Forwards LER 98-017-01,re Fire Protection Program Deficiencies That Were Discovered on 980812.Commitments Made within Ltr,Encl
ML20198N729
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/29/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198N734 List:
References
B17573, NUDOCS 9901060197
Download: ML20198N729 (5)


LER-2098-017, Forwards LER 98-017-01,re Fire Protection Program Deficiencies That Were Discovered on 980812.Commitments Made within Ltr,Encl
Event date:
Report date:
3362098017R00 - NRC Website

text

_. -_ - . _ . _ .. . ,. . ..

~'~

gky

, Northeast  % rerry na. (amte 136), wnerrora, er 06383 i NuclearEnergy  ;

f)  % yu,, gg,,

Northeast Nudear Energy Company I P.O. Box 128

  • Waterfora, CT 06385-0128 (860) 447-1791 raz (860) 444-4277 3 1

Uw Northeast Utilities Systema 5 DEC 2 91999 l Docket No. 50-336

'B17573 Re: 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(ii) l 1

l 1

U.S. Nuclear Regulatory Commission Document Control Desk l

Washington, DC 20555  ;

Millstone Nuclear Power Station Unit No. 2 l Licensee Event Report 98-017-01  !

Fire Protection Proaram Deficiencies  ;

i This letter forwards Licensee Event Report (LER) 98-017-01, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on i August 12,1998. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i) )

and 10 CFR 50.73(a)(2)(ii). This LER supplement provides an update on the analyses and investigation for this condition.

The Northeast Nuclear Energy Company's (NNECO) commitments made within this letter are included in Attschment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY Y

J. A!. ' 3 rice g Dingtor, Millstone Unit No. 2 }

cc: see page 2 9901060197 781229 n

pq

/h W '

PDR ADOCK 05000336M i S . .PDR i 0s3421-5 REV.12 95

- ~.

U.S. Nuclear Regul tory Commission B17573\Page 2 Attachments: 1. List of Regulatory Commitments

2. LER 98-017-01 cc: H. J. Miller, Region i Administrator S. Dombek, NRC Project Manager, Millstone Unit 2 D. P. Beaulieu, Senior Resident inspector, Millstore Unit No. 2 E. V. Imbro, Director, Millstone ICAVP inspections l;

)

i i

{

i I

i

e Docket No. 50-336 817573 Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments December 1998

. . U.S. Nuclear Regulatory Commission B17573\ Attachment 1\Page 1

. . Attachment 1 Regulatory Commitment Enclosure l List of Regulatory Commitments j

The following table identifies those actions committed to by NNECO in this document.

4 REGULATORY COMMITMENT COMMITTED DATL OR OUTAGE 4: Fire watches have been posted at inoperable Complete fire barriers in accordance with the plant's Technical Requirements Manual (TRM).

Fire seal installation records have been Complete reviewed to verify seal design meets design criteria.

Management level responsibility for organization and Complete implementation of the Site Fire Protection Program has been assioned.

The surveillance procedure for fire penetration Complete seals has been revised to improve inspection criteria and to ensure that the entire population of

. seals is inspected, as required.

B17573.01: The plant will be within its fire Prior to Mode 4 from the protection licensing and design basis prior to present plant shutdown Mode 4 from the present plant shutdown.

Should any inoperable fire barriers remain, compensatory measures in accordance with the TRM will be continued.

. . . . . .. .--.~ .__ .. . _ - - . -. .. - . _ . . . . -

. i l

Docket No. 50-336 B17573  !

1 Attachment 2 >

Millstone Nuclear Power Station, Unit No. 2 P LER 98-017-01 ,

b I

t i

1

.J

! )

1 l.

i \

l' L

t-i December 1998 e

k i

2 e

4 e