05000423/LER-1997-011, Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions

From kanterella
Jump to navigation Jump to search
Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions
ML20140H529
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/12/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16525, NUDOCS 9706180301
Download: ML20140H529 (4)


LER-2097-011, Provides Revised Schedule for Completion of Corrective Actions Committed to in LER 97-011-00, H Recombiner Heaters Potentially Outside of Design Basis Under Degraded Voltage Conditions
Event date:
Report date:
4232097011R00 - NRC Website

text

_ . . - _ _ . - . _ . - . . . _ . _ _ _ . . . . _ _

_ ___.___-,_.______,._m. _ . _ _ , , , _,

' g g.g Itape Ferry Iki (Route 1Ns), Waterford, CT 06385 Nuclear Energy nin, ion, soa,ar com siain n

, Nordwa.: Nuclear Energy Company

, P.O. Ilus 128

[ Waterford, CT 06335-0128 ,

(860) 447 1791 l Faa (860) 444 4277 The Nortlwant Utihtic Synem June 12,1997 I Docket No 50-423 -

B16525 i

U.S. Nuclear Regulatory Commission  !

Attention: Document Control Desk -

Washington, DC 20555 i Millstone Nuclear Power Station Unit No. 3 i Revised Schedule Ca'culation Of Hydroaen Recombiner Heater Performance j The purpose of this letter is to provide our revised schedule for the completion of {

corrective actions previously committed to in Licensee Event Report 97-011-00, i "Hydroaen Recombiner Heaters Potentially Outside Of Dosion Basis Under l Dearaded Voltaae Conditions". This extension is necessitated as a direct result i of providing the incorrect parameters to Boeing /Rocketdyne with which to perform the calculations committed to within our letter of February 28,1997.  !

The design parameters provided were based on the original sub-atmospheric j pressure containment design. These parameters changed as a result of an  ;

increase in containment operating pressure authorized under Amendment 59.  !

Our revised commitments are provided in Attachment 1. l Should you have any questions regarding this matter please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, l 1

NORTHEAST NUCLEAR ENERGY COMPANY l G.

C.

A ,

irector - Millstone Unit 3 f

\

9706180301 970612 PDR ADOCK 05000423: g S PDR '

mams unus-es l]l$, ,

t , U.S. Nucl:ar Regulatory Commission l

B16525'Page 2 i i

ec ' H. J. Miller, Region i Administrator '

i- W.D. Travers, PhD, Director, Special Projects Office J. W. Andersen, NRC Project V,anager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3  ;

i f

l s

l l

l l

\

l I e

I

-. ~ . . . . . . . - . . - .._.. _. . - _ . - . - - - . - _ ~ _ _ - - - . - . . . . . - _ .

l l ct l-I f Docket No. 50-423 B16525 l

l i i

I Attachment 1 Millstone Nuclear Power Station Unit No. 3 Revised Commitments I

l i

1 l

l l

June 1997 l l

1 i

l l

4

,- U.S. Nucl:cr Regulatory Commission B16525%ttachment 1\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this ,

document. Please notify the Manager - Nuclear Licensing at the Millstone l Nuclear Power Station Unit No. 3 of any r(asstions regarding this document or  :

any associated regulatory commitments.

Commitment Committed Date B16233-01 1 Perform a calculation or evaluation to August 13,1997 (LER 97-011-00) determine the Hydrogen Recombiner heater performance under degraded voltage conditions.