Forwards LER 98-020-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980320.Commitments Made by Util,Encl
ML20216G998
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/13/1998
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216H002 List:
References
B17158, NUDOCS 9804210006
Download: ML20216G998 (4)


LER-2098-020, Forwards LER 98-020-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980320.Commitments Made by Util,Encl
Event date:
Report date:
4232098020R00 - NRC Website

text

i,'

No h d Rope Ferry Rd. (Route 156), Waterford, CT 06385 Nuclear Fnergy um,m, Noci,a, eo.,r stan,.

Northeast Nuclear Energy C,nnpany

  • P.O. Box 128 Watrriord, C1' 06385-0128 (860) 447-1791 Fax (860) 444-4277 ne Northeast Utilitics System April 13,1998 Docket No. 50-423 B17158 Re: 10 CFR 50.73(a)(2)(i)(B)

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Reoort 98-020-00

" Daily Check of Radiation Monitor not Performed in Accordance with Technical Soecifications" This letter forwards Licensee Event Report (LER) 98-020-00, documenting a i condition that was determined reportable at Millstone Unit No. 3 on March 20, 1998. This LER is submitted pursuant to 10 CFR 50.73(a)(2)(i)(B). Northeast Nuclear Energy Company's (NNECO) commitments in response to this event are contained within Attachment 1 to this letter. )

i Should you have any questions regarding this submittal, please contact Mr. I David A. Smith at (860) 437-5840. l

[ \

Very truly yours, i

y )

NORTHEAST NUCLEAR ENERGY

/gY

'/ J COMPANY

's A

r t r, Millstone Unit No. 3 9804210006 980413 PDR ADOCK 05000423 S PDR l

U.S. Nucisar Regulatory Commission B17158/Page 2 ,

l

Attachment:

1) NNECO's commitments in response to LER 98-020-00
2) LER 98-020-00 cc: H. J. Miller, Region 1 Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Ph.D., Director, Special Projects Corrective Action Group Files (CR M3-98-1473)

Corrective Action Group Files (CR M3-98-1885) l J

l KAM:km I

I f

1

)

\

Docket No. 50-423 B17158 Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 98-020-001 1

1 1

April 13,1998 i

I I

B17158 Attachment List of Regulatory Commitments

. The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Regulatory Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due The notes referencing "during periods of Complete release" have been removed from the Daily and Shiftly Control Room Rounds form for the Waste Neutralization Sump Monitor and the Liquid Waste Effluent Line.

The requirement to channel check the flow Complete rate measurement device during periods of release has been added to the appropriate Plant Equipment Operator rounds forms.

I