SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50 250 Turkey Point UNIT Unit No.
3 DATE Januar 10 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT.MONTH
- DECEMBER, 1980 Unit No.
3 operated at approximately 100% R.P. after the unit was re-turned to service on December 6, 1980, except for load reductions of December 8-9 and 9-11, 1980.
Refer to "Unit Shutdowns and Power Reductions",section of 'December,
- 1980, Operating Status Report for
'dditional information.
Major Safety-related maintenance activities performed during the month included:
,Inspections and requirements of IE. Bulletins and NUREG-0578 are continuing.
Florida Power
& Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for ad-ditional information.
Completed repair of leaking tube plugs in'team generator No.
3B.
Completed inspection of reactor coolant pump No..
3B shaft seals.
P,
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50 251 UNIT Turkey Point Unit No.
4 DATE January 10, 1'981 COMP LETED BY V. T. Chilson TELEP 11ONE (305) 552-382'4 REPORT MONTH
- DECEMBER, 1980 Unit No.
4 was removed from service for scheduled refueling, mainte-
- nance, and inspections.
(Continued from previous month).
Refer to "Unit Shutdowns and Power Reductions" section of the, December,
- 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and'RC for additional information.
Completed Steam Generator Tube Inspection Program.
Installed eighteen new fuel assemblies.
~r I
W I
SUMMARY
OF OPERATING EXPERiENCE DOCKET NO.
UNIT 50 335 St. Lucie Unit. No.
1 DATE Januar 10, 1981 COMPLETED BY V. T. Chilson REPORT MONTH DECEMBER 1980 TELEPHONE (305) 552-3824 Unit. operated at approximately 100% R.P. during month.
Refer to "Unit Shutdowns and Power Reductions" section of the December,
- 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements fo IE Bulletins and NUREG-0578 are continuing.
Florida Power S Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.