05000423/LER-1997-050, Forwards LER 97-050-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971017,per 10CFR50.73 (a)(2)(ii)(B).Commitments in Response to Event Contained within Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 97-050-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971017,per 10CFR50.73 (a)(2)(ii)(B).Commitments in Response to Event Contained within Attachment 1
ML20199G943
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/15/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199G948 List:
References
B16806, NUDOCS 9711250339
Download: ML20199G943 (5)


LER-2097-050, Forwards LER 97-050-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971017,per 10CFR50.73 (a)(2)(ii)(B).Commitments in Response to Event Contained within Attachment 1
Event date:
Report date:
4232097050R00 - NRC Website

text

- .-

.r < .

'/ M-hC( !. Hope Ferry Rd. (Route 156) Titerford, CT 06385

] N @ Milletone Nuclear Power Station Northeast Nuclear Energy Company P.O. Bus 128 j

  • "i* -

Waterford, CT 06385-0128 '

.(860) 447 1791 Fan (860) 444-4277

% Northeast Utilit'ee System

~ November 15,1997

- Docket No. 50-423 B16806 Re: 10 CFR 50.73(a)(2)(ii)(B)-

- Nuclear Regulatory Commission Document Control Desk Wa.mngton, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-050-00 Submitted Pursuant to 10 CFR 50.73(a)(2)(ii)(B)

This letter forwards Licensee Event Report 97-050-00, document:ng a condition

that was determined reportable at Millstone Unit No. 3 on October 17, 1997.

This LER is submitted pursuant to 10 CFR 50.73(a)(2)(ii)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours,

-I NORTHEAST NUCLEAR ENERGY COMPANY

'W

3>

/

,/-

/ D.UnitHicks V Director, Millstone Unit No. 3 9711250339 971115 %

PDR- ADOCK 05000423 S PDR oss m -s uv. u m lllllll ll

.5

  • U.S. Nucle:r Regul: tory Commission

, B16806/Page 2

Attachment:

1) NNECO's commitments in rasponse to LER 97-050-00
2) LER 97-050 cc: H. J, Miller, Region I Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Trevers, Dr., Director, Special Projects Corrective Action Group Files (CR M3-97-3301, CR M3-97-2779)

4 Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 97 050-00)

November 15,1997

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this docJment. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any qucttions regarding this document or any r associated regulatory commitments. I Number Commitmeni Due The work orders and parts purchasing Completed documents for the FWlVs have been corrected.

B16806-01 The Feedwater Isolation Valves will be Prior to Entry into (

inspected and unqualified parts will be Mode 4 replaced.

B16806 02 A review of open and a representativa Prior to Entry into sample of closed (historical) work orders Mode 4 associated with Electrical Environmental Qualification (EEO) will be conducted to ensure the adequacy of replacement parts identified for use in EEQ applications. Non-qualifier; parts will be replaced with qualified parte, as applicable.

Docket No. 50-423 B16806 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of fLER 97-050 00)

November 15,1997

_ - - _ _ _ _ _ _ _ _ _ - _ ___