Forwards LER 98-024-00 Re 981030 Potential Leakage Path Through Containment Pressure Instrument.Commitments Made by Util,Encl
ML20196G733
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/25/1998
From: Price J, Swientoniewski
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196G736 List:
References
B17555, NUDOCS 9812080067
Download: ML20196G733 (5)


LER-2098-024, Forwards LER 98-024-00 Re 981030 Potential Leakage Path Through Containment Pressure Instrument.Commitments Made by Util,Encl
Event date:
Report date:
3362098024R00 - NRC Website

text

- .-. _. .- -- -- .. . . -

New R pe Ferry Rd. (Route 156), Waterford. Cr 06385

]

Nuclear Energy waisione Noacar rower station Northeast Nudear Eocrgy Company .

P,0. Box 128 i Waterford, CT 06385-0128 (860) 447-1791  !

Fax (860) 444-4277

'ne Northeast Utilities System NOV 2 51998  ;

)

Docket No. 50-336 B17555 Re: 10 CFR 50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 98-024-00 Potential Leakaae Path throuah Containment Pressure instrument identified This letter forwards Licensee Event Report (LER) 98-024-00, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on October 30, 1998. This ' LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii).

The Northeast Nuclear Energy Company's (NNECO) commitments made within this letter are included in Attachment 1. .

t I

Very truly yours, ,

I' l NORTHEAST NUCLEAR ENERGY COMPANY I l'

FOR: J.A. Price Director - Millstone Unit No. 2 l c

h ~

n, 4 ,4 John T. Swientoniewski Assistant Unit Director Millstone Unit No. 2 y T

cc: see page 2 9812090067 981125 M PDR ADOCK 05000336 S PDR 3_

om22 s ex. n-u

. \

. U.S. Nucl r R::gulatory Commission B17555\Page 2 l 1

Attachments: 1. List of Regulatory Commitments <

2. LER 98-024-00 cc: H. J. Miller, Region i Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2  ;

D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2  ;

E. V. Imbro, Director, Millstone ICAVP Inspections S. Dembek, Unit 1 Project Manager, Millstone Unit 1 i

i I

P R

9 I

1 i <  ;

I l

. i I- l i

i I

h Docket No. 50-336 i B17555

!- . i

! f L- i l e l 1 o

! l L

I-l' e i

i Attachment 1 i Millstone Nuclear Power Station, Unit No. 2 l l Commitments i i

i I

L i<

4 i  !

!- t l' i i

i i  !

r t

November 1998  !

l t

r i

i t a

I.  !

i i l

r I~ , . . , - . _ . . , , . . _ . . - -

. ._. .. . . . . _ _ - - _ . .- = - - _ . _ . . - - . . .-- - _

e  !

U.S. Nucber R::gulatory Commission B17555\ Attachment 1\Page 1

, , Attachment 1 Regulatory. Commitment Enclosure l List of Regulatory Commitments j l

The following table identifies those actions committed to by NNECO in this  ;

document. I REGULATORY COMMITMENT COMMITTED DATE OR  :

OUTAGE B17555.01: The nonconforming containment Mode 4 from current ,

pressure instruments will be replaced with outage l suitable components that comply with FSAR  ;

Section 5.2.8.2.1.

i l

I l

i o -

r 1 i

+

f

?

l Docket No. 50-336  !

B17555  !

(

i i

I i l'

l 1

1 i

i Attachment 2 l l  ;

l -- Millstone Nuclear Power Station, Unit No. 2 l a

, LER 98-024-00  !