Provides Revised Completion Date for Commitment Submitted in LER 97-019-00 Re Failure to Account for Instrument Uncertainty in DWST Level.Commitment Made by Util,Encl
ML20212F152
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/25/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16828, NUDOCS 9711040197
Download: ML20212F152 (4)


LER-2097-019, Provides Revised Completion Date for Commitment Submitted in LER 97-019-00 Re Failure to Account for Instrument Uncertainty in DWST Level.Commitment Made by Util,Encl
Event date:
Report date:
4232097019R00 - NRC Website

text

' O NdM S'3""'("'")*'*""""

hv Nuclear Energy u ii,io,, N ic., Po.., sia a.

Nortlwast Nulear fmry Gunpany P O Ikii 125 Watethrel. (T 06E 0128

( % 0) 447 1791 l'as (fWh) 444 4277 11, Nortlept ti al<

t ice 87 orm DockcLBoJ9-422 fl1@2S October 25,1997 RE: LER 97-019 00 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Commitment Revision Eqylsion.plDalp For Ompletion Of DWST LeyMmmentation.ghonges The purpose of this letter is to provide a revised completion date for a commitment submitted within Licensee Event Report (LER) 97-010-00, Violation Of Technical Specification As A Result Of Failure To Account For Instrument Uncertainty in DWST Level." Within the LER we indicated that by October 10, 1997, provisions would be made (e.g., hardware modifications and changes to surveillance procedures) such that the surveillance verifies adequate valume is contained within the Domineralized Water Storage Tank to meet Technical Specification requirements. This commitment was scheduled to be completed by Octobe' 10, 1997. The hardware changes were implomonted by the required date, but turnover of the system to Operations and completion of revisions to the applicable operations procedures has not yet been completed. Our revised commitment date is provided in Attachment 1. \

Should you have any questions regarding this matter please contact Mr David A I Smith at (860) 437 5840.

Very truly yours,

/i(O, NORTHEAST NUCLEAfi ENERGY COMP Y -c GpDV N& '_

g ,3 ,,ATirector Millstone Unit 3 v> 7 i 1 9711040197 971025 PDR ADOCK 0500o423 s PDR

o U.S. Nuclear Regulatory Commission '

' B16828\Page 2 r

- RAL: j i

cc: - H. J. Miller, Nioni Administrator l W.D. Travers, lhD, Director, Special Projects Office  ;

J. W. . Andersen, NRC Project Manager, Millstone Unit No. 3  :

A. C. f . Corne, Senior Resident inspector, Millstone Unit No. 3 l T

I f

S i

I r

i t

T 4r--r-' Y-m*P 'm 'w-4g-W*1 >1~'*rm'-

--Ww'T r %t-YFy"-f d' V8T'"' T' V 1'" 0 T'7 M Y M rdYt- b T W 'W' i 7

i' 7

Docket No. 50-423 B16828 t

I i

Attachment 1 Millstone Nuclear Power Station Unit No. 3 Revised Schedule Revision Of Date For Comoletion Of DWST LevelInstrumentation Chanaes i

s.

i Og tober ivr/

I.

~

S I u * -

  • 7 # -

T r' 'p" "

W t' r-P'e'-f*T*p- ===*'TN#g M

U.S. Nuclear Regul: tory Commhslon

, B16828 %ttachment 1\Page 1 Enclosure  ;

List of Regulatory Commitments -

- The following table identifies those actions committed to by NNECO in this ,

document. Please notify the Manager . Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or ,

an/ associated regulatory commitments.

Committed Date or Number Commitment Outage l B16262 01 Provisions will be made such that the Prior to entry into - -!

surveillance verifies adequate volume Mode 4.  :

is contained within the Domineralized Water Storage Tank to meet Technical Specification requirements.