05000423/LER-1997-017, Forwards LER 97-017-02,documenting Condition Determined Reportable at Unit 3 on 970206.Util Commitments in Response to Event Contained within Attachment 1 to Ltr

From kanterella
Jump to navigation Jump to search
Forwards LER 97-017-02,documenting Condition Determined Reportable at Unit 3 on 970206.Util Commitments in Response to Event Contained within Attachment 1 to Ltr
ML20211Q058
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/11/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211Q062 List:
References
B16705, NUDOCS 9710220083
Download: ML20211Q058 (5)


LER-2097-017, Forwards LER 97-017-02,documenting Condition Determined Reportable at Unit 3 on 970206.Util Commitments in Response to Event Contained within Attachment 1 to Ltr
Event date:
Report date:
4232097017R00 - NRC Website

text

_ _ _ _ _ _ _ _ _ _ _ _ _

gj ltop ferry lld. (hie 156), Waterford. CT 06385 Nuclear Energy m. ion, N,u., % r, si.tk Northe. t Nwlear F.ncrgy Curnpuy I'.0. Ikia 128 -

Waterfunl, CT 06385-0128 (t460) 4471791 Fas (860) 444 4277

, m Nortimt thihtice Svetrau October 11,1997 Docket No. 50-423 6191kG Re:10CFR 50.73(a)(2)(1)(B)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-017-02 Submitted Pursuant to 10CFR 50.73(a)(2)(i)(B)

This letter forwards Supplement 2 to Licensee Event Report (LER) 97 017 00, documenting a condition that was determined at Millstone Unit No. 3 on February 6,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(1)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, -

NORTHEAST NUCLEAR ENERGY '1,., b< 9' , /

~

COMPANY 1

r~

x

,,,049 a-A% "

p. D. Hicks

/ Unit Director, Millstone Unit No. 3 9710220083 971011 So" - ^oc"o5oo=' $$1551(llt ,

U.S. Nuclear Regul: tory Commission B16705/Page 2

Attachment:

1) NNECO's commitments in response to LER 97 017 02
2) LER 97-017 02 cc: H. J. Miller, Region i Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3

- J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects CR File (M3 97-3017) i

, -. Docket No. 50-423 B16705 Attachment 1 Millstone Nuclear Power Station, Unit No. 3.

NNECO's Commitments -

In Response To (LER 97 017-02)

October 11,1997

Enclosure -

List of Regulatory Commitments The following- table identifies those actions committed to by NNECO in this document. Please notify the Manager Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated ,

regulatory commitments.

Number - Commitment Due B16705-01 Surveillance testing procedures will be - Prior to Mode 4.

revised and testing performed to verify proper operation of the auto sequencing of the Control Room chillers /pumpsand instrument and Computer Room air conditioning units in accordance with Technical Specification requirements.

P

Docket No. 50-423 B16705 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 97-017-02)

October 11,1997

_