Forwards LER 97-039-00,documenting Condition Determined at Millstone Unit 3 on 970614.List of Commitments Provided
ML20149F472
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/14/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149F476 List:
References
B16557, NUDOCS 9707220204
Download: ML20149F472 (4)


LER-2097-039, Forwards LER 97-039-00,documenting Condition Determined at Millstone Unit 3 on 970614.List of Commitments Provided
Event date:
Report date:
4232097039R00 - NRC Website

text

_ ._

e 8\ Northeast ""I" F#"r R1 (Route iso). Watnf*d cm335 N Nuclear Energy .wuktmie Nudcar Power Stadon Northeast Nuclear Energy Company

. P.O. Ih 128 Waterford, CT 06385-0128

. (860) 447-1791 Fax (660) 444-4277 The Northeast Utilities System

. July 14,1997 Decket No. 50-423 B16557 l

Re: 10CFR 50.73(a)(2)(i)(B)

U. S. Nuclear Regulatory Commission

Document Control Desk Washington, DC 20555 l

i Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-039-00 Submitted Pursuant to 10CFR 50.73(a)(2)(i)(B)

This letter forwards Licensee Event Report 97-039-00, documenting a condition that was determined at Millstone Unit No. 3 on June 14, 1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(i)(B). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

.~

'. D.TIFCKs Unit Director, Millstone Unit No. 3

  • ~ O O R 1 9y07220204 970714 >

PDR ADOCK 05000423 8 ll l l l ll ll

.. . ~ .

. 1 l

l

" U.S. Nuclaar Regulatory Commission l B16557/Page 2 l

Attachment:

1) NNECO's commitments in response to LER 97-039-00 1
2) LER 97-039-00 )

cc: H. J. Miller, Region I Administrator i A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects l

1 l

l

,, .~. ..- . . . . . . .. . .- -. .. . . . . . - . . . . _ . . . . .- . ..

l l ..

. Dock'et No. 50-423 B16557 l

l i

1 l

l 1

I l

l l

Attachment 1 I

l 1

l l

Millstone Nuclear Power Station, Unit No. 3

! NNECO's Commitments in Response To j (LER 97-039-00)

I l

l l

1 1

I i

1 l

1 1

)

i July 14,1997 i.

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear L) censing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due B16557-01 The Turbine Building Sump Effluent Prior to entry into Monitor solenoid valve will be repaired or Mode 4 replaced as necessary.

B16557-02 A Turbine Building Sump Effluent Monitor Prior to entry into design change will be prepared and Mode 4 implemented such that the operators are alerted to a low sample flow condition.

B16557-03 A review of the radiation monitor post- Prior to entry into calibration and restoration procedures will Mode 4 be conducted and revised, as necessary, to ensure the monitor's operability prior to being restored to service.

B16557-04 Other similar type radiation monitors will be Prior to entry into evaluated for applicability to this condition. Mode 4

. _ . . . . ~ - . _ . . . . _ . . . . . .. . .__ . - .. _ _ . . _ . . _ . _ _ _ _ . _ . . _ . _ . _ _ _ _ _ . _ . _ _ _ .

i.

. l Docket No. 50-423 B16557-i

)
. 1 t

l J

r I

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of l (LER 97-039-00) a i

4 i

t i

i 4

h i July 14,1997 i

4

.,,..m___ _ - . . . , .

.