Category:PRESERVICE & INSERVICE INSPECTION & TEST REPTS
MONTHYEARML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A5761997-07-10010 July 1997 Refueling Outage ISI Rept. ML17353A7771996-06-20020 June 1996 Refueling Outage,Form NIS-1 Owners Data Rept for Inservice Insps. ML17353A5201996-01-0303 January 1996 Refueling Outage ISI Rept. ML17353A4311995-10-17017 October 1995 Third 10-Yr ISI Interval IST Program for Pumps & Valves. ML17352B0291994-12-31031 December 1994 Refueling Outage ISI Rept. ML17353A3941994-11-23023 November 1994 SG Insp Rept. ML17352A7761994-08-15015 August 1994 ISI Rept. ML17352A7771994-05-10010 May 1994 FP&L Turkey Point Nuclear Plant Unit 3 Refueling Outage 1994 Siemens Power Corp Final Rept. ML17352A2301993-09-0101 September 1993 Third Ten-Year Inservice Insp Program for Turkey Point Nuclear Power Plant Units 3 & 4. ML17352A2001993-08-20020 August 1993 Inservice Insp Rept. ML17349A7541993-03-0909 March 1993 Refueling Outage Inservice Insp Rept. ML17349A2181992-04-14014 April 1992 Rev 4 to Second 10-Yr Inservice Insp Interval - Inservice Testing Program for Pumps & Valves. ML17348B3561992-01-10010 January 1992 ISI Summary Rept,Second Interval,Third Period,First Outage (1991). ML17348B3201991-12-0505 December 1991 ISI Summary Rept Second Interval, Third Period,First Outage (1991) Class 1,All Status Components. ML17348A3201990-05-22022 May 1990 Rev 0 to Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects for Turkey Point Nuclear Power Plant Unit 3. ML17348A5481990-04-0404 April 1990 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities,900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17347B3441989-09-15015 September 1989 Form NIS-1 Owner Data Rept for Inservice Insps,1987 Unscheduled Outage. ML17347A6621987-12-10010 December 1987 Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval. ML17347A6611987-12-10010 December 1987 1987 Inservice Insp Summary Rept. ML17347A1881986-12-0101 December 1986 Inservice Insp Rept for 860111-0901,describing Results of Eddy Current Exam of Steam Generator Tubes & Data Rept for Repairs or Replacements ML17342A2361985-12-31031 December 1985 1985 Inservice Insp Summary Rept for Turkey Point Nuclear Power Plant Unit 3. ML17346A5111984-09-0404 September 1984 Inservice Insp Rept for 840306-0631.Describes Exams Performed on Reactor Pressure Vessel,Rcs Piping,Auxiliary Spray,Safety Injection Sys Piping,Rhr Piping Boron Injection,Steam Generator & Pressurizer ML17346A2661984-03-30030 March 1984 Inservice Insp Rept on 831001 to 840107,describing Insp of Various Components or Appurtenances ML17345B2111983-08-10010 August 1983 Owners Data Rept for Inservice Insps ML17341B3761982-09-0909 September 1982 Inservice Insp Rept Consisting of Class 1 & 2 Summary Exam Tables for Third Period of Program ML17340A5101980-12-18018 December 1980 Inservice Insp in Nov 1980.Describes Gauging of Steam Generator Hot & Cold Legs,Measurement of Visible Flow Slots,Eddy Current Insp of Small Radius U-bends & Preventive Plugging 1999-06-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
ATTACHMENT TO L-95-268 TUEQG>~Y POINT UNIT 4 STEAM GENERATOR INSPECTION REPORT 9510110128 951006 PDR ADOCK 05000251 Q 'PDR
(Qi., I 1
'age 1 of 1 FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATIONRESULTS As required by the provisions of the ASME CODE RULES EDDY CURRENT EXAMINATIONRESULTS PIANT: Turkey Point Unit 4 EXAMINATIONDATES: OCTOBER 14, 1994 thru OCTOBER 17, 1994 TOTAL TUBES TUBES TOTAL TOTAL TUBES PLUGGED AS PLUGGED -
PLUGGED STEAM TUBES PREVENTIVE THIS TUBES GENERATOR INSPECTED 20% - 39% 40 - 100% MAINTENANCE OUTAGE IN S/G 4E210A 3198 4 NONE NONE NONE.
4E210B 3206 NONE NONE NONE 4E21 OC 3205 10 NONE'ONE NONE LOCATION OF INDICATIONS (20% - 'j 00%)
SUPPORT. LOCATIONS, TOP OF TUBE SHEET TOTAL STEAM AVB 1 THROUGH 6 TO ¹1 SUPPORT INDICATIONS GENERATOR BARS COLD L'EG HOT LEG COLD LEG HOT LEG 20% - 39% 40% TO 100%
4E210A NONE 3 NONE NONE 4E210B NONE 2 NONE NONE 4E21 OC NONE NONE 13 NONE Remarks:
CERTIFICATION OF RECORD We certify that the statements in, this report are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.
Florida Power & Li ht Co.
DATE: PREPARED BY:
S EDDY URRENT RD NATOR REVIEWED BY:
DATE'ATE. I, T S SUPERVISOR APPROVED BY:
/ PROGRAM M AGER
4l
~ ~
CUMULATIVE DISTRIBUTION
SUMMARY
TURKEY POINT UNIT 1 4 10'/94 COMPONENT : S/G A Page : 1 of 1 Date : 11/22/94 Time : 0800 Examination Dates : 10/14/94 thru 10/17/94 Total Number of Tubes Inspected .....: 3198 Total Indications Between 204 and 394 5 Greater than or equal to 404 0 Total Tubes Plugged as Preventive Maint 0 Total Tubes Plugged 0 Location Of Indications 20% to 100%
Hot Leg Cold Leg TSH .5 to 01H -2.1 1 TSC .5 to 01C -2.1 : 0 01H -2.0 to 06H +2.0 1 01C -2.0 to 06C +2.0 : 3 06H +2.1 to AV1 -3.1 0 06C +2.1 to AV4 -3.1 : 0 AV1 -3.0 to AV4 -3 0 0
it
~ I
CUHULATI VE EXANINAT ION REPORT PTH 4 OUTAGE : 10/94 CONPONENT : S/G A Page : 1 of 1 DESCRIPTIOH 20X TO 100X INDICATIONS Date : 11/29/94 Time : 0800 I ( Extent I 10/94 N/A I (Row(Col(Leg(Req(Tst/Note( Reel Probe (, 'Location (Volts(oeg(Ch ( X (Oiff( Location (Volts(Deg(Ch ( X (
'--- I--(---I--- I--------I------I- (
I
--I- - I -I---I--I---I---.---------I--.--I---I"-I--+
( Z8( 14( C (TEC(TEH (AC004-02(A-720-H/ULC (01H 43.1 I'.6(144( 1( 31( I I I I I. I I I I C ITECITEH IAC004-02(A-720-H/ULC (ozc z.6 .8(149( 1(,27( ~
I I I I I
( 44( 36( H ITECITEC (AN012 04(A 72 N/ULC ITSH .7 1.1(151( 1( 31( I I I I I
(
1 I 82( H ITECITEC PSIAH004 01(A 72 H/ULC (04C 9.4 ( 1.2(156( 1( 25( I I I I 2( 90( C (06C(06C SCIAC012 04(A 720 N/ULC (02C 44.8 1( 37(
('4(140(
I
'-- I-- (--- (--- (------- I-------I-I I I I
-I---I---I----I I I I Hunber of RECORDS Selected from Current Outage 5 Hurdler of TUBES Selected from Current Outage: 4
CUMULATIVE DISTRIBUTION
SUMMARY
.TURKEY POINT UNIT 1 4 10/94 COMPONENT : S/G B Page : 1 of 1 Date : ll/22/94 Time : 0800 Examination Dates : 10/14/94 thru 10/17/94 Total Number of Tubes Inspected .....: 3206 Total Indications Between 204 and 39% 6 Greater than or equal to 404 0 Total Tubes Plugged as Preventive Maint .0 Total Tubes Plugged 0 Location Of Indications 204 to 1004 Hot Leg Cold Leg TSH .5 to 01H -2.1 2 TSC .5 to 01C -2.1 : 0 01H -2.0 to 06H +2.0 2 01C -2.0 to 06C +2.0 : 2 06H +2.1 to AV1 -3.1 0 06C +2.1 to AV4 -3.1 : 0 AV1 -3.0 to AV4 -3.0
0 41 CUHULATIVE EXAMINATION REPORT PTN-4 OUTAGE : 10/94 COMPONENT : S/G B Page : 1 of 1 DESCRIPTION : ZOX TO 100K INDICATIONS Date : 11/22/94 Time : 0800
+
I '( Extent I 10/94 I I N/A I IRoMICol(Leg(Req(Tst/Note( Reel probe Location (Volts(oeg(Ch X (Diff( iLocation (Volts(Deg(ch,( X
'--I---I---I---I--------I-----.-I-I
-I"--
I I-- I---I (
I-. t I t t
-I---I---+
(
3( 24( C (O6C(O6C SS(BCO11 (A-72O-H/ULC (O3C 25.6 I 1.0 I 154 I 1I 27I I I I I I
( 22( 48( H ITEc(TEc Rc(BH022 IA-720-H/ULc (TSH 6.1 ~ 6f150( 1( 34( I ( I I
( 42( 48( H ITEC(TEC SCIBH010 (A-720.H/ULC (06C .0 .5(120(P 1( 29( I I I I I
( 37( 69( H (TEC(TEC PS(BH028 (A-720-M/ULC (TSH 21.6 I .6I155I 1I 29( I .I I t I 13( 75( H ITEC(TEC PSIBH003 ,IA-720-M/ULC (01H 48.2 1 'I146I 1I 39I I I I I I I I
( 14f'2( M (TEC(TEC PS(BH004 fA-720-H/ULC f02H'5.7 1.1f154( if 32( I I I I I
+ --- I---I--- I--. I--------I------I- I I .I - I---I- I I I I I
+
Number of RECORDS Selected from Current Outage : 6 Nunber of TUBES Selected from Current Outage : 6
II II CUMULATIVE DISTRIBUTION SUM4IARY TURKEY POINT UNIT 10/94 f 4 COMPONENT : S/G C Page : 1 of 1 Date : 11/22/94 Time : 0800 Examination Dates : 10/14/94 thru 10/17/94 Total Number of Tubes Inspected .....: 3205 Total Indications Between 204 and 394 13 Greater than or equal to 404 0 Total Tubes Plugged as Preventive Maint 0 Total Tubes Plugged 0 Location Of Indications 20~ to 100%
Hot Leg Cold Leg TSH .5 to 01H -2.1 0 TSC .5 to 01C -2.1 01H -2.0 to 06H +2.0 3 01C -2.0 to 06C +2.0 06H +2.1 to AV1 -3.1 : 1 06C +2.1 to AV4 -3.1 AV1 -3.0 to AV4 -3.0 : 1
C
(
~ ~ ~
CUMULATI VE EXAMINATION REPORT PTN-4 OUTAGE : 10/94 COMPONENT S/G C Page : 1 of 1 DESCRIPTION : 20K TO 100K INDICATIONS Date : 11/22/94 Time : 0800 I'
( Extent I I 10/94 N/A I (Row(col(Leg(Req(Tst/Note( Reel ( Ppobe I Location '(Volts(Deg(Ch,( II (Diff( Location (Volts(Deg(ch ( x I
'--I---I-.-I---(- - I I- I I- 'I -I---l----l-.-----------l----l---l--I---'
I 22( 7( C ITEHITEH SICC006 IA 720 M/ULC IAV .5I IP 2I 20I I I I I I I 3( 52( C (06C(06C PSICC010 (A-720-M/ULC (01C 29.4 .4(157( 1( 29( I I I I I I 24( 56( H ITEc(TEC ICH007 IA 720.M/ULC (04H 3 3 I 8(143( 1I 37( I I I I I I I I H ITECITEC ICH007 IA-720-M/ULC 104C 32.4 I .9I146I 1I 34 I I I I I I I I H ITECITEC ICH007 IA 720 M/ULC (02C 8.5 I .9(141( 1( 38( I I I I I I 42( 56( H ITECITEC PL'ICH010 (A-720.M/ULC (06C -.6 1.1(125(P,1 I 28( I I I I I I H ITECITEC SS(CH010 (A-720.M/ULC (05C 32.8 I, .6I147I 1I 33I I I I I ( I I 24I 62I H ITECITEC .PSICH008 IA-720.M/ULC I02C 34.9 .8(156(, 1( 27( I I I I I I
I I
32(
16I 30(
70(
72I 72(
H H
H ITECITEC ITECITEC (TECITEC ICH009 ICH003 SS(CH006 (A-720-M/ULC (AV1 IA-720-M/ULC IOSH 42.7 IA-720-M/ULC (04C
.0 21.1 I
I I
6I (P 2l 20(
4(>>2( 1( 30(
.3(>>2( 1( 28(
I I
I I,I I
I I
I I
I I
I I
I I
I I
37( 72( H ITECITEC SC(CH009 (A-720-M/UL'C IOSH 44.5 .4(151( 1( 31( '(
( I I I I I 77( ITECITEC PSICH006 IA 720 M/ULC l02C 0.4 .4(156(
'-- I--- I--(---I-------I-I I H I -I. I I -I--I--.I- I I I I
".--.------(-----I-.-I.
I I
I Neer of RECORDS Selected from Current Outage : 13 Number of TUSES Selected from Current Outage : 10
il Il II I'