05000336/LER-1998-007, Forwards Corrected LER 98-007-00,documenting Event Which Occurred at Millstone Unit 2 on 980408.LER Is Being Resubmitted Due to Omission of Rept Date on Original Submittal.Commitments Made within Ltr,Encl

From kanterella
Jump to navigation Jump to search
Forwards Corrected LER 98-007-00,documenting Event Which Occurred at Millstone Unit 2 on 980408.LER Is Being Resubmitted Due to Omission of Rept Date on Original Submittal.Commitments Made within Ltr,Encl
ML20247Q392
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/14/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247Q397 List:
References
B17255, NUDOCS 9805280257
Download: ML20247Q392 (5)


LER-2098-007, Forwards Corrected LER 98-007-00,documenting Event Which Occurred at Millstone Unit 2 on 980408.LER Is Being Resubmitted Due to Omission of Rept Date on Original Submittal.Commitments Made within Ltr,Encl
Event date:
Report date:
3362098007R00 - NRC Website

text

a

[ gg g hope Ferry Rd. (House 156), Wcterford. CT 06385 Nuclear Energy muotone Nuacar Po,rr sanon Northeast Nuclear Energy Corupany P.O. Box 128

' . Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilities System MAY I 41998 Docket No. 50-336 E!?.2EE Re: 10 CFR 50.73(a){2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Resubmittal of Licensee Event Report 98-007-00 Reanalysis of Main Steam Line Break Indicates Possible Fuel Failures This letter forwards Licensee Event Report (LER) 98407-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2, on April 8, 1998. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii). This LER is being resubmitted due to the omission of the report date in the original submittal.

The Northeast Nuclear Energy Company's (NNECO) commitments made within this letter are included in Attachment 1.

I Very truly yours, l l NORTHEAST NUCLEAR ENERGY COMPANY l

/

J. A. Pri nku cc: See page 2 Director illstone Unit No. 2

'[

99052902$ 990514 P PDR S

ADOCK 05000336{:

PDR OfG4224 IIEY,12-95

_.u__ _ _ :.

1 ,

f U.S. Nuclear Reguhtory Commission l B17255\Page 2 Attachments: 1. List of Regulatory Commitments

2. i ER 98-007 00 l

H cc: H. J. Miller, Regbn 1 Admin;strater D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 t

D. P. Beaulieu, Senior Resident inspector, Millstune Unit No. 2

W. D. Travers, Ph.D, Director, Special Projects Office P. F. McKee, Deputy Director of Licensing, Special Projects Office W. D. Lanning, Deputy Director of Inspections, Special Projects Office i

l i,

.._....~.________________j

ON l

  • Docket No. 50-336 B17255.

l l-l I

1 Attachme.nt 1 1 Millstone Nuclear Power Station, Unit No. 2 i

Commitments l

i May 1998

!I

1 l .

I U.S. Nucl:ar Regul tory Commission B17255%ttachment 1\Page 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this j l document. t l REGULATORY COMMITMENT COMMITTED DATE OR

(

OUTAGE As contained in NNECO Letter B17230, dated May 8, ii.98.

l l

l I

Docket No. 50-336 B17255 Attachment 2 Millstone Nuclear Power Station, Unit No. 2 LER 98-007-00 l

L:

l l

[

May 1998 e

j l

~