05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed
ML20132B748
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/09/1996
From: Richardson P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132B752 List:
References
B16056, GL-96-01, GL-96-1, NUDOCS 9612170373
Download: ML20132B748 (2)


LER-2096-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed
Event date:
Report date:
3362096035R00 - NRC Website

text

..y ..% .. . __m. ~ _ . _ _ . . _ _ _ _ _ . _ _ _ - . , . . _ . _ _ . _ . _ . . . _ _ - . . - _ . . _ _ . _ . . . . _ .

8

e i A N:rthe _st - i 7 seiaen sm wriin, er 06037

.. Utilities System .wnhea.: uta. serviu comt.any i- P.O. Box 270 Ilartford, cT 061410270 t- (C60) 665 5000 i

December 9,1996 i

i Docket No. 50-336 =i i B16056 J

. Re
10 CFR 50.73(a)(2)(i) i  !
i l

, U.S. Nuclear Regulatory Commission Document Control Desk l Washington, DC 20555

. This letter forwards Licensee Event Report (LER) 96-035-00, documenting an event that t occurred at Millstone Nuclear Power Station, Unit No. 2 on October 9,1996. This LER is being j l submitted pursuant to 10 CFR 50.73(a)(2)(i).

!~ The following are NNECO's commitments made within this letter. All other statements made L within this letter are for information or.ly. ,

I B16056-01: A review is on-going which includes an assessment of Technical ' d i Specification surveillance requirements to address the concems i

! identified in Generic Letter 96-01. This review will be completed by l September 30,1997.

B16056-02: Training will be provided to l&C and Operations Department  ;

surveillance procedure development personnel on the information i produced by the Generic Letter 96-01 review. This training will i emphasize the process utilized to ensure complete testing of logic i circuits required by Technical Specifications. This training will be  !

completed by September 30,;1997. l 1

i B16056-03: For the interim period, awareness briefings will be held with l&C and ) l Operations Department surveillance procedure writing personnel by I  :

January 15,1997

/ L' 9612170373 961209 PDR. ADOCK 05000336 S PDR 160016 ny ms

.U. S. NuQl:Ir Regulatory Commission 816056/P gs 2 ,

616056-04: The procedures that direct the process of writing and revising surveillance procedures will be revised to incorporate the process developed in response to Generic Letter 96-01. This will ensure that future surveillance procedure revisions will maintain compliance with logic testing requirements. This revision will be completed by i

. September 30,1997. l l

i i

Very truly yours, l NORTHEAST NUCLEAR ENERGY COMPANY P. M. Richardson Director- Millstone Unit No. 2 l

l

Attachment:

LER 96-035-00  :

1 1

cc: W. D. Travers, Director of Special Projects l H. J. Miller, Region I Administrator D. P. Beaulieu, Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2

)