Pages that link to "05000336/LER-1994-001, Forwards LER 94-001-01,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 3 on 940118.No Commitments Made within Ltr"
Jump to navigation
Jump to search
The following pages link to 05000336/LER-1994-001, Forwards LER 94-001-01,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 3 on 940118.No Commitments Made within Ltr:
Displayed 6 items.
- 05000336/LER-1994-003, Application for Amend to License DPR-65,incorporating Addl Requirements Into TS Re non-QA Equipment Utilized to Achieve Feedwater Isolation in Response to MSLB Inside Containment, Per Commitment Made in LER 94-003-00 & Listed I (← links)
- 05000336/LER-1994-020, Forwards LER 94-020-01 Re DG Fuel Oil Supply Being Less than IEEE Std.Rept Reflects Completion of Outstanding Corrective Action (← links)
- ML20141F465 (redirect page) (← links)
- ML20141F469 (← links)
- 05000336/LER-1994-001 (redirect page) (← links)
- 05000336/LER-2014-001 (← links)
- 05000336/LER-2014-002 (← links)
- 05000336/LER-2014-003 (← links)
- 05000336/LER-2014-004 (← links)
- 05000336/LER-2014-007 (← links)
- 05000336/LER-2015-001 (← links)
- 05000336/LER-2015-002 (← links)
- 05000336/LER-2015-003 (← links)
- 05000336/LER-2016-002 (← links)
- 05000336/LER-2016-001 (← links)
- 05000336/LER-1993-019 (← links)
- 05000336/LER-1993-008 (← links)
- 05000336/LER-1993-018 (← links)
- 05000336/LER-1993-016 (← links)
- 05000336/LER-1993-014 (← links)
- 05000336/LER-1990-010 (← links)
- 05000336/LER-1990-008 (← links)
- 05000336/LER-1990-009 (← links)
- 05000336/LER-1987-009 (← links)
- 05000336/LER-1982-022, Forwards LER 82-022/03L-0 (← links)
- 05000336/LER-1982-024, Forwards LER 82-024/03L-0 (← links)
- 05000336/LER-1982-021, Forwards LER 82-021/03L-0 (← links)
- 05000336/LER-1982-018, Forwards LER 82-018/03L-0 (← links)
- 05000336/LER-1982-019, Forwards LER 82-019/99X-0.Detailed Event Analysis Encl (← links)
- 05000336/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000336/LER-1982-016, Forwards LER 82-016/01T-0 (← links)
- 05000336/LER-1982-015, Forwards LER 82-015/03L-0 (← links)
- 05000336/LER-1982-014, Forwards LER 82-014/03L-0 (← links)
- 05000336/LER-1982-007, Forwards LER 82-007/03L-0 (← links)
- 05000336/LER-1982-005, Forwards LER 82-005/03L-0 (← links)
- 05000336/LER-1982-006, Forwards LER 82-006/03L-0 (← links)
- 05000336/LER-1982-040, Forwards LER 82-040/03L-0 (← links)
- 05000336/LER-1982-038, Forwards LER 82-038/03L-0.Detailed Event Analysis Encl (← links)
- 05000336/LER-1982-039, Forwards LER 82-039/03L-0 (← links)
- 05000336/LER-1993-007, Incorporates NRC Comments Discussed During 940324 Telcon Into 931217 Application for Amend to License DPR-65,revising TS 3.8.1.1,as Result of LER 93-007-00,dtd 930428 & Util 930726 Response to NOV from Insp Rept 50-336/93-81 (← links)
- 05000336/LER-1982-036, Forwards LER 82-036/03L-0 (← links)
- 05000336/LER-1981-005, Forwards LER 81-005/03L-0 (← links)
- 05000336/LER-1978-031, Forwards LER 78-031/03L-0 (← links)
- 05000336/LER-1978-030, Forwards LER 78-030/03L-0 (← links)
- 05000336/LER-1982-046, Forwards LER 82-046/03L-0 (← links)
- 05000336/LER-1982-047, Forwards LER 82-047/03L-0 (← links)
- 05000336/LER-1982-037, Forwards LER 82-037/03L-0 (← links)
- 05000336/LER-1982-035, Forwards LER 82-035/03L-0 (← links)
- 05000336/LER-1982-034, Forwards LER 82-034/03L-0 (← links)
- 05000336/LER-1982-020, Forwards LER 82-020/03L-0 (← links)
- 05000336/LER-1979-014, Forwards LER 79-014/03X-2 (← links)
- 05000336/LER-1982-033, Forwards LER 82-033/03L-0 (← links)
- 05000336/LER-1982-030, Forwards LER 82-030/03L-0 (← links)
- 05000336/LER-1982-031, Forwards LER 82-031/03L-0 (← links)
- 05000336/LER-1982-029, Forwards LER 82-029/03L-0 (← links)
- 05000336/LER-1982-028, Forwards LER 82-028/03L-0.Detailed Event Analysis Encl (← links)
- 05000336/LER-1983-013, Forwards LER 83-013/03L-0 (← links)
- 05000336/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis Encl (← links)
- 05000336/LER-1983-004, Forwards LER 83-004/03L-0 (← links)
- 05000336/LER-1982-041, Forwards LER 82-041/03L-0 (← links)
- 05000336/LER-1994-003, Application for Amend to License DPR-65,incorporating Addl Requirements Into TS Re non-QA Equipment Utilized to Achieve Feedwater Isolation in Response to MSLB Inside Containment, Per Commitment Made in LER 94-003-00 & Listed I (← links)
- 05000336/LER-1983-020, Updated LER 83-020/01X-1:on 830613,2,557 Degraded Tubes Discovered on Steam Generator Tubing.Cause Undetermined. Tubes W/Flaws Less than + or - 40% Through Wall or Eddy Current Probe Restrications repaired.W/840213 Ltr (← links)
- 05000336/LER-1991-009, Forwards LER 91-009-03,reflecting Completion of Outstanding Corrective Action,Per 10CFR50.73(a)(2)(i) (← links)
- 05000336/LER-1994-020, Forwards LER 94-020-01 Re DG Fuel Oil Supply Being Less than IEEE Std.Rept Reflects Completion of Outstanding Corrective Action (← links)
- 05000336/LER-1983-012, Updated LER 83-012/03X-1:on 830322 & 26,charging Pump C Shut Down Due to Lost Oil Pressure.Caused by Failed Integral Oil Pump Drive Coupling.Coupling Repaired (← links)
- 05000336/LER-1982-053, Forwards LER 82-053/03L-0 (← links)
- 05000336/LER-1982-052, Forwards LER 82-052/03L-0.Detailed Event Analysis Encl (← links)
- 05000336/LER-1983-007, Updated LER 83-007/01T-1:on 830318,nonconservative Safety Analysis Assumption Discovered in Steam Generator Tube Rupture Analysis.Radiological Consequences of Reanalysis Being Analyzed (← links)
- 05000336/LER-1982-032, Forwards Updated LER 82-032/03X-1.Detailed Event Analysis Encl (← links)
- 05000336/LER-1983-009, Forwards LER 83-009/01T-0 (← links)
- 05000336/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000336/LER-1983-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl (← links)
- 05000336/LER-1983-008, Forwards LER 83-008/01T-0 (← links)
- 05000336/LER-1980-012, Forwards Updated LER 80-012/03X-1 (← links)
- 05000336/LER-1981-011, Forwards Updated LER 81-011/03X-1 (← links)
- 05000336/LER-1981-018, Forwards Updated LER 81-018/03X-2 (← links)
- 05000336/LER-1981-036, Forwards Updated LER 81-036/03X-1 (← links)
- 05000336/LER-1983-006, Forwards LER 83-006/03L-0 (← links)
- 05000336/LER-1983-001, Forwards LER 83-001/04T-0 (← links)
- 05000336/LER-1983-002, Forwards LER 83-002/03L-0 (← links)
- 05000336/LER-1982-026, Forwards LER 82-026/03L-0 (← links)
- 05000336/LER-1982-044, Forwards Updated LER 82-044/03X-1 (← links)
- 05000336/LER-1997-003, Corrected Page One to LER 97-003-01:on 961216,discovered Discrepancy in Plant Procedure Utilized to Perform Periodic Insp of Fire Protection Sys Smoke Detectors.Caused by Failure to Properly Incorporate Ts.Ts Partially Revised (← links)
- 05000336/LER-1997-008, Forwards LER 97-008-00,documenting Event Occurred at Unit 2 on 970310.Commitments Made within Ltr Listed as Submitted (← links)
- 05000336/LER-1997-007, Provides List of Commitments for LER 97-007-00 Re Event That Occurred on 970308 (← links)
- 05000336/LER-1996-031, Forwards LER 96-031-01,documenting Event Occurred at Unit 2 on 961003.Commitments Made within Ltr Listed (← links)
- 05000336/LER-1997-006, Forwards LER 97-006-00 Which Documents an Event That Occurred on 970211.Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970204.Commitments Made,Listed (← links)
- 05000336/LER-1997-019, Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed (← links)
- 05000336/LER-1997-017, Forwards LER 97-017-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970417.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-010, Forwards LER 97-010-00,documenting Event Occurred at Unit 2 on 970112.Commitments Made within Ltr Listed (← links)
- 05000336/LER-1992-003, Requests 10-day Extension to File Contentions Re Spent Fuel Pool Design Specs (Ref LER 92-003-00) at Plant.W/Certificate of Svc.Served on 920819 (← links)
- 05000336/LER-1997-021, Forwards LER 97-021-00,documenting an Event That Occurred on 970423,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr, Submitted (← links)
- 05000336/LER-1997-018, Forwards LER 97-018-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970421.Commitments Made within Ltr,Submitted (← links)
- 05000336/LER-1997-016, Forwards LER 97-016-00 Per 10CFR50.73(a)(2)(i)(B).Also Includes Commitments Made in Ltr (← links)
- 05000336/LER-1997-015, Forwards LER 97-015-00 Per 10CFR50.73(a)(2)(v).Also Includes Commitments Made in Ltr (← links)
- 05000336/LER-1994-001, Forwards LER 94-001-01,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 3 on 940118.No Commitments Made within Ltr (← links)
- 05000336/LER-1997-014, Forwards LER 97-014-00 Which Documents an Event That Occurred on 970415.Commitments Made within Ltr,Submitted (← links)
- 05000336/LER-1993-023, Forwards LER 93-023-02,documenting Event Occurred at Unit 2 on 930622.Commitments Made within Ltr Listed (← links)
- 05000336/LER-1997-012, Forwards LER 97-012-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970410.Commitments Made within Ltr,Submitted (← links)
- 05000336/LER-1996-029, Forwards LER 96-029-01,providing Update on Analyses & Investigation for Event.Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1995-020, Forwards Supplemental LER-95-020-01 Which Documents Event That Occurred at Mnps,Unit 2 on 950516.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-011, Forwards LER 97-011-00,documenting Event Occurred at Unit 2 on 970402.Commitments Made within Ltr Listed (← links)
- 05000336/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred on 970108,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1995-019, Forwards LER 95-019-02,documenting Event That Occurred at Millstone Nuclear Power Station Unit 2 on 950514.Util Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1996-043, Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1996-042, Forwards LER 96-042-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961218.Commitments Made within Ltr (← links)
- 05000336/LER-1996-041, Forwards LER 96-041-00,documenting Event at Plant on 961217.Commitments Made Re Event Listed (← links)
- 05000336/LER-1996-023, Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425 (← links)
- 05000336/LER-1996-040, Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1996-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1996-037, Provides List of Commitments Re LER 96-037 (← links)
- 05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted (← links)
- 05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed (← links)
- 05000336/LER-1979-040, Forwards LER 79-040/03L-0 (← links)
- 05000336/LER-1998-020, Forwards LER 98-020-00 Re SI Recirculation Header Piping Components Not Fully Satisfying ISI Requirements IAW ASME Code Section XI Criterion.Commitments Made within Ltr Also Encl (← links)
- 05000336/LER-1998-021, Forwards LER 98-021-00,documenting Condition That Was Discovered at Mnps,Unit 2,on 980825.Commitments Made by Util,Encl (← links)
- 05000336/LER-1998-019, Forwards LER 98-019-00,re Potential Inability to Close AFW Regulator Valves After Helb,Discovered on 980826.Util Commitments,Encl (← links)
- 05000336/LER-1998-018, Forwards LER 98-018-00,re Condition That Was Discovered at Millstone Unit 2 on 980818.Commitments Made by Util Also Encl (← links)
- 05000336/LER-1996-003, Forwards LER 96-003-01,documenting Event That Originally Occurred at Mnps,Unit 2,on 960205.Encl Provides Final Update on Analyses & Investigation for Event.Commitments Made by Util Are Included in Attachment 1 (← links)
- 05000336/LER-1996-018, Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler (← links)
- 05000336/LER-1997-025, Forwards LER 97-025-00 Which Documents Event That Occurred at Mnps,Unit 2 on 910828.Submittal Delayed Due to Inadequate Review of Event at Time of Discovery.Commitments Made by Util,Listed (← links)
- 05000336/LER-1994-016, Forwards LER 94-016-01.Original Rept Had Been Erroneously Submitted Ref Millstone Unit 1 License & Docket Number. Rev 1 to LER Reflects Correct Numbers (← links)
- 05000336/LER-1998-024, Forwards LER 98-024-00 Re 981030 Potential Leakage Path Through Containment Pressure Instrument.Commitments Made by Util,Encl (← links)
- 05000336/LER-1999-009, Forwards LER 99-009-00,re Manual Rt Due to Steam Leak in Turbine Bldg.Commitments Made by Util Are Encl (← links)
- 05000336/LER-1999-008, Forwards LER 99-008-00,documenting Event That Occurred at Unit 2 on 990511.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1998-023, Forwards LER 98-023-00,re Failure to Adequately Test Containment Air Recirculation Fans IAW TS SR 4.6.2.1.2(a) on 980924.LER Submitted Beyond 30-day Discovery Time Period. Licensee Commitments Also Included (← links)
- 05000336/LER-1998-002, Forwards LER 98-002-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980109,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1998-001, Forwards LER 98-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980108.LER Being Submitted Per 10CFR50.73(a)(2)(ii) Requirements. Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1997-034, Forwards LER 97-034-00 Which Documents Condition That Was Identified at Mnps,Units 2 on 971029.Commitments Made within Ltr Listed (← links)
- 05000336/LER-1997-024, Forwards LER 97-024-01,documenting Condition Discovered at Mnps,Unit 2 on 970619.Suppl Provides Update on Analyses & Investigation of Condition.Commitments Made by Util,Encl (← links)
- 05000336/LER-1998-025, Forwards LER 98-025-00,documenting Condition Discovered at Mnps,Unit 2,on 981111.Commitments Made by Util,Encl (← links)
- 05000336/LER-1995-032, Forwards Suppl to LER 95-032-01,documenting Event That Occurred at Unit 2 on 950808.LER Suppls Repts Completions of Short & long-term Corrective Actions Associated W/Pipe Rupture in Secondary Sys within Turbine Bldg (← links)
- 05000336/LER-1998-017, Forwards LER 98-017-01,re Fire Protection Program Deficiencies That Were Discovered on 980812.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-022, Forwards LER 98-022-01 Re AFW DC Power Supply Failure That Was Not Considered in Safety Analysis on 980910.Commitments Made in Ltr Encl (← links)
- 05000336/LER-1996-024, Forwards LER 96-024-02,documenting Event Which Occurred on 960507 Re Inadequate ESAS & RPS Response Time Surveillance Testing.Commitments Made within Ltr Are Included in Attachment 1 (← links)
- 05000336/LER-1992-012, Forwards LER 92-012-00 Required to Be Submitted within 30 Days Per 10CFR50,50.73(a)((2)(iv) & 50.73(a)(2)(v) (← links)
- 05000336/LER-1996-017, Forwards LER 96-017-01,documenting Condition That Was Discovered at Unit 2 on 960320.LER Suppl Provides Update on Analyses & Investigation of Condition.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1997-037, Forwards LER 97-037-00,documenting Event That Occurred at Mnps,Unit 2,on 971126.Commitments Made by Util,Encl (← links)
- 05000336/LER-1997-036, Forwards LER 97-036-00,which Describes Event That Occurred at Facility on 971117.Commitments Made within Ltr Listed (← links)
- 05000336/LER-1999-007, Forwards LER 99-007-00,documenting Event That Occurred on 990319.Attachment 1 Contains Commitments Made within Ltr (← links)
- 05000336/LER-1999-006, Forwards LER 99-006-00,re Condition Discovered at Millstone Unit 2 on 990301,IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util Are Encl (← links)
- 05000336/LER-1999-004, Forwards LER 99-004-00 Documenting Event That Occurred at Mnps,Unit 2 on 990211,per 10CFR50.73(a)(2)(i).Commitments Made by Util Encl (← links)
- 05000336/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred at Millstone,Unit 2 on 971111.Listed Commitments Made within Ltr (← links)
- 05000336/LER-1996-004, Forwards LER 96-004-01,documenting Event That Occurred at Unit 2 on 960131.New Util Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-009, Forwards LER 97-009-01,documenting Condition Discovered at Mnps,Unit 2 on 970325.Suppl Provides Update on Analysis for Condition,Including Identification of Addl Deficiencies. Commitments Made by Util,Encl (← links)
- 05000336/LER-1998-026, Forwards LER 98-026-00,re Exceeded Pressurizer Spray Line Fatigue Limits Due to Insufficient Thermal Effects Analysis. Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1999-005, Forwards LER 99-005-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 2 on 990223. Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1984-005, Confirms That Rev to LER 84-005 Will Be Submitted within 2 Months,Clarifying Performance of Type A,B & C Testing During 1983 Refueling Outage as Discussed in 860604 Meeting (← links)
- 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl (← links)
- 05000336/LER-1997-032, Forwards LER 97-032-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970922.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-031, Forwards LER 97-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970918.Commitments Made within Ltr Listed (← links)
- 05000336/LER-1997-020, Forwards LER 97-020-03,documenting Condition That Was Discovered at Mnps,Unit 2,on 970423.LER Supplements Update on Analyses & Investigation of Condition.Commitments Made by Util Are Included in Attachment 1 (← links)
- 05000336/LER-1998-005, Forwards LER 98-005-01 Re HELB Deficiencies for Piping Inside Containment on 980318.Commitments,encl (← links)
- 05000336/LER-1998-016, Forwards LER 98-016-00,which Discusses Inadequate Administrative Controls on Safety Injection Valve. Commitments Made within Rept,Encl (← links)
- 05000336/LER-1998-013, Forwards LER 98-013-00,re Event Which Occurred at Millstone Unit 2 on 980526.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-012, Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-011, Forwards LER 98-011-00,documenting Event That Occurred at Unit 2 on 980502.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1998-010, Forwards LER 98-010-00,documenting Event That Occurred at Unit 2 on 980508.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1998-009, Forwards LER 98-009-00,documenting Event Which Occurred at Millstone Unit 3 on 980501.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-008, Forwards LER 98-008-00,re Event Which Occurred at Millstone Unit 2,on 980423,per 10CFR50.73(a)(2)(i).Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-007, Forwards Corrected LER 98-007-00,documenting Event Which Occurred at Millstone Unit 2 on 980408.LER Is Being Resubmitted Due to Omission of Rept Date on Original Submittal.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1997-022, Forwards LER 97-022-03,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970602.LER Suppl Provides Update on Results of Analyses & Investigation.Util Commitments Made within Ltr Included in Attachment (← links)
- 05000336/LER-1998-006, Forwards LER 98-006-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 980327.LER Being Submitted Per 10CFR50.73(a)(2)(ii).NNECOs Commitments Made within Ltr Listed (← links)
- 05000336/LER-1998-015, Forwards LER 98-015-00,re Condition Discovered at Millstone Unit 2 on 980504.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-014, Forwards LER 98-014-00 Re Condition Discovered at Millstone Unit 2 on 980629.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1997-033, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) (← links)
- 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl (← links)
- 05000336/LER-1997-023, Updates NRC Staff Re Submittal of Suppl to LER 97-023-00 as Committed to by Facility for Unit 2 in LER 97-023-00.LER 50-336/97-023-00 Contained Listed Commitment for Unit 2 (← links)
- 05000336/LER-1996-030, Forwards LER 96-030-01,documenting Event That Occurred at Millstone,Unit 2 on 960820.LER Supplement Provides an Update on Analyses & Investigation Currently Underway for Event. Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1998-004, Forwards LER 98-004-00 Re Event Which Occurred at Millstone Unit 2 on 980316.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1997-027, Forwards LER 97-027-00,documenting Event That Occurred at Unit 2 on 970802.Commitment,listed (← links)
- 05000336/LER-1998-003, Forwards LER 98-003-00,documenting Event That Occurred at Unit 2 on 980113.Util Commitments Made within Ltr Included in Attachment 1 (← links)
- 05000336/LER-1996-025, Provides Update on Status of GL 96-01 Actions as Committed to by Util for Unit 2 in & LER 96-025-01. Commitment Contained in ,Listed.As of 970915, Requested Action of Subj GL Has Been Completed (← links)
- 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 (← links)
- 05000336/LER-1997-030, Forwards LER 97-030-00,documenting Event That Occurred at Unit 2 on 970830.Util Commitments Listed in Ltr (← links)
- 05000336/LER-1997-029, Forwards LER 97-029-00,documenting Condition That Was Identified at Plant Unit 2 on 970826.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-028, Forwards LER 97-028-00,documenting Condition Discovered at Plant on 970822.List of Commitments Provided (← links)
- 05000336/LER-1997-026, Forwards LER 97-026-00,documenting Event That Occurred at Facility on 970729.Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1982-027, Forwards LER 82-027/03L-0 (← links)
- 05000336/LER-1982-025, Forwards LER 82-025/03L-0 (← links)
- 05000336/LER-1982-023, Forwards LER 82-023/03L-0 (← links)
- 05000245/LER-1994-020, Forwards LER 94-020-01 Which Documents Event That Occurred on 940527,per 10CFR50.73(a)(2)(ii).Commitments,listed (← links)
- 05000336/LER-1994-016, Forwards LER 94-016-01.Original Rept Had Been Erroneously Submitted Ref Millstone Unit 1 License & Docket Number. Rev 1 to LER Reflects Correct Numbers (← links)