly.

Functional testing activities identified one (1) snubber which deviated from the specified criteria.

Functional testing consisted of twenty-three functional tests, the tested snubbers are divxded into four categories:

Sample 1, Augmented, Post cleaning and Spares.

Visual examination, functional testing and evaluation activities were performed at Turkey Point Unit 3 under the direction of the Turkey Point site representative.

Work performed was in accordance with the above referenced FP&L procedures and in accordance with the SPC Quality Assurance Program.

Visual examination of 109 mechanical shock arrestors identified thirty one (31) shock arrestors deviating for the examination criteria.

These conditions were determined to be maintenance items.

Therefore, none of these conditions constituted visual failures.

A summary of Visual Examination Results is provided in the summary section of this report.

Functional testing of the twelve(12) original sample snubbers (Sample 1

3-1000/

3-1038/

3-1043/

3-1044/

3-1046/

3-1048/

3-1057/

3-1070/

3-1071/

3-1081, 3-1106 and 3-1137) identified no snubbers deviating from the specified criteria.

Augmented functional testing of three (3) snubbers (3-1045 3-1094 and 3-1110) was performed.

The snubber installed at tag location 3-1094 failed to meet the specified criteria for initial drag.

Snubbers installed at tag locations 3-1054, 3-1077, 3 1078/

3 1079/

and 3-1080 were functionally tested after cleaning and all met the specified criteria.

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT Three (3) spare snubbers were functionally tested to be used as replacement snubbers.

Spare 1

was installed at, tag location 3-1080.

Spare 2

was installed at tag location 3-1078.

Spare 3

was installed at tag location 3-1094.

Summaries of functional test results for Sample 1, Augmented Tests, Post cleaning tests and testing of Spares are provided in the summary section of this report.

Thirty one (31)

Deviation Reports were generated as result of Visual examination and functional testing'ctivities.

These reports were submitted to the site representative for disposition intructzons.

Upon receipt of disposition instructions, the instructions were completed and

verified, thus closing the report.

A summary of'eviation Reports is provided in the summary section of this report.

The purchase order required that snubbers installed at tag locations 3-1054, 3-1077, 3-1078, 3-1079 and 3-1080 be partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned, evaluated and reassembled, snubber condition permitting.

A summary of the conditions found upon disassembly is provided in the summary section of this report.

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT PROGRAM SUMMARIES VISUAL EXAMINATION

SUMMARY

TAG SERIAL 4 VT-3DATE VTRSLT A/F DEVO ~

3-1000 3-1001 3-1002 3-1003 3-1004 3-1005 3-1006 1

3-1007 3-1008 3-1009 3-1010 3-1011 3-1012 3-1013 3-1014 3-1015 3-1016 3-1017 3-1018 3-1019 3-1020 3-1021 18015 27095 104 29625 101 10035 3051 4590 8084 1203 11931 12376 8086 33624 1722 18009 18012 18003 18013 2889 103 16725 04/15/94 04/12/94 04/12/94 04/12/94 04/12/94 04/08/94 04/12/94 04/13/94 04/13/94 04/13/94 04/13/94 04/13/94 04/07/94 04/22/94 PASS PASS DEV.

DEV.

PASS DEV.

DEV.

PASS PASS DEV.

DEV.

DEV.

PASS PASS 04/22/94 04/22/94 04/22/94 04/22/94 04/13/94 04/13/94 04/22/94 PASS PASS PASS PASS DEV.

DEV.

DEV.

04/22/94

'ASS 3-TPN-94-3-1002 4-TPN-94-3-1003 2-TPN-94-3-1005 5-TPN-94-3-1006 6-TPN-94-3-1009 7-TPN-94-3-1010 8-TPN-94-3-1011 9-TPN-94-3-1019 10-TPN-94-3-1020 32-TPN-94-3-1021

r

~

~ i

~

~

~

I FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG SERIAL 0 VT-3DATE VTRSLT A/F DEVO ~

3-1022 3-1023 3-1024 3-1025 3-1028 3-1029 3-1030 3-1031 3-1032 3-1033 3-1034 3-1035 3-1036 3-1037 3-1038 3-1039 3-1040 3-1041 3-1042 3-1043 3-1044 3-1045 3-1046 3-1047 3-1048 18006 23273 17427 P

100 11135 11330 11121 27086 24410 19328 24429 19330 27100 11922 11934 16241 16239 16234 12365 17899 17900 17189 17903 17902 17904 16245 04/22/94 04/22/94 PASS PASS 04/22/94 PASS 04/22/94 04/22/94 04/22/94 04/22/94 04/14/94 04/14/94 04/14/94 PASS PASS PASS PASS PASS DEV.

PASS 04/14/94 PASS 04/14/94 PASS 04/16/94 04/15/94 04/15/9 4 04/15/94 04/15/94 04/15/94 04/18/94 04/18/94 PASS PASS DEV.

DEV.

DEV.

PASS PASS PASS 04/18/94 PASS 04/18/94 04/18/94 04/18/94 04/18/94 PASS PASS PASS PASS 04/14/94 PASS 16-TPN-94-3-1032 17-TPN-94-3-1039 18-TPN-94-3-1040 19-TPN-94;3-1041

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG ¹ SERIAL ¹ VT-3DATE VTRSLT A/F DEVO 3-1050 3-1051 3-1052 3-1053 3-1054 3-1055 3-1057 3-1058 3-1060 3-1069 3-1070 3-1071 3-1072 3-1073 3-1074 3-1075 3-1076 3-1077 3-1078 3-1079 3-1080 3-1081 3-1082 3-1083 3-1084 17906 16249 16233 2462 16248 13697 27106 27102 19329 27072 27079 27069 27073 27090 27104 18074 19725 16230 16229 10176 10173 11921 11932 11925 7000 04/18/94 04/19/94 04/19/94 04/19/94 PASS PASS PASS PASS

'4/19/94 PASS 04/19/94 04/18/94 04/18/94 04/18/94 04/18/94 04/18/94 04/19/94 04/19/94 04/19/94 04/18/94 04/16/94 04/16/94 04/15/94 04/15/94 04/15/94 04/15/94 04/15/94 PASS PASS PASS PASS PASS PASS PASS DEV.

PASS PASS DEV.

DEV.

DEV.

DEV.

DEV.

DEV.

PASS 04/15/94 PASS 04/21/94 PASS 04/20/94 PASS 29-TPN-94-3-1072 24-TPN-94-3-1075 25-TPN-94-3-1076 15-TPN-94-3-1077 14-TPN-94-3-1078 13-TPN-94-3-1079 12-TPN-94-3-1080

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG SERIAL 4 VT-3DATE VTRSLT A/F DEVO ~

3-1091 3-1092 3-1093 3-1094 3-1095 3-1096 3-1097 3-1098 3-1099 3-1100 3-1101 27087 27105 27091 27074 16733 11993 16724 33628 38481 17819 33626 29451 04/16/94 04/16/92 04/1 6/94 04/19/94 04/14/94 04/19/94 04/19/94 04/15/94 04/15/94 04/15/94 04/15/94 04/15/94 DEV.

DEV.

DEV.

DEV.

PASS PASS PASS PASS PASS PASS DEV.

PASS 21-TPN-94-3-1091 22-TPN-94-3-1092 23-TPN-94-3-1093 28-TPN-94-3-1094 20-TPN-94-3-1101 3-1103 3-1104 3-1105 3-1106 3-1110 3-1111 3-1112 3-1120 3-1121 3-1123 3-1124 3-1125 3-1126 3-1127 24412 16134 29495 16136 2875 27083 18325 24430 12988 12991 12986 12989 12990 04/19/94 04/14/94 04/14/94 04/14/94 04/19/94 04/19/94 04/19/94 04/15/94

~04/07/94 04/07/94 04/08/94 04/08/94 04/08/94 11996 04/19/94 PASS PASS PASS DEV.

PASS PASS PASS PASS PASS DEV.

PASS PASS PASS PASS 11-TPN-94-3-1106 1-TPN-94-3-1123

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG SERIAL 4 VT-3DATE VTRSLT A/F DEVO.

3-1128 3-1129 3-1130 3-1131 3-1132 3-1133 3-1134'-1135 3-1136 3-1137 12985 12987 17840 17837 17838 13695 17836 17839 19884 19885 04/08/94 04/13/94 04/11/94 04/11/94 04/11/94 04/11/94 04/11/94 04/12/94 04/16/94 04/16/94 PASS PASS PASS PASS PASS PASS PASS PASS PASS PASS

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 4: 3-1000 FUNCTIONAL TEST SUMMARIES SAMPLE 1 Functus.onal Test Summary MODEL: PSA-1 FTRSLT:

PASS TBKAWY: 6.1 TIDRAG: 10.8 TAIDRAG: 6.1 TTST LOAD: 1411.6 TACTV.: 0.009 TFDRAG: 11.9 TFADRAG: 6.6 TAG 8: 3-1038 FTRSLT:

PASS TBKAWY: 363. 5 TXDRAG: 626. 5 TAIDRAG: 248 '

TTST LOAD: 44650 TACTV.: 0.017 TFDRAG: 554.1 TFADRAG: 259.3 TAG 5: 3-1044 FTRSLT:

PASS TBKAWY: 46.2 TXDRAG: 55.4 TAIDRAG: 40.0 TTST LOAD: 13456.4 TACTV.: 0.019 TFDRAG: 66.5 TFADRAG: 53.6 TAG 5: 3-1046 FTRSLT:

PASS TBKAWY: 26.5 TIDRAG: 53.9 TAIDRAG: 36.7 TTST LOAD: 14690.0 TACTV.: 0.017 TFDRAG: 62.0 TFADRAG: 37.7 FDATE: 04/

CBKAWY: 35 CXDRAG: 47 CADRAG: 27 CTST LOAD:

CACTV.: 0.

CFDRAG:

63 CFADRAG:

3 19/94

.5

~ 3.914090. 3 009

.31.0 FDATE: 04/14/94 CBKAWY: 12.7 CIDRAG: 13.6 CADRAG: 9.1 CTST LOAD: 1440.3 CACTV.: 0.009 CFDRAG: 14.7 CFADRAG: 9.2 MODEL: PSA-35 FDATE: 04/16/94 CBKAWY: 205.4 CXDRAG: 447.2 CADRAG: 194 0

CTST LOAD: 47290 CACTV.: 0.016 CFDRAG: 602.2 CFADRAG: 225.4 MODEL: PSA-10 FDATE: 04/19/94 CBKAWY: 54 '

CXDRAG: 86.1 CADRAG: 65.7 CTST LOAD: 13484.6 CACTV.: 0.013 CFDRAG: 58.6 CFADRAG: 42.3 MODEL: PSA-10 SERIAL g:

18015 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL 4 11934 BKAWY RSLT:

PASS IDRAG RSLT PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g:

17900 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL 4:

17903 BKAWY RSLT PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT SAMPLE 1 Functional Test Summary (continued)

TAG 4: 3-1048 FTRSLT:

PASS TBKAWY: 42.1 TIDRAG: 81.3 TAIDRAG: 41.2 TTST LOAD: 13636 '

TACTV.: 0.019 TFDRAG: 39.7 TFADRAG: 29.5 TAG 5: 3-1057 FTRSLT:

PASS TBKAWY: 2 1. 9 TIDRAG: 41. 0 TAIDRAG: 22.6 TTST LOAD: 5831.8 TACTV.: 0.010 TFDRAG: 47.6 TFADRAG: 23.1 TAG 5 '-1070 FTRSLT:

PASS TBKAWY: 39. 0 TIDRAG: 51. 8 TAIDRAG: 29.5 TTST LOAD: 5535.2 TACTV.: 0.011 TFDRAG: 55.5 TFADRAG: 30.9 TAG 4: 3-1071 FTRSLT:

PASS TBKAWY: 30. 1 TXDRAG: 37.7 TAXDRAG: 22.3 TTST LOAD: 5727.2 TACTV.: 0.012 TFDRAG: 34.7 TFADRAG: 20.6 MODEL: PSA-10 FDATE: 04/19/94 CBKAWY: 43.3 CIDRAG: 57.7 CADRAG: 30.3 CTST LOAD: 13268.3 CACTV.: 0.011 CFDRAG: 54.9 CFADRAG: 32.1 MODEL: PSA-3 FDATE: 04/19/94 CBKAWY: 22.2 CXDRAG: 33.4 CADRAG: 18.6 CTST LOAD: 5721.8 CACTV.: 0.005 CFDRAG: 35.9 CFADRAG: 19.5 MODEL: PSA-3 FDATE: 04/19/94 CBKAWY: 31.0 CIDRAG: 56.2 CADRAG: 33.5 CTST LOAD: 5363.4 CACTV.: 0.006 CFDRAG: 49.1 CFADRAG: 29.0 MODEL: PSA-3 FDATE: 04/19/94 CBKAWY: 14.1 CIDRAG: 34.5 CADRAG: 20.3 CTST LOAD: 5534.8 CACTV.: 0.008 CFDRAG: 26.3 CFADRAG: 12.2 SERXAL g:

17904 BKAWY RSLT:

PASS XDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERXAL g:

27106 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g:

27079 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g:

27069 BKAWY RSLT PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT SAMPLE 1 Functional Test Summary (continued)

TAG I: 3-1081 FTRSLT:

PASS TBKAWY: 398.1 TIDRAG: 494.9 TAIDRAG: 251.9 TTST LOAD: 43990 TACTV.: 0.015 TFDRAG: 536.5 TFADRAG: 157.7 TAG 4: 3-1106 FTRSLT:

PASS TBKAWY: 4.9 TIDRAG: 8.9 TAIDRAG: 6.1 TTST LOAD: 337.4 TACTV.: 0.007 TFDRAG: 8.3 TFADRAG: 5.7 t

TAG I 3-1137 FTRSLT:

PASS TBKAWY: 2.3 TIDRAG: 3.7, TAIDRAG: 2.4 TTST LOAD: 624.2 TACTV.: 0.014 TFDRAG: 4.7 TFADRAG: 3.1 MODEL: PSA-35 FDATE: 04/15/94 CBKAWY: 372.8 CIDRAG: 372.8:

CADRAG: 173.9 CTST LOAD: 48440 CACTV.: 0.014 CFDRAG: 479.1 CFADRAG: 254.3 MODEL: PSA-1/4 FDATE: 04/15/94 CBKAWY: 6.6 CIDRAG: 8.0 CADRAG:

3 '

CTST LOAD: 310.5 CACTV.: 0.006 CFDRAG: 6.5 CFADRAG: 3.4 MODEL: PSA-1/2 FDATE: 04/16/94 CBKAWY: 3.9 CIDRAG: 4.4 CADRAG: 3.1 CTST LOAD: 629.1 CACTV.: 0.012 CFDRAG: 4.0 CFADRAG: 2.7 SERIAL g:

11921 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g:

29495 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g:

19885 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS

FLORIDA POWER

& LIGHT Co.

TURKEY POXNT NUCLEAR PLANT UNXT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATXON FINAL REPORT TAG 8

3-1045 Augmented Functus.onal Test summary MODEL: PSA-10 FTRSLT:

PASS TBKAWY: 24 '

TIDRAG: 36.9 TAIDRAG: 22.5 TTST LOAD: 13892.2 TACTV.: 0.019 TFDRAG: 49.0 TFADRAG: 32.3 TAG 8: 3-1094 FTRSLT: FAIL TBKAWY: 165.3 TIDRAG: 208.4 TAIDRAG: 114.9 TTST LOAD: 5887.0 TACTV.: 0.012 TFDRAG: 155.3 TFADRAG: 73 '

TAG g: 3-1110 FTRSLT:

PASS TBKAWY: 5.8 TXDRAG: 8.7 TAIDRAG: 6.0 TTST LOAD: 1402.7 TACTV.: 0.009 TFDRAG: 7.7 TFADRAG: 4.8 FDATE: 04/19/94 CBKAWY: 46.8 CIDRAG: 65.0 CADRAG: 48.2 CTST LOAD: 13239.6 CACTV.: 0.011 CFDRAG: 46.5 CFADRAG: 32.7 MODEL: PSA-3 FDATE: 04/19/94 CBKAWY: 158.4 CIDRAG: 343.2 CADRAG: 138.6 CTST LOAD: 5827.7 CACTV.: 0.007 CFDRAG: 192.0 CFADRAG: 93.1 MODEL: PSA-1 FDATE: 04/15/94 CBKAWY: 3.2 CIDRAG: 6.8 CADRAG: 3.2 CTST LOAD: 1424.4 CACTV.: 0.008 CFDRAG: 7.9 CFADRAG: 4.4 SERIAL 8:

17189 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g: 27074 BKAWY RSLT:

PASS IDRAG RSLT: FAIL AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL 4:

16136 BKAWY RSLT:

PASS XDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS

TAG 4 3-1054 FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT Post Cleaning Funotional Test Summary MODEL: PSA-10 A/L FTRSLT:

PASS TBKAWY: 22.7 TIDRAG: 38.9 TAIDRAG: 20.4 TTST LOAD: 13832.7 TACTV.: 0. 017 TFDRAG: 39.8 TFADRAG: 22.3 TAG 4 3-1077 A/L FTRSLT:

PASS TBKAWY: 44.3 TIDRAG: 44.3 TAIDRAG: 22.6 TTST LOAD: 14507.4 TACTV.: 0.017 TFDRAG: 37.6 TFADRAG: 21.9 TAG g: 3-1078 A/L FTRSLT:

PASS TBKAWY: 16. 6 TIDRAG: 34.0 TAIDRAG: 14.9 TTST LOAD: 14313.1 TACTV.: 0.018 TFDRAG: 45.8 TFADRAG: 29.1 TAG 4: 3-1079 A/L FTRSLT:

PASS TBKAWY: 17.1 TIDRAG: 29. 8 TAIDRAG: 16.6 TTST LOAD: 14036.6 TACTV.: 0.019 TFDRAG: 29.2 TFADRAG: 14 '

A/L FDATE: 04/19/94 CBKAWY: 35.8 CIDRAG: 55.9 CADRAG: 36.0 CTST LOAD: 13256.4 CACTV.: 0.017 CFDRAG: 47.4 CFADRAG: 30.5 MODEL: PSA-10 A/L FDATE: 04/16/94 CBKAWY: 39.4 CIDRAG: 58.0 CADRAG: 36.5 CTST LOAD: 13683.9 CACTV.:

0 '10 CFDRAG: 52.2 CFADRAG: 32.6 MODEL: PSA-10 A/L FDATE: 04/18/94 CBKAWY: 34.3 CIDRAG: 47.7 CADRAG: 31.1 CTST LOAD: 13148.8 CACTV.: 0.011 CFDRAG: 32.5 CFADRAG: 17.1 MODEL: PSA-10 A/L FDATE: 04/16/94 CBKAWY: 29.5 CIDRAG: 39.1 CADRAG: 23.6 CTST LOAD: 13728.1 CACTV.: 0.010 CFDRAG: 42.0 CFADRAG: 25.8 SERIAL 4:

16248 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g:

16230 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL 8:

16229 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL g:

10176 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNXT 3 REFUELXNG OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT Post Cleaning Functional Test Summary Cont.

TAG g 3-1080 A/L FTRSLT:

PASS TBKAWY: 15.4 TIDRAG: 39. 4 TAXDRAG: 18.0 TTST LOAD: 13637.2 TACTV.: 0.017 TFDRAG: 60.6 TFADRAG: 26.2 MODEL: PSA-10 A/L FDATE: 04/18/94 CBKAWY: 27.6 CIDRAG: 47.9 CADRAG: 15.6 CTST LOAD: 13072.4 CACTV.: 0.009 CFDRAG: 23-1 CFADRAG: 8.8 SERIAL 8:

10173 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG g: Spare 1

Spare Functional Test summary MODEL: PSA-10 A/L FTRSLT:

PASS TBKAWY: 15.4 TIDRAG: 39.4 TAIDRAG: 18.0 TTST LOAD: 13637.2 TACTV.: 0.017 TFDRAG: 60.6 TFADRAG: 26.2 TAG g: Spare 2

A/L FTRSLT:

PASS TBKAWY: 16.6 TIDRAG: 34.0 TAIDRAG: 14.9 TTST LOAD: 14313.1 TACTV.: 0.018 TFDRAG: 45.8 TFADRAG: 29.1 l

TAG 5: Spare 3

FTRSLT:

PASS TBKAWY: 16.9 TIDRAG: 20.8

~ TAIDRAG: 10 '

TTST LOAD: 5301.1 TACTV.: 0.011 TFDRAG: 20.1 TFADRAG: 10.0 A/L FDATE: 04/18/94 CBKAWY: 27.6 CIDRAG: 47.9 CADRAG: 15.6 CTST LOAD: 13072.4 CACTV.: 0.009 CFDRAG: 23.1 CFADRAG: 8.8 MODEL: PSA-10 A/L FDATE: 04/18/94 CBKAWY: 34.3 CIDRAG: 47.7 CADRAG: 31.1 CTST LOAD': 13148.8 CACTV.: 0.011 CFDRAG: 32.5 CFADRAG: 17.1 MODEL: PSA-3 FDATE: 04/19/94 CBKAWY: 10.4 CIDRAG: 21.3 CADRAG: 10.7 CTST LOAD: 5378.4 CACTV.: 0.008 CFDRAG: 21.2 CFADRAG: 11.2 SERIAL g:

12396 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT-PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL 5:

16244 BKAWY RSLT:

PASS IDRAG RSLT:

PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS SERIAL 4:

4388 BKAWY RSLT:

PASS IDRAG'SLT-PASS AVDRAG RSLT:

PASS TEST LOAD RSLT:

PASS ACTV. RSLT:

PASS FDRAG RSLT:

PASS TFADRAG RSLT:

PASS

FLORXDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELXNG OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG g: 3-1002 DEVIATION REPORT

SUMMARY

DEVXATION g: 03-TPN-93-,3-1002 INT DATE 4/12/94 CLOSE DATE: 4/12/94 CONDITION:

Transition tube assembly mounting bolts are flush with snubber housing flange.

The existing bolts are 5/16>> dia with 7/16>> thread engagement.

1 DISPOSITION:

ACCEPTABLE AS IS.

TAG 5

3-1003 CLOSE DATE: 4/12/94 DISPOSITION:

ACCEPTABLE AS XS DEVIATION 4: 04-TPN-94-3-1003 INT. DATE: 4/12/94 Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 5/16>> dia. with 7/16>> engagement.

Thread engagement

> 1 bolt dia.

t TAG 4: 3-1005 DEVIATXON 4: 02-TPN-94-3-1005 XNT. DATE: 4/11/94 CLOSE DATE: 4/11/94 CONDITION:

DISPOSITION:

1) Both load pins on this MSA show wear.

2)

Load pin holes in holes in the structural attachment appear to be elongated approximately 1/32>>.

1) Replaced load pins.

g 4/ ~c/i

++p84cEk 2)

CR written on holes.

c rC P~l-A5'4 TAG g: 3-1006 DEVXATION 8: 05-TPN-94-3-1006 INT. DATE: 4/12/94 CLOSE DATE: 4/23/94 CONDXTION:

DISPOSITION:

1)

Load pin holes in structural attachment appear to be elongated approximately 1/16>>,

load pin holes in the pipe attachment appear to be elongated approximately 1/32>>

2) Snubber end load pin shows excessive wear.
3) Snubber could not be hand stroked.

1

& 2)

CR written

3) Stroked snubber in test bench at default pressure.

c'Abir~A

<Ci oW cd p~g-RF4 s>>4egrrc$.

r~

5'Q-oV/

gyp'.Hc @

Ja~8><5 c Los< +~8 f4 9w gaza'c-.

Xp us srH vzsr h

&4~

~ L FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 4: 3-1009 DEVIATION 4: 06-TPN-94-3-1009 INT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDXTION:

DXSPOSITION:

1)

Load pin holes in structural attachment appear to be elongated approximately 1/32", load pin holes in the pipe attachment appear to be elongated approximately 1/16>>

2)

Load pin xn the strut end shows excessive wear.

1) Replaced load pin on strut end.

2)

CR written ~ Pg-gQ,,

Pen 99-o'/I I~4(Cb (44882&

E'La&~ TE5 ~

/9<4 c.mF TAG 4 3-1010 DEVIATION 0: 07-TPN-94-3-1010 INT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION:

DISPOSITION:

1)

Load pin holes in structural attachment appear to be elongated approximately 1/16", load pin holes in the pipe attachment appear to be elongated approximately 1/32" 2)

Load pin xn the structural attachment shows excessive wear.

1) Replaced load pin on structural end.

2)

CR written

~g Pc~ p,gg Pgg

$'8-o~l I

+50+&8Ii&

~~~~

g4g c.~~ i r

DEVIATION,g: 08-TPN-94-3-1011 XNT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION:

Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement.

Thread engagement 1 bolt dia.

DXSPOSITION:

ACCEPTABLE AS XS TAG 5'-1019 DEVIATION 4: 09-TPN-94-3-1019 INT-DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 5/16" dia. with 1/2" engagement.

Thread engagement

> 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS IS

FLORIDA POWER

& LZGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SXEMENS POWER CORPORATION FINAL REPORT TAG g: 3-1020 DEVIATION 8: 10-TPN-94-3-1020 INT. DATE: 4/13/94 CLOSE DATE: 4/21/94 CONDITION:

Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 5/16" dia. with 1/2" engagement.

Thread engagement

> 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS IS TAG 4 3-1021 DEVIATION I: 32-TPN-94-3-1021 INT. DATE: 4/25/94 CLOSE DATE: 4/25/94 CONDITION:

The "L" dimension for this MSA is 1/8" below the specified min.

The U bolt and trapeze assembly has rotated on the pipe.

The angularity is less then 6 deg.

However, the snubber housing flange is in contact with the pipe insulation.

No further action by Siemen

. <~~ni>>

- 9Y-5SP gbb~ss~W ccAbirib~.

g~o gii'0i 0o&w yZE+4I~Q

~&bI7~~~.

DISPOSITION:

TAG I: 3-1032 DEVIATION I: 16-TPN-94-3-1032 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION:

The "L" dimension for this MSA is 1/4" below the specified min.

DISPOSITION:

No further action by Siemens.

<o~birio~ Her'~

~->'l->4'f 4bWgcW coah irio4.

c.o alai ri <

co~<~

PcA rerg 9'p oqg TAG I'-1039 DEVXATION I: 17-TPN-94-3-1039 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 DISPOSITION:

No further action by Siemens.

Pg)~a=>sc>

cc

>billion,

+ cAa T~

bMuiai'bid-/f"SP5 ski *l gugnirr<q ~

i<~.elo'w rz v8~.

a ~~<r s~~cfwg

+ovz<~; ~

pihc~~io>

34

~PEcibi+'0 o>

cu4$ irioA 4~PovzT.

TAG 8: 3-1022 l

DEVIATION I: 30-TPN-94-3-1022 INT. DATE: 4/23/94 CLOSE DATE: 4/23/94 CONDITION:

CONDITION:

Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 1/2" engagement.

Thread engagement

> 1 bolt dia.

DXSPOSITION:

ACCEPTABLE AS IS

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 4: 3-1040 DEVIATION 4: 18-TPN-94-3-1040 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION:

DISPOSITION:

Transition'ube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 1/2" dia. with 1/2" thread engagement.

Thread engagement

> 1 bolt dia.

ACCEPTABLE AS IS TAG g: 3-1041 DEVIATION 0: 19-TPN-94-3-1041 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION:

Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 1/2" dia. with 5/8" thread engagement.

Thread engagement

> 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS.IS TAG 8: 3-1057 DEVIATION 0: 26-TPN-94-3-1057 INT. DATE: 4/19/94 CLOSE DATE: 4/21/94 CONDITION:

DISPOSITION:

1) Transition tube assembly mounting bolts are flush with the snubber housing flange. Ex>sting bolts are 5/16" dia.

with'/16" thread engagement.

Thread engagement 1 bolt dia.

2)

The pipe clamp for this MSA is rotated, The clamp is not binding on the snubber.

However, the pipe insulation is tom.

1)

ACCEPTABLE AS IS 2)

No further action by Siemens.

TAG 5: 3-1070 DEVIATION 4: 27-TPN-94-3-1070 INT. DATE 4/19/94 CLOSE DATE: 4/21/94 CONDITION:

DISPOSITION:

1) Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement.

Thread engagement 1 bolt dia.

2)

Two base plate anchor bolts are loose.

1)

ACCEPTABLE AS IS 2)

No further action by Siemens.

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 0: 3-1072 DEVIATION 4: 29-TPN-94-3-1072 INT. DATE: 4/20/94 CLOSE DATE: 4/21/94 CONDITION:

The "L" dimension for this MSA is 1/8" less than the min.

DISPOSITION:

Adjusted the turnbuckle on transition tube assembly to bring the "L" dimension to 16.0".

I TAG 5 3-1075 DEVIATION 4: 24-TPN-94-3-1075 INT. DATE: 4/18/94 CLOSE DATE: 4/21/94 CONDITION:

The "L" dimension for this MSA is'ess than the specified min.

DISPOSITION:

No further action bv Siemens.

p-p-oboe gpyrzS~4

~~a ir(o> r P<4 ~3>>4

++5 IS~~ eh Tu C OAZ<~

b ~ S c<CPaWV Co>d rrial.

TAG 8

3-107 6 DEVIATION 4 25-TPN-94-3-1076 INT. DATE: 4/18/94 CLOSE DATE: 4/2 1/94 Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement.

Thread engagement ) 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS IS TAG 0: 3-1077 DEVIATION g: 15-TPN-94-3-1078 INT. DATE: 4/15/94 CLOSE DATE: 4/21/94 CONDITION Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement.

Thread engagement ) 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS IS

FLORIDA POWER

& LIGHT Co TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 8: 3-1078 DEVIATION 4: 14-TPN-94-3-1078 INT. DATE: 4/15/94 CLOSE DATE: 4/23/94 CONDITION:

DISPOSXTION:

1) Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement.

Thread engagement

> 1 bolt dia.

2) Spherical bearing on strut end is dislodged 1/8".

I 1)

ACCEPTABLE AS IS

2) Restaked spherical bearing.

TAG 4'-1079 DEVIATION 0: 13-TPN-94-3-1079 INT. DATE: 4/15/94 CLOSE DATE: 4/21/94 CONDXTION:

Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement.

Thread engagement

> 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS IS TAG 8: 3-1080 CONDXTZON:

DZSPOSITXON:

ACCEPTABLE AS ZS DEVXATXON g: 12-TPN-94-3-1080 ZNT. DATE: 4/15/94 CLOSE DATE: 4/21/94 Transition tube assembly mounting bolts are flush with snubber housing flange. Existing bolts are 1/2" dia. with 5/8" engagement.

Thread engagement,

> 1 bolt dia.

TAG 4: 3-1091 DEVIATION 4: 21-TPN-94-3-1091 INT DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION:

Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement.

Thread engagement

> 1 bolt dia.

\\

DISPOSXTXON:

ACCEPTABLE AS IS

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG 4: 3-1092 DEVXATION g: 22-TPN-94-3-1092 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION:

Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement.

Thread engagement

> 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS XS TAG 4: 3-1093 DEVIATION 4: 23-TPN-94-3-1093 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 CONDITION:

Transition tube assembly mounting bolts are flush with the snubber housing flange. Existing bolts are 5/16" dia. with 7/16" thread engagement.

Thread engagement

> 1 bolt dia.

DISPOSITION:

ACCEPTABLE AS XS TAG 4: 3-1094 t

DEVIATION 4: 28-TPN-94-3-1094 INT. DATE: 4/20/94 CONDITION:

This MSA could not be hand. stroked.

CLOSE DATE: 4/2 1/94 DXSPOSITION:

Replaced with tested spare s/n 4388.

TAG g: 3-1101 DEVIATXON g: 20-TPN-94-3-1101 INT. DATE: 4/16/94 CLOSE DATE: 4/21/94 During review of VT exam results it was identified that the specified "L" max.

on dwg. 5613-H-671/54A RO exceeds the maximum stroke of the MSA by 1/2".

o~

cW-M-9l>

DXSPOSITION:

No further action by Siemens.

coup i7-.om w~go~

Bhb<~SScC C.O~Q(7)g&.

~

~~+

~

)~g~/QQ g$ /$

/g gp f SmrSMs7) c5 T

~zo~&~MRTm ~r Ger~< C.g

~odZ~~ruy-bi~e~S' R5 br ac-)<>+2 oA cogpiy-~oA

<ePo~y-,

TAG 5: 3-1106 DEVXATXON 0: 11-TPN-94-3-1106 INT. DATE: 4/15/94 CLOSE DATE: 4/21/94 CONDXTION:

This snubber required more force than normal(for a PSA 1/4) to hand stroke.

DISPOSITION:

Functionally tested snubber.

FLORXDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG g: 3-1123 DEVIATION 8: 01-TPN-94-3-1123 INT. DATE: 4/8/94 CLOSE DATE: 4/23/94 CONDITION:

MSA could not be hand stroked in the field.

DISPOSITION:

Stroked with test bench at default pressure.

TAG g: n/a DEVIATION g:

31 XNT. DATE: 4/23/94 CLOSE DATE: 4/23/94 CONDITION:

DISPOSITXON:

Daily velocity verification was performed on 4/14

& 4/15 using velocities outside the specified 2-3XPM.

Use As Xs: Paragraphs 6.4.3

& 6.5.3 do not so specifically state that velocities given are nominal, however, the specified 2

3 IPM velocities are nominal velocities.

Any velocity between 1 and 5

XPM is acceptable for verifying the test machines ability to calculate velocity.

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT OVERHAUL

SUMMARY

TAG'-1054 Overhaul Report g: TPN-94-3-1054 Serial I: 16248

==

Description:==

Remarks:

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

This snubber was partially disassembled (only as far as require to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

TAGN 3-1077 Overhaul Report I: TPN-94-3-1077 Serial I: 16230

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with'xcess grease.

This snubber was partially disassembled (only as far as recpxired to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

4 TAGN 3 1078 Overhaul Report I: TPN-94-3-1078 Serial g:

16229

==

Description:==

Remarks:

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned and evaluated.

Evaluation identified that the capstan spring and capstan were severely worn. The snubber was replaced and turne over to the customer for future overhaul.

FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT TAG¹ ~ 3-107 9 Overhaul Report ¹: TPN-94-3-1079 Serial ¹:

10176

==

Description:==

Remarks:

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

This snubber was partially disassembled (only as far as recpxired to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

TAG¹'-1080 Overhaul Report ¹: TPN-94-3-1080 Serial ¹:

10173

==

Description:==

Remarks:

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned and evaluated.

Evaluation identified that the capstan spring and capstan were severely worn. The snubber was replaced and turned over to the customer for future overhaul.

TAG¹:

SPARE 1

Overhaul Report ¹: TPN-94-3-SPARE 1

Serial ¹: 12396

==

Description:==

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

Remarks:

', This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

h TAG¹:

SPARE 2

Overhaul Report ¹: TPN-94-3-SPARE 2

Serial ¹:

16244'escription:

Remarks:

This MSA was manufactured during the time period when PSA 10 snubbers were shipped with excess grease.

This snubber was partially disassembled (only as far as required to remove excess grease from the capstan area),

cleaned, evaluated and reassembled.

JP

FLORXDA POWER

& LIGHT Co.

TURKEY POXNT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT This completed the scope of the SPC's visual examination, functional testing and evaluation activities.

PERSONNEL AND EQUIPMENT USED:

PERSONNEL NAME POSITION FUNCTION M.L.

D. E.

T.W.

F.W.

E.R.

Miller Moore Marshall Musgrove Simmons Q.C. Supervisor Visual Examiner Visual Examiner Technician Technician Q.C.

& Site Lead Lead VT Examiner VT Examiner Machine Operator Test Technician Personnel performing examination'and testing activities were qualified and certified xn accordance with SPC's Quality Assurance Program.

A copy of personnel certifications is provided in the. Project Plan.

TEST EQUXPMENT Equipment used in support of testing activities was calibrated in accordance with SPC's Quality Assurance Program.

Copies of equipment calibration certificates are included in the Project Plan.

REFERENCES:

FPL Procedures:

FPL ADM 0190.83 FPL OP 0209.9 FPL ADM 0190.85 FPL O-CMM-105.1 SPC Procedures:

Mechanical Shock Arrestors Surveillance Program Visual Examination of Mechanical Shock Arrestors Functional Testing of Mechanical Shock Arrestors Snubber Removal and Replacement TPN General Maintenance items for MSA SPC SNPS-PP-3319-TPN SNPS-CAL-1.2, REV.

1 SNPS-EXM-1.1, REV.0 SNPS-TST-F 1, REV.

0 Quality Assurance Manual Rev.

14 Project Plan Daily Verification of Test.

Ecpxipment Visual Examination of Mechanical Functional Testing of Pacific Scientific Mechanical Snubbers Disassembly and Repair of PSA Snubbers

0

4 FLORIDA POWER

& LIGHT Co.

TURKEY POINT NUCLEAR PLANT UNIT 3 REFUELING OUTAGE 1994 SIEMENS POWER CORPORATION FINAL REPORT MATERIAL SUPPLIED BY FPL

1) Replacement Spacer washers and load pins
2) Safety Wire for Forward Brackets and Transition Tube Assemblies on PSA Snubbers
3) Washers, retainer rings, keeper rings

& NRRG 159

4) Spare PSA 3's, 10's

& 35's

1