Forwards LER 97-056-00,documenting Condition That Was Determined Reportable on 971107,per 10CFR50.73(a)(2)(ii)(B). Attachment 1 Contains Commitments Made in Ltr
ML20203B383
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/05/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203B387 List:
References
B16865, NUDOCS 9712150023
Download: ML20203B383 (5)


LER-2097-056, Forwards LER 97-056-00,documenting Condition That Was Determined Reportable on 971107,per 10CFR50.73(a)(2)(ii)(B). Attachment 1 Contains Commitments Made in Ltr
Event date:
Report date:
4232097056R00 - NRC Website

text

N.

e

(# . NdM **P' F"'r "d- (" " 2 56) **'' 'd' CT 66385 Nielear Energy a s.ty,e N a .,e m ,st.ooo

-Q .

- Northeast Nuclear Energy Company P.o. Box 128

' Tatedord,Cr 06385 0128 (800) H7-1791 i Fas (860) 444-4277 Tim Northeast Utilities System December 5,1997 Docket No. 50-423 i, B16865 3

Re: 10 CFR 50.73(a)(2)(ii)(B)

~

Nuclear Regulatc.y Commission Document Control Desk

_ Washington, DC 20555 Millstone Nuclear Po ver Station Unit 3 f 1.icensee Event Report 97-056-00 ,

-- Submitted Pursuant to 10 CFR 50.73(an'2)(ii)(B) }

( This letter forwards Licerisee Event Report 97-056-00, documenting a condition that was determined reportable at Millstone Unit No. 3 on November 7,1997. '

This LER is submitted pursuant to 10 CFR 50.73(a)(2)(ii)(B). NNECO's commitments in response to blis event are contained within Attachment 1 to this letter.

- Should you have any quections regarding this submittal, please contact Mr.

David A. Smith at (8S0) 437-5840.

)

Very truly yours, NORTHEAST NUCLEAR. ENERGY '

- COMPANY Y/f'h ) )

~

. riissO Unit Director, Millstone Unit No. 2 9n205 PDR ADOCK 0500

-- S e osun .c+

  • ne

'" { { f,..... h..

l - U.S. Nuclear Regulatory Commission l B16865/Page 2-

Attachment:

1) WNECO's commitments in response to LER 97-056-00
2) LER 97-056-00 cc: H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects Corrective Action Group Files (CR M3-97-3788)

SCN:

1 l

E

Docket Mo, 50-423_

B16865

. Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 97-056-00)

December 5,1997

Enclosure List of Regulatory Commitments ihe following table identifies those actions committed to by NNECO in this

, document. Please notify '.he Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulator / commitments.

i Number Commiment Due B16865-01 A design modification will be implemented Prior to entry into to ensure that sufficient Service Water Mode 4

- system pressure is available to refill the control building air conditioning condensers following a design basis

[

t accident. I E

K

=

3

{. .

. _ . . _ _ . , . _. ,_ _, _ _ . . . . . . .,_.. _...__. _ _ . . _ . . . _ , . __ .. _ _ . .._. .... _.__ ~_ ,.

..+ .;,.

~  :> .

r. .

.s_

s. ,

' Docket No. 50-423 B16801-t 4

0 s

Attachment 2 ,

Millstone Nuclear Power Station, Unit No. 3

- NNECO's Submittal of (LER 97 056-00)

)

Z.'

a n

F Je h' 'h i Decembdr 5,1997

e. _.

b i'.- -

4

-,y.-

-- ,I,EL _.Qb + +~r>+ - - . .e-4--, .-