Forwards LER 97-031-00,documenting Condition That Was Determined at Facility on 970507.Commitments Made in Response to Event,Encl
ML20140G592
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/05/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140G594 List:
References
B16478, NUDOCS 9706160360
Download: ML20140G592 (5)


LER-2097-031, Forwards LER 97-031-00,documenting Condition That Was Determined at Facility on 970507.Commitments Made in Response to Event,Encl
Event date:
Report date:
4232097031R00 - NRC Website

text

. _ . _ . . _ . . _ - _ _ _ _ ._ _ . . _ _.

l Northeast Hope Fng R1 (Route Wsh WatufordM m>38*>

}))$ NuclearEnergy l shns,on,socica, coa.e,si , ion l Northeast Nuclear Energy Company

, P.O. Ilom 128 Waterford CT 0638.50128 (860) 447 1791 Fax (8t>0) 444-4277 The Northeaat Utilities System June 5,1997 Docket No. 50-423 B16478 1

Re:10CFR 50.73(a)(2)(i)(B)

U. S. Nuclear Regulatory Commission Document Control Desk l Washington, DC 20555 t Millstone Nuclear Power Station Unit 3 i Licensee Event Report 97-031-00 Submitted Pursuant to 10CFR 50.73(a)(2)(i)

This letter forwards Licensee Event Report 97-031-00, documenting a condition that was determined at Millstone Unit No. 3 on May 7,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

l Should you have any questions regarding this submittal, please contact Mr.

i David A. Smith at (860) 437-5840.

Very truly yours, l

l NORTHEAST NUCLEAR ENERGY COMPANY j

l /

r

f. D.UnitHicks Director, Millstone Unit No. 3 3 9706160360 970605

, PDR ADOCK 05000423 j S PDR om224 arv. 2 93 ..

l ll I

. U.S. Nucl2ar R:gulatory Commission B16478/Page 2 l

Attachment:

1) NNECO's commitments in response to LER 97-031-00
2) LER 97-031-00 cc: H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 ,

J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 J W. D. Travers, Dr., Director, Special Projects l

l l

1 i

I i

l l  !

, l

- ,. _ ,m .-. - , -y ,

t

(; , Docket No. 50-423 l B16478 l

l Attachment 1 i

i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments

l. In Response To (LER 97-031-00) l.

1 i

1 l

t t June 5,1997 l

l

(

l

, y , .-m -- -- -_. , ..

m_ ,_,.m , , _ , _ . , ,. .,

l .

4 L

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

j Number Commitment Due B16478-01 The Residual Heat Removal System Prior to entry into suction / isolation valve Low Pressure Mode 4 )

, Interlock bistable calibration will be re- l l evaluated and the low pressure j l permissive bistable will be recalibrated to comply with the TS.

l I

l L

l

l. .

k a -

4 Docket No. 50-423 B16478 l

l i

)

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of LLER 97-031-00)

June 5,1997 l

l I