Forwards LER 98-002-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980109,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed
ML20202C844
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/06/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202C848 List:
References
B16993, NUDOCS 9802130042
Download: ML20202C844 (4)


LER-2098-002, Forwards LER 98-002-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980109,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed
Event date:
Report date:
3362098002R00 - NRC Website

text

_ _ _ _ _ _ _ _ _ _ _ _ - - _ - _ - _ _ _ _ _ _ _

g Rope Ferry Rd. (Route 156), Toterford. CT 06385 Nuclear Energy wn tor,e n-te.r rmt stadon

  • Nortlwast Nuclear Dwrgy comi.any a . -

P.O. Dos 128 Waterford, CT 06385-0128 (860) 447 1791 Fas (860) 4441277

%e Nottimt Utihtice System FEB 6 1998 Docket No. 50-336 B16993 Re: 10 CFR 50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter fofwards Licensee Event Report (LER) 98-002-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on January 9,

, 1998. This LER is being submitted pursuant to 10 CFR 50.7?NV2)(ii).

The NNECO's commitments mede within this letter are included in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY i

J. A. Ici Dire -liillstone Unit No. 2 Attachments: 1. List of Regulatory Commitments

2. LER 98-002-00

,)

cc: H. J. Miller, Region I Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 -

D.- P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 l M, p W. O. Travers, Ph.D,, Director, Special Projects Office M P. F. McKee, Deputy Director of Licensina, Special Projects Office W. D. Lanning, Depuy Director of Inspections, Special Projects Office J

9802130042'98020

PDR ADOCK 0500o336 ll'.ll

... lll.ll',ll, j ,j .ll S PDR

Docket No. 50-336 '

B16993 i

Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Commitments.

_ __ =

February 1998 u

U.S. Nuclear Regul: tory Commission B16993\ Attachment 1\Page 1 Attachment 1

- Regulatory Commitment Enclosure -

List of Regulatory Commitments -

The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended o_r planned actions by NNECO. They are described to the NRC for the-NRC's information and are not regulatory commitments. The Director - Regulatory Affairs or Manager - Regulatory Compliance Unit 2 should be notified of any questions regarding this document or any associated regulatory commitments.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B16993-01: The identified design deficiencies Mode 4 from current outage i

will be evaluated and apprcpriate corrective actions determinea. These correcthen actions will be completed prior to entry into F 2.- i Trom the current outage.

B16993-02: A review of the facility LOCA Mode 4 from current outage Analysis will be completed prior to entry into Mode 4 from the current outage to ensure that additional weaknesses relating to the single failure criterion have been identified and addressed.

e

Docket No. 50-336 B16993

=

l.

l Attachment 2 Millstone Nuclear Power Station, Unit No. 2 February 1998

. .