Forwards LER 98-013-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980219 Re TS Required Sampling During Mode 5 Not Being Completed for SG Drain Down.Util Commitments in Response to Event Also Encl
ML20217D666
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/20/1998
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217D669 List:
References
B17093, NUDOCS 9803300143
Download: ML20217D666 (5)


LER-2098-013, Forwards LER 98-013-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 980219 Re TS Required Sampling During Mode 5 Not Being Completed for SG Drain Down.Util Commitments in Response to Event Also Encl
Event date:
Report date:
4232098013R00 - NRC Website

text

l

-N h t Rope Ferry Rd. (Route 156), Wettrford, CT 06385 Nuclear Energy - uiii. cone Nuciear ro e, station 1 Northeast Nuclear Energy Company P.o. Box 128

, g Waterford, Cr 06385-0128 (860) 447-1791 Fax (860) 444 4277 The Northeast Utilities System March 20,1998 Docket No. 50-423 B17093 Re: 10 CFR 50.73(a)(2)(i)(B)

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 98-013-00 Submitted Pursuant to 10 CFR 50.73(a)(2)(i)(B)

" Technical Specification Reauired Samolina Durina Mode 5 Not Comoleted for Steam Generator Drain Down" This letter forwards Licensee Event Report (LER) 98-013-00, documenting a condition that was determined reportable at Millstone Unit No. 3 on February 19, 1998. This LER is submitted pursuant to 10 CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY f~

=

/ ,

7 sn

, , g

=

pUnit Director, Millstone Unit No. 3 [y 9903300143 980320 --

PDR ADOCK 05000423 S PDR

., U.S. Nucle r Regulatory Commission B17093/Page 2

$ttachment: 1) NNECO's commitments in response to LER 98-013-00

2) LER 98-013-00 l cc: H. J. Miller, Region i Administrator l A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 l J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 l W. D. Travers, Ph.d., Director, Special Projects Corrective Action Group Files (CR M3-98-0991) i 3

RWM:rm

?.

1 I

l I

1 1

l l Docket No. 50-423

, s B17093 l

l Attachment 1 Millstone Nuclear Power Station, Unit No. 3

NNECO's Commitments in Response To (LER 98-013-00) l r

l March 20,1998 f

U.S. Nuclear Regul-tory Commission B17093/ Attachment 1/Page 1 I t Attachment i List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this j document. Please notify the Manager - Regulatory Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due B17093-01 The Steam Generator (S/G) Blowdown May 30,1998 Radiation Monitor Inoperative procedure and  !

form that are used to perform sampling to I satisfy the Technical Specification Action Statement that is entered when effluent releases via this pathway are made and the ,

monhor is inoperable will be revised to clarify l applicability of drain down of a S/G in wet l layup.

B17093-02 An administrative control discharge form will May 30,1998 be formalized to provide clear guidance for liquid discharges from site.

I l 8 Docket No. 50-423 l

B17093 l

l L

! I l

i  ;

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 98-013-00) l 1

l March 20,1998 i