Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARB17766, Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys1999-09-23023 September 1999 Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys B17832, Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers1999-09-0707 September 1999 Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers B17829, Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-14331999-08-25025 August 1999 Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 B17799, Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.41999-08-0505 August 1999 Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.4 B17772, Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM1999-07-16016 July 1999 Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM B17764, Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e1999-05-17017 May 1999 Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e B17621, Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-061999-04-19019 April 1999 Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-06 B17737, Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump1999-04-0707 April 1999 Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump B17343, Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld1999-03-19019 March 1999 Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld B16997, Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-101999-03-19019 March 1999 Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-10 B17658, Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes1999-03-17017 March 1999 Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted B17566, Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump1999-03-0202 March 1999 Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump B17669, Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements1999-02-11011 February 1999 Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements B17004, Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld1999-01-18018 January 1999 Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld B17623, Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage1999-01-18018 January 1999 Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage ML20199L0631999-01-18018 January 1999 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into TS 3/4.2.2, Heat Flux Hot Channel Factor-FQ(Z), 6.9.1.6.a & 6.9.1.6.b, Colr B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS1999-01-18018 January 1999 Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS B17517, Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.11999-01-0404 January 1999 Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.1 B17519, Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included1998-12-28028 December 1998 Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included B17542, Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl1998-12-10010 December 1998 Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl B17342, Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred1998-12-0404 December 1998 Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred B17546, Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2)1998-12-0404 December 1998 Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2) B17498, Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl1998-11-13013 November 1998 Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl B17492, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time1998-11-10010 November 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time B16951, Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F1998-10-22022 October 1998 Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F B17417, Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices1998-09-28028 September 1998 Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices B17413, Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA1998-09-28028 September 1998 Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA B17381, Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.61998-09-0909 September 1998 Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.6 ML20237B2691998-08-12012 August 1998 Application for Amend to License DPR-65,updating List of Documents Describing Analytical Methods Specified in TS 6.9.1.8b.Rev 1 to EMF-98-036,encl ML20236Y4951998-08-0606 August 1998 Application for Amend to License NPF-49,revising TS Surveillance 4.4.5.3.a Re SG Tube Insp Interval B16902, Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves1998-08-0404 August 1998 Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves B17310, Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts1998-07-30030 July 1998 Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts B17046, Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling1998-07-30030 July 1998 Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling B17190, Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation1998-07-21021 July 1998 Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation B16537, Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-041998-07-17017 July 1998 Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-04 B17280, Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes1998-07-0202 July 1998 Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes B17308, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR1998-06-10010 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR B17276, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR1998-06-0606 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR B17288, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR1998-06-0505 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR B16186, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time1998-05-14014 May 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time ML20247J1131998-05-0707 May 1998 Application for Amend to License NPF-49,incorporating Attached Proposed Rev Into Chapter 15 of Unit 3 FSAR B17210, Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration1998-05-0101 May 1998 Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration B17112, Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only1998-04-29029 April 1998 Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only B17194, Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation1998-04-23023 April 1998 Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation B17144, Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation1998-04-14014 April 1998 Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation ML20216J5141998-04-13013 April 1998 Application for Amend to License DPR-65,adding TS 3.5.5, ECCS - Trisodium Phosphate B17028, Application for Amend to License NPF-49,revising TS 3/4.4.3 by Replacing Pressurizer Max Water Inventory Requirements W/ Pressurizer Level Requirement1998-04-0707 April 1998 Application for Amend to License NPF-49,revising TS 3/4.4.3 by Replacing Pressurizer Max Water Inventory Requirements W/ Pressurizer Level Requirement ML20216C0401998-04-0606 April 1998 Application for Amend to License DPR-65,changing TSs 3.4.4, RCS - Pressurizer, 3.6.1.5, Containment Sys - Air Temp & 3.7.1.5, Plant Sys - Msli Valves. Info Will Be Added to Bases of Associated TSs to Address Proposed Changes B17141, Application for Amend to License NPF-49,incorporating Rev Into Chapters 2,3 & 9 of Fsar,Adding New Sump Pump Subsys to Address Groundwater Inleakage Through Containment Basemat1998-04-0101 April 1998 Application for Amend to License NPF-49,incorporating Rev Into Chapters 2,3 & 9 of Fsar,Adding New Sump Pump Subsys to Address Groundwater Inleakage Through Containment Basemat 1999-09-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARB17766, Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys1999-09-23023 September 1999 Application for Amend to License DPR-65,to Return Hydrogen Purge Sys to Former Classification of Being within Scope of Maint Rule Program,But Not as risk-significant Sys B17832, Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers1999-09-0707 September 1999 Application for Amend to License DPR-65,removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers B17829, Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-14331999-08-25025 August 1999 Suppl 1 to TS Change Request 1-1-99 for Amend to License DPR-21,revising Proposed Permanently Defueled TS Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 B17799, Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.41999-08-0505 August 1999 Application for Amend to License NPF-49,incorporating Editorial Revs to TS Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Sections B 3/4.3.2,B 3/4.4.11, B 3/4.6.1.2 & B 3/4.8.4 B17772, Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM1999-07-16016 July 1999 Application for Amend to License DPR-65,relocating Selected TS Re Refueling Operations & Associated Bases to Plant TRM ML20207G6321999-06-0303 June 1999 Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49, Respectively,Replacing Specific Titles in Section 6.0 of TSs for All Three Millstone Units with Generid Titles B17764, Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e1999-05-17017 May 1999 Application for Amend to License NPF-49,deleting Reference to ASME Code Paragraph Iwv 3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger Contained in TS 4.4.6.2.2.e B17621, Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-061999-04-19019 April 1999 Application for Amend to License DPR-21,reflecting Permanently Defueled Condition of Unit 1,Tech Specs Administrative Controls Section as Allowed by Guidance Contained in NRC Administrative Ltr 95-06 B17737, Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump1999-04-0707 April 1999 Mod to 990104 Application for Amend to License DPR-65, Changing Value for Turbine Driven Auxiliary Feedwater Pump Associated with Monthly Surveillance Testing of Various ESF Pump B17343, Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld1999-03-19019 March 1999 Application for Amend to License NPF-49,revising TS to Support Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of Ol.Proprietary & non- Proprietary Licensing Repts,Encl.Proprietary Rept Withheld B16997, Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-101999-03-19019 March 1999 Application for Amend to License DPR-65,relocating Instrumentation TSs 3.3.3.2,3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 Trm,Per GL 95-10 B17658, Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes1999-03-17017 March 1999 Application for Amend to License DPR-65,revising TSs 3.5.2, 3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys.Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207L2581999-03-0505 March 1999 Amend 104 to License DPR-21,changing TSs for Staffing & Training Requirements to Allow Use of Certified Fuel Handlers to Meet Plant Staffing Requirements B17566, Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump1999-03-0202 March 1999 Application for Amend to License NPF-49,proposing Amend to TS 3/4.7.4, SW Sys, by Adding AOT for One SW Pump Using Duration More in Line with Significance Associated with Function of Pump B17669, Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements1999-02-11011 February 1999 Suppl to Application for Amend to License DPR-65,revising DG Action Statements & Surveillance Requirements ML20199L0631999-01-18018 January 1999 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into TS 3/4.2.2, Heat Flux Hot Channel Factor-FQ(Z), 6.9.1.6.a & 6.9.1.6.b, Colr B17004, Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld1999-01-18018 January 1999 Application for Amend to License NPF-49,revising TS Table 3.7-6, Area Temp Monitoring & Revising FSAR to Describe Full Core off-load Condition as Normal Evolution.Proprietary Rev 2 to HI-971843,encl.Proprietary Info Withheld B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS1999-01-18018 January 1999 Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS B17623, Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage1999-01-18018 January 1999 Application for Amend to License DPR-65,changing TS 3.6.1.2, Containment Sys - Containment Leakage B17517, Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.11999-01-0404 January 1999 Application for Amend to License DPR-65,incorporating Changes to ESF Pump Testing Contained in TSs 3.5.2,3.6.2.1, 3.7.1.2,3.7.3.1 & 3.7.4.1 B17519, Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included1998-12-28028 December 1998 Application for Amend to License DPR-65,revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1.Addl TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes,Included B17542, Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl1998-12-10010 December 1998 Application for Amend to License DPR-65,requesting Review & Approval to Plant Fsar,Per 10CFR50.90.Changes to Plant FSAR Pages,Encl B17546, Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2)1998-12-0404 December 1998 Application for Amend to License DPR-21,requesting NRC Approval of Certified Fuel Handler Training & Retraining Program & Request for Exemption from Requirements of 10CFR50.54(m)(2) B17342, Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred1998-12-0404 December 1998 Application for Amend to License NPF-49,proposing Rev to TS 4.7.10.e to Eliminate Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred B17498, Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl1998-11-13013 November 1998 Application for Amend to License DPR-65,revising FSAR Due to Increase in Radiological Consequences Caused by Changes in Assumptions Used in Updated Dose Consequences Analysis of Sgtr.Rvised FSAR Pages Encl B17492, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time1998-11-10010 November 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H, from Indefinite Period of Time B16951, Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F1998-10-22022 October 1998 Application for Amend to License DPR-65,changing TS 3.3.2.1, Instrumentation - ESFAS Intrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F B17417, Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices1998-09-28028 September 1998 Application for Amend to License DPR-65,re Separation Requirement in FSAR of Six Inches,Which Is Applied to Redundant Vital Cables,Internal Wiring of Redundant Vital Circuits & Associated Devices B17413, Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA1998-09-28028 September 1998 Application for Amend to License DPR-65,revising TS Sections 3.3.2.1,3.4.6.2,3.4.8,3.6.2.1,3.6.5.1,3.7.6.1 & 3.9.15 as Result of Revised MSLB Analyses & Revised Determinations of Radiological Consequences of MSLB & LOCA B17381, Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.61998-09-0909 September 1998 Application for Amend to License DPR-65,changing TS Definitions 1.24,1.27,1.31,TSs 3.0.2,4.0.5,3.2.3,3.3.2.1, 3.4.1.1,3.4.11 & Adding TS 3.0.6 ML20237B2691998-08-12012 August 1998 Application for Amend to License DPR-65,updating List of Documents Describing Analytical Methods Specified in TS 6.9.1.8b.Rev 1 to EMF-98-036,encl ML20236Y4951998-08-0606 August 1998 Application for Amend to License NPF-49,revising TS Surveillance 4.4.5.3.a Re SG Tube Insp Interval B16902, Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves1998-08-0404 August 1998 Application for Amend to License DPR-65,changing TS 3.7.1.3, Plant Sys - Condensate Storage Tank & Adding TS 3.7.1.7, Plant Sys - Atomspheric Steam Dump Valves B17310, Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts1998-07-30030 July 1998 Application for Amend to License DPR-65,changing TS Bases 3/4.9.1,3/4.1.1.1,3/4.7.1.6,3/4.7.7,3/4.5.4 & 3/4.3.3.10 by Resolving Miscellaneous Condition Repts B17046, Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling1998-07-30030 July 1998 Application for Amend to License NPF-49,clarifying Administrative Controls for RHR Isolation Valves When RHR Sys Is in Svc for Core Cooling B17190, Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation1998-07-21021 July 1998 Application for Amend to License DPR-65,changing Tech Specs 2.1.1, Safety Limits - Reactor Core, 2.2.1, Limiting Safety Sys Settings - Reactor Trip Setpoints & 3.3.1.1, Instrumentation - Reactor Protective Instrumentation B16537, Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-041998-07-17017 July 1998 Application for Amend to License DPR-65,modifying DG Testing Requirements by Incorporating Recommendations Contained in GLs 84-15,93-05 & 91-04 B17280, Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes1998-07-0202 July 1998 Application for Amend to License DPR-65,revising Section 9.7.2, Svc Water & Section 9.4 Reactor Bldg Closed Cooling Water, Affected by Change.Attachment 1 Provides Discussion of Proposed Changes ML20236K3401998-07-0101 July 1998 Amend 218 to License DPR-65,changing TS by Modifying Low Temp Overpressure Protection Requirements B17308, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR1998-06-10010 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 12 of Millstone Unit 3 FSAR B17276, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR1998-06-0606 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapters 6,9 & 15 of Millstone Unit 3 FSAR B17288, Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR1998-06-0505 June 1998 Application for Amend to License NPF-49,by Incorporating Attached Proposed Rev Into Chapter 15 of Millstone,Unit 3 FSAR B16186, Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time1998-05-14014 May 1998 Application for Amend to License DPR-65,modifying TSs 3.3.1.1 & 3.3.2.1 to Restrict Time Most Reactor Protection or Esfa Channels Can Be in Bypass Position to 48 Hours,From Indefinite Period of Time ML20247J1131998-05-0707 May 1998 Application for Amend to License NPF-49,incorporating Attached Proposed Rev Into Chapter 15 of Unit 3 FSAR B17210, Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration1998-05-0101 May 1998 Application for Amend to License NPF-49,revising TS 3/4.5.4 Re Refueling Water Storage Tank Min Boron Concentration B17112, Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only1998-04-29029 April 1998 Application for Amend to License DPR-65,replacing Two low- Range Pressurizer transmitters,PT-103 & PT-103-1 Which Will Identify That Two low-range Pressurizer Pressure Instrument Channels Are Independent & Redundant Only B17194, Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation1998-04-23023 April 1998 Application for Amend to License NPF-49,changing TS Bases Section 3/4.3.3.5 to Add Wording to Clarify Calibration of Intermediate Range Neutron Amps Channel Associated W/Remote Shutdown Instrumentation B17144, Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation1998-04-14014 April 1998 Application for Amend to License NPF-49,assuring That PORVs Will Be Capable of Automatic Cycling as Well as Manual Cycling When in TS Action Statements That Allow Indefinite Continued Operation ML20216J5141998-04-13013 April 1998 Application for Amend to License DPR-65,adding TS 3.5.5, ECCS - Trisodium Phosphate 1999-09-07
[Table view] |
LER-2094-003, Application for Amend to License DPR-65,incorporating Addl Requirements Into TS Re non-QA Equipment Utilized to Achieve Feedwater Isolation in Response to MSLB Inside Containment, Per Commitment Made in LER 94-003-00 & Listed Insp Repts |
Event date: |
|
---|
Report date: |
|
---|
3362094003R00 - NRC Website |
|
text
~l
-(
gegggg 107 Selden Street, Berlin. Ur 06037 h g(f Utilities System snhemt rnau,4 senice company P O. Ibx 270
+
1lanford cf On1410270 (203) 6t0-5000 May 6, 1994 Docket No. 50-336 B14835 Re: 10CFR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Feedwater Isolation Introduction Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby proposes to amend Operating License No. DPR-65 by incorporating the attached proposed changes into the Technical Specifications of Millstone Unit No. 2. NNECO is proposing to incorporate additional requirements into the Millstone Unit No. 2 Technical Specifications regarding non-Quality Assurance equipment utilized to achieve feedwater isolation in response to a Main Steam Line Break (MSLB) inside containment. They include Limiting Conditions for Operation (LCO), Applicability Statements, Action Statements, and Surveillance Requirements.
Additionally, NNECO is proposing to modify the Bases and the Index to reflect the additional requirements. These proposed changes are being submitted for NRC review and approval to comply with commitments made in Licensee Event Report (LER) 94-003-00
- 0) and the inspection report for Millstone Combined Inspection 50-245/94-01, 50-336/94-01, and 50-423/94-01 (2)
(1) D. B. Miller, Jr. letter to the U.S. Nuclear Regulatory Commission, " Facility Operating License No. DPR-65, Docket No. 50-336, Licensee Event Report 94-003-00," dated March 18, 1994.
(2) W. D. Lanning letter to J. F. Opeka, " Millstone Combined Inspection 50-245/94-01; 50-336/94-01; 50-423/94-01," dated April 22, 1994 1 i
4051 Op 9 0 00 6 ,
P ;
. . ~ . -- . . .- ..- .
..' l l
l U.S. Nuclear Regulatory Commission B14835/Page 2 May 6, 1994 A detailed discussion of these proposed changes is provided below. Attachments 1 and 2 present the marked-up and retyped technical specification pages, respectively.
pacKg mund In the event of an MSLB inside containment, feedwater to the ]
faulted steam generator must be isolated to ensure containmer.t )
pressure and temperature remain within design values. Feedwater isolation is provided by the feedwater regulating valves (FRV),
feedwater pump discharge isolation valves, feedwater block valves, and feedwater regulating bypass valves, all of which -
close on a main steam isolation (MSI) signal. On February 18, 1994, a condition that could have resulted in the inability to automatically isolate feedwater to a faulted steam generator was '
discovered at Millstone Unit No. 2. This condition was promptly reported to the NRC Staff in accordance with 10CFR50.72, and an LER was submitted on March 18, 1994, in accordance with 10CFR50.73.
The sequence of events for the postulated scenario was an MSLB '
inside containment involving steam generator no. 1 (SG1) coincident with a loss of the Division 1 DC bus and the failure of the power source for the control circuit of HGl's FRV (vital 120 VAC instrument bus VA-10) to automatically transfer to its alternate power supply. This postulated scenario would result in the inability to automatically isolate feedwater to SG1, thereby, challenging containment integrity.
For SG1, feedwater isolation is provided by closure of valves 2-FW-51A (SG1 FRV), 2-FW-42A (SG1 feedwater block valve), 2-FW-41A (SG1 feedwater regulating bypass valve), 2-FW-3BA (steam generator feedwater pump 1A discharge isolation valve), and 2-FW-38B (steam generator feedwater pump 1B discharge isolation valve) on an MSI signal. In the event of an MSLB involving SG1 and a loss of the Division 1 DC bus, isolation of feedwater to SGl.is-provided by 2-FW-51A. Alternate means of isolating feedwater flow to the faulted steam generator would be lost as. a consequence of the lack of transfer capability from the normal station service transformer to the reserve station service transformer due to the loss of the Division 1 DC bus. In this event, the power supply for the control circuit of 2-FW-51A (bus VA-10) would have to transfer from its primary power supply (Vital 120 VAC Inverter - 1 (INV-1)) to its alternate power supply (non-vital 120 VAC Inverter - 5 (INV-5)), because INV-1 is supplied by the Division 1 DC bus. If the transfer of bus VA-10 from INV-1 to INV-5 does not occur, feedwater isolation of SG1 cannot be achieved automatically. This potential scenario was created by a degradation of the synchronizing capability between l
l 1
l
- - -- =~
U.S. Nuclear Regulatory Commission B14835/Page 3 May 6, 1994 INV-1 and INV-5 discovered on February 18, 1994. This !
degradation created the potential to inhibit the transfer of the static switch powering bus VA-10 fron INV-1 to INV-5.
l In response to the discovery of this condition, a dedicated operator was stationed to manually transfer bus VA-10's power '
supply, if necessary. A reactor downpower of Millstone Unit No.
2 commenced to provide time for an orderly shutdown should the degradation remain unresolved and to allow isolation of ;
Subsequently, the cause of the intermittent Sync feedwater.
Failure alarms, which inhibit transfer capability of the static switch to INV-5, was determined to be cetpoint drift of the alternate source underfrequency limiter circuit. An adjustment to t% limiter circuit was made, the synchronizing circuit was declared operational after a one-hour period free of Sync Failure alarms had elapsed, and the reactor downpower was halted.
Additional corrective actions in response to-this condition were noted in the LER. They included the implementation of a night order which directs the control room operators to use the ,
requirements of Millstone Unit No. 2 Technical Specifications l 3.3.2.1 and 3.0.3 for any subsequent problems with feedwater '
isolation valves or the power supplies for bus VA-10 until more appropriate system requirements are developed and approved.
Additionally, NNECO committed to submit proposed changes to the Millstone Unit No. 2 Technical Specifications to the NRC Staff ,
for review and approval. On March 7, 1994, NNECO stated that the proposed changes to the technical specifications would be submitted within 60 days. This commitment was noted in the j inspection report for NRC Combined Inspection 50-245/94-01, 50- l 336/94-01, and 50-423/94-01.
Description of Proposed Chances Currently, Table 3.3.5 of the Millstone Unit No. 2 Technical Specifications contains response time requirements for feedwater isolation to ensure rapid isolation of feedwater to the steam generators in order to maintain the maximum internal containment pressure below the containment design pressure of 54 psig.
Although discussed in the Bases, clear LCOs and Action Statements specifying operability requirements for the non-Quality Assurance (QA) equipment associated with feedwater isolation are not included within the Millstone Unit No. 2 Technical Specifications. NNECO is proposing to incorporate additional requirements into the Millstone Unit No. 2 Technical Specifications regarding non-QA equipment utilized to achieve feedwater isolation in response to an MSLB inside containment.
They include LCOs, Applicability Statements, Action Statements, and Surveillance Requirements. Additionally, NNECO is proposing
.l .'
U.S. Nuclear Regulatory Commission B14835/Page 4 May 6, 1994 to modify the Index and the Bases to reflect the - additional requirements.
NNECO proposes to incorporate an additional section numbered 3/4.7.1.6 and titled " Plant Systems -
Main Feedwater Isolation.
Components (MFICs)" into the Millstone Unit No. 2 Technical ,
Specifications. It contains the requirements regarding the mechanical and instrumentation and control (I&C) components that are credited for isolating feedwater in response to an MSLB inside containment (i.e. the feedwater pump discharge isolation ;
valves, the feedwater block valves, the feedwater regulating bypass valves, the FRVs, and the feedwater pump trip circuitry).
The section includes LCOs, Applicability Statements, Action Statements, and Surveillance Requirements. Also, NNECO is proposing to modify the Index to reflect the additional section and to add Bases Section 3/4.7.1.6 to provide personnel with information concerning the new technical specification.
NNECO proposes to incorporate an additional section numbered 3/4.8.2.lA and titled "Onsite Power Distribution Systems - A.C.
Distribution - Operating" into the Millstone Unit No. 2 Technical Specifications. It contains the requirements regarding INV-5 and {
INV-6. These inverters provide an alternate source of 120 VAC <
power for the control circuits of the FRVs which are credited for the mitigation of an MSLB inside containment. The primary sources of 120 VAC power for the control circuit.of the FRVs are i INV-1 and vital 120 VAC inverter -
2 (INV-2). The section ;
includes LCOs, Applicability Statements, Action Statements, and l Surveillance Requirements. Also, NNECO is proposing to add l
information to Bases Section 3/4.8 to provide personnel with information concerning Technical Specification 3/4.8.2.lA. !
NNECO proposes to incorporate an additional section numbered 3/4.8.2.5 and titled "Onsite Power Distribution Systems. -
D.C.
Distribution - Operating" into the Millstone Unit No. 2 Technical Specifications. It contains the requirements regarding the non-QA turbine battery. The turbine battery provides power to the main turbine generator auxiliaries (e.g., lube oil pumps, etc.).
The turbine battery also provides an alternate source of 120 VAC power for the control circuits of the FRV3 via INV-5 and INV-6.
This non-safety grade alternate power source for the control circuits of the FRVs is credited for the mitigation of an MSLB l inside containment. Tha section includes LCOs, Applicability Statements, Action Statements, and Surveillance Requirements.
Also, NNECO is proposing to modify the Index to reflect the new section and to add information to Bases Section 3/4.8 to' provide personnel with information concerning Technical Specification 3/4.8.2.5.
,l .'
U.S. Nuclear Regulatory Commission B14835/Page 5 May 6, 1994 NNECO proposes to modify the Bases for Technical Specification Sections 3/4.3.1 and 3/4.3.2 by denoting that the feedwater pumps are assumed to trip immediately upon receipt of an MSI signal.
The intent of this proposed change is to provide personnel with additional information.
Currently, there is an "X" in the bottom right-hand corner of page B 3/4 7-3. This "X" is errant, and NNECO proposes that it be removed. Additionally, NNECO p)roposes to place a crossed-out reference to Amendment No. 32( in the right-hand corner.
Amendment No. 32 is the only amendment to date that has affected '
this page of the technical specifications.
Safety Assessment NNECO's proposal to add sections 3/4.7.1.6, 3/4.8.2.lA, and 3/4.8.2.5 into the Millstone Unit No. 2 Technical Specifications will incorporate additional requirements regarding components ,
that are credited to provide feedwater isolation in the event of l an MSLB inside containment. These proposed changes will impose additional limitations, restrictions, and controls not currently in place in the Millstone Unit No. 2 Technical Specifications.
Incorporation of requirements regarding feedwater isolation is consistent with Section 3.7.3 of NUREG-1432, " Standard Technical j Specifications, Combustion Engineering Plants." ,
l Proposed Action Statement 3.7.1.6.a permits one feedwater isolation component per feedwater flow path to be inoperable for a period of up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, before being either restored, closed or isolated, or secured. If none of these can be accomplished, the Action Statement requires the unit to be placed in hot j shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. In order for containment j' integrity to be challenged, redundant equipment would have to fail and an MSLB inside containment would have to occur within the same 72-hour period. The likelihood of this scenario is considered negligible, and the Action Statement times are considered acceptable. l Proposed Action Statement 3.7.1.6.b permits two or more of the
- g. feedwater isolation components in the same flow path to be inoperable for a period of up to eight hours, before ' being restored, closed or isolated, or secured. If the number of inoperable feedwater components is reduced to one per feedwater flow path within the eight-hour period, the Action Statement (3) G. Lear letter to D. C. Switzer, transmitting Amendment No.
32 to Facility Operating License No. DPR-65 for the Millstone Nuclear Power Station, Unit No. 2, dated October 27, 1977.
U.S. Nuclear Regulatory Commission B14835/Page 6 May 6, 1994 directs that the requirements of Action Statement 3.7.1.6.a be followed. If the number of inoperable feedwater isolation components per feedwater flow path cannot be reduced to one within the eight-hour period, the Action Statement requires the unit to be placed in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. In this case, containment integrity could be challenged if an MSLB inside containment occurred within the same eight-hour period.
The probability of this occurring is approximately 5.0E-7. This probability does not consider the fact that containment integrity is expected to be maintained well beyond the design pressure.
Therefore, the likelihood of this scenario is considered negligible, and the Action Statement times are considered acceptable.
The proposed Action Statements for Technical Specifications 3/4.8.2.1A and 3/4.8.2.5 permit INV-5, INV-6, and the turbine battery to be inoperable for a period of up to seven days, before being restored. If any of these cannot be accomplished, the Action Statements require the unit to be placed in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. INV-5, INV-6, and the turbine battery act as backup components in powering 120 VAC buses VA-10 and VA-20. The likelihood of a primafy 120 VAC power source failing coincident with an MSLB inside containment while Millstone Unit No. 2 is operating in the Action Statement period of seven days is considered negligible. Thus, the Action Statement times are considered acceptable.
While the additional Surveillance Requirements do impact the assumed availability of the subject components, the time frames assumed do not significantly impact the overall probability of containment failure.
Additionally, NNECO's proposals to modify the Bases and the Index of the Millstone Unit No. 2 Technical Specifications will: 1) provide personnel with information concerning the additional requirements, and 2) correct an editorial error. These proposed changes-to the Bases and the Index do not alter the manner in which equipment is operated, nor do they affect equipment availability.
Overall, the proposed changes are acceptable and will have a negligible impact on the health and safety of the public. In fact, these changes increase the margin of safety because they provide concise LCOs, Applicability Statements, Action Statements, and Surveillance Requirements for the non-QA equipment credited for mitigation of an MSLB. Additionally, the equipment allowed outage times have been determined to be appropriate and safe, and the imposition of additional l
l
l l
l U.S. Nuclear Regulatory Commission B14835/Page 7 i May 6, 1994 i
Surveillance Requirements do not significantly impact the overall probability of containment failure.
S_ignificant Hazards Consideration NNECO has reviewed the proposed changes in accordance with 10CFR50.90 and has concluded that the changes do not involve a significant hazards consideration (SHC). The basis for this conclusion is that the three criteria of 10CFR50.92(c) are not ,
compromised.
The proposed changes do not involve an SHC because the changes would not:
- 1. Involve a significant increase in the probability- or consequences of an accident previously analyzed.
Currently, the Millstone Unit No. 2 Technical Specifications contain response time requirements for the feedwater isolation valves to ensure rapid isolation of feedwater to the steam generators and to maintain the peak containment pressure below the containment design pressure of 54 psig. ,
However, clear Action Statements specifying operability requirements for the non-QA equipment associated with feedwater isolation are not included within the Millstone i Unit No. 2 Technical Specifica'".ons. NNECO's proposal to add l sections 3/4.7.1.6, 3/4.8.2.lA, and 3/4.8.2.5 into the 1 Millstone Unit No. 2 Technical Specifications will incorporate additional requirements regarding components that are credited to provide feedwater isolation in the event of an MSLB inside containment. These proposed changes will impose additional limitations, restrictions, and controls not currently in place in the Millstone Unit No. 2 Technical Specifications.
Additionally, NNECO's proposals to modify the Bases and the Index of the Millstone Unit No. 2 Technical Specifications will: 1) provide personnel with information concerning the ,
additional requirements, and 2) correct an editorial error. l These proposed changes to the Bases and the Index do not I alter the manner in which equipment is operated, nor do they affect equipment availability.
Based on the above, the proposed license amendment does not involve a significant increase in- the probability or
, consequences of an accident previously analyzed. "
l
. 1 U.S. Nuclear Regulatory Commission !
B14335/Page 8 May 6, 1994 ;
- 2. Create the possibility of a new or different kind of accident from any previously analyzed.
NNECO's proposal to add sections 3/4.7.1.6, 3/4.8.2.1A, and 3/4.8.2.5 into the Millstone Unit No. 2 Technical Specifications will incorporate additional- requirements regarding components that are credited to provide .feedwater isolation in the event of an MSLB inside containment. These proposed changes will impose additional limitations, restrictions, and controls not currently in place in the Millstone Unit No. 2 Technical Specifications.
Additionally, NNECO's proposals to modify the Bases and the Index of the Millstone Unit No. 2 Technical Specifications will: 1) provide personnel with information concerning the additional requirements, and 2) correct an editorial error.
These proposed changes to the Bases and the Index do not alter the manner in which equipment is operated, nor do they affect equipment availability.
Based on the above, the proposed license amendment cannot .
create the possibility of a new or different kind of accident from any previously analyzed.
- 3. Involve a significant reduction in a margin of safety. ,
i NNECO's proposal to add sections 3/4.7.1.6, 3/4.8.2.1A, and ~
3/4.8.2.5 into the Millstone Unit No. 2 Technical Specifications will incorporate additional requirements regarding components that are credited 'to provide feedwater isolation in the event of an MSLB inside containment. These proposed changes will impose additional limitations, restrictions, and controls not currently in place in the Millstone Unit No. 2 Technical Specifications. ,
Additionally, NNECO's proposals to modify the Bases and the Index of the Millstone Unit No. 2 Technical Specifications '
will: 1) provide personnel with information concerning the additional requirements, and 2) correct an editorial error.
These proposed changes to the - Bases and the Index do not alter the manner in which equipment is operated, nor do they affect equipment availability.
Therefore, this proposed. license amendment does not involve a significant reduction in a margin of safety. In fact, the margin of safety will be increased due to the imposition of restrictions on the non-QA equipment credited for feedwater isolation in the eTent of an MSLB inside containment, t
I
U.S. Nuclear Regulatory Commission B14835/Page 9 May 6, 1994
- The Commission has provided guidanca concerning the application of standards in 10CFR50.92 by providing certain examples (March 6, 1986, 51 FR 7751) of amendments that are considered not likely to involve an SHC. The proposed changes to add sections 3/4.7.1.6, 3/4.8.2.1A, and 3/4.8.2.5 into the Millstone Unit No.
2 Technical Specifications will incorporate additional requirements regarding components that provide feedwater isolation in the event of an MSLB inside containment. These proposed changes are enveloped by example (ii), "A change that constitutes an additional limitation, restriction, or control not l presently included in the technical specifications, e.g., a more stringent surveillance requirement." The proposed changes to-update the Index and to reference Amendment No. 32 on page B 3/4 7-3 are enveloped by example (i), "a purely administrative change to technical specifications: for example, a change to achieve consistency throughout the technical specifications, correction of an error, or a change in nomenclature." The proposed changes to the Bases of the Technical Specifications have been made to provide personnel with information concerning the additional technical specification requirements.
Environmental Consideration NNECO has reviewed the proposed license amendment against the critoria of 10CFR51.22 for environmental considerations. The proposed changes do not involve a significant hazards consideration, do not increase the types and amounts of effluents that may be released offsite, nor significantly increase individual or cumulative occupational radiation exposures. Based-on the foregoing, NNECO concludes'that the proposed changes meet the criteria delineated in 10CFR51. 22 (c) ( 9) for a categorical exclusion from the requirements for an environmental impact statement.
Nuclear Review Board Review The Millstone Unit No. 2 Nuclear Review Board has reviewed the-proposed amendment and has concurred with the above determination.
Proposed Schedule for License Amendment Issuance l
This request is not necessary for continued plant operation and l as such no specific schedule for approval and issuance is requested. However, we request that the changes be effective upon issuance,-with implementation within 30 days.
. In accordance with 10CFR50.91(b), we are providing the State of l Connecticut with a copy of this proposed amendment.
y - - - m. , s
l J
l U.S. Nuclear Regulatory Commission .
B14835/Page 10 .)
May 6, 1994 l l
1 Should the NRC Staff have any questions regarding this submittal, please contact-Mr. R. H. Young, Jr. at (203) 665-3717.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 09.ftv U
J. F._Opoka Executive Vice President cc: T. T. Martin, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 Mr. Kevin T.A. McCarthy, Director Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street P.O. Box 5066 Hartford, Connecticut 06102-5066 Subscribed and sworn to before me this _ day of h /A P , 1994
" &\A M sif. k NotYry Public Wne" '
Date Commission Expires: 3/8 [
-- , - . - , _ _ - ,
|
---|
|
|
| | Reporting criterion |
---|
05000336/LER-1994-001, Forwards LER 94-001-01,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 3 on 940118.No Commitments Made within Ltr | Forwards LER 94-001-01,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 3 on 940118.No Commitments Made within Ltr | | 05000336/LER-1994-003, Application for Amend to License DPR-65,incorporating Addl Requirements Into TS Re non-QA Equipment Utilized to Achieve Feedwater Isolation in Response to MSLB Inside Containment, Per Commitment Made in LER 94-003-00 & Listed I | Application for Amend to License DPR-65,incorporating Addl Requirements Into TS Re non-QA Equipment Utilized to Achieve Feedwater Isolation in Response to MSLB Inside Containment, Per Commitment Made in LER 94-003-00 & Listed Insp Repts | | 05000336/LER-1994-016, Forwards LER 94-016-01.Original Rept Had Been Erroneously Submitted Ref Millstone Unit 1 License & Docket Number. Rev 1 to LER Reflects Correct Numbers | Forwards LER 94-016-01.Original Rept Had Been Erroneously Submitted Ref Millstone Unit 1 License & Docket Number. Rev 1 to LER Reflects Correct Numbers | | 05000336/LER-1994-020, Forwards LER 94-020-01 Re DG Fuel Oil Supply Being Less than IEEE Std.Rept Reflects Completion of Outstanding Corrective Action | Forwards LER 94-020-01 Re DG Fuel Oil Supply Being Less than IEEE Std.Rept Reflects Completion of Outstanding Corrective Action | | 05000245/LER-1994-020, Forwards LER 94-020-01 Which Documents Event That Occurred on 940527,per 10CFR50.73(a)(2)(ii).Commitments,listed | Forwards LER 94-020-01 Which Documents Event That Occurred on 940527,per 10CFR50.73(a)(2)(ii).Commitments,listed | |
|