05000423/LER-1997-037, Forwards LER 97-037-00 Which Documents Condition Identified at Millstone,Unit 3 on 970516.Condition Later Determined Reportable on 970624.Commitments Made by Util,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 97-037-00 Which Documents Condition Identified at Millstone,Unit 3 on 970516.Condition Later Determined Reportable on 970624.Commitments Made by Util,Encl
ML20196J279
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/22/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196J286 List:
References
B16500, NUDOCS 9708040135
Download: ML20196J279 (5)


LER-2097-037, Forwards LER 97-037-00 Which Documents Condition Identified at Millstone,Unit 3 on 970516.Condition Later Determined Reportable on 970624.Commitments Made by Util,Encl
Event date:
Report date:
4232097037R00 - NRC Website

text

~ . . . ~ . . . - . - . - - . . ~ . - . . ~ . - . - .

j

$0Me88g Hope ferry Rd. (Route 156), Waterford, LT 06385 duelear Eriergy uiston, Nociear po ,r station Northeast Nuclear Energy Company P.O. Iku 128 Waterford, CF 06385-0128 ,

(860) 447-1791 Fax (860) 444-4277

% Northeast Utihties System 1 i

1 July 22,1997

  • Docket No. 50-423 B16500 Re:10CFR 50.73(a)(2)(i)(B) l U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l

Millstone Nuclear Power Station Unit 3 l Licensee Event Report 97-037-00 i

l Submitted Pursuant to 10CFR 50.73(a)(2)(i)(B) )

This letter forwards Licensee Event Report 97-037-00, documenting a condition that was identified at Millstone Unit No. 3 on May 16,1997 and later determined reportable on June 24, 1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

l Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

I I

3 Very truly yours, l

NORTHEAST NUCLEAR ENERGY COMPANY ,g, k

1 fAA

. D. Hicp(

Unit Director, Millst n nit No. 3

(.

9700040(3$990N PDR g

ADOCK 05000423 PDR h h.llh! -

l.

. . ~ . _ _ . .

1 l

l l .U.S. N,uclear Regulatory Commission

B16500/Page 2 l

Attachment:

1) NNECO's commitments in response to LER 97-037-00
2) LER 97-037-00 cc: H. J. Miller, Region i Administrator A. C. Cerne. Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NPC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects i 1

i l

l l

i

l

- s i

l Docket No. 50-423  !

B16500 i I

l 1

i I

l Attachment 1 ,

1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments In Response To (LER 97-037-001 l

I 1

l I

l July 22,1997 -

r

l ' '

L -

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this i document. Please notify the' Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Nun arr Commitment Due B16500-01 A Technical Specification change request will Prior to Conducting be submitted prior to plant start-up that will Heatup Activities permit both Residual Heat Removal loops to for Entry into be removed from operation during a planned Mode 4.

heatup to Mode 4 when at least one Reactor Coolant Pump loop is operable and in ,

operation and when two steam generators ,

are operable. i i

I l-l

}

e 1<

Docket No. 50-423 B16500 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 97-037-00) i l

l l

L. ,

!- 1 July 22,1997 I i

4 8 1 I

. __ - _ _ _ . . _ - _ _