Forwards LER 97-061-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 971218.Commitments Made by Util,Encl
ML20198R604
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/17/1998
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198R608 List:
References
B16934, NUDOCS 9801230358
Download: ML20198R604 (5)


LER-2097-061, Forwards LER 97-061-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 971218.Commitments Made by Util,Encl
Event date:
Report date:
4232097061R00 - NRC Website

text

.

l,

,O

[ .W

('~'j R,ge rary Rd (Route If.(,). Uninfied. Cr 0 fan $

( '

Nudcar Fawrgy u,n,,,,,,3,ua, rm, si,ti.

Neilwaat Nwhar Fawary Cmgeny P.o. Dos 128 hafwd Cr0(d85 0128 (860) 447 1791 I as (860) 444 4277

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 LIGAnsee Event Report 97 061-00 Submitted Pursuant to 10 CFR 50.73(a)(2)(i)(B.)

This letter forwards Licensee Event Report 97 06100, documenting a condition that was determined reportable at Millstone Unit No. 3 on December 18,1997.

This LER is submitted pursuant to 10 CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840. y

'Y

/'

Very truly yours, t

NORTHEAST NUCLEAR ENERGY A COMPANY

. I;5 blGKI

., linit Director, Millstone Unit No. 3 Y

g,im,.g,iin,u\n omas4 mar.

i

. U.S. Nucle:r Regul: tory Commission ,

. B16934/Page 2 l

!' 4

Attachment:

1) NNECO's commitments in response to LER 97-06100
2) - LER 97-061-00 '  !

cc: H. J. Miller, Region I Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3  !

J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 l

W. D. Travers, Dr. Director, Special Projects -l Corrective Action Group Files (CR M3 97-4588)  :

I 3 -

SCN: sn 1

?

r i

k

t i

t f

i i

1 a

r i

f h

, 3-y +c, , v, w a ay e-wa y y- -w-----s<gm.m,--_-ir, ---,--+-p-%,*+ + . - - e, , ,--s-n.----we+.y-- e-r,- +-m,---=wny.wmcs-=-rw-h-,,,ee-e w .*-wwge--ry -e--, = - * - * - >mm-p m -t m e

s .

. Docket No. 50-423 B16934 ,

Attachment 1 -

Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments

.In Response To (LER 9746100) e January 17,1998 1

y -

I' 4 l' I ' ' '

_ . _ _ . . . . . _ _ _ . . m.___ _ . _ . _ . ___..,_______L2ma _a.. _a

I f

l Enclosure j List of Regulatory Commitments  !

The following table identifies those actions committed to by NNECO in this j document. Please notify the Manager - Regulatory Compliance at the Millstone i

Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments. l t

Number Commitment Due i B16934-01 Perform a review of systems outside of Prior to Entry into  !

containment that could leak highly Mode 4  !

radioactive fluids'during a serious l t

transient or accident, to ensure potential offsite dose consequences are within the licensing basis.

B16934 02 Perform a leak test of each potential Prior to Entry into leakage path to establish valve baseline Mode 2 leakages and incorporate the results into the offsite dose assessment calculation.

B16934 03 An overall MP3 leakage reduction program July 31,1998 document will be prepared and program owner identified. Program elements determined to be inadequate will be addressed in accordance with the Millstone Corrective Action Program.

Docket No. 5Q-423 B16934 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 -

NNECO's Submittal of (LERM 06140)

January 17,1998

. .