Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl
ML20247P377
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/18/1998
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247P381 List:
References
B17173, NUDOCS 9805270434
Download: ML20247P377 (5)


LER-2098-016, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl
Event date:
Report date:
4232098016R00 - NRC Website

text

___ _- . - _ _ _ _ - - _ _ _ . - - - _ _ _ _ _ _

  1. - J gg Rope Ferry Rd. (Poute 156), Waterford, CT 06385 b FE7 M!Ilstone Nuclear Power Statior.

. .- Northeast Nuclear Energy Company P.O. Bo.128

,~ Waterford, CT 06385-0128 O (860) 4471*t?1 Fan (860) 444-4277 He Northeast Utilitiu System -

May 18,1998 Docket No. 50-423 B17173

{ Re: 10 CFR 50.73(a)(2)(vii) .

l l Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Reoort 98-016-01

" Potential Air / Gas intrusion in Chemical and Volume Control System" This letter forwards supplemental Licensee Event Report 98-016-01, documenting a condition that was originally determined reportable at Millstone Unit No. 3 on February 23,1998. This LER is submitted pursuant to 10 CFR 50.73(a)(2)(vii). Northeast Nuclear Energy Company's (NNECO) commitments in response to this event are contairied within Attachment 1 to this letter. [I Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

x JN Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Mk W M.' H. Urothe'rs' L .Vice President, Operations 9805270434 980518 F PDR ' ADOCK 050004;23 S; -PDR @'Q

~

\ .

l .

U.S. Nucle r Regulatory Commission B17173/Page 2 l Attachmerit: 1) NNECO's commitments in response to LER 98-016-01

2) LER 98-016-01 cc: H. J. Miller, Region l Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager,' Millstone Unit No. 3 W. D. Travers, Ph.D., Director, Special Projects Corrective Action Group Files (CR M3-98-2011)

Corrective Action Group Files (CR M3-98-2055) l l

KAM:km i

1

L l:

l' .

L Docket No. 50-423 B17173 L

l-l l

Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To II FR 98-016-01)

May 18,1998

.~

B17173 Attachment List of Regulatory Commitments The. following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Regulatory Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due B17173-01 Troubleshooting of the Boric Acid Transfer Complete System to determine the source (s) of air intrusion into the system and corrective actions have been identified.

B17173-02 Procedures have been revised to Complete incorporate leseons leamed from the troubleshooting effort to avoid air -

entrainment during Boric Acid Transfer System operation to address deficiencies in the design of the system.

B17173-03 Vent valves have been added to tie'high Complete points in the gravity boration pathways.

B17173-04 Validate effectiveness of the revised batching Prior to Mode 2 procedure and revise as necessary.

B17173-05 Evaluate potential system modifications to Prior to Refueling minimize hydrogen stripping and eliminate Outage 6 locations which promote gas accumulation.

B17173-06 Investigate potential sources of hydrogen and Prior to Mode 2 recommend corrective actions to reduce or eliminate the gas buildup.

B17173-07 Develop a surveillance program to periodically Prior to Mode 2 monitor the affected piping, to establish a gas accumulation rate and periodicity for venting gas to ensure charging pump operability.

B17173-08 Establish a maximum allowed volume of gas in Prior to Mode 2 ,

the boric acid gravity boration piping, to ensure pump operability and establish an allowable venting frequency.

1

E Docket No. 50-423 -

B17173

(

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of ILER 98-016-01) t May 18,1998