Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures B17851, Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d)1999-08-27027 August 1999 Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d) B17855, Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.7901999-08-17017 August 1999 Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.790 B17849, Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr1999-08-16016 August 1999 Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr B17854, Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings1999-08-14014 August 1999 Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings B17850, Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept1999-08-11011 August 1999 Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept B17837, Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl1999-08-0707 August 1999 Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl B17657, Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 19991999-08-0303 August 1999 Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 1999 B17845, Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered1999-08-0202 August 1999 Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered B17831, Informs NRC Staff That Change 3 to Rev 25 of Mnps Emergency Plan Was Implemented on 990715.Change Removes Facility Organizational Charts from Emergency Plan & Identifies Relocation to Nuqap1999-07-26026 July 1999 Informs NRC Staff That Change 3 to Rev 25 of Mnps Emergency Plan Was Implemented on 990715.Change Removes Facility Organizational Charts from Emergency Plan & Identifies Relocation to Nuqap B17834, Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld1999-07-20020 July 1999 Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld B17836, Forwards Revised NRC Form 396 & Supporting Physician Rept for Licensed Operator Restricted from Licensed Duties, Effective 990628,due to Medical Condition.Without Encl1999-07-20020 July 1999 Forwards Revised NRC Form 396 & Supporting Physician Rept for Licensed Operator Restricted from Licensed Duties, Effective 990628,due to Medical Condition.Without Encl B17811, Submits Response to NRC AL 99-02,requesting That Licensees Provide Numerical Estimates of Licensing Actions to Be Expected to Be Submitted in Fy 2000 & 20011999-07-20020 July 1999 Submits Response to NRC AL 99-02,requesting That Licensees Provide Numerical Estimates of Licensing Actions to Be Expected to Be Submitted in Fy 2000 & 2001 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options B17835, Forwards Rev 33 to Millstone Station Physical Security Plan, Per 10CFR50.54(p)(2).Licensee Determined That Changes Do Not Decrease Effectiveness of Plan.Rev Withheld from Public Disclosure,Per 10CFR2.790(d)(1)1999-07-16016 July 1999 Forwards Rev 33 to Millstone Station Physical Security Plan, Per 10CFR50.54(p)(2).Licensee Determined That Changes Do Not Decrease Effectiveness of Plan.Rev Withheld from Public Disclosure,Per 10CFR2.790(d)(1) B17818, Provides NRC Staff with Change to TS Bases Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only.Change Was Reviewed & Approved by Unit 3 Plant Operations Review Committee IAW Provisions of 10CFR50.591999-07-16016 July 1999 Provides NRC Staff with Change to TS Bases Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only.Change Was Reviewed & Approved by Unit 3 Plant Operations Review Committee IAW Provisions of 10CFR50.59 B17824, Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 21999-07-13013 July 1999 Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident B17816, Provides Certification That M Lettrich,Has Completed Eligibility Requirements,Per 10CFR55.31 for Operator License.Util Requests That Licensing Action Be Taken for Named Individual1999-07-0101 July 1999 Provides Certification That M Lettrich,Has Completed Eligibility Requirements,Per 10CFR55.31 for Operator License.Util Requests That Licensing Action Be Taken for Named Individual B17801, Forwards 10CFR50.59 Annual Rept for Period Jan-Dec 1998. Various Changes That Were Initiated in Previous Yrs & Completed in 1998,also Incorporated Into Annual Rept1999-06-30030 June 1999 Forwards 10CFR50.59 Annual Rept for Period Jan-Dec 1998. Various Changes That Were Initiated in Previous Yrs & Completed in 1998,also Incorporated Into Annual Rept B17819, Forwards Rev 17 to FSAR & Addendum 6 to Annual Rept.Nneco Recently Completed Review of Unit 2 Design & Licensing Bases Which Resulted in Changes to FSAR Provided in Encl 1.Encl 2 Includes Info Covering Changes Not Included in1999-06-30030 June 1999 Forwards Rev 17 to FSAR & Addendum 6 to Annual Rept.Nneco Recently Completed Review of Unit 2 Design & Licensing Bases Which Resulted in Changes to FSAR Provided in Encl 1.Encl 2 Includes Info Covering Changes Not Included in B17780, Forwards Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) TR, IAW 10CFR50.54(a)(3).Changes to TR Are Shown as Text in Bold Italics1999-06-30030 June 1999 Forwards Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) TR, IAW 10CFR50.54(a)(3).Changes to TR Are Shown as Text in Bold Italics B17723, Responds to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for Units 2 & 3 Encl.Without Encl1999-06-29029 June 1999 Responds to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for Units 2 & 3 Encl.Without Encl B17767, Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr1999-06-29029 June 1999 Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr 1999-09-03
[Table view] |
LER-2096-021, Forwards LER 96-021-02 Re Components Not Included in IST Program as Result of Programmatic Deficiencies.Status of NNECO Commitments from Previous LER Suppl Are Contained in Attachment 1.Addl Commitments Contained in Attachment 2 |
Event date: |
|
---|
Report date: |
|
---|
4232096021R00 - NRC Website |
|
text
'
g g. . Rope Ferry Rd. (Route 156), Octerford, Cr 06385 l Nuclear Energy . xiiistone Nuclear Power Station Northeast Nuclear Energy Company
~ P.o. Box 128 Taterford, CT 06385-0128 -t (860) 447 1791 i
' Fax (860) 444-4277 The Northemt Utilities System ,
JN 9 1998 Docket No. 50-423
'B17146
)
Re: 10 CFR 50.73(a)(2)(i)(B) ,
1
. U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-021-02
- Components Not included in The in-Service Test Proaram As A Result Of ProarammaticDeficiencies"
. This letter forwards Supplement 2 to Licensee Event Report (LER) 96-021-00, documenting responses.' to conditions - that were . determined reportable at Millstone Unit No. 3 on July 26,1996. This LER is submitted pursuant to 10 CFR
- 50.73(a)(2)(i)(B). A status of_ Northeast Nuclear Energy Company's (NNECO) commitments from the previous LER supplement (Supplement 1) are contained within Attachment 1 to this letter. Additional comrnitments identified in this supplement (Supplement 2) are contained within Attachment 2 to this letter.
Should you have any questions regarding this submittal, please contact Mr. /
David A. Smith at (860) 437-5840.
Very truly yours, V
,/
NORTHEAST NUCLEAR ENERGY COMPANY. / 7/1 1
-//I')))
M. H. Brothers V N G( C O 5 -
wm!
Vice President, Operations
- 9906160099 990609 PDR. ADOCK 05000423 g ;
g PDR y '
1 0404334 Nt"V.~ 13-05 I L=2_ :-__. _.
./- - U.S. Nucle:r Regulatory Commi:sion B17146\Page 2 Attachments:1) Status of regulatory commitments from the previous LER Supplement (LER 96-021-01)
- 2) NNECO's commitments in response to LER 90-021-02
- 3) LER 96-021-02 cc: H. J. Miller,' Region l Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 -
W. D. Travers, Ph.D Director, Special Projects Corrective Action Group Files (CR M3-96-0285)
RAL:rl L
I L -
i It p
i k s
c
+
Docket No. 50-423 B17146 Attachment 1 Millstone Nuclear Power Station, Unit No. 3 Status of Regulatory Commitments From The Previous LER Supplement (LER 96-021-01)
June 1998 l
4
~~
+, . 'U.S. Nuclear Regulatory Commis: ion
- B17146\ Attachment 2\Page 2 Attachment 1 Status of Regulatory Commitments From The Previous LER Supplement
-The following table provides a status of those actions committed _to by NNECO in the
- previous LER supplement (Supplement 1). Please nMify the Manager - Regulatory
' Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
- Number Commitment Due Date B15898 The existing IST documents and procedures Complete will be reviewed and revised as required to ensure the program addresses all of the requirements of 10 CFR 50.55a(f) by May 31, 1997.
B15898-02 A procedure.will be developed and _ Complete implemented to administer and monitor the IST Program by May 31,1997. ..
B15898-03 Staff will be assigned to implement and Complete .
manage the IST program by May 31.-1997.
B15898-04 The seventy one (71) individual discrepancies Complete identified during the review of the IST Program against surveillance procedures will be corrected.
B15898-05 The seven (7) licensing commitments Complete discrepancies identified during the review of the Inservice Test Program will be corrected.
B15898-06 The IST surveillance procedures, the IST Complete Manual and IST Bases Document will be revised to include the components identified during the review of the Inservice Test Manual, Revision 4.
B15898-07: The twenty eight (28) individual discrepancies Complete identified in the selected system review of the IST Program component test methods performed as part of the Inservice Test Program review will be corrected.
B15898 The IST Program component test methods will Complete be reviewed and identified deficiencies will be corrected. I m< B15898 The pump vibration velocity measurements test _ Complete f
procedures will be revised to incorporate the .
acceptance criteria of ASME Section XI 1989 Edition.
T,
.I
' l.
m
- e, -
'U.S. Nucbar Regul: tory Commission B17146\ Attachment 2\Page 3 Number Commitment Due Date B15898-10 A procedure will be implemented to verify the Complete open safety function for valves CHS*V58, AV8146, AV8147, RCS*V31, V32, V147, and V148.
B15898-11 A procedure will be implemented to test Complete Charging System control valve CHS*HCV182 during refueling outages or whenever seal injection is not required.
B15898-13 Procedures will be revised to require that data Complete be recorded and analyzed for Service Water System valves SWP*MOV57A-D, Hydrogen Recombiner valves HCS*V4,V5,V11,V12, and Control Building Chilled Water valves HVK*V1,V39,V37,V75.
B15898-14 Service Water System valves SWP*V104, Complete V109 will be added to the check valve ;
disassembly and inspection matrix.
B15898-15 High Pressure Safety injection check valves Complete SlH*V81 and SlH*V83 will be disassembled, inspected, and added to the check valve ,
disassemiy and inspection matrix. l B15898-16 The measurement of the closed stroke time for Complete Service Water System valves SWP*MOV54A-D will be added to the IST Program.
B15898-17 The measurement of the closed stroke time for Complete Charging System valves CHS*LCV112D/E will i be added to the IST Program.
B15898-18 An exercise to open test, which can be verified Complete quarterly by normal operation, will be added to the IST Program for Charging System valves CHS*V394,V434,V467,V501, V396, V397, V436, V437, V469, V470, V503, and V504.
B15898-19 A procedure will be implernented to test Complete Charging System check valve CHS*V261 and i Safety injection Systern check valve SlH*V11 during refueling outages.
B15898-20 The closed function of Reactor Coolant system Complete j l
valves RCS*HCV442A/B, RCS*SV8095A/B and RCS*SV8096A/3 will be added to the IST Program and the valves tested.
B15898-21 The measurement of the closed stroke time for Complete the Reactor Coolant System motor operated gate valves RCS*MV8000A/B will be added to i the inservice Test Program. i l
'U S Nucle:r Regulatory Commission B17146\ Attachment 2\Page 4 Number Commitment Due Date B15898-22 The measurement of the closed stroke time for Complete the Containment Recirculation valves RSS*MV38A/B will be added to the Inservice Test Program.
B15898-23 The surveillance procedure will be revised to Complete add the stroke tirne to close function for Safety injection motor operated valves SlH*MV8801 A/B and SlH*MV8802A/B.
B15898-24 An exercise to close requirement for the Fuel Complete Pool Cooling check valves SFC*V3 and SFC*V6 will be added to the Inservice Test Program.
B15898-25 A stroke time to close test will be added to the Complete Inservice Test Program for Main Steam motor operated valves MSS *MV74A-D.
B15898-26 A surveillance procedure to verify leakage Complete limits for the Emergency Diesel Generator Starting Air System check valves EGA*V4,V11,V30,V37 will be implemented.
B15898-27 An exercise to close requirement for the Complete Emergency Diesel Generator Fuel Oil Transfer System check valves EGF*V1, V3, V7, V9 will be added to the inservice Test Program.
B15898-28 A test to manual exercise Control Building Complete '
Ventilation valves HVC*AOV25 and AOV26 on a refueling frequency will be added to the surveillance program.
B15898-29 Additionally, the Service Water System valves During RFO6 SWP*V836, V837 will be inspected during RFO6.
l l
1 L_2__- _- . _ _ = _
Docket No. 50-423
- . B17146 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 96-02142)
June 1998 I.
e.
. U.S. Nuclerr Regul: tory Commiszion
' B17146\ Attachment 2\Page 2 Attachment 2 List of Regulatory Commitments
,The following _ table -identifies' those actions committed to by NNECO--in- this document. Please notify the Manager - Regulatory Compliance at the Millstone Nuclear' Power Station Unit No. 3 of any questions regarding this document or any.
- associated regulatory commitments.
Number - Commitment Due Date B17146-01 Reactor Plant Component Cooling Water Complete System valves CCP*V965 and V966, CCP*AOV178A-D, and CCP*V27, V38, V63, V74 have been added to the IST Program Plan, Revision 5. Surveillance procedures have been revised to incorporate testing of these valves. Testing of these valves has-been successfully completed.
B17146-02 A procedure will be implemented to verify the Complete closed safety function for Charging System valves CHS*FCV110B and 111B.' These ,
valves have been added to the IST Program Plan, Revision 5. Surveillance procedures have been revised to incorporate testing of these valves. Testing of these valves has been successfully completed.
B17146 Charging System valve CHS*V42 has been. Complete added to the IST Program Plan, Revision 5.
Surveillance Procedures have been revised to incorporate testing of CHS*V42.' Testing of this valve has been successfully completed.
B17146-04 Reactor Plant Component Cooling Water Complete System valves CCP*TV32A/B/C have been modified to include a manual valve in the air supply line which will allow adequate testing of the fail safe function.
817146-05 Reactor Plant Component Cooling Water . Complete System valves CCP*V981 and CCP*V986 have been added to the IST Program Plan,-
~
Revision 5. - Surveillance procedures have been revised to incorporate testing of these valves. Testing of these valves has been -
successfully completed.
'f, 1
--____m._m-.._m___.____m.m_______
'U.S. Nuclear Regulatory Commission B17146\ Attachment 2\Page 3 Number Commitment Due Date B17146-06 Control Building Chilled Water System valves Complete HVK*PDV32A/B, HVK*TV39A/B, HVK*TV41 A/B, HVK*TV68A/B, HVK*TV69A/B, HVK*TV70A/B, HVK*TV71 A/B, HVK*TV72A/B, HVK*TV73A/B, HVK*TV74A/B, HVK*TV75A/B, HVK*TV76A/B, HVK*TV77A/B have been added to the IST Program Plan, Revision 5. Surveillance procedures have been revised to incorporate testing of these valves. Testing of these valves has been successfully completed.
B17146-07 EDG excess flow check valves Complete EGA*EFV35A1/A2/B1/B2 have been included in the IST Program Plan, Revision
- 5. Surveillance procedures have been revised to incorporate testing of these check valves. Testing of these valves has been successfully completed.
B17146-08 Surveillance procedures have been revised Complete to utilize non-intrusive techniques to verify closure of Charging System check valve CHS*V261 and Safety injection System check valve SlH*V11 during future testing.
l
_ _ _ _ _ _ _ _ _
|
---|
|
|
| | Reporting criterion |
---|
05000245/LER-1996-003, Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted | Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted | | 05000336/LER-1996-003, Forwards LER 96-003-01,documenting Event That Originally Occurred at Mnps,Unit 2,on 960205.Encl Provides Final Update on Analyses & Investigation for Event.Commitments Made by Util Are Included in Attachment 1 | Forwards LER 96-003-01,documenting Event That Originally Occurred at Mnps,Unit 2,on 960205.Encl Provides Final Update on Analyses & Investigation for Event.Commitments Made by Util Are Included in Attachment 1 | | 05000423/LER-1996-004, Forwards LER 96-004-01 Documenting Condition That Was Originally Determined Reportable at Mnps,Unit 3,on 960319. Commitments Made by Util,Encl | Forwards LER 96-004-01 Documenting Condition That Was Originally Determined Reportable at Mnps,Unit 3,on 960319. Commitments Made by Util,Encl | | 05000336/LER-1996-004, Forwards LER 96-004-01,documenting Event That Occurred at Unit 2 on 960131.New Util Commitment Made within Ltr,Listed | Forwards LER 96-004-01,documenting Event That Occurred at Unit 2 on 960131.New Util Commitment Made within Ltr,Listed | | 05000423/LER-1996-007, Forwards LER 96-007-02 Which Supplements Rept Submitted on 960502,per 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(B&D), 10CFR50.73(a)(2)(vii)(B&D).Commitments in Response to Event, Encl | Forwards LER 96-007-02 Which Supplements Rept Submitted on 960502,per 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(B&D), 10CFR50.73(a)(2)(vii)(B&D).Commitments in Response to Event, Encl | | 05000423/LER-1996-009, Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii) | Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii) | | 05000245/LER-1996-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr | Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr | | 05000423/LER-1996-015, Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted | Forwards LER 96-015-05,documenting Event That Occurred at Plant,Unit 3 on 960610,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted | | 05000336/LER-1996-017, Forwards LER 96-017-01,documenting Condition That Was Discovered at Unit 2 on 960320.LER Suppl Provides Update on Analyses & Investigation of Condition.Util Commitments Made within Ltr Included in Attachment 1 | Forwards LER 96-017-01,documenting Condition That Was Discovered at Unit 2 on 960320.LER Suppl Provides Update on Analyses & Investigation of Condition.Util Commitments Made within Ltr Included in Attachment 1 | | 05000336/LER-1996-018, Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler | Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler | | 05000423/LER-1996-019, Forwards LER 96-019-01 Documenting Event That Occurred at Millstone Nuclear Power Station Unit 3 on 960627.Util Commitments Made within Ltr,Listed | Forwards LER 96-019-01 Documenting Event That Occurred at Millstone Nuclear Power Station Unit 3 on 960627.Util Commitments Made within Ltr,Listed | | 05000245/LER-1996-020, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated | Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated | | 05000423/LER-1996-021, Forwards LER 96-021-02 Re Components Not Included in IST Program as Result of Programmatic Deficiencies.Status of NNECO Commitments from Previous LER Suppl Are Contained in Attachment 1.Addl Commitments Contained in Attachment | Forwards LER 96-021-02 Re Components Not Included in IST Program as Result of Programmatic Deficiencies.Status of NNECO Commitments from Previous LER Suppl Are Contained in Attachment 1.Addl Commitments Contained in Attachment 2 | | 05000245/LER-1996-023, Forwards LER 96-023-01,documenting Condition Discovered at Millstone,Unit 1 on 960306.Attachment 1 Contains Commitments Made within Ltr | Forwards LER 96-023-01,documenting Condition Discovered at Millstone,Unit 1 on 960306.Attachment 1 Contains Commitments Made within Ltr | | 05000336/LER-1996-023, Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425 | Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425 | | 05000336/LER-1996-024, Forwards LER 96-024-02,documenting Event Which Occurred on 960507 Re Inadequate ESAS & RPS Response Time Surveillance Testing.Commitments Made within Ltr Are Included in Attachment 1 | Forwards LER 96-024-02,documenting Event Which Occurred on 960507 Re Inadequate ESAS & RPS Response Time Surveillance Testing.Commitments Made within Ltr Are Included in Attachment 1 | | 05000336/LER-1996-025, Provides Update on Status of GL 96-01 Actions as Committed to by Util for Unit 2 in & LER 96-025-01. Commitment Contained in ,Listed.As of 970915, Requested Action of Subj GL Has Been Completed | Provides Update on Status of GL 96-01 Actions as Committed to by Util for Unit 2 in & LER 96-025-01. Commitment Contained in ,Listed.As of 970915, Requested Action of Subj GL Has Been Completed | | 05000245/LER-1996-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed | Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed | | 05000423/LER-1996-026, Forwards LER 96-026-02 Which Documents Condition That Was Determined at Plant,Unit 3 on 960730 | Forwards LER 96-026-02 Which Documents Condition That Was Determined at Plant,Unit 3 on 960730 | | 05000423/LER-1996-028, Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment | Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment | | 05000423/LER-1996-029, Forwards Revised Commitments That Were Previously Submitted to NRC in LER 96-029-00, Functional Deficiency in Setting of ECCS Throttle Valve Positions | Forwards Revised Commitments That Were Previously Submitted to NRC in LER 96-029-00, Functional Deficiency in Setting of ECCS Throttle Valve Positions | | 05000336/LER-1996-029, Forwards LER 96-029-01,providing Update on Analyses & Investigation for Event.Commitments Made within Ltr,Listed | Forwards LER 96-029-01,providing Update on Analyses & Investigation for Event.Commitments Made within Ltr,Listed | | 05000336/LER-1996-030, Forwards LER 96-030-01,documenting Event That Occurred at Millstone,Unit 2 on 960820.LER Supplement Provides an Update on Analyses & Investigation Currently Underway for Event. Commitments Made within Ltr,Encl | Forwards LER 96-030-01,documenting Event That Occurred at Millstone,Unit 2 on 960820.LER Supplement Provides an Update on Analyses & Investigation Currently Underway for Event. Commitments Made within Ltr,Encl | | 05000245/LER-1996-031, Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16 | Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16 | | 05000336/LER-1996-031, Forwards LER 96-031-01,documenting Event Occurred at Unit 2 on 961003.Commitments Made within Ltr Listed | Forwards LER 96-031-01,documenting Event Occurred at Unit 2 on 961003.Commitments Made within Ltr Listed | | 05000423/LER-1996-031, Forwards LER 96-031-01 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 to Ltr | Forwards LER 96-031-01 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 to Ltr | | 05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves | Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves | | 05000423/LER-1996-034, Forwards LER 96-034-02,documenting Condition That Was Initially Determined Reportable at Millstone Unit 3 on 960918.Commitments Made in Response to Event Also Encl | Forwards LER 96-034-02,documenting Condition That Was Initially Determined Reportable at Millstone Unit 3 on 960918.Commitments Made in Response to Event Also Encl | | 05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed | Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed | | 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage | Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage | | 05000245/LER-1996-035, Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug | Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug | | 05000423/LER-1996-036, Forwards LER 96-036-02,documenting Condition Originally Identified on 960926.List of Commitments Provided | Forwards LER 96-036-02,documenting Condition Originally Identified on 960926.List of Commitments Provided | | 05000336/LER-1996-037, Provides List of Commitments Re LER 96-037 | Provides List of Commitments Re LER 96-037 | | 05000423/LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping | Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping | | 05000245/LER-1996-037, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) | Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) | | 05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted | Forwards LER 96-038.Commitments Made Re LER Submitted | | 05000336/LER-1996-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed | Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed | | 05000245/LER-1996-039, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided | Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided | | 05000423/LER-1996-040, Discusses LER 96-040-00, Potential Component Cooling Water Sys Overcooling Due to Loss of Instrument Air Sys Concurrent W/Low Svc Water Inlet Temp. Revised Commitment Provided in Encl | Discusses LER 96-040-00, Potential Component Cooling Water Sys Overcooling Due to Loss of Instrument Air Sys Concurrent W/Low Svc Water Inlet Temp. Revised Commitment Provided in Encl | | 05000336/LER-1996-040, Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed | Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed | | 05000336/LER-1996-041, Forwards LER 96-041-00,documenting Event at Plant on 961217.Commitments Made Re Event Listed | Forwards LER 96-041-00,documenting Event at Plant on 961217.Commitments Made Re Event Listed | | 05000423/LER-1996-042, Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00 | Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00 | | 05000336/LER-1996-042, Forwards LER 96-042-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961218.Commitments Made within Ltr | Forwards LER 96-042-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961218.Commitments Made within Ltr | | 05000336/LER-1996-043, Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed | Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed | | 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl | Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl | | 05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl | Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl | | 05000245/LER-1996-046, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed | Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed | | 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval | Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval | | 05000423/LER-1996-047, Revises Commitment Made in Response to LER 96-047-00 Re Seismic Qualification Training | Revises Commitment Made in Response to LER 96-047-00 Re Seismic Qualification Training | | 05000423/LER-1996-048, Provides Commitments Re LER 96-048.Surveillance Procedures Used to Test Load Shed & re-energizing Feature for Both Trains of Charging Sys Pumps Will Be Revised to Conform W/ TS 4.8.1.1.2.g.6 | Provides Commitments Re LER 96-048.Surveillance Procedures Used to Test Load Shed & re-energizing Feature for Both Trains of Charging Sys Pumps Will Be Revised to Conform W/ TS 4.8.1.1.2.g.6 | |
|