05000423/LER-1997-006, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1
ML20138J489
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/30/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138J492 List:
References
B16379, NUDOCS 9705080232
Download: ML20138J489 (5)


LER-2097-006, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1
Event date:
Report date:
4232097006R00 - NRC Website

text

._ . . _ .. . _

} Northeast ""I" F"'T "d d"""'" *')' *"'"'"'dd "f' jk}, Nuclear Energy uaisione Nocie., ro.y sisiion Northeast Nuclear Energy Conipany P.O. Ilus 128 Waterford, Ur 0638.5-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilitica Systern April 30,1997 Docket No. 50-423 B16379 Re:10CFR 50.73(a)(2)(i)

U. S. Nuclear Regulatory Commission Document Control Desk ,

Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-006-01 Submitted Pursuant to 10CFR 50.73(a)(2)(i)

This letter forwards Supplement 1 to Licensee' Event Report 97-006-00, documenting a condition that was determined at Millstone Unit No. 3 on January i 17,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(i). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

1 Should you have any questions regarding this submittal, please contact Mr. )

l James M. Peschel at (860) 437-5840. l r

l l

Very truly yours, i NORTHEAST NUCLEAR ENERGY nn0030 COMPANY 9705000232 970430 "5 e

{DR ADOCK 05000423- i m PDR ,

N A  % / \

fM Unit Director, Millstone Unit No. 3 g

y 9 I Os34224 REV 124

%,h}hh a

I

. U.S. Nuclear Regulatory Commission B16379/Page 2 I

l

Attachment:

1) NNECO's commitments in response to LER 97-006-01 i
2) LER 97-006-01 '!

t cc: F _ J. Miller, Region i Administrator l A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 ,

W. D. Travers, Dr., Director, Special Projects l

' I.

i i

i i

i h

f e

l' I

i i  ;

I I

l i t

l I i t

i t

i I

t I l I t

t

. t l  :

' i l  !

i t

I t

l i

I  :

i

h Dacket No. 50-423 [

B16379 l i

t I

t i

+

i i

t i

Attachment 1  !

Millstone Nuclear Power Station, Unit No. 3 '

NNECO's Commitments  !

in Response To 1 (LER 97-006 01)  !

l i

l i

i i

l l

l 1

l \

I I

l l

l April 30,1997 1

1

+

l

'U.S. Nuclaar Reguintory Commission i B16379\ Attachment 1\Page 1 h

I Enclosure  ;

List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this  ;

document. Any other actions discussed in the submittal represent intended or  ;

pisoned actions by NNECO. They are described to the NRC for the NRC's .

information and are not regulatory commitments. Please notify the Manager -  !

Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions l regarding this document or any associated regulatory commitments.  ;

Number Commitment Due j B16379-01 A Technical Specification Change- May 30,1997  !

Request will be submitted to add the RHR l Suction CIVs to the list of valves included l' in the note contained within Surveillance Requirement 4.6.1.1.a.

i 1

i l

I I

e i

1 1

j l

I

Docket No. 50-423 816379 1

i I

i

~

i

.i l-Attachment 2 i- Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of i (LER 97-006-01)  ;

i i

l l

l

{

t i

f i

l April 30,1997 1