05000423/LER-1997-053, Forwards LER 97-053-00,documenting Condition That Was Determined Reportable at Millstone Unit 3 on 971024. Attachment to Ltr Contains Commitments in Response to Event

From kanterella
Jump to navigation Jump to search
Forwards LER 97-053-00,documenting Condition That Was Determined Reportable at Millstone Unit 3 on 971024. Attachment to Ltr Contains Commitments in Response to Event
ML20202A876
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/24/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202A880 List:
References
B16846, NUDOCS 9712030009
Download: ML20202A876 (5)


LER-2097-053, Forwards LER 97-053-00,documenting Condition That Was Determined Reportable at Millstone Unit 3 on 971024. Attachment to Ltr Contains Commitments in Response to Event
Event date:
Report date:
4232097053R00 - NRC Website

text

. -. . --

ggg Ruge Terry Rd. (Route 156), Tctnford. Cr ON Nuclear Energy u,to,,, No,ua, com siaiu Nwdicast Nukar f>wsgy comgiany r o. Inos 128 Taterford, Cr 06385-0128 (860) 447 1701 Fas (860) 444 4277

'I1w Nortlwan UtiLtice Sysinn November 24,1997 Docket No. 50-423 D_1034E Re: 10 CFR 50.73(a)(2)(i)(B)

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-053-00 Submitted Pursuant to 10 CFR 50,73(a)(2)(i)(B)

This letter forwards Licensee Event Report 97-053-00, documenting a condition that was determined reportable at Millstone Unit No. 3 on October 24, 1997.

This LER is submitted pursuant to 10 CFR 50.73(a)(2)(1)(B). NNECO's commitments in response to this event are contained withir Attachment 1 to this letter.

Should you have any questions regarding this submittal, p!aase contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, t --)RTHEAST NUCLEAR ENERGY y- I COMPANY JU[ )

A M y*OO08 r tor, stone Unit No. 3 9712030009 971124

[A 0 g ((lggg{

\,

4 4

. U.S. Nuclear Regulatory Commission B16846/Page 2 l

Attschment: 1) NNECO's commitments in response to LER 97-053-00

2) LER 97-053 00 cc: H. J. Miller, Region l Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects Corrective Action Group Files (CR M3 97-3606 and M3-97-3822)

t t

Dockg* No. 50-42.3  ;

B16846 ,

r t

tL 5

i

i l

-v 5-

~

i

Attachment 1  ;

- Millstone Nuclear Power Station, Unit No. 3 i NNECO's Commitments  ;

in Response To }

(LER 9745340) .

i t

t i

l:

-i s

)

I November 24,1997' i i,

+

7'

.-u, ,y,,v -c--,.

-,,,,y,, ,,+,-eu. . - . , , . . - . , e.,,.,.-

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 ef any questions regarding this document or any associated regulatory commitments.

Number Commitment Due B16846-1 The applicable procedures for the Channel Prior to entry into Check requirement to the Steam Mode 4.

Generator Blowdown Effluent Line oath will be corrected to comply with Technical Specifications.

B16846 2 Applicable procedures for all modes will Prior to entry into be corrected to ensure that the other Mode 4.

missed Radioactive Liquid and Gaseous Effluent Monitoring Instrumentation Channel Check Surveillance Requirements are implemented as required by TS.

. - - , - 3 - - + y.- -.w--r --

w-----e----- e nv---w-e--+-e

4, t

Docket No. 50-423 B16646  :

t 4

r s

e i

i Attachment 2 Mi'Istone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 9745340) e i

November 29,1997 e w

, -=- w-- - -s, --s +e - s-s.-. m --e <-- '-.-w<-a r- - - = - -s -=ar--e =- w ---.-e w--e r,e =%,-we=-- , +-w-i. -----*-y---w,-+ - --w*s-re=~*,