ML17340A623

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1980
ML17340A623
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 01/10/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A566 List:
References
NUDOCS 8101210418
Download: ML17340A623 (6)


Text

~

~ ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE Januar 10 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT .MONTH DECEMBER, 1980 Unit No. 3 operated at approximately 100% R.P. after the unit was re-turned to service on December 6, 1980, except for load reductions of December 8-9 and 9-11, 1980. Refer to "Unit Shutdowns and Power Reductions",section of 'December, 1980, Operating Status Report for information. 'dditional Major Safety-related maintenance activities performed during the month included:

,Inspections and requirements of IE. Bulletins and NUREG-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

Completed repair of leaking tube plugs in'team generator No. 3B.

Completed inspection of reactor coolant pump No..

3B shaft seals.

P,

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 251 Turkey Point UNIT Unit No. 4 DATE January 10, 1'981 COMP LETE D BY V. T. Chilson TELEP 11ONE (305) 552-382'4 REPORT MONTH DECEMBER, 1980 Unit No. 4 was removed from service for scheduled refueling, mainte-nance, and inspections. (Continued from previous month). Refer to "Unit Shutdowns and Power Reductions" section of the, December, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and'RC for additional information.

Completed Steam Generator Tube Inspection Program.

Installed eighteen new fuel assemblies.

I

~r W

I

SUMMARY

OF OPERATING EXPERiENCE DOCKET NO. 50 335 St. Lucie UNIT Unit. No. 1 DATE Januar 10, 1981 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH DECEMBER 1980 Unit. operated at approximately 100% R.P. during month. Refer to "Unit Shutdowns and Power Reductions" section of the December, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements fo IE Bulletins and NUREG-0578 are continuing.

Florida Power Light Company commitments for S

NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

0