05000423/LER-1998-001, Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl
ML20202J205
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/30/1998
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202J209 List:
References
B16983, NUDOCS 9802230105
Download: ML20202J205 (5)


LER-2098-001, Forwards LER 98-001-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980106.Commitments Made by Util,Encl
Event date:
Report date:
4232098001R00 - NRC Website

text

._

)

]p Northeast NuclearEnergy Hope Fmy Rd. (Route Wh Wa&rd, CF 06385 wai,,oo, soci,,, po.,, stat;an Northeast Nuclear Energy company

. . P.O. Bos 128 Waterford, CF 06385-0128 (860) 447-1791 Fax (860) 444-4277

'ne Northea.at Utilities System January 30,1998 Docket No. 50-423 B16983 l

Re: 10 CFR 50.73(a)(2)(v0(A)

Nuclear Regulatory Commission l Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 98-001-00 Submitted Pursuant to 10 CFR 50.73(a)(2)(vii)(A)

This letter forwards Licensee Event Report 98-001-00, documenting a condition thst was deteimined reportable at Millstone Unit No. 3 on January 6,1998. This LER is submitted pursuant to 10 CFR 50.73(a)(2)(vii)(A). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY e x

\

j

/GTHicks Unit Director, Millstone Unit No. 3 /%M, i /

/

9002230105 900130 PDR S ADOCK 05000423 pgg , .

~

0$H22-5 RF112-95

,f,,\ , \  ;

  • * * *8 ' ' '

m ..

, U.S. Nucl3:r R:gul: tory Commiss!on

. B 16983/Pcga 2

Attachment:

1) NNECO's commitments in response to LER 98-00100
2) LER 98-001-00 cc: H. J. Miller, Region i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Ph.d., Director, Special Projects Corrective Action Group Files (CR M3 97-4872,4873,4495) o

Docket No. 50-423 E16983 Attachment 1 Millstone Nuclear Power Station, Unit No. 3 lJNECO's Commitments In Response To (LER 98-001-00)

January 30,1998

\

, U.S. Nucl: r R:gulatory Commission

. B16983/Attachm:nt 1/Pege 1

. . l Enclosure l List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this (

document. Please notify the Manager Regulatory Compliance at the Millstone '

Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regtilatory commitments.

Number Commitment Due B16983-1 Change motor pinion keys on Complete 3SIL*MV8808A/B/C/D to 4140 key material.

B16983-2 Ensure all Limitorque 1018 motor pinion Comp!ete gear key stock material is removed from stock and replaced with the vendor recommended 4140 key material.

B16983 3 Revise Limitorque Operator Maintenance Complete procedures to have maintenance verify key material, if key material cannot be verified as 4140 material have the existing key replaced with 4140 keys from stock.

Docket No. 50423 B16983 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 98-001-00)

January 30,1998