05000336/LER-1998-012, Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl
ML20249C358
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/22/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20249C359 List:
References
B17314, NUDOCS 9806290111
Download: ML20249C358 (5)


LER-2098-012, Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl
Event date:
Report date:
3362098012R00 - NRC Website

text

__ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ __-___-

3g,,,g n..p.. s ern na (n.. i, cu. s us..,a. cT m,3c l g\f Nuclear Energy si n n.. \oara, r. r, ri.h.

N.riliemas \uricar F.nern 0nmpany P O lb.t12M 4 airrf..c.f. C*l Oh38." -O l.'8 Hr0)44*-)?91 I at (h00) 444 42**

'Dac \urdarmai l'tilstaea 5)sicm l

JJ4 ? ? '998 Docket No 50-336 B17314 Re: 10 CFR 50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission 4 Document Control Desk l Washington, DC 20555 j Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 98-012-00 l

Nonconservative Assumptions in the Facility Loss of l Normal Feedwater Analysis l i

This letter forwards Licensee Event Report (LER) 98-012-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on May 21,

.1998. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii).

The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N

J. A./Pfice Dire,c)or - Millstone Unit Nc. 2 ,

1 ;j ' . -

cc: see page 2 -

9906290111 9g0622

{DR ADOCK 0500o336 PDR (N4de N k hd" &

U.S. Nuclear Regulatory Commission B17314\Page 2 Attachments: 1. List of Regulatory Commitments

2. LER 98-012-00 cc: H. J. Miller, Region i Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 W. D. Travers, PhD, Director, Special Projects Office l P. F. McKee, Deputy Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office

Docket No 50 336 B17314 I

l l

i Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments l

l I

June 1998

\

1 _ __________ _____________-_.___ _ _ -__

U.S. Nuclear Regulatory Commission B17314\ Attachment 1\Page 1 Attachment 1 R'egulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO.in this document.

I REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE.

B17314.01: Reanalysis of the FSAR Loss of Mode 3 from current Normal Feedwater Analysis will be completed prior outage to entry into Mode 3 from the current outage.

B17314.02: An evaluation of all FSAR Chapter 14 Mode 3 from current events will be performed prior to entry into Mode 3 outage from the current outage to assure that the appropriate steam generator inventory is used.

l J

as

-________m ___ _______m-__ .___

4 Docket No. 50-336 B17314 l

1 1

Attachment 2 I I

Millstone Nuclear Power Station, Unit No. 2 LER 98-012-00 i l

l l

1 June 1998

'O O . _ _ . . - _ . _ _ _ _ _ - . ,