05000336/LER-1996-023, Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425

From kanterella
Jump to navigation Jump to search
Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425
ML20133M207
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/15/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133M209 List:
References
B16135, NUDOCS 9701220302
Download: ML20133M207 (2)


LER-2096-023, Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425
Event date:
Report date:
3362096023R00 - NRC Website

text

-_

o N e st Mill ta'* o*e*

  • 16 *5 rerry nos., w.terrora, er Utilities System ,, o. is,,128 Waterrord, CT 063r>-0128 (203) 447-1791 AN I 51997 Docket No. 50-336 B16135 Re: 10 CFR 50.'73(a)(2)(i)(B)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards supplemental Licensee Event Report (LER) 96-023-01, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 25,1996. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i)(B). This LER supplement provides an update on the analysis and investigation for this event.

Additional corrective action based on the results of the investigation are included in this LER.

The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only, +

B16135-01: Technical Specification surveillance procedures will be reviewed to ensure  !

compliance with Technical Specification surveillance requirements as part j of the Millstone Unit No. 2 Operational Readiness Plan. The review will initially focus on Technical Specification surveillance procedures required for Mode 6 and defueled. Surveillance procedures required for subsequent mode changes will be reviewed prior to mode entry. (This commitment was previously sent to the NRC in the response to NOV  !

336/96-08-07, NNECO Commitment No. B16076-2.)

i l

Very truly yours, l / @j, i

NORTHEAST NUCLEAR ENERGY COMPANY d'4 s

W'i J. A. PQcpillstone unit No. 2 210093 Director M ,

i cc: see Page 2 I i

9701220302 970115 PDR ADOCK 05000336 -

S PDR e 4

i O.S. Nuclear Regulatory Commi:sion B16135/Page 2 3

Attachment:

LER 96-023-01 cc: W. D. Travers, Director of Special Projects .

H. J. Miller, Region i Administrator -

D. P. Beaulieu, Senior Resident inspector (Acting), Millstone Unit No. 2 i D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 l l