ML17340A623: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/10/1981
| issue date = 01/10/1981
| title = Monthly Operating Repts for Dec 1980
| title = Monthly Operating Repts for Dec 1980
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 12:21, 18 June 2019

Monthly Operating Repts for Dec 1980
ML17340A623
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 01/10/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A566 List:
References
NUDOCS 8101210418
Download: ML17340A623 (6)


Text

~~~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Januar 10 1981 COMPLETED BY V.T.Chilson TELEPHONE (305)552-3824 REPORT.MONTH DECEMBER, 1980 Unit No.3 operated at approximately 100%R.P.after the unit was re-turned to service on December 6, 1980, except for load reductions of December 8-9 and 9-11, 1980.Refer to"Unit Shutdowns and Power Reductions",section of'December, 1980, Operating Status Report for'dditional information.

Major Safety-related maintenance activities performed during the month included: ,Inspections and requirements of IE.Bulletins and NUREG-0578 are continuing.

Florida Power&Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

Completed repair of leaking tube plugs in'team generator No.3B.Completed inspection of reactor coolant pump No..3B shaft seals.

P,

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turkey Point Unit No.4 DATE January 10, 1'981 COMP LETE D BY V.T.Chilson TELEP 11ONE (305)552-382'4 REPORT MONTH DECEMBER, 1980 Unit No.4 was removed from service for scheduled refueling, mainte-nance, and inspections.(Continued from previous month).Refer to"Unit Shutdowns and Power Reductions" section of the, December, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and'RC for additional information.

Completed Steam Generator Tube Inspection Program.Installed eighteen new fuel assemblies.

~r I W I

SUMMARY

OF OPERATING EXPERiENCE DOCKET NO.UNIT 50-335 St.Lucie Unit.No.1 DATE Januar 10, 1981 COMPLETED BY V.T.Chilson REPORT MONTH DECEMBER 1980 TELEPHONE (305)552-3824 Unit.operated at approximately 100%R.P.during month.Refer to"Unit Shutdowns and Power Reductions" section of the December, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included: Inspections and requirements fo IE Bulletins and NUREG-0578 are continuing.

Florida Power S Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

0