05000423/LER-1997-055, Forwards LER 97-055-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971105.Commitments Made by Util,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 97-055-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971105.Commitments Made by Util,Encl
ML20203D150
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/05/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203D155 List:
References
B16861, NUDOCS 9712160123
Download: ML20203D150 (5)


LER-2097-055, Forwards LER 97-055-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971105.Commitments Made by Util,Encl
Event date:
Report date:
4232097055R00 - NRC Website

text

gg Rrge Terry Rd. (hte 156), TCserford, CT 06385 Nuclear Energy um,t ,N.u. % ust.Sn hartbeast Nuckar T.nergy Canpany P.o. Bos 128 Tatedord, CT 06385-0128 (860) 447 1791 Fas (860) 444 4277 The Northeut Utilith Systern December 5,1997 Docket No. 50-423 B16861 Re: 10 CFR 50.73(a)(2)(i)(B)

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-055-00 Submitted Pursuant to 10 CFR 50.73(a)(2)(i)(B)

This letter forwards Licensee Event Report 97-055-00, documenting a condition that was determined reportable et Millstone Unit No. 3 on November 5,1997.

This LER is submitted pursuant to 10 CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY n m O'D. Hicks i

/ Unit Director, Millstone Unit No. 3

  1. @l )t

, .* o ..

. 7 21go g g7 3 ,, ,

i I

U.S. Nucle:r Regul: tory Commission  !

- B16861/Page 2

Attachment:

1)' NNECO's commitments in response to LER 97-055-00

2) LER 97-055-00 l s

i ec: H. J. Miller, RenIon I Administrator  !

A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstor,e Unit No. 3 i W. D. Travers, Dr., Director, Special Projects  ;

Corrective Action Group Files (CR M3-97-3896)  !

I i

I i

i k RAL. i i

i e

i l

l 1

i i

t

, Docket No. 50-423 -

B16861 -

i P

f s

h I

r Attachment 1 Millstone Nuclear Power Station, snit No. 3 NNECO's Commitments -

In Response To 3 (LER 9745540)

.a-December 5,1997

'h-+-

+ -

4 -

r a vn =w- .eU, *,--v i .~ n , e +-w-- -. E = w r -r ,.i

(..

Enclosure List of Regulatory Commitments The following table- identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regLlatory commitments, i

Nurnber Commitment Due A walkdown of the area temperature Complete monitors has been performed to verify that the monitors are instailed as required.

B16861-01 Area temperature monitor 3ECS-TE098 will Prior to entry into be relocated to within the B and D RSS Mode 4 cubicle. ,

5 i

s Docket No. 50-423 B16861 ,

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of LLER 97-055-00)

December 5,1997

_ - _ _ _ _ _ _ _ _- ..