05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves

From kanterella
Jump to navigation Jump to search
Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves
ML20128M533
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/07/1996
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128M538 List:
References
B15899, NUDOCS 9610160111
Download: ML20128M533 (2)


LER-2096-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves
Event date:
Report date:
4232096032R00 - NRC Website

text

.. - - .. -- .--

g=

8" N::rtheast 1 7 seiden suun Buk cr 06037 Utilities System Nonheat Utumes Senice Company P.O. Box 270 llanford, CT 06141-0270 (203) 665-5000 October 7,1996 Docket No. 50-423 B15899 Re: 10CFR 50.73(a)(2)(v)(C) 10CFR 50.73(a)(2)(v)(C)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report 96-032-00, documenting a condition that was determined at Millstone Unit No. 3 on September 9,1996. This LER is submitted pursuant to 10CFR 50.73(a)(2)(v)(C) and 10CFR 50.73(a)(2)(v)(D).

The following are NNECO's commitments made within this letter:

B15899-01: Perform the hydrostatic test of the SlH relief valves at the required test pressure. The retest will be performed during the current outage. j i

B15899-02: Provide retraining and counseling to the individuals responsible l for initially performing hydrostatic tests . Such retraining will l encompass ASME code requirements and system design requirements.

B15899-03: Maintained the Plant in Mode 5 or lower until such time as the hydrostatic testing of the SlH relief valves has been completed and the issues resolved.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 6

/1 N I 1 ..S M.' H. Brd(hers A~

1G0000 Unit Director, Millstone Unit No. 3 \

t

Attachment:

LER 96-032-00 9610160111 961007 PDR ADOCK 05000423 S PDR

. U.S. Nuclxr R:gulatory Commission

. B15899\Page 2 cc: H. J. Miller, Region i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 i

i l

l 1