05000336/LER-1998-016, Forwards LER 98-016-00,which Discusses Inadequate Administrative Controls on Safety Injection Valve. Commitments Made within Rept,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 98-016-00,which Discusses Inadequate Administrative Controls on Safety Injection Valve. Commitments Made within Rept,Encl
ML20237A118
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/07/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20237A119 List:
References
B17395, NUDOCS 9808130107
Download: ML20237A118 (5)


LER-2098-016, Forwards LER 98-016-00,which Discusses Inadequate Administrative Controls on Safety Injection Valve. Commitments Made within Rept,Encl
Event date:
Report date:
3362098016R00 - NRC Website

text

- _ _ - _ - _ - _ - . - - - - - - _ _ - _ . _ - - - - - - - _ _ - - - - - - - - - _ - - - - - - - - - - - - _ - - -

ggg Rope Ferry Rd. (Route 156), Waterford. CT 06385 Nuclear Energy h&one Na 1 car Power Station Northeast Nuclear Energy Company P.O. Box 128 Waterford. CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilitice System AG 7I998 Docket No. 50-336 B17395 Re: 10 CFR 50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 98-016-00 Inadeauate Administrative Controls on Safety iniection Valve This letter forwards Licensee Event Report (LER) 98-016-00, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on July 8,1998. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii).

The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY V

J. p. frice D  : tor - Millstone Unit No. 2 L cc: see page 2

  • ' ~

9908130107 990907 PDR ADOCK 05000336 d S PDR ,

1

(*3422-5 REV.12-95 i.

U.S. Nuclear Reguittory Commission J B17395\Page 2 Attachments: 1. List of Regulatory Commitments

2. LER 98-016-00 cc: H. J. Miller, Region I Administrator D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 E. V. Imbro, (Acting) Director, Special Projects Office W. M. Dean, (Acting) Deputy Director of Licensing - Special Projects Office
W. D. Lanning, Deputy Director of Inspections, Special Projects Office I

I

l l

\

Docket No. 50-336 i B17395  !

l l

Attachment 1 Millstone Nuclear Power Station, Unit No. 2 {

Commitments l

l l

l 1

1 l

l I August 1998 l l

l

l :. .

U.S. Nucl:ar R:gulatory Commission B17395%ttachment 1\Page 1 l

Attachment 1 Regulatory Commitment Enclosure l List of Regulatory Commitments l

' The following table identifies those actions committed to by NNECO in this document.

l l

! REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17395.01: As a result of this condition, the Mode 4 from current appropriate procedures will be revised to direct outage that 2-SI-459 be closed if a LOCA were to occur while the valve is open during an evolution. This information will be incorporated into the appropriate procedures to assure adequate administrative control. These activities will be i completed prior to entry into Mode 4 of the current l outage.

l l

l I

. \.

i

Docket No. 50-336 l B17395 i

l' f

l Attachment 2 l Millstone Nuclear Power Station, Unit No. 2 LER 98-016-00 i

l August 1998 l

)