Forwards LER 97-048-00 Documenting Condition That Was Determined at Millstone,Unit 3 on 970806.Attachment 1 Contains Commitments in Response to Event
ML20216G099
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/05/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216G104 List:
References
B16697, NUDOCS 9709120209
Download: ML20216G099 (4)


LER-2097-048, Forwards LER 97-048-00 Documenting Condition That Was Determined at Millstone,Unit 3 on 970806.Attachment 1 Contains Commitments in Response to Event
Event date:
Report date:
4232097048R00 - NRC Website

text

. . . - . - - - ._ _ . . . . _ _ _

N4 h t "1* "'r "d' (""" 6) * '"f*d Cf C1885 Nuclear Energy an.iw, Nui Iw= sisia.  ;

Nwdwet Nwlear Enngy Dunpany .

P.O. Ikis 128

-, , Watnford.Ur 0638L0128

+ e* (203) 447 1791 l's: (203) 444 4277 W Nwtlemi Utahtw bystnn September 5,1997 Docket No. 50-423 B16697 Re: 10CFR 50.73(a)(2)(li)(B)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

[

Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-048 03 Submitted Pursuant to 10CFR 50.73(a)(2)(li)(B)

This letter forwards Licensee Event Report 97 048 00, documenting a condition that was determined at Millstone Unit No. 3 on August 6,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(ii)(B). NNECO's commitments in response to this event are contained within Attachment i to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, 7 r}87 NORTHEAST NUCLEAR ENERGY COMPANY

- p \

< \

A p- Unitse "'

Director, Millstone Unit No. 3

) -s,s.)-

970912O209 970905

$DR ADOCK 05000423 PDR.

im m uv.i t kh,k .

i . . i t

U.S. Nucle:r Regul: tory Commission  !

B16697/Page 2  !

i

. 'Attachtnel L 1) NNECO's commitments in response to LER 97 048-00 -

2) . LER 97-048 00 l

cc: _ H. J. Miller, Region I Administrator j

i A. C. Carne, Senior Resident inspector, Millstone Unit No. 3  ;

J. W. Andersen, NRC Project Manager, Millstone Unit No. 3  !

~ W. D. Travers, Dr., Director, Special Projects l' CR File (CR M3 97 2539) ,

t i

i x

8- l 4

1

'1

+ .

i

=I i

i i

t i

I J-I I

I k

3--w-,ty3,-+, , e v iy . y w- iv , ,%--- y,3 ,,,y g.pw--,.--w_,., u e,,,,z.,,,_49,--,-.-,,.m-+,,y..e,.c,--23c.,_.--,,_. --,...w,-+%. ,ww %-v~,1-.e4--r- -,e

i l

t t

Docket No. 50-423'-  !

.. B16697  ;

t t

e

.i  !

i i

i t

i

-P I

I Attachment 1  :

4 s

. Millstone Nuclear Power Station, Unit No,3 '

r NNECO's Commitments i

! In Response To i (LER 9744840) l i

1 i

t

.. 1 4

i i .

F e ,

t i

i

-i

'i

-/

t September 5,1997 i

h 6

V '- v' er w ++s mar iw1, wvar www w e --* , v = w e- e e we- - m ceN -wey%,---,-.my<e.e>m+,aw-e wei--*e- -n MFM1"P -a>' "P'F "itNW 4 T WM*F' YWM F*49P* **F'7'P"7'v" "

b Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager Nuclear Licensing at the Millstone Nuclear .

Power Station Unit No. 3 of any questions regarding this document or any associated '

regulatory commitments.

Number Commitment Due  :

B16697-01 The valves used to isolate the dilution Complete path ways have been administratively locked closed to preclude the possibility of ,

uncontrolled boron dilution of the RCS.

B16697 02 The configuration control problems have Complete been previously addressed in LER 96-026 02.

B16697-03 Before using the Primary Grade Water Prior to Entry into System for reactor coolant system Mode 4 makeup, the system will comply with the flow rate limits of the boron dilution event '

analysis.

.. - , . . .- - - -. .-- -. .