05000336/LER-1996-017, Forwards LER 96-017-01,documenting Condition That Was Discovered at Unit 2 on 960320.LER Suppl Provides Update on Analyses & Investigation of Condition.Util Commitments Made within Ltr Included in Attachment 1

From kanterella
Jump to navigation Jump to search
Forwards LER 96-017-01,documenting Condition That Was Discovered at Unit 2 on 960320.LER Suppl Provides Update on Analyses & Investigation of Condition.Util Commitments Made within Ltr Included in Attachment 1
ML20198G393
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/17/1998
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198G397 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 B17577, NUDOCS 9812290070
Download: ML20198G393 (5)


LER-2096-017, Forwards LER 96-017-01,documenting Condition That Was Discovered at Unit 2 on 960320.LER Suppl Provides Update on Analyses & Investigation of Condition.Util Commitments Made within Ltr Included in Attachment 1
Event date:
Report date:
3362096017R00 - NRC Website

text

a N:hd " P' f*"Y "d- ("""te is6), w.terrora, cr 0638s

' NuclearEnergy uinistone Nuclear Power Station Northeast Nuclear Energy Company

, P.O. Box 128 T .

Waterford. Cr 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northeast Utilities System DEC 171993 Docket No. 50-336 B17577 Re: 10 CFR 50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 2 Licensee Event Report 96-017-01 Hvdi.-:+i Monitorina System does not Meet Sinale Failure Criteria This letter forwards Supplement 1 to Licensee Event Report (LER) 96-017-00, documenting a condition that was discovered at Millstone Nuclear Power Station, Unit No. 2, on March 20,1996. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(ii). This LER supplement provides an update on the analyses and investigation of this condition.

The Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter are included in Attachment 1.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY c , D F G J.A. Price Director - Millstone Unit No. 2 1

cc: see page 2 9 i

/

9812290070 981217 "

PDR S

ADOCK 05000336 PDR 1; Os3422 5 REV.12 05

- -. .. . . _ . . ~ . . _ . . . . - - . . -. . .. . _ - - . ..

U.S. Nuclear R:gul tory Commission B17577\Page 2 Attabis: 1. List of Regulatory Commitments

2. LER 96-017-01 cc: H. J. Miller, Region i Administrator S. Dembek, NRC Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 E. V. Imbro, Director, Millstone ICAVP inspections

~

Docket No. 50-336 l B17577 ,

l l

l l

(

f I

i-i l'

1 Attachment 1 l

l Millstone Nuclear Power Station, Unit No. 2 Commitments l.

1 l

l f-l l-l December 1998 1

6.

I 1 i

I

U.S. Nucirr Regulttory Commission B17577%ttachment 1\Page 1

. Attachment 1 Regulatory Commitment Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

REGULATORY COMMITMENT COMMITTED DATE OR OUTAGE B17577.01: A design change will modify the Mode 4 from current backup air system to assure the availability of outage backup air if a single bottle or regulator were to fail. This modification will be completed prior to entering Mode 4 from the current outage.

B17577.02 A design change to repower the Mode 4 from current containment isolation valves which will eliminate outage the DC power single failure vulnerability will be completed prior to entering Mode 4 from the current outage.

1 i

i Docket No. 50-336 B17577 )

l l

l I

1 l

Attachment 2 Millstone Nuclear Power Station, Unit No. 2 LER 96417-01 1

l i

I i

December 1998

, - .-