05000336/LER-1998-018, Forwards LER 98-018-00,re Condition That Was Discovered at Millstone Unit 2 on 980818.Commitments Made by Util Also Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 98-018-00,re Condition That Was Discovered at Millstone Unit 2 on 980818.Commitments Made by Util Also Encl
ML20153D421
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/16/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20153D412 List:
References
B17449, NUDOCS 9809250055
Download: ML20153D421 (5)


LER-2098-018, Forwards LER 98-018-00,re Condition That Was Discovered at Millstone Unit 2 on 980818.Commitments Made by Util Also Encl
Event date:
Report date:
3362098018R00 - NRC Website

text

- * - - - - - - -

a- , .  ;; >, - - -

Northeast . ..

Rope Ferry lld. (noute 156), Waterford, CF 06385 Nuclear Energy win. tone Nucica, ro.er station

  • ~'

Northeast Nuclear Energy Company -

r.O. Box 128 Waterford, CT 06335-0128

. (860) 447 1791 Fax (860) 444 4277 He Northeast Utilities Systern SEP I 61998 Docket No. 50-336 B17449 Re: 10 CFR 50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 98-018-00 Spatial Separation of Redundant Cables Does Not Meet Minimum Reauirements This letter forwards Licensee Event Report (LER) 98-018-00, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on August 18, 1998. This LER is being submitted pursuant to 10 CFR

50.73(a)(2)(ii)(B) as a condition outside the design basis of the plant.

The Northe'ast Nuclear Energy Company (NNECO) commitments made within this letter are included in Attachment 1.

. a Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY i

J. A!FVice

, , , ._: p- ylie m 3 l cc: see page 2 9809250055 980918 PDR ADOCK 05000336-S PM UM4&b KLV.12-95

- ~ - - - - - ' - - - - - - ' -

. . - = = :: = = .=:=.: = -- --

yT' we em

z2 ', ;, ' ;

l.t ydf[ ~ m w;. . v ,

U.S. Nuclear Regulatory Commission "E "*

B17449\Page 2 .

,, J ;,.T ' : ,

i Vi fac " . ' , ,

%qv
ML i Attachtrients: 1. List of Regulatory Commitments l
2. LER 98-018-00 1

L cc: H. J. Miller, Region i Administrator "f' '

D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No.'2F @

D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2

! E. V. Imbro, Millstone ICAVP inspections 1

i i

i O

/.

t

  • d' i

t i

i i

l

C. :r -- .

c ,-

i, .-

I.t

3 I

, Docket No. 50-336

!~ B17449- 1 i i l

t r f

^

1 l

l i

l Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments i

  • l l

t -

.s i

1 l

. September 1998 l

1

( ^ ~; L - . , .X. : J. l., -. -.- . -.: - -- .

.w. -

~ ;p

/

. ~

l U.S. Nuclear Regulatory Commission '

i B17449\ Attachment 1\Page 1

&S [' *% '

Attachment 1 -

Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. --

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17449.01: As required, appropriate corrective Mode 4 from current actions shall be implemented prior to entry into outage Mode 4 from the current outage such that the identified components are within the facility's licensing basis.

l l

l t

  • 5 t

s

-mm

- -:s

=..

> . h. _\,

't.I'fn&: *'"e..

' Docket No. 50-336 B17449-

. 2:

, s ~..

Attachment 2 Millstone Nuclear Power Station, Unit No. 2 LER 98-018-00 e -

is Sop'encer 199G

__ - _ _ -_ .