Forwards LER 98-025-00,documenting Event at Millstone Unit 3 on 980427,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl
ML20248D996
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/26/1998
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20248D999 List:
References
B17226, NUDOCS 9806030156
Download: ML20248D996 (4)


LER-2098-025, Forwards LER 98-025-00,documenting Event at Millstone Unit 3 on 980427,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl
Event date:
Report date:
4232098025R00 - NRC Website

text

a Hope Ferry Rd. (Route 156), Tcterferd, (T 06385 Nht Nuclear Energ'y unione N.cie.1 Po cr station Northeast Nuclear Energy Cornpany P.O. Box 128 e . Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 h Nonheast Utilities Systein May 26,1998 Docket No. 50-423 B17226 Re: 10 CFR 50.73(a)(2)(i)(B)

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 98-025-00

  • Failure to Perform Technical Specification Reauired Full Looo Channel Calibmtion of Meteorological Monitorina Instrumentation" This letter forwards Licensee Event Report (LER) 98-025-00, documenting a condition that was determined reportable at Millstone Unit No. 3 on April' 27, 1998. This LER is submitted pursuant to 10 CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I j\ l

~

n1R cN \

[> h M. H. BrotherP L,u1J5 Vice President, Operations 9906030156 980526

= =ac" **"lWi' .

U.S. N'ucle:r Regul:1ory Commission 817226/ Attachment 1/Page 2 Atta'chmerit: 1) NNECO's commitments in response to LtiR 98-025-00

2) LER 98-025-00 cc: H. J. Miller, Reg!on i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Ph.D, Director, Special Projects Corrective Action Group Files (CR M3-98-2195)

SCN:sn

= --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

r ll 1.

l Docket No. 50423 -

B17226 1

l l

l

?

Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 98-025-00)

May 26,1998

U.S. Nucle:r Reguli: tory Commi:sion B17226/ Attachment 1/Page 2 Attachment .1 List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. .Please notify the Manager - Regulatory. Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number ~ Commitment Due B17226-01 A site-wide surveillance procedure to Complete perform a " full-loop" calibration of the meteorological monitoring system's wind speed instrumentation was prepared, Site Operations Review Committee approved, and performed.

o

t Docket No. 50-423 B17226 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 98-025-00)

May 26,1998