05000423/LER-1997-057, Forwards LER 97-057-00 Which Documents Condition That Was Determined Reportable at Unit 3 on 971118,per 10CFR50.73(a)(2)(i)(B).Commitments in Response to Event Contained within Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 97-057-00 Which Documents Condition That Was Determined Reportable at Unit 3 on 971118,per 10CFR50.73(a)(2)(i)(B).Commitments in Response to Event Contained within Attachment 1
ML20197H691
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/18/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197H696 List:
References
B16872, NUDOCS 9712310351
Download: ML20197H691 (5)


LER-2097-057, Forwards LER 97-057-00 Which Documents Condition That Was Determined Reportable at Unit 3 on 971118,per 10CFR50.73(a)(2)(i)(B).Commitments in Response to Event Contained within Attachment 1
Event date:
Report date:
4232097057R00 - NRC Website

text

y-6 , -

g_ Rope Ferry Rd. (Route 156), hierford, Cr 06385

- Nuclear Energy wiii, tor, N ciear Po. r siation Northeast Nuclear IMgy company P.O. Ik,z 128

.- . Taterford, Cr 063d5-0128 (860) 447-1791 Fax (860) 444 4277 The Nordwt Utilities System December 18,1997 Docket No. 50-423 B16872 Re: 10 CFR 50.73(a)(2)(i)(B)

- Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-057-00 Submitted Pursuant to 10 CFR 50.73(a)(2)(i)(B) r This letter forwarc's Licensee Event Report 97-057-00, documenting a condition that was determined reportable at Millstone Unit No. 3 on November 18,1997.

This LER is submitted pursuant to 10 CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

/

/

Very truly yours, EL NORTHEAST NUCLEAR ENERGY COMPANY k

V' yMU8 G O' Hicks nit Director, Millstone Unit No. 3 9712310351 PDR 971218 ADOCK 05000423 n4 mmune

^

l

' U.S. Nucle:r Regulatory Commission B16872/Page 2  ;

Attachment:

1) NNECO's commitments in response to LER 97-057-00 ,
2) LER 97-057-00 cc: H. J. Miller, Region i Administrator -

A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects Corrective Action Group Files (CR M3-97-4015)

RAL: rl e .49 - ,- r ,

I

.e: .-

r Docket' No. 50-423 -

, f. ,

B16872 i

P h

i 1

Attachment 1 i

Millstone Nuclear Power Station, Unit No. 3 .

- NNECO's Commitments in Response To (LER 97-457-00)

December 18,1997 i a.

h P

n- w-

  • w re r w+.W
  • 1 l ,

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due The actuator for the "A" Emergency Completed Ventilation System air intake damper has been replaced with a functional actuator.

B16872-01 Safety evaluatica procedures and training March 1,1998 are being revised to improve the quality and detail within the Safety Evaluations.

B16872-03 A briefing will be provided to Technical January 31,1998 Support personnei on this event.

s

  • ~

Docket No. 50-423 B16872 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of

' (LER 97-057-00)

December 18,1997

._