Pages that link to "05000423/LER-1998-001, Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl"
Jump to navigation
Jump to search
The following pages link to 05000423/LER-1998-001, Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl:
Displayed 50 items.
- 05000336/LER-1998-020, Forwards LER 98-020-00 Re SI Recirculation Header Piping Components Not Fully Satisfying ISI Requirements IAW ASME Code Section XI Criterion.Commitments Made within Ltr Also Encl (← links)
- 05000423/LER-1998-038, Forwards LER 98-038-00 Re Manual Rt Due to High Conductivity in Condensate Sys on 980915.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-037, Forwards LER 98-037-00,re TS 3.0.3 Entry Due to Both SW Trains Declared Inoperable Following Failure of Check Valves Associated with Injection of Sodium Hypochlorite on 980910 & 18.Util Commitments Contained in Attachment 1 to (← links)
- 05000336/LER-1998-021, Forwards LER 98-021-00,documenting Condition That Was Discovered at Mnps,Unit 2,on 980825.Commitments Made by Util,Encl (← links)
- 05000336/LER-1998-019, Forwards LER 98-019-00,re Potential Inability to Close AFW Regulator Valves After Helb,Discovered on 980826.Util Commitments,Encl (← links)
- 05000336/LER-1998-018, Forwards LER 98-018-00,re Condition That Was Discovered at Millstone Unit 2 on 980818.Commitments Made by Util Also Encl (← links)
- 05000336/LER-1998-024, Forwards LER 98-024-00 Re 981030 Potential Leakage Path Through Containment Pressure Instrument.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-043, Forwards LER 98-043-00,re Manual Rt Due to High Conductivity in Condensate Sys.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-042, Forwards LER 98-042-00,re Licensing & Design Basis Review of Lpms Which Identified That TS Definition of Acot Was Not Met.Determined Event Reportable on 981020.Special Rept Dtd 980909,is Supplemented.Commitments Included in Att (← links)
- 05000336/LER-1998-023, Forwards LER 98-023-00,re Failure to Adequately Test Containment Air Recirculation Fans IAW TS SR 4.6.2.1.2(a) on 980924.LER Submitted Beyond 30-day Discovery Time Period. Licensee Commitments Also Included (← links)
- 05000423/LER-1998-041, Forwards LER 98-041-00,re Failure to Enter Action Statement for Inoperable SG Water Level Channel IAW TSs on 981016. Commitments Made by Util Also Encl (← links)
- 05000423/LER-1998-040, Forwards LER 98-040-00,documenting Condition That Was Determined Reportable on 981017.Attachment 1 Contains Commitments Made in Response to Event (← links)
- ML20195B871 (← links)
- 05000423/LER-1998-039, Forwards LER 98-039-00,documenting Event That Occurred on 981001 at Millstone Unit 3.Commitments Made by Util,Encl (← links)
- 05000336/LER-1998-002, Forwards LER 98-002-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980109,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1998-001, Forwards LER 98-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980108.LER Being Submitted Per 10CFR50.73(a)(2)(ii) Requirements. Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1998-025, Forwards LER 98-025-00,documenting Condition Discovered at Mnps,Unit 2,on 981111.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-045, Forwards LER 98-045-00,re Rt Due to MSIV Closure During Partial Stroke Testing Due to Solenoid Valve Failure on 981211.Commitments,encl (← links)
- 05000336/LER-1998-017, Forwards LER 98-017-01,re Fire Protection Program Deficiencies That Were Discovered on 980812.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-022, Forwards LER 98-022-01 Re AFW DC Power Supply Failure That Was Not Considered in Safety Analysis on 980910.Commitments Made in Ltr Encl (← links)
- 05000423/LER-1998-044, Forwards LER 98-044-00,re Rt Due to High Differential Pressure Between a & B Condensers on 981111.Util Commitments in Response to Event Contained within Attachment 1 of Ltr (← links)
- ML20205R875 (← links)
- 05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-004, Forwards LER 98-004-00,re Event Which Occurred at Millstone Unit 3 on 980114.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-005, Forwards LER 98-005-00,documenting Condition That Was Determined to Be Reportable at Millstone,Unit 3 on 980116. Commitments Made by Ltr,Listed (← links)
- ML20202J205 (redirect page) (← links)
- 05000423/LER-1998-001 (redirect page) (← links)
- 05000423/LER-2014-003 (← links)
- 05000423/LER-2016-005 (← links)
- 05000423/LER-2016-004 (← links)
- 05000423/LER-2016-003 (← links)
- 05000423/LER-2016-002 (← links)
- 05000423/LER-2016-001 (← links)
- 05000423/LER-2017-001 (← links)
- 05000423/LER-2019-001 (← links)
- 05000423/LER-1993-004 (← links)
- 05000423/LER-1993-012 (← links)
- 05000423/LER-1993-011 (← links)
- 05000423/LER-1990-026 (← links)
- 05000423/LER-1990-024 (← links)
- 05000423/LER-1990-025 (← links)
- 05000423/LER-1990-022 (← links)
- 05000423/LER-1990-021 (← links)
- 05000423/LER-1990-019 (← links)
- 05000423/LER-1995-005, Forwards Suppl LER 95-005-01,updating Cause of Event & Including Addl Actions to Prevent Recurrence (← links)
- 05000423/LER-1996-009, Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii) (← links)
- 05000423/LER-1997-022, Forwards LER 97-022-00,documenting Conditions That Occurred at Millstone Nuclear Power Station,Unit 3 on 970218.Util Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1997-018, Forwards LER 97-018-00,documenting Condition Determined at Millstone Unit 3 on 970208.Util Commitments Attached (← links)
- 05000423/LER-1997-016, Provides List of Commitments Re LER 97-016-00 Per 10CFR50.73(a)(2)(ii)(B) (← links)
- 05000423/LER-1997-015, Forwards LER 97-015-00,documenting Condition Determined at Millstone Unit 3 on 970204 Per 10CFR50.73(a)(2)(ii)(B).Utils Commitments Attached (← links)
- 05000423/LER-1997-014, Forwards LER 97-014-00,documenting Condition Determined at Millstone Unit 3 on 970203.Util Commitments Attached (← links)
- 05000423/LER-1997-010, Forwards LER 97-010-00,documenting Condition Determined at Millstone Unit 3 on 970129 Per 10CFR50.73(a)(2)(v). Commitments Attached (← links)
- 05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl (← links)
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl (← links)
- 05000423/LER-1997-005, Corrects Numbering Inconsistency in Commitments Addressing LER 97-005-00 (← links)
- 05000423/LER-1996-042, Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00 (← links)
- 05000423/LER-1997-007, Forwards LER 97-007-00,documenting Condition That Was Determined at Millstone Nuclear Power Station,Unit 3 on 970123.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1997-004, Forwards LER 97-004-00 Documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 3 on 970114.Util Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1997-003, Forwards LER 97-003-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970113,per 10CFR50.73(a)(2)(ii) (B).List of Commitments,Encl (← links)
- 05000423/LER-1997-033, Forwards LER 97-033-00,documenting an Event That Occurred at Mnps,Unit 3 on 970527.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-013, Provides Revised Schedule for Submittal of LARs Identified in LER 97-013-00, Failure to Meet General Design Criteria 57 for Ms Supply Containment Isolation Valves to AFW Pump Turbine. LAR Will Be Submitted by 970630 (← links)
- 05000423/LER-1997-023, Forwards LER 97-023-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970320,per 10CFR50.73(a)(2)(i) (← links)
- 05000423/LER-1996-047, Revises Commitment Made in Response to LER 96-047-00 Re Seismic Qualification Training (← links)
- 05000423/LER-1996-050, Revises Commitments Previously Submitted to NRC in LER 96-050-00 Re Range of Control Bldg Chilled Water Pump Gauges Used for Surveillance Not in Accordance W/Asme Chapter XI Requirements (← links)
- 05000423/LER-1996-031, Forwards LER 96-031-01 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-029, Forwards LER 97-029-00 Per 10CFR50.73(a)(2)(ii).Commitments Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-028, Forwards LER 97-028-00 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 of Ltr (← links)
- 05000423/LER-1996-049, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-011, Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions (← links)
- 05000423/LER-1997-031, Forwards LER 97-031-00,documenting Condition That Was Determined at Facility on 970507.Commitments Made in Response to Event,Encl (← links)
- 05000423/LER-1997-024, Revises Schedule for Commitment Made in LER 97-024-00, Engineeered Safeguards Bldg Monitor Noble Gas Activity Monitor Sensitivity Not Meeting TS Requirements (← links)
- 05000423/LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping (← links)
- 05000423/LER-1997-006, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1 (← links)
- 05000423/LER-1997-026, Forwards LER 97-026-00,documenting Condition That Occurred on 970325.Util Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000423/LER-1996-028, Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment (← links)
- 05000423/LER-1996-048, Provides Commitments Re LER 96-048.Surveillance Procedures Used to Test Load Shed & re-energizing Feature for Both Trains of Charging Sys Pumps Will Be Revised to Conform W/ TS 4.8.1.1.2.g.6 (← links)
- 05000423/LER-1996-026, Forwards LER 96-026-02 Which Documents Condition That Was Determined at Plant,Unit 3 on 960730 (← links)
- 05000423/LER-1997-002, Forwards LER 97-002-00 Re Torquing of Battery Connections Not Performed as Part of Connection Tightness Checks. Util Commitments in Response to Events Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-001, Submits Commitments Re LER 97-001-00,documenting Condition Determined at Plant on 970104 (← links)
- 05000423/LER-1996-019, Forwards LER 96-019-01 Documenting Event That Occurred at Millstone Nuclear Power Station Unit 3 on 960627.Util Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-051, Forwards LER 96-051-00 & Util Commitments in Response to Event (← links)
- 05000423/LER-1996-007, Forwards LER 96-007-02 Which Supplements Rept Submitted on 960502,per 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(B&D), 10CFR50.73(a)(2)(vii)(B&D).Commitments in Response to Event, Encl (← links)
- 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval (← links)
- 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage (← links)
- 05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves (← links)
- 05000423/LER-1998-038, Forwards LER 98-038-00 Re Manual Rt Due to High Conductivity in Condensate Sys on 980915.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-037, Forwards LER 98-037-00,re TS 3.0.3 Entry Due to Both SW Trains Declared Inoperable Following Failure of Check Valves Associated with Injection of Sodium Hypochlorite on 980910 & 18.Util Commitments Contained in Attachment 1 to (← links)
- 05000423/LER-1997-021, Provides Clarification of Actions Taken in Completing Commitment Previously Submitted in LER 97-021-00, Defective Design of RSS Expansion Joint Tie Rod Assembly (← links)
- 05000423/LER-1997-030, Provides Revised Schedule for Submittal of LAR as Identified in LER 97-030-00.LAR Was Previously Scheduled to Be Submitted on 970801 & Is Currently Scheduled to Be Submitted by 970831.W/revised Commitments (← links)
- 05000423/LER-1997-039, Forwards LER 97-039-00,documenting Condition Determined at Millstone Unit 3 on 970614.List of Commitments Provided (← links)
- 05000423/LER-1997-038, Forwards LER 97-038-00,documenting Condition Determined at Mnps,Unit 3 on 970613.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1998-043, Forwards LER 98-043-00,re Manual Rt Due to High Conductivity in Condensate Sys.Commitments Made by Util,Encl (← links)
- 05000423/LER-1999-006, Forwards LER 99-006-00,re Failure of Both Reactor Plant Aerated Drains SR Air Driven Sump Pumps During Technical Requirements Manual Surveillance on 990516.Commitments Also Encl (← links)
- 05000423/LER-1998-042, Forwards LER 98-042-00,re Licensing & Design Basis Review of Lpms Which Identified That TS Definition of Acot Was Not Met.Determined Event Reportable on 981020.Special Rept Dtd 980909,is Supplemented.Commitments Included in Att (← links)
- 05000423/LER-1998-041, Forwards LER 98-041-00,re Failure to Enter Action Statement for Inoperable SG Water Level Channel IAW TSs on 981016. Commitments Made by Util Also Encl (← links)
- 05000423/LER-1998-040, Forwards LER 98-040-00,documenting Condition That Was Determined Reportable on 981017.Attachment 1 Contains Commitments Made in Response to Event (← links)
- 05000423/LER-1999-005, Forwards LER 99-005-00,re Failure to Perform Surveillance on RCS Pressurizer Heater Penetration Breakers,Determined Reportable on 990510.Commitments Made,Encl (← links)
- 05000423/LER-1998-039, Forwards LER 98-039-00,documenting Event That Occurred on 981001 at Millstone Unit 3.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-053, Forwards LER 97-053-00,documenting Condition That Was Determined Reportable at Millstone Unit 3 on 971024. Attachment to Ltr Contains Commitments in Response to Event (← links)
- 05000423/LER-1997-009, Forwards Suppl 01 to LER 97-009-00,documenting Addl Conditions to Those Determined Reportable at Millstone Unit 3 on 970123.Commitments Made within Ltr Are Listed in LER 97-009-01.W/o Encl (← links)
- 05000423/LER-1997-050, Forwards LER 97-050-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971017,per 10CFR50.73 (a)(2)(ii)(B).Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000423/LER-1997-052, Forwards LER-97-052-00 Which Documents Event That Occurred at Millstone,Unit 3 on 971014.Commitments Made within Ltr, Encl (← links)
- 05000423/LER-1998-045, Forwards LER 98-045-00,re Rt Due to MSIV Closure During Partial Stroke Testing Due to Solenoid Valve Failure on 981211.Commitments,encl (← links)
- 05000423/LER-1997-051, Forwards LER 97-051-00,documenting Event That Occurred at Plant,Unit 3 on 971007,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted (← links)
- 05000423/LER-1996-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted (← links)
- 05000423/LER-1997-061, Forwards LER 97-061-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 971218.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-044, Forwards LER 98-044-00,re Rt Due to High Differential Pressure Between a & B Condensers on 981111.Util Commitments in Response to Event Contained within Attachment 1 of Ltr (← links)
- 05000423/LER-1997-059, Forwards LER 97-059-00 Which Documents Condition That Was Determined Reportable at Millstone Unit 3 on 971125,per 10CFR50.73(a)(2)(ii)(B).Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-058, Forwards LER 97-058-00 Which Documents Condition That Was Determined Reportable at Mnps,Unit 3 on 971122,per 10CFR50.73(a)(2)(i)(B).Commitments Made in Response to Event Also Encl (← links)
- 05000423/LER-1997-057, Forwards LER 97-057-00 Which Documents Condition That Was Determined Reportable at Unit 3 on 971118,per 10CFR50.73(a)(2)(i)(B).Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000423/LER-1996-034, Forwards LER 96-034-02,documenting Condition That Was Initially Determined Reportable at Millstone Unit 3 on 960918.Commitments Made in Response to Event Also Encl (← links)
- 05000423/LER-1997-036, Forwards LER 97-036-01 Which Documents Conditions That Was Determined Reportable at Facility on 970605,per 10CFR50.73(a)(2)(i)(B) & 10CFR50.73(a)(2)(ii)(B).Commitments in Response to Event Also Encl (← links)
- 05000423/LER-1996-040, Discusses LER 96-040-00, Potential Component Cooling Water Sys Overcooling Due to Loss of Instrument Air Sys Concurrent W/Low Svc Water Inlet Temp. Revised Commitment Provided in Encl (← links)
- 05000423/LER-1997-027, Provides Revised Completion Date for Commitment Submitted within LER 97-027-00 Re Corrective Action Not Met for Trending Valve Leakage.Revised Completion Date Is 970501 (← links)
- 05000423/LER-1997-055, Forwards LER 97-055-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971105.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-056, Forwards LER 97-056-00,documenting Condition That Was Determined Reportable on 971107,per 10CFR50.73(a)(2)(ii)(B). Attachment 1 Contains Commitments Made in Ltr (← links)
- 05000423/LER-1998-004, Forwards LER 98-004-00,re Event Which Occurred at Millstone Unit 3 on 980114.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-005, Forwards LER 98-005-00,documenting Condition That Was Determined to Be Reportable at Millstone,Unit 3 on 980116. Commitments Made by Ltr,Listed (← links)
- 05000423/LER-1998-001, Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-003, Forwards LER 98-003-00,documenting Condition That Was Determined to Be Reportable at Millstone Nuclear Power Station,Unit 3 on 980114.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-062, Forwards LER 97-062-01,documenting Condition Determined Reportable at Millstone,Unit 2 on 971219.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-037, Forwards LER 97-037-00 Which Documents Condition Identified at Millstone,Unit 3 on 970516.Condition Later Determined Reportable on 970624.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-019, Provides Revised Completion Date for Commitment Submitted in LER 97-019-00 Re Failure to Account for Instrument Uncertainty in DWST Level.Commitment Made by Util,Encl (← links)
- 05000423/LER-1997-020, Forwards Revised Schedule for Reconfiguring CCW Side of Containment Air Recirculation Sys to Provide Required Flowrates When Supplied by Reactor Plant Chilled Water Sys or Reactor Plant Ccws,Identified in LER 97-020-00 (← links)
- 05000423/LER-1998-012, Forwards LER 98-012-01,documenting Addl Info Pertaining to Condition That Was Determined Reportable on 980218. Attachment 1 Contains Commitments in Response to Event (← links)
- 05000423/LER-1998-036, Forwards LER 98-036-00,which Discusses ESF Bldg Sump Pump Design Deficiencies.Commitments Made in Rept,Encl (← links)
- 05000423/LER-1998-031, Forwards LER 98-031-00,re Event Which Was Determined Reportable on 980526.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-054, Forwards LER 97-054-01,re Event Which Occurred at Millstone Unit 3 on 971029.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-009, Forwards Revised Commitments Contained in LER 98-009-00 for Mnps,Unit 3, Containment Radiation Monitor CMS*22 Setpoints Non-Conservative W/Respect to Conforming W/Commitments Made to Reg Guide 1.45 within Fsar (← links)
- 05000423/LER-1998-030, Forwards LER 98-030-00,documenting Condition Determined Reportable at Mnps,Unit 3,on 980515.Commitments Made by Util Are Contained in Attachment 1 to Ltr (← links)
- 05000423/LER-1998-028, Forwards LER 98-028-00,documenting Condition Determined Reportable at Unit 3 on 980513.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1996-021, Forwards LER 96-021-02 Re Components Not Included in IST Program as Result of Programmatic Deficiencies.Status of NNECO Commitments from Previous LER Suppl Are Contained in Attachment 1.Addl Commitments Contained in Attachment (← links)
- 05000423/LER-1998-029, Forwards LER 98-029-00,supplementary Leak Collection & Release Sys Bypass Leakage May Result in Unaccounted Control Room & TSC Doses.Attachment 1 Contains Commitments Made in Ltr (← links)
- 05000423/LER-1997-063, Forwards LER 97-063-01,re Event Determined Reportable at Millstone Unit 3 on 971231.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-043, Forwards LER 97-043-00,documenting Condition Determined Reportable on 970630.List of Commitments Provided (← links)
- 05000423/LER-1998-025, Forwards LER 98-025-00,documenting Event at Millstone Unit 3 on 980427,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-002, Informs of Revised Completion Date to Complete Commitment Contained in LER 98-002-00, Verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Not Being Met. New Commitment Made by Util,Encl (← links)
- 05000423/LER-1998-016, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-060, Forwards LER 97-060-01,determined Reportable at Millstone Unit 3 on 971209,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-022, Forwards LER 98-022-00,documenting Condition That Determined Reportable at Millstone Unit 3 on 980408.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-023, Forwards LER 98-023-00,documenting Condition That Determined Reportable at Millstone Unit 3 on 980411.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-024, Forwards LER 98-024-00, Failure to Complete Action Associated W/Ts 4/3.3.1 within Required Time Period. Commitments Made by Util,Encl (← links)
- 05000423/LER-1996-004, Forwards LER 96-004-01 Documenting Condition That Was Originally Determined Reportable at Mnps,Unit 3,on 960319. Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-032, Forwards LER 98-032-00,re Event Determined Reportable at Millstone Unit 3 on 980618.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-035, Forwards LER-98-035-00,documenting Condition That Was Determined Reportable on 980612.Attachment 1 Contains Commitments to Ltr (← links)
- 05000423/LER-1998-034, Forwards LER 98-034-00,documenting Condition,Determined Reportable at Millstone Unit 3 on 980614.Util Commitments in Response to Event Contained within Attachments 1 to Ltr (← links)
- 05000423/LER-1998-033, Forwards LER 98-033-00,re Event Determined Reportable at Millstone Unit 3 on 980610.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-027, Forwards LER 98-027-00 Which Notes That Unmonitored Flowpath for Safety Injection Pump Cooling Pumps May Prevent Detection of Pump Degradation.Commitments,Encl (← links)
- 05000423/LER-1998-026, Forwards LER 98-026-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 980416.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-018, Forwards LER 98-018-00,documenting Condition That Was Determined Reportable on 980302.Attachment 1 Contains Commitments in Response to Event (← links)
- 05000423/LER-1998-007, Forwards LER 98-007-00,documenting Event That Occurred at Millstone,Unit 3 on 980129.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-017, Forwards LER 98-017-00,re Condition That Occurred at Millstone Unit 3 on 980227.Commitments Made in Rept,Encl (← links)
- 05000423/LER-1997-044, Forwards LER 97-044-00,documenting Condition,Determined at Unit 3 on 970701.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-041, Forwards Revised Schedule for Completion of Commitment Identified in LER 97-041-00,submitted on 970813.Commitment to Define Operable Service Water Loop as Two Pumps Per Loop by 970930 Will Be Completed by 971122 (← links)
- 05000423/LER-1997-034, Forwards LER 97-034-01,documenting Condition That Was Determined at Millstone,Unit 3 on 970918.Attachment 1 to Ltr Contains Commitments in Response to Event (← links)
- 05000423/LER-1998-014, Forwards LER 98-014-00,failure to Provide Weepholes in Conduits & Junction Boxes Per 10CFR50.73(a)(2)(ii)(B). Attachment 1 Contains Commitments in Response to Event (← links)
- 05000423/LER-1998-015, Forwards LER 98-015-00,documenting Condition Determined Reportable at Unit 3 on 980221.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-013, Forwards LER 98-013-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980219 Re TS Required Sampling During Mode 5 Not Being Completed for SG Drain Down.Util Commitments in Response to Event Also Encl (← links)
- 05000423/LER-1998-021, Forwards LER 98-021-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980318.Commitments Made by Util,Encl (← links)
- 05000423/LER-1998-010, Forwards LER 98-010-00,documenting Condition That Was Determined at Millstone,Unit 3 on 980214.Util Commitments Provided in Ltr,Encl (← links)
- 05000423/LER-1998-011, Forwards LER 98-011-00,re Failure to Adequately Test Driven AFW Pump at Fixed Speed & Test Position Indication of Two Valves Per Section XI of ASME Code.Commitments,Encl (← links)
- 05000423/LER-1998-019, Forwards LER 98-019-00,documenting Condition Determined Reportable at Unit 3 on 980313.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-020, Forwards LER 98-020-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980320.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-048, Forwards LER 97-048-00 Documenting Condition That Was Determined at Millstone,Unit 3 on 970806.Attachment 1 Contains Commitments in Response to Event (← links)
- 05000423/LER-1998-008, Forwards LER 98-008-00,documenting Condition Determined Reportable at Millstone Unit 3 on 980210.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1997-017, Forwards LER 97-017-02,documenting Condition Determined Reportable at Unit 3 on 970206.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-049, Forwards LER 97-049-00,documenting Condition That Was Determined Reportable on 970925.Commitments in Response to Event Contained in Attachment 1 to Ltr (← links)
- 05000423/LER-1996-029, Forwards Revised Commitments That Were Previously Submitted to NRC in LER 96-029-00, Functional Deficiency in Setting of ECCS Throttle Valve Positions (← links)
- 05000423/LER-1997-047, Forwards LER 97-047-00,documenting Condition,Determined at Unit 3 on 970815.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-012, Forwards Revised Commitments Re Expansion Joint Tie Rod Assemblies,Previously Submitted to NRC in LER 97-012-00 (← links)
- 05000423/LER-1997-046, Forwards LER 97-046-00,documenting Condition Determined at Unit 3 on 970523 & Later Determined to Be Reportable on 970711.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-040, Forwards LER 97-040-00,documenting Condition Determined on 970627.List of Commitments in Response to Event Encl (← links)
- 05000423/LER-1996-036, Forwards LER 96-036-02,documenting Condition Originally Identified on 960926.List of Commitments Provided (← links)
- 05000423/LER-1997-042, Forward LER 97-042-00,documenting Condition Determined to Be Reportable on 970703.List of Commitments Provided (← links)
- 05000423/LER-1997-045, Forwards LER 97-045-00,documenting Condition,Determined Reportable at Unit 3 on 970703.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1992-005, Discusses Omission of RCS Depressurization Function from TS Requirements for Remote Shutdown Capability,Per LER 92-005 Submitted Via .Caused by Administrative Oversight.Ts Change Will Be Processed & Valves Tested (← links)
- 05000423/LER-1998-003, Forwards LER 98-003-00,documenting Condition That Was Determined to Be Reportable at Millstone Nuclear Power Station,Unit 3 on 980114.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-026, Forwards LER 98-026-00,re Exceeded Pressurizer Spray Line Fatigue Limits Due to Insufficient Thermal Effects Analysis. Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-012, Forwards LER 98-012-01,documenting Addl Info Pertaining to Condition That Was Determined Reportable on 980218. Attachment 1 Contains Commitments in Response to Event (← links)
- 05000336/LER-1998-005, Forwards LER 98-005-01 Re HELB Deficiencies for Piping Inside Containment on 980318.Commitments,encl (← links)
- 05000423/LER-1998-036, Forwards LER 98-036-00,which Discusses ESF Bldg Sump Pump Design Deficiencies.Commitments Made in Rept,Encl (← links)
- 05000336/LER-1998-016, Forwards LER 98-016-00,which Discusses Inadequate Administrative Controls on Safety Injection Valve. Commitments Made within Rept,Encl (← links)
- 05000423/LER-1998-031, Forwards LER 98-031-00,re Event Which Was Determined Reportable on 980526.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-013, Forwards LER 98-013-00,re Event Which Occurred at Millstone Unit 2 on 980526.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-009, Forwards Revised Commitments Contained in LER 98-009-00 for Mnps,Unit 3, Containment Radiation Monitor CMS*22 Setpoints Non-Conservative W/Respect to Conforming W/Commitments Made to Reg Guide 1.45 within Fsar (← links)
- 05000336/LER-1998-012, Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-011, Forwards LER 98-011-00,documenting Event That Occurred at Unit 2 on 980502.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000423/LER-1998-030, Forwards LER 98-030-00,documenting Condition Determined Reportable at Mnps,Unit 3,on 980515.Commitments Made by Util Are Contained in Attachment 1 to Ltr (← links)
- 05000423/LER-1998-028, Forwards LER 98-028-00,documenting Condition Determined Reportable at Unit 3 on 980513.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1998-029, Forwards LER 98-029-00,supplementary Leak Collection & Release Sys Bypass Leakage May Result in Unaccounted Control Room & TSC Doses.Attachment 1 Contains Commitments Made in Ltr (← links)
- 05000336/LER-1998-010, Forwards LER 98-010-00,documenting Event That Occurred at Unit 2 on 980508.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1998-009, Forwards LER 98-009-00,documenting Event Which Occurred at Millstone Unit 3 on 980501.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-025, Forwards LER 98-025-00,documenting Event at Millstone Unit 3 on 980427,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-008, Forwards LER 98-008-00,re Event Which Occurred at Millstone Unit 2,on 980423,per 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Encl (← links)
- ML20248C626 (← links)
- 05000336/LER-1998-007, Forwards Corrected LER 98-007-00,documenting Event Which Occurred at Millstone Unit 2 on 980408.LER Is Being Resubmitted Due to Omission of Rept Date on Original Submittal.Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-002, Informs of Revised Completion Date to Complete Commitment Contained in LER 98-002-00, Verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Not Being Met. New Commitment Made by Util,Encl (← links)
- 05000423/LER-1998-016, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl (← links)
- 05000423/LER-1998-022, Forwards LER 98-022-00,documenting Condition That Determined Reportable at Millstone Unit 3 on 980408.Util Commitments in Response to Event Contained within Attachment 1 to Ltr (← links)